Anda di halaman 1dari 139

Lampiran I : Keputusan Bupati Siak

Nomor : /HK/KPTS/2019
Tanggal : September 2019

DAFTAR STANDAR SATUAN HARGA (SSH)


A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 ASET
1 1 ASET LANCAR
1 1 7 PERSEDIAAN
1 1 7 01 BARANG PAKAI HABIS
1 1 7 01 01 BAHAN
1 1 7 01 01 01 BAHAN BANGUNAN DAN KONSTRUKSI
1 1 7 01 01 01 001 Aspal
1 1 7 01 01 01 Aspal Curah (satu drum = 165 kg) Kg 2.866.400
1 1 7 01 01 01 Aspal Drum Bh 14.700
1 1 7 01 01 01 Aspal Emulsi Kg 16.700
1 1 7 01 01 01 Aspal Modifikasi Kg 8.000
1 1 7 01 01 01 Anti strpping agent Kg 70.000
1 1 7 01 01 01 Expansion Tipe Joint Asphaltic Plug M 1.515.000
1 1 7 01 01 01 002 Semen
1 1 7 01 01 01 Semen Setara Tiga roda 50 kg Zak 75.600
1 1 7 01 01 01 Semen Setara Tiga roda 40 kg Zak 61.000
1 1 7 01 01 01 Semen Setara Semen padang 50 kg Zak 79.600
1 1 7 01 01 01 Semen Setara Semen padang 1 kg Kg 1.592
1 1 7 01 01 01 Semen Setara Semen padang 40 kg Zak 58.000
1 1 7 01 01 01 Semen putih Setara Tiga Roda Zak 147.600
1 1 7 01 01 01 Mortar M3 478.500
1 1 7 01 01 01 Tile Grout/Semen warna Kg 24.800
1 1 7 01 01 01 003 Kaca
1 1 7 01 01 01 Kaca bening 3 mm M2 95.700
1 1 7 01 01 01 Kaca bening 5 mm M2 103.600
1 1 7 01 01 01 Kaca bening 6 mm M2 109.300
1 1 7 01 01 01 Kaca bening 8 mm M2 263.300
1 1 7 01 01 01 Kaca bening 10 mm M2 333.500
1 1 7 01 01 01 Kaca rayben 3 mm M2 289.900
1 1 7 01 01 01 Kaca rayben 5 mm M2 347.700
1 1 7 01 01 01 Kaca rayben 8 mm M2 367.100
1 1 7 01 01 01 Kaca rayben 10 mm M2 448.800
1 1 7 01 01 01 Kaca buram 3 mm M2 185.000
1 1 7 01 01 01 Kaca buram 5 mm M2 186.500
1 1 7 01 01 01 Kaca Nako + Bingkai M2 80.400
1 1 7 01 01 01 Kaca Block Kg 217.700
1 1 7 01 01 01 Kaca Cermin M2 253.800
1 1 7 01 01 01 Kaca Pemantul Reflector M2 253.800
1 1 7 01 01 01 Glass Blead kg 21.800
1 1 7 01 01 01 Kaca clear tempered 5 mm M2 151.600
1 1 7 01 01 01 Kaca clear tempered 6 mm M2 212.200
1 1 7 01 01 01 Kaca clear tempered 8 mm M2 303.200
1 1 7 01 01 01 Kaca clear tempered 10 mm M2 447.300
1 1 7 01 01 01 Kaca clear tempered 12 mm M2 485.200
1 1 7 01 01 01 Kaca clear tempered 15 mm M2 2.274.400
1 1 7 01 01 01 Kaca lampu taman lokal Buah 185.700
1 1 7 01 01 01 Sealent Kg 20.600
1 1 7 01 01 01 004 Pasir
1 1 7 01 01 01 Pasir urug M3 274.100
1 1 7 01 01 01 Pasir pasang M3 361.300
1 1 7 01 01 01 Pasir Cor/beton M3 436.200
1 1 7 01 01 01 Pasir Halus (untuk HRS) M3 311.400
1 1 7 01 01 01 Tanah urug didatangkan M3 129.900
1 1 7 01 01 01 Tanah hitam subur M3 230.500
1 1 7 01 01 01 Tanah hitam M3 230.500
1 1 7 01 01 01 Timbunan pilihan M3 297.000
1 1 7 01 01 01 Bahan tanah timbunan (Quarry) M3 297.000
1 1 7 01 01 01 Pasir Tailing M3 259.000
1 1 7 01 01 01 005 Batu
1 1 7 01 01 01 Batu Pecah/split M3 671.600
1 1 7 01 01 01 Plastik alas hitam ( pjg 1 M = 2,4 M2 ) M2 35.000
1 1 7 01 01 01 Joint saelant Kg 16.800
1 1 7 01 01 01 Sirtu M3 398.700
1 1 7 01 01 01 Batu kali M3 423.700
1 1 7 01 01 01 Batu gunung M3 607.000
1 1 7 01 01 01 Batu Bata biasa Buah 800
1 1 7 01 01 01 Batu Bata Press Buah 800
1 1 7 01 01 01 Batako Buah 9.250
1 1 7 01 01 01 Kerikil M3 467.400
1 1 7 01 01 01 Batu belah/Kerakal M3 276.650
1 1 7 01 01 01 Batu pecah isian bronjong Dia. 10 - 30 cm M3 560.800
1 1 7 01 01 01 Filler (abu batu) M3 300
1 1 7 01 01 01 Geotextile non woven 250 gr/m3 M2 60.000
1 1 7 01 01 01 Geotextile woven 250 gr/m3 M2 55.500
1 1 7 01 01 01 Bata beton ringan Ex. Celcon Uk. 9 x 19 x 39 Buah 6.100
1 1 7 01 01 01 Grass Block Buah 28.000
1 1 7 01 01 01 Paving Block K 175
1 1 7 01 01 01 - Segi Enam Tebal 6 cm Buah 2.900
1 1 7 01 01 01 - Segi Enam Tebal 8 cm Buah 3.500
1 1 7 01 01 01 - Segi Empat Tebal 6 cm Buah 2.900
1 1 7 01 01 01 - Segi Empat Tebal 8 cm Buah 3.500
1 1 7 01 01 01 Paving Block K 225
1 1 7 01 01 01 - Segi Enam Tebal 6 cm Buah 2.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 01 - Segi Enam Tebal 8 cm Buah 2.500
1 1 7 01 01 01 Coneblock 10 x 10 x 20 Buah 4.600
1 1 7 01 01 01 Paving Block Tebal 6 cm M2 129.900
1 1 7 01 01 01 Paving Block Tebal 8 cm M2 135.900
1 1 7 01 01 01 Paving Block Tebal 6 cm, warna M2 141.800
1 1 7 01 01 01 Paving Block Tebal 8 cm, warna M2 147.700
1 1 7 01 01 01 Kansteen Coneblock/Kerb Buah 54.800
1 1 7 01 01 01 Batu Kerawang Beton Buah 31.400
1 1 7 01 01 01 Batu Kerawang Tanah Liat Buah 29.100
1 1 7 01 01 01 Batu Sikat M2 354.800
1 1 7 01 01 01 Batu Andesit Ukuran 30 x 30 M2 206.800
1 1 7 01 01 01 Batu Andesit Ukuran 30 x 60 M2 212.700
1 1 7 01 01 01 Batu Andesit Ukuran 15 x 30 M2 259.900
1 1 7 01 01 01 Batu bara Kg 660
1 1 7 01 01 01 006 Cat
1 1 7 01 01 01 Cat Menie
1 1 7 01 01 01 - Kayu Liter 28.850
1 1 7 01 01 01 - Besi Liter 34.600
1 1 7 01 01 01 Cat Dasar Liter 61.000
1 1 7 01 01 01 Cat Dasar
1 1 7 01 01 01 - Antifade Setara jotun/nippon Liter 198.500
1 1 7 01 01 01 - Kelas I Setara jotun/nippon Liter 119.100
1 1 7 01 01 01 - Kelas II Setara jotun/nippon Liter 96.900
1 1 7 01 01 01 - Kelas III Setara jotun/nippon Liter 59.000
1 1 7 01 01 01 Interior (luar)
1 1 7 01 01 01 - Kelas I Setara jotun/nippon Liter 106.300
1 1 7 01 01 01 - Kelas II Setara jotun/nippon Liter 51.900
1 1 7 01 01 01 - Kelas III Setara jotun/nippon Liter 40.300
1 1 7 01 01 01 Alkali Setara jotun/nippon Liter 99.200
1 1 7 01 01 01 Cat Minyak
1 1 7 01 01 01 - Kelas I Setara jotun/nippon Liter 101.500
1 1 7 01 01 01 - Kelas II Setara jotun/nippon Liter 78.400
1 1 7 01 01 01 Cat Anti karat kg 90.000
1 1 7 01 01 01 Plamer kg 25.700
1 1 7 01 01 01 Pernis Liter 69.200
1 1 7 01 01 01 Residu klg 78.400
1 1 7 01 01 01 Sikabonding (cairan utk penyambung beton) Kg 74.950
1 1 7 01 01 01 Sika addivedive (cairan utk pengeras beton) Kg 57.650
1 1 7 01 01 01 Curing compound Liter 103.800
1 1 7 01 01 01 additive Liter 69.200
1 1 7 01 01 01 Waterproofing Kg 150.550
1 1 7 01 01 01 Cat marka (Non Thermopplastic) Kg 58.500
1 1 7 01 01 01 Cat marka (Thermopplastic) Kg 64.800
1 1 7 01 01 01 karbit Kg 34.600
1 1 7 01 01 01 Bahan untuk waterprofing Kg 150.600
1 1 7 01 01 01 Curing compound Liter 103.800
1 1 7 01 01 01 Additive Liter 69.150
1 1 7 01 01 01 Assetiline Btl 322.800
1 1 7 01 01 01 Oxygen btl 149.400
1 1 7 01 01 01 Dempul
1 1 7 01 01 01 - Biasa Kg 73.200
1 1 7 01 01 01 - Jati Kg 170.100
1 1 7 01 01 01 - Besi Kg 170.100
1 1 7 01 01 01 Cat Impra Kg 76.800
1 1 7 01 01 01 Kapur tembok Kg 118.800
1 1 7 01 01 01 Amplas kayu Lembar 14.100
1 1 7 01 01 01 Amplas besi Lembar 14.100
1 1 7 01 01 01 Wallpaper 1,06 m x 15,60 m Setara LG Roll 759.100
1 1 7 01 01 01 Wallpaper 1,06 m x 15,60 m Roll 378.100
1 1 7 01 01 01 Wallpaper 0,53 m x 10,00 m Roll 295.400
1 1 7 01 01 01 Elastomer jenis 1 (300 x 350 x 41) buah 847.800
1 1 7 01 01 01 Elastomer jenis 2 (350 x 400 x 39) buah 1.075.300
1 1 7 01 01 01 Elastomer jenis 3 (400 x 450 x 73) buah 3.949.200
1 1 7 01 01 01 Curing M2 150.000
1 1 7 01 01 01 Lem wallpaper Kg 29.500
1 1 7 01 01 01 007 Seng
1 1 7 01 01 01 Seng BJLS 18 Lembar 47.000
1 1 7 01 01 01 Seng BJLS 20 Lembar 52.000
1 1 7 01 01 01 Seng BJLS 30 Lembar 87.700
1 1 7 01 01 01 Plastik gelombang tebal Lembar 46.000
1 1 7 01 01 01 Plastik gelombang tipis Lembar 65.000
1 1 7 01 01 01 Perabung Seng Lembar 89.000
1 1 7 01 01 01 Seng alumunium polos 0,25mm t : 0,25 mm Lembar 23.000
1 1 7 01 01 01 Seng alumunium polos 0,30mm t : 0,30 mm Lembar 89.000
1 1 7 01 01 01 Seng alumunium polos 0,40mm t : 0,40 mm Lembar 139.000
1 1 7 01 01 01 008 Baja
1 1 7 01 01 01 Pelat Baja
1 1 7 01 01 01 - Ukuran tebal 1 mm Uk. 1,22 x 2,44 m Lembar 403.500
1 1 7 01 01 01 - Ukuran tebal 1,2 mm Uk. 1,22 x 2,44 m Lembar 443.800
1 1 7 01 01 01 - Ukuran tebal 1,5 mm Uk. 1,22 x 2,44 m Lembar 495.650
1 1 7 01 01 01 - Ukuran tebal 1,8 mm Uk. 1,22 x 2,44 m Lembar 434.550
1 1 7 01 01 01 - Ukuran tebal 2 mm Uk. 1,22 x 2,44 m Lembar 485.000
1 1 7 01 01 01 - Ukuran tebal 2,5 mm Uk. 1,22 x 2,44 m Lembar 802.000
1 1 7 01 01 01 - Ukuran tebal 3 mm Uk. 1,22 x 2,44 m Lembar 864.450
1 1 7 01 01 01 - Ukuran tebal 4 mm Uk. 1,22 x 2,44 m Lembar 968.200
1 1 7 01 01 01 - Ukuran tebal 5 mm Uk. 1,22 x 2,44 m Lembar 1.210.300
1 1 7 01 01 01 - Ukuran tebal 6 mm Uk. 1,22 x 2,44 m Lembar 1.527.200
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 01 - Ukuran tebal 8 mm Uk. 1,22 x 2,44 m Lembar 2.074.700
1 1 7 01 01 01 - Ukuran tebal 10 mm Uk. 1,22 x 2,44 m Lembar 2.420.500
1 1 7 01 01 01 - Ukuran tebal 12 mm Uk. 1,22 x 2,44 m Lembar 2.904.600
1 1 7 01 01 01 Paku Beton (Putih)
1 1 7 01 01 01 Paku Beton 2,5 cm Kotak 23.052
1 1 7 01 01 01 Paku Beton 3 cm Kotak 23.052
1 1 7 01 01 01 Paku Beton 4 cm Kotak 23.052
1 1 7 01 01 01 Paku Beton 5 cm Kotak 23.052
1 1 7 01 01 01 Paku Beton (Hitam)
1 1 7 01 01 01 Paku Beton 3 cm Kotak 10.373
1 1 7 01 01 01 Paku Beton 5 cm Kotak 14.984
1 1 7 01 01 01 Paku Beton 7 cm Kotak 18.442
1 1 7 01 01 01 Baja Struktural/Profil WF, C, H, L… Titik Leleh 240 Mpa Kg 34.700
1 1 7 01 01 01 Baja Tulangan (Polos) U24 Kg 17.200
1 1 7 01 01 01 Baja Tulangan (Polos) U32 Kg 17.600
1 1 7 01 01 01 Baja Tulangan (Ulir) D32 Kg 17.000
1 1 7 01 01 01 Baja Tulangan (Ulir) D39 Kg 17.300
1 1 7 01 01 01 Baja Tulangan (Ulir) D48 Kg 18.100
1 1 7 01 01 01 Strip Bearing Buah 296.000
1 1 7 01 01 01 Kabel Baja Prategang (Strand) Kg 72.000
1 1 7 01 01 01 Angkur Baut Kg 20.000
1 1 7 01 01 01 Formwork Plate M2 750.000
1 1 7 01 01 01 Expansion Join Baja Siku M1 360.500
1 1 7 01 01 01 010 Patok Beton
1 1 7 01 01 01 Patok beton Buah 127.600
1 1 7 01 01 01 011 Tiang Beton
1 1 7 01 01 01 D 300 cm MUTU K 350 M1 485.100
1 1 7 01 01 01 Tiang Pancang Beton Pratekan DiaMeter 350 Kelas A3 M1 558.200
1 1 7 01 01 01 Tiang Pancang Beton Pratekan DiaMeter 300 Kelas C0 M1 522.900
1 1 7 01 01 01 Tiang Pancang Beton Pratekan DiaMeter 400 Kelas A2 M1 712.400
1 1 7 01 01 01 Tiang Pancang Beton Pratekan DiaMeter 450 Kelas A1 M1 877.200
1 1 7 01 01 01 Tiang Pancang Beton Pratekan DiaMeter 600 Kelas A1 M1 1.405.700
1 1 7 01 01 01 Mini Pile 20 x 20 (K-400) M1 340.500
1 1 7 01 01 01 Mini Pile 25 x 25 (K-400) M1 476.700
1 1 7 01 01 01 Mini Pile 30 x 30 (K-400) M1 688.900
1 1 7 01 01 01 012 Besi Beton
1 1 7 01 01 01 Besi Tulangan (Polos) U24 Kg 16.900
1 1 7 01 01 01 Besi Tulangan (Polos) U32 Kg 17.100
1 1 7 01 01 01 Besi Tulangan (Ulir) D32 Kg 17.300
1 1 7 01 01 01 Besi Tulangan (Ulir) D39 Ex.Karakatau Steel Kg 17.700
1 1 7 01 01 01 013 Tegel
1 1 7 01 01 01 Tegel polos Uk. 30 x 30 M2 68.000
1 1 7 01 01 01 Tegel motif Uk. 30 x 30 M2 180.000
1 1 7 01 01 01 Keramik Kualitas Bagus
1 1 7 01 01 01 Ukuran 20x20 cm M2 88.000
1 1 7 01 01 01 Ukuran 20x25 cm M2 85.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 78.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 125.000
1 1 7 01 01 01 Keramik Kualitas Menengah
1 1 7 01 01 01 Ukuran 20x20 cm M2 85.000
1 1 7 01 01 01 Ukuran 20x25 cm M2 80.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 75.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 120.000
1 1 7 01 01 01 Keramik Kualitas Biasa
1 1 7 01 01 01 Ukuran 20x20 cm M2 78.000
1 1 7 01 01 01 Ukuran 20x25 cm M2 78.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 73.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 113.000
1 1 7 01 01 01 Plin keramik
1 1 7 01 01 01 Bon-bon keramik M1 9.000
1 1 7 01 01 01 Vinyl M2 406.000
1 1 7 01 01 01 Karpet M2 35.000
1 1 7 01 01 01 Granit Kualitas Bagus
1 1 7 01 01 01 Ukuran 20x20 cm M2 350.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 357.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 378.000
1 1 7 01 01 01 Ukuran 60x60 cm M2 400.000
1 1 7 01 01 01 Granit Kualitas Menengah
1 1 7 01 01 01 Ukuran 20x20 cm M2 232.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 252.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 275.000
1 1 7 01 01 01 Ukuran 60x60 cm M2 357.000
1 1 7 01 01 01 Granit Kualitas Biasa
1 1 7 01 01 01 Ukuran 20x20 cm M2 189.000
1 1 7 01 01 01 Ukuran 30x30 cm M2 196.000
1 1 7 01 01 01 Ukuran 40x40 cm M2 218.000
1 1 7 01 01 01 Ukuran 60x60 cm M2 259.000
1 1 7 01 01 01 Parquet Jati M2 406.000
1 1 7 01 01 01 Parquet Kelapa M2 406.000
1 1 7 01 01 01 Lem Vinyl Kg 57.000
1 1 7 01 01 01 Vinyl Lembar 232.000
1 1 7 01 01 01 Keramik dinding Uk. 30 x 60 M2 159.800
1 1 7 01 01 01 Stepnousing Buah 24.000
1 1 7 01 01 01 Granite Tile 40 x 40 cm M2 316.700
1 1 7 01 01 01 Plint Granite tile 10 x 40 Uk.10 x 40 Buah 79.100
1 1 7 01 01 01 014 Genteng
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 01 Atap Genteng Metal Tebal 0.4 mm Setara multiroof Lembar 82.500
1 1 7 01 01 01 Atap Genteng Metal Tebal 0.35 mm Setara sakura roof Lembar 51.500
1 1 7 01 01 01 Atap Genteng Metal Tebal 0.3 mm Setara sakura roof Lembar 47.800
1 1 7 01 01 01 Atap Genteng Metal Tebal 0.25 mm Setara sakura roof Lembar 43.300
1 1 7 01 01 01 Perabung genteng metal Setara sakura roof Lembar 28.700
1 1 7 01 01 01 Perabung asbes Uk.0,25 x 1 m M1 28.700
1 1 7 01 01 01 Genteng beton Buah 12.400
1 1 7 01 01 01 Genteng keramik Jatiwangi Buah 25.700
1 1 7 01 01 01 Perabung genteng keramik Buah 29.800
1 1 7 01 01 01 Nok genteng keramik M1 29.800
1 1 7 01 01 01 Spandek M1 68.400
1 1 7 01 01 01 Selulosa bitumen Uk.0,95 x 2 m tbl.0,3 cm Uk.0,95 x 2 m tbl.0,3 cm Lembar 170.200
1 1 7 01 01 01 Selulosa bitumen Uk.0,4 x 1,06 m tbl.0,3 cm Uk.0,4 x 1,06 m tbl.0,3 cm Lembar 60.000
1 1 7 01 01 01 Zincalume panel Lembar 44.600
1 1 7 01 01 01 Shading Net/ atap kandang Gulung 2.373.100
1 1 7 01 01 01 015 Bis Beton
1 1 7 01 01 01 Gorong - Gorong beton
1 1 7 01 01 01 - DiaMeter 20 cm Buah 230.550
1 1 7 01 01 01 - DiaMeter 30 cm Buah 288.150
1 1 7 01 01 01 - DiaMeter 40 cm Buah 345.800
1 1 7 01 01 01 - DiaMeter 60 cm Buah 403.450
1 1 7 01 01 01 - DiaMeter 80 cm Buah 518.700
1 1 7 01 01 01 - DiaMeter 100 cm Buah 576.300
1 1 7 01 01 01 - DiaMeter 120 cm Buah 634.000
1 1 7 01 01 01 016 Plat
1 1 7 01 01 01 Pelat Rambu (Eng. Grade) Buah 230.400
1 1 7 01 01 01 Pelat Rambu (High I. Grade) Buah 249.200
1 1 7 01 01 01 Plat MCB Lokal Buah 61.900
1 1 7 01 01 01 017 Steel Sheet Pile
1 1 7 01 01 01 SP II 400 x 100 x 10,5mm t=12m Batang 5.683.500
1 1 7 01 01 01 SP IIA 400 x 120 x 9,2mm t=12m Batang 5.117.300
1 1 7 01 01 01 SP III 400 x 125 x 13mm t=12m Batang 7.107.000
1 1 7 01 01 01 SP IIIA 400 x 150 x 13,1mm t=12m Batang 6.917.000
1 1 7 01 01 01 SP IV 400 x 170 x 15,5mm t=12m Batang 9.015.300
1 1 7 01 01 01 SP IVA 400 x 185 x 116,1mm t=12m Batang 8.765.800
1 1 7 01 01 01 018 Concrete Sheet Pile
1 1 7 01 01 01 Sheet Pile W 350 A, L = 1 M' M1 1.338.200
1 1 7 01 01 01 Sheet Pile W 325 A, L = 1 M' M1 1.173.350
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 S (3xd10mm) M1 102.600
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 D (3xd10mm) M1 107.000
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 S (3xd13mm) M1 117.500
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 D (3xd13mm) M1 121.900
1 1 7 01 01 01 Concrete Sheet Pile ST 32×3 S (3xd13mm) M1 134.400
1 1 7 01 01 01 Concrete Sheet Pile ST 32×3 D (3xd13mm) M1 140.400
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 S (4xd10mm) M1 115.500
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 D (4xd10mm) M1 120.000
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 S (4xd13mm) M1 135.300
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 D (4xd13mm) M1 139.900
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 S (4xd13mm) M1 177.400
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 D (4xd13mm) M1 184.800
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 S (4xd16mm) M1 203.000
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 D (4xd16mm) M1 210.300
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 S (6xd13mm) M1 268.300
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 D (6xd13mm) M1 278.700
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 S (4xd16mm) M1 269.300
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 D (4xd16mm) M1 279.700
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 S (8xd13mm) M1 357.200
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 D (8xd13mm) M1 370.800
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 S (6xd16mm) M1 371.000
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 D (6xd16mm) M1 384.500
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 S (8xd13mm) M1 434.200
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 D (8xd13mm) M1 450.400
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 S (6xd16mm) M1 447.900
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 D (6xd16mm) M1 464.100
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 S (3xd10mm) M1 101.600
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 D (3xd10mm) M1 105.900
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 S (3xd13mm) M1 116.400
1 1 7 01 01 01 Concrete Sheet Pile ST 28×3 D (3xd13mm) M1 120.700
1 1 7 01 01 01 Concrete Sheet Pile ST 32×3 S (3xd13mm) M1 133.000
1 1 7 01 01 01 Concrete Sheet Pile ST 32×3 D (3xd13mm) M1 139.100
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 S (4xd10mm) M1 114.400
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 D (4xd10mm) M1 118.800
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 S (4xd13mm) M1 134.000
1 1 7 01 01 01 Concrete Sheet Pile ST 20×3 D (4xd13mm) M1 138.500
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 S (4xd13mm) M1 175.700
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 D (4xd13mm) M1 183.000
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 S (4xd16mm) M1 201.000
1 1 7 01 01 01 Concrete Sheet Pile ST 25×3 D (4xd16mm) M1 208.300
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 S (6xd13mm) M1 265.700
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 D (6xd13mm) M1 276.000
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 S (4xd16mm) M1 266.700
1 1 7 01 01 01 Concrete Sheet Pile ST 30×3 D (4xd16mm) M1 276.900
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 S (8xd13mm) M1 353.800
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 D (8xd13mm) M1 367.200
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 S (6xd16mm) M1 367.400
1 1 7 01 01 01 Concrete Sheet Pile ST 35×3 D (6xd16mm) M1 380.800
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 S (8xd13mm) M1 429.900
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 D (8xd13mm) M1 446.000
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 S (6xd16mm) M1 443.500
1 1 7 01 01 01 Concrete Sheet Pile ST 40×3 D (6xd16mm) M1 459.600
1 1 7 01 01 01 PCI Girder L=16m Buah 78.174.000
1 1 7 01 01 01 PCI Girder L=20m Buah 181.800.000
1 1 7 01 01 01 PCI Girder L=25m Buah 223.928.900
1 1 7 01 01 01 PCI Girder L=30m Buah 226.492.500
1 1 7 01 01 01 PCI Girder L=35m Buah 472.002.900
1 1 7 01 01 01 PCI Girder L=40m Buah 321.735.500
1 1 7 01 01 01 PCI Girder L=42m Buah 363.600.000
1 1 7 01 01 01 PCI Girder L=45m Buah 393.748.500
1 1 7 01 01 01 019 Kawat Beronjong
1 1 7 01 01 01 Kawat bronjong Ukuran 2,1 x 1 x 0,5 m Dia 3mm Unit 542.100
1 1 7 01 01 01 020 Karung
Karung Plastik Isi 50 Kg Buah 4.600
1 1 7 01 01 01 021 Minyak Cat/Thinner
1 1 7 01 01 01 Kualitas bagus Kg 53.000
1 1 7 01 01 01 Kualitas menengah Kg 37.800
1 1 7 01 01 01 Kualitas biasa Kg 10.800
1 1 7 01 01 01 022 Plafon
1 1 7 01 01 01 Gypsum board 9mm Setara Jayaboard ukuran 1,20 x 2,40 M Lembar 100.400
1 1 7 01 01 01 Setara Elephant ukuran 1,20 x 2,40 M Lembar 94.500
1 1 7 01 01 01 Setara Knauf ukuran 1,20 x 2,40 M Lembar 92.100
1 1 7 01 01 01 Calsiboard Lembar 103.000
1 1 7 01 01 01 Eternit Lembar 57.000
1 1 7 01 01 01 Asbes Lembar 141.000
1 1 7 01 01 01 List Gypsumboard 6 mm Setara Versaboard Lembar 19.500
1 1 7 01 01 01 List Gypsumboard 9 mm Setara Versaboard Lembar 22.600
1 1 7 01 01 01 List Calsiboard M1 110.000
1 1 7 01 01 01 List Eternit M1 14.000
1 1 7 01 01 01 Profil Aluminimum T M1 37.000
1 1 7 01 01 01 GRC Board Uk. 1,2 x 2,4 m
1 1 7 01 01 01 - Tebal 4mm Setara versaboard Lembar 108.700
1 1 7 01 01 01 - Tebal 6mm Setara versaboard Lembar 189.700
1 1 7 01 01 01 - Tebal 9mm Setara versaboard Lembar 237.200
1 1 7 01 01 01 List GRC 4 mm Setara Versaboard Lembar 88.700
1 1 7 01 01 01 List GRC 6 mm Setara Versaboard Lembar 189.700
1 1 7 01 01 01 List GRC 9 mm Setara Versaboard Lembar 237.200
1 1 7 01 01 01 Plafon PVC
1 1 7 01 01 01 Plat Gloss White 0,8 mm x 20 cm M1 20.600
1 1 7 01 01 01 Plat Doff White 0,8 mm x 20 cm M1 23.700
1 1 7 01 01 01 Plafon Akustik Uk. 60 x 120 M2 129.900
1 1 7 01 01 01 Uk. 60 x 120 Lembar 59.000
1 1 7 01 01 01 Listplank GRC
1 1 7 01 01 01 - Lebar 10 cm M1 59.000
1 1 7 01 01 01 - Lebar 20 cm M1 77.300
1 1 7 01 01 01 - Lebar 30 cm M1 97.900
1 1 7 01 01 01 023 Pipa Galvanis
1 1 7 01 01 01 Pipa Galvanis DiaMeter. 1.5" M1 57.350
1 1 7 01 01 01 Pipa Galvanis DiaMeter. 1.6" M1 59.750
1 1 7 01 01 01 Pipa Galvanis DiaMeter 3" M1 119.700
1 1 7 01 01 01 Pipa Galvanis DiaMeter 4" M1 155.000
1 1 7 01 01 01 024 Besi Anyaman Wiremesh
1 1 7 01 01 01 - Ukuran DiaMeter 6 mm Uk. 2,1 x 5,4 m Lembar 479.700
1 1 7 01 01 01 - Ukuran DiaMeter 8 mm Uk. 2,1 x 5,4 m Lembar 820.200
1 1 7 01 01 01 025 Plastik Hitam
1 1 7 01 01 01 Plastik hitam p. 1 m = 2,4 m M2 8.200
1 1 7 01 01 01 026 Bahan Agr.Base
1 1 7 01 01 01 Bahan Agr.Base Kelas A M3 645.100
1 1 7 01 01 01 Bahan Agr.Base Kelas B M3 634.400
1 1 7 01 01 01 Bahan Agr.Base Kelas C M3 467.900
1 1 7 01 01 01 Bahan Agr.Base Kelas S M3 485.900
1 1 7 01 01 01 Aggregat Pecah mesin 0-5 mm Aggregat halus untuk hotmix M3 646.900
1 1 7 01 01 01 Aggregat Pecah mesin 5-10 mm & 10-20 Aggregat kasar untuk hotmix M3 663.300
1 1 7 01 01 05 027 Bahan sanitair
1 1 7 01 01 05 Kloset Duduk Setara Toto Buah 4.431.700
1 1 7 01 01 05 Jet Washer Setara Toto Buah 300.000
1 1 7 01 01 05 Kloset Jongkok berwarna Setara Toto Buah 519.000
1 1 7 01 01 05 Kloset Jongkok putih Setara Toto Buah 462.000
1 1 7 01 01 05 Kloset Jongkok Type Flush Setara Toto Buah 4.081.000
1 1 7 01 01 05 Urinoir Setara Toto Buah 4.035.000
1 1 7 01 01 05 Sekat Urinoir Setara Toto Buah 1.580.000
1 1 7 01 01 05 - Wastafel Ukuran Kecil Buah 427.000
1 1 7 01 01 05 - Wastafel Ukuran Sedang Buah 533.000
1 1 7 01 01 05 - Wastafel Komplit LW 240 CJ Ex Toto,Komplit kran & Acc Buah 680.000
1 1 7 01 01 05 Bak Cuci Piring ( bahan Stainless )
1 1 7 01 01 05 - Ukuran Kecil 1 lubang Buah 548.000
1 1 7 01 01 05 - Ukuran Besar 2 lubang Buah 634.000
1 1 7 01 01 05 Bak Mandi Fibere Glass
1 1 7 01 01 05 - Ukuran Kecil Buah 289.000
1 1 7 01 01 05 - Ukuran Besar Buah 375.000
1 1 7 01 01 05 Tangki air Stainless kapasitas 1 m3 + Kedudukan Buah 4.323.000
1 1 7 01 01 05 Tangki air Stainless kapasitas 0,5 m3 + Kedudukan Buah 2.881.500
1 1 7 01 01 05 Kran Air Biasa (Plastik)
1 1 7 01 01 05 - Ukuran 1/2 Buah 17.500
1 1 7 01 01 05 - Ukuran 3/4 Buah 23.500
1 1 7 01 01 05 Kran Air ( Stainless )
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 05 - Ukuran 1/2 Buah 202.000
1 1 7 01 01 05 - Ukuran 3/4 Buah 207.500
1 1 7 01 01 05 Stop Kran (Bahan Kuningan)
1 1 7 01 01 05 - Ukuran 1/2 Buah 86.500
1 1 7 01 01 05 - Ukuran 3/4 Buah 110.000
1 1 7 01 01 05 Floor Drain (Stainless) Setara Toto Buah 527.000
1 1 7 01 01 05 Floor Drain Biasa Buah 177.200
1 1 7 01 01 05 Shower spray Setara Toto Unit 292.000
1 1 7 01 01 05 Shower set Setara Toto Unit 836.000
1 1 7 01 01 05 Tempat Sabun Setara Toto Buah 137.500
1 1 7 01 01 05 Kran zink Setara Toto Buah 445.500
1 1 7 01 01 05 Kitchen Zink Hwaco 1L Unit 550.000
1 1 7 01 01 05 Pompa Air Jet Pump/Sumur dalam Groundfos, Kap.250 watt Unit 3.558.600
1 1 7 01 01 05 Mesin Pompa Groundfos, Kap.150 watt Unit 2.166.100
1 1 7 01 01 05 Pelampung otomatis Buah 82.500
1 1 7 01 01 05 Pintu Fiberglass (engsel+kunci) Set 576.500
1 1 7 01 01 05 028 Bahan Gantungan Kunci
1 1 7 01 01 05 Kunci Tanam 2 x Slag
- Setara SES Buah 346.000
- Setara Belluci Buah 323.000
1 1 7 01 01 05 Kait angin :
- Kwalitas No. 1 Buah 45.000
- Kwalitas No. 2 Buah 35.000
1 1 7 01 01 05 Engsel Setara SES :
- Uk. 3" Buah 184.500
- Uk. 4" Buah 317.000
1 1 7 01 01 05 Engsel Setara Belluci :
- Uk. 3" Buah 44.000
- Uk. 4" Buah 58.000
1 1 7 01 01 05 Grendel 2" :
- Kwalitas No.1 Buah 52.000
- Kwalitas No.2 Buah 35.000
1 1 7 01 01 05 Grendel 3" :
- Kwalitas No.1 Buah 55.000
- Kwalitas No.2 Buah 40.000
1 1 7 01 01 05 Grendel 4" :
- Kwalitas No.1 Buah 81.000
- Kwalitas No.2 Buah 55.000
1 1 7 01 01 05 Tarikan Pintu Tanam :
- Kwalitas No. 1 Pasang 267.000
- Kwalitas No. 2 Pasang 156.000
1 1 7 01 01 05 Tarikan Jendela :
- Kwalitas No. 1 Pasang 45.000
- Kwalitas No. 2 Pasang 40.000
1 1 7 01 01 05 Door Closer Unit 709.000
1 1 7 01 01 05 028 Bahan Aluminium
1 1 7 01 01 05 Rolling dor alluminium 0,80 M2 511.300
1 1 7 01 01 04 BAHAN BAKAR DAN PELUMAS
1 1 7 01 01 04 001 Bahan Bakar Minyak
1 1 7 01 01 04 Bio solar Liter 14.800
1 1 7 01 01 04 Dexlite Liter 15.700
1 1 7 01 01 04 Pertamina Dex Liter 18.000
1 1 7 01 01 04 Pertalite Liter 11.500
1 1 7 01 01 04 Pertamax Liter 15.100
1 1 7 01 01 04 Pertamax turbo Liter 17.700
1 1 7 01 01 04 Minyak tanah Liter 15.600
1 1 7 01 01 04 Premium Liter 10.600
1 1 7 01 01 04 002 Minyak Pelumas
1 1 7 01 01 04 Minyak Pelumas/Olie liter 30.500
1 1 7 01 01 04 Minyak bekisting liter 17.700
1 1 7 01 01 05 BAHAN BAKU
1 1 7 01 01 05 001 Kawat
1 1 7 01 01 05 Kawat berduri M1 134.000
1 1 7 01 01 05 Kawat nyamuk M2 25.500
1 1 7 01 01 05 Kawat harmonica M2 44.000
1 1 7 01 01 05 Kawat ikat (bindrat) Kg 25.900
1 1 7 01 01 05 Kawat Las Kg 33.500
1 1 7 01 01 05 Kawat Jaring Kg 29.500
1 1 7 01 01 05 002 Kayu
1 1 7 01 01 05 Balok kayu kelas I Setara Jati/laban/belian M3 4.800.000
1 1 7 01 01 05 Papan kayu kelas I Setara Jati/laban/belian M3 4.800.000
1 1 7 01 01 05 Balok kayu kelas II Setara Meranti /Punak M3 4.000.000
1 1 7 01 01 05 Papan kayu kelas II Setara Meranti /Punak M3 4.000.000
1 1 7 01 01 05 Balok kayu kelas III Setara Balam/Campuran M3 3.200.000
1 1 7 01 01 05 Papan kayu kelas III Setara Balam/Campuran M3 3.200.000
1 1 7 01 01 05 Balok kayu kelas IV Setara Terentang M3 2.500.000
1 1 7 01 01 05 Papan kayu kelas IV Setara Terentang M3 2.500.000
1 1 7 01 01 05 Kayu cerocok panjang 4 m Batang 25.000
1 1 7 01 01 05 Kayu Dolken panjang 4 m Batang 20.000
1 1 7 01 01 05 Kayu Bekisting/perancah M3 3.200.000
1 1 7 01 01 05 Kayu Profil Batang 22.000
1 1 7 01 01 05 Bambu diameter 6 - 8 / 600 cm Batang 22.000
1 1 7 01 01 05 Penjaga jarak bekisting / spacer Buah 17.700
1 1 7 01 01 05 003 Tripleks
1 1 7 01 01 05 Tripleks Tebal 3 mm Lembar 72.000
1 1 7 01 01 05 Tripleks Tebal 4 mm Lembar 80.000
1 1 7 01 01 05 Tripleks Tebal 6 mm Lembar 107.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 05 Tripleks Tebal 9 mm Lembar 171.300
1 1 7 01 01 05 Tripleks Tebal 12 mm Lembar 231.000
1 1 7 01 01 05 004 Teakwood
1 1 7 01 01 05 Teakwood Tebal 9 mm Lembar 145.000
1 1 7 01 01 05 Teakwood Tebal 12 mm Lembar 185.000
1 1 7 01 01 05 005 Besi
1 1 7 01 01 05 Besi Pagar BRC P. 120 x 240 cm Lembar 292.600
1 1 7 01 01 05 Besi Tempa M2 372.400
1 1 7 01 01 05 Rel Pengaman M1 454.800
1 1 7 01 01 05 Expansion Cap M2 27.100
1 1 7 01 01 05 Paku biasa Uk. 2" - 5" Kg 21.200
1 1 7 01 01 05 Paku seng Kg 30.900
1 1 7 01 01 05 Paku asbes Kg 30.900
1 1 7 01 01 05 Paku skrup Kg 28.300
1 1 7 01 01 05 Paku Beton 7 cm Kg 27.100
1 1 7 01 01 05 Paku atap genteng metal Kg 38.100
1 1 7 01 01 05 Paku gypsum Kg 43.300
1 1 7 01 01 05 Paku triplek Kg 29.300
1 1 7 01 01 05 Skrew atap Buah 1.000
1 1 7 01 01 05 Skrew gypsum Buah 700
1 1 7 01 01 05 Paku ramset Kg 20.000
1 1 7 01 01 05 Paku Kayu 2 cm Kg 23.052
1 1 7 01 01 05 Paku kayu 2,5 cm Kg 19.594
1 1 7 01 01 05 Paku Kayu 3 cm Kg 19.594
1 1 7 01 01 05 Paku Kayu 4 cm Kg 19.594
1 1 7 01 01 05 Paku Kayu 5 cm Kg 19.594
1 1 7 01 01 05 Paku Kayu 7 cm Kg 19.594
1 1 7 01 01 05 Paku Kayu 10 Kg 19.594
1 1 7 01 01 05 Paku Payung Seng 7 cm Kotak 25.357
1 1 7 01 01 05 Paku Payung Seng 10 cm Kotak 27.662
1 1 7 01 01 05 Hollow Kotak 100 x 100 x 2,1 x 6 m Batang 1.059.500
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 1,8 x 6 m Batang 75.000
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 2 x 6 m Batang 160.300
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 2,1 x 6 m Batang 172.800
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 6 m C Batang 115.300
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 6 m D Batang 85.300
1 1 7 01 01 05 Hollow Kotak 20 x 20 x 6 m F Batang 106.200
1 1 7 01 01 05 Hollow Kotak 30 x 30 x 1,8 x 6 m Batang 258.000
1 1 7 01 01 05 Hollow Kotak 30 x 30 x 2 x 6 m Batang 242.000
1 1 7 01 01 05 Hollow Kotak 30 x 30 x 2,1 x 6 m Batang 264.900
1 1 7 01 01 05 Hollow Kotak 30 x 30 x 6 m D Batang 165.900
1 1 7 01 01 05 Hollow Kotak 30 x 30 x 6 m F Batang 172.800
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 6 m F Batang 178.700
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 1,8 x 6 m Batang 311.100
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 2 x 6 m Batang 311.100
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 2,1 x 6m Batang 371.000
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 2,3 x 6m Batang 219.000
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 6 m D Batang 253.400
1 1 7 01 01 05 Hollow Kotak 40 x 40 x 6 m F Batang 449.100
1 1 7 01 01 05 Hollow Kotak 50 x 50 x 6 x 1,8 x 6m Batang 529.800
1 1 7 01 01 05 Hollow Kotak 50 x 50 x 6 x 2 x 6m Batang 437.600
1 1 7 01 01 05 Hollow Kotak 50 x 50 x 6 x 2,1 x 6m Batang 311.100
1 1 7 01 01 05 Hollow Kotak 50 x 50 x 6 m F Batang 241.900
1 1 7 01 01 05 Hollow Korek 20 x 40 x 2,1 x 6 m Batang 172.800
1 1 7 01 01 05 Hollow Korek 20 x 40 x 6 m F Batang 184.300
1 1 7 01 01 05 Hollow Korek 20 x 40 x 1,8 x 6 mF Batang 334.000
1 1 7 01 01 05 Hollow Korek 40 x 60 x 6 m F Batang 472.300
1 1 7 01 01 05 Hollow Partisi 50 x 80 x 2,1 x 6 m Batang 39.300
1 1 7 01 01 05 Hollow Partisi 20 x 40 Galvanis Batang 50.800
1 1 7 01 01 05 Hollow GLV 20 x 40 x 1,2 Batang 184.300
1 1 7 01 01 05 BESI SIKU
1 1 7 01 01 05 Siku 100 mm x 100 mm x 6 m SNI Batang 2.302.850
1 1 7 01 01 05 Siku 100 mm x 100 mm x 6 m STD Batang 2.222.500
1 1 7 01 01 05 Siku 30 mm x 30 mm x 6 m IP Batang 34.600
1 1 7 01 01 05 Siku 30 mm x 30 mm x 6 m SNI Batang 172.740
1 1 7 01 01 05 Siku 30 mm x 30 mm x 6 m STD Batang 196.000
1 1 7 01 01 05 Siku 40 mm x 40 mm x 6 m IP Batang 80.700
1 1 7 01 01 05 Siku 40 mm x 40 mm x 6 m SNI Batang 357.000
1 1 7 01 01 05 Siku 40 mm x 40 mm x 6 m STD Batang 230.400
1 1 7 01 01 05 Siku 50 mm x 50 mm x 6 m IP Batang 138.400
1 1 7 01 01 05 Siku 50 mm x 50 mm x 6 m SNI Batang 598.850
1 1 7 01 01 05 Siku 50 mm x 50 mm x 6 m STD Batang 403.150
1 1 7 01 01 05 Siku 60 mm x 60 mm x 6 Batang 391.650
1 1 7 01 01 05 Siku 70 mm x 70 mm x 6 Batang 518.670
1 1 7 01 01 05 Besi Kanal UNP
1 1 7 01 01 05 UNP 100 mm x 60 mm x 6 m Batang 403.410
1 1 7 01 01 05 UNP 100 mm x 60 mm x 6 m Master Batang 1.036.450
1 1 7 01 01 05 UNP 120 mm x 60 mm x 6 m Master Batang 1.174.506
1 1 7 01 01 05 UNP 150 mm x 60 mm x 6 m Master Batang 2.187.760
1 1 7 01 01 05 UNP 125 mm x 60 mm x 6 m Master Batang 1.659.000
1 1 7 01 01 05 UNP 80mm x 60mm x 6m Batang 266.000
1 1 7 01 01 05 Besi Kanal CNP
1 1 7 01 01 05 CNP 100 mm x 1,7 mm x 6 Meter Batang 319.400
1 1 7 01 01 05 CNP 100 mm x 60 mm x 2 mm x 6 Meter Batang 426.150
1 1 7 01 01 05 CNP 100 mm x 60 mm x 2,1 mm x 6 Meter Batang 368.500
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 05 CNP 125 mm x 60 mm x 1,8 mm x 6 Meter Batang 357.000
1 1 7 01 01 05 CNP 125 mm x 60 mm x 2,1 mm x 6 Meter Batang 361.563
1 1 7 01 01 05 CNP 75 mm x 1,7 mm x 6 Meter Batang 251.000
1 1 7 01 01 05 CNP 75 mm x 60 mm x 2,1 mm x 6 Meter Batang 299.550
1 1 7 01 01 05 Besi Strip 4 x 38 mm x 6 Meter Kg 15.750
1 1 7 01 01 05 006 Karet
1 1 7 01 01 05 Expansion Join Tipe Rubber M1 1.515.000
1 1 7 01 01 08 001 Bahan/Bibit Tanaman Pertanian
1 1 7 01 01 08 Durian Durian Bangkok Batang 140.200
1 1 7 01 01 08 Durian Bangkok Montong(Durio Ziblhenus Mur) Okulasi 168.300

