Anda di halaman 1dari 15

18.

00
9.00 9.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
1.00

1.00
1
4.00

4.00
B
8.00

8.00
RUANG KELAS RUANG KELAS
2
±0,00 ±0,00

PEMBERI TUGAS
4.00

4.00
3
2.00

2.00
PEKERJAAN

4
1.00

1.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
9.00 9.00
DIKETAHUI
18.00
A
A B C D E F G

DENAH
SKALA 1 : 100
PEMBERI TUGAS

TAMPAK DEPAN
SKALA 1 : 100

PEKERJAAN

DIKETAHUI

TAMPAK BELAKANG
SKALA 1 : 100

2017
T.SAMPING KIRI
SKALA 1 : 100

PEMBERI TUGAS

PEKERJAAN

DIKETAHUI

T.SAMPING KANAN
SKALA 1 : 100
+6.50

KUDA - KUDA DAN RANGKA ATAP


BAJA RINGAN
+3.70
+3.50

PLAFOND +3.40

± 0.00 ±0.00
-0.05

KOLOM TERTANAM
KOLOM TERTANAM KOLOM TERTANAM 25/25 -1.30
30/35 30/35
PONDASI PLAT
PONDASI PLAT PONDASI PLAT SETEMPAT
SETEMPAT SETEMPAT

8.00 2.00
10.00
POTONGAN A-A PEMBERI TUGAS

SKALA 1 : 100

+6.50

KUDA - KUDA DAN RANGKA ATAP KUDA - KUDA DAN RANGKA ATAP
BAJA RINGAN BAJA RINGAN PEKERJAAN

+3.70
+3.50

+3.40 +3.40

DIKETAHUI

±0.00 ±0.00 ±0.00 ±0.00 ±0.00


-0.15

KOLOM TERTANAM KOLOM TERTANAM KOLOM TERTANAM


30/35 30/35 30/35 -1.15

PONDASI PLAT PONDASI PLAT PONDASI PLAT


SETEMPAT SETEMPAT SETEMPAT

9.00 9.00
18.00
POTONGAN B-B
SKALA 1 : 100
15

SLOOF 15/20
SLOOF 15/20
PAS. DINDING 1/2 BATA
LANTAI
LANTAI
ADUKAN 1 : 5
ADUKAN 1 : 5
URUGAN PASIR
URUGAN PASIR

±0.00
-0.05 -0.05 -0.05 -0.05
20 5 5

20 5 5
10
- 0.30
- 0.30

30
TRASRAM
1PC : 3PS TRASRAM
1PC : 3PS
70

15 20 15

70
URUGAN TANAH
PONDASI BATU KALI URUGAN TANAH
1PC : 5PS PONDASI BATU KALI
1PC : 5PS

- 1.00
- 1.00
5 15

5 15
AANSTAMPING
AANSTAMPING
- 1.15
URUGAN PASIR - 1.15
- 1.20 URUGAN PASIR - 1.20
0.25 0.25
70 70
100 100
DETAIL PONDASI A DETAIL PONDASI B
SKALA 1 : 20 SKALA 1 : 20
KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35

KOLOM 30/35 KOLOM 30/35 KOLOM 30/35


PAS. SLOOF 15/20
PAS. PONDASI BATU KALI
8.00

AANSTAMPING

KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35 KOLOM 30/35
2.00

A B
PAS. SLOOF 15/20 PAS. SLOOF 15/20 PAS. SLOOF 15/20 PAS. SLOOF 15/20 PAS. SLOOF 15/20 PAS. SLOOF 15/20

KOLOM 25/25 KOLOM 25/25 KOLOM 25/25 KOLOM 25/25

9.00 9.00
18.00
RENCANA PONDASI 1 : 100
RENCANA PONDASI LAJUR DETAIL PONDASI 1 : 20
SKALA 1 : 100
006
18.00
9.00 9.00
K.1 K.1 K.1 K.1 K.1 K.1 K.1
P.1 P.1 P.1 P.1 P.1 P.1 P.1