1 1 7 01 01 08 Durian Matahari Okulasi 154.200


1 1 7 01 01 08 Durian Petruk Okulasi 154.200
1 1 7 01 01 08 Durian Suakino Okulasi 154.200
1 1 7 01 01 08 Durian Sukun Okulasi 154.200
1 1 7 01 01 08 Durian Sunan Okulasi 154.200
1 1 7 01 01 08 Jambu Jambu Air/Eugenia Sp T= 0,50 m Batang 126.200
1 1 7 01 01 08 Jambu Air/Eugenia Sp T= 1 m Batang 126.200
1 1 7 01 01 08 Jambu Klutuk (biji) / Syzygium Guajaya T = 0,50 Batang 42.000
m
1 1 7 01 01 08 Jambu Klutuk (biji) / Syzygium Guajaya T = 1,00 Batang 59.900
m
1 1 7 01 01 08 Jambu Mawar/Syzygium Jaboz T= 0,50 m Batang 74.900
1 1 7 01 01 08 Jambu Mawar/Syzygium Jaboz T= 1 m Batang 149.600
1 1 7 01 01 08 Jambu Laut/ Halarena Pubawcens T= 200-250 Batang 149.600
cm
1 1 7 01 01 08 Jambu Bangkok/Psidium SP T= 0,50 m Batang 59.900
1 1 7 01 01 08 Jambu Bangkok/Psidium SP T= 1 Batang 149.600
1 1 7 01 01 08 Jambu Darsono / Syzygium Mallaccenais T = Batang 59.900
0,50
1 1 7 01 01 08 Jambu Darsono / Syzygium Mallaccenais T = 1 Batang 74.900
m
1 1 7 01 01 08 Jambu Air 2 Varietas Degus T= 80 cm umur 2 Batang 179.600
tahun asal
1 1 7 01 01 08 Jambu Air Camplong Okulasi 99.500
1 1 7 01 01 08 Jambu Cingcolo Hijau ( Syzygium Aqireum ) Okulasi 104.800
1 1 7 01 01 08 Jambu Air Cingcolo Merah Okulasi 99.500
1 1 7 01 01 08 Jambu Air Kancing Okulasi 134.600
1 1 7 01 01 08 Jambu Air Klampok Okulasi 119.600
1 1 7 01 01 08 Jambu Air Lilin Okulasi 104.800
1 1 7 01 01 08 Jambu Bangkok (Psidium Guajava L) Okulasi 52.400
1 1 7 01 01 08 Jambu Bol Darsono (Syzygium Mallaccenais L) Okulasi 55.700

1 1 7 01 01 08 Jambu Mede/ Mente (Anacardium Ocicidentatel) Okulasi 134.600

1 1 7 01 01 08 Jambu Sukun Okulasi 149.400


1 1 7 01 01 08 Jambu Kristal Okulasi 168.300
1 1 7 01 01 08 Jambu Jamaika Okulasi 149.400
1 1 7 01 01 08 Jeruk Jeruk Dali ( Citrus Maksimaburin Merr ) Okulasi 59.900
1 1 7 01 01 08 Jeruk Bali ( Citrus Grandia T= 0,50 m ) Batang 179.600
1 1 7 01 01 08 Jeruk Keprok Garut ( Citrus Nobilis Lour ) Okulasi 59.700
1 1 7 01 01 08 Jeruk Kingkil ( Tripacia Intolia Burm P.Wills ) Okulasi 49.500
1 1 7 01 01 08 Jeruk Manis (Citrus Auran Tiace Lour ) Okulasi 59.700
1 1 7 01 01 08 Jeruk Nipis ( Citrus Ouran Tipoli Chrism Pena ) Okulasi 59.700

1 1 7 01 01 08 Jeruk Purut ( Citrus Histrik DC ) Okulasi 59.700


1 1 7 01 01 08 Mangga Mangga T = 0,50 m Batang 79.600
1 1 7 01 01 08 Mangga T = 1 m Batang 140.200
1 1 7 01 01 08 Mangga T = 0,75 m Batang 134.600
1 1 7 01 01 08 Mangga 2 Varietas Gadung T = 2 m umur 5 Batang 112.100
tahun asal
1 1 7 01 01 08 Mangga 2 Varietas Gadung T = 15 m umur 3 Batang 89.900
tahun asal
1 1 7 01 01 08 Mangga Apel Okulasi 70.100
1 1 7 01 01 08 Mangga Arumanis Okulasi 119.200
1 1 7 01 01 08 Mangga Gadung T = 0,50 m Okulasi 70.100
1 1 7 01 01 08 Mangga Gedong Gincu Okulasi 89.900
1 1 7 01 01 08 Mangga Golek Okulasi 149.600
1 1 7 01 01 08 Mangga Indramayu Okulasi 149.600
1 1 7 01 01 08 Mangga Kelapa Okulasi 134.600
1 1 7 01 01 08 Mangga Madu Anggur Okulasi 119.600
1 1 7 01 01 08 Mangga Manalagi ( Aenapera Indico Lour ) T = 1 Okulasi 149.600
m
1 1 7 01 01 08 Mangga Nam Dok Mel Okulasi 29.900
1 1 7 01 01 08 Rambutan T = 1 m Batang 149.600
1 1 7 01 01 08 Rambutan Aceh Lebak ( Nephelium Lappaceam Okulasi 149.600
Lour )
1 1 7 01 01 08 Rambutan Binjae Okulasi 119.200
1 1 7 01 01 08 Rambutan Rapiah Okulasi 124.800
1 1 7 01 01 08 Nangka Nangka T = 0,50 m Batang 79.600
1 1 7 01 01 08 Sawo Sawo Kecik/ Manikara Kauzi T = 0,50 m Batang 70.100
1 1 7 01 01 08 Sawo Kecik/ Manikara Kauzi T = 1 m Batang 79.600
1 1 7 01 01 08 Sawo Manila / Achras Zapola T = 0,50 m Batang 99.700
1 1 7 01 01 08 Sawo Manila / Achras Zapola T = 1 m Batang 129.700
1 1 7 01 01 08 Sawo Durian / Chryssophylium Cainilo T = 150- Batang 49.800
200 m
1 1 7 01 01 08 Belimbing Manis Belimbing Manis T = 0,50 m Batang 70.100
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 08 Belimbing Manis T = 1 m Batang 149.600
1 1 7 01 01 08 Belimbing Demak ( Averhoa Carambola Lour ) Okulasi 140.200

1 1 7 01 01 08 Belimbing Dewi Okulasi 149.600


1 1 7 01 01 08 Belimbing Penang Okulasi 62.400
1 1 7 01 01 08 Belimbing Philipina Okulasi 62.400
1 1 7 01 01 08 Belimbing Wulan Okulasi 99.700
1 1 7 01 01 08 Belimbing Wuluh ( Averca Blimbi Lour ) Okulasi 87.300
1 1 7 01 01 08 Kelengkeng Kelengkeng T = 0,50 m Batang 140.200
1 1 7 01 01 08 Kelengkeng T = 1 m Batang 299.300
1 1 7 01 01 08 Benih Tanaman Aglonema T = 15 cm 5 bulan asal wadah pot Batang 70.100
1 1 7 01 01 08 Alpokat T = 50 cm Batang 105.100
1 1 7 01 01 08 Alpokat Mentega ( Persea Americana MW ) Sambung 59.700
1 1 7 01 01 08 Antorium Lokal Stek 164.600
Batang
1 1 7 01 01 08 Benih Bayam Gram 500
1 1 7 01 01 08 Benih Kangkung Gram 300
1 1 7 01 01 08 Benih Kacang Panjang Gram 1.000
1 1 7 01 01 08 Benih Pare Gram 8.000
1 1 7 01 01 08 Benih Melon Pack 210.300
1 1 7 01 01 08 Benih Sayur Kol Pack 374.000
1 1 7 01 01 08 Benih Sawi Gram 10.500
1 1 7 01 01 08 Benih Sawi Kg 21.000
1 1 7 01 01 08 Benih Timun Gram 10.000
1 1 7 01 01 08 Benih Cabe Batang 1.600
1 1 7 01 01 08 Benih Cabe Gram 35.000
1 1 7 01 01 08 Benih Jamur Kayu Log 9.100
1 1 7 01 01 08 Benih Tomat Pack 374.000
1 1 7 01 01 08 Benih Semangka Gram 19.900
1 1 7 01 01 08 Benih Terong Gram 11.200
1 1 7 01 01 08 Pisang Ambon ( Musa Paradisiaca Lour ) Kultur 74.900
Jaringan
1 1 7 01 01 08 Pisang Cavendia Kultur 74.900
Jaringan
1 1 7 01 01 08 Pisang Raja Kultur 87.300
Jaringan
1 1 7 01 01 08 Benih Salak Betina Pohon 69.800
1 1 7 01 01 08 Benih Salak Jantan Pohon 89.700
1 1 7 01 01 08 Sayuran dalam pot T = 10 cm umur 2 tahun asal Batang 61.300
biji
1 1 7 01 01 08 Sirsak Manis ( Aroma Murkala Lour ) Sambung 70.100
1 1 7 01 01 08 Sirsak Ratu Sambung 124.800
1 1 7 01 01 08 Sayuran dalam pot T = 10 cm umur 2 tahun asal Ikat 9.100
biji
1 1 7 01 01 08 Sukun ( Artokarpus Komunis Porsi ) Tunas 124.800
1 1 7 01 01 08 Tanaman Toga T = 15 cm umur 2 bulan Batang 29.900
1 1 7 01 01 08 Adenium Induk Buah 1.002.400
1 1 7 01 01 08 Adenium Benihan dari Biji Buah 85.300
1 1 7 01 01 08 Stek Adenium Lokal Buah 37.400
1 1 7 01 01 08 Benih Cabe Kecil,Besar,Sawi Buah 70.300
1 1 7 01 01 08 Tanaman Toga Buah 1.200
1 1 7 01 01 08 Duku Batang 59.700
1 1 7 01 01 08 Markisa Okulasi 149.600
1 1 7 01 01 08 Pulasan Okulasi 49.800
1 1 7 01 01 08 Pepaya Batang 19.900
1 1 7 01 01 08 Nenas Anakan 10.000
1 1 7 01 01 08 Bougenvil Bougenvil Biasa/Bougenvilea SP T = 0,50 m Batang 80.900
1 1 7 01 01 08 Bougenvil Biasa/Bougenvilea SP T = 1 m Batang 161.700
1 1 7 01 01 08 Bougenvil Varia ge/Bougenvilea SP T = 0,50 m Batang 89.900

1 1 7 01 01 08 Bougenvil Biasa/Bougenvilea SP T = 0,50 m Batang 179.600


1 1 7 01 01 08 Bougenvil Ungu Batang 89.900
1 1 7 01 01 08 Bougenvil Pagar Batang 44.900
1 1 7 01 01 08 Cendrawasih / Philatus Ninuri T = 0,02 m Batang 37.400
1 1 7 01 01 08 Cemara Cemara Angin / Cassuarina Equsetifolia T = 1 m Batang 389.000

1 1 7 01 01 08 Cemara Angin / Cassuarina Equsetifolia T = 1,5 Batang 359.000


m
1 1 7 01 01 08 Cemara Rentes / Cassuarina SP T = 1 m Batang 179.600
1 1 7 01 01 08 Cemara Udang T = 1,50 m Batang 359.000
1 1 7 01 01 08 Cemara Kipas / Thuja Occidentalis T = 1 m Batang 59.900
1 1 7 01 01 08 Cemara Kipas / Thuja Occidentalis T = 1,5 m Batang 89.900
1 1 7 01 01 08 Cemara Pentris / Araucaria SP T = 1 m Batang 538.600
1 1 7 01 01 08 Cemara Pentris / Araucaria SP T = 1,5 m Batang 658.300
1 1 7 01 01 08 Kamboja Kamboja Jepang T = 0,50 m Batang 134.600
1 1 7 01 01 08 Kamboja Jepang T = 1 m Batang 269.300
1 1 7 01 01 08 Kamboja / Plumera SP T = 2- 2,5 m Batang 538.600
1 1 7 01 01 08 Kamboja Bunga Putih / Plumeriawhite T = 1 m Batang 179.600
1 1 7 01 01 08 Kamboja Bali T = 0,50 m Batang 239.300
1 1 7 01 01 08 Kana /Canna Hybrida T = 0,50 m Batang 59.900
1 1 7 01 01 08 Kamboja Batang 89.900
1 1 7 01 01 08 Kamboja Merah Batang 493.700
1 1 7 01 01 08 Kamboja Kuning Batang 493.700
1 1 7 01 01 08 Kamboja Merah Muda T = 1,5 m Batang 1.226.800
1 1 7 01 01 08 Kawisto / Feronika Limonia Swingle Batang 179.600
1 1 7 01 01 08 Kawisto / Feronika Limonia Swingle T = 1 m Batang 927.500
1 1 7 01 01 08 Buah Mentega Siap Tanam Batang 99.700
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 08 Benih Bendan Siap Tanam, T = 0,50 m,..T = 1 m Batang 137.200
1 1 7 01 01 08 Buah Naga Tinggi Tanaman 30 cm Stek 87.300
1 1 7 01 01 08 Manggis Manggis Okulasi siap tanam Okulasi 89.700
1 1 7 01 01 08 Manggis Seedling siap tanam Seedling 71.800
1 1 7 01 01 08 Benih Pisang Anakan Pisang siap Tanam Anakan 18.000
1 1 7 01 01 08 Pisang Bengkulu Anakan 16.200
1 1 7 01 01 08 Pisang Barangan Anakan 13.800
1 1 7 01 01 08 Benih Tanaman Hias Anggrek Jemes Stori Stek 8.700
1 1 7 01 01 08 Anggrek Apple Blosom Stek 10.700
1 1 7 01 01 08 Anggrek Panda Genta Bandung Stek 10.700
1 1 7 01 01 08 Anggrek Panda Pensil Stek 4.700
1 1 7 01 01 08 Anggrek Kala Jengking Stek 4.700
1 1 7 01 01 08 Anggrek Oncidium Pot 68.800
1 1 7 01 01 08 Anggrek Dendorium Pot 68.800
1 1 7 01 01 08 Bunga Nangkas Batang 4.700
1 1 7 01 01 08 Asoka Batang 11.300
1 1 7 01 01 08 Melati Puring Batang 14.800
1 1 7 01 01 08 Kemuning Batang 8.200
1 1 7 01 01 08 Puring Batang 7.100
1 1 7 01 01 08 Benih Padi Benih Pejenis Kg 199.100
1 1 7 01 01 08 Benih Dasar Kg 99.500
1 1 7 01 01 08 Benih Pokok Kg 39.800
1 1 7 01 01 08 Benih Sebar Kg 21.900
1 1 7 01 01 08 Benih jagung Benih Pokok Kg 29.900
1 1 7 01 01 08 Benih Sebar Kg 23.900
1 1 7 01 01 08 Jagung Hibrida Kg 168.300
1 1 7 01 01 08 Jagung Manis Pack 258.900
1 1 7 01 01 08 Kedelai Benih pokok Kg 69.800
1 1 7 01 01 08 Benih Sebar Kg 49.800
1 1 7 01 01 08 Kacang Hijau Benih pokok Kg 79.600
1 1 7 01 01 08 Benih Sebar Kg 49.800
1 1 7 01 01 08 Ubi Kayu Stek 1.000
1 1 7 01 01 08 Kacang Tanah Benih pokok Kg 69.800
1 1 7 01 01 08 Benih Sebar Kg 49.800
1 1 7 01 01 08 002 Bahan/Bibit Tanaman Perkebunan
1 1 7 01 01 08 Bibit kelapa sawit dalam polybag Pohon 52.000
1 1 7 01 01 08 Kecamba kelapa sawit tenera Stut 16.000
1 1 7 01 01 08 Bibit kelapa hibrida sudah berdaun empat Pohon 26.000
1 1 7 01 01 08 Bibit kelapa kopyor sudah berdaun empat Pohon 310.000
1 1 7 01 01 08 bibit kopi dalam polybag asal okulasi Pohon 21.000
1 1 7 01 01 08 bibit kopi asal stek umur 3-6 bulan Batang 11.000
1 1 7 01 01 08 benih kopi unggul Biji 1.000
1 1 7 01 01 08 bibit kakao dalam polybag asal okulasi Pohon 26.000
1 1 7 01 01 08 bibit kakao unggul Biji 11.000
1 1 7 01 01 08 bibit pinang dalam polybag Pohon 16.000
1 1 7 01 01 08 bibit sagu berakar, bertunas 2-3 daun baru Pohon 26.000
1 1 7 01 01 08 bibit sagu pelepah 30-40 cm Batang 5.000
1 1 7 01 01 08 bibit karet dalam polybag asal okulasi Pohon 21.000
1 1 7 01 01 08 bibit karet unggul Biji 1.000
1 1 7 01 01 08 bibit lada dalam polybag asal stek akar 5-7 ruas Pohon 21.000
1 1 7 01 01 08 bibit lada Dalam polybag asal stek akar 4-5 ruas Batang 6.000
1 1 7 01 01 08 Rumput gajah mini M2 70.900
1 1 7 01 01 08 Gebalan rumput paitan M2 34.100
1 1 7 01 01 09 ISI TABUNG PEMADAM KEBAKARAN
1 1 7 01 01 09 001 Isi tabung pemadam kebakaran 3 Kg ABC Powder
1 1 7 01 01 09 Tabung pemadam kebakaran 3 Kg Buah 925.600
1 1 7 01 01 09 Isi DRY CHEMICAL POWDER Unit 41.200
1 1 7 01 01 09 CARBON DIOXIDE (CO2) Unit 41.200
1 1 7 01 01 09 Foam Liquid Unit 46.400
1 1 7 01 01 09 Foam AFFF 6% Unit 51.510
1 1 7 01 01 10 ISI TABUNG GAS
1 1 7 01 01 10 001 Isi tabung gas oksigen
1 1 7 01 01 10 Isi tabung gas oksigen 0,75 m3 0,75 m3 M3 15.400
1 1 7 01 01 10 Isi tabung gas oksigen 1 m3 1 M3 M3 20.600
1 1 7 01 01 10 Isi tabung gas oksigen 1,5 m3 1,5 M3 M3 25.700
1 1 7 01 01 10 Isi tabung gas oksigen 2 m3 2 M3 M3 30.900
1 1 7 01 01 10 002 Isi tabung gas elpiji
1 1 7 01 01 10 Isi tabung gas elpiji 3 Kg 3 Kg Kg 41.000
1 1 7 01 01 10 Isi tabung gas elpiji 5,5 Kg 5,5 Kg Kg 71.200
1 1 7 01 01 10 Isi tabung gas elpiji 12 Kg 12 Kg Kg 150.500
1 1 7 01 01 11 BAHAN/BIBIT TERNAK/BIBIT IKAN
1 1 7 01 01 11 001 Bahan/Bibit Ternak
1 1 7 01 01 11 Bibit Sapi
1 1 7 01 01 11 Bakalan PO PO 1,5 tahun Ekor 17.020.000
1 1 7 01 01 11 Bibit jantan PO PO 2 tahun Ekor 18.155.000
1 1 7 01 01 11 Bibit betina PO PO1,5 tahun Ekor 14.751.000
1 1 7 01 01 11 Bakalan Simental Simental 1,5 tahun Ekor 20.424.000
1 1 7 01 01 11 Bibit jantan Simental Simental 2 tahun Ekor 22.693.000
1 1 7 01 01 11 Bibit Betina Simental Simental 1,5 tahun Ekor 20.424.000
1 1 7 01 01 11 Bakalan FH FH 1,5 tahun Ekor 15.886.000
1 1 7 01 01 11 Bibit Jantan FH FH 2 tahun Ekor 16.504.000
1 1 7 01 01 11 Bibit Betina FH FH 1,5 tahun Ekor 15.215.000
1 1 7 01 01 11 Bakalan Brahman Cross (BC) BC 1,5 tahun Ekor 18.567.000
1 1 7 01 01 11 Bibit Jantan Brahman Cross (BC) BC 2 tahun Ekor 20.630.000
1 1 7 01 01 11 Bibit Betina Brahman Cross (BC) BC 1,5 tahun Ekor 20.424.000
1 1 7 01 01 11 Sapi Bali Jantan 2 Tahun Ekor 12.482.000
1 1 7 01 01 11 Sapi Bali Betina 2 Tahun Ekor 11.347.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 01 11 Bibit Kerbau
1 1 7 01 01 11 Bakalan Kerbau 1.5 - 2 Tahun/Ekor Ekor 18.722.000
1 1 7 01 01 11 Bibit jantan Kerbau 2 Tahun/Ekor Ekor 19.290.000
1 1 7 01 01 11 Bibit betina Kerbau 1.5 - 2 Tahun/Ekor Ekor 18.155.000
1 1 7 01 01 11 Bibit Ayam
1 1 7 01 01 11 Bibit jantan Buras (7 - 8 th)/ Ekor Ekor 75.000
1 1 7 01 01 11 Bibit betina Buras (5 - 6 th)/ Ekor Ekor 86.000
1 1 7 01 01 11 DOC Broiler 100 Ekor Ekor 693.000
1 1 7 01 01 11 DOC Petelur 100 Ekor Ekor 767.000
1 1 7 01 01 11 Bibit Itik
1 1 7 01 01 11 Bibit jantan Lakal (7 - 8 th)/ Ekor Ekor 80.000
1 1 7 01 01 11 Bibit betina Lokal (8 - 12 th)/ Ekor Ekor 86.000
1 1 7 01 01 11 DOC Broiler 100 Ekor Ekor 227.000
1 1 7 01 01 11 DOC Petelur 100 Ekor Ekor 398.000
1 1 7 01 01 11 Bibit Kambing
1 1 7 01 01 11 Betina 7 - 8 bulan Ekor 1.759.000
1 1 7 01 01 11 Jantan 7 - 8 bulan Ekor 1.986.000
1 1 7 01 01 11 Bibit jantan Kambing PE (12 - 18 th)/ Ekor Ekor 2.837.000
1 1 7 01 01 11 Bibit betina Kambing 8 - 12 th/ Ekor Ekor 1.986.000
1 1 7 01 01 11 Bibit Kelinci
1 1 7 01 01 11 Bibit Jantan 7 - 8 bulan Ekor 155.000
1 1 7 01 01 11 Bibit Betina 7 - 8 bulan Ekor 129.000
1 1 7 01 01 11 002 Bahan/Bibit Ikan
1 1 7 01 01 11 Mas 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 8 - 12 Cm Ekor 1.000
1 1 7 01 01 11 Nila 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 8 - 12 Cm Ekor 1.000
1 1 7 01 01 11 Semah 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 8 - 12 Cm Ekor 1.000
1 1 7 01 01 11 Lele 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 Bedik 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 Barau 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 01 11 Belut 3 - 5 Cm Ekor 1.000
1 1 7 01 01 11 5 - 8 Cm Ekor 1.000
1 1 7 01 02 SUKU CADANG
1 1 7 01 02 01 SUKU CADANG ALAT ANGKUTAN
1 1 7 01 02 01 001 Suku Cadang Alat Angkutan Darat Bermotor
1 1 7 01 02 01 ACCU MOBIL YUASA
1 1 7 01 02 01 NS-40 (L) Buah 511.000
1 1 7 01 02 01 N -40 Z (XL) Buah 697.000
1 1 7 01 02 01 N -50 Buah 877.000
1 1 7 01 02 01 N -50 Z 9XL) Buah 980.000
1 1 7 01 02 01 NS-70 Buah 1.084.000
1 1 7 01 02 01 N -100 Buah 1.702.000
1 1 7 01 02 01 N -100 Buah 920.000
1 1 7 01 02 01 12V-32 AH Buah 723.000
1 1 7 01 02 01 12V-40 AH Buah 269.000
1 1 7 01 02 01 12V-50 AH Buah 289.000
1 1 7 01 02 01 12V-65 AH Buah 440.000
1 1 7 01 02 01 12V-120 AH Buah 744.000
1 1 7 01 02 01 BAN KENDARAAN RODA 4
1 1 7 01 02 01 MERK BRIKDGESTON UK.100X13 LUAR DALAM Pasang 661.000
1 1 7 01 02 01 UK.175X70X13 LUAR DALAM Pasang 697.000
1 1 7 01 02 01 UK.185/70X30 LUAR DALAM Pasang 630.000
1 1 7 01 02 01 UK.235/70 LUAR DALAM Pasang 1.109.000
1 1 7 01 02 01 Ban Truck Buah 1.759.000
1 1 7 01 02 01 GT RADIAL Tipe Champiro HPY
1 1 7 01 02 01 205/55 ZR16 94W XL Buah 1.006.000
1 1 7 01 02 01 245/40 ZR17 95Y XL Buah 1.733.000
1 1 7 01 02 01 205/45 ZR17 88W XL Buah 1.249.000
1 1 7 01 02 01 215/45 R17 91Y XL Buah 1.290.000
1 1 7 01 02 01 225/45 ZR17 94Y XL Buah 1.382.000
1 1 7 01 02 01 235/45 ZR17 94Y Buah 1.408.000
1 1 7 01 02 01 235/45 ZR17 99Y XL Buah 1.548.000
1 1 7 01 02 01 205/50 ZR17 93W XL Buah 1.311.000
1 1 7 01 02 01 225/50 ZR17 98Y XL Buah 1.599.000
1 1 7 01 02 01 235/50 ZR17 100Y XL Buah 1.733.000
1 1 7 01 02 01 215/55 ZR17 94W Buah 1.238.000
1 1 7 01 02 01 225/65 R17 102V Buah 1.137.000
1 1 7 01 02 01 255/35 ZR18 94Y XL Buah 2.043.000
1 1 7 01 02 01 265/35 ZR18 97Y XL Buah 2.113.000
1 1 7 01 02 01 205/40 ZR18 86Y XL Buah 1.393.000
1 1 7 01 02 01 Tipe Champiro HPX
1 1 7 01 02 01 195/50 ZR15 82 XL Buah 897.000
1 1 7 01 02 01 205/50 ZR16 91 XL Buah 997.000
1 1 7 01 02 01 205/55 ZR16 94W XL Buah 1.019.000
1 1 7 01 02 01 215/55 ZR16 97W XL Buah 1.095.000
1 1 7 01 02 01 225/60 ZR16 102W XL Buah 1.109.000
1 1 7 01 02 01 235/60 ZR16 104W XL Buah 1.138.000
1 1 7 01 02 01 205/40 ZR17 84W XL Buah 1.235.000
1 1 7 01 02 01 215/40 ZR17 87W XL Buah 1.284.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 02 01 Tipe Champiro GTX
1 1 7 01 02 01 185/65 R13 84H Buah 643.000
1 1 7 01 02 01 185/60 R14 82V Buah 685.000
1 1 7 01 02 01 195/60 R14 86V Buah 734.000
1 1 7 01 02 01 185/65 R14 89H Buah 686.000
1 1 7 01 02 01 195/65 R14 89H Buah 749.000
1 1 7 01 02 01 195/60 R14 88H Buah 800.000
1 1 7 01 02 01 205/60 R15 91V Buah 864.000
1 1 7 01 02 01 225/60 R15 96V Buah 971.000
1 1 7 01 02 01 195/65 R15 91V Buah 830.000
1 1 7 01 02 01 205/65 R15 94V Buah 865.000
1 1 7 01 02 01 205/60 R16 92H Buah 1.038.000
1 1 7 01 02 01 Tipe Champiro 50
1 1 7 01 02 01 195/50 R16 84V Buah 935.000
1 1 7 01 02 01 Tipe Champiro BAX 2
1 1 7 01 02 01 185/55 R14 80H Buah 739.000
1 1 7 01 02 01 195/50 R15 82V Buah 878.000
1 1 7 01 02 01 205/50 R15 86V Buah 904.000
1 1 7 01 02 01 185/55 R15 82V Buah 821.000
1 1 7 01 02 01 195/55 R15 85V Buah 911.000
1 1 7 01 02 01 205/55 R15 88V Buah 948.000
1 1 7 01 02 01 195/60 R15 88V Buah 784.000
1 1 7 01 02 01 205/60 R15 91V Buah 847.000
1 1 7 01 02 01 225/60 R15 96V Buah 977.000
1 1 7 01 02 01 195/65 R15 91V Buah 823.000
1 1 7 01 02 01 205/50 R16 87V Buah 999.000
1 1 7 01 02 01 185/55 R16 83V Buah 970.000
1 1 7 01 02 01 205/55 R16 91V Buah 1.007.000
1 1 7 01 02 01 215/55 R16 93V Buah 1.035.000
1 1 7 01 02 01 205/60 R16 92V Buah 986.000
1 1 7 01 02 01 215/60 R16 95V Buah 1.008.000
1 1 7 01 02 01 225/60 R16 98V Buah 1.062.000
1 1 7 01 02 01 Tipe Champiro BXT
1 1 7 01 02 01 175/60 R13 77H Buah 529.000
1 1 7 01 02 01 185/60 R13 80H Buah 562.000
1 1 7 01 02 01 165/60 R13 77T Buah 550.000
1 1 7 01 02 01 175/65 R13 80T Buah 559.000
1 1 7 01 02 01 185/60 R14 82 T/H Buah 644.000
1 1 7 01 02 01 195/60 R14 86H Buah 672.000
1 1 7 01 02 01 165/65 R14 79T Buah 568.000
1 1 7 01 02 01 175/65 R14 82H Buah 579.000
1 1 7 01 02 01 185/65 R14 86H Buah 642.000
1 1 7 01 02 01 195/65 R14 89H Buah 703.000
1 1 7 01 02 01 185/60 R15 88H XL Buah 725.000
1 1 7 01 02 01 195/60 R15 88H Buah 752.000
1 1 7 01 02 01 205/60 R15 91H Buah 815.000
1 1 7 01 02 01 165/65 R15 81H Buah 644.000
1 1 7 01 02 01 185/65 R15 88H Buah 759.000
1 1 7 01 02 01 195/65 R15 91H Buah 787.000
1 1 7 01 02 01 205/65 R15 94H Buah 816.000
1 1 7 01 02 01 215/65 R15 96H Buah 876.000
1 1 7 01 02 01 205/60 R16 92H Buah 969.000
1 1 7 01 02 01 215/60 R16 95H Buah 981.000
1 1 7 01 02 01 225/60 R16 98H Buah 1.030.000
1 1 7 01 02 01 215/65 R16 98H Buah 926.000
1 1 7 01 02 01 Tipe Champiro ECO
1 1 7 01 02 01 185/60 R13 80H Buah 548.000
1 1 7 01 02 01 165/65 R13 77T Buah 516.000
1 1 7 01 02 01 175/65 R13 80T Buah 54.000
1 1 7 01 02 01 155/70 R13 7ST Buah 434.000
1 1 7 01 02 01 175/70 R13 82H Buah 498.000
1 1 7 01 02 01 165/80 R13 83T Buah 467.000
1 1 7 01 02 01 185/60 R14 82H Buah 618.000
1 1 7 01 02 01 175/65 R14 86T Buah 556.000
1 1 7 01 02 01 185/65 R14 86H Buah 611.000
1 1 7 01 02 01 185/70 R14 88H Buah 607.000
1 1 7 01 02 01 195/70 R14 91H Buah 683.000
1 1 7 01 02 01 185/80 R14 91S Buah 681.000
1 1 7 01 02 01 195/60 R15 88H Buah 714.000
1 1 7 01 02 01 205/60 R15 91H Buah 774.000
1 1 7 01 02 01 175/65 R15 84H Buah 650.000
1 1 7 01 02 01 185/65 R15 88H Buah 678.000
1 1 7 01 02 01 195/65 R15 91H Buah 727.000
1 1 7 01 02 01 205/60 R15 94H Buah 797.000
1 1 7 01 02 01 215/65 R15 96H Buah 833.000
1 1 7 01 02 01 205/60 R16 92H Buah 921.000
1 1 7 01 02 01 Tipe Savero M/T
1 1 7 01 02 01 235/75 R15 104/101Q RWL Buah 1.247.000
1 1 7 01 02 01 31x10.5 R15 6PR 109Q OWL Buah 1.633.000
1 1 7 01 02 01 33x12.5 R15 6PR 108Q OWL Buah 1.948.000
1 1 7 01 02 01 245x75 R16 120/116Q RWL Buah 1.848.000
1 1 7 01 02 01 265/75 R16 112/109Q RWL Buah 1.888.000
1 1 7 01 02 01 Tipe Savero Komodo M/T
1 1 7 01 02 01 235/75 R15 104Q RWL Buah 1.299.000
1 1 7 01 02 01 31x10.5 R15 6PR 109Q OWL Buah 1.672.000
1 1 7 01 02 01 265/75 R16 112Q RWL Buah 1.950.000
1 1 7 01 02 01 Tipe Savero A/T Plus
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 02 01 205/70 R15 96T Buah 953.000
1 1 7 01 02 01 235/75 R15 105T Buah 1.099.000
1 1 7 01 02 01 235/70 R15 103S OWL Buah 1.109.000
1 1 7 01 02 01 265/70 R15 112T Buah 1.377.000
1 1 7 01 02 01 30x9.5 R15 LT 104S OWL Buah 1.322.000
1 1 7 01 02 01 31x10.5 R15 LT 109S OWL Buah 1.550.000
1 1 7 01 02 01 245/70 R16 111S Buah 1.532.000
1 1 7 01 02 01 265/70 R16 112T Buah 1.590.000
1 1 7 01 02 01 275/70 R16 114T OWL Buah 1.662.000
1 1 7 01 02 01 225/75 R16 104T Buah 1.396.000
1 1 7 01 02 01 245/75 R16 111T Buah 1.560.000
1 1 7 01 02 01 265/75 R16 116T Buah 1.615.000
1 1 7 01 02 01 265/60 R17 108T Buah 1.624.000
1 1 7 01 02 01 265/65 R17 112T Buah 1.723.000
1 1 7 01 02 01 275/65 R17 115T Buah 1.788.000
1 1 7 01 02 01 DUNLOP 155/80 R12 SP10 Buah 342.000
1 1 7 01 02 01 185/70 R14 SP10 Buah 551.000
1 1 7 01 02 01 185/65 R15 SP10 Buah 594.000
1 1 7 01 02 01 185/65 R15 SP300 Buah 621.000
1 1 7 01 02 01 165/80 R13 PROSAFER Buah 391.000
1 1 7 01 02 01 165 R13 8PR LT5 Buah 466.000
1 1 7 01 02 01 175 R13 8PR LT5 Buah 562.000
1 1 7 01 02 01 185 R14 8PR LT5 Buah 632.000
1 1 7 01 02 01 20565 R15 D80V4 Buah 709.000
1 1 7 01 02 01 235/70 R15 TG30 Buah 7.956.000
1 1 7 01 02 01 30x9,5 R15 AT1 Buah 1.112.000
1 1 7 01 02 01 31x10,5 R15 AT1 Buah 1.223.000
1 1 7 01 02 01 235/75 R15 109S RF AT22 Buah 1.393.000
1 1 7 01 02 01 27x8,50 R14 LT95Q MT2 Buah 805.000
1 1 7 01 02 01 31x10,5 R15 LT9QMT2 Buah 1.140.000
1 1 7 01 02 01 265/75 R16 MT2 Buah 1.394.000
1 1 7 01 02 01 205/55 VR16 DIREZZA101 Buah 892.000
1 1 7 01 02 01 195/50 VR16 DIREZZA101 Buah 761.000
1 1 7 01 02 01 215/50 VR17 DIREZZA101 Buah 919.000
1 1 7 01 02 01 205/45 WR17 DIREZZA101 Buah 753.000
1 1 7 01 02 01 215/45 WR17 DIREZZA101 Buah 751.000
1 1 7 01 02 01 225/45 WR18 DIREZZA101 Buah 1.000.000
1 1 7 01 02 01 225/40 WR18 DIREZZA101 Buah 764.000
1 1 7 01 02 01 235/40 WR18 DIREZZA101 Buah 1.000.000
1 1 7 01 02 01 215/40 WR18 DIREZZA101 Buah 741.000
1 1 7 01 02 01 Tipe LM dan SP TOURING
1 1 7 01 02 01 185/70 HR14 LM704 Buah 595.000
1 1 7 01 02 01 195/70 HR14 LM704 Buah 621.000
1 1 7 01 02 01 205/70 HR14 LM704 Buah 645.000
1 1 7 01 02 01 205/70 HR15 LM704 Buah 667.000
1 1 7 01 02 01 215/70 HR15 LM704 Buah 713.000
1 1 7 01 02 01 185/65 HR14 LM704 Buah 615.000
1 1 7 01 02 01 185/65 HR15 LM704 Buah 656.000
1 1 7 01 02 01 195/65 HR15 LM704 Buah 676.000
1 1 7 01 02 01 205/65 HR15 LM704 Buah 768.000
1 1 7 01 02 01 215/65 HR16 LM704 Buah 793.000
1 1 7 01 02 01 175/60 HR15 LM704 Buah 564.000
1 1 7 01 02 01 185/60 HR14 LM704 Buah 667.000
1 1 7 01 02 01 185/60 HR15 LM704 Buah 761.000
1 1 7 01 02 01 195/60 HR15 LM704 Buah 756.000
1 1 7 01 02 01 195/60 HR14 LM704 Buah 720.000
1 1 7 01 02 01 205/60 HR15 LM704 Buah 775.000
1 1 7 01 02 01 215/60 HR16 LM704 Buah 831.000
1 1 7 01 02 01 215/60 HR17 LM704 Buah 877.000
1 1 7 01 02 01 215/60 HR15 LM704 Buah 810.000
1 1 7 01 02 01 225/60 HR18 LM704 Buah 919.000
1 1 7 01 02 01 185/55 VR15 LM704 Buah 620.000
1 1 7 01 02 01 195/55 VR15 LM704 Buah 651.000
1 1 7 01 02 01 195/55 VR16 LM704 Buah 790.000
1 1 7 01 02 01 195/55 VR16 LM704 Buah 85.000
1 1 7 01 02 01 205/55 VR16 LM704 Buah 827.000
1 1 7 01 02 01 215/55 VR16 LM704 Buah 760.000
1 1 7 01 02 01 225/55 VR17 LM704 Buah 960.000
1 1 7 01 02 01 195/50 VR15 LM704 Buah 741.000
1 1 7 01 02 01 195/50 VR16 LM704 Buah 695.000
1 1 7 01 02 01 205/50 VR16 LM704 Buah 845.000
1 1 7 01 02 01 235/50 VR18 LM704 Buah 984.000
1 1 7 01 02 01 195/45 VR16 XLM704 Buah 634.000
1 1 7 01 02 01 205/45 ZR17 LM704 Buah 683.000
1 1 7 01 02 01 175/70 TR12 TI SP TOURING Buah 382.000
1 1 7 01 02 01 175/70 TR13 TI SP TOURING Buah 433.000
1 1 7 01 02 01 185/70 TR14 TI SP TOURING Buah 513.000
1 1 7 01 02 01 195/70 TR14 TI SP TOURING Buah 553.000
1 1 7 01 02 01 185/80 TR14 TI SP TOURING Buah 453.000
1 1 7 01 02 01 195/65 TR15 TI SP TOURING Buah 543.000
1 1 7 01 02 01 205/65 TR15 TI SP TOURING Buah 631.000
1 1 7 01 02 01 165/65 TR13 TI SP TOURING Buah 465.000
1 1 7 01 02 01 175/65 TR14 TI SP TOURING Buah 482.000
1 1 7 01 02 01 185/60 TR15 TI SP TOURING Buah 558.000
1 1 7 01 02 01 185/55 TR15 TI SP TOURING Buah 552.000
1 1 7 01 02 01 FILTER OLI TOYOTA KIJANG Buah 47.000
1 1 7 01 02 01 CARRY/SUZUKI Buah 47.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 02 01 DAIHATUS/FEROZA Buah 47.000
1 1 7 01 02 01 PANTHER Buah 68.000
1 1 7 01 02 01 TAFT Buah 68.000
1 1 7 01 02 01 PS Buah 47.000
1 1 7 01 02 01 L.300 Buah 114.000
1 1 7 01 02 01 Avanza Buah 68.000
1 1 7 01 02 01 Inova Buah 88.000
1 1 7 01 02 01 Triton Buah 181.000
1 1 7 01 02 01 Forturner Buah 119.000
1 1 7 01 02 01 Pajero Buah 191.000
1 1 7 01 02 01 KARPET LANTAI APV/Innova/Fortuner Set 265.000
1 1 7 01 02 01 Agya/Ayla Set 192.000
1 1 7 01 02 01 Avanza/Xenia/Ertiga/Mobilio Set 238.000
1 1 7 01 02 01 All New Avanza/All New Xenia Set 243.000
1 1 7 01 02 01 CRV/All New CRV Set 258.000
1 1 7 01 02 01 Grand Livina Set 196.000
1 1 7 01 02 01 Grand Max Set 241.000
1 1 7 01 02 01 Honda Freed Set 250.000
1 1 7 01 02 01 Honda Jazz/All New Jazz Set 192.000
1 1 7 01 02 01 Kijang Grand Depan Sambung Set 259.000
1 1 7 01 02 01 Kijang Grand Depan Pisah Set 233.000
1 1 7 01 02 01 Kijang 2000 Set 253.000
1 1 7 01 02 01 Panther Lama Depan Sambung Set 257.000
1 1 7 01 02 01 Panther Lama Depan Pisah Set 254.000
1 1 7 01 02 01 Panther New Set 259.000
1 1 7 01 02 01 Terios/Rush Set 233.000
1 1 7 01 02 01 Yaris Set 158.000
1 1 7 01 02 01 KARPET UNIVERSAL Comfort Set 148.000
1 1 7 01 02 01 Elegant (Semi Colour) Set 167.000
1 1 7 01 02 01 Elegant (Black) Set 148.000
1 1 7 01 02 01 Best Food Set 155.000
1 1 7 01 02 01 KARPET PICK UP Canter Set 71.000
1 1 7 01 02 01 COLT L-300 Set 52.000
1 1 7 01 02 01 COLT Diesel PS-100 Set 57.000
1 1 7 01 02 01 FUS0 Set 74.000
1 1 7 01 02 01 Grand Max Depan Set 60.000
1 1 7 01 02 01 Hilux Set 52.000
1 1 7 01 02 01 Hino Dutro Set 60.000
1 1 7 01 02 01 Kijang Grand Depan sambung Set 101.000
1 1 7 01 02 01 Panther Lama Depan Sambung Set 74.000
1 1 7 01 02 01 KARPET BAK PICK UP T 120 (146cm x 217cm x 8mm) Set 607.000
1 1 7 01 02 01 (HAMMER / POLOS) Futura (155cm x 230cm x 8mm) Set 714.000
1 1 7 01 02 01 L-300 (160cm x 240cm x 8mm) Set 735.000
1 1 7 01 02 01 L-300 (170cm x 260cm x 8mm) Set 836.000
1 1 7 01 02 01 Carry Extra (165cm x 225 cm x 8mm) Set 702.000
1 1 7 01 02 01 Zebra Jumbo (168cm x 235cm x 8mm) Set 756.000
1 1 7 01 02 01 PEMB RADIATOR MERK STT Kaleng 47.000
1 1 7 01 02 01 MINYAK REM MERK PRESTONO Liter 26.000
1 1 7 01 02 01 MERK GROWN B DOT 3 Kaleng 26.000
1 1 7 01 02 01 MINYAK GEMUK MERK ROTARYO,45 KG(G200) Kaleng 26.000
1 1 7 01 02 01 MERK ROTARY ,16 KG Kaleng 104.000
1 1 7 01 02 01 MERK TOP H1 TEMP Kaleng 47.000
1 1 7 01 02 01 AIR ACCU Botol 16.000
1 1 7 01 02 01 AIR HUAN Botol 16.000
1 1 7 01 02 01 HEAD UNIT AUDIO FIONER FH M.90 Unit 2.063.000
1 1 7 01 02 01 COMPRESON & LIGHT MINI Unit 325.000
1 1 7 01 02 01 PESAWAT RIG 1C HUNH POWER DUAL BAND Unit 4.720.000
1 1 7 01 02 01 AUDIO CAUITIK USA BP 5000&ASESORIS Unit 207.000
1 1 7 01 02 01 SIRENE BESAR Unit 191.000
1 1 7 01 02 01 SARUNG JOK LAND KRUISER Unit 2.579.000
1 1 7 01 02 01 TIANG BENDERA Unit 100.000
1 1 7 01 02 01 KARPET BRUDRU LAND KRUISER Unit 207.000
1 1 7 01 02 01 SELECON GLAZE AMWAR Unit 207.000
1 1 7 01 02 01 DEODORIZER ACR 134 Unit 57.000
1 1 7 01 02 01 LEATHER & TIRE Unit 57.000
1 1 7 01 02 01 SARINGAN BENSIN TOYOTA KIJANG Buah 47.000
1 1 7 01 02 01 SUZUKI Buah 47.000
1 1 7 01 02 01 DAITHASU/FEROZA Buah 47.000
1 1 7 01 02 01 PANTHER Buah 88.000
1 1 7 01 02 01 TAFT Buah 88.000
1 1 7 01 02 01 L.300 SOLAR Buah 114.000
1 1 7 01 02 01 Inova Buah 465.000
1 1 7 01 02 01 Fortuner Buah 465.000
1 1 7 01 02 01 Fotuner Solar Buah 465.000
1 1 7 01 02 01 Pajero Solar Buah 258.000
1 1 7 01 02 01 KLAKSON BOSCH Set 258.000
1 1 7 01 02 01 HELLA Set 362.000
1 1 7 01 02 01 DENSO Set 310.000
1 1 7 01 02 01 VELG RACING NRD 3.611.000
1 1 7 01 02 01 KEDUDUKAN PLAT KENDARAAN RODA 4 44.000
1 1 7 01 02 01 SENTER MOBIL 1.548.000
1 1 7 01 02 01 SENTER Biasa Police T6 Senter SWAT, 2 baterai 236.300
1 1 7 01 02 01 SENTER Biasa Police T6 Senter SWAT, 1 baterai 124.000
1 1 7 01 02 01 SARUNG MOBIL UNTUK SEDAN Buah 258.000
1 1 7 01 02 01 PARFUM MOBIL JOVAK 37.000
1 1 7 01 02 01 FARFUM SPAIY PUJI 129.000
1 1 7 01 02 01 TEMPAT TISU 181.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 02 01 002 Suku Cadang Alat Angkutan Darat Tak Bermotor
1 1 7 01 02 01 Yamaha Jupiter MX
1 1 7 01 02 01 Kampas rem depan Buah 78.000
1 1 7 01 02 01 Kampas rem belakang Buah 47.000
1 1 7 01 02 01 Kampas kopling Buah 98.000
1 1 7 01 02 01 Saringan udara Buah 47.000
1 1 7 01 02 01 Gir besar satu set Buah 176.000
1 1 7 01 02 01 piston Buah 129.000
1 1 7 01 02 01 Gigi Kopling Buah 62.000
1 1 7 01 02 01 Ring Piston Buah 129.000
1 1 7 01 02 01 Kabel Gas Buah 114.000
1 1 7 01 02 01 Jari-jari Buah 31.000
1 1 7 01 02 01 CDI Buah 217.000
1 1 7 01 02 01 Bola Lampu Depan Buah 21.000
1 1 7 01 02 01 Bola Lampu belakang Buah 6.000
1 1 7 01 02 01 Kanvas Rem Belakang Buah 47.000
1 1 7 01 02 01 Sokbreker Belakang Buah 378.000
1 1 7 01 02 01 Kabel Kopling Buah 47.000
1 1 7 01 02 01 Kaca spion Buah 31.000
1 1 7 01 02 01 Lampu Sein Depan Buah 31.000
1 1 7 01 02 01 Kabel KiloMeter Buah 31.000
1 1 7 01 02 01 Stang Piston Buah 272.000
1 1 7 01 02 01 Spat Board Belakang Buah 68.000
1 1 7 01 02 01 Spat Board depan Buah 57.000
1 1 7 01 02 01 Kabel rem Belakang Buah 11.000
1 1 7 01 02 01 Bussy Buah 21.000
1 1 7 01 02 01 Saklar Lampu Buah 62.000
1 1 7 01 02 01 Yamaha Jupiter Z
1 1 7 01 02 01 Kampas rem depan Buah 21.000
1 1 7 01 02 01 Kampas rem belakang Buah 47.000
1 1 7 01 02 01 Kampas kopling Buah 47.000
1 1 7 01 02 01 Saringan udara Buah 47.000
1 1 7 01 02 01 Gir besar satu set Buah 176.000
1 1 7 01 02 01 piston Buah 47.000
1 1 7 01 02 01 Gigi Kopling Buah 62.000
1 1 7 01 02 01 Ring Piston Buah 71.000
1 1 7 01 02 01 Kabel Gas Buah 37.000
1 1 7 01 02 01 Jari-jari Buah 31.000
1 1 7 01 02 01 CDI Buah 310.000
1 1 7 01 02 01 Bola Lampu Depan Buah 21.000
1 1 7 01 02 01 Bola Lampu belakang Buah 6.000
1 1 7 01 02 01 Kanvas Rem Belakang Buah 47.000
1 1 7 01 02 01 Sokbreker Belakang Buah 325.000
1 1 7 01 02 01 Kabel Kopling Buah 31.000
1 1 7 01 02 01 Kaca spion Buah 21.000
1 1 7 01 02 01 Lampu Sein Depan Buah 47.000
1 1 7 01 02 01 Kabel KiloMeter Buah 31.000
1 1 7 01 02 01 Stang Piston Buah 171.000
1 1 7 01 02 01 Spat Board Belakang Buah 47.000
1 1 7 01 02 01 Spat Board depan Buah 68.000
1 1 7 01 02 01 Kabel rem Belakang Buah 11.000
1 1 7 01 02 01 Bussy Buah 21.000
1 1 7 01 02 01 Saklar Lampu Buah 42.000
1 1 7 01 02 01 MEGA PRO
1 1 7 01 02 01 Piston asli Buah 47.000
1 1 7 01 02 01 Ring Piston Buah 78.000
1 1 7 01 02 01 Kabel Gas Buah 42.000
1 1 7 01 02 01 Kabel Kopling Buah 37.000
1 1 7 01 02 01 CDI Buah 150.000
1 1 7 01 02 01 Bola Lampu Depan Buah 21.000
1 1 7 01 02 01 Bola Lampu Belakang Buah 11.000
1 1 7 01 02 01 Sokbreker Depan Kiri Buah 155.000
1 1 7 01 02 01 Sokbreker Depan Kanan Buah 362.000
1 1 7 01 02 01 sokbreker Belakang Buah 196.000
1 1 7 01 02 01 Paking Set kabulator Buah 31.000
1 1 7 01 02 01 Kampas Rem Depan Buah 47.000
1 1 7 01 02 01 kampas Rem Belakang Buah 47.000
1 1 7 01 02 01 Kampas Kopling Buah 37.000
1 1 7 01 02 01 Rantai Roda Set Buah 145.000
1 1 7 01 02 01 Sariingan Udara Buah 37.000
1 1 7 01 02 01 Rantai Temeng Buah 73.000
1 1 7 01 02 01 Kabulator satu set Buah 258.000
1 1 7 01 02 01 Bussy Buah 12.000
1 1 7 01 02 01 Saklar Lampu Buah 47.000
1 1 7 01 02 01 YAMAHA MIO SOUL
1 1 7 01 02 01 Kampas Rem Depan Buah 16.000
1 1 7 01 02 01 Kampas Rem Belakang Buah 37.000
1 1 7 01 02 01 Kampas Kopling Buah 210.000
1 1 7 01 02 01 Saringan Udara Buah 47.000
1 1 7 01 02 01 V-belt Buah 78.000
1 1 7 01 02 01 Roller/Buah Buah 8.000
1 1 7 01 02 01 Rumah Roller Buah 57.000
1 1 7 01 02 01 CDI Buah 191.000
1 1 7 01 02 01 Relay Starter Buah 26.000
1 1 7 01 02 01 Kabel SpidoMeter Buah 26.000
1 1 7 01 02 01 Piston Buah 58.000
1 1 7 01 02 01 Ring Piston Buah 74.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 02 01 Rocker Arm Buah 83.000
1 1 7 01 02 01 Sokbreker Belakang Buah 166.000
1 1 7 01 02 01 Bussy Buah 21.000
1 1 7 01 02 01 BAN KENDARAAN RODA DUA IRC 350-08 R Buah 104.000
1 1 7 01 02 01 300-10 R/V Buah 109.000
1 1 7 01 02 01 350-10 L/VS Buah 124.000
1 1 7 01 02 01 225-17 P/R Buah 104.000
1 1 7 01 02 01 250-17 TR Buah 119.000
1 1 7 01 02 01 275-17 GSR,NR 25 Buah 150.000
1 1 7 01 02 01 300-117 GSRM Buah 179.000
1 1 7 01 02 01 300-17 TR Buah 179.000
1 1 7 01 02 01 250-18 P/R NR 21 Buah 135.000
1 1 7 01 02 01 275-18 R/GSRM Buah 176.000
1 1 7 01 02 01 275-18NTC/TB Buah 181.000
1 1 7 01 03 ALAT/BAHAN UNTUK KEGIATAN KANTOR
1 1 7 01 03 01 ALAT TULIS KANTOR
1 1 7 01 03 01 001 Alat Tulis
1 1 7 01 03 01 Pena
1 1 7 01 03 01 Pena Balliner Lusin 232.100
1 1 7 01 03 01 Pena Boxi Maruman Lusin 114.000
1 1 7 01 03 01 Pena Sheet Lusin 166.000
1 1 7 01 03 01 Pena Unibal Signo Broad Lusin 232.100
1 1 7 01 03 01 Pena Boxi UB-105 Lusin 124.000
1 1 7 01 03 01 Pena Balliner Lusin 181.500
1 1 7 01 03 01 Pena Pilot Lusin 37.100
1 1 7 01 03 01 Pena Pent Lusin 81.000
1 1 7 01 03 01 Pena Merk Pilot BPTP Buah 2.000
1 1 7 01 03 01 Pena Merk Pental Buah 55.000
1 1 7 01 03 01 Pena Top A. 6 Lusin 41.000
1 1 7 01 03 01 Pena Ero Lusin 41.000
1 1 7 01 03 01 Pena kilometrico Lusin 39.000
1 1 7 01 03 01 Pena Read-Leaf Buah 48.000
1 1 7 01 03 01 Pena Parkar Loreal Ball Buah 78.000
1 1 7 01 03 01 Pena Sticka Buah 24.000
1 1 7 01 03 01 Pena Sonata Buah 9.000
1 1 7 01 03 01 Pena Ero 2 Warna Buah 8.000
1 1 7 01 03 01 Pena Ero 4 Warna Set 10.000
1 1 7 01 03 01 Pena F.6 SBA Isi 4 Buah Buah 30.000
1 1 7 01 03 01 Pena IBM Merk Franco Buah 7.000
1 1 7 01 03 01 Pena Snowman Buah 3.000
1 1 7 01 03 01 Pena Tinta Emas/Perak Buah 7.000
1 1 7 01 03 01 Pena Parker Buah 1.000
1 1 7 01 03 01 Pena Senator Buah 1.000
1 1 7 01 03 01 Pena Mont Blanc Lusin
1 1 7 01 03 01 Pena Boxy Hitam Buah 10.000
1 1 7 01 03 01 Pena Pentel Lengkap Buah 55.000
1 1 7 01 03 01 Pena Boliner Merk Pilot Buah 7.000
1 1 7 01 03 01 Pena Boxy (Unibal) Buah 9.000
1 1 7 01 03 01 Pena Pilot G-1 Grip Buah 14.000
1 1 7 01 03 01 Pena Pensil Gambar :
1 1 7 01 03 01 Pena Uk. No. 5 s/d 9 Set 542.000
1 1 7 01 03 01 Pena Merk Hero Set 78.000
1 1 7 01 03 01 Pena Merk Hero Buah 9.000
1 1 7 01 03 01 Pena Parker P.V. 55 Set 929.000
1 1 7 01 03 01 Pena Pilot Buah 40.000
1 1 7 01 03 01 Pensil
1 1 7 01 03 01 Pensil HB Merk Fabel Castel Buah 6.000
1 1 7 01 03 01 Pensil Copy B Lusin 18.000
1 1 7 01 03 01 Pensil Merk F. Castel Lusin 46.000
1 1 7 01 03 01 Pensil HB Merk Hing Gull Buah 3.000
1 1 7 01 03 01 Pensil Merk Buaya Batang 5.000
1 1 7 01 03 01 Pensil Pakai Stif Merk HB Batang 3.000
1 1 7 01 03 01 Pensil HB.B. Merk Steadler Buah 6.000
1 1 7 01 03 01 Pensil Merk Steadler 2 B Buah 6.000
1 1 7 01 03 01 Pensil Warna Lusin 26.000
1 1 7 01 03 01 Pensil Cat Air Warna Lusin 26.000
1 1 7 01 03 01 Pensil Sheet Merk Kutsuwa Buah 40.000
1 1 7 01 03 01 Ballpoint gell Warna hitam Buah 88.600
1 1 7 01 03 01 Ballpoint Balliner Ballpoint standar AE7 0.5mm Buah 41.300
1 1 7 01 03 01 Stabillo Merk BOSS Buah 11.800
1 1 7 01 03 01 Spidol non permanen Snowman Buah 11.800
1 1 7 01 03 01 002 Tinta Tulis, Tinta Stempel
1 1 7 01 03 01 Tinta Stempel
1 1 7 01 03 01 Tinta Stempel Merk Yamara 50 cc Botol 13.000
1 1 7 01 03 01 Tinta Stempel Lokal Botol 5.000
1 1 7 01 03 01 Tinta Stempel Luar Negeri (Artline) Botol 36.000
1 1 7 01 03 01 Tinta Tulis Ukuran Kecil U. 105 Buah 2.000
1 1 7 01 03 01 Tinta Tulis Ukuran Sedang 111 Buah 4.000
1 1 7 01 03 01 Stempel Bupati Bahan karet, model bulat dan otomatis Buah 254.000
1 1 7 01 03 01 Stempel SETDA Bahan karet, model bulat dan otomatis Buah 254.000
1 1 7 01 03 01 Bantalan Stempel Basic Buah 17.700
1 1 7 01 03 01 003 Penjepit Kertas
1 1 7 01 03 01 Binder Clip 155 Doz 13.500
1 1 7 01 03 01 111 Doz 9.400
1 1 7 01 03 01 107 Doz 10.600
1 1 7 01 03 01 200 Doz 17.700
1 1 7 01 03 01 260 Doz 21.200
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 01 Paper Clip 1 Doz 3.500
1 1 7 01 03 01 3 Doz 4.700
1 1 7 01 03 01 5 Doz 7.000
1 1 7 01 03 01 004 Penghapus/Korektor
1 1 7 01 03 01 Penghapus Pensil Merk fabel castel Buah 11.000
1 1 7 01 03 01 Penghapus Pensil Steadler kecil Buah 6.000
1 1 7 01 03 01 Penghapus Pensil Steadler besar Buah 11.000
1 1 7 01 03 01 Penghapus Pensil Faber Castell kecil Buah 7.000
1 1 7 01 03 01 Penghapus Pensil Faber Castell besar Buah 11.000
1 1 7 01 03 01 Penghapus Stip Bantex kecil isi 30 Buah Pak 61.000
1 1 7 01 03 01 Penghapus Stip Staedtler isi 40 Buah Pak 80.000
1 1 7 01 03 01 Penghapus Stip joyko 526 B40P isi 40 Pak 29.000
1 1 7 01 03 01 Penghapus Stip joyko 526 B20 isi 20 Pak 36.000
1 1 7 01 03 01 Penghapus Pelikan pelikan Buah 16.000
1 1 7 01 03 01 Penghapus White Board Atari kecil Buah 8.000
1 1 7 01 03 01 Penghapus White Board Atari besar Buah 11.000
1 1 7 01 03 01 Penghapus White Board GM besar Buah 12.000
1 1 7 01 03 01 Penghapus White Board Cadwell sedang Buah 4.000
1 1 7 01 03 01 Penghapus White Board Enter besar Buah 9.000
1 1 7 01 03 01 Penghapus Cair KE-01 Merk Kenko Buah 10.000
1 1 7 01 03 01 005 Buku Tulis
1 1 7 01 03 01 Kiki Folio Isi 100 Lbr Buah 26.000
1 1 7 01 03 01 Kiki Folio Isi 62 Lbr Buah 12.000
1 1 7 01 03 01 Kiki Folio Isi 38 Lbr Buah 9.000
1 1 7 01 03 01 Sinar Dunia Folio Isi 38 Lbr Buah 9.000
1 1 7 01 03 01 Sinar Dunia Folio Isi 100 Lbr Buah 25.000
1 1 7 01 03 01 Buku Kotak-kotak Isi 38 Lbr Buah 26.000
1 1 7 01 03 01 Buku Gambar A3 Buah 12.000
1 1 7 01 03 01 Buku Gambar A4 Buah 9.000
1 1 7 01 03 01 Buku Kas B Buah 25.000
1 1 7 01 03 01 Buku Kas K Buah 10.000
1 1 7 01 03 01 Kwitansi Besar Buah 9.000
1 1 7 01 03 01 Kwitansi Kecil Buah 3.000
1 1 7 01 03 01 Buku ekspedisi Merk standart Buah 29.500
1 1 7 01 03 01 006 Ordner dan Map
1 1 7 01 03 01 Map Album Merk Oker Brand Buah 78.000
1 1 7 01 03 01 Map Batik Merk Hope Buah 2.000
1 1 7 01 03 01 Map Biasa Stof Map Folio Merk Biola Buah 3.000
1 1 7 01 03 01 Map Buffalow Buah 6.000
1 1 7 01 03 01 Map Dokumen Folio Buah 44.000
1 1 7 01 03 01 Map Folder Buah 26.000
1 1 7 01 03 01 Map Biasa Biola Buah 2.000
1 1 7 01 03 01 Map Tulang Buah 2.500
1 1 7 01 03 01 Map Gantung Snelhecter Uk. 24cm Buah 9.000
1 1 7 01 03 01 Map Jurnal Buah 12.000
1 1 7 01 03 01 Map Lapangan CHP CHP Board 620 Buah 8.000
1 1 7 01 03 01 Map Ordener Uk. Besar Buah 31.000
1 1 7 01 03 01 Map Ordener Uk. Kecil Buah 31.000
1 1 7 01 03 01 Map Ordener Folio CM-GM Buah 24.000
1 1 7 01 03 01 Map Ordener Folio 32x21x7 cm Buah 22.000
1 1 7 01 03 01 Map Ordener Plastik Merk Diploma Ukuran Besar Buah 47.000
1 1 7 01 03 01 Map Plastik Tulang Buah 7.000
1 1 7 01 03 01 Map Plastik Plastik Sea Gull Buah 7.000
1 1 7 01 03 01 Map Plastik Palstik Jepit (Snelhecter) Buah 7.000
1 1 7 01 03 01 Map Plastik Folio Fix Buah 10.000
1 1 7 01 03 01 Map Plastik Folio 32x21cmFix Buah 5.000
1 1 7 01 03 01 Map Snelhecter Uk. 24x35 Buah 2.000
1 1 7 01 03 01 Map Snelhecter Uk. 24 1/2 x 35 1/2 cm Buah 78.000
1 1 7 01 03 01 Map Untuk Surat Berharga 32x21cm isi 40 Buah 21.000
1 1 7 01 03 01 Map Tali lokal, ukuran folio tali kain' Buah 11.800
1 1 7 01 03 01 Map kertas biasa merk biola kotak 118.100
1 1 7 01 03 01 Map kertas biasa tulang merk biola kotak 88.600
1 1 7 01 03 01 007 Penggaris
1 1 7 01 03 01 Penggaris Plastik Merk Buterfly Plastik 30 cm Buah 3.000
1 1 7 01 03 01 Penggaris Plastik Merk Joyko Plastik 50 cm Buah 11.000
1 1 7 01 03 01 Penggaris Kayu Kayu 1 Meter Buah 12.000
1 1 7 01 03 01 Penggaris segitiga Segi Tiga Merk Bazik Buah 14.000
1 1 7 01 03 01 Penggaris segitiga Segi Tiga no. 12 Buah 17.000
1 1 7 01 03 01 Penggaris Besi Besi 30 cm Buah 19.000
1 1 7 01 03 01 008 Cutter (Alat Tulis Kantor)
1 1 7 01 03 01 Tacco Rentengan Kecil Lusin 186.000
1 1 7 01 03 01 Drupa L-600 Buah 16.000
1 1 7 01 03 01 Novus L-500 Buah 11.000
1 1 7 01 03 01 Joyko L-500 Buah 26.000
1 1 7 01 03 01 Joyko A-300 Buah 7.000
1 1 7 01 03 01 Joyko A-18 Buah 8.000
1 1 7 01 03 01 Kenko A-300 Buah 16.000
1 1 7 01 03 01 Kenko L-500 Buah 22.000
1 1 7 01 03 01 Kenko L-550 Buah 46.000
1 1 7 01 03 01 Kenko 918C Besar Buah 9.000
1 1 7 01 03 01 Gunindo Kecil Buah 6.000
1 1 7 01 03 01 Gunindo Besar Buah 9.000
1 1 7 01 03 01 pisau cutter A 300 Buah 15.000
1 1 7 01 03 01 pisau cutter L 500 Buah 16.000
1 1 7 01 03 01 Mata pisau cutter Mata pisau Cutter A. 300 Kotak 6.000
1 1 7 01 03 01 Mata pisau cutter L 500 Kotak 7.000
1 1 7 01 03 01 009 Pita Mesin Ketik
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 01 Pita Mesin Tik Swallow Buah 26.000
1 1 7 01 03 01 Pita Mesin Tik Daito Buah 16.000
1 1 7 01 03 01 Pita Mesin Tik AEG Buah 14.000
1 1 7 01 03 01 Pita Mesin Tik Plastik Buah 24.000
1 1 7 01 03 01 Pita Mesin Tik IBM Buah 19.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Pelikan Rol 78.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Canon Rol 40.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Daito Kaleng Rol 24.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Daito Plastik Rol 16.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Ribbon Rol 16.000
1 1 7 01 03 01 Mesin Ketik Listrik Merk Swallow Rol 40.000
1 1 7 01 03 01 010 Alat Perekat
1 1 7 01 03 01 Lem Kertas Fox Uk. Besar Botol 21.000
1 1 7 01 03 01 Lem Kertas Fox Uk. Kecil Botol 9.000
1 1 7 01 03 01 Lem Kertas Uhu Botol 8.000
1 1 7 01 03 01 Isolasi Ban Kecil Buah 8.000
1 1 7 01 03 01 Isolasi Merk Plastik 1/2 Buah 4.000
1 1 7 01 03 01 Isolasi Kertas 2 Buah 19.000
1 1 7 01 03 01 Isolasi Kain 2 Buah 17.000
1 1 7 01 03 01 Isolasi Kuning Buah 10.000
1 1 7 01 03 01 Isolasi Bening Merk Nachi Buah 9.000
1 1 7 01 03 01 Lem Kayu Lem FOX Putih PVAc 1 kg Kg 25.000
1 1 7 01 03 01 Lem Kayu Lem FOX Kuning 2,5 kg Kg 56.000
1 1 7 01 03 01 Lem Kertas Lem merk Povinal Tanggung Kg 11.800
1 1 7 01 03 01 Isolasi hitam Superflix Buah 14.700
1 1 7 01 03 01 Isolasi bening Superflix Buah 23.600
1 1 7 01 03 01 011 Stadler HD
1 1 7 01 03 01 Stadler HD Staedtler Luna Triangular Coloured Pensil Warna Set 10.300

1 1 7 01 03 01 Staedtler 137 C24 Luna Aquarell Watercolour Set Set 52.600


Pensil Warna [24 pcs]
1 1 7 01 03 01 Pensil Warna Faber Castell Classic 48 Warna Set 143.300
FREE Pensil Warna Joyko ISI 12WARNA
1 1 7 01 03 01 012 Staples
1 1 7 01 03 01 Staples Merk Sea Gull Buah 16.000
1 1 7 01 03 01 Pembuka Staples Merk Max Buah 16.000
1 1 7 01 03 01 Staples Kangaro Buah 20.000
1 1 7 01 03 01 Hekter Tembak Buah 150.000
1 1 7 01 03 01 Stapler Besar Type HS 45P Buah 41.300
1 1 7 01 03 01 Stapler Kecil Type HS 45P Buah 14.700
1 1 7 01 03 01 013 Isi Staples
1 1 7 01 03 01 Isi Staples Max No. 10 Im Kotak 78.000
1 1 7 01 03 01 Isi Staples Max No. 30 Im Kotak 146.000
1 1 7 01 03 01 Isi Hekter Tembak Kotak 20.000
1 1 7 01 03 01 Isi Stapler besar Merk Kangaro no.24 kotak 9.400
1 1 7 01 03 01 Isi Stapler kecil Merk Kangaro no.10 kotak 4.700
1 1 7 01 03 01 014 Jilid
1 1 7 01 03 01 Jilid Biasa Tipis Set 3.000
1 1 7 01 03 01 Jilid Biasa Sedang Set 5.100
1 1 7 01 03 01 Jilid Biasa Tebal Set 8.200
1 1 7 01 03 01 Jilid Spiral Tipis Set 10.300
1 1 7 01 03 01 Jilid Spiral Sedang Set 15.400
1 1 7 01 03 01 Jilid Spiral Tebal Set 20.600
1 1 7 01 03 01 Jilid Buku Tipis Set 10.300
1 1 7 01 03 01 Jilid Buku Tebal Set 30.900
1 1 7 01 03 01 015 Barang Cetakan
1 1 7 01 03 01 Cetak LJ USBN HVS, Kwarto, Ukuran 210x297, 80 gram Lembar 2.000
berwarna
1 1 7 01 03 01 Cetak DNT Lembar 1.000
1 1 7 01 03 01 Cetak DNS Lembar 1.000
1 1 7 01 03 01 Foto Copy Lembar 300
1 1 7 01 03 01 Cetak Ijazah Lembar 26.000
1 1 7 01 03 01 Cetak Sampul STTB Lembar 11.000
1 1 7 01 03 01 Cetak SHUN Lembar 26.000
1 1 7 01 03 01 Cetak Kartu Peserta Ujian Lembar 6.000
1 1 7 01 03 01 Cetak STTB Lembar 26.000
1 1 7 01 03 01 Cetak Sampul STTB Lembar 11.000
1 1 7 01 03 01 Oplah : 0001 s/d 1000 Buku Buku 63.000
1 1 7 01 03 01 : 1001 s/d 2000 Buku Buku 60.000
1 1 7 01 03 01 : 2001 s/d 3000 Buku Buku 60.000
1 1 7 01 03 01 Buku Patokan Harga Oplah : 320 Buku Buku 500.000
Satuan Barang Dan Jasa Bahan : HVS 80 gr
Ukuran : Kwarto
Cetak : 2 muka, 1 warna
Cover : AP. 250 gram
Isi : ± 560 Halaman
Jilid : Lem Punggung,
Pakai Pembatas HVS 60 gram Berwarna ± 25
Lembar
1 1 7 01 03 01 Buku Penyaluran Obat Ukuran : 21,5 X 32,5 cm
Bahan : HVS 60 gr
Cetak : 1 muka, 1 warna
Isi : 36 Lembar
Oplah : 0001 s/d 1000 Buku Buku 19.000
: 1001 s/d 2000 Buku Buku 19.000
: 2001 s/d 3000 Buku Buku 18.000
1 1 7 01 03 01 Form DPP PPb. 1.07 Ukuran : 9 X 11” 4Ply NCR
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
Penerangan pajak Cetak : 1 Muka/3 Warna
Isi : 4 Lembar /Set
Oplah : 0001 s/d 1000 Set Set 3.000
: 1001 s/d 2000 Set Set 3.000
: 2001 s/d 3000 Set Set 3.000
1 1 7 01 03 01 Form SKUM FA Ukuran : 9 X 11” 3Ply NCR
Cetak : 2 muka, 1 warna
Oplah : 0001 s/d 1000 Set Set 2.000
: 1001 s/d 2000 Set Set 2.000
: 2001 s/d 3000 Set Set 2.000

1 1 7 01 03 01 Blanko Skp Pegawai Bahan : HVS 70 gr


Ukuran : Db. Kwarto
Oplah : 00001 s/d 10000 Lbr Lembar 1.000
: 10001 s/d 20000 Lbr Lembar 1.000
: 20001 s/d 30000 Lbr Lembar 1.000
1 1 7 01 03 01 Map DUKDA/DIKDA Bahan : Buffalo Skin
Ukuran : 24 X 25 cm Snelhecter plastik pakai
kaca Lampiran 17 Jenis terdiri dari 130 Lembar

Bahan : HVS 70 gr
Oplah : 001 s/d 500 exp Eksp 138.000
501 s/d 1000 exp Eksp 132.000
1001 s/d 1500 exp Eksp 131.000

1 1 7 01 03 01 Map IMB/IPB/IPPB/IP Bahan : Buffalo Skin


Ukuran : 24 X 36 cm
Cetak : 2 muka, 5 warna Lipatan dalam
Ukuran : 6 X 24 cm, 6 X 36 cm
Oplah : 0001 s/d 5000 Buah Buah 13.000
: 5001 s/d 10000 Buah Buah 13.000
:10001 s/d 15000 Buah Buah 12.000
1 1 7 01 03 01 Map berkas pegawai Bahan : HVS 70 gr Buah 32.000
Ukuran : Db. Kwarto Cetak : 2 muka, 1 warna
Logo : Pemda Provinsi Riau Sisi bawah cetak
NIP/NRK Model Map tali dengan kait

penutup bentuk kotak semua sisi tertutup


Oplah : 25000 Buah
1 1 7 01 03 01 Map calon Bahan : Buffalo Skin 230 gr
PNS/Psicotest Piagam Pensiun/ Penghargaan masa Cetak : 1 muka / 5 warna
Kerja/kenaikan Pangkat piagam 100%
Map Dinas / Mutasi Jabatan Ukuran : 25 X 35 cm Tanpa kantong
Oplah : 0001 s/d 1000 Buah Buah 19.000
: 1001 s/d 2000 Buah Buah 17.000
: 2001 s/d 3000 Buah Buah 17.000
1 1 7 01 03 01 Map Hukuman Disiplin/Izin usaha swasta / izin Perkawinan Bahan : Buffalo Skin 230 gr
Perceraian/Map Dinas Berkas…/Map berkas Pengukuran /
Rencana Daerah Map Keterangan Rencana Daerah

Cetak : 1 muka / 1 warna


Ukuran : 25 X 35 cm Tanpa kantong
Oplah : 0001 s/d 1000 Buah Buah 19.000
: 1001 s/d 2000 Buah Buah 19.000
: 2001 s/d 3000 Buah Buah 18.000
1 1 7 01 03 01 Penetapan status Bahan : NCR Paper
Kendaraan bermotor Cetak : 1 muka / 3 warna
(model BUA 02) peru bahan status Ukuran : Folio
Kendaraan umum Memakai nomerator, 1 set 6 Lembar, warna putih
Ditengah
(model BUA 03)/ persetujuan / pengalihan pemilikan (balik Memakai nomerator, 1 set 6 Lembar, warna putih
nama) Ditengah
Kendaraan Bermotor Oplah : 00001 s/d 10000 Set Set 3.000
(model BUA 10) : 10001 s/d 20000 Set Set 3.000
: 20001 s/d 30000 Set Set 3.000
1 1 7 01 03 01 Kartu izin usaha Bahan : NCR Continous
Kendaraan Form berwarna uku
(model BUA 06) Ran 24 X 14 cm
Cetak : 1 muka / 3 warna
Pakai Nomerator
Isi : 2 Lembar / set
Oplah : 00001 s/d 10000 Set Set 3.000
: 10001 s/d 20000 Set Set 2.000
: 20001 s/d 30000 Set Set 2.000
1 1 7 01 03 01 Kartu Pengawasan Bahan : NCR Continous
Kendaraan Form berwarna uku
(model BUA 07) Ran 24 X 14 cm
Cetak : 1 muka / 3 warna
Oplah : 00001 s/d 10000 Set Set 3.000
: 10001 s/d 20000 Set Set 2.000
: 20001 s/d 30000 Set Set 2.000
1 1 7 01 03 01 Kartu Izin Operasi Bahan : NCR Paper warna Merah, Kuning
Ukuran : 11 X 15 cm, 2 Lembar
Cetak : 2 muka / 3 warna
Oplah : 00001 s/d 10000 Set Set 2.000
: 10001 s/d 20000 Set Set 2.000
: 20001 s/d 30000 Set Set 1.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
Pakai Nomerator
Oplah : 00001 s/d 10000 Set
: 10001 s/d 20000 Set Set 2.000
: 20001 s/d 30000 Set
1 1 7 01 03 01 Plat uji/tanda uji Bahan : Zink Plate antikorosi Buah 4.000
Ukuran : 6 X 6 cm
Warna : Abu-abu tuametalik, Cetak
Timbul, ditengah Logo Dept Perhubungan Buatan
peruri
1 1 7 01 03 01 Buku Uji berkala Bahan : Kertas Khusus
Paper 100 grm bertanda water
Ukuran : 125 X 88 cm
Isi : 6 lembar, 12 Halaman, lembar Kedua
diberi Nomor
Oplah : 00001 s/d 10000 Buku Buku 18.000
: 10001 s/d 20000 Buku Buku 17.000
: 20001 s/d 30000 Buku Buku 17.000
1 1 7 01 03 01 Form surat Bahan : NCR Paper
Keterangan pajak, PKB’/BBN-KB Ukuran : 9,5” X 11”4 Ply
Form Surat Keterangan Fiskal Antar Daerah Cetak : 1 muka / 3 warna Nomenator +
Hologram + Narasi
Oplah : 00001 s/d 10000 Set Set 6.000
: 10001 s/d 20000 Set Set 5.000
: 20001 s/d 30000 Set Set 5.000
1 1 7 01 03 01 Kupon TPR terminal Bahan : Water mark 80 gram
Bis cepat/lambat/ Non bus antar daerah Ukuran : 2,75” X 5”1 ply
Cetak : 1 muka / 3 warna
Cetak : 1 muka / 3 warna
Isi : 500 lembar / Blok
Oplah : 0001 s/d 5000 Blok Blok 9.000
: 5001 s/d 10000 Blok Blok 8.000
: 10001 s/d 15000 Blok Blok 8.000
1 1 7 01 03 01 Perintah Bahan : NCR
Pengeluaran/ Penyaluran/Bon Pengambilan barang Ukuran : 21,5” X 33 cm
Isi : 6 lembar / Set, 5 Set/blok
Cetak : 1 muka / 1 warna
Lembar 1 : Putih
Lembar 2 : Kuning
Lembar 3 : hijau
Lembar 4 : merah
Lembar 5 : biru
Lembar 6 : merah
Oplah : 0001 s/d 5000 Blok Blok 38.000
: 5001 s/d 10000 Blok Blok 35.000
: 10001 s/d 15000 Blok Blok 33.000
1 1 7 01 03 01 SK. Kenaikan gaji Berkala Bahan : Form Paper Set 4.000
Ukuran : 147/8 X 11”m
Isi : 3 ply
Cetak : 1 muka / 1 warna
1 1 7 01 03 01 Surat Tanda Setor Bahan : NCR
Ukuran : 10,5” X 22,5 cm
Isi : 3 ply/set
Cetak : 1 muka / 3 warna + Tanda tangan
Nomenator + Perporsi
Oplah : 0001 s/d 5000 Set Set 3.000
: 5001 s/d 10000 Set Set 3.000
: 10001 s/d 15000 Set Set 3.000
1 1 7 01 03 01 Blanko SKO a.n Bahan : Form Paper
Ukuran : 9,5” X 11”
Oplah : 00001 s/d 10000 Set Set 5.000
: 10001 s/d 20000 Set Set 4.000
: 20001 s/d 30000 Set Set 4.000
1 1 7 01 03 01 Surat keterangan penghentian Bahan : Form Paper
Pembayaran gaji Pegawai Ukuran : 27X 37 cm 4 ply/set Cetak : 1 muka / Set 7.000
1 warna Oplah : 001 s/d 050 Set
: 051 s/d 100 Set Set 6.000
: 101 s/d 151 Set Set 6.000
1 1 7 01 03 01 Surat setoran pajak Bahan : NCR Paper Set 5.000
Ukuran : 9 ½ X 11”-6 ply Cetak : 1 muka / 1
warna Isi : 1 Set 6 lembar
1 1 7 01 03 01 Formulir tanda terima Bahan : NCR Continous Form Set 2.000
Ukuran : 9 ½ X 11”-6 ply
Cetak : 1 muka / 1 warna
Isi : 1 set 2 lembar
1 1 7 01 03 01 Informasi penerimaan Bahan : NCR Continous Form Set 3.000
Dan pengeluaran belanja rutin Ukuran : 9 ½ X 11”-6 ply
Cetak : 1 muka / 1 warna
Isi : 3 lembar / set
Pakai Logo Pemda Provinsi Riau
1 1 7 01 03 01 Rekapitulasi SPJ Rutin Dan Pembangunan Bahan : NCR Continous Form Set 4.000
Ukuran : 147/8 X 11”2 ply
Cetak : 1 muka / 1 warna
Pakai Logo Pemda Provinsi Riau
1 1 7 01 03 01 Buku besar pengeluaran Bahan : HVS 70 gr Buku 438.000
Ukuran : 32 X 41 cm
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
Isi : 500 lembar/buku Cetak : 2 muka / 1
warna Cover karton lapisan linen teks polimas jilid
jahit dan lem punggung
Oplah : 01 s/d 75 Buku
1 1 7 01 03 01 Buku besar penerimaan Bahan : HVS 70 gr Buku 438.000
Ukuran : 29 X 39 cm
Isi : 500 lembar/buku
Cetak : 2 muka / 1 warna Cover karton lapisan
linen teks
Oplah : 01 s/d 75 Buku
1 1 7 01 03 01 Kartu pengawasan Bahan : BC 180 gram
Kredit anggaran Rutin/pembangunan Ukuran : 26 X 36 cm
Cetak : 1 muka / 1 warna
Warna : Merah
Oplah : 00001 s/d 10000 Lbr Lembar 2.000
: 10001 s/d 20000 Lbr Lembar 2.000
: 20001 s/d 30000 Lbr Lembar 2.000
1 1 7 01 03 01 SPP beban tetap/ Bahan : Cont Form carbonies Set 7.000
Sementara/ Lampiran Ukuran : 24 X 33 cm
Isi : 4 lembar/Set
Cetak : 1 muka / 1 warna
1 1 7 01 03 01 Blanko Notice/SKPD Bahan : NCR Paper Set 5.000
Ukuran : 9,5” X 4”-4ply
Cetak : 1 muka / 1 warna Nomorator, Narsi
Dipenda
Pakai Logo Pemda Provinsi Riau
Isi : 1 Set 4 lembar
1 1 7 01 03 01 Nota Pengambilan barang Bahan : HVS 60 gr dan
Dorslag
Ukuran : folio
Isi : 1 Buku 50 Set, 1set 2 Lembar 1 HVS
+ 1 doorslag
Oplah : 001 s/d 500 buku Buku 32.000
: 501 s/d 1000 buku Buku 31.000
: 1001 s/d 1500 buku Buku 30.000
1 1 7 01 03 01 Nota Pengiriman Barang/Sp kependudukan TKA/ BA Bahan : NCR Paper
pemeriksaan pelanggaran
Ukuran : folio
Cetak :
Isi : 3 lembar/set, 50 Set/blok 2 Lembar

Oplah : 0001 s/d 1000 Blok Blok 100.000


: 1001 s/d 2000 Blok Blok 99.000
: 2001 s/d 3000 Blok Blok 98.000
1 1 7 01 03 01 Peneg PKB Bahan : Plat alumunium Buah 7.000
Ukuran : 0,3 mm
Type : MF
Double side tape (lem perekat bolak-balik,
kualitas spesial Ukuran : 54 X 60 mm, warna
Merah hati
Cetak : 1 muka/3warna
: Pengeringan oven
: Logo Pemda Prov. Riau
: Ukuran 12 X 17mm Dibawah diberi penempatan

Angka embosing Angka tanpa Cetak Dibawah


Penempatan angka Yang diembos diberi
Nomorator
: Narasi Dipenda
1 1 7 01 03 01 Cetak cover dan jilid Buku nota Keuangan APBD Bahan : Kertas Konstruk 150 gram Buku 23.000
Ukuran : Kwarto warna hijau
Cetak : 1 muka/5warna
Isi : +/- 392 halaman Jilid Lem Punggung

Oplah : 001 s/d 170 blok


1 1 7 01 03 01 Cetak Cover dan jilid buku nota Keuangan APBD Bahan : HVS 100 gr Buku 23.000
Ukuran : Kwarto warna putih
Cetak : 1 muka/1warna Memakai kiblat
disudut kanan atas terdapat kata rancangan
Isi : +/- 392 Halaman
Oplah : 001 s/d 150 Blok
1 1 7 01 03 01 Cetak Cover dan jilid buku materi Perhitungan APBD Bahan : Kertas Konstruk 150 gram Buku 23.000
Ukuran : Folio
Warna : Hijau Muda
Cetak : 1 muka/5 warna
Isi : +/- 495 halaman Jilid lem punggung
Oplah : 001 s/d 150 Blok
1 1 7 01 03 01 Cetak cover dan jilid Buku nota Keuangan APBD Bahan : HVS 100 gr Blok 10.000
Ukuran : Folio warna putih
Cetak : 1 muka/1 warna
: memakai kiblat disudut kanan
atas terdapat kata rancangan
Isi : +/- 495 halaman
Oplah : 001 s/d 110 blok
1 1 7 01 03 01 Cetak cover dan jilid Buku Bahan : Kertas Konstruk 150 gram
Ukuran : Folio
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
Cetak : 1 muka/5warna Isi : +/- 218 Buku 38.000
halaman Jilid Lem Punggung
Oplah : 01 s/d 75 buku
1 1 7 01 03 01 Cetak cover dan jilid Buku Bahan : HVS 100 gram Buku 38.000
Ukuran : Folio warna Putih
Cetak : 1 muka/ 1 warna
: memakai kiblat disudut kanan atas terdapat kata
rancangan
Isi : +/- 218 halaman
Oplah : 01 s/d 10 Buku
1 1 7 01 03 01 Cetak Cover dan jilid buku II A (Belanja rutin) Bahan : Kertas Konstruk 150 gram Buku 38.000
Ukuran : Folio
Cetak : 1 muka/5warna
Isi : +/- 425 halaman Jilid Lem Punggung

Oplah : 01 s/d 75 buku


1 1 7 01 03 01 Cetak Cover dan jilid buku II A Bahan : HVS 100 Gram Blok 38.000
(Belanja rutin) Ukuran : Folio, Warna Putih
Cetak : 1 muka/5warna
: memakai kiblat disudut kanan
atas terdapat kata rancangan
Isi : +/- 363 halaman
Oplah : 01 s/d 75 buku
1 1 7 01 03 01 Cetak Cover dan jilid buku III B (Belanja rutin) Bahan : Kertas Konstruk 150 gram Buku 38.000
Ukuran : Folio
Cetak : 1 muka/5warna
Isi : +/- 367 halaman Jilid Lem Punggung

Oplah : 01 s/d 75 buku


1 1 7 01 03 01 Cetak Cover dan jilid buku III B Bahan : HVS 100 gram Buku 38.000
(Belanja rutin) Ukuran : Folio warna Putih
Cetak : 1 muka/ 1 warna
: memakai kiblat disudut kanan
atas terdapat kata rancangan
Isi : +/- 367 halaman
Oplah : 01 s/d 10 Buku
1 1 7 01 03 01 Cetak Cover dan jilid buku III B Bahan : Kertas Konstruk 150 gram Buku 38.000
(Belanja rutin) Ukuran : Folio
Cetak : 1 muka/5warna
Isi : +/- 396 halaman Jilid Lem Punggung

Oplah : 01 s/d 75 buku


1 1 7 01 03 01 Cetak Cover dan jilid buku III B Bahan : HVS 100 Gram Buku 38.000
(Belanja rutin) Ukuran : Folio, Warna Putih
Cetak : 1 muka/ 1 warna
: memakai kiblat disudut kanan
atas terdapat kata rancangan
Isi : +/- 396 halaman
Oplah : 01 s/d 10 buku
1 1 7 01 03 01 Cetak Cover dan jilid buku Daftar Sisa UUDP Belanja Rutin Bahan : Kertas Kontruk 150 gram Buku 38.000
dan Pembangunan
Ukuran : Double Kuwarto Warna : Hijau
Muda Cetak : 1 muka/ 5 warna Isi : +/-
398 halaman Jilid Lem Punggung
Oplah : 01 s/d 50 buku
1 1 7 01 03 01 Cetak Cover dan jilid buku data perhitungan APBD Bahan : Kertas Konstruk 150 gram Buku 38.000
Ukuran : Folio
Cetak : 1 muka/ 5 warna
Isi : +/- 65 halaman Jilid Lem Punggung

Oplah : 001 s/d 275 Buku


1 1 7 01 03 01 Amplop LP2P Bahan : HVS 100 gram Buah 2.000
Ukuran : 10 X 25 cm
Cetak : 1 muka/ 1 warna
Oplah : 50.000 Buah
1 1 7 01 03 01 Map Pajak Kendaraan Bermotor Ukuran : Map 48 X 35 cm
Ukuran kantong dalam 24 X 16
Bahan : BC 180 Gram
Cetak : 2 Muka / 1 warna Tulisan “Dipenda :
Nopol BM Tanggal Pendaftran Berbinaki dan 6
Garis
Oplah : 0001 s/d 1000 Buah Buah 7.000
: 1001 s/d 2000 Buah Buah 6.000
: 2001 s/d 3000 Buah Buah 6.000
1 1 7 01 03 01 Kartu Pengawasan SPJ rutin Bahan : BC 180 Gram
Ukuran : 26 X 36 cm
Cetak : 2 muka/ 1 warna
Oplah : 0001 s/d 5000 Lembar 3.000
1 1 7 01 03 01 SPJ Daftar Bahan : NCR 4 Ply Set 5.000
Penerimaan UUDP Ukuran : 147/8 X 11”
Cetak : 1 muka/ 1 warna
Isi : 1 Set 4 Lembar