SL.15/20 SL.15/20 SL.15/20 SL.15/20 SL.15/20 SL.15/20


1
4.00

4.00
SL.15/20

SL.15/20

SL.15/20
K.1 K.1 K.1
P.1 P.1 P.1
8.00

8.00
2
4.00

4.00
SL.15/20

SL.15/20

SL.15/20
K.1 K.1 K.1 K.1 K.1 K.1 K.1
P.1 P.1 P.1 P.1 P.1 P.1 P.1

SL.15/20 SL.15/20 SL.15/20 SL.15/20 SL.15/20 SL.15/20


3
SL.15/20

SL.15/20

SL.15/20
2.00

2.00
K.2 K.2 K.2 K.2 K.2 K.2 K.2
P.2 P.2 P.2 P.2 P.2 P.2 P.2
SL.15/20 SL.15/20 SL.15/20
4
3.00 3.00 3.00 3.00 3.00 3.00
9.00 9.00
18.00

A B C D E F G

RENCANA PONDASI PLAT, SLOOF & KOLOM LT.1


SKALA 1 : 100

RENCANA PONDASI PLAT,


1 : 100
SLOOF & KOLOM LT.1

007
MK. LANTAI ± 0.00 MK. LANTAI ± 0.00

20

20
SLOOF 15/20 SLOOF 15/20

URUGAN URUGAN URUGAN URUGAN


TANAH TANAH TANAH TANAH

8 D 13 6 D 13
190

190
BEGEL BEGEL
160

160
Ø 8 - 100 Ø 12 - 150 Ø 8 - 100 Ø 12 - 150

30
LANTAI KERJA
25 LANTAI KERJA
30

20
URGAN PASIR URGAN PASIR
5

5
- 1.90 - 1.90
5

5
10 80 10 10 60 10
100 15 80
2 Ø 12

POTONGAN 1-1 Ø 8-10 POTONGAN 2-2

20
SKALA 1 : 25 SKALA 1 : 25
2 Ø 12

Selimut Beton
T = 2,5 CM

DETAIL PENULANGAN
SLOOF 15/20
4 D 13 SKALA 1 : 10
6 D 13

Ø 12 - 150
1-1 Ø 12 - 150 2-2
Ø 12 - 150

Ø 12 - 150
80

60

25
15

15
SLOOF 15/20 SLOOF 15/20
35

25 BEGEL Ø 8 - 100
30 BEGEL Ø 8 - 100
SLOOF 15/20

SLOOF 15/20
4 D 13

15 15
80 60

DETAIL PONDASI 1 : 25
DETAIL PONDASI P.1 DETAIL PONDASI P.2
SKALA 1 : 25 SKALA 1 : 25
008
30
4 D16

35
BEGEL Ø 8-10
25
PLAT LANTAI PLAT LANTAI PLAT LANTAI PLAT LANTAI 2 D13
SELIMUT BETON
BALOK 20/30 BALOK 20/30 T= 3 CM BALOK 20/30 BALOK 20/30
2 D13
4 D16
25 BEGEL Ø 8-10
POTONGAN KOLOM A
SKALA 1 : 10 SELIMUT BETON

A L/4 Ø8 - 10
X L/4 Ø8 - 10
T= 3 CM

2 D13

30 POTONGAN KOLOM X
4 D16
SKALA 1 : 10

25
2 D13
35
BEGEL Ø 8-20
2 D13

SELIMUT BETON 25 BEGEL Ø 8-20


T= 3 CM
B 1/2 L Ø8 - 20 4 D16 Y 1/2 L Ø8 - 20 SELIMUT BETON
T= 3 CM
POTONGAN KOLOM B 2 D13
SKALA 1 : 10
POTONGAN KOLOM Y
SKALA 1 : 10
30
4 D16