1 1 7 01 03 01 Buku Register Bahan : HVS 70 gram Buku 144.000


Pengesahan UUDP Rutin/ Pembangunan Ukuran : 32,5 X 43 cm
Cetak : 1 muka/ 1 warna
Isi : 1 Buku150 Lembar
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
Cover : B Skin 230 gr
Jilid : Lem Punggung Bungkus Kain Linen
Oplah : 001 s/d 500 Buku
1 1 7 01 03 01 Buku SKO Ukuran : Folio Buku 38.000
Bahan : HVS 60 gr
Cetak : 1 Muka / 1 warna
Cover : Board, Karton Lapis, Kain Linen
Jilid : Jahit Benang
Oplah : 001 s/d 500 Buku
1 1 7 01 03 01 Blanko Beritta acara Bahan : Quequeror 250 grm Lembar 19.000
Ukuran : Double Folio
Cetak : 1 muka/ 2 warna
Logo : Pemda Provisi Riau
Oplah : 00001 s/d 10000
1 1 7 01 03 01 Buku SPPD Bahan : NCR Buku 150.000
Ukuran : Folio
Cetak : 1 muka/ 1 warna
Isi : 1 Buku 50 Set
1 Set 3 Lembar
Oplah : 01 s/d 25 Buku
1 1 7 01 03 01 Blanko Rekap Bahan : HVS 70 gr Set 13.000
RKBMD Ukuran : 43 X 30 cm
Cetak : 1 muka/ 1 warna
Isi : 1 Buku 20 Set
Oplah : 6500 Set
1 1 7 01 03 01 Blanko Rekap DUPDA Bahan : HVS 80 gram Set 113.000
Ukuran : 43 X 30 cm dan 30X 21 cm
Cetak : 1 muka/ 1 warna
Isi : 1 Set15 Lembar
Terdiri dari 3 Lembar
Ukuran :43 x 30 cm dan 12 lembar ukuran 30 X
21 cm
Cover : Map Sneihecker
Ukuran : 32,5 X 23,5 cm
Cetak : 1 muka/ 1 warna
Oplah : 6500 Set
1 1 7 01 03 01 Buku Kas Umum Bahan : NCR
Ukuran : Folio isi 20 set, 1 Set 5 Lembar
Cetak : 1 Muka / 1 warna
Cover : BC 180 gram
Pakai : Logo Riau
Oplah : 0001 s/d 1000 Buah Buah 63.000
: 1001 s/d 2000 Buah Buah 62.000
: 2001 s/d 3000 Buah Buah 57.000
1 1 7 01 03 01 Buku Petunjuk teknis sensus barang Bahan : HVS 80 gram
Ukuran : 21 X 29 cm
Isi : 195 Halaman (100 lbr) Cetak : 2
muka/ 1 warna
Cover : Art paper 310 gram
Cetak : 2 muka tek hitam
Logo : Pemda Propinsi Riau
Jilid : Perfect bending lem Panas pakai
Pembatas HVS 60 Gram berwarna 4 Lembar
Oplah : 0001 s/d 1000 Exp exp 125.000
: 1001 s/d 2000 Exp exp 114.000
: 2001 s/d 3000 Exp exp 103.000
1 1 7 01 03 01 Map Snelhecter Bahan : Buffalo Skin Buah 19.000
Revisi Dukda Ukuran : 50 X 32 cm terbuka, 23 ½ X 32 cm
Tertutup
Cetak : 1 muka/ 1 warna
Berjendela diplastik : Dipasang Snelhecter
Warna : 150 Buah Kuning
Warna : 2.250 Buah
Oplah : 2400 Buah
1 1 7 01 03 01 Blanko revisi Ukuran : Lbr ke 1 + 29,7 X 21 cm s/d 3 Lbr ke Buah 10.000
4 + 29,7 X 42 cm s/d 3
Bahan : HVS 80 gram
Isi : 1 Set 7 Lembar
Cetak : 1 muka/ 1 warna
Oplah : 2400 Buah
1 1 7 01 03 01 Sertifikat pelatihan Form Nota Perhitungan pajak/form Bahan : BC 180 gram Lembar 4.000
Pendaftaran wajib pajak daerah/ rekap pemakaian faktur-
faktur, bon/bill/form pemberitahuan tidak melaksanakan
pembukaan/form Panggilan
Ukuran : 22 X 33 cm
Cetak : 1 muka/ 2 warna Pakai Logo Pemda
Provinsi Riau
Oplah : 4000 Buah
Bahan : NCR Paper
Ukuran : Folio
Logo : Pemda Prov Riau
Cetak : 1 muka/ 1 warna
Isi : 1 Buku 100 set
1 set = 2 lembar
Oplah : 00001 s/d 10000 Buku Buku 138.000
: 10001 s/d 20000 Buku Buku 125.000
: 20001 s/d 30000 Buku Buku 125.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 01 Surat Pemberitahuan Pajak Bahan : NCR Paper
Daerah/ Surat Setoran Pajak Ukuran : Folio
Daerah Cetak : 1 muka/ 1 warna
Logo : Pemda Prov Riau
Isi : 1 Buku 50 set
1 set = 3 lembar
Oplah : 00001 s/d 10000 Buku Buku 144.000
: 10001 s/d 20000 Buku Buku 144.000
: 20001 s/d 30000 Buku Buku 144.000
1 1 7 01 03 01 Blanko Pengeluaran Bibit Tanaman Bahan : NCR Paper
Ukuran : Folio
Cetak : 1 muka/ 1 warna
Isi : 1 Buku 25 set
1 set = 5 lembar
Oplah : 00001 s/d 10000 Buku 63.000
: 10001 s/d 20000 Buku 63.000
: 20001 s/d 30000 Buku 63.000
1 1 7 01 03 01 Tanda bukti pembayaran/tanda bukti Penerimaan Bahan : NCR Paper
Ukuran : 16 X 21 cm Blok 35.000
Cetak : 1 muka/ 1 warna
Isi : 1 Buku 100 set
1 set = 2 lembar
Cover : Carton Kraft
Oplah : 0001 s/d 5000 Blok
1 1 7 01 03 01 Map calon PNS/Psicotes Piagam Pensiun/penghargaan Bahan : Buffalo Skin 230 gr
Masa kerja /kenaikan pangkat. Piagam 100% Map
dinas/Mutasi Jabatan
Cetak : 1 muka/ 5 warna
Cetak : 1 muka/ 1 warna
Oplah : 0001 s/d 1000 Buah Buah 25.000
: 1001 s/d 2000 Buah Buah 23.000
: 2001 s/d 3000 Buah Buah 19.000
1 1 7 01 03 01 Informasi penerimaan dan pengeluaran belanja rutin Bahan : NCR Continous Form 3 Ply Ukuran : Box 2.124.000
9,5 X 11”Folio
Cetak : 1 muka/ 2 warna
Logo : Pemda Prov riau
Isi : 1 Box 100 Set
Oplah : 01 s/d 85 Box
1 1 7 01 03 01 Sticker Nagkutan Lebaran Bahan : Plastik Vinyl
Tebal : 0,10 mm Ukuran : 82 X 18 cm Cetak
: 1 muka/ 2 warna
Oplah : 0001 s/d 5000 Lbr Lembar 32.000
5001 s/d 10000 Lbr Lembar 32.000
10001 s/d 15000 Lbr Lembar 32.000
1 1 7 01 03 01 Book Note Bahan : HVS 70 gr
Warna : Putih
Ukuran : 25 X 35 cm
Isi : 50 lembar/buku
Oplah : 1000 Buku Buku 10.000
1 1 7 01 03 01 Buku Induk Pegawai Bahan : HVS 70 gram
Ukuran : Folio
Isi : 122 Halaman
Cetak : 1 muka
Cover : Board Lapis Linen
Jilid : Lem Punggung
Oplah : 0001 s/d 1000 Buku Buku 50.000
1001 s/d 2000 Buku Buku 42.000
2001 s/d 3000 Buku Buku 41.000
1 1 7 01 03 01 Kotak Suara Dibuat dari karton double wall kedap air dan Buah 236.300
merupakan barang habis pakai
Bentuk Kotak Suara sebagai berikut :
- Sisi samping berbentuk empat persegi panjang

- Sisi samping berbentuk bujur sangkar


- Sisi samping kanan dan kiri diberi tulisan
Pemerintah Kabupaten Siak Warna Hitam
- Tutup bagian tengah diberi celah/lubang untuk
masukan surat suara
- Sisi samping kanan dan kiri diberi pegangan
untuk mengangkat
Ukuran kotak suara sebagai berikut :
- Ukuran : tinggi 60 cm, panjang 40 cm, lebar 40
cm.
- Panjang celah/lubang pada tutup : 18 cm
- Lebar celah/lubang pada tutup : 1 cm
- Jenis karton : double wall coating
Ketebalan : minimal 6mm
1 1 7 01 03 01 Bilik Suara - Dibuat dari karton double wal kedap air yang Buah 206.800
berkualitas baik merupakan barang habis pakai

- Sisi kanan dan Kiri diberi tiang penguat dari


bahan yang sama
- Diberi tulisan Pemerintah Kabupaten Siak Pada
3 sisi vertikal
- Ukuran 60 x 160 cm (50+50+50cm)
- Berat 0,9 Kg
- Bahan Kardus double wall
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
- Warna : putih
- Tebal : minimal 6mm
1 1 7 01 03 01 Surat Suara Spesifikasi teknis surat suara : Kertas HVS 80 Lembar 1.100
gram (non security paper), Berwarna, warna
kertas putih (min 90%), Cetak kualitas
baik.Ukuran Surat Suara : 2 (dua) pasangan
calon : lebar 10 cm dan panjang 10 cm,3 (tiga)
pasangan calon : lebar 8 cm dan panjang 10 cm,
4 (empat) pasangan calon : lebar 6 cm dan
panjang 8 cm, 5 (lima) pasangan calon : lebar 5
cm dan panjang 6 cm

1 1 7 01 03 01 Cetak Buku Karya Fiksi dan Non Fiksi Buku sejarah,Karya ilmiah,Novel,Cerita Rakyat, Buku 177.200
Cerpen, Naskah Drama, Puisi, Pantun, Syair dan
Esai

1 1 7 01 03 01 Cetak foto ukuran 2,5 R Lembar 5.900


1 1 7 01 03 01 Cetak foto ukuran 5 R Lembar 8.800
1 1 7 01 03 01 Cetak foto ukuran 3 R Lembar 7.000
1 1 7 01 03 01 Cetak foto ukuran 10 R Lembar 29.500
1 1 7 01 03 01 Cetak foto ukuran 20 R Lembar 70.900
1 1 7 01 03 01 Ukuran 20 R + Figura Buah 354.500
1 1 7 01 03 01 Cetak Brosur Rim 1.418.100
1 1 7 01 03 01 Cetak Ceklist verifikasi kelengkapan akta Lembar 114.600
1 1 7 01 03 01 Cetak Ceklist blanko formulir biodata penduduk WNI Blok 177.200
1 1 7 01 03 01 Cetak Ceklist verifikasi kelengkapan berkas KK/KTP Rim 102.800
1 1 7 01 03 01 Cetak surat pernyataan perubahan data penduduk Blok 88.600
1 1 7 01 03 01 Cetak Surat keterangan verifikasi Blok 103.400
1 1 7 01 03 01 Buku register akta kelahiran Buku 59.000
1 1 7 01 03 01 Cetak buku peserta Buku 59.000
1 1 7 01 03 01 Ceklist verifikasi kelengkapan berkas pindah datang Blok 103.400
1 1 7 01 03 01 Blanko biasa Lembar 5.300
1 1 7 01 03 01 Formulir blanko penduduk WNI (F1.15) Blok 159.832.500
1 1 7 01 03 01 Formulir blanko permohonan KK baru (F1.15) Blok 61.400
1 1 7 01 03 01 Formulir blanko permohonan perubahan KK (F1.06) Blok 61.400
1 1 7 01 03 01 Cetak buku register Buku 59.000
1 1 7 01 03 01 Blanko akta pengesahan anak Buku 5.900
1 1 7 01 03 01 Buku visum sarana kerja PKB/PLKB Ukuran ± 25 cm x 15 cm, tebal ± 125 lembar, Buah 449.000
dengan menggunakan kertas HVS 80 gr cetak
logo BKKBN + Dua Anak Cukup pada bagian
atas dan cover berwarna biru tua dari bahan lux
serta berlogo BKKBN dan nama SKPD-KB
Kab/Kota cetak hot print emas. Beberapa
halaman memuat tentang informasi program
KKBPK.
1 1 7 01 03 01 Buku Agenda Sarana kerja PPKBD/Sub PPKBD Ukuran ± 25cm x 19cm, tebal ± 125 lembar, Buah 449.000
menggunakan kertas HVS 80gr cetak logo
BKKBN + Dua Anak Cukup pada bagian atas
dan; cover berwarna biru tua dari bahan lux serta
berlogo BKKBN cetak hot print emas, Beberapa
halaman memuat tentang informasi program
KKBPK.

1 1 7 01 03 01 Lembar Balik Alat Konseling KB Ukuran: 34 x 24,5 cm; Bahan: Art Carton 260gr; Buah 449.000
Tatakan: Penopang Board No.30 (sebelum
dilipat), lapis Kain Linen; Finishing: Laminating
Glossy 2 muka, Spiral warna putih + plastik
pembungkus.
1 1 7 01 03 01 Buku Kerja PLKB Ukuran ± 25 cm x 15 cm, tebal ± 125 lembar, Buah 449.000
dengan menggunakan kertas HVS 80 gr cetak
logo BKKBN + Dua Anak Cukup pada bagian
atas dan cover berwarna biru tua dari bahan lux
serta berlogo BKKBN dan nama SKPD-KB
Kab/Kota cetak hot print emas. Beberapa
halaman memuat tentang informasi program
KKBPK.
1 1 7 01 03 01 Fotocopy A3 Peta Buah 2.300
1 1 7 01 03 01 Fotocopy A3 Untuk BKU,belanja fungsional,belanja Buah 400
administrasi
1 1 7 01 03 01 Map Bupati Kertas buffalo,230 gsm,warna kuning dan bahan Buah 6.800
kertas
1 1 7 01 03 01 Map Setda Kertas buffalo, 230 gsm, warna kuning bahan Buah 8.200
kertas
1 1 7 01 03 01 Amplop Setda amplop kesing dinas coklat bahan kertas padi Kotak 70.900
ada logo Pemda Siak ukuran 11
1 1 7 01 03 01 Amplop Bupati amplop kesing dinas coklat bahan kertas padi Kotak 70.900
ada logo Garuda ukuran 11
1 1 7 01 03 01 Lembar disposisi Kertas HVS 1/2folio, 70 GSM Rim 41.300
1 1 7 01 03 01 Cetak NCR Kosong Kertas NCR folio, 4 rangkap Lembar 65.800
1 1 7 01 03 01 Sit card Kertas linen, 140 gsm Lembar 29.500
1 1 7 01 03 01 Cetak Undangan HUT RI bahan amplop KS 210 Gr, isi 260 gr, cetak full Lembar 17.700
colour, full laminating doff atau closy kilat
1 1 7 01 03 01 Cetak Buku panduan HUT RI bahan amplop KS 210 Gr Buku 23.600
1 1 7 01 03 01 Cetak Imsakiyah ukuran A3 konstruk, full colour, satu sisi Lembar 29.500
1 1 7 01 03 01 Cetak Undangan HUT Kabupaten bahan ammplop Ks 210 gr, isi 260 gr, cetak full Lembar 17.700
colour, full laminating doff atau closy kilat
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 01 Cetak Kartu Lebaran Bupati amplop: bahan kertas art karton 230 gr ukuran Lembar 21.200
21x 14 full colour, kartu legaran: bahan kertas Art
karton 230 gr ukuran 20x13 full colour

1 1 7 01 03 01 Cetak kartu lebaran Wakil Bupati Amplop: bahan kertas art karton 230 gr ukuran Lembar 21.200
21x 14 full colour, kartu legaran: bahan kertas Art
karton 230 gr ukuran 20x13 full colour

1 1 7 01 03 01 Cetak kartu lebaran Sekda Amplop: bahan kertas art karton 230 gr ukuran Lembar 21.200
21x 14 full colour, kartu legaran: bahan kertas Art
karton 230 gr ukuran 20x13 full colour

1 1 7 01 03 01 Cetak kartu lebaran Asisten Amplop: bahan kertas art karton 230 gr ukuran Lembar 21.200
21x 14 full colour, kartu legaran: bahan kertas Art
karton 230 gr ukuran 20x13 full colour

1 1 7 01 03 01 Kartu nama Bupati ukuran 8,8 x 5,5 cm bahan konstruk Pak 531.800
1 1 7 01 03 01 Kartu nama Wakil Bupati ukuran 8,8 x 5,5 cm bahan konstruk Pak 531.800
1 1 7 01 03 01 Kartu nama Sekda ukuran 8,8 x 5,5 cm bahan konstruk Pak 531.800
1 1 7 01 03 01 Kartu nama Asisten ukuran 8,8 x 5,5 cm bahan konstruk Pak 531.800
1 1 7 01 03 01 Blangko SPPD kop Setda kertas NCR timbal balik, 4 rangkap isi 50 set Buku 295.400
1 1 7 01 03 01 Cetak Shoping Bag berlogo Kabupaten Merk : Hand made, bahan;kertas, Karton kilat, uk; Buah 32.400
P=35 cm x L=30 cm x 8 cm, warna; kuning
kombinasi hijau bermotif payung sekaki, ada logo
kabupaten siak dan logo kerajaan Siak, sisi kiri
kanan ada tulisan Siak.
1 1 7 01 03 01 ID Card Tanda pengenal standart Buah 59.000
1 1 7 01 03 01 Cetak Leaflet Forum Anak Lembar 11.800
1 1 7 01 03 01 Cetak Sertifikat Peserta Pembinaan Fasilitator Forum Anak Lembar 23.600
Di Kabupaten Siak
1 1 7 01 03 01 Cetak Tanda Peserta Pembinaan Fasilitator Forum Anak Di Lembar 23.600
Kab. Siak
1 1 7 01 03 01 Cetak Buku Laporan Kegiatan Lembar 236.300
1 1 7 01 03 01 Cetak Buku Saku Anak Berhadapan Dengan Hukum (ABH) Eksemplar 118.100

1 1 7 01 03 01 Cetak Buku Laporan Kegiatan Pembinaan Dan Eksemplar 236.300


Penyelenggaraan Perlindungan Anak
1 1 7 01 03 01 Daftar Penjelasan Rim 94.500
1 1 7 01 03 01 Laporan Pengujian BL-03 Rim 307.200
1 1 7 01 03 01 Buku Uji Buah 14.100
1 1 7 01 03 01 Kertas Berita Acara Pemeriksaan Kendaraan Rim 236.300
1 1 7 01 03 01 Kertas Master Kalibrasi Box 2.599.900
1 1 7 01 03 01 Cetak Blangko Tilang Buku 177.200
1 1 7 01 03 01 015 Seminar Kit
1 1 7 01 03 01 Seminar Kit Seminar Kit (Tas,Pulpen dan Kertas) Set 77.300
1 1 7 01 03 01 Seminar Kit (Blocknote A5 dan Pulpen Promosi) Set 412.600

1 1 7 01 03 01 016 Gunting Kertas


1 1 7 01 03 01 kenko kenko besar 848 N Buah 14.000
1 1 7 01 03 01 kenko kenko besar Buah 42.000
1 1 7 01 03 01 kenko kenko sedang Buah 13.000
1 1 7 01 03 01 kenko kenko stainless Buah 46.000
1 1 7 01 03 01 yoyko LL 6.5" Buah 19.000
1 1 7 01 03 01 yoyko joyko kecil 838 N Buah 10.000
1 1 7 01 03 01 yoyko joyko besar 848 N Buah 14.000
1 1 7 01 03 01 ladytop ladytop 2070 K Buah 20.000
1 1 7 01 03 01 Gunting besar merk Ideal Buah 23.600
1 1 7 01 03 01 Gunting kecil merk Ideal Buah 11.800
1 1 7 01 03 01 Gunting Stainless 14 cm Buah 102.800
1 1 7 01 03 01 017 Pena Gambar
1 1 7 01 03 01 Pena Gambar - Staedler F 0.1 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.2 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.3 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.4 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.4 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.5 Pcs 86.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.6 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.7 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.8 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 0.9 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 1.0 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 1.5 Pcs 78.000
1 1 7 01 03 01 Pena Gambar - Steadler F 2.0 Pcs 78.000
1 1 7 01 03 01 Rapido
1 1 7 01 03 01 Rapido - Besar Buah 80.000
1 1 7 01 03 01 Rapido - Kecil Buah 49.000
1 1 7 01 03 01 Rapido Set 2.000.000
1 1 7 01 03 01 018 Kapur Tulis
1 1 7 01 03 01 Kapur Tulis Warna Kotak 16.000
1 1 7 01 03 01 Merk crown Kotak 13.000
1 1 7 01 03 01 Putih Kotak 11.000
1 1 7 01 03 01 Sarjana Peti 36.000
1 1 7 01 03 01 019 Stapler Hechmachine
1 1 7 01 03 01 Stapler Merk Kenko HD-10 N Buah 23.000
1 1 7 01 03 01 Stapler Merk Kenko HD-30 N Buah 46.000
1 1 7 01 03 01 Stapler Merk Kenko HD-12/13 N Buah 185.000
1 1 7 01 03 01 Stapler Merk Kenko HD-12/24 N Buah 374.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 01 Stapler Merk Kenko HD-12/14 L Buah 1.641.000
1 1 7 01 03 01 Sapler Max HD - 10 N Buah 26.000
1 1 7 01 03 01 Sapler Max HD - 50 Buah 96.000
1 1 7 01 03 01 Sapler Max HD- 3 D Buah 127.000
1 1 7 01 03 01 020 Peraut Pensil
1 1 7 01 03 01 SDI Kecil Buah 10.000
1 1 7 01 03 01 Angel3 Peraut Meja sedang Buah 74.000
1 1 7 01 03 01 Angel5 Peraut Meja mesar Buah 98.000
1 1 7 01 03 01 021 Calculator
1 1 7 01 03 01 Calkulator
1 1 7 01 03 01 Citizen CT500 Buah 232.000
1 1 7 01 03 01 Citizen CT600 Buah 255.000
1 1 7 01 03 01 Citizen CT700 Buah 482.000
1 1 7 01 03 01 Citizen No.310 Buah 65.000
1 1 7 01 03 01 Citizen No.600 Buah 184.000
1 1 7 01 03 01 Citizen No.8836 Buah 330.000
1 1 7 01 03 01 Citizen No.915 Buah 333.000
1 1 7 01 03 01 Citizen SDC-868L Buah 183.000
1 1 7 01 03 01 Citizen SDC-8780L Buah 208.000
1 1 7 01 03 01 Casio DM 1200 TV Buah 294.000
1 1 7 01 03 01 Casio DM 1400 TV Buah 332.000
1 1 7 01 03 01 Casio DM 1600 TV Buah 346.000
1 1 7 01 03 01 Casio DS 2L / DS 2 TV Buah 716.000
1 1 7 01 03 01 Casio JS - 20 TV Buah 838.000
1 1 7 01 03 01 Casio Scientificfx 350 MS Buah 277.000
1 1 7 01 03 01 Origin No. 837 Buah 147.000
1 1 7 01 03 01 Alfalink EI - 16T Buah 432.000
1 1 7 01 03 01 Karce KC D27 (12 digit) Buah 183.000
1 1 7 01 03 02 KERTAS DAN COVER
1 1 7 01 03 02 001 Kertas HVS
1 1 7 01 03 02 Kertas HVS Folio 60 Gram Rim/500 42.000
1 1 7 01 03 02 Kertas HVS Folio 70 Gram Rim/500 49.500
1 1 7 01 03 02 Kertas HVS Folio 80 Gram Rim/500 62.000
1 1 7 01 03 02 Kertas HVS Doeble Folio 60 Gram Rim/500 73.000
1 1 7 01 03 02 Kertas HVS Doeble Folio 70 Gram Rim/500 98.000
1 1 7 01 03 02 Kertas HVS A3 70 Gram Rim/500 92.800
1 1 7 01 03 02 Kertas HVS A4 70 Gram Rim/500 49.500
1 1 7 01 03 02 Kertas HVS F4 70 Gram Rim/500 51.500
1 1 7 01 03 02 Kertas HVS Folio Warna 60 Gram Rim/500 42.000
1 1 7 01 03 02 Kertas Kwarto Kwarto 60 Gram Rim/500 45.000
1 1 7 01 03 02 Kertas Kwarto Kwarto 70 Gram Rim/500 47.000
1 1 7 01 03 02 Kertas Kwarto Kwarto 80 Gram Rim/500 52.000
1 1 7 01 03 02 Kertas HVS DF Uk. 33 x 43 cm, Berat 60 gr Rim/500 74.000
1 1 7 01 03 02 Kertas HVS DF Uk. 33 x 43 cm, Berat 70 gr Rim/500 83.000
1 1 7 01 03 02 Kertas HVS DF Uk. 33 x 43 cm, Berat 80 gr Rim/500 104.000
1 1 7 01 03 02 Kertas HVS Double Kwarto Uk. 29 x 43 cm, Berat 60 gr Rim/500 69.000
1 1 7 01 03 02 Kertas HVS Double Kwarto Uk. 29 x 43 cm, Berat 70 gr Rim/500 78.000
1 1 7 01 03 02 Kertas HVS Double Kwarto Uk. 29 x 43 cm, Berat 80 gr Rim/500 93.000
1 1 7 01 03 02 002 Berbagai Kertas
1 1 7 01 03 02 Kertas Sheet Merk Falcon Uk. 60 x 80 cm Lembar 139.000
1 1 7 01 03 02 Kertas Faximile Gulung 37.000
1 1 7 01 03 02 Kertas Bergaris Doeble Folio 100 lbr 25.700
1 1 7 01 03 02 Kertas Brifkard 86 x 60 cm Lembar 11.000
1 1 7 01 03 02 Kertas Bufalow F4 Pak 30.900
1 1 7 01 03 02 Kertas Bufalow Besar Lembar 9.000
1 1 7 01 03 02 Kertas Casing Flano Lembar 9.000
1 1 7 01 03 02 Kertas Casing Pembungkus Tauca / brand Lembar 4.100
1 1 7 01 03 02 Kertas Copatur Folio Rim/500 58.000
1 1 7 01 03 02 Kertas Dorslag Folio Rim/500 6.000
1 1 7 01 03 02 Kertas Origami Pak 5.100
1 1 7 01 03 02 Kertas Karton Pak 3.000
1 1 7 01 03 02 Kertas Foto Pak 39.200
1 1 7 01 03 02 Kertas Duplikator (cap burung) Folio Rim/500 54.000
1 1 7 01 03 02 Kertas Duplikator (cap burung) Doeble Folio Rim/500 62.000
1 1 7 01 03 02 Kertas Faxmile Uk. 210mm x 30 mm Gulung 31.000
1 1 7 01 03 02 Kertas Faxmile Uk. 210 x 30 Roll 78.000
1 1 7 01 03 02 Kertas Faxmile Uk. 210 x 50 Roll 155.000
1 1 7 01 03 02 Kertas Faxmile Uk. 210 x 100 Roll 310.000
1 1 7 01 03 02 Kertas Kalkir Diamant 80/85 Gr Roll 135.000
1 1 7 01 03 02 Kertas Kalkir Diamant 80/85 Gr Roll 160.000
1 1 7 01 03 02 Kertas Kalkir Osolino Isi 10 Lbr Rol 87.000
1 1 7 01 03 02 Kertas Kalkir 100/105 Rol 14.000
1 1 7 01 03 02 Kertas Kas Register Lembar 7.000
1 1 7 01 03 02 Kertas Komputer 1 ply 9 1/2 x 11 dus 140.000
1 1 7 01 03 02 Kertas Komputer 1 Ply 2000 Lembar Box 241.000
1 1 7 01 03 02 Kertas Komputer 2 Ply 1000 Set Box 238.000
1 1 7 01 03 02 Kertas Komputer 3 Ply 1000 Set Box 367.000
1 1 7 01 03 02 Kertas Komputer 4 Ply 500 Set Box 589.000
1 1 7 01 03 02 Kertas Komputer 5 Ply 500 Set Box 645.000
1 1 7 01 03 02 Kertas Komputer 6 Ply 500 Set Box 628.000
1 1 7 01 03 02 Kertas Komputer 1 Ply 2000 Lembar Box 358.000
1 1 7 01 03 02 Kertas Komputer 2 Ply 1000 Set Box 305.000
1 1 7 01 03 02 Kertas Komputer 3 Ply 1000 Set Box 866.000
1 1 7 01 03 02 Kertas Komputer 4 Ply 1000 Set Box 880.000
1 1 7 01 03 02 Kertas Komputer 5 Ply 500 Set Box 813.000
1 1 7 01 03 02 Kertas Komputer 6 Ply 500 Set Box 1.029.000
1 1 7 01 03 02 Kertas Komputer NCR 3 Ply 14 7/8 x 11" : 1000 Set Box 542.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 02 Kertas Krap ( Hias ) Tauca/Brand Lembar 3.000
1 1 7 01 03 02 Kertas Krap ( Hias ) Hias Lembar 3.000
1 1 7 01 03 02 Kertas Krap Pembungkus Tauca / brand Lembar 4.000
1 1 7 01 03 02 Kertas Krap Pembungkus Pembungkus Lembar 3.000
1 1 7 01 03 02 Kertas Krap Pembungkus Mentalik Hias Lembar 3.000
1 1 7 01 03 02 Kertas Krap Pembungkus Marmer Kraf Warna Lembar 4.000
1 1 7 01 03 02 Kertas Pembungkus Arsip Lembar 3.000
1 1 7 01 03 02 Kertas Marmar Krap Warna Tauca/Brand Lembar 4.000
1 1 7 01 03 02 Kertas Mesin Hitung Uk. 5.8 Hos Gulung 5.000
1 1 7 01 03 02 Hero 5.8 x 6.5 cm Rol 13.000
1 1 7 01 03 02 Hero 6.8 x 6.5 cm Rol 16.000
1 1 7 01 03 02 Hero 7.5 x 6.5 cm Rol 20.000
1 1 7 01 03 02 Hero 4.8 x 5.8 cm Rol 227.000
1 1 7 01 03 02 Hero 5.8 x 6.8 cm Rol 41.000
1 1 7 01 03 02 Kertas Mesin Kira ( Koran ) HVS 5.8 Lembar 8.000
1 1 7 01 03 02 Kertas Mesin Sandi 1 Pak isi 25 Roll Pak 258.000
1 1 7 01 03 02 Kertas Metalik ( Hias ) Tauca/Brand Lembar 3.000
1 1 7 01 03 02 Kertas MiliMeter Star Rol 57.000
1 1 7 01 03 02 Kertas MiliMeter Folio Rim/500 44.000
1 1 7 01 03 02 Kertas MiliMeter Qalkuer Star Rim/500 48.000
1 1 7 01 03 02 Kertas Minyak Pembersih Lensa Kotak 17.000
1 1 7 01 03 02 Kertas NCR Isi 300 Blok 78.000
1 1 7 01 03 02 Kertas NCR Isi 500 Blok 124.000
1 1 7 01 03 02 Kertas Padalarang Gulung 9.000
1 1 7 01 03 02 Kertas Penghisap Lembar 2.000
1 1 7 01 03 02 Kertas Qakuer Dinamon 70/75 gram Rol 38.000
1 1 7 01 03 02 Kertas Sampul Copy Lembar 6.000
1 1 7 01 03 02 Kertas Sampul Licin Plano 28 Gram Lembar 3.000
1 1 7 01 03 02 Kertas Stensil Folio Rim/500 40.000
1 1 7 01 03 02 Kertas Stensil Doeble Folio Rim/500 62.000
1 1 7 01 03 02 Kertas Stensil ( Buram ) Folio Rim 29.000
1 1 7 01 03 02 Kertas Stensil ( Buram ) Doble Folio Rim 44.000
1 1 7 01 03 02 Kertas Stensil Koran Folio Rim/500 37.000
1 1 7 01 03 02 Kertas Stensil Koran Doble Folio Rim/500 47.000
1 1 7 01 03 02 Kertas Stroks 5,8 Rol 4.000
1 1 7 01 03 02 Kertas Stroks 6,8 Rol 4.000
1 1 7 01 03 02 Kertas Tissu Kotak 16.000
1 1 7 01 03 02 Kertas Total Lucky Linen Rol 6.000
1 1 7 01 03 02 Klip Kertas Kotak Kecil Kotak 6.000
1 1 7 01 03 02 Kop Surat 1/2 Folio NCR Block 35.000
1 1 7 01 03 02 Kop Surat 1 Blk = 100 Set Set 84.000
1 1 7 01 03 02 Kop Surat 1 Set = 2 Lembar Rim 58.000
1 1 7 01 03 02 Kertas Karbon Karbon Globe Executive Block 88.600
1 1 7 01 03 02 Kertas Tissue Gulung Nice Block 40.700
1 1 7 01 03 02 Kertas Ploter A0 45 100 GSM A0 (40") 100 M Roll 413.600
1 1 7 01 03 02 003 Kertas Cover
1 1 7 01 03 02 Kertas Karton Lembar 9.000
1 1 7 01 03 02 Kerta HVS Folia Warna Uk. 32 x 21 cm, Isi 500 Lmbr Rim/500 73.000
1 1 7 01 03 02 Kerta HVS DF Warna Uk. 33 x 43 cm, Berat 60 gr Rim/500 93.000
1 1 7 01 03 02 Kerta HVS DF Warna Uk. 29,7 x 43 cm, Berat 60 gr Rim/500 83.000
1 1 7 01 03 02 Karton Tebal Gloria Licin Putih Lembar 11.000
1 1 7 01 03 02 Karton Tebal Lucky Linen Lembar 9.000
1 1 7 01 03 02 004 Amplop
1 1 7 01 03 02 Amplop Coklat
1 1 7 01 03 02 AA Folio Pak 83.000
1 1 7 01 03 02 GSU F4 Pak 136.000
1 1 7 01 03 02 AA A3 Pak 136.000
1 1 7 01 03 02 Garda Kabinet Pak 41.000
1 1 7 01 03 02 Garda Uang Pak 51.000
1 1 7 01 03 02 Garda 1/2 Folio Pak 40.000
1 1 7 01 03 02 Garda A4 Pak 58.000
1 1 7 01 03 02 Garda B4 Pak 151.000
1 1 7 01 03 02 GSU Super Cabinet Pak 44.000
1 1 7 01 03 02 GSU 1/2 Folio Pak 72.000
1 1 7 01 03 02 GSU Kwarto Pak 87.000
1 1 7 01 03 02 GSU Folio Pak 64.000
1 1 7 01 03 02 GSU B4 Pak 104.000
1 1 7 01 03 02 GSU 30 x 40 cm Pak 211.000
1 1 7 01 03 02 GSU 30 x 40 cm Pak 120.000
1 1 7 01 03 02 Garda Folio Pak 61.000
1 1 7 01 03 02 Garda B4 Pak 88.000
1 1 7 01 03 02 Paravion 12 x 24 cm Pak 58.000
1 1 7 01 03 02 Paravion 13,5 x 27,5 cm Pak 62.000
1 1 7 01 03 02 Paravion 17 x 24 cm Pak 77.000
1 1 7 01 03 02 Paravion 17,5 x 27,5 cm Pak 90.000
1 1 7 01 03 02 Paravion 19,5 x 27,5 cm Pak 92.000
1 1 7 01 03 02 Paravion 24 x 30 cm Pak 109.000
1 1 7 01 03 02 Paravion 25 x 35 cm Pak 115.000
1 1 7 01 03 02 Paravion 27,5 x 37,5 cm Pak 119.000
1 1 7 01 03 02 Paravion 30 x 40 cm Pak 133.000
1 1 7 01 03 02 Paravion 31 x 42 cm Pak 178.000
1 1 7 01 03 02 Paravion 40 x 50 cm Pak 257.000
1 1 7 01 03 02 Paravion 12 x 24 cm Pak 69.000
1 1 7 01 03 02 Paravion 13,5 x 27,5 cm Pak 74.000
1 1 7 01 03 02 Paravion 17 x 24 cm Pak 87.000
1 1 7 01 03 02 Paravion 17,5 x 27,5 cm Pak 103.000
1 1 7 01 03 02 Paravion 19,5 x 27,5 cm Pak 106.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 02 Paravion 24 x 30 cm Pak 116.000
1 1 7 01 03 02 Paravion 25 x 35 cm Pak 125.000
1 1 7 01 03 02 Paravion 27,5 x 37,5 cm Pak 133.000
1 1 7 01 03 02 Paravion 30 x 40 cm Pak 145.000
1 1 7 01 03 02 Paravion Samson Spesial S1 Pak 83.000
1 1 7 01 03 02 Paravion Samson Spesial S2 Pak 68.000
1 1 7 01 03 02 Paravion Samson Spesial S3 Pak 59.000
1 1 7 01 03 02 Paravion Samson Spesial S4 Pak 52.000
1 1 7 01 03 02 Paravion Samson Spesial S5 Pak 35.000
1 1 7 01 03 02 Paravion Samson Spesial S6 Pak 29.000
1 1 7 01 03 02 Premier Samson Premier A Pak 14.000
1 1 7 01 03 02 Premier Samson Premier B Pak 19.000
1 1 7 01 03 02 Premier Samson Premier C Pak 29.000
1 1 7 01 03 02 Premier Samson Premier D Pak 40.000
1 1 7 01 03 02 Premier Samson Premier E Pak 49.000
1 1 7 01 03 02 Jaya 90 Jendela Kiri Pak 40.000
1 1 7 01 03 02 Amplop Putih
1 1 7 01 03 02 Jaya 90 Jendela Kanan Pak 40.000
1 1 7 01 03 02 Jaya 90 Kabinet Pak 27.000
1 1 7 01 03 02 Jaya 110 Persegi Pak 21.000
1 1 7 01 03 02 Jaya 104 Tanggung Pak 18.000
1 1 7 01 03 02 Paperline 90 Kabinet Pak 24.000
1 1 7 01 03 02 Paperline 110 Persegi Pak 19.000
1 1 7 01 03 02 Paperline 104 Tanggung Pak 16.000
1 1 7 01 03 02 Sinar Dunia 90 PPS Pak 37.000
1 1 7 01 03 02 Sinar Dunia 110 PPS Pak 37.000
1 1 7 01 03 02 Royal 90 Kabinet Pak 24.000
1 1 7 01 03 02 Royal 110 Persegi Pak 19.000
1 1 7 01 03 02 Royal 104 Tanggung Pak 16.000
1 1 7 01 03 02 Hambo Pak 58.000
1 1 7 01 03 02 005 Kop Surat
1 1 7 01 03 02 Kop Surat 1/2 Folio NCR Block 35.000
1 1 7 01 03 02 Kop Surat 1 Blk = 100 Set Block 84.000
1 1 7 01 03 02 Kop Surat 1 Set = 2 Lembar Block 58.000
1 1 7 01 03 02 Kop Setda Kertas HVS folio,70 GSM,berlogo Kabupaten Rim 11.200
Siak
1 1 7 01 03 02 Kop Bupati berlogo emas beralamat Kertas HVS folio, warna putih, lambang burung Rim 354.500
garuda
1 1 7 01 03 02 Kop Bupati berlogo emas tidak beralamat Kertas HVS folio, warna putih, lambang burung Rim 336.800
garuda
1 1 7 01 03 03 BAHAN CETAK
1 1 7 01 03 03 001 Transparant Sheet
1 1 7 01 03 03 Mika Bening Mika Bening Lembaran 0.5mm PVC Clear Sheet Lembar 174.000

1 1 7 01 03 03 Mika Bening Mika Bening Lembaran 0.5mm PVC Clear Sheet Lembar 524.000

1 1 7 01 03 03 002 Tinta Cetak


1 1 7 01 03 03 Tinta Flutter Hitam Canon Set 1.548.000
1 1 7 01 03 03 Tinta Flutter Warna Canon Set 2.321.000
1 1 7 01 03 03 Tinta Canon BCI -24 Black Botol 78.000
1 1 7 01 03 03 Tinta Canon BC-03 Botol 78.000
1 1 7 01 03 03 Tinta Canon BCI - 24 Color Coral Botol 78.000
1 1 7 01 03 03 Tinta Canon BCI - 3e BK Botol 336.000
1 1 7 01 03 03 Tinta Canon BE-20 Buah 465.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml Black Botol 217.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml Cyan Botol 217.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml Magenta Botol 222.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml Yellow Botol 222.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml Light Cyan Botol 222.000
1 1 7 01 03 03 Tinta Printer Inkjet Epson L-Series 250 ml light Magenta Botol 222.000
1 1 7 01 03 03 Tinta Fax Botol 166.000
1 1 7 01 03 03 Tinta Grafika Botol 47.000
1 1 7 01 03 03 Tinta HP. 51626 A Botol 442.000
1 1 7 01 03 03 Tinta HP.51649 A ( Warna ) Botol 449.000
1 1 7 01 03 03 Tinta HP.C 6614 D ( Hitam ) Botol 408.000
1 1 7 01 03 03 Tinta Komputer HP 51626 A Botol 264.000
1 1 7 01 03 03 Tinta Komputer Canon BC-20 Botol 52.000
1 1 7 01 03 03 Tinta Koreksi ASIA Botol 18.000
1 1 7 01 03 03 Tinta Tanda Coblos Botol 41.000
1 1 7 01 03 03 Tinta Photo Copy HP 120 Gestetner Botol 253.000
1 1 7 01 03 03 Tinta Photo Copy HP 120 Canon No.1 Botol 181.000
1 1 7 01 03 03 Tinta Printer Laser Jet Botol 748.000
1 1 7 01 03 03 Tinta Stempel Botol 16.000
1 1 7 01 03 03 Tinta Stempel Lokal Botol 39.000
1 1 7 01 03 03 Tinta Stempel Luar Negeri (Artline) Botol 36.000
1 1 7 01 03 03 Tinta Stensil Gestetner Botol 39.000
1 1 7 01 03 03 Tinta Stensil Merk Aneka Lokal Tube 47.000
1 1 7 01 03 03 Tinta Stensil Merk Daito 747 Tube 55.000
1 1 7 01 03 03 Tinta Stensil Merk Gestetner 44 L Tube 117.000
1 1 7 01 03 03 Tinta Stensil Merk Richi Tube 47.000
1 1 7 01 03 03 Tinta Warna Hitam Desjet 670c Botol 325.000
1 1 7 01 03 03 Tinta Warna HP Desjet 670c Botol 390.000
1 1 7 01 03 03 Tip-Ex Kotak 11.000
1 1 7 01 03 03 Toner photocopy (lengkap) TN311 Tabung 159.900
1 1 7 01 03 03 Toner HP Laserjet P 1006 Tabung 697.000
1 1 7 01 03 03 Ribbon Printonix Set 1.290.000
1 1 7 01 03 03 Catrige Canon Black Buah 288.300
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 03 Catrige Canon Warna Buah 333.200
1 1 7 01 03 03 Tinta Epson Botol 77.900
1 1 7 01 03 03 Serbuk Toner Refill Buah 183.100
1 1 7 01 03 03 Tinta Security/Ribbon Buah 4.643.100
1 1 7 01 03 03 Cartridge Canon 810 Black Cartridge Canon 810 Black Buah 319.000
1 1 7 01 03 03 Cartridge Canon 811 Colour Cartridge Canon 811 Colour Buah 319.000
1 1 7 01 03 03 Cartridge Canon 830 Black Cartridge Canon 830 Black Buah 319.000
1 1 7 01 03 03 Cartridge Canon 831 Colour Cartridge Canon 831 Colour Buah 319.000
1 1 7 01 03 03 Cartridge HP Office jet 7610/7612 Black 932 black Buah 437.200
1 1 7 01 03 03 Cartridge HP Office jet 7610/7612 Cyan 932 cyan Buah 259.900
1 1 7 01 03 03 Cartridge HP Office jet 7610/7612 Magenta 932 magenta Buah 259.900
1 1 7 01 03 03 Cartridge HP Office Jet 7610/7612 Yellow 932 yellow Buah 259.900
1 1 7 01 03 03 Cartridge LC400BK Printer Brother MFC J5910 DW Cartridge LC400BK Buah 177.200
1 1 7 01 03 03 Cartridge LC400C Printer Brother MFC J5910 DW Cartridge LC400C Buah 147.700
1 1 7 01 03 03 Cartridge LC400M Printer Brother MFC J5910 DW Cartridge LC400M Buah 147.700
1 1 7 01 03 03 Cartridge LC400Y Printer Brother MFC J5910 DW Cartridge LC 400Y Buah 147.700
1 1 7 01 03 03 HP Ploter Black 500,500PS,510,800,815MFP,820MFP Unit 1.884.600
1 1 7 01 03 03 HP Ploter Colour 500,500PS,510,800,815MFP,820MFP Unit 2.002.400
1 1 7 01 03 03 003 Plat Cetak
1 1 7 01 03 03 Plat cetak Unit 278.500
1 1 7 01 03 03 Plat Cetak PLATINUM mesin Folio Unit 6.100
1 1 7 01 03 03 005 Film Cetak
1 1 7 01 03 03 Roll Film cetak 4r Roll 4.100
1 1 7 01 03 03 10rs Roll 11.300
1 1 7 01 03 03 14r Roll 40.200
1 1 7 01 03 03 HDP Rescrue printer film Plastik 2.040.900
1 1 7 01 03 03 006 Stensil Sheet
1 1 7 01 03 03 Kertas Stensil Folio Rim/500 40.000
1 1 7 01 03 03 Kertas Stensil Doeble Folio Rim/500 62.000
1 1 7 01 03 03 Kertas Stensil ( Buram ) Folio Rim 29.000
1 1 7 01 03 03 Kertas Stensil ( Buram ) Doble Folio Rim 44.000
1 1 7 01 03 03 Kertas Stensil Koran Folio Rim/500 37.000
1 1 7 01 03 03 Kertas Stensil Koran Doble Folio Rim/500 47.000
1 1 7 01 03 03 Tinta Stensil Gestetner Botol 39.000
1 1 7 01 03 03 Tinta Stensil Merk Aneka Lokal Tube 47.000
1 1 7 01 03 03 Tinta Stensil Merk Daito 747 Tube 55.000
1 1 7 01 03 03 Tinta Stensil Merk Gestetner 44 L Tube 117.000
1 1 7 01 03 03 Tinta Stensil Merk Richi Tube 47.000
1 1 7 01 03 03 007 Spanduk, Baliho dan Standing Banner
1 1 7 01 03 03 Spanduk Meter 82.700
1 1 7 01 03 03 Spanduk Contoh : Seminar Sehari Tentang Anak Set 472.700
Berhadapan Dengan Hukum (ABH), Forum
Group Discussion (FGD) Penanganan Anak
Berhadapan Dengan Hukum (ABH) dan
Pembinaan Dan Sinkronisasi Forum Anak Di 14
Kecamatan
1 1 7 01 03 03 Baliho Meter 147.700
1 1 7 01 03 03 Banner Unit 354.500
1 1 7 01 03 03 Umbul - umbul Lembar 590.900
1 1 7 01 03 03 Papan Himbauan Bahan plat besi, tulisan stiker laminating, uk. 120 Set 2.533.400
cm x 170 cm, tinggi 320 cm
1 1 7 01 03 03 Balon terbang (untuk publikasi) Set 11.800
1 1 7 01 03 04 BENDA POS
1 1 7 01 03 04 001 Materai
1 1 7 01 03 04 Materai 3000 Rp. 3000 Buah 4.000
1 1 7 01 03 04 Materai 6000 Rp. 6000 Buah 7.000
1 1 7 01 03 04 002 Perangko
1 1 7 01 03 04 Perangko 3000 Rp. 3000 Buah 3.500
1 1 7 01 03 04 Perangko 5000 Rp. 5000 Buah 6.000
1 1 7 01 03 04 Perangko 8000 Rp. 8000 Buah 9.000
1 1 7 01 03 04 Perangko 10000 Rp. 10000 Buah 11.000
1 1 7 01 03 06 BAHAN KOMPUTER
1 1 7 01 03 06 001 Continuous Form
1 1 7 01 03 06 Continuous Form 1 ply 2000 S Box 280.000
1 1 7 01 03 06 Continuous Form 2 ply 1000 S Box 604.000
1 1 7 01 03 06 Continuous Form 3 ply 1000 S Box 776.000
1 1 7 01 03 06 Continuous Form 4 ply 500 S Box 776.000
1 1 7 01 03 06 Continuous Form 5 ply 500 S Box 903.000
1 1 7 01 03 06 CF 14 7/8 x 11 1 ply 2000 S Box 572.000
1 1 7 01 03 06 CF 14 7/8 x 11 2 ply 1000 S Box 648.000
1 1 7 01 03 06 CF 14 7/8 x 11 3 ply 1000 S Box 922.000
1 1 7 01 03 06 CF 14 7/8 x 11 4 ply 500 S Box 986.000
1 1 7 01 03 06 CF 14 7/8 x 11 5 ply 500 S Box 986.000
1 1 7 01 03 06 002 Computer File/Tempat Disket
1 1 7 01 03 06 Tempat CD Buah 241.000
1 1 7 01 03 06 003 Pita Printer
1 1 7 01 03 06 Isi Pita Printer Epson LX-300 Buah 175.400
1 1 7 01 03 06 Epson S015140 - 2170 Buah 37.000
1 1 7 01 03 06 Epson S015264 - 8750 Buah 88.000
1 1 7 01 03 06 Epson S015142 - 7754 Buah 22.000
1 1 7 01 03 06 Epson S01533 - 8766 Buah 330.000
1 1 7 01 03 06 Epson S01033 Buah 32.000
1 1 7 01 03 06 Epson S01033 Buah 154.000
1 1 7 01 03 06 Epson SO15086 Buah 386.000
1 1 7 01 03 06 Epson SO15086 Buah 370.000
1 1 7 01 03 06 Epson SO15086 Buah 289.000
1 1 7 01 03 06 Epson SO15086 Buah 595.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 06 Epson SO15086 Buah 595.000
1 1 7 01 03 06 Epson SO15086 Buah 239.000
1 1 7 01 03 06 Epson SO15086 Buah 595.000
1 1 7 01 03 06 004 Tinta/Toner Printer
1 1 7 01 03 06 Tinta Flutter Hitam Canon Set
1 1 7 01 03 06 Tinta Flutter Warna Canon Set
1 1 7 01 03 06 Tinta Print Canon Canon BC-20 Botol 52.000
1 1 7 01 03 06 Tinta Canon BCI -24 Black Botol 78.000
1 1 7 01 03 06 Tinta Canon BC-03 Botol 78.000
1 1 7 01 03 06 Tinta Canon BCI - 24 Color Coral Botol 78.000
1 1 7 01 03 06 Tinta Canon BCI - 3e BK Botol 336.000
1 1 7 01 03 06 Tinta HP. 51626 A Botol 442.000
1 1 7 01 03 06 Tinta HP.51649 A ( Warna ) Botol 446.000
1 1 7 01 03 06 Tinta HP.C 6614 D ( Hitam ) Botol 408.000
1 1 7 01 03 06 Tinta Epson Botol 93.000
1 1 7 01 03 06 Tinta Warna HP Desjet 670c Botol 390.000
1 1 7 01 03 06 Tinta Print HP HP 51626 A Botol 264.000
1 1 7 01 03 06 Tinta Printer Inkjet Epson L-Series 250 ml Black Botol 123.800
1 1 7 01 03 06 Epson L-Series 250 ml Cyan Botol 123.800
1 1 7 01 03 06 Epson L-Series 250 ml Magenta Botol 123.800
1 1 7 01 03 06 Epson L-Series 250 ml Yellow Botol 123.800
1 1 7 01 03 06 Epson L-Series 250 ml Light Cyan Botol 123.800
1 1 7 01 03 06 Epson L-Series 250 ml light Magenta Botol 123.800
1 1 7 01 03 06 Tinta Fax Botol 207.000
1 1 7 01 03 06 Tinta Photo Copy HP 120 Gestetner Botol 253.000
1 1 7 01 03 06 Tinta Photo Copy HP 120 Canon No.1 Botol 181.000
1 1 7 01 03 06 Tinta Warna Hitam Desjet 670c Botol 325.000
1 1 7 01 03 06 Tinta Printer Laser Jet Botol 748.000
1 1 7 01 03 06 Serbuk Toner Refill Buah 258.000
1 1 7 01 03 06 Tinta Eprint Botol 76.800
1 1 7 01 03 06 Tinta Data Print Botol 41.300
1 1 7 01 03 06 Toner HP Laserjet Pro M201n toner HP 83A Tabung 1.063.600
1 1 7 01 03 06 Ribbon BLACK EPSON LQ 2180/2190 Ribbon Black EPSON LQ 2180/2190 Buah 159.500
1 1 7 01 03 06 Toner Printer Laserjet Fuji Xerox Docuprint 3105 Fuji Xerox Tabung 3.663.500
1 1 7 01 03 06 Toner Printer Laserjet Fuji Xerox PE220 Toner printer laserjet fuji xerox PE220 Tabung 1.654.500
1 1 7 01 03 06 Toner Printer Laserjet TN 2130 Brother MFC 7340 Toner brother TN 2130 Tabung 886.300
1 1 7 01 03 06 Toner Printer Laserjet TN 2260 Brother MFC 7360 Toner brother TN 2260 Tabung 768.100
1 1 7 01 03 06 Toner Printer Laserjet 85A HP P1102 Toner HP 85 A Tabung 1.063.600
1 1 7 01 03 06 Toner Printer Laserjet 12A HP P1020 Toner HP 12 A Tabung 1.122.700
1 1 7 01 03 06 Toner Printer Brother HL-61 Set 1.290.000
1 1 7 01 03 06 005 Disket
1 1 7 01 03 06 Flooyy disket Verbatim 1,44 MB Buah 33.000
1 1 7 01 03 06 006 USB/Flash Disk
1 1 7 01 03 06 USB 2.0 Flash Drive SanDisk Cruzer Blade 2.0 CZ50-8GB 8 GB Buah 101.000
1 1 7 01 03 06 SanDisk Ultra Flair USB3.0 CZ73-16GB Buah 127.900
1 1 7 01 03 06 SanDisk Cruzer Blade 2.0 CZ50-32GB Buah 143.300
1 1 7 01 03 06 USB 3.0 Flash Drive SanDisk Ultra Dual USB Drive 3.0 16GB Flash Buah 132.000
Drive
1 1 7 01 03 06 SanDisk Cruzer Fit 2.0 CZ33-32GB Buah 183.600
1 1 7 01 03 06 Sandisk Cool Czech OTG Flash Drive USB 3.0 Buah 265.000
32GB
1 1 7 01 03 06 SanDisk Ultra USB 3.0 CZ48-64GB Buah 292.900
1 1 7 01 03 06 USB 3.1 Flash Drive SANDISK Ultra Fit USB3.1 CZ430-128GB Buah 462.100
1 1 7 01 03 06 USB 3.1 Flash Drive Sandisk OTG Type-C Flash Drive USB 3.1 - Buah 518.800
64GB
1 1 7 01 03 06 007 Kartu Memori
1 1 7 01 03 06 Kartu memori Sandisk Micro SDXC 80 MB/S 64GB Class 10 unit 392.000
1 1 7 01 03 06 Kartu memori Sandisk Ultra 32GB Class 10 original Memory unit 227.000
1 1 7 01 03 06 Memory Card SDHC Extreme Pro 16 GB Buah 886.300
1 1 7 01 03 06 Compact Flash (CF) 16 GB Buah 1.028.100
1 1 7 01 03 06 Secure Access Module (SAM) Buah 295.400
1 1 7 01 03 06 008 CD/DVD Drive
1 1 7 01 03 06 CD-R ( CD Recordable ) Sony Buah 19.000
1 1 7 01 03 06 Sony Pak 763.000
1 1 7 01 03 06 Verbatim Pak 191.000
1 1 7 01 03 06 Verbatim Buah 16.000
1 1 7 01 03 06 Mediatech Pak 193.000
1 1 7 01 03 06 Imation Pak 176.000
1 1 7 01 03 06 Maxell Pak 212.000
1 1 7 01 03 06 Maxell Buah 16.000
1 1 7 01 03 06 Verbatim Buah 276.000
1 1 7 01 03 06 Sony Buah 18.000
1 1 7 01 03 06 Blank Buah 10.000
1 1 7 01 03 06 CD-R Mini Imation Buah 18.000
1 1 7 01 03 06 Verbatim Buah 20.000
1 1 7 01 03 06 DVD-R Verbatim Pak 367.000
1 1 7 01 03 06 Verbatim Pak 305.000
1 1 7 01 03 06 Verbatim Buah 30.000
1 1 7 01 03 06 Sony Pak 256.000
1 1 7 01 03 06 Verbatim Pak 413.000
1 1 7 01 03 06 Verbatim Buah 23.000
1 1 7 01 03 06 Verbatim Buah 165.000
1 1 7 01 03 06 Verbatim Buah 205.000
1 1 7 01 03 06 CDRW GTpro Pak 440.000
1 1 7 01 03 06 Mediatech Pak 413.000
1 1 7 01 03 06 Sony Pak 34.000
1 1 7 01 03 06 Sony Pak 37.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 06 DVD-RW Verbatim Buah 44.000
1 1 7 01 03 06 Verbatim Buah 47.000
1 1 7 01 03 06 Verbatim Buah 82.000
1 1 7 01 03 06 Verbatim Pak 293.000
1 1 7 01 03 06 Verbatim Buah 246.000
1 1 7 01 03 06 Verbatim Buah 246.000
1 1 7 01 03 06 Verbatim Buah 19.000
1 1 7 01 03 06 009 Hard Disk Internal
1 1 7 01 03 06 Hardisk SEAGATE Barracuda 250 GB 250 GB,7200 RPM,SATA III,16MB,3,5" Unit 624.000
1 1 7 01 03 06 Hardisk SEAGATE Barracuda 500 GB 500 GB,7200 RPM,SATA III,16MB,3,5" Unit 665.300
1 1 7 01 03 06 Hardisk SEAGATE Momentum 500 GB 500 GB,5400 RPM,SATA III,16MB,3,5" Unit 706.500
1 1 7 01 03 06 Hardisk SEAGATE Barracuda 1 TB 1 TB,7200 RPM,SATA III,64MB,3,5" Unit 850.900
1 1 7 01 03 06 Hardisk SEAGATE Barracuda 2 TB 2 TB,7200 RPM,SATA III,64MB,3,5" Unit 1.217.100
1 1 7 01 03 06 Hardisk SEAGATE Barracuda 3 TB 3 TB,7200 RPM,SATA III,64MB Unit 1.624.600
1 1 7 01 03 06 Hardisk SEAGATE 4 HDD TB 4 TB,SATA III,64MB Unit 2.418.800
1 1 7 01 03 06 010 Mouse
1 1 7 01 03 06 Mouse 4 GHz wireless technology Mouse, Nano- Unit 280.500
receiver, USB
1 1 7 01 03 06 Wireless Optical Mouse,1600dpi, USB Unit 294.500
1 1 7 01 03 06 2.4GHz Wireless, BlueEye Technology, Stick-N- Unit 490.800
Go Mount, 1200 dpi, USB
1 1 7 01 03 06 2.4 GHz Wireless, Up to 9- month battery Unit 154.200
life,USB Nanoreceiver, 1000 DPI
1 1 7 01 03 06 011 CD/DVD
1 1 7 01 03 06 CD R Verbatim 50 Pcs 700 MB Pcs 225.800
1 1 7 01 03 06 DVD R VERBATIM DVD -/+R 4.7 GB Spindle 50 Pcs Pcs 290.800
1 1 7 01 03 07 PERABOT KANTOR
1 1 7 01 03 07 001 Sapu Dan Sikat
1 1 7 01 03 07 Sapu lidi Buah 10.300
1 1 7 01 03 07 Sapu plastik Buah 37.000
1 1 7 01 03 07 Sapu Lantai Buah 94.500
1 1 7 01 03 07 Sapu taman Buah 100.400
1 1 7 01 03 07 Sapu Ijuk - Pendek Buah 16.000
1 1 7 01 03 07 - Panjang Buah 21.000
1 1 7 01 03 07 Bros Lantai - Kawat Buah 10.000
1 1 7 01 03 07 - Plastik Buah 16.000
1 1 7 01 03 07 Bros WC - Biasa Buah 16.000
1 1 7 01 03 07 - Narita Buah 19.000
1 1 7 01 03 07 - Nagata Buah 50.000
1 1 7 01 03 07 Sikat/Bros WC Lion Star Buah 13.500
1 1 7 01 03 07 Sikat gigi Pepsodent Buah 13.500
1 1 7 01 03 07 002 Alat-Alat Pel Dan Lap
1 1 7 01 03 07 Sapu pel jambul Buah 37.000
1 1 7 01 03 07 Sapu pel karet sogun Buah 73.000
1 1 7 01 03 07 Sapu pel tarik nagata Buah 73.000
1 1 7 01 03 07 Kain pel tangkai Buah 37.000
1 1 7 01 03 07 Kain Lap Tangan Lusin 46.400
1 1 7 01 03 07 Lap bulu ayam Buah 29.900
1 1 7 01 03 07 Lap tangan gantung Buah 23.700
1 1 7 01 03 07 lap piring Buah 23.700
1 1 7 01 03 07 003 Ember, Selang, Dan Tempat Air Lainnya
1 1 7 01 03 07 Ember besar tutup 50 ltr Buah 59.000
1 1 7 01 03 07 Ember kecil Buah 72.700
1 1 7 01 03 07 Selang Air Meter 114.000
1 1 7 01 03 07 Gayung Lion star Buah 51.500
1 1 7 01 03 07 Ember plastik Buah 154.700
1 1 7 01 03 07 Skop sampah Buah 154.700
1 1 7 01 03 07 004 Keset Dan Tempat Sampah
1 1 7 01 03 07 Keset kaki kain menengah Buah 87.700
1 1 7 01 03 07 Keset kaki karet Buah 104.000
1 1 7 01 03 07 Keset kaki serabut besar Buah 116.000
1 1 7 01 03 07 Keset kaki serabut menengah Buah 57.000
1 1 7 01 03 07 Tempat sampah biasa besar Buah 18.500
1 1 7 01 03 07 Tempat sampah biasa kecil Buah 13.400
1 1 7 01 03 07 Tempat sampah sinpo kecil Buah 37.000
1 1 7 01 03 07 Tempat sampah tutup menengah Buah 31.000
1 1 7 01 03 07 Tempat sampah tutup waran menengah Buah 24.000
1 1 7 01 03 07 Tempat sampah tutup waran besar Buah 57.000
1 1 7 01 03 07 Keset karpet Ul. 42 x 50 cm Buah 34.200
1 1 7 01 03 07 Celemek Buah 20.000
1 1 7 01 03 07 Serbet Buah 27.100
1 1 7 01 03 07 Tong Sampah Buah 118.100
1 1 7 01 03 07 005 Kunci, Kran Dan Semprotan
1 1 7 01 03 07 Kunci Kunci 2 Slaag Kwalitas Bagus 323.000
1 1 7 01 03 07 Kunci 2 Slaag Kwalitas Menengah Bh 48.000
1 1 7 01 03 07 Kunci 2 Slaag Kwalitas Bagus Bh 29.000
1 1 7 01 03 07 Kunci 1 Slag Kwalitas Bagus Bh 29.000
1 1 7 01 03 07 Kunci 1 Slag Kwalitas Menengah Bh 29.000
1 1 7 01 03 07 Kunci 1 Slag Kwalitas Bagus Bh 21.000
1 1 7 01 03 07 Kunci Toilet Kwalitas Bagus Bh 42.000
1 1 7 01 03 07 Kunci Toilet Kwalitas Menengah Bh 163.000
1 1 7 01 03 07 Kunci Toilet Kwalitas Biasa Bh 83.000
1 1 7 01 03 07 Kran Kran air Kwalitas Bagus Bh 155.000
1 1 7 01 03 07 Kran air Kwalitas Menengah Bh 61.000
1 1 7 01 03 07 Kran air Kwalitas Biasa Bh 35.000
1 1 7 01 03 07 Kunci Inggris Merk Tekiro Bh 53.100
1 1 7 01 03 07 006 Alat Pengikat
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 07 Tali Nilon Roll 48.000
1 1 7 01 03 07 Tali Stapping band 15mm Roll 206.300
1 1 7 01 03 07 Tali tambang 5mm Roll 154.700
1 1 7 01 03 07 Tali plastik rafia 1 kg Roll 15.400
1 1 7 01 03 07 Tali tambang plastik 8mm Roll 361.000
1 1 7 01 03 07 Klem kabel 8 mm Clipsal Roll 29.500
1 1 7 01 03 07 Tali Ijuk Clipsal Kg 5.900
1 1 7 01 03 07 007 Peralatan Ledeng
1 1 7 01 03 07 Metal Fitting Buah 706.500
1 1 7 01 03 07 Pipa ledeng Roll 743.700
1 1 7 01 03 07 Tang potong Tekiro Buah 59.000
1 1 7 01 03 07 Tang kombinasi Tekiro Buah 59.000
1 1 7 01 03 07 Tang klancip Tekiro Buah 53.100
1 1 7 01 03 07 Obeng plus Kokon Buah 35.400
1 1 7 01 03 07 Obeng minus Japaline Buah 29.500
1 1 7 01 03 07 Martil Fukung Buah 41.300
1 1 7 01 03 07 008 Bahan Kimia Untuk Pembersih
1 1 7 01 03 07 Densol carbon lusinan lusin 372.000
1 1 7 01 03 07 Densol prostex proslen lusinan lusin 310.000
1 1 7 01 03 07 Densol prostex proslen botol besar botol 26.000
1 1 7 01 03 07 Densol prostex proslen botol kecil botol 181.000
1 1 7 01 03 07 Densol wipol lusin 310.000
1 1 7 01 03 07 Super Pel botol 16.000
1 1 7 01 03 07 Karbol kaleng 16.000
1 1 7 01 03 07 Pembersih lantai protek botol 24.000
1 1 7 01 03 07 Sabun mandi Dettol Cair botol 16.500
1 1 7 01 03 07 Odol gigi Pepsodent 225 gr kotak 15.300
1 1 7 01 03 07 Anti serangga Baygon cair 275 ml Buah 23.600
1 1 7 01 03 07 Sabun cuci Rinso 900 gr Bungkus 24.200
1 1 7 01 03 07 Pengharum pakaian Downy 900 ml Botol 54.900
1 1 7 01 03 07 sampho Rejoyce 170 ml Botol 21.800
1 1 7 01 03 07 Semir sepatu hitam Kiwi 75 ml Botol 30.100
1 1 7 01 03 07 Semir sepatu coklat Kiwi 75 ml Botol 30.100
1 1 7 01 03 07 Sabun cuci piring Sunlight 750 ml Botol 27.100
1 1 7 01 03 07 Pengkilat perabot Pledge 350 gr Kaleng 40.700
1 1 7 01 03 07 Pemutih Bayclin 500 ml Botol 7.600
1 1 7 01 03 07 Busa pembersih Buah 11.200
1 1 7 01 03 07 Pembersih Kaca Cling 425 ml Botol 13.500
1 1 7 01 03 07 009 Alat Untuk Makan Dan Minum
1 1 7 01 03 07 Gelas Merk Sango Polos Kotak 7.000
1 1 7 01 03 07 Gelas Merk Sango Polos Kotak 68.000
1 1 7 01 03 07 Gelas Merk Sango Kembang Kotak 78.000
1 1 7 01 03 07 Gelas Merk RRT Kotak 93.000
1 1 7 01 03 07 Gelas Merk RRT Kembang Kotak 93.000
1 1 7 01 03 07 Gelas HS 830 Lusin 310.000
1 1 7 01 03 07 Gelas Mug Melamin Pakai Tutup Besar Buah 44.000
1 1 7 01 03 07 Gelas Mug Melamin Pakai Tutup Tanggung Buah 35.000
1 1 7 01 03 07 Gelas Mug Melamin Pakai Tutup Kecil Buah 31.000
1 1 7 01 03 07 Gelas Es 212 Lusin 22.000
1 1 7 01 03 07 Gelas Es HS-9 Lusin 16.000
1 1 7 01 03 07 Gelas Blimbingan Lusin 23.000
1 1 7 01 03 07 Gelas Duralex Tinggi Lusin 117.000
1 1 7 01 03 07 Gelas Duralex Pendek Lusin 78.000
1 1 7 01 03 07 Gelas Polos Puith, Coklat Tinggi Lusin 48.000
1 1 7 01 03 07 Gelas Polos Putih, Coklat Pendek Lusin 33.000
1 1 7 01 03 07 Gelas Berkaki Dema Lusin 186.000
1 1 7 01 03 07 Gelas Berkaki Dema Lusin 206.000
1 1 7 01 03 07 Gelas Bistro/Anggel Lusin 233.000
1 1 7 01 03 07 Gelas Berkaki Kendang Firna Lusin 117.000
1 1 7 01 03 07 Gelas Berkaki Biasa Lusin 62.000
1 1 7 01 03 07 Gelas Berkaki Biasa Lusin 83.000
1 1 7 01 03 07 Gelas Berkaki Pakai Lis 1 Lusin 457.000
1 1 7 01 03 07 Gelas Berkaki Pakai Lis 2 Lusin 387.000
1 1 7 01 03 07 Gelas HS 06 VIP Buah 21.000
1 1 7 01 03 07 Gelas Tinggi Gold Buah 31.000
1 1 7 01 03 07 Gelas Coctail HS Buah 62.000
1 1 7 01 03 07 Gelas Makan Tinggi Dema Buah 26.000
1 1 7 01 03 07 Gelas Makan Biasa Gross 283.000
1 1 7 01 03 07 Gelas Makan Model Tinggi Gross 1.238.000
1 1 7 01 03 07 Gelas Teh RRT Lusin 68.000
1 1 7 01 03 07 Sango Lusin 88.000
1 1 7 01 03 07 Teko Stenlis Nanyang Buah 16.000
1 1 7 01 03 07 Bima 24" Buah 98.000
1 1 7 01 03 07 Piring Makan Duralex Buah 52.000
1 1 7 01 03 07 Acapai 10,5 Lusin 104.000
1 1 7 01 03 07 Sango/Ceper/Kembang Lusin 155.000
1 1 7 01 03 07 Sango 9" Ceking Lusin 73.000
1 1 7 01 03 07 Kedaung Lusin 26.000
1 1 7 01 03 07 8" Lusin 62.000
1 1 7 01 03 07 Acapai 18 " Lusin 60.000
1 1 7 01 03 07 RRT 16 " Lusin 52.000
1 1 7 01 03 07 Makan Sango Ceper Besar Lusin 145.000
1 1 7 01 03 07 Makan Sango Ceper Tanggung Lusin 349.000
1 1 7 01 03 07 Makan Sango Cekung Lusin 13.000
1 1 7 01 03 07 Makan Sango Cekung Lusin 252.000
1 1 7 01 03 07 Makan Sango Cekung 8" Lusin 93.000
1 1 7 01 03 07 Makan Sango Cekung 9" Lusin 13.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 07 Makan RRT Kembang Lusin 96.000
1 1 7 01 03 07 Makan RRT Polos Putih Lusin 86.000
1 1 7 01 03 07 Makan Polos Coklat Lusin 70.000
1 1 7 01 03 07 Makan Polos Putih Lusin 35.000
1 1 7 01 03 07 Ikan Oval Milamin Bsr Polos Buah 59.000
1 1 7 01 03 07 Ikan Oval milamin (T) Polos Buah 39.000
1 1 7 01 03 07 Ikan Oval Milamin (B) Kembang Buah 87.000
1 1 7 01 03 07 Ikan Oval Milamin (T) Kembang Buah 59.000
1 1 7 01 03 07 Ikan Oval Milamin (K) Kembang Buah 24.000
1 1 7 01 03 07 Ikan Oval Milamin Polos (k) Buah 47.000
1 1 7 01 03 07 Ikan Oval Kembang RRT (B) Buah 124.000
1 1 7 01 03 07 Ikan Oval Kembang RRT (T) Buah 86.000
1 1 7 01 03 07 Ikan Oval Kembang RRT (K) Buah 9.000
1 1 7 01 03 07 Ikan Oval Polos RRT (K) Buah 86.000
1 1 7 01 03 07 Ikan Oval Polos RRT (B) Buah 59.000
1 1 7 01 03 07 Ikan Oval Polos RRT (T) Buah 47.000
1 1 7 01 03 07 Piring Ikan Oval Sango Besar Buah 186.000
1 1 7 01 03 07 Piring Ikan Oval sango (T) Buah 140.000
1 1 7 01 03 07 Piring Ikan Oval Sango Kecil Buah 93.000
1 1 7 01 03 07 Piring Ikan Polos putih Buah 28.000
1 1 7 01 03 07 Piring Ikan polos Tebal Buah 40.000
1 1 7 01 03 07 Piring Salmino Merk Staimks Stel Buah 62.000
1 1 7 01 03 07 Duralex Lusin 37.000
1 1 7 01 03 07 Piring Sayur 8 " RRC/8 " Buah 155.000
1 1 7 01 03 07 Piring Sop Indo Keramik Lusin 73.000
1 1 7 01 03 07 Piring Buah 6 " Sango Segi Lusin 104.000
1 1 7 01 03 07 6" Sango Bulat Lusin 62.000
1 1 7 01 03 07 Piring Oval Sedang Sango Buah 47.000
1 1 7 01 03 07 RRT 14" Buah 42.000
1 1 7 01 03 07 Piring Gulai 8" Lusin 62.000
1 1 7 01 03 07 Piring Sambal 7" Lusin 57.000
1 1 7 01 03 07 Sendok Makan Seinless Steel Biasa Lusin 11.000
1 1 7 01 03 07 Makan Steinless Steel Biasa Lusin 36.000
1 1 7 01 03 07 Makan Steinless Steel Dol Lusin 34.000
1 1 7 01 03 07 Makan Steinless Steel Tipis Lusin 21.000
1 1 7 01 03 07 Nasi Steinless Steel Lusin 16.000
1 1 7 01 03 07 Nasi Steinless Steel Lusin 140.000
1 1 7 01 03 07 Kecil Steinless Steel Biasa Lusin 26.000
1 1 7 01 03 07 Makan Steinless steel Dol Lusin 44.000
1 1 7 01 03 07 Ikan Steinless Steel Bunga Lusin 19.000
1 1 7 01 03 07 Ikan Steinless Steel Polos Tebal Lusin 29.000
1 1 7 01 03 07 Ikan Steinless Steel Polos Tebal Lusin 20.000
1 1 7 01 03 07 Kuah Steinless Steel Besar Lusin 65.000
1 1 7 01 03 07 Kuah Steinless Steel Besar Lusin 53.000
1 1 7 01 03 07 Kuah Steinless Steel Sedang Lusin 31.000
1 1 7 01 03 07 Kuah Steinless Steel Sedang Lusin 29.000
1 1 7 01 03 07 Kuah Steinless Steel Kecil Lusin 19.000
1 1 7 01 03 07 Kuah Cap Cay Lusin 171.000
1 1 7 01 03 07 Stenlis Lusin 31.000
1 1 7 01 03 07 Kayu Set 310.000
1 1 7 01 03 07 Sendok Sayur Stenlis Besar Buah 26.000
1 1 7 01 03 07 Stenlis Sedang Buah 21.000
1 1 7 01 03 07 Stenlis Kecil Buah 16.000
1 1 7 01 03 07 Sendok Nasi Stenlis Buah 29.000
1 1 7 01 03 07 Sendok Goreng Stenlis Sedang Buah 31.000
1 1 7 01 03 07 Stenlis Kecil Pasang 16.000
1 1 7 01 03 07 Garpu Lusin 102.000
1 1 7 01 03 07 Makan Steinless Steel Biasa Lusin 11.000
1 1 7 01 03 07 Makan Steinless Steel Dol Lusin 34.000
1 1 7 01 03 07 Kecil Steinless Steel Dol Lusin 43.000
1 1 7 01 03 07 Kecil Steinless Steel Besar Lusin 22.000
1 1 7 01 03 07 Mangkuk Nasi RRT Buah 42.000
1 1 7 01 03 07 Sango Buah 31.000
1 1 7 01 03 07 Buah 42.000
1 1 7 01 03 07 Periuk Nasi Halco 30" Buah 62.000
1 1 7 01 03 07 Halco 38" Buah 155.000
1 1 7 01 03 07 Bima Besar Buah 207.000
1 1 7 01 03 07 Kobokan Cuci Tangan Buah 31.000
1 1 7 01 03 07 Rantang Aluminium Besar 26/4 Susun 28.000
1 1 7 01 03 07 Aluminium Sedang 20/4 Susun 186.000
1 1 7 01 03 07 Aluminium Kembang Besar 16/4 Susun 73.000
1 1 7 01 03 07 Aluminium Kembang Besar 16/4 Susun 71.000
1 1 7 01 03 07 Plastik (Picnic) Susun 44.000
1 1 7 01 03 07 Email Panda 16 Susun 68.000
1 1 7 01 03 07 Plastik Nikita Susun 47.000
1 1 7 01 03 07 Plastik Oval Susun 62.000
1 1 7 01 03 07 Termos Nasi Besar Buah 112.000
1 1 7 01 03 07 Termos Es 10 Liter Buah 127.000
1 1 7 01 03 07 Termos Es Sedang Buah 537.000
1 1 7 01 03 07 Termos Nasi 26 Ltr MP Buah 93.000
1 1 7 01 03 07 Termos Nasi 20 Lr Lion Star Buah 126.000
1 1 7 01 03 07 Termos Nasi 16 Ltr Buah 38.000
1 1 7 01 03 07 Termos Nasi 15 Ltr Buah 47.000
1 1 7 01 03 07 Termos Nasi 14 Ltr MP Buah 117.000
1 1 7 01 03 07 Termos Nasi 12,5 Ltr MP Buah 117.000
1 1 7 01 03 07 Tutup Gelas Stenlis Set 37.000
1 1 7 01 03 07 010 Kaos Lampu Petromak
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 07 Kaos Lampu Petromak Set 26.000
1 1 7 01 03 07 011 Kaca Lampu Petromak
1 1 7 01 03 07 Kaca Lampu Petromak Set 36.100
1 1 7 01 03 07 012 Pengharum Ruangan
1 1 7 01 03 07 Penyegar ruangan botol 17.000
1 1 7 01 03 07 Parfum ruangan jumbo botol 23.000
1 1 7 01 03 07 Pengharum glade diamon Buah 21.000
1 1 7 01 03 07 Pengharum glade gantung Buah 14.000
1 1 7 01 03 07 Pengharum glade kaleng Buah 31.000
1 1 7 01 03 07 Pengharum plage Buah 45.000
1 1 7 01 03 07 Pengharum Kamar Mandi - Dahlia kaleng 21.000
1 1 7 01 03 07 Pengharum Kamar Mandi - Semerbak kaleng 10.000
2 1 7 01 03 07 Kamper/kapur barus Bagus Buah 32.400
3 1 7 01 03 07 kamper kamar mandi Bagus Buah 25.400
3 1 7 01 03 07 Pengharum ruangan elektrik Unit 200.900
4 1 7 01 03 07 Isi ulang pengharum ruangan elektrik Botol 29.500

1 1 7 01 03 07 013 Kuas
1 1 7 01 03 07 Kuas Golong Kuas roll Buah 27.100
1 1 7 01 03 07 kuas Biasa
1 1 7 01 03 07 - Uk.1" Buah 14.100
1 1 7 01 03 07 - Uk.2" Buah 17.700
1 1 7 01 03 07 - Uk.3" Buah 21.200
1 1 7 01 03 07 - Uk.4" Buah 23.600
1 1 7 01 03 07 014 Segel/Tanda Pengaman
1 1 7 01 03 07 Stiker Hologram Buah 50.000
1 1 7 01 03 07 Satpol PP Line Garis pembatas, panjang 300 m, lebar 3" Unit 177.200
bertuliskan dilarang melintasi garis Satpol PP
(DO NOT CROSS) dan berlogo SATPOL PP
1 1 7 01 03 07 Stiker Penyegelan Bahan stiker tempel plastik, Uk. 50 cm x 25 cm Buah 82.700

1 1 7 01 03 07 015 Taplak meja


1 1 7 01 03 07 Taplak meja Taplak / Hias Pcs 108.000
1 1 7 01 03 07 Taplak Tatakan Pcs 78.000
1 1 7 01 03 07 Meja Kecil Pcs 69.000
1 1 7 01 03 07 Meja Panjang (Tamu) Pcs 16.000
1 1 7 01 03 07 Antik Songket Pcs 137.000
1 1 7 01 03 07 Meja Makan Antik Pcs 233.000
1 1 7 01 03 07 Antik Besar Pcs 155.000
1 1 7 01 03 07 Meja Bordir Kotun RRT Buah 465.000
1 1 7 01 03 07 Meja Bordir Kotun RRT Buah 87.000
2 1 7 01 03 07 016 Tissu
1 1 7 01 03 07 Tissu basah Mittu Kaleng 23.000
1 1 7 01 03 07 Tissu lap tangan Bks 11.000
1 1 7 01 03 07 Tissu paseo Kotak 17.000
1 1 7 01 03 08 ALAT LISTRIK
1 1 7 01 03 08 001 Kabel Listrik
1 1 7 01 03 08 Eterna N.Y.A 11/2 M/M BGS Meter 181.000
1 1 7 01 03 08 Eterna N.Y.A 21/2 M/M BGS Meter 300.000
1 1 7 01 03 08 Eterna N.Y.A 4 M/M BGS Meter 516.000
1 1 7 01 03 08 Eterna N.Y.A 6 M/M Meter 10.000
1 1 7 01 03 08 Eterna N.Y.A 10 m/m Meter 176.000
1 1 7 01 03 08 Eterna N.Y.A 16 m/m Meter 28.000
1 1 7 01 03 08 Eterna N.Y.M 2 X 2,5 M/M Meter 12.000
1 1 7 01 03 08 Eterna N.Y.M 2 X 4 M/M Meter 23.000
1 1 7 01 03 08 Eterna N.Y.M 2 X 6 M/M Meter 25.000
1 1 7 01 03 08 Eterna N.Y.M 2 X 10 M/M Meter 44.000
1 1 7 01 03 08 Eterna N.Y.M 2 X 16 M/M Meter 42.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 1,5 M/M Meter 13.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 2,5 M/M Meter 16.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 4 M/M Meter 26.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 6 M/M Meter 35.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 10 M/M Meter 58.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 16 M/M Meter 83.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 25 M/M Meter 104.000
1 1 7 01 03 08 Eterna N.Y.M 3 X 35 M/M Meter 135.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 1,5 M/M Meter 15.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 2,5 M/M Meter 21.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 4 M/M Meter 34.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 6 M/M Meter 47.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 10 M/M Meter 75.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 16 M/M Meter 88.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 25 M/M Meter 98.000
1 1 7 01 03 08 Eterna N.Y.M 04 X 35 M/M Meter 114.000
1 1 7 01 03 08 Eterna N.Y.M 01 X 2,5 M/M Meter 4.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 0,75 M/M Meter 52.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 1,5 M/M Meter 78.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 2,5 M/M Meter 110.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 0,4 M/M Meter 124.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 0,6 M/M Meter 29.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 10 M/M Meter 6.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 0,75 M/M Meter 7.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 1,5 M/M Meter 9.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 2,5 M/M Meter 5.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 4 M/M Meter 23.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 6 M/M Meter 34.000
1 1 7 01 03 08 Eterna NYMHY. 03 X 10 M/M Meter 42.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 08 Eterna NYMHY. 03 X 16 M/M Meter 11.000
1 1 7 01 03 08 Eterna NYMHY. 04 X 0,75 M/M Meter 16.000
1 1 7 01 03 08 Eterna NYMHY. 04 X 1,5 M/M Meter 11.000
1 1 7 01 03 08 Eterna NYMHY. 04 X 2,5 M/M Meter 23.000
1 1 7 01 03 08 Eterna NYMHY. 04 X 4 M/M Meter 29.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 10 M/M Meter 19.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 6 M/M Meter 42.000
1 1 7 01 03 08 Eterna NYMHY. 02 X 16 M/M Meter 27.000
1 1 7 01 03 08 Kabel BC uk. 6 - 10 mm Meter 11.000
1 1 7 01 03 08 NYY uk. 3 x 6 mm Meter 27.000
1 1 7 01 03 08 NYY uk. 3 x 2.5 mm Meter 19.000
1 1 7 01 03 08 NYY uk. 3 x 4.5 mm Meter 28.000
1 1 7 01 03 08 NYY uk. 4 x 2.5 mm Meter 25.000
1 1 7 01 03 08 NYY uk. 4 x 4 mm Meter 31.000
1 1 7 01 03 08 NYY uk. 4 x 6 mm Meter 48.000
1 1 7 01 03 08 NYY uk. 4 x 10 mm Meter 78.000
1 1 7 01 03 08 NYY uk. 4 x 16 mm Meter 104.000
1 1 7 01 03 08 NYY uk. 4 x 25 mm Meter 172.000
1 1 7 01 03 08 Kabel Serabut 3 x 1,5 MM Roll 774.000
1 1 7 01 03 08 Eterna Kabel listrik transparan 2 x 2,5 MM Roll 708.100
1 1 7 01 03 08 002 Lampu Listrik
1 1 7 01 03 08 Lampu hemat Listrik 7 watt 220 V PLSI/82 Buah 42.000
1 1 7 01 03 08 Lampu hemat Listrik 11 watt 220 V PLSL/82 Buah 42.000
1 1 7 01 03 08 Lampu hemat Listrik 50 watt 220 V PLSL/82 Buah 88.000
1 1 7 01 03 08 Lampu hemat Listrik Fliip 12 watt Buah 42.000
1 1 7 01 03 08 Lampu hemat Listrik 15 watt Buah 48.000
1 1 7 01 03 08 Lampu hemat Listrik 20 watt Buah 47.000
1 1 7 01 03 08 Lampu ultra Violet 10 W Buah 27.000
1 1 7 01 03 08 Lampu TL 2 x 18 watt Ex. Pannasonic Buah 200.800
1 1 7 01 03 08 Lampu TL 2 x 36 watt Ex. Pannasonic Buah 602.400
1 1 7 01 03 08 Lampu Downlight komplit 20 watt Buah 294.500
1 1 7 01 03 08 Lampu TL 1 x 18 watt uk.kecil, merk philips Buah 28.000
1 1 7 01 03 08 Lampu TL 1 x 36 watt uk. Kecil, merk philips Buah 37.400
1 1 7 01 03 08 Lampu HPLN 400w Merk philips Buah 206.800
1 1 7 01 03 08 Bola lampu fokus Halopica Buah 26.500
1 1 7 01 03 08 Bola lampu PLC Merk philips, 18 watt Buah 56.600
1 1 7 01 03 08 Bola lampu 18 w Merk philips, 18 watt Buah 70.900
1 1 7 01 03 08 Bola lampu 20 w Merk philips, 20 watt Buah 76.800
1 1 7 01 03 08 Bola lampu 23 w Merk philips, 23 watt Buah 82.700
1 1 7 01 03 08 Bola lampu 8 w Merk philips, 8 watt Buah 47.200
1 1 7 01 03 08 Bola lampu 11 w Merk philips, 11 watt Buah 59.000
1 1 7 01 03 08 Bola lampu 42 w Merk philips, 42 watt Buah 189.000
1 1 7 01 03 08 Lampu LED 7 w Merk philips, 7 watt Buah 70.900
1 1 7 01 03 08 Lampu LED 9 w Merk philips, 9 watt Buah 127.600
1 1 7 01 03 08 Lampu LED 13 w Merk philips, 13 watt Buah 129.900
1 1 7 01 03 08 Bola lampu pijar 25 w Merk philips, 25 watt Buah 59.000
1 1 7 01 03 08 Halogen Lamp 150 W Merk philips Buah 520.800
1 1 7 01 03 08 Lampu 45 watt Setara Philips Buah 73.000
1 1 7 01 03 08 Lampu 25 watt Setara Philips Buah 52.000
1 1 7 01 03 08 Lampu 15 watt Setara Philips Buah 47.000
1 1 7 01 03 08 Bola Lampu Sorot 1000 watt Buah 47.000
1 1 7 01 03 08 Bola Lampu TLE 22 Buah 37.000
1 1 7 01 03 08 Bola Lampu Traffic Light Pijar - Pijar Buah 62.000
1 1 7 01 03 08 - LED Buah 362.000
1 1 7 01 03 08 lampu SE 18 watt Buah 87.000
1 1 7 01 03 08 lampu SE 25 watt Buah 93.700
1 1 7 01 03 08 003 Stop Kontak
1 1 7 01 03 08 Stop Kontak Tanpa Arde 6310 Buah 5.000
1 1 7 01 03 08 Tanpa Arde 660 Buah 6.000
1 1 7 01 03 08 Arde putih 6130 Buah 11.000
1 1 7 01 03 08 Arde hitam 6130 Buah 7.000
1 1 7 01 03 08 3 pass Arde 6333 Buah 21.000
1 1 7 01 03 08 4 lubang ARD 6144 LP Buah 20.000
1 1 7 01 03 08 Arde 6100 Buah 23.000
1 1 7 01 03 08 Arde 5511 Buah 37.000
1 1 7 01 03 08 Arde tutup 6122 Buah 18.000
1 1 7 01 03 08 Arde Putar 6140 Buah 37.000
1 1 7 01 03 08 Tanpa Arde 6600 Buah 42.000
1 1 7 01 03 08 IB Buah 11.000
1 1 7 01 03 08 OB Buah 8.000
1 1 7 01 03 08 Stop kontak Apboot 660 Buah 13.000
1 1 7 01 03 08 Arde putih no. 6230 Buah 28.000
1 1 7 01 03 08 Arde hitam no. 6730 B Buah 27.000
1 1 7 01 03 08 3 Pase No. 623 B Buah 31.000
1 1 7 01 03 08 4 Lubang No. 6144 Buah 21.000
1 1 7 01 03 08 Stop kontak 6 L Yosikawa Buah 171.300
1 1 7 01 03 08 Stop kontak 5 L Yosikawa Buah 37.400
1 1 7 01 03 08 Stop kontak 2 L Yosikawa Buah 28.800
1 1 7 01 03 08 004 Saklar
1 1 7 01 03 08 Saklar Engkel Imbouw 6611 Buah 16.000
1 1 7 01 03 08 Seri Inbouw 6612 Buah 22.000
1 1 7 01 03 08 Tripel radium 6613 Buah 44.000
1 1 7 01 03 08 Tripel radium 6611 Buah 24.000
1 1 7 01 03 08 Engkel radium 6612 Buah 21.000
1 1 7 01 03 08 Seri radium 6612 Buah 21.000
1 1 7 01 03 08 Engkel opbauw 630 Buah 11.000
1 1 7 01 03 08 Engkel Persegi 640 Buah 12.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 08 Seri Opbouw 630 Buah 14.000
1 1 7 01 03 08 Seri Persegi 640 Buah 11.000
1 1 7 01 03 08 Porselin hitam 6311 Buah 9.000
1 1 7 01 03 08 Porselin putih 6312 Buah 21.000
1 1 7 01 03 08 Porselin putih 6311 w Buah 21.000
1 1 7 01 03 08 Porselin putih 6312 w Buah 20.000
1 1 7 01 03 08 Engkel No. 6411 Buah 21.000
1 1 7 01 03 08 Saklar Seri 1B Buah 16.000
1 1 7 01 03 08 Saklar tunggal 1B Buah 11.000
1 1 7 01 03 08 005 Stacker
1 1 7 01 03 08 Stacker Baru biasa 344 N Buah 3.000
1 1 7 01 03 08 Arde Baru 3300 Buah 12.000
1 1 7 01 03 08 Arde 3340 Buah 11.000
1 1 7 01 03 08 Aprat 810 Buah 4.000
1 1 7 01 03 08 Aprat 313 Buah 13.000
1 1 7 01 03 08 T. Hitam 810 Buah 4.000
1 1 7 01 03 08 T. Putih 810 Buah 31.000
1 1 7 01 03 08 T. Arde 3360 Buah 16.000
1 1 7 01 03 08 Super 3360 Buah 21.000
1 1 7 01 03 08 3 Pase Arde 334 Buah 21.000
1 1 7 01 03 08 3 Pase Arde 4320 Buah 21.000
1 1 7 01 03 08 Contra stiker 334 Buah 11.000
1 1 7 01 03 08 Oven stiker 844 Buah 11.000
1 1 7 01 03 08 Oven stiker gepeng 644 Buah 6.000
1 1 7 01 03 08 006 Balast
1 1 7 01 03 08 Balast 10 watt/220 V Buah 31.000
1 1 7 01 03 08 15 watt/220 V Buah 31.000
1 1 7 01 03 08 20 watt/220 V BGS Buah 47.000
1 1 7 01 03 08 40 watt/220 V BGS Buah 47.000
1 1 7 01 03 08 400w, Philips Buah 324.900
1 1 7 01 03 08 007 Starter
1 1 7 01 03 08 Starter Stater FS 2 Buah 6.000
1 1 7 01 03 08 Starter 20w Philiphs Buah 17.700
1 1 7 01 03 08 Starter 36w Philiphs Buah 23.600
1 1 7 01 03 08 008 Pitting
1 1 7 01 03 08 Pitting Plafon 210 Buah 6.000
1 1 7 01 03 08 Plafon miring 210 Buah 6.000
1 1 7 01 03 08 Flapon miring No. 226 Buah 6.000
1 1 7 01 03 08 gantung 216 L Buah 6.000
1 1 7 01 03 08 gantung baru 216 N Buah 6.000
1 1 7 01 03 08 Kap 216 c Buah 6.000
1 1 7 01 03 08 Kombinasi 226 Buah 8.000
1 1 7 01 03 08 colok 336 Buah 7.000
1 1 7 01 03 08 Roset 410 Buah 7.000
1 1 7 01 03 08 Amatir 40 w 5040 Buah 7.000
1 1 7 01 03 08 Amatir 60 5060 Buah 78.000
1 1 7 01 03 08 Amatir 100 w 5100 Buah 98.000
1 1 7 01 03 08 009 Accu
1 1 7 01 03 08 Accu Stiker AC Arde 4320 Buah 31.000
1 1 7 01 03 08 Stop Kontak AC Arde 23 Buah 52.000
1 1 7 01 03 08 010 Batu Baterai
1 1 7 01 03 08 Batu baterai Panasonic Besar Buah 22.000
1 1 7 01 03 08 Panasonic Sedang Buah 11.000
1 1 7 01 03 08 Panasonic kecil Buah 6.000
1 1 7 01 03 08 ABC Besar Set 13.000
1 1 7 01 03 08 ABC Tanggung Set 9.000
1 1 7 01 03 08 ABC Kotak Buah 14.000
1 1 7 01 03 08 ABC AA Set 10.000
1 1 7 01 03 08 Alkaline ABC Kotak Buah 29.000
1 1 7 01 03 08 Alkaline ABC AA Set 41.000
1 1 7 01 03 08 Alkaline ABC AA Set 14.000
1 1 7 01 03 08 Alkaline ABC AAA Set 39.000
1 1 7 01 03 08 Alkaline ABC AAA Set 14.000
1 1 7 01 03 08 ABC/Alkaline AA Set 20.000
1 1 7 01 03 08 ABC/Alkaline AAA Set 20.000
1 1 7 01 03 08 011 Stavol
1 1 7 01 03 08 Stavolt Stabilizer matsunaga 1000watt 1000 watt 1000w Unit 299.100
svc 1000n stabilize
1 1 7 01 03 08 Matsunaga / stabilizer 1000w Unit 299.100
1 1 7 01 03 08 stabilizer regulator listrik oki 5000 watt stabiliser Unit 1.872.100
5000watt 5000va 5000 va
1 1 7 01 03 08 Changger Baterai AA Komplit Buah 531.800
1 1 7 01 03 08 012 Breaker
1 1 7 01 03 08 Breaker 250 Amp Pcs 1.960.000
1 1 7 01 03 08 150 Amp Pcs 1.857.000
1 1 7 01 03 08 100 Amp Pcs 1.754.000
1 1 7 01 03 08 80 Amp Pcs 919.000
1 1 7 01 03 08 75 Amp Pcs 919.000
1 1 7 01 03 08 60 Amp Pcs 919.000
1 1 7 01 03 08 50 Amp Pcs 836.000
1 1 7 01 03 08 40 Amp Pcs 836.000
1 1 7 01 03 08 32 Amp Pcs 805.000
1 1 7 01 03 08 25 Amp Pcs 774.000
1 1 7 01 03 08 20 Amp Pcs 769.000
1 1 7 01 03 08 013 Contaktor
1 1 7 01 03 08 Contaktor 100 Amp Pcs 2.682.000
1 1 7 01 03 08 Contaktor 85 Amp Pcs 2.167.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 08 Contaktor 80 Amp Pcs 1.857.000
1 1 7 01 03 08 Contaktor 65 Amp Pcs 919.000
1 1 7 01 03 08 Contaktor 50 Amp Pcs 877.000
1 1 7 01 03 08 Contaktor 32 Amp Pcs 496.000
1 1 7 01 03 08 014 MCB
1 1 7 01 03 08 MCB 1p 6A Merlin gerin Buah 100.400
1 1 7 01 03 08 MCB 1p 10A Merlin gerin Buah 106.300
1 1 7 01 03 08 MCB 1p 16A Merlin gerin Buah 112.200
1 1 7 01 03 08 MCB 1p 32A Merlin gerin Buah 124.000
1 1 7 01 03 08 MCB 3p 25A Merlin gerin Buah 236.300
1 1 7 01 03 08 MCB 3p 32A Merlin gerin Buah 277.700
1 1 7 01 03 08 MCB 3p 40A Merlin gerin Buah 324.100
1 1 7 01 03 08 MCB 3p 50A Merlin gerin Buah 506.100
1 1 7 01 03 08 MCB 3p 63A Merlin gerin Buah 506.100
1 1 7 01 03 09 PERLENGKAPAN DINAS
1 1 7 01 03 09 001 Bahan Baku Pakaian
1 1 7 01 03 09 Kain tenun Siak pria Kain : Motif bunga/ buah/ menyesuaikan, benang Helai 886.300
emas menengah panjang 180 cm x 15 cm,
selendang : benang emas padar, uk. 180 cm x 80
cm jahit pinggir dan bordir
1 1 7 01 03 09 Kain tenun Siak wanita Kain : Motif bunga/ buah/ menyesuaikan, benang Helai 1.595.000
emas menengah panjang 180 cm x 15 cm,
selendang : benang emas padar, uk. 130 cm x 15
cm jahit pinggir dan bordir
1 1 7 01 03 09 Kain Batik Siak Bahan kain Sutra, Motif bunga-bunga/ Helai 64.900
menyesuaikan, bentuk empat persegi uk. 1 m x
2m
1 1 7 01 03 09 Baju seragam peserta dan pendamping lomba masak Helai 590.900
berbahan serba ikan
1 1 7 01 03 09 Pakaian PPNS Bahan pakain dilengkapi tanda kewenangan Setel 803.600
bordir serta tanda pengenal dan terdapat badge
PEMDA
1 1 7 01 03 09 Baju kaos Pol-PP lengan panjang + bordir Bahan katun, Uk.M,L dan XL Helai 200.900
1 1 7 01 03 09 Baju kaos Pol-PP lengan pendek + bordir Bahan katun, Uk.M,L dan XL Helai 151.200
1 1 7 01 03 09 Pakain PDL Linmas Setel 3.899.900
1 1 7 01 03 09 Pakain PDU II Setel 8.863.500
1 1 7 01 03 09 Pakain PDU Khusus Setel 1.624.900
1 1 7 01 03 09 Baju kaos dalam Lengan pendek dalam Helai 70.900
1 1 7 01 03 09 Baju Tamu Undangan Setel 236.300
1 1 7 01 03 09 Baju Wasit, Juri, Timer, Technical Delegate, Chefrefri, Setel 177.200
Asisten Chefrefri, Sekretaris Juri, Pengolah
1 1 7 01 03 09 Baju Panitia, Medis, Kebersihan, Keamanan Setel 177.200
1 1 7 01 03 09 Pakain kerja lapangan petugas kebersihan Setel 177.200
1 1 7 01 03 09 Pakain kerja lapangan petugas teknisi Setel 177.200
1 1 7 01 03 09 Pakain kerja lapangan petugas keamanan Setel 177.200
1 1 7 01 03 09 Pakaian melayu Komplit Setel 1.772.700
1 1 7 01 03 09 002 Penutup Kepala
1 1 7 01 03 09 Topi Sarana kerja PKB/PLKB dan PPKBD dan Sub PPKBD warna biru tua, bertuliskan "Dua Anak Buah 200.900
Cukup"(bordir) serta nama SKPD-KB kab/Kota,
di bagian samping kiri dan kanan topi dan di
bagian depan topi berlogo BKKBN (bordir)