25
2 D13

A L/4 Ø8 - 10 35
X L/4 Ø8 - 10
2 D13
BEGEL Ø 8-10
25 BEGEL Ø 8-10

SELIMUT BETON SELIMUT BETON


T= 3 CM T= 3 CM

4 D16 2 D13

SLOOF 15/20 SLOOF 15/20 POTONGAN KOLOM A SLOOF 15/20 SLOOF 15/20 POTONGAN KOLOM X
SKALA 1 : 10 SKALA 1 : 10

DETAIL PENULANGAN KOLOM K.1 (30/35) DETAIL PENULANGAN KOLOM K.2 (25/25)
SKALA 1 : 20 SKALA 1 : 20

1 : 20
DETAIL TULANGAN 1 : 10

009
18.00
9.00 9.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
1.00

1.00
4.00

4.00
8.00

8.00
4.00

4.00
2.00

2.00
1.00

1.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
9.00 9.00
18.00

RENCANA LANTAI KERAMIK 30 X 30


SKALA 1 : 100

RENCANA LANTAI KERAMIK 1 : 100

010
18.00
9.00 9.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
1.00

1.00
1
J1 J1 J1 J1 J1 J1
4.00

4.00
8.00

8.00
RUANG KELAS RUANG KELAS
2
±0,00 ±0,00
4.00

4.00
P1
J1 J1 P2 J1 J1 P2
3
2.00

2.00
4
1.00

1.00
1.00 3.00 3.00 3.00 3.00 3.00 3.00 1.00
9.00 9.00
18.00

A B C D E F G

RENCANA KUSEN
SKALA 1 : 100

RENCANA KUSEN 1 : 100

011
5

5
60

60
5

5
280

280
210

210
13

13
10 5 73 5 73 510 10 5 80 510
160 90
13

13

10 5 150 510 10 5 80 510


160 90

DETAIL KUSEN TIPE P2 DETAIL KUSEN TIPE P1


SKALA 1 : 20 SKALA 1 : 20 DETAIL KUSEN 1 : 20

012
13 13

5
60

60
KACA POLOS

5
175

175
100

100
KACA POLOS KACA POLOS KACA POLOS

5
260
10 5 80 5 80 5 80 510
13

260
10 5 80 5 80 5 80 510
13

8 66 8 80 8 66 8
82 82

DETAIL KUSEN TIPE J1


SKALA 1 : 20

DETAIL KUSEN 1 : 20

013
KETERANGAN :

= PAS.LAMPU SL 20 WATT
= PAS.STOP KONTAK
= PAS.SHAKELAR GANDA
= PAS.SHAKELAR TUNGGAL

18.00
9.00 9.00
3.00 3.00 3.00 3.00 3.00 3.00
1.00

1.00
4.00

4.00
TEMPAT PERAGA

TEMPAT PERAGA
+ 0.20

+ 0.20
8.00

8.00
RUANG KELAS RUANG KELAS
±0,00 ±0,00
4.00

4.00
2.00

2.00
1.00

1.00
3.00 3.00 3.00 3.00 3.00 3.00
9.00 9.00

18.00

INSTALASI LISTRIK & PLAFOND


SKALA 1 : 100

INSTALASI LISTRIK & PLAFOND 1 : 100

014
0.6
0
0.6
0

D
0
0.6
A
C 0
0.6
0
0.6
E B 0
0.6
0
0.6
0
0.6

ISOMETRI RANGKA PLAFOND


SKALA : 1:50

KASO 5/7 KASO 5/7


KASO 5/7 PAKU 3 BUAH 7 cm Ø 3mm BALK UTAMA 6/12

PAPAN 2/20 KASO 5/7

RANGKA BAWAH
DIPOTONG 1/2

PAKU 3 BUAH 7 cm Ø 3mm

DETAIL A DETAIL B DETAIL C


SKALA 1 : 20 SKALA 1 : 20 SKALA 1 : 20

BALK GANTUNG 8/12 PENGGANTUNG 8/12

KUDA-KUDA

PAKU 10 cm
PAKU 3 BUAH
KASO 5/7 7 cmØ 3 mm

DETAIL D DETAIL E
SKALA 1 : 20
SKALA 1 : 20

DETAIL PLAFOND 1 : 20

015
9.00

TRUSS

RENCANA ATAP
SKALA 1 : 100

18.00
9.00 9.00
RING BALK 15/20 RING BALK 15/20 RING BALK 15/20 RING BALK 15/20

RING BALK 15/20

RING BALK 15/20


RING BALK 15/20
8.00

8.00
RING BALK 15/20

RING BALK 15/20


RING BALK 15/20 RING BALK 15/20 RING BALK 15/20 RING BALK 15/20
BALOK 15/20

BALOK 15/20

BALOK 15/20
2.00

2.00
BALOK 15/20 BALOK 15/20
RENCANA ATAP 1 : 100
RENCANA RINGBALK RENCANA RINGBALK 1 : 100
SKALA 1 : 100
016

Anda mungkin juga menyukai