1 1 7 01 03 09 Topi Pet Buah 177.200


1 1 7 01 03 09 Topi Pet PDU Buah 362.300
1 1 7 01 03 09 Helm Standart upacara Buah 489.200
1 1 7 01 03 09 Topi Topi Linmas Buah 70.900
1 1 7 01 03 09 003 Penutup Badan
1 1 7 01 03 09 Jas hujan Sarana kerja PKB/PLKB Terbuat dari bahan yang berkualitas baik, warna Buah 531.800
putih dan biru tua, bertuliskan Dua Anak Cukup
dibagian dada kiri depan sebelah atas dan logo
BKKBN serta nama SKPD-KB Kab/Kota (sablon)

1 1 7 01 03 09 Rompi Sarana kerja PKB/PLKB dan PPKBD dan Sub Terbuat dari bahan drill berkualitas baik. Buah 378.100
PPKBD Bertuliskan "dua Anak Cukup" di bagian depan
dada sebelah kiri, logo kab/kota dan nama SKPD-
KB kab/kota (bordir) di bagian depan dada
sebelah kanan, menggunakan resleting depan.
Ukuran disesuaikan dengan data PPLKB dan
PKB/PLKB.
1 1 7 01 03 09 Rompi Tim Yustisi + Sablon Bahan double mesh jala tebal, ukuran Buah 285.900
M,L,XL,XXL,XXXL
1 1 7 01 03 09 Rompi Petugas Patroli + Sablon Bahan double mesh jala tebal, ukuran Buah 285.900
M,L,XL,XXL,XXXL
1 1 7 01 03 09 004 Penutup Tangan
1 1 7 01 03 09 Sarung tangan standart upacara Pasang 55.400
1 1 7 01 03 09 Sarung tangan Bahan kulit Pasang 202.000
1 1 7 01 03 09 005 Penutup Kaki
1 1 7 01 03 09 Sepatu kerja Sarana kerja PKB/PLKB dan PPKBD dan Sub Warna hitam, terbuat dari bahan kulit yang Buah 768.100
PPKBD berkkualitas baik dan jenis sepatu disesuaikan
dengan kondisi wilayah
1 1 7 01 03 09 Sepatu Dinas Lapangan Berbahan upper : semi kulit Pasang 577.900
1 1 7 01 03 09 Sepatu Dinas Lapangan Satpol PP Pariwisata Berwarna hitam, berbahan semi kulit kilap Pasang 577.900
1 1 7 01 03 09 Sepatu Olahraga Pasang 354.500
1 1 7 01 03 09 Sepatu Sepatu PDL Khusus Pasang 609.800
1 1 7 01 03 09 Sepatu Sepatu PDL Pasang 330.900
1 1 7 01 03 09 Sepatu Sepatu latihan Pasang 413.600
1 1 7 01 03 09 006 Atribut
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 09 Plang Papan Nama PPKBD/Sub PPKBD Ukuran 30 cm x 40 cm; Bahan Akrilik Bening 2 Buah 295.400
mm atau bahan yang kokoh dan mudah didapat
di daerah; warna dasar putih; Bertuliskan nama
PPKBD/Sub PPKBD; warna tulisan hitam
dengan logo BKKBN dan logo Kab/Kota serta
alamat lengkap; Dipasang di dinding rumah
PPKBD/Sub PPKBD bagian depan/luar.

1 1 7 01 03 09 Ban Lengan Patroli Bahan kain warna hitam Buah 59.000


1 1 7 01 03 09 Baret Terbuat dari bahan dasar bludru warna khaki tua Buah 76.800
kehijau - hijauan
1 1 7 01 03 09 Dasi Satpol PP Pariwisata Terbuat dari bahan dasar bludru warna khaki tua Buah 59.000
kehijau - hijauan
1 1 7 01 03 09 Ban Lengan Patroli Bordir/Biasa Bahan Sintesis Tulisan Scotlight nyala, logo Buah 128.800
bordir tempel
1 1 7 01 03 09 Kopel Buah 105.400
1 1 7 01 03 09 Sal Helai 29.500
1 1 7 01 03 09 Pangkat PDU Pasang 289.800
1 1 7 01 03 09 Wing PDU Buah 94.500
1 1 7 01 03 09 Lambang kewenangan Unit 311.900
1 1 7 01 03 09 Pin Pasang 29.500
1 1 7 01 03 09 Tali pluit/tali kour Bahan nilon tali komando Set 20.000
1 1 7 01 03 09 Kopel rim Kopel PDL linmas Buah 70.900
1 1 7 01 03 09 Ban Lengan Ban Lengan Linmas Buah 100.400
1 1 7 01 03 09 007 Perlengkapan Lapangan
1 1 7 01 03 09 Tas Kerja Sarana Kerja PKB/PLKB (ukuran ± L.25 cm x T.49 cm x P.31 cm). Terbuat Buah 295.400
dari Polyester 600D – Nylon 1882 atau setara,
berkualitas baik dan bertuliskan “Dua Anak
Cukup” berlogo BKKBN, logo Kab/Kota dan
nama SKPD-KB Kab/Kota (bordir). Tahan air

1 1 7 01 03 09 Tas Kerja Sarana Kerja PPKBD dan Sub PPKBD Bahan Polyester 600D - Nylon 1682 atau setara, Buah 295.400
Tahan air; Bertuliskan 1) "Dua Anak Cukup"
berlogo BKKBN 2) “ PPKBD dan Sub PPKBD
Kader Pelopor KB ”; Ukuran disesuaikan.

1 1 7 01 03 09 Payung Sarana kerja PKB/PLKB dan PPKBD dan Sub Terbuat dari bahan parasut yang berkualitas baik, Buah 295.400
PPKBD warna putih dan biru tua, bertuliskan "Dua Anak
Cukup" dan logo BKKBN (sablon)
1 1 7 01 03 09 Lampu Stick Light Red Baton Stick Tongkat lampu Pol PP Buah 236.300
1 1 7 01 03 09 Slempang/dahrem Buah 95.200
1 1 7 01 03 09 Pentungan bahan karet, panjang min. 60 cm Buah 89.200
1 1 7 01 03 09 Tas Kegiatan bahan karet, panjang min. 60 cm Buah 177.200
1 1 7 01 03 09 Tas Sekolah bahan karet, panjang min. 60 cm Buah 59.000
1 1 7 01 03 11 PERLENGKAPAN PENDUNGKUNG OLAH RAGA
1 1 7 01 03 11 001 Bendera Start
1 1 7 01 03 11 Bendera Start Buah 389.000
1 1 7 01 03 11 002 Kostum Olah Raga
1 1 7 01 03 11 Baju Bola lembar 88.000
1 1 7 01 03 11 Baju Kaos Standar lembar 82.700
1 1 7 01 03 11 Star lembar 47.000
1 1 7 01 03 11 Baju+Celana Bola Kaki Adidas/Pro Aktive Set 1.181.800
1 1 7 01 03 11 Baju Pemain Bola Volly Pra Aktive/Celana Adidas Lusin 827.200
1 1 7 01 03 11 Baju Pemain Sepak Takraw Yonex Sport Wear lembar 155.000
1 1 7 01 03 11 Baju Pemain Badminton Yonex lembar 82.700
1 1 7 01 03 11 Baju Olah raga lembar 413.600
1 1 7 01 03 11 Celana Olahraga lembar 413.600
1 1 7 01 03 11 Baju Olah raga Sablon Satpol PP lembar 88.600
1 1 7 01 03 11 Pakaian Olahraga/ Costum/ Baju Pertandingan Atlit
Costum/baju Pertandingan Atlit Sepak Bola Setel 177.200
Costum/baju Pertandingan pelatih / Official Sepak Bola Setel 177.200
1 1 7 01 03 11 Sepak Takrau Putra/Putri
Costum/baju Pertandingan Atlit Sepak Takrau Setel 177.200
Costum/baju Pertandingan pelatih / Official Sepak Takrau Setel 177.200

1 1 7 01 03 11 Bola Voli Putra/Putri


Costum/baju Pertandingan Atlit Bola Voli Setel 236.300
Costum/baju Pertandingan pelatih / Official Bola Voli Setel 236.300
1 1 7 01 03 11 Tenis Meja Putra/Putri
Costum/baju Pertandingan Atlit Tenis Meja Setel 177.200
Costum/baju Pertandingan pelatih / Official Tenis Meja Setel 177.200
1 1 7 01 03 11 Tenis Lapangan Putra/Putri
Costum/baju Pertandingan Atlit Tenis Lapangan Setel 177.200
Costum/baju Pertandingan pelatih / Official Tenis Lapangan Setel 177.200

1 1 7 01 03 11 Silat Putra/Putri
Costum/baju Pertandingan Atlit Silat Setel 472.700
Costum/baju Pertandingan pelatih / Official Silat Setel 472.700
1 1 7 01 03 11 Bulu Tangkis Putra/Putri
Costum/baju Pertandingan Atlit Bulu Tangkis Setel 177.200
Costum/baju Pertandingan pelatih / Official Bulu Tangkis Setel 177.200
1 1 7 01 03 11 Bola Basket Putra/Putri
Costum/baju Pertandingan Atlit Bola Basket Setel 236.300
Costum/baju Pertandingan pelatih / Official Bola Basket Setel 206.300
Pakaian Olahraga/Costum Atlit dan Pelatih Os 295.400
Training Sport Atlit dan Pelatih Os 413.600
1 1 7 01 03 11 Pakaian latihan Os 177.200
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 11 Trening Sport Os 413.600
1 1 7 01 03 11 Nomor Start Lengkap Lembar 41.300
1 1 7 01 03 11 Training Sport Atlit, Pelatih, Official Setel 413.600
1 1 7 01 03 11 003 Bola Tenis Lapangan
1 1 7 01 03 11 Bola Tenis Lapangan Dunlop isi 4 Tabung 118.100
1 1 7 01 03 11 Dunlop isi 3 Tabung 100.400
1 1 7 01 03 11 Bola Tenis Lapangan Buah 155.000
1 1 7 01 03 11 004 Bola Tenis Meja
1 1 7 01 03 11 Bola Pingping Nitaku Buah 23.600
1 1 7 01 03 11 Bola Buttefly - Kuning Buah 23.600
1 1 7 01 03 11 005 Bola Futsal
1 1 7 01 03 11 Bola Futsal Buah 354.500
1 1 7 01 03 11 005 Bola Kaki
1 1 7 01 03 11 Bola Kaki Mikasa Buah 413.600
1 1 7 01 03 11 Adidas Buah 413.600
1 1 7 01 03 11 Molten Buah 413.600
1 1 7 01 03 11 Bola Kaki Original Nike Buah 2.500.000
1 1 7 01 03 11 Bola Kaki Original Adidas Buah 2.787.000
1 1 7 01 03 11 006 Bola Basket
1 1 7 01 03 11 Bola Basket Mikasa Buah 413.600
1 1 7 01 03 11 Spalding Buah 413.600
1 1 7 01 03 11 Molten MX-7 Buah 413.600
1 1 7 01 03 11 007 Bola Volly
1 1 7 01 03 11 Bola Volly Mikasa MG210.3 M.V 210 Buah 413.600
1 1 7 01 03 11 Mikasa Asli Buah 886.300
1 1 7 01 03 11 008 Bola Takrau
1 1 7 01 03 11 Bola Takrau Rotan Buah 47.200
1 1 7 01 03 11 Santentis Buah 354.500
1 1 7 01 03 11 009 Bola Bulu Tangkis
1 1 7 01 03 11 Bola Bulu Tangkis Partra Tabung 52.000
1 1 7 01 03 11 Hero Tabung 62.000
1 1 7 01 03 11 Rirbaya Tabung 62.000
1 1 7 01 03 11 Merak Tabung 62.000
1 1 7 01 03 11 Garuda hijau Buah 73.000
1 1 7 01 03 11 Gajamada hijau Buah 73.000
1 1 7 01 03 11 Mido Buah 70.900
1 1 7 01 03 11 Brantas Buah 59.000
1 1 7 01 03 11 Samurai biru Buah 62.000
1 1 7 01 03 11 Bola Bulu Tangkis Jaya Tabung 73.000
1 1 7 01 03 11 KS Tabung 57.000
1 1 7 01 03 11 Hade Power Tabung 57.000
1 1 7 01 03 11 Yonex Tabung 362.000
1 1 7 01 03 11 010 Kaos Kaki
1 1 7 01 03 11 Kaos Kaki original Filla, Yonex Pasang 475.000
1 1 7 01 03 11 Romeru, Nike Pasang 413.000
1 1 7 01 03 11 Atlet Pasang 413.000
1 1 7 01 03 11 Kaos Kaki olah raga bisas Pasang 103.100
1 1 7 01 03 11 Kaos kaki Bahan nilon. Kaos kaki PDH/PDL Pasang 20.600
1 1 7 01 03 11 Kaos Kaki Latihan Pasang 51.500
1 1 7 01 03 11 011 Sepatu Bola Kaki
1 1 7 01 03 11 Sepatu Bola Kaki Original Nike Buah 825.400
1 1 7 01 03 11 Puma Buah 825.400
1 1 7 01 03 11 Adidas Buah 825.400
1 1 7 01 03 11 012 Stodwatch
1 1 7 01 03 11 Stodwatch Diamond 100 Menory Buah 515.900
1 1 7 01 03 11 013 Skiping
1 1 7 01 03 11 Skiping GTO Buah 61.900
1 1 7 01 03 11 ROX Buah 51.500
1 1 7 01 03 11 014 Pluit
1 1 7 01 03 11 Pluit Pramuka Buah 41.200
1 1 7 01 03 11 FOX 80 Buah 61.900
1 1 7 01 03 11 FOX 40 Buah 61.900
1 1 7 01 03 11 FOX FT 40 Buah 92.800
1 1 7 01 03 11 014 Cabang Basket Putra/Putri
Sepatu Bola Basket Pasang 886.300
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Sepak Takrau Putra/Putri
Sepatu Sepak Takraw Pasang 590.900
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Bola Voli Putra/Putri
Sepatu Voli Pasang 886.300
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Bulu Tangkis Putra/Putri
Sepatu Bulu Tangkis Pasang 886.300
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Tenis Meja Putra/Putri
Sepatu Tenis Meja Pasang 886.300
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Tenis Lapangan Putra/Putri
Sepatu Tenis Lapangan Pasang 886.300
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 11 014 Cabang Futsal
Sepatu Futsal Pasang 590.900
Sepatu Pelatih / Official Pasang 886.300
1 1 7 01 03 12 SUVENIR/CENDERA MATA
1 1 7 01 03 12 001 Plakat
1 1 7 01 03 12 Plakat Akrilic Set 450.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 01 03 12 Laser Set 650.000
1 1 7 01 03 12 Crystal Set 1.300.000
1 1 7 01 03 12 Kayu Set 150.000
1 1 7 02 02 PIPA
1 1 7 02 02 06 PIPA PLASTIK PVC (UPVC)
1 1 7 02 02 06 001 Pipa Plastik PVC
1 1 7 02 02 06 Pipa PVC dia ½” M1 29.000
1 1 7 02 02 06 Pipa PVC dia ¾” M1 35.000
1 1 7 02 02 06 Pipa PVC dia 1” M1 48.000
1 1 7 02 02 06 Pipa PVC dia 1 ½ ” M1 83.000
1 1 7 02 02 06 Pipa PVC dia 2 M1 102.000
1 1 7 02 02 06 Pipa PVC dia 2 ½” M1 150.000
1 1 7 02 02 06 Pipa PVC dia 3” M1 197.000
1 1 7 02 02 06 Pipa PVC dia 4” M1 319.000
1 1 7 02 02 06 Pipa PVC dia 6” M1 528.000
1 1 7 02 02 06 Pipa PVC D (Pipa Tipis) 16.000
1 1 7 02 02 06 Pipa PVC dia ½” M1 22.000
1 1 7 02 02 06 Pipa PVC dia ¾” M1 29.000
1 1 7 02 02 06 Pipa PVC dia 1” M1 35.000
1 1 7 02 02 06 Pipa PVC dia 1 ½ ” M1 61.000
1 1 7 02 02 06 Pipa PVC dia 2 M1 75.000
1 1 7 02 02 06 Pipa PVC dia 2 ½” M1 129.000
1 1 7 02 02 06 Pipa PVC dia 3” M1 170.000
1 1 7 02 02 06 Pipa PVC dia 4” M1 238.000
1 1 7 02 02 06 Pipa PVC dia 6” M1 678.000
1 1 7 02 02 06 Socket (Tebal)
1 1 7 02 02 06 Socket 5” Buah 42.000
1 1 7 02 02 06 Socket 4” Buah 35.000
1 1 7 02 02 06 Socket 3” Buah 16.000
1 1 7 02 02 06 Socket 2,5” Buah 10.000
1 1 7 02 02 06 Socket 2” Buah 8.000
1 1 7 02 02 06 Socket 1,5” Buah 7.000
1 1 7 02 02 06 Socket 1” Buah 6.000
1 1 7 02 02 06 Socket 3/4” Buah 6.000
1 1 7 02 02 06 Socket 1/2” Buah 6.000
1 1 7 02 02 06 Socket (Tebal)
1 1 7 02 02 06 Socket 5” Buah 69.400
1 1 7 02 02 06 Socket 4” Buah 63.400
1 1 7 02 02 06 Socket 3” Buah 30.000
1 1 7 02 02 06 Socket 2,5” Buah 23.100
1 1 7 02 02 06 Socket 2” Buah 17.300
1 1 7 02 02 06 Socket 1,5” Buah 9.000
1 1 7 02 02 06 Socket 1” Buah 6.000
1 1 7 02 02 06 Socket 3/4” Buah 6.000
1 1 7 02 02 06 Socket 1/2” Buah 6.000
1 1 7 02 02 06 Tee (Tebal)
1 1 7 02 02 06 Tee 5” Buah 217.000
1 1 7 02 02 06 Tee 4” Buah 122.000
1 1 7 02 02 06 Tee 3” Buah 61.000
1 1 7 02 02 06 Tee 2,5” Buah 42.000
1 1 7 02 02 06 Tee 2” Buah 29.000
1 1 7 02 02 06 Tee 1,5” Buah 21.000
1 1 7 02 02 06 Tee 1” Buah 11.000
1 1 7 02 02 06 Tee 3/4” Buah 9.000
1 1 7 02 02 06 Tee 1/2” Buah 6.000
1 1 7 02 02 06 Tee (Tipis)
1 1 7 02 02 06 Tee 5” Buah 83.000
1 1 7 02 02 06 Tee 4” Buah 48.000
1 1 7 02 02 06 Tee 3” Buah 29.000
1 1 7 02 02 06 Tee 2,5” Buah 21.000
1 1 7 02 02 06 Tee 2” Buah 15.000
1 1 7 02 02 06 Tee 1,5” Buah 11.000
1 1 7 02 02 06 Tee 1” Buah 9.000
1 1 7 02 02 06 Tee 3/4” Buah 8.000
1 1 7 02 02 06 Tee 1/2” Buah 6.000
1 1 7 02 02 06 Elbow (Tebal)
1 1 7 02 02 06 Elbow 5” Buah 129.000
1 1 7 02 02 06 Elbow 4” Buah 95.000
1 1 7 02 02 06 Elbow 3” Buah 55.000
1 1 7 02 02 06 Elbow 2,5” Buah 35.000
1 1 7 02 02 06 Elbow 2” Buah 28.000
1 1 7 02 02 06 Elbow 1,5” Buah 16.000
1 1 7 02 02 06 Elbow 1” Buah 7.000
1 1 7 02 02 06 Elbow 3/4” Buah 6.000
1 1 7 02 02 06 Elbow 1/2” Buah 6.000
1 1 7 02 02 06 Elbow (Tipis)
1 1 7 02 02 06 Elbow 5” Buah 90.000
1 1 7 02 02 06 Elbow 4” Buah 35.000
1 1 7 02 02 06 Elbow 3” Buah 21.000
1 1 7 02 02 06 Elbow 2,5” Buah 16.000
1 1 7 02 02 06 Elbow 2” Buah 9.000
1 1 7 02 02 06 Elbow 1,5” Buah 8.000
1 1 7 02 02 06 Elbow 1” Buah 6.000
1 1 7 02 02 06 Elbow 3/4” Buah 6.000
1 1 7 02 02 06 Elbow 1/2” Buah 6.000
1 1 7 02 02 06 PIPA HDPE SDR 17 (PN 10)
1 1 7 02 02 06 - Pipa HDPE Dia 063 M1 55.800
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - Pipa HDPE Dia 075 M1 76.800
1 1 7 02 02 06 - Pipa HDPE Dia 090 M1 110.500
1 1 7 02 02 06 - Pipa HDPE Dia 110 M1 164.900
1 1 7 02 02 06 - Pipa HDPE Dia 160 M1 345.400
1 1 7 02 02 06 - Pipa HDPE Dia 200 M1 540.900
1 1 7 02 02 06 - Pipa HDPE Dia 250 M1 840.900
1 1 7 02 02 06 - Pipa HDPE Dia 315 M1 1.338.400
1 1 7 02 02 06 BEND HDPE 90
1 1 7 02 02 06 - Bend HDPE 90 Dia 063 Buah 482.900
1 1 7 02 02 06 - Bend HDPE 90 Dia 090 Buah 788.400
1 1 7 02 02 06 - Bend HDPE 90 Dia 110 Buah 1.439.000
1 1 7 02 02 06 - Bend HDPE 90 Dia 160 Buah 2.567.700
1 1 7 02 02 06 - Bend HDPE 90 Dia 200 Buah 4.003.300
1 1 7 02 02 06 - Bend HDPE 90 Dia 250 Buah 2.032.600
1 1 7 02 02 06 - Bend HDPE 90 Dia 315 Buah 2.404.700
1 1 7 02 02 06 BEND HDPE 45
1 1 7 02 02 06 - Bend HDPE 45 Dia 063 Buah 205.900
1 1 7 02 02 06 - Bend HDPE 45 Dia 090 Buah 265.400
1 1 7 02 02 06 - Bend HDPE 45 Dia 110 Buah 409.500
1 1 7 02 02 06 - Bend HDPE 45 Dia 160 Buah 685.300
1 1 7 02 02 06 - Bend HDPE 45 Dia 200 Buah 1.230.400
1 1 7 02 02 06 - Bend HDPE 45 Dia 250 Buah 1.990.200
1 1 7 02 02 06 - Bend HDPE 45 Dia 315 Buah 3.171.100
1 1 7 02 02 06 EQUAL TEE HDPE
1 1 7 02 02 06 - Equal Tee HDPE Dia 063X 063 Buah 439.500
1 1 7 02 02 06 - Equal Tee HDPE Dia 090 X 090 Buah 605.500
1 1 7 02 02 06 - Equal Tee HDPE Dia 110 X 110 Buah 708.800
1 1 7 02 02 06 - Equal Tee HDPE Dia 160 X 160 Buah 1.090.700
1 1 7 02 02 06 - Equal Tee HDPE Dia 200 X 200 Buah 2.020.200
1 1 7 02 02 06 - Equal Tee HDPE Dia 250 X 250 Buah 1.874.800
1 1 7 02 02 06 - Equal Tee HDPE Dia 315 X 315 Buah 4.507.900
1 1 7 02 02 06 REDUCED TEE HDPE
1 1 7 02 02 06 - Reduser Tee HDPE Dia 090 x 063 Buah 661.300
1 1 7 02 02 06 - Reduser Tee HDPE Dia 110 x 063 Buah 970.700
1 1 7 02 02 06 - Reduser Tee HDPE Dia 110 x 090 Buah 1.258.500
1 1 7 02 02 06 - Reduser Tee HDPE Dia 160 x 063 Buah 1.356.300
1 1 7 02 02 06 - Reduser Tee HDPE Dia 160 x 090 Buah 1.356.300
1 1 7 02 02 06 - Reduser Tee HDPE Dia 160 x 110 Buah 1.356.300
1 1 7 02 02 06 - Reduser Tee HDPE Dia 200 x 110 Buah 3.370.100
1 1 7 02 02 06 - Reduser Tee HDPE Dia 200 x 160 Buah 3.370.100
1 1 7 02 02 06 - Reduser Tee HDPE Dia 250 x 200 Buah 5.232.700
1 1 7 02 02 06 - Reduser Tee HDPE Dia 315 x 200 Buah 6.410.100
1 1 7 02 02 06 REDUCER HDPE
1 1 7 02 02 06 - Reducer HDPE Dia 090 X 063 Buah 176.900
1 1 7 02 02 06 - Reducer HDPE Dia 110 x 063 Buah 234.800
1 1 7 02 02 06 - Reducer HDPE Dia 110 X 090 Buah 234.800
1 1 7 02 02 06 - Reducer HDPE Dia 160 x 063 Buah 452.600
1 1 7 02 02 06 - Reducer HDPE Dia 160 x 090 Buah 571.600
1 1 7 02 02 06 - Reducer HDPE Dia 160 x 110 Buah 571.600
1 1 7 02 02 06 - Reducer HDPE Dia 200 x 160 Buah 817.100
1 1 7 02 02 06 - Reducer HDPE Dia 250 x 160 Buah 1.722.400
1 1 7 02 02 06 - Reducer HDPE Dia 250 x 200 Buah 166.600
1 1 7 02 02 06 - Reducer HDPE Dia 315 x 200 Buah 2.197.300
1 1 7 02 02 06 END CAP HDPE
1 1 7 02 02 06 - End Cap HDPE Dia 063 Buah 120.200
1 1 7 02 02 06 - End Cap HDPE Dia 090 Buah 260.200
1 1 7 02 02 06 - End Cap HDPE Dia 110 Buah 359.400
1 1 7 02 02 06 - End Cap HDPE Dia 160 Buah 572.300
1 1 7 02 02 06 - End Cap HDPE Dia 200 Buah 966.200
1 1 7 02 02 06 - End Cap HDPE Dia 250 Buah 1.509.500
1 1 7 02 02 06 - End Cap HDPE Dia 315 Buah 2.795.700
1 1 7 02 02 06 STUB END FLANGE HDPE
1 1 7 02 02 06 - Stub End Flange HDPE Dia 063 Buah 291.700
1 1 7 02 02 06 - Stub End Flange HDPE Dia 090 Buah 355.700
1 1 7 02 02 06 - Stub End Flange HDPE Dia 110 Buah 480.800
1 1 7 02 02 06 - Stub End Flange HDPE Dia 160 Buah 806.800
1 1 7 02 02 06 - Stub End Flange HDPE Dia 200 Buah 1.314.700
1 1 7 02 02 06 - Stub End Flange HDPE Dia 250 Buah 1.800.900
1 1 7 02 02 06 - Stub End Flange HDPE Dia 315 Buah 3.263.500
1 1 7 02 02 06 STUB END HDPE
1 1 7 02 02 06 - Stub End HDPE Dia 063 Buah 112.500
1 1 7 02 02 06 - Stub End HDPE Dia 090 Buah 183.400
1 1 7 02 02 06 - Stub End HDPE Dia 110 Buah 228.100
1 1 7 02 02 06 - Stub End HDPE Dia 160 Buah 413.400
1 1 7 02 02 06 - Stub End HDPE Dia 200 Buah 731.300
1 1 7 02 02 06 - Stub End HDPE Dia 250 Buah 990.500
1 1 7 02 02 06 - Stub End HDPE Dia 315 Buah 1.904.100
1 1 7 02 02 06 FLANGE HDPE
1 1 7 02 02 06 - Flange HDPE Dia 063 Buah 112.500
1 1 7 02 02 06 - Flange HDPE Dia 090 Buah 276.700
1 1 7 02 02 06 - Flange HDPE Dia 110 Buah 423.100
1 1 7 02 02 06 - Flange HDPE Dia 160 Buah 652.400
1 1 7 02 02 06 - Flange HDPE Dia 200 Buah 1.039.700
1 1 7 02 02 06 - Flange HDPE Dia 250 Buah 1.356.700
1 1 7 02 02 06 - Flange HDPE Dia 315 Buah 2.818.200
1 1 7 02 02 06 JOINER (STRAIGHT COUPLING) HDPE
1 1 7 02 02 06 - Joiner (Straight Coupling) HDPE Dia 160 x 63 Buah 226.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - Joiner (Straight Coupling) HDPE Dia 20 x 63 Buah 526.738
1 1 7 02 02 06 Saddle Clamp HDPE Dia 63 x 1" Buah 65.500
1 1 7 02 02 06 GATE VALVE
1 1 7 02 02 06 - Gate Valve Dia 063 Buah 1.739.000
1 1 7 02 02 06 - Gate Valve Dia 090 Buah 2.502.700
1 1 7 02 02 06 - Gate Valve Dia 110 Buah 3.477.100
1 1 7 02 02 06 - Gate Valve Dia 160 Buah 6.395.100
1 1 7 02 02 06 - Gate Valve Dia 200 Buah 9.992.300
1 1 7 02 02 06 - Gate Valve Dia 250 Buah 17.001.700
1 1 7 02 02 06 - Gate Valve Dia 315 Buah 21.210.200
1 1 7 02 02 06 PIPA GIP MEDIUM
1 1 7 02 02 06 - Pipa GIP Medium Dia 020 M1 68.600
1 1 7 02 02 06 - Pipa GIP Medium Dia 050 M1 142.000
1 1 7 02 02 06 - Pipa GIP Medium Dia 075 M1 233.800
1 1 7 02 02 06 - Pipa GIP Medium Dia 100 M1 338.500
1 1 7 02 02 06 - Pipa GIP Medium Dia 150 M1 542.200
1 1 7 02 02 06 - Pipa GIP Medium Dia 200 M1 784.800
1 1 7 02 02 06 - Pipa GIP Medium Dia 250 M1 2.527.700
1 1 7 02 02 06 - Pipa GIP Medium Dia 300 M1 2.527.700
1 1 7 02 02 06 TEE GIP ALL FLANGE CI
1 1 7 02 02 06 - Tee GIP All Flange 050 X 050 Buah 293.600
1 1 7 02 02 06 - Tee GIP All Flange 075 X 075 Buah 504.700
1 1 7 02 02 06 - Tee GIP All Flange 100 X 100 Buah 628.800
1 1 7 02 02 06 - Tee GIP All Flange 150 X 150 Buah 1.176.900
1 1 7 02 02 06 - Tee GIP All Flange 200 X 200 Buah 1.847.400
1 1 7 02 02 06 - Tee GIP All Flange 250 X 250 Buah 2.742.100
1 1 7 02 02 06 - Tee GIP All Flange 300 X 300 Buah 3.959.200
1 1 7 02 02 06 BEND GIP 90 ALL FLANGE
1 1 7 02 02 06 - Bend GIP 90 All Flange 050 Buah 403.500
1 1 7 02 02 06 - Bend GIP 90 All Flange 075 Buah 605.200
1 1 7 02 02 06 - Bend GIP 90 All Flange 100 Buah 749.200
1 1 7 02 02 06 - Bend GIP 90 All Flange 150 Buah 1.325.500
1 1 7 02 02 06 - Bend GIP 90 All Flange 200 Buah 2.132.400
1 1 7 02 02 06 - Bend GIP 90 All Flange 250 Buah 3.175.500
1 1 7 02 02 06 - Bend GIP 90 All Flange 300 Buah 4.328.100
1 1 7 02 02 06 BEND GIP 45 ALL FLANGE
1 1 7 02 02 06 - Bend GIP 45 All Flange 110 Buah 356.400
1 1 7 02 02 06 - Bend GIP 45 All Flange 160 Buah 753.500
1 1 7 02 02 06 GIBOULT JOINT
1 1 7 02 02 06 - Giboult Joint 050 Buah 149.900
1 1 7 02 02 06 - Giboult Joint 075 Buah 184.500
1 1 7 02 02 06 - Giboult Joint 100 Buah 230.600
1 1 7 02 02 06 - Giboult Joint 150 Buah 403.500
1 1 7 02 02 06 - Giboult Joint 200 Buah 518.700
1 1 7 02 02 06 - Giboult Joint 250 Buah 634.000
1 1 7 02 02 06 - Giboult Joint 300 Buah 749.200
1 1 7 02 02 06 FLANGE RING
1 1 7 02 02 06 - Flange Ring 063 Buah 206.800
1 1 7 02 02 06 - Flange Ring 090 Buah 338.200
1 1 7 02 02 06 - Flange Ring 110 Buah 516.900
1 1 7 02 02 06 - Flange Ring 160 Buah 796.700
1 1 7 02 02 06 - Flange Ring 200 Buah 1.270.400
1 1 7 02 02 06 - Flange Ring 250 Buah 1.658.000
1 1 7 02 02 06 - Flange Ring 310 Buah 3.445.100
1 1 7 02 02 06 BLIND FLANGE
1 1 7 02 02 06 - Blank Flange 050 Buah 187.300
1 1 7 02 02 06 - Blank Flange 075 Buah 230.600
1 1 7 02 02 06 - Blank Flange 100 Buah 288.200
1 1 7 02 02 06 - Blank Flange 150 Buah 504.300
1 1 7 02 02 06 - Blank Flange 200 Buah 580.200
1 1 7 02 02 06 - Blank Flange 250 Buah 709.100
1 1 7 02 02 06 - Blank Flange 300 Buah 838.000
1 1 7 02 02 06 REDUCER GIP ALL FLANGE
1 1 7 02 02 06 - Reducer GIP All Flange 075 X 050 Buah 335.200
1 1 7 02 02 06 - Reducer GIP All Flange 100 X 075 Buah 438.300
1 1 7 02 02 06 - Reducer GIP All Flange 150 X 100 Buah 850.900
1 1 7 02 02 06 - Reducer GIP All Flange 200 X 150 Buah 1.263.500
1 1 7 02 02 06 - Reducer GIP All Flange 250 X 200 Buah 1.908.200
1 1 7 02 02 06 - Reducer GIP All Flange 250 X 201 Buah 2.424.000
1 1 7 02 02 06 Air Valve F/F Single 2'' Buah 1.825.700
1 1 7 02 02 06 BaroMeter/Pressure Gauge 2'' Buah 166.700
1 1 7 02 02 06 FLANGE LAS
1 1 7 02 02 06 - Flange Las RF PN-10 1.1/4'' (GIP) Buah 53.200
1 1 7 02 02 06 - Flange Las RF PN-10 1.1/2'' (GIP) Buah 57.800
1 1 7 02 02 06 - Flange Las RF PN-10 2'' (GIP) Buah 79.600
1 1 7 02 02 06 - Flange Las RF PN-10 2.1/2'' (GIP) Buah 113.400
1 1 7 02 02 06 - Flange Las RF PN-10 3'' (GIP) Buah 123.700
1 1 7 02 02 06 - Flange Las RF PN-10 4'' (GIP) Buah 149.500
1 1 7 02 02 06 - Flange Las RF PN-10 5'' (GIP)) Buah 181.700
1 1 7 02 02 06 - Flange Las RF PN-10 6'' (GIP) Buah 217.300
1 1 7 02 02 06 - Flange Las RF PN-10 8'' (GIP) Buah 315.200
1 1 7 02 02 06 - Flange Las RF PN-10 10'' (GIP) Buah 398.600
1 1 7 02 02 06 - Flange Las RF PN-10 12'' (GIP) Buah 475.500
1 1 7 02 02 06 - Flange Las RF PN-10 14'' (GIP) Buah 741.500
1 1 7 02 02 06 - Flange Las RF PN-10 16'' (GIP) Buah 1.007.600
1 1 7 02 02 06 - Flange Las RF PN-10 18'' (GIP) Buah 1.136.400
1 1 7 02 02 06 - Flange Las RF PN-10 20'' (GIP) Buah 1.511.400
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - Flange Las RF PN-10 24'' (GIP) Buah 2.994.400
1 1 7 02 02 06 KARET (RUBBER) PACKING 5 MM
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 2'' Buah 15.400
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 3'' Buah 22.600
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 4'' Buah 25.700
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 6'' Buah 46.400
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 8'' Buah 63.900
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 10'' Buah 103.100
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 12'' Buah 128.900
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 14'' Buah 266.100
1 1 7 02 02 06 - Karet (Rubber) Packing 5 mm PN-10 16'' Buah 278.500
1 1 7 02 02 06 WATER Meter
1 1 7 02 02 06 - Water Meter 1/2" Buah 354.300
1 1 7 02 02 06 - Water Meter 3/4" Buah 475.500
1 1 7 02 02 06 - Water Meter 2" Buah 1.867.000
1 1 7 02 02 06 - Water Meter 3" Buah 2.176.400
1 1 7 02 02 06 - Water Meter 4" Buah 2.435.300
1 1 7 02 02 06 - Water Meter 6" Buah 3.790.700
1 1 7 02 02 06 - Water Meter 8" Buah 4.564.300
1 1 7 02 02 06 - Water Meter 10" Buah 13.144.900
1 1 7 02 02 06 - Water Meter 12" Buah 17.019.700
1 1 7 02 02 06 MALE THREAD ADAPTOR (MTA)
1 1 7 02 02 06 - MTA 20 mm x 1/2'' Buah 8.500
1 1 7 02 02 06 - MTA 20 mm x 3/4'' Buah 8.500
1 1 7 02 02 06 - MTA 25 mm x 1/2''' Buah 11.000
1 1 7 02 02 06 - MTA 25 mm x 3/4'' Buah 11.000
1 1 7 02 02 06 - MTA 25 mm x 1'' Buah 11.400
1 1 7 02 02 06 - MTA 32 mm x 1/2'' Buah 16.100
1 1 7 02 02 06 - MTA 32 mm x 3/4'' Buah 16.100
1 1 7 02 02 06 - MTA 32 mm x 1'' Buah 16.100
1 1 7 02 02 06 - MTA 40 mm x 1'' Buah 40.800
1 1 7 02 02 06 - MTA 40 mm x 1 1/4'' Buah 41.200
1 1 7 02 02 06 - MTA 40 mm x 1 1/2'' Buah 41.200
1 1 7 02 02 06 - MTA 50 mm x 1 1/4'' Buah 54.800
1 1 7 02 02 06 - MTA 50 mm x 2'' Buah 58.200
1 1 7 02 02 06 - MTA 63 mm x 2'' Buah 78.200
1 1 7 02 02 06 - MTA 75 mm x 2'' Buah 156.100
1 1 7 02 02 06 - MTA 75 mm x 2 1/2'' Buah 156.100
1 1 7 02 02 06 - MTA 90 mm x 3'' Buah 181.600
1 1 7 02 02 06 - MTA 110 mm x 4'' Buah 427.600
1 1 7 02 02 06 END CAP
1 1 7 02 02 06 - End Cap Dia 20 mm Buah 2.800
1 1 7 02 02 06 - End Cap Dia 25 mm Buah 3.900
1 1 7 02 02 06 - End Cap Dia 32 mm Buah 5.500
1 1 7 02 02 06 - End Cap Dia 40 mm Buah 7.800
1 1 7 02 02 06 - End Cap Dia 50 mm Buah 28.600
1 1 7 02 02 06 - End Cap Dia 63 mm Buah 64.200
1 1 7 02 02 06 - End Cap Dia 75 mm Buah 170.100
1 1 7 02 02 06 - End Cap Dia 90 mm Buah 157.000
1 1 7 02 02 06 - End Cap Dia 110 mm Buah 333.100
1 1 7 02 02 06 FEMALE THREAD ADAPTOR (FTA)
1 1 7 02 02 06 - FTA 20 mm x 1/2'' Buah 10.600
1 1 7 02 02 06 - FTA 20 mm x 3/4'' Buah 10.600
1 1 7 02 02 06 - FTA 25 mm x 1/2'' Buah 12.300
1 1 7 02 02 06 - FTA 25 mm x 3/4'' Buah 12.300
1 1 7 02 02 06 - FTA 25 mm x 1'' Buah 12.300
1 1 7 02 02 06 - FTA 32 mm x 3/4'' Buah 19.100
1 1 7 02 02 06 - FTA 32 mm x 1'' Buah 19.100
1 1 7 02 02 06 - FTA 40 mm x 1'' Buah 44.600
1 1 7 02 02 06 - FTA 40 mm x 1 1/4'' Buah 44.600
1 1 7 02 02 06 - FTA 40 mm x 1 1/2'' Buah 44.600
1 1 7 02 02 06 - FTA 50 mm x 1 1/4'' Buah 62.500
1 1 7 02 02 06 - FTA 50 mm x 1 1/2'' Buah 62.500
1 1 7 02 02 06 - FTA 63 mm x 2'' Buah 106.700
1 1 7 02 02 06 - FTA 75 mm x 2'' Buah 159.500
1 1 7 02 02 06 - FTA 75 mm x 2 1/2'' Buah 169.300
1 1 7 02 02 06 - FTA 90 mm x 3'' Buah 215.700
1 1 7 02 02 06 - FTA 110 mm x 4'' Buah 435.200
1 1 7 02 02 06 COUPLER
1 1 7 02 02 06 - Coupler Dia 20 mm Buah 14.800
1 1 7 02 02 06 - Coupler Dia 25 mm Buah 20.400
1 1 7 02 02 06 - Coupler Dia 32 mm Buah 29.300
1 1 7 02 02 06 - Coupler Dia 40 mm Buah 66.800
1 1 7 02 02 06 - Coupler Dia 50 mm Buah 76.100
1 1 7 02 02 06 - Coupler Dia 63 mm Buah 117.800
1 1 7 02 02 06 - Coupler Dia 75 mm Buah 222.900
1 1 7 02 02 06 - Coupler Dia 90 mm Buah 280.800
1 1 7 02 02 06 - Coupler Dia 110 mm Buah 622.400
1 1 7 02 02 06 REDUCER
1 1 7 02 02 06 - Reducer Dia 25 x 20 Buah 3.600
1 1 7 02 02 06 - Reducer Dia 32 x 20 Buah 5.900
1 1 7 02 02 06 - Reducer Dia 32 x 25 Buah 5.200
1 1 7 02 02 06 - Reducer Dia 40 x 20 Buah 49.300
1 1 7 02 02 06 - Reducer Dia 40 x 25 Buah 9.400
1 1 7 02 02 06 - Reducer Dia 40 x 32 Buah 9.000
1 1 7 02 02 06 - Reducer Dia 50 x 20 Buah 53.600
1 1 7 02 02 06 - Reducer Dia 50 x 25 Buah 57.800
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - Reducer Dia 50 x 32 Buah 14.500
1 1 7 02 02 06 - Reducer Dia 50 x 40 Buah 12.500
1 1 7 02 02 06 - Reducer Dia 63 x 25 Buah 80.400
1 1 7 02 02 06 - Reducer Dia 63 x 32 Buah 88.900
1 1 7 02 02 06 - Reducer Dia 63 x 40 Buah 102.900
1 1 7 02 02 06 - Reducer Dia 63 x 50 Buah 106.700
1 1 7 02 02 06 - Reducer Dia 75 x 50 Buah 173.100
1 1 7 02 02 06 - Reducer Dia 75 x 63 Buah 197.400
1 1 7 02 02 06 - Reducer Dia 90 x 63 Buah 215.200
1 1 7 02 02 06 - Reducer Dia 90 x 75 Buah 265.500
1 1 7 02 02 06 - Reducer Dia 110 x 63 Buah 85.200
1 1 7 02 02 06 - Reducer Dia 110 x 90 Buah 101.300
1 1 7 02 02 06 TEE EQUAL
1 1 7 02 02 06 - Tee Equal Dia 20 mm Buah 22.100
1 1 7 02 02 06 - Tee Equal Dia 25 mm Buah 29.700
1 1 7 02 02 06 - Tee Equal Dia 32 mm Buah 46.800
1 1 7 02 02 06 - Tee Equal Dia 40 mm Buah 116.100
1 1 7 02 02 06 - Tee Equal Dia 50 mm Buah 129.300
1 1 7 02 02 06 - Tee Equal Dia 63 mm Buah 180.300
1 1 7 02 02 06 - Tee Equal Dia 75 mm Buah 382.000
1 1 7 02 02 06 - Tee Equal Dia 90 mm Buah 245.000
1 1 7 02 02 06 - Tee Equal Dia 110 mm Buah 429.200
1 1 7 02 02 06 MALE THREAD TEE (MTT)
1 1 7 02 02 06 - MTT Dia 20 mm x 1/2'' Buah 31.600
1 1 7 02 02 06 - MTT Dia 20 mm x 3/4'' Buah 19.500
1 1 7 02 02 06 - MTT Dia 25 mm x 1/2'' Buah 25.100
1 1 7 02 02 06 - MTT Dia 25 mm x 3/4'' Buah 37.300
1 1 7 02 02 06 - MTT Dia 25 mm x 1'' Buah 25.100
1 1 7 02 02 06 - MTT Dia 32 mm x 3/4'' Buah 37.800
1 1 7 02 02 06 - MTT Dia 32 mm x 1'' Buah 292.700
1 1 7 02 02 06 - MTT Dia 40 mm x 1'' Buah 89.300
1 1 7 02 02 06 - MTT Dia 40 mm x 1 1/4'' Buah 89.300
1 1 7 02 02 06 - MTT Dia 50 mm x 1 1/4'' Buah 99.900
1 1 7 02 02 06 - MTT Dia 50 mm x 1 1/2'' Buah 99.900
1 1 7 02 02 06 - MTT Dia 63 mm x 2'' Buah 169.700
1 1 7 02 02 06 - MTT Dia 75 mm x 2'' Buah 292.700
1 1 7 02 02 06 - MTT Dia 75 mm x 2 1/2'' Buah 294.400
1 1 7 02 02 06 - MTT Dia 90 mm x 3'' Buah 427.600
1 1 7 02 02 06 - MTT Dia 110 mm x 3'' Buah 852.200
1 1 7 02 02 06 - MTT Dia 110 mm x 4'' Buah 855.200
1 1 7 02 02 06 FEMALE THREAD TEE (FTT)
1 1 7 02 02 06 - FTT Dia 20 mm x 1/2'' Buah 25.700
1 1 7 02 02 06 - FTT Dia 20 mm x 3/4'' Buah 19.500
1 1 7 02 02 06 - FTT Dia 25 mm x 1/2'' Buah 25.100
1 1 7 02 02 06 - FTT Dia 25 mm x 3/4'' Buah 27.900
1 1 7 02 02 06 - FTT Dia 25 mm x 1'' Buah 25.100
1 1 7 02 02 06 - FTT Dia 32 mm x 3/4'' Buah 37.800
1 1 7 02 02 06 - FTT Dia 32 mm x 1'' Buah 51.400
1 1 7 02 02 06 - FTT Dia 40 mm x 1'' Buah 98.200
1 1 7 02 02 06 - FTT Dia 40 mm x 1 1/4'' Buah 98.200
1 1 7 02 02 06 - FTT Dia 50 mm x 1 1/4'' Buah 110.600
1 1 7 02 02 06 - FTT Dia 50 mm x 1 1/2'' Buah 110.600
1 1 7 02 02 06 - FTT Dia 63 mm x 2'' Buah 176.700
1 1 7 02 02 06 - FTT Dia 75 mm x 2'' Buah 316.900
1 1 7 02 02 06 - FTT Dia 75 mm x 2 1/2'' Buah 324.200
1 1 7 02 02 06 - FTT Dia 90 mm x 3'' Buah 434.400
1 1 7 02 02 06 - FTT Dia 110 mm x 3'' Buah 912.600
1 1 7 02 02 06 - FTT Dia 110 mm x 4'' Buah 912.600
1 1 7 02 02 06 REDUCING TEE
1 1 7 02 02 06 - Reducing Tee Dia 25 x 20 Buah 33.300
1 1 7 02 02 06 - Reducing Tee Dia 32 x 20 Buah 40.500
1 1 7 02 02 06 - Reducing Tee Dia 32 x 25 Buah 43.100
1 1 7 02 02 06 - Reducing Tee Dia 40 x 25 Buah 76.500
1 1 7 02 02 06 - Reducing Tee Dia 40 x 32 Buah 79.500
1 1 7 02 02 06 - Reducing Tee Dia 50 x 20 Buah 129.300
1 1 7 02 02 06 - Reducing Tee Dia 50 x 25 Buah 129.300
1 1 7 02 02 06 - Reducing Tee Dia 50 x 32 Buah 129.300
1 1 7 02 02 06 - Reducing Tee Dia 50 x 40 Buah 129.300
1 1 7 02 02 06 - Reducing Tee Dia 63 x 32 Buah 197.400
1 1 7 02 02 06 - Reducing Tee Dia 63 x 50 Buah 197.400
1 1 7 02 02 06 - Reducing Tee Dia 75 x 50 Buah 374.400
1 1 7 02 02 06 - Reducing Tee Dia 75 x 63 Buah 388.900
1 1 7 02 02 06 - Reducing Tee Dia 90 x 63 Buah 461.600
1 1 7 02 02 06 - Reducing Tee Dia 90 x 75 Buah 484.200
1 1 7 02 02 06 - Reducing Tee Dia 110 x 63 Buah 951.400
1 1 7 02 02 06 - Reducing Tee Dia 110 x 75 Buah 960.700
1 1 7 02 02 06 - Reducing Tee Dia 110 x 90 Buah 956.900
1 1 7 02 02 06 MALE THREAD ELBOW (MTE)
1 1 7 02 02 06 - MTE Dia 20 x 1/2'' Buah 10.600
1 1 7 02 02 06 - MTE Dia 20 x 3/4'' Buah 11.900
1 1 7 02 02 06 - MTE Dia 25 x 1/2'' Buah 13.500
1 1 7 02 02 06 - MTE Dia 25 x 3/4'' Buah 22.400
1 1 7 02 02 06 - MTE Dia 25 x 1'' Buah 14.800
1 1 7 02 02 06 - MTE Dia 32 x 3/4'' Buah 22.100
1 1 7 02 02 06 - MTE Dia 32 x 1'' Buah 26.400
1 1 7 02 02 06 - MTE Dia 40 x 1'' Buah 53.600
1 1 7 02 02 06 - MTE Dia 40 x 1 1/4'' Buah 53.600
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - MTE Dia 50 x 1 1/4'' Buah 67.200
1 1 7 02 02 06 - MTE Dia 50 x 1 1/2'' Buah 67.200
1 1 7 02 02 06 - MTE Dia 63 x 2'' Buah 116.100
1 1 7 02 02 06 - MTE Dia 75 x 2'' Buah 181.600
1 1 7 02 02 06 - MTE Dia 75 x 2 1/2'' Buah 181.600
1 1 7 02 02 06 - MTE Dia 90 x 3'' Buah 248.000
1 1 7 02 02 06 - MTE Dia 110 x 3'' Buah 511.000
1 1 7 02 02 06 - MTE Dia 110 x 4'' Buah 511.000
1 1 7 02 02 06 ELBOW EQUAL
1 1 7 02 02 06 - Elbow Equal 20 mm Buah 17.000
1 1 7 02 02 06 - Elbow Equal 25 mm Buah 22.100
1 1 7 02 02 06 - Elbow Equal 32 mm Buah 32.300
1 1 7 02 02 06 - Elbow Equal 40 mm Buah 80.400
1 1 7 02 02 06 - Elbow Equal 50 mm Buah 91.000
1 1 7 02 02 06 - Elbow Equal 63 mm Buah 180.300
1 1 7 02 02 06 - Elbow Equal 75 mm Buah 263.800
1 1 7 02 02 06 - Elbow Equal 90 mm Buah 245.000
1 1 7 02 02 06 - Elbow Equal 110 mm Buah 429.200
1 1 7 02 02 06 FEMALE THREAD ELBOW (FTE)
1 1 7 02 02 06 - FTE Dia 20 x 1/2'' Buah 25.800
1 1 7 02 02 06 - FTE Dia 20 x 3/4'' Buah 11.900
1 1 7 02 02 06 - FTE Dia 25 x 1/2'' Buah 30.700
1 1 7 02 02 06 - FTE Dia 25 x 3/4'' Buah 16.100
1 1 7 02 02 06 - FTE Dia 25 x 1'' Buah 16.100
1 1 7 02 02 06 - FTE Dia 32 x 3/4'' Buah 24.600
1 1 7 02 02 06 - FTE Dia 32 x 1'' Buah 24.600
1 1 7 02 02 06 - FTE Dia 40 x 1'' Buah 56.500
1 1 7 02 02 06 - FTE Dia 40 x 1 1/4'' Buah 56.500
1 1 7 02 02 06 - FTE Dia 50 x 1 1/4'' Buah 76.100
1 1 7 02 02 06 - FTE Dia 50 x 1 1/2'' Buah 76.100
1 1 7 02 02 06 - FTE Dia 63 x 2'' Buah 122.100
1 1 7 02 02 06 - FTE Dia 75 x 2'' Buah 200.400
1 1 7 02 02 06 - FTE Dia 75 x 2 1/2'' Buah 208.000
1 1 7 02 02 06 - FTE Dia 90 x 3'' Buah 282.500
1 1 7 02 02 06 - FTE Dia 110 x 3'' Buah 581.600
1 1 7 02 02 06 - FTE Dia 110 x 4'' Buah 581.600
1 1 7 02 02 06 FLANGE ADAPTOR
1 1 7 02 02 06 - Flange Adaptor Dia 63 x 2'' Buah 433.200
1 1 7 02 02 06 - Flange Adaptor Dia 75 x 2 1/2'' Buah 567.300
1 1 7 02 02 06 - Flange Adaptor Dia 90 x 3'' Buah 417.800
1 1 7 02 02 06 - Flange Adaptor Dia 110 x 4'' Buah 853.900
1 1 7 02 02 06 FERRULE CUTTER (THREADED CONNECTION)
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 x 1/2'' Buah 130.600
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 x 3/4'' Buah 132.700
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 x 1'' Buah 135.300
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 1/4 x 1/2'' Buah 133.600
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 1/4 x 3/4'' Buah 135.300
1 1 7 02 02 06 - Ferrule Cutter (Threaded Connection) Dia 1 1/4 x 1'' Buah 136.500
1 1 7 02 02 06 FERRULE CUTTER (PE CONNECTION)
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 x 20 Buah 130.600
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 x 25 Buah 132.700
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 x 32 Buah 135.300
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 1/4 x 20 Buah 133.600
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 1/4 x 25 Buah 135.300
1 1 7 02 02 06 - Ferrule Cutter (Pe Connection) Dia 1 1/4 x 32 Buah 136.500
1 1 7 02 02 06 CLAMP SADDLE
1 1 7 02 02 06 - Clamp Saddle Dia 25 x 1/2'' Buah 23.800
1 1 7 02 02 06 - Clamp Saddle Dia 25 x 3/4'' Buah 24.600
1 1 7 02 02 06 - Clamp Saddle Dia 32 x 3/8'' Buah 26.300
1 1 7 02 02 06 - Clamp Saddle Dia 32 x 1/2'' Buah 26.300
1 1 7 02 02 06 - Clamp Saddle Dia 32 x 3/4'' Buah 26.300
1 1 7 02 02 06 - Clamp Saddle Dia 32 x 1'' Buah 27.200
1 1 7 02 02 06 - Clamp Saddle Dia 40 x 3/8'' Buah 31.000
1 1 7 02 02 06 - Clamp Saddle Dia 40 x 1/2'' Buah 31.000
1 1 7 02 02 06 - Clamp Saddle Dia 40 x 3/4'' Buah 31.400
1 1 7 02 02 06 - Clamp Saddle Dia 40 x 1'' Buah 34.000
1 1 7 02 02 06 - Clamp Saddle Dia 50 x 3/8'' Buah 32.700
1 1 7 02 02 06 - Clamp Saddle Dia 50 x 1/2'' Buah 32.700
1 1 7 02 02 06 - Clamp Saddle Dia 50 x 3/4'' Buah 34.000
1 1 7 02 02 06 - Clamp Saddle Dia 50 x 1'' Buah 36.500
1 1 7 02 02 06 - Clamp Saddle Dia 63 x 3/8'' Buah 43.800
1 1 7 02 02 06 - Clamp Saddle Dia 63 x 1/2'' Buah 44.100
1 1 7 02 02 06 - Clamp Saddle Dia 63 x 3/4'' Buah 44.600
1 1 7 02 02 06 - Clamp Saddle Dia 63 x 1'' Buah 47.200
1 1 7 02 02 06 - Clamp Saddle Dia 63 x 11/4'' Buah 48.900
1 1 7 02 02 06 - Clamp Saddle Dia 75 x 1/2'' Buah 68.500
1 1 7 02 02 06 - Clamp Saddle Dia 75 x 3/4'' Buah 68.900
1 1 7 02 02 06 - Clamp Saddle Dia 75 x 1'' Buah 71.400
1 1 7 02 02 06 - Clamp Saddle Dia 75 x 1 1/4'' Buah 73.600
1 1 7 02 02 06 - Clamp Saddle Dia 75 x 1 1/2'' Buah 74.400
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 3/8'' Buah 83.300
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 1/2'' Buah 83.300
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 3/4'' Buah 85.000
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 1'' Buah 88.000
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 1 1/4'' Buah 91.400
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 1 1/2'' Buah 92.700
1 1 7 02 02 06 - Clamp Saddle Dia 90 x 2 Buah 99.100
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 3/8'' Buah 105.900
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 1/2'' Buah 105.900
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 3/4'' Buah 107.200
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 1'' Buah 109.300
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 1 1/4'' Buah 112.300
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 1 1/2'' Buah 113.600
1 1 7 02 02 06 - Clamp Saddle Dia 110 x 2'' Buah 121.200
1 1 7 02 02 06 - Clamp Saddle Dia 125 x 3/8'' Buah 117.800
1 1 7 02 02 06 - Clamp Saddle Dia 125 x 1/2'' Buah 117.800
1 1 7 02 02 06 - Clamp Saddle Dia 125 x 3/4'' Buah 118.700
1 1 7 02 02 06 - Clamp Saddle Dia 125 x 1'' Buah 121.600
1 1 7 02 02 06 - Clamp Saddle Dia 125 x 2'' Buah 221.200
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 3/8'' Buah 181.200
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 1/2'' Buah 181.200
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 3/4'' Buah 181.600
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 1'' Buah 184.600
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 1 1/4'' Buah 186.700
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 1 1/2'' Buah 187.600
1 1 7 02 02 06 - Clamp Saddle Dia 140 x 2'' Buah 193.600
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 3/8'' Buah 183.800
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 1/2'' Buah 183.800
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 3/4'' Buah 184.600
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 1'' Buah 186.700
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 1 1/4'' Buah 192.300
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 1 1/2'' Buah 193.600
1 1 7 02 02 06 - Clamp Saddle Dia 160 x 2'' Buah 199.900
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 3/8'' Buah 291.400
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 1/2'' Buah 291.400
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 3/4'' Buah 292.300
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 1'' Buah 295.700
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 1 1/2'' Buah 299.500
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 1 1/4'' Buah 298.600
1 1 7 02 02 06 - Clamp Saddle Dia 180 x 2'' Buah 304.600
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 3/4'' Buah 336.900
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 1'' Buah 339.500
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 1 1/4'' Buah 341.600
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 1 1/2'' Buah 342.900
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 2'' Buah 348.000
1 1 7 02 02 06 - Clamp Saddle Dia 200 x 3'' Buah 361.600
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 3/8'' Buah 363.300
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 1/2'' Buah 363.300
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 3/4'' Buah 364.200
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 1'' Buah 366.300
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 1 1/4'' Buah 368.000
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 1 1/2'' Buah 369.300
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 2'' Buah 375.700
1 1 7 02 02 06 - Clamp Saddle Dia 225 x 3'' Buah 391.800
1 1 7 02 02 06 - Clamp Saddle Dia 250 x 3/4'' Buah 697.300
1 1 7 02 02 06 - Clamp Saddle Dia 250 x 1'' Buah 713.100
1 1 7 02 02 06 - Clamp Saddle Dia 250 x 1 1/2'' Buah 733.500
1 1 7 02 02 06 - Clamp Saddle Dia 250 x 2'' Buah 738.600
1 1 7 02 02 06 - Clamp Saddle Dia 250 x 3'' Buah 755.200
1 1 7 02 02 06 PP Bush
1 1 7 02 02 06 - PP Bush Dia 3/4" x 1/2" Buah 5.400
1 1 7 02 02 06 - PP Bush Dia 1 x 3/4" Buah 6.200
1 1 7 02 02 06 - PP Bush Dia 1 1/2" x 1" Buah 15.100
1 1 7 02 02 06 - PP Bush Dia 2" x 1" Buah 24.800
1 1 7 02 02 06 - PP Bush Dia 2 x 1 1/2" Buah 24.800
1 1 7 02 02 06 Pipa Porus Dia. 12" M1 61.400
1 1 7 02 02 06 003 Elastomer
1 1 7 02 02 06 Elastomer Buah 1.822.700
1 3 2 01 03 12 PERLENGKAPAN KEBAKARAN HUTAN
1 3 2 01 03 12 001 Backpack Pump (Pompa Punggung Besar)
1 3 2 01 03 12 Pompa Punggung JUFA - 15L Backpack Pump Kapasitas Kantong Air : 15 liter, Daya Semprot : Set 3.935.300
10 meter, Panjang Pompa Kuningan : 50 - 51 cm,
Berat Pompa dalam kondisi kosong : 2 - 2,5 kg

1 3 2 01 03 12 002 Floating Fire Pump (Pompa Punggung Kecil)


1 3 2 01 03 12 Pompa Terapung Pemadam Kebakaran Portable Fire Set 59.090.000
Floating Pump Niagara 1
1 3 2 01 03 12 004 Jet Shooter
1 3 2 01 03 12 Jet Shooter Forest Pro 20L Pompa Ransel Pemadam Kapasitas Tampung Tangki 20 Liter Air Set 3.249.000
Kebakaran Hutan
1 3 2 01 03 12 005 Golok Pemadam
1 3 2 01 03 12 Golok Pemadam Buah 508.100
1 3 2 01 03 12 024 Pulaski Axe (Kapak Dua Fungsi)
Pulaski Axe (Kapak Dua Fungsi) 64.900
1 3 2 01 03 12 026 Sabit Semak
Sabit Semak 76.800
1 3 2 04 ALAT PERTANIAN
1 3 2 04 01 ALAT PENGOLAHAN
1 3 2 04 01 01 ALAT PENGOLAHAN TANAH DAN TANAMAN
1 3 2 04 01 01 003 Pacul
1 3 2 04 01 01 Pacul Buah 31.000
1 3 2 04 01 01 004 Linggis
1 3 2 04 01 01 Linggis Besi diaMeter 30 mm Buah 47.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 04 01 01 005 Garpu Pacul
1 3 2 04 01 01 Garpu Tanah Buah 66.000
1 3 2 04 01 01 Garpu Mini Buah 8.000
1 3 2 04 01 01 006 Garpu Kayu
1 3 2 04 01 01 Garpu bergagang Merk : Diamond Buah 78.000
1 3 2 04 01 01 007 Garpu Besi
1 3 2 04 01 01 Garpu merk Buah 56.000
1 3 2 04 01 01 008 Tractor Four Wheel (Dengan kelengkapanya)
1 3 2 04 01 01 Traktor pengolah lahan kebun 33 pk Rotary Unit 309.450.000
1 3 2 04 01 01 009 Tractor Tangan Dengan Perlengkapannya
1 3 2 04 01 01 Hand Traktor (Geledek) YTS – 85 – YL (HP) Unit 41.776.000
1 3 2 04 01 01 Hand Traktor (Geledek) Merk : Yanmar BM -DX Unit 32.286.000
1 3 2 04 01 01 Hand Traktor (Geledek) Merk : Yanmar BM -2 Unit 7.737.000
1 3 2 04 01 01 Hand Traktor (Geledek) Merk : Yanmar YST - DX Unit 32.233.000
1 3 2 04 01 01 Hand Traktor (Geledek) Merk : Yanmar YOF - 80 Unit 24.550.000
1 3 2 04 01 01 Hand Traktor (Geledek) Merk : Yanmar Y.M 70 Unit 13.616.000
1 3 2 04 01 01 011 Skap
1 3 2 04 01 01 Skap Bahan besi gagang kayu Buah 42.000
1 3 2 04 01 01 012 Garu
1 3 2 04 01 01 Garu Mini Bahan besi Buah 137.500
1 3 2 04 01 01 Garu plastik Bahan Plastik Buah 120.000
1 3 2 04 01 01 Garu Besi panjang Bahan besi Buah 810.000
1 3 2 04 01 01 013 Tong Komposter
1 3 2 04 01 01 Tong Fermentasi Buah 496.300
1 3 2 04 01 02 ALAT PEMELIHARAAN TANAMAN/IKAN/TERNAK
1 3 2 04 01 02 001 Kored
1 3 2 04 01 02 Kored Pacul Ex Lokal Buah 67.000
1 3 2 04 01 02 002 Arit
1 3 2 04 01 02 Arit bergagang Ukuran : Standar Buah 45.000
1 3 2 04 01 02 003 Babatan
1 3 2 04 01 02 Parang Merk Diamond Buah 63.000
1 3 2 04 01 02 004 Pacul Dangir
1 3 2 04 01 02 Pacul Dangir Buah 118.100
1 3 2 04 01 02 005 Penyemprot Otomatis (Automatic)
1 3 2 04 01 02 Sprayer Hands Sprayer semi otomatis 10 Liter Buah 284.000
1 3 2 04 01 02 Sprayer Hands Sprayer Semi otomatis 14 Liter Buah 331.000
1 3 2 04 01 02 Hand Spayer Tasco. Mist 15/425 Manual Unit 289.000
1 3 2 04 01 02 006 Penyemprot Mesin (Power Sprayer)
1 3 2 04 01 02 Power sprayer Buah 1.898.000
1 3 2 04 01 02 007 Penyemprot Tangan (Hand Sprayer)
1 3 2 04 01 02 Hand Sprayer Merek solo unit 579.000
1 3 2 04 01 02 Sprayer Hands Sprayer otomatis 10 Liter Buah 1.218.000
1 3 2 04 01 02 Sprayer Hands Sprayer otomatis 14 Liter Buah 1.032.000
1 3 2 04 01 02 Hand Sprayer Lokal Kapasitas : 15 Liter Buah 481.000
1 3 2 04 01 02 008 Alat Penyiang Tanaman
1 3 2 04 01 02 Gergaji Senso Buah 4.642.000
1 3 2 04 01 02 Mesin Potong Padi Gendong, MPR 328 PP (10,5/12,5 kg) Buah 1.548.000
1 3 2 04 01 02 Mesin Potong Padi Gendong, MM4 Buah 5.467.000
1 3 2 04 01 02 Mesin Potong Rumput Suoperay, 450 watt Buah 356.000
1 3 2 04 01 02 009 Gunting
1 3 2 04 01 02 Gunting Tanaman Gunting Dahan Buah 47.000
1 3 2 04 01 02 Gunting Tanaman Gunting Pangkas/Gergaji Buah 98.000
1 3 2 04 01 02 Gunting Tanaman Gunting Ranting Buah 48.000
1 3 2 04 01 02 Gunting Tanaman Guntung Rumput Gagang Kayu Buah 37.000
1 3 2 04 01 02 Gunting Tanaman Guntung Rumput Gagang Besi Buah 47.000
1 3 2 04 01 02 Gunting Tanaman Sellery 2'' 66-165 Buah 114.000
1 3 2 04 01 02 Gunting Dahan Merk : tiger , ex Taiwan Buah 61.000
1 3 2 04 01 02 010 Hidro Tile
1 3 2 04 01 02 Hidro Tile Yanmar Gx-270 (9 HP) Unit 15.115.000
1 3 2 04 01 02 Hidro Tile Yanmar L-60 (6 HP) Unit 29.015.000
1 3 2 04 01 02 011 Dryer
1 3 2 04 01 02 Dryer Agrindo Yanmar ABD – 3200 Unit 90.828.000
1 3 2 04 01 02 Dryer Ingine TR – 65 YanmarEngine TF 65 R Unit 14.508.000
1 3 2 04 01 02 Dryer YanmarEngine TS – 60 Unit 92.594.000
1 3 2 04 01 02 012 Genset
1 3 2 04 01 02 Genset 3 KUA / Instansi Firman(Bensin) Unit 5.740.000
1 3 2 04 01 09 ALAT ALAT PETERNAKAN
1 3 2 04 01 09 007 Container
1 3 2 04 01 09 CONTAINER GOLDN PHONIX
2L Unit 11.227.100
3L Unit 12.408.900
10L Unit 14.181.600
20L Unit 17.136.100
35L Unit 21.272.400
1 3 2 04 01 09 CONTAINER TW-USA
1,5 XT Unit 17.254.280
3 XT Unit 19.736.060
10 XT Unit 22.926.920
20 XT Unit 28.599.560
34 XT (MULUT BESAR, KAP. 28.800 STRAW) Unit 35.217.640
35 HC Unit 38.172.140
35 LD (KHUSUS N2 CAIR) Unit 35.926.720
50 LD (KHUSUS N2 CAIR) Unit 36.872.160
LWD (POMPA N2 CAIR) Unit 23.754.180
1 3 2 04 01 09 CONTAINER CD-FRANCE
B 2002 (MULUT KECIL) Unit 16.545.200
B 2003 (MULUT KECIL) Unit 19.145.160
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
B 2009 (MULUT KECIL) Unit 21.745.120
B 2020 (MULUT KECIL) Unit 29.521.364
B 2036 (MULUT KECIL) Unit 35.572.180
B 2034 (MULUT BESAR) Unit 43.490.240
B 2035 (MULUT BESAR) Unit 3.722.670
1 3 2 04 01 01 023 Plastic Glove
1 3 2 04 01 01 Plastic Glove 2 jari Lokal Pack 132.300
1 3 2 04 01 01 5 Jari import Pack 248.100
1 3 2 04 01 01 024 Plastik Sheat
1 3 2 04 01 01 PLASTIK SHEAT SAPI (IMV) Pack 92.100
1 3 2 04 01 01 PLASTIK SHEAT SAPI (Minitube) Pack 124.000
1 3 2 04 01 01 025 Goblet
1 3 2 04 01 01 Goblet besar isi 700 batang 700 batang Unit 29.500
1 3 2 04 01 01 Goblet sedang isi 200 batang 200 batang Unit 23.600
Goblet kecil isi 100 batang 100 batang Unit 21.200
1 3 2 04 01 01 026 Hoof Knife
1 3 2 04 01 01 Hoof Knife Unit 1.205.400
1 3 2 04 01 01 027 Speculum Vagina
1 3 2 04 01 01 Speculum Vagina Kambing Unit 1.471.300
1 3 2 04 01 01 Sapi Unit 3.722.600
1 3 2 04 01 01 028 Trocar
1 3 2 04 01 01 Trocar Sapi Unit 354.500
1 3 2 04 01 01 Universal Unit 945.400
1 3 2 04 01 01 029 Jarum
1 3 2 04 01 01 Jarum Europlex Pack 236.300
1 3 2 04 01 01 Terumo needle 18 g Pack 259.900
1 3 2 04 01 01 030 Cone
1 3 2 04 01 01 Cone Kambing Unit 1.158.100
1 3 2 04 01 01 Sapi Unit 986.800
1 3 2 05 ALAT KANTOR DAN RUMAH TANGGA
1 3 2 05 01 ALAT KANTOR
1 3 2 05 01 03 ALAT REPRODUKSI (PENGGANDAAN)
1 3 2 05 01 03 011 Mesin Fotocopy Lainnya
1 3 2 05 01 03 Mesin foto copy CANON IR 1025 Unit 1.809.000
1 3 2 05 01 03 TOSHIBA e-STUDIO (2006] Unit 43.401.000
1 3 2 05 01 03 TOSHIBA e-STUDIO 2505H Unit 41.376.000
1 3 2 05 01 03 FUJI XEROX DocuCentre Unit 39.495.000
1 3 2 05 01 03 FUJI XEROX Unit 44.848.000
1 3 2 05 01 03 FUJI XEROX DocuCentre Unit 44.848.000
1 3 2 05 01 03 FUJI XEROX Unit 46.294.000
1 3 2 05 01 03 CANON IR 2420L Unit 42.967.000
1 3 2 05 01 03 TOSHIBA e-STUDIC, [2007] Unit 57.289.000
1 3 2 05 01 03 CANON IR 2521 Unit 52.356.000
1 3 2 05 01 03 TOSHIBA e-STUDIO2051C Unit 96.277.000
1 3 2 05 01 03 TOSHIBA e-STUDIO Unit 84.342.000
1 3 2 05 01 03 TOSHIBA e-STUDIO 306SE Unit 105.029.000
1 3 2 05 01 04 ALAT PENYIMPAN PERLENGKAPAN KANTOR
1 3 2 05 01 04 001 Lemari Besi/Metal
1 3 2 05 01 04 Lemari Besi/Metal Unit 4.431.700
1 3 2 05 01 04 002 Lemari Kayu
1 3 2 05 01 04 Lemari Kayu Unit 1.979.500
1 3 2 05 01 04 005 Filing Cabinet Besi
1 3 2 05 01 04 Rak Arsip Paket 46.552.800
1 3 2 05 01 04 006 Filing Cabinet Kayu
1 3 2 05 01 04 Rak Arsip Paket 46.552.800
1 3 2 05 01 05 ALAT KANTOR LAINNYA
1 3 2 05 01 05 001 Alat Penghancur Kertas
1 3 2 05 01 05 Alat penghancur kertas -Shedde panasonic HPS.SD Buah 11.317.000
1 3 2 05 01 05 -110-ST BMC Buah 4.057.000
1 3 2 05 01 05 -220-ST BMC Buah 4.826.000
1 3 2 05 01 05 -IB-30 N Inchiban Buah 5.125.000
1 3 2 05 01 05 -Cimple intimus Buah 1.111.000
1 3 2 05 01 05 -Intimus S SE Buah 11.531.000
1 3 2 05 01 05 -Intimus S 100 Buah 2.136.000
1 3 2 05 01 05 -Intimus S 300 Buah 10.249.000
1 3 2 05 01 05 -Pelikan CC Buah 9.822.000
1 3 2 05 01 05 -Pelikan SC Buah 5.979.000
1 3 2 05 01 05 -Pelikan SPSC Buah 18.790.000
1 3 2 05 01 05 -Type 2400 SC (2MM) Buah 9.284.000
1 3 2 05 01 05 003 Mesin Absensi
1 3 2 05 01 05 Mesin Absensi Absensi [XI00C] Unit 2.722.000
1 3 2 05 01 05 Inch, PhotolD, Web Server,
1 3 2 05 01 05 Scheduled Bell, SMS
1 3 2 05 01 05 Message, Workcode, 4
1 3 2 05 01 05 Function Keys
1 3 2 05 01 05 FINGERPLUS
1 3 2 05 01 05 Software Z Soft
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi User (1:N) Unit 1.353.000
1 3 2 05 01 05 Standalone, 1500
1 3 2 05 01 05 Fingerprint, 50.000 Records,
1 3 2 05 01 05 SOLUTION Mesin
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Absensi [P202] Unit 2.343.000
1 3 2 05 01 05 LCD Colour 2.4 Inch, T9,
1 3 2 05 01 05 Schedulle Bell, SMS Message
1 3 2 05 01 05 Fingerprint with 500
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 01 05 Fingerprint Capacity, 50.000
1 3 2 05 01 05 FINGERSPOT Logic
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Series Unit 2.863.000
1 3 2 05 01 05 TFT Screen, USB flash disk
1 3 2 05 01 05 Support., Wall Mounted
1 3 2 05 01 05 Standalone Fingerprint with
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Record, SD Card USB Host, Unit 3.124.000
1 3 2 05 01 05 USB Client
1 3 2 05 01 05 Standalone Fingerprint with
1 3 2 05 01 05 2.000 Fingerprint, 50.000
1 3 2 05 01 05 Record, Sensor Optical
1 3 2 05 01 05 FINGERPLUS ZT-
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Simple Payrol, Free Unit 3.320.000
1 3 2 05 01 05 Download SDK, USB
1 3 2 05 01 05 Flashdisk
1 3 2 05 01 05 Stand Alone System, Sensor
1 3 2 05 01 05 Optical Crystal, 20.000
1 3 2 05 01 05 Fingerprint Capacity,
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi SMS Gateway, Simple Payrol, Unit 3.514.000
1 3 2 05 01 05 Free Download SDK, TFT
1 3 2 05 01 05 Color 3 Inch, USB Flashdisk
1 3 2 05 01 05 Fingerprint with 3,000
1 3 2 05 01 05 Fingerprint Capacity,
1 3 2 05 01 05 100.000 Records Capacity,
1 3 2 05 01 05 5OOdpi, USB Interiace,
1 3 2 05 01 05 FINGERSPOT
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Premier Series Unit 4.082.000
1 3 2 05 01 05 Flash Disk support, Web
1 3 2 05 01 05 Server, Work Code, Sh-ort
1 3 2 05 01 05 Messages, 3.0 Inch TFT
1 3 2 05 01 05 Color LCD, Wall Mounted
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Control, Alarm Function, Unit 4.881.000
1 3 2 05 01 05 Internal Baterai, Web
1 3 2 05 01 05 Server, "WIS, Timezone, 4 F-
1 3 2 05 01 05 keys, d1l.
1 3 2 05 01 05 Fingerprint Attendance dan
1 3 2 05 01 05 Door. AccesF, 3000
1 3 2 05 01 05 Fingerprint Capacity, 60.000
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Absensi [F20] Unit 5.323.000
1 3 2 05 01 05 Colour, Op~.,;cal Kristal,
1 3 2 05 01 05 RFID Card Read:lr
1 3 2 05 01 05 (Proximity Card),USB Flash
1 3 2 05 01 05 Disk
1 3 2 05 01 05 Fingerprint with 50.000
1 3 2 05 01 05 Fingerprint Capacity,
1 3 2 05 01 05 500.000 Recor]s,
1 3 2 05 01 05 RS2321485 & TCP/IP
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Multimedia Series Unit 6.921.000
1 3 2 05 01 05 Resolution, Access Control
1 3 2 05 01 05 Support, USF, flash disk
1 3 2 05 01 05 Support, Phoio ID, Camera,
1 3 2 05 01 05 Fingerprint Attendance with
1 3 2 05 01 05 1600 Fingerprint Capacity,
1 3 2 05 01 05 50.000 Record Capacity,
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi TCP/IP connection, HS232 & Unit 7.558.000
1 3 2 05 01 05 RS485, LCID Colour, Opt;cal
1 3 2 05 01 05 Sensor
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Absensi [X401] Unit 7.808.000
1 3 2 05 01 05 1,3MP, Access Control,
1 3 2 05 01 05 Alarm, RFID Reader, Internal
1 3 2 05 01 05 Baterai, F.Cover, Web
1 3 2 05 01 05 Server, T9, SMS
1 3 2 05 01 05 Standalone Fingerprint with
1 3 2 05 01 05 20.000 Fingerprint, 200.000
1 3 2 05 01 05 Record, Sensor Optical
1 3 2 05 01 05 FINGERPLUS ZT-
1 3 2 05 01 05 Absensi, SMS Gateway,
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Simple Payrol, Free Unit 7.986.000
1 3 2 05 01 05 Download SDK, USB
1 3 2 05 01 05 Flashdisk, Wifi
1 3 2 05 01 05 Standalone Fingerprint with
1 3 2 05 01 05 1500 Face, 3000 Fingeprint,
1 3 2 05 01 05 10.000 ID Card, 200.000
1 3 2 05 01 05 FINGERPLUS FID
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi 87 + RFID + Unit 8.393.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 01 05 Internal Batteray
1 3 2 05 01 05 Gateway, Simple Payrol,
1 3 2 05 01 05 Free Download SDK, USB
1 3 2 05 01 05 Flashdisk
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Standalone Fingerprint with Unit 10.736.000
1 3 2 05 01 05 5.000 Fingerprint, 100.000
1 3 2 05 01 05 Record, Face Recognition,
1 3 2 05 01 05 FINGERPLUS SF-
1 3 2 05 01 05 SMS Gateway, Simple Payrol,
1 3 2 05 01 05 Free Download SDK, USB
1 3 2 05 01 05 Flashdisk
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi 7200 Unit 14.616.000
1 3 2 05 01 05 Port, Photo ID, USB
1 3 2 05 01 05 Flashdisk
1 3 2 05 01 05 Built in Web-Server,
1 3 2 05 01 05 Fingerprint Attendance with
1 3 2 05 01 05 1000 User Capacity, 10.000
1 3 2 05 01 05 Records"Fransaction,
1 3 2 05 01 05
1 3 2 05 01 05 Mesin Absensi Master/Slave Data Unit 28.341.000
1 3 2 05 01 05 Synchronization, Contactless
1 3 2 05 01 05 Smart Card, Optical
1 3 2 05 01 05 Fingerprint sensor
1 3 2 05 02 ALAT RUMAH TANGGA
1 3 2 05 02 01 MEUBELAIR
1 3 2 05 02 01 001 Meja Kerja Besi /Metal
1 3 2 05 02 01 Meja Kerja Besi /Metal Set 5.817.600
1 3 2 05 02 01 002 Meja Kerja Kayu
1 3 2 05 02 01 Meja Kerja Kayu Set 5.817.600
1 3 2 05 02 01 Meja Kerja Kayu Deluxe Set 5.817.600
1 3 2 05 02 01 006 Bangku Panjang Besi/Metal
1 3 2 05 02 01 Bangku Panjang Besi Panjang 120 cm Buah 366.100
1 3 2 05 02 01 Bangku Panjang Besi Panjang 150 cm Buah 464.100
1 3 2 05 02 01 007 Bangku Panjang Kayu
1 3 2 05 02 01 Bangku Panjang Kayu Set 1.930.000
1 3 2 05 02 01 020 Meja Obat
1 3 2 05 02 01 Meja Obat Meja Troli Instrumen Stainless 2 Rak Unit 1.181.000
1 3 2 05 02 01 021 Meja Kartu
1 3 2 05 02 01 Meja Kartu Unit 106.700
1 3 2 05 02 01 022 Meja Bayi
1 3 2 05 02 01 Meja Bayi Unit 2.625.100
1 3 2 05 02 01 023 Meja Sekolah
1 3 2 05 02 01 Meja Sekolah SD Bahan Kayu Unit 459.000
1 3 2 05 02 01 Meja Sekolah SMP Bahan Kayu Unit 557.000
1 3 2 05 02 01 Meja Sekolah SMA Bahan Kayu Unit 557.000
1 3 2 05 02 01 024 Meja 1/2 Biro
1 3 2 05 02 01 Meja 1/2 Biro Buah 3.805.900
1 3 2 05 02 01 025 Kasur/Spring Bed
1 3 2 05 02 01 Kasur/Spring Bed Comforta Kasur Super Choice Uk 90x200 Unit 1.855.900
1 3 2 05 02 01 Comforta Kasur Super Choice Uk 120x200 Unit 2.268.900
1 3 2 05 02 01 Comforta Kasur Super Choice Uk 160x200 Unit 2.621.500
1 3 2 05 02 01 Comforta Kasur Super Choice Uk 180x200 Unit 2.983.500
1 3 2 05 02 01 Comforta Kasur Super Choice Uk 200x200 Unit 3.387.100
1 3 2 05 02 01 King Koil Kasur Amani Uk 100x200 Unit 8.950.800
1 3 2 05 02 01 King Koil Kasur Amani Uk 120x200 Unit 9.721.800
1 3 2 05 02 01 King Koil Kasur Amani Uk 160x200 Unit 12.202.600
1 3 2 05 02 01 King Koil Kasur Amani Uk 180x200 Unit 13.074.200
1 3 2 05 02 01 King Koil Kasur Amani Uk 200x200 Unit 14.012.900
1 3 2 05 02 01 026 Sketsel
1 3 2 05 02 01 Sketsel/penyekat ruangan Bahan Bambu Unit 510.500
1 3 2 05 02 01 Bahan Sintesis Unit 510.500
1 3 2 05 02 01 Bahan Rotan Unit 644.600
1 3 2 05 02 01 Bahan kayu Unit 2.063.000
1 3 2 05 02 01 027 Meja Makan Besi
1 3 2 05 02 01 Meja Makan kafe Unit 361.000
1 3 2 05 02 01 Meja Makan Besi Unit 706.500
1 3 2 05 02 01 Meja Besi Brother Satu Biro Unit 2.888.200
1 3 2 05 02 01 028 Meja Makan Kayu
1 3 2 05 02 01 Meja Makan Kayu Onel Meja Makan Pitavone Natural Unit 2.854.600
1 3 2 05 02 01 Cass Living Meja Makan Brew Indie Teakwood Unit 3.403.900

1 3 2 05 02 01 Bahan : Kayu Jati, top meja teakblock 18 mm Unit 1.925.000


lengkap dengan 4 buah kursi makan bahan kayu
jati jok busa super dibungkus kain imitasilir
finishing plitur Ukr 140x90x75 cm
1 3 2 05 02 01 Aveda Meja Makan Elwood 160 Kayu Unit 3.094.500
1 3 2 05 02 01 029 Kursi Fiberglaas/Plastik
1 3 2 05 02 01 Kursi Fiberglaas/Plastik Buah 175.000
1 3 2 05 02 01 032 Kursi Putar
1 3 2 05 02 01 Kursi Putar Royal 60cm x 60cm x 80cm Buah 1.376.000
1 3 2 05 02 01 033 Kursi Biasa
1 3 2 05 02 01 Kursi Biasa Buah 50.500
1 3 2 05 02 01 034 Bangku Sekolah
1 3 2 05 02 01 Bangku Sekolah Kursi Kuliah Chitose MND - Kursi Unit 501.800
Sekolah,Chrom, Height 450 mm,PVC Vinyl
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 01 Bangku Sekolah + Meja Kursi Sekolah CHITOSE Echool Plus,Plastic, Set 893.200
Height 300-460 mm,finishing coating
1 3 2 05 02 01 035 Bangku Tunggu
1 3 2 05 02 01 Bangku Tunggu KURSI TUNGGU CARRERA CW 04 ITALY Unit 4.760.300
1 3 2 05 02 01 KURSI TUNGGU CARRERA CW 04 SPAIN Unit 1.743.200
1 3 2 05 02 01 3 Seat Unit 1.031.500
1 3 2 05 02 01 4 Seat Unit 1.547.200
1 3 2 05 02 01 4 Seat Dengan Banatalan Unit 3.093.400
1 3 2 05 02 01 036 Kursi Lipat
1 3 2 05 02 01 Kursi Lipat Lotte Mart Tiger Buah 401.200
1 3 2 05 02 01 Chittose Buah 371.300
1 3 2 05 02 01 IKEA Buah 442.500
1 3 2 05 02 01 Picnic Chair Bymarka Steel/Poly Assorted Buah 326.900
1 3 2 05 02 01 037 Bangku Injak
1 3 2 05 02 01 Bangku Injak Buah 174.300
1 3 2 05 02 01 038 Meja Cetakan
1 3 2 05 02 01 Meja Cetakan Event Desk standar tanpa cetakan Unit 515.700
1 3 2 05 02 01 Meja Cetakan Event Desk counter Unit 1.340.900
1 3 2 05 02 01 039 Meja Komputer
1 3 2 05 02 01 Meja Komputer Meja Komputer Ukuran 75,0x75,5x60,0 cm Buah 783.300
1 3 2 05 02 01 Meja Komputer ukr 75,0x125,5x60,0 cm Buah 1.682.000
1 3 2 05 02 01 Meja Komputer ukr 75,0x155,5x81,5 cm Buah 1.324.000
1 3 2 05 02 01 Meja Komputer ( CD Roll Up ) ukr Buah 7.522.000
75,0x90,0x60,0cm
1 3 2 05 02 01 Meja Komputer ( CD Roll Up ) ukr Buah 2.690.000
75,0x12,5x60,0 cm
1 3 2 05 02 01 040 Pot Bunga
1 3 2 05 02 01 Pot Bunga Plastik Buah 10.000
1 3 2 05 02 01 Pot Bunga Beton Buah 150.000
1 3 2 05 02 01 041 Partisi
1 3 2 05 02 01 Partisi Kantor Modera Buah 1.856.700
1 3 2 05 02 01 Partisi Kayu 4 Pintu bahan kayu Buah 2.063.000
1 3 2 05 02 01 042 Publik Astari (pembatas Antrian)
1 3 2 05 02 01 Publik Astari (pembatas Antrian) Lapis Beludru, bahan stainless Set 1.805.100
1 3 2 05 02 01 Model Pita, bahan stainless Set 876.700
1 3 2 05 02 01 043 Rak Sepatu (Alumunium)
1 3 2 05 02 01 Rak Sepatu (Alumunium) Unit 1.160.400
1 3 2 05 02 01 044 Gantungan Jas
1 3 2 05 02 01 Gantungan Jas Bahan kayu Unit 670.400
1 3 2 05 02 01 Bahan Stainless Unit 257.800
1 3 2 05 02 01 Hanger Plastik Unit 26.500
1 3 2 05 02 01 045 Nakas
1 3 2 05 02 01 Nakas Unit 1.595.700
1 3 2 05 02 01 046 Cubikal
1 3 2 05 02 01 Cubikal Unit 2.836.600
1 3 2 05 02 01 047 Workstation
1 3 2 05 02 01 Workstation 2 Seater PARTISI KANTOR 2 STAFF ADITECH FRW 03 Set 5.054.300

Workstation 2 Seater PARTISI KANTOR 2 STAFF ADITECH FRW 06 Set 5.260.600

Workstation 2 Seater PARTISI KANTOR 2 STAFF ARKADIA Set 8.303.500


DOMESTIKA 2
Workstation 3 Seater PARTISI KANTOR 3 STAFF UNO PREMIUM Set 12.120.100
KONFIGURASI 24 A
Workstation 4 Seater PARTISI KANTOR 4 STAFF ADITECH SWD Set 17.494.200
02
Workstation 4 Seater PARTISI KANTOR 4 STAFF ARKADIA EXCEL Set 24.756.000
1
Workstation 8 Seater PARTISI KANTOR 8 STAFF UNO PREMIUM Set 34.761.500
KONFIGURASI 25 C
1 3 2 05 02 01 048 Sofa
1 3 2 05 03 06 Sofa Type Classic, Rangka Besi, Busa cetak Buah 1.922.000
dibungkus kain Fabric
1 3 2 05 03 06 Type : 1 Seat Set 4.729.000
1 3 2 05 03 06 Type : 2 Seat Set 22.436.000
1 3 2 05 03 06 Type : 3 Seat Set 27.732.000
1 3 2 05 03 06 Sofa Terdiri Dari 1 Buah sofa 3 dudukan 1 Buah sofa Buah 25.454.000
2 dudukan 1 Buah sofa 1 dudukan Rangka kayu
jati busa cetak dibungkus kain import finishing
melamic meja besar Uk.88x88x45 cm meja sofa
pakai kaca reben uk 5mm

1 3 2 05 02 01 049 Meja Rias


1 3 2 05 02 01 Meja Rias Set 2.320.800
1 3 2 05 02 02 ALAT PENGUKUR WAKTU
1 3 2 05 02 02 001 Jam Mekanis
1 3 2 05 02 02 Jam Mekanis Dia.28 cm Buah 292.900
1 3 2 05 02 02 Jam Mekanis Dia.38 cm Buah 683.800
1 3 2 05 02 02 002 Jam Listrik
1 3 2 05 02 02 Jam Listrik Buah 464.100
1 3 2 05 02 02 003 Jam Elektronik
1 3 2 05 02 02 Jam Sholat Digital Buah 1.444.100
1 3 2 05 02 02 004 Control Clock
1 3 2 05 02 03 ALAT PEMBERSIH
1 3 2 05 02 03 001 Mesin Penghisap Debu/Vacuum Cleaner
1 3 2 05 02 03 Mesin Penghisap Debu/Vacuum Cleaner -Merk Aiwa AWN 99 Buah 387.000
1 3 2 05 02 03 -Merk Sanken Buah 4.255.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 03 003 Mesin Pemotong Rumput
1 3 2 05 02 03 Mesin Pemotong Rumput Gendong Sinaka Buah 2.579.000
1 3 2 05 02 03 Gendong Robin Buah 2.063.000
1 3 2 05 02 03 Gendong Tanaka 328 Buah 3.095.000
1 3 2 05 02 03 Gendong Tanaka 338 Buah 7.737.000
1 3 2 05 02 03 Dorong Murai Buah 2.321.000
1 3 2 05 02 03 Dorong Honda Buah 5.158.000
1 3 2 05 02 03 004 Mesin Cuci
1 3 2 05 02 03 Panasonic 6 Kg/6000 unit 1.651.000
1 3 2 05 02 03 Sanyo 650/6 Kg unit 1.599.000
1 3 2 05 02 03 Sharp 7,0 Kg NA-F45AIT unit 1.857.000
1 3 2 05 02 03 Sharp 8,0 Kg NA-F55Y6T/H unit 2.063.000
1 3 2 05 02 03 LG 14 Kg unit 2.772.000
1 3 2 05 02 03 006 Alat Pembersih Salju
1 3 2 05 02 04 ALAT PENDINGIN
1 3 2 05 02 04 001 Lemari Es
1 3 2 05 02 04 Lemari Es LG Kulkas GN - V212RL unit 3.817.000
1 3 2 05 02 04 LG Kulkas GN M602PC unit 16.504.000
1 3 2 05 02 04 LG Kulkas GN-M352CLN unit 9.826.000
1 3 2 05 02 04 LG Kulkas GN-M392CPC unit 10.573.000
1 3 2 05 02 04 LG Kulkas GN-V191RL unit 2.012.000
1 3 2 05 02 04 LG Kulkas GN-V222SL T unit 4.384.000
1 3 2 05 02 04 LG GN-Y201CH Unit 3.473.000
1 3 2 05 02 04 LG GN-V201SP Unit 3.473.000
1 3 2 05 02 04 LG GN-V231 RP Unit 3.839.000
1 3 2 05 02 04 PANASONIC Kulkas NR-A171M unit 3.817.000
1 3 2 05 02 04 PANASONIC Kulkas NR-A191S unit 16.504.000
1 3 2 05 02 04 SHARP Kulkas SJ - P851NLV-HS ( SIL unit 9.826.000
1 3 2 05 02 04 SHARP Kulkas SJ-F190G-ZS unit 10.573.000
1 3 2 05 02 04 SHARP Kulkas SJ-F231S-RD unit 2.012.000
1 3 2 05 02 04 SHARP Kulkas SJ-G203T-ZS unit 4.384.000
1 3 2 05 02 04 SHARP Kulkas SJ-M172T-ZS unit 3.473.000
1 3 2 05 02 04 SHARP Kulkas SJ-S170T-RD unit 3.473.000
1 3 2 05 02 04 SJ-G190-T-ZS Unit 3.404.000
1 3 2 05 02 04 SJ-8190T-RD Unit 3.508.000
1 3 2 05 02 04 SJ-S 180T-D Unit 3.404.000
1 3 2 05 02 04 SJ-G170T-ZS Unit 3.301.000
1 3 2 05 02 04 SJ-G 170T- CG Unit 3.301.000
1 3 2 05 02 04 SJ-G205T-ZS Unit 3.611.000
1 3 2 05 02 04 SJ-G205T-UP Unit 3.611.000
1 3 2 05 02 04 Sharp Unit 5.055.000
1 3 2 05 02 04 SJ-F232G-ZS Unit 5.261.000
1 3 2 05 02 04 SJ-F 236 S - RD Unit 5.983.000
1 3 2 05 02 04 SJ-F 190 M Unit 4.539.000
1 3 2 05 02 04 SJ-F 2018- RD Unit 5.055.000
1 3 2 05 02 04 SR-D1878SB Unit 2.270.000
1 3 2 05 02 04 SJ-G 205 T-UP Unit 2.992.000
1 3 2 05 02 04 PR 21 BGR/B/V/W Unit 5.158.000
1 3 2 05 02 04 PR 22 BGR/B/V/W Unit 5.261.000
1 3 2 05 02 04 PR 22 BGR/B/V/W Unit 5.364.000
1 3 2 05 02 04 004 A.C. Split
1 3 2 05 02 04 A.C. Split LG 1 PK Unit 4.642.000
1 3 2 05 02 04 LG AC 1 1/2 PK S13INV-2 Unit 9.284.000
1 3 2 05 02 04 LG AC 1 PK S09LS-1 Unit 4.642.000
1 3 2 05 02 04 LG AC 1 PK S10INV-2 Unit 5.674.000
1 3 2 05 02 04 LG AC 1/2 PK S051CE Unit 4.642.000
1 3 2 05 02 04 LG AC 1/2 PK S05LG-2 Unit 4.849.000
1 3 2 05 02 04 LG AC 3/4 PK S07LS-1 Unit 5.158.000
1 3 2 05 02 04 LG Standing 2 PK Unit 14.441.000
1 3 2 05 02 04 PANASONIC 1 1/2 PK Unit 5.777.000
1 3 2 05 02 04 PANASONIC 1 PK Unit 4.384.000
1 3 2 05 02 04 PANASONIC 2 PK Unit 7.737.000
1 3 2 05 02 04 PANASONIC 3/4 PK Unit 3.869.000
1 3 2 05 02 04 PANASONIC AC 1 PK CS/CU-KC9KKJ Unit 5.674.000
1 3 2 05 02 04 PANASONIC AC 1 PK CS/CU-S10KKP Unit 7.737.000
1 3 2 05 02 04 PANASONIC AC 1 PK CS/CU-UC9JKJ Unit 4.900.000
1 3 2 05 02 04 PANASONIC AC 1/2 PK CS/CU-KC5KKJ Unit 4.900.000
1 3 2 05 02 04 PANASONIC AC 1PK CS/CU-C9KKP Unit 6.705.000
1 3 2 05 02 04 SHARP AC 1 1/2 PK AH-XP13LY Unit 7.814.000
1 3 2 05 02 04 SHARP AC 1 PK AH-A9KCY Unit 4.900.000
1 3 2 05 02 04 SHARP AC 1 PK AH-AP 9KHL Unit 5.932.000
1 3 2 05 02 04 SHARP AC 1 PK AH-AP9LSY Unit 5.777.000
1 3 2 05 02 04 SHARP AC 1 PK AH-X9LEY Unit 6.705.000
1 3 2 05 02 04 SHARP AC 1 PK AH-XP10LY Unit 7.479.000
1 3 2 05 02 04 SHARP AC 1/2 PK AH-A5KCY Unit 3.611.000
1 3 2 05 02 04 SHARP AC 1/2 PK AH-AP 5KHL Unit 5.932.000
1 3 2 05 02 04 SHARP AC 1/2 PK AH-AP5LSY Unit 5.158.000
1 3 2 05 02 04 SHARP AC 3/4 PK AH-A7KCY Unit 6.705.000
1 3 2 05 02 04 SHARP AC 3/4 PK AH-AP 7KHL Unit 7.221.000
1 3 2 05 02 04 SHARP AC 3/4 PK AH-AP7LSY Unit 5.674.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 05 LA Unit 4.333.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 05 VD Unit 4.230.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 12 VD Unit 5.261.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 05VE Unit 2.889.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 05VF Unit 3.301.000
1 3 2 05 02 04 A.C. Split Polytron 0,5 PAC 05VX Unit 4.126.000
1 3 2 05 02 04 A.C. Split Polytron 1 PK PAC 09 LA Unit 5.055.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 04 A.C. Split Polytron 1 PK PAC 09 VA Unit 5.148.000
1 3 2 05 02 04 A.C. Split Polytron 1 PK PAC 09VX Unit 5.261.000
1 3 2 05 02 04 A.C. Split Polytron 2 PK PAC 18 VA Unit 7.118.000
1 3 2 05 02 04 A.C. Split Polytron PAS 78 Unit 2.579.000
1 3 2 05 02 04 A.C. Split Polytron PAS 68 Unit 2.270.000
1 3 2 05 02 04 A.C. Split Polytron PAS 77 Unit 2.579.000
1 3 2 05 02 04 A.C. Split Polytron PAS 79 Unit 2.889.000
1 3 2 05 02 04 A.C. Split Samsung 0,5 PK AR05JRFLAWKNSE Unit 4.436.000
1 3 2 05 02 04 A.C. Split Samsung 0,75 PK AR07JRFLAWKNSE Unit 4.745.000
1 3 2 05 02 04 A.C. Split Samsung 1 PK AR09JRFLAWKNSE Unit 5.261.000
1 3 2 05 02 04 A.C. Split Samsung 1 PK AR10JVFN Unit 6.179.000
1 3 2 05 02 04 005 Portable Air Conditioner (Alat Pendingin)
1 3 2 05 02 04 Portable Air Conditioner (Alat Pendingin) Sharp plasmacluster Unit 9.064.400
1 3 2 05 02 04 Panasonic floor standing Unit 20.740.000
1 3 2 05 02 04 Panasonic floor standing Unit 28.292.200
1 3 2 05 02 04 006 Kipas Angin
1 3 2 05 02 04 006 Kipas Angin biasa Maspion 437.200
1 3 2 05 02 04 006 Cosmos 276.500
1 3 2 05 02 04 007 Exhause Fan
1 3 2 05 02 04 Exhause Fan PANASONIC 16" Unit 944.200
1 3 2 05 02 05 ALAT DAPUR
1 3 2 05 02 05 001 Kompor Listrik (Alat Dapur)
1 3 2 05 02 05 Kompor Listrik (Alat Dapur) Modena 1.595.400
1 3 2 05 02 05 Maspion 467.500
1 3 2 05 02 05 002 Kompor Gas (Alat Dapur)
1 3 2 05 02 05 Kompor Gas Rinnai Set 362.000
1 3 2 05 02 05 Hitachi 1 Tabung Set 1.290.000
1 3 2 05 02 05 Hitachi 2 Tabung Set 1.754.000
1 3 2 05 02 05 Merk Hitachi 2 Tungku Buah 269.000
1 3 2 05 02 05 Merk Rinnai 1,5 Tungku RT - 503E Buah 269.000
1 3 2 05 02 05 Merk Rinnai 2 Tungku Buah 581.000
1 3 2 05 02 05 Merk Rinnai 3 Tungku Buah 310.000
1 3 2 05 02 05 Tabung Gas Buah 47.000
1 3 2 05 02 05 Merk Sharp Lengkap Buah 1.463.000
1 3 2 05 02 05 Merk Hitachi Lengkap Buah 1.388.000
1 3 2 05 02 05 Kompor Gas Standing Merk Elektroluk 9714 Buah 15.086.000
1 3 2 05 02 05 Merk Indesit (Italy) Buah 9.516.000
1 3 2 05 02 05 003 Kompor Minyak
1 3 2 05 02 05 Tomo-tomo 14 Sumbu Buah 93.000
1 3 2 05 02 05 Buterfly 20 Sb=Tabung Kaca Buah 418.000
1 3 2 05 02 05 Buterfly 10 Sumbu Buah 140.000
1 3 2 05 02 05 Hock 22 Sumbu Buah 181.000
1 3 2 05 02 05 Hock 16 Sumbu Buah 129.000
1 3 2 05 02 05 Bahan Seng/Plat 18 Sumbu Buah 110.000
1 3 2 05 02 05 Bahan seng 18 Sumbu Buah 44.000
1 3 2 05 02 05 RRT 20 Sumbu Buah 117.000
1 3 2 05 02 05 Buatan Lokal Buah 47.000
1 3 2 05 02 05 Cap Kupu-Kupu Buah 78.000
1 3 2 05 02 05 Hock 16 Buah 186.000
1 3 2 05 02 05 Hock 22 Buah 254.000
1 3 2 05 02 05 005 Rice Cooker (Alat Dapur)
1 3 2 05 02 05 Miyako unit 362.000
1 3 2 05 02 05 COSMOS MINI RICE COOKER 3 IN1 CRJ-101 unit 258.000
TS
1 3 2 05 02 05 COSMOS RICE COOKER 3 IN 1 CRJ 610 unit 465.000
1 3 2 05 02 05 COSMOS RICE COOKER 3 IN 1 CRJ-326 TS unit 413.000

1 3 2 05 02 05 COSMOS RICE COOKER 3 IN 1 CRJ602 unit 516.000


1 3 2 05 02 05 COSMOS RICE COOKER CRJ 520TS unit 413.000
1 3 2 05 02 05 COSMOS RICE COOKER CRJ 621 unit 325.000
1 3 2 05 02 05 COSMOS RICE COOKER CRJ 624 TS unit 465.000
1 3 2 05 02 05 PHILIPS RICE COOKER HD 4729(T) unit 723.000
1 3 2 05 02 05 SHARP RICE COOKER 3 IN 1 KS-A18TTR unit 774.000
1 3 2 05 02 05 SHARP RICE COOKER KS-M18L (W) unit 568.000
1 3 2 05 02 05 SHARP RICE COOKER KS-R19SRT unit 748.000
1 3 2 05 02 05 008 Kitchen Set
1 3 2 05 02 05 Kitchen Set Merk Bima Set 619.000
1 3 2 05 02 05 009 Tabung Gas
1 3 2 05 02 05 Tabung Gas 3 KG Tabung 805.000
1 3 2 05 02 05 5,5 KG Tabung 337.000
1 3 2 05 02 05 12 KG Tabung 166.000
1 3 2 05 02 05 010 Mesin Giling Bumbu
1 3 2 05 02 05 Gilingan Daging / Bumbu No. 5 Buah 774.000
1 3 2 05 02 05 Gilingan Daging / Bumbu No. 8 Buah 1.032.000
1 3 2 05 02 05 Gilingan Daging / Bumbu No.10 Buah 1.290.000
1 3 2 05 02 05 012 Mesin Parutan Kelapa
1 3 2 05 02 05 Mesin Parut Kelapa Unit 3.095.000
1 3 2 05 02 05 014 Alat Pemanggang Roti/Sate
1 3 2 05 02 05 Touster Merk Nasional Buah 669.000
1 3 2 05 02 05 Iwasaki Buah 191.000
1 3 2 05 02 05 Touster Merk Philip Buah 581.000
1 3 2 05 02 05 Touster Merk Air Lux Buah 178.000
1 3 2 05 02 05 Touster Merk Maspion Buah 303.000
1 3 2 05 02 05 Touster Merk Miyako Buah 222.000
1 3 2 05 02 05 Touster Merk Kirin Buah 300.000
1 3 2 05 02 05 015 Rak Piring Alumunium
1 3 2 05 02 05 Rak Piring Alumunium Master/Nagata Buah 207.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 05 Almunium Buah 4.900.000
1 3 2 05 02 05 Lokal Buah 155.000
1 3 2 05 02 05 Kaca Buah 764.000
1 3 2 05 02 05 Kecil SS2 Tanggung Buah 75.000
1 3 2 05 02 05 Besar SS4 FK-GS Buah 160.000
1 3 2 05 02 05 SS4 Master Buah 150.000
1 3 2 05 02 05 Eagle Plastik Buah 55.000
1 3 2 05 02 05 Plastik S2 E/G Buah 82.000
1 3 2 05 02 05 Plastik S3 E/G Buah 121.000
1 3 2 05 02 05 Galaxi Buah 98.000
1 3 2 05 02 05 Master Buah 256.000
1 3 2 05 02 05 016 Alat Penyimpan Beras
1 3 2 05 02 05 Cosmos Maspion 60 Kg Buah 362.000
1 3 2 05 02 05 017 Panci
1 3 2 05 02 05 Panci Halco Buah 140.000
1 3 2 05 02 05 Almunium Set 26.000
1 3 2 05 02 05 Almunium 45" Set 71.000
1 3 2 05 02 05 Almunium Susun Lima (16, 18, 20, 22, 24) Buah 88.000
1 3 2 05 02 05 Almunium 40 cm Buah 237.000
1 3 2 05 02 05 Almunium 30 cm Buah 103.000
1 3 2 05 02 05 Burik (Email) 40 cm Buah 191.000
1 3 2 05 02 05 Burik (Email) Set 449.000
1 3 2 05 02 05 Merk Djawa 22 cm Buah 55.000
1 3 2 05 02 05 Merk Djawa 24 cm Buah 63.000
1 3 2 05 02 05 Merk Djawa 26 cm Buah 73.000
1 3 2 05 02 05 Merk Djawa 28 cm Buah 87.000
1 3 2 05 02 05 Merk Djawa 30 cm Buah 103.000
1 3 2 05 02 05 Merk Djawa 36 cm Buah 185.000
1 3 2 05 02 05 Merk Djawa 38 cm Buah 83.000
1 3 2 05 02 05 Merk Djawa 40 cm Buah 237.000
1 3 2 05 02 05 Burik 40 cm Buah 191.000
1 3 2 05 02 05 018 Blender
1 3 2 05 02 05 Blender COSMOS BLENDER CB 180 G/P Unit 310.000
1 3 2 05 02 05 COSMOS BLENDER CB 287 Unit 490.000
1 3 2 05 02 05 COSMOS BLENDER CB 289 Unit 413.000
1 3 2 05 02 05 PHILIPS BLENDER Unit 671.000
1 3 2 05 02 05 019 Mixer
1 3 2 05 02 05 Mixer YAMAHA
1 3 2 05 02 05 Yamaha EMX512SC Buah 6.298.000
1 3 2 05 02 05 Yamaha EMX5016CF Buah 9.962.000
1 3 2 05 02 05 Yamaha EMX5014C Buah 5.840.000
1 3 2 05 02 05 SAMSON
1 3 2 05 02 05 Samson XML910 12-Channel Powered Mixer Buah 5.668.000
1 3 2 05 02 05 Samson S4000 20-Channel Powered Mixer Buah 12.023.000
1 3 2 05 02 05 ALTO EMPIRE
1 3 2 05 02 05 Alto Empire TMX160 DFX 16Channel Powered Buah 9.303.000
Mixer
1 3 2 05 02 05 Alto Empire TMX200 DFX 20Channel Powered Buah 13.740.000
Mixer
1 3 2 05 02 05 Alto Empire TMX80 DFX 8Channel Powered Buah 5.496.000
Mixer
1 3 2 05 02 05 Alto Empire TMX 120 DFX 12 Channel Powered Buah 8.015.000
Mixer
1 3 2 05 02 05 Alto Empire RMX508 DFX Powered Mixer Buah 5.496.000
1 3 2 05 02 05 Alto Empire RMX1008 DFX Buah 6.870.000
1 3 2 05 02 05 025 Thermos Air
1 3 2 05 02 05 Thermos Air Besar Buah 112.000
1 3 2 05 02 05 Termos Es 10 Liter Buah 117.000
1 3 2 05 02 05 Termos Es Sedang Buah 537.000
1 3 2 05 02 05 Termos Nasi 26 Ltr MP Buah 93.000
1 3 2 05 02 05 Termos Nasi 20 Lr Lion Star Buah 126.000
1 3 2 05 02 05 Termos Nasi 16 Ltr Buah 38.000
1 3 2 05 02 05 Termos Nasi 15 Ltr Buah 47.000
1 3 2 05 02 05 Termos Nasi 14 Ltr MP Buah 126.000
1 3 2 05 02 05 Termos Nasi 12,5 Ltr MP Buah 133.000
1 3 2 05 02 05 Termos Air Panas RRT 1 Pon Buah 29.000
1 3 2 05 02 05 Termos Air Panas RRT 5 Pon Buah 47.000
1 3 2 05 02 05 Termos Air Panas RRT Buah 75.000
1 3 2 05 02 05 Termos Air Panas Lion Star 50 HP Buah 42.000
1 3 2 05 02 05 Termos Air Panas (Japan) Buah 427.000
1 3 2 05 02 05 Termos Air Panas (Airport Rabbit) Buah 272.000
1 3 2 05 02 05 Teromos Air panas (Japan) Buah 272.000
1 3 2 05 02 05 Termos Air Panas Sakura Besar Buah 59.000
1 3 2 05 02 05 Termos Air Panas Basi Kecil 1 liter Buah 71.000
1 3 2 05 02 06 ALAT RUMAH TANGGA LAINNYA (HOME USE)
1 3 2 05 02 06 001 Radio
1 3 2 05 02 06 Radio Frequency ID Chip Unit 56.800
1 3 2 05 02 06 Radio Frequency ID Gate Unit 41.453.400
1 3 2 05 02 06 Radio HT Unit 3.127.800
1 3 2 05 02 06 002 Televisi
1 3 2 05 02 06 Televisi LG LCD TV 22LD330 22 INCH unit 2.063.000
1 3 2 05 02 06 LG LCD TV 26LD330 26 INCH unit 2.476.000
1 3 2 05 02 06 LG LCD TV 32LD330 32 INCH unit 3.611.000
1 3 2 05 02 06 LG LCD TV 32LD420 32 INCH unit 3.869.000
1 3 2 05 02 06 LG LCD TV 32LD450 32 INCH unit 3.301.000
1 3 2 05 02 06 LG LCD TV 32LD460 32 INCH unit 3.404.000
1 3 2 05 02 06 LG LCD TV 32LD550 32 INCH unit 3.404.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 06 LG LED TV 32LE5100 32 INCH unit 3.404.000
1 3 2 05 02 06 LG LED TV 42LE4500 42 INCH unit 6.705.000
1 3 2 05 02 06 PANASONIC LCD TV TH-L32C20X 32 INCH unit 4.023.000
1 3 2 05 02 06 PANASONIC LCD TV TH-L32U20S 32 INCH unit 3.611.000
1 3 2 05 02 06 SAMSUNG LCD TV 32C350 32 INCH unit 3.714.000
1 3 2 05 02 06 SAMSUNG LCD TV 32C450 32 INCH unit 3.714.000
1 3 2 05 02 06 SHARP LCD TV 32A39 32 INCH unit 3.611.000
1 3 2 05 02 06 SHARP LCD TV 32L50 32 INCH unit 5.674.000
1 3 2 05 02 06 SHARP LCD TV 40L50 40 INCH unit 7.221.000
1 3 2 05 02 06 SHARP LED TV40LE700+AIR PURIFIER IG- unit 7.221.000
BC 1
1 3 2 05 02 06 TOSHIBA LCD TV 32AV700 32 INCH unit 3.714.000
1 3 2 05 02 06 TOSHIBA LCD TV 32CV700 32 INCH unit 3.508.000
1 3 2 05 02 06 TOSHIBA LCD TV 32EV700 32 INCH unit 3.611.000
1 3 2 05 02 06 TOSHIBA LCD TV 40CV700 40 INCH unit 6.912.000
1 3 2 05 02 06 Televisi Plasma LG PLASMA TV 42PJ250 42 INCH unit 5.674.000
1 3 2 05 02 06 PANASONIC PLASMA TV TH-P42A2G 42 unit 7.221.000
INCH
1 3 2 05 02 06 PANASONIC PLASMA TV TH-P42X20G 42 unit 7.737.000
INCH
1 3 2 05 02 06 004 Tape Recorder Alat Rumah Tangga
1 3 2 05 02 06 Mesin Aiwa 6250 Watt unit 619.000
1 3 2 05 02 06 005 Amplifier
1 3 2 05 02 06 Power Amplifer PHONIC
1 3 2 05 02 06 Phonic XP 5000 Buah 13.168.000
1 3 2 05 02 06 Phonic XP 3000 Buah 9.561.000
1 3 2 05 02 06 Phonic XP 2000 Buah 5.897.000
1 3 2 05 02 06 Phonic XP 1000 Buah 4.180.000
1 3 2 05 02 06 SAMSON
1 3 2 05 02 06 Samson SXD5000 Power Amp with DSP Buah 4.237.000
1 3 2 05 02 06 Samson SX3200 Power Amp Buah 7.729.000
1 3 2 05 02 06 Samson SX2800 Power Amp Buah 6.813.000
1 3 2 05 02 06 Samson SX2400 Power Amp Buah 5.954.000
1 3 2 05 02 06 006 Equalizer
1 3 2 05 02 06 Peavey Q 231 Buah 6.157.000
1 3 2 05 02 06 DBX 2231 Buah 5.903.000
1 3 2 05 02 06 32 x 2 CH Buah 13.704.000
1 3 2 05 02 06 Ponik Buah 5.271.000
1 3 2 05 02 06 007 Loudspeaker
1 3 2 05 02 06 LOUDSPEKAER JBL 725 THREE WAY SOUND SYSTEM 4 PCS 5.222.000
1 3 2 05 02 06 LOUDSPEAKER JBL 7285 THREE WAY SOUND SYSTEM 2 PCS 2.611.000
1 3 2 05 02 06 POWER AMPLIFIER CROWN MA 3600 SOUND SYSTEM 2 PCS 2.611.000
1 3 2 05 02 06 POWER AMPLIFIER CROWN MA 5000 10.000 WATT 1 PCS 1.306.000
1 3 2 05 02 06 LOUDSPEAKER RCF ART500A SPEAKER TWO WAY 10.000 WATT 2 PCS 1.306.000
1 3 2 05 02 06 SPEAKER MANAGEMENT RCF DX 4008 SOUND SYSTEM 1 PCS 1.306.000
1 3 2 05 02 06 008 Sound System
1 3 2 05 02 06 Sound System Paket S. System Meeting Standar Besar Mackie Paket 29.197.000
& AKG
1 3 2 05 02 06 Paket S. System Meeting Standar Besar Yamaha Paket 31.773.000
& AKG
1 3 2 05 02 06 Paket S. System Meeting Standar Besar Yamaha Paket 32.346.000
& Sennheiser
1 3 2 05 02 06 Paket S. System Meeting Standar Besar Yamaha Paket 25.476.000
& ARK
1 3 2 05 02 06 Paket S. System Meeting Standar Besar Mackie Paket 31.487.000
& Shure
1 3 2 05 02 06 Paket S. System Meeting Standar Besar Mackie Paket 29.483.000
& ARK
1 3 2 05 02 06 013 Megaphone
1 3 2 05 02 06 TOA ZR-510 Buah 2.063.000
1 3 2 05 02 06 014 Microphone
1 3 2 05 02 06 Microphone Shure SV100 Multi-Purpose Microphone Set 692.000
1 3 2 05 02 06 Samson Concert 277 Dual Handheld Set 3.435.000
1 3 2 05 02 06 Shure SVX288/PG58 Dual Vocal Wireless Set 6.584.000
System
1 3 2 05 02 06 Shure SVX288/PG28 Dual Vocal Wireless Set 6.298.000
System
1 3 2 05 02 06 Shure SVX24/PG58 Wireless Vocal System Set 4.065.000
1 3 2 05 02 06 Shure SVX24/PG28 Wireless Vocal System Set 3.664.000
1 3 2 05 02 06 Samson Concert 288Pro Combo Dual-Channel Set 4.294.000
Wireless System
1 3 2 05 02 06 Samson Concert 288 Dual Handheld Wireless Set 3.893.000
System
1 3 2 05 02 06 AKG C 417L Omni Lavalier Mic w/Preamp and Buah 1.718.000
Mini XLR Connector
1 3 2 05 02 06 Samson CM20P Gooseneck Podium Mic Set 1.088.000
1 3 2 05 02 06 Samson CM15P Gooseneck Podium Microphone Set 1.088.000

1 3 2 05 02 06 015 Microphone Floor Stand


1 3 2 05 02 06 STAND MICROPHONE LONG 10.000 WATT 5 PCS 196.000
1 3 2 05 02 06 STAND MICROPHONE LONG SOUND SYSTEM 10 PCS 653.000
1 3 2 05 02 06 STAND MICROPHONE SHORT 60.000 WAT SOUND SYSTEM 5 PCS 196.000
1 3 2 05 02 06 STAND MICROPHONE SHORT 60.000 WAT SOUND SYSTEM 10 PCS 653.000
1 3 2 05 02 06 018 Unit Power Supply
1 3 2 05 02 06 APC APC BE500R-AS Unit 720.000
1 3 2 05 02 06 APC APC BX625CI-MS Unit 826.000
1 3 2 05 02 06 CYBEOWER CYBEOWER SU600E Unit 805.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 06 CYBEOWERVALUE10OOEi Unit 2.087.000
1 3 2 05 02 06 EATON EATON E Series NV Unit 9.379.000
1 3 2 05 02 06 EMERSON EMERSON Liebert [PSA600- 600VA / 360W, Unit 795.000
1 3 2 05 02 06 GENERAL ELECTRIC VH Unit 11.458.000
1 3 2 05 02 06 020 Stabilisator
1 3 2 05 02 06 Stabilizer FIRMAN SVC 500Va Buah 1.042.000
1 3 2 05 02 06 Stabilizer FIRMAN SVC 1000Va Buah 1.579.000
1 3 2 05 02 06 Stabilizer FIRMAN SVC 1500Va Buah 2.311.000
1 3 2 05 02 06 Stabilizer FIRMAN SVC 2000Va Buah 5.498.000
1 3 2 05 02 06 Stabilizer FIRMAN SVC 3000Va Buah 6.561.000
1 3 2 05 02 06 Stabilizer FIRMAN SVC 10 Kva Buah 8.562.000
1 3 2 05 02 06 Stabilizer MATSUSHITA 2 Kva Buah 2.569.000
1 3 2 05 02 06 Stabilizer MATSUSHITA 5 Kva Buah 6.602.000
1 3 2 05 02 06 Stabilizer MATSUSHITA 20 Kva Buah 21.043.000
1 3 2 05 02 06 Stabilizer MATSUMEGA 2 Kva Buah 5.856.000
1 3 2 05 02 06 Stabilizer MATSUMEGA 5 Kva Buah 10.109.000
1 3 2 05 02 06 Stabilizer MATSUMEGA 20 Kva Buah 24.241.000
1 3 2 05 02 06 Stabilizer YORITSU XP-1000 Red Buah 2.115.000
1 3 2 05 02 06 Stabilizer YORITSU XP-500 Red Buah 1.754.000
1 3 2 05 02 06 021 Camera Video
1 3 2 05 02 06 Canon ULXIA H G20 Unit 27.531.000
1 3 2 05 02 06 Camera (untuk KTP-el) Unit 10.045.300
1 3 2 05 02 06 022 Camera film
1 3 2 05 02 06 Canon Canon EOS 5D Mark APS-C Digital SLR, 18.0 Unit 60.859.000
SD/SDHC/SDXC Card Slot,
1 3 2 05 02 06 Canon EOS 70D 3.0" Clear View High Unit 18.361.000
1 3 2 05 02 06 023 Tustel
1 3 2 05 02 06 Nikon D90 KIT Unit 13.744.000
1 3 2 05 02 06 Olympus Mju 9000 Unit 2.170.000
1 3 2 05 02 06 024 Mesin Jahit
1 3 2 05 02 06 Mesin jahit Buterfly Sanghai Buah 1.238.000
1 3 2 05 02 06 Singer Buah 2.146.000
1 3 2 05 02 06 025 Timbangan Orang
1 3 2 05 02 06 Timbangan dewasa Import Buah 318.000
1 3 2 05 02 06 Elektrik Kapasitas : 100 gram Unit 471.000
1 3 2 05 02 06 Timbangan bayi RGZ 20 A - GEA CHINA unit 877.000
1 3 2 05 02 06 026 Timbangan Barang
1 3 2 05 02 06 Timbangan Barang Kapasitas : 5 Kg Buah
1 3 2 05 02 06 Timbangan Barang RL 310 Kapasitas : 3100 gram Unit
1 3 2 05 02 06 028 Lambang Garuda Pancasila
1 3 2 05 02 06 Lambang Garuda Pancasila Set 340.000
1 3 2 05 02 06 029 Gambar Presiden/Wakil Presiden
1 3 2 05 02 06 029 Poster foto Bahan kertas kontruk ukuran 40 x 60 Buah 14.700
1 3 2 05 02 06 030 Lambang Korpri/Dharma Wanita
1 3 2 05 02 06 Lambang Korpri/Dharma Wanita Buah 59.000
1 3 2 05 02 06 031 Aquarium (Alat Rumah Tangga Lainnya ( Home Use )
1 3 2 05 02 06 AQUARIUM SET UKURAN 60x30x35c Set 289.500
1 3 2 05 02 06 032 Tiang Bendera
1 3 2 05 02 06 Bahan Besi Permanen Unit 1.011.000
1 3 2 05 02 06 034 Seterika
1 3 2 05 02 06 Seterika Merk Philip 114 / 1172 Buah 440.000
1 3 2 05 02 06 Merk Maaspion Buah 207.000
1 3 2 05 02 06 Merk Nasional NI Buah 335.000
1 3 2 05 02 06 Merk Compor HI 216 Buah 774.000
1 3 2 05 02 06 Merk Philip Dryron Buah 671.000
1 3 2 05 02 06 Merk Panasonic Buah 390.000
1 3 2 05 02 06 036 Tangga Aluminium
1 3 2 05 02 06 Tangga Almunium Sorong Uk. 3 Mtr Biasa Buah 619.000
1 3 2 05 02 06 Tangga Aluminium Lipat Uk. 2,5 m Merk Fortuna Buah 1.934.000
1 3 2 05 02 06 Tangga Lipat Aluminium Uk. 2,5 Meter 2 m Buah 774.000
1 3 2 05 02 06 Aluminium Uk. 2,5 Meter 2,5 m Buah 851.000
1 3 2 05 02 06 037 Kaca Hias
1 3 2 05 02 06 Kaca Pembatas Ruang Unit 844.000
1 3 2 05 02 06 038 Dispenser
1 3 2 05 02 06 Dispenser MIYAKO PORT DISPENSER H&C WD-289 HC Unit 929.000

1 3 2 05 02 06 MIYAKO PORT DISPENSER H&F HWD-190H Unit 233.000

1 3 2 05 02 06 SANKEN STAND DISPENSER H&C HWD 715 Unit 1.857.000

1 3 2 05 02 06 Shar Unit 2.321.000


1 3 2 05 02 06 048 Handy Cam
1 3 2 05 02 06 Handy Cam Sony Handycam FDR-AXP55 Unit 17.708.000
1 3 2 05 02 06 Sony Handycam FDR-AX40 Unit 15.362.200
1 3 2 05 02 06 Sony Handycam HDR-PJ410 Unit 4.133.900
1 3 2 05 02 06 Sony Handycam FDR-AX30 Unit 21.271.200
1 3 2 05 02 06 049 Mesin Obras
1 3 2 05 02 06 Butterfly Butterfly DC-1 Unit 2.301.000
1 3 2 05 02 06 Butterfly Butterfly GN-794 Unit 8.562.000
1 3 2 05 02 06 Shunfa Shunfa SF 747.24 Unit 8.046.000
1 3 2 05 02 06 057 Karpet
1 3 2 05 02 06 Karpet Lantai Plastik Tebal Buah 1.032.000
1 3 2 05 02 06 Nobel Meter 186.000
1 3 2 05 02 06 Kanera Meter 135.000
1 3 2 05 02 06 Karpet Bludru / Permandani Kembang Uk. 3 x 2 m 180 x 260 Lembar 413.000
1 3 2 05 02 06 Kembang Uk. 2 x 2 m 160 x 220 Lembar 258.000
1 3 2 05 02 06 Kembang Uk. 1 x 1 1/2 m Lembar 155.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 02 06 Kembang Uk. 2 x 1 1/2 m 115 x 160 Lembar 207.000
1 3 2 05 02 06 Kembang untuk Sholat 6 m Lembar 1.175.000
1 3 2 05 02 06 Karpet Karina Meter 59.000
1 3 2 05 02 06 Karpet Polos Meter 44.000
1 3 2 05 02 06 Karpet Polos Merk Karina 115 x 160 Meter 65.000
1 3 2 05 02 06 Karpet Polos Biasa Meter 34.000
1 3 2 05 02 06 067 DVD Player
1 3 2 05 02 06 DVD Player LG DVD PLAYER DV-451 Unit 671.000
1 3 2 05 02 06 LG DVD PLAYER DV-520 Unit 723.000
1 3 2 05 02 06 LG DVD PLAYER DV-551 Unit 826.000
1 3 2 05 02 06 LG DVD PLAYER DV-552 Unit 929.000
1 3 2 05 02 06 LG DVD PLAYER DV-581 Unit 774.000
1 3 2 05 02 06 LG DVD PLAYER DV-582 Unit 774.000
1 3 2 05 02 06 LG DVD PLAYER DV-586 Unit 93.000
1 3 2 05 02 06 PANASONIC DVD PLAYER S-38 Unit 826.000
1 3 2 05 02 06 PANASONIC DVD PLAYER S-58 Unit 877.000
1 3 2 05 02 06 068 Tangga
1 3 2 05 02 06 Tangga Lipat Alumunium Set 1.559.000
1 3 2 05 02 06 Tangga Alumunium Alumunium t = 2,5 m Set 1.250.000
1 3 2 05 02 06 069 Lampu
1 3 2 05 02 06 Battery Lilon lampu Emergency Visalux Buah 106.300
1 3 2 05 02 06 070 Jemuran
1 3 2 05 02 06 Jemuran Dari Plastik Plastik Buah 207.000
1 3 2 05 02 06 Jemuran Dari Besi Kecil Vinil Uk. 1x1 m Buah 117.000
1 3 2 05 02 06 Besar Besi Uk 1,5 x 1,5 m Buah 195.000
1 3 2 05 02 06 Aluminium Uk. 1,5 x 1,5 m Buah 349.000
1 3 2 05 02 06 Aluminium Uk. 2,5 x 2 m Buah 465.000
1 3 2 05 02 06 Aluminium Uk. 1,5 x 2 m Buah 413.000
1 3 2 05 02 06 071 Patung Peraga Pakaian
1 3 2 05 02 06 Patung Peraga Pakaian Unit 732.700
1 3 2 05 02 06 075 Tangki Air
1 3 2 05 02 06 Tangki air kapasitas 2 m3 2 m3 Buah 2.600.000
1 3 2 05 02 06 Tangki air kapasitas 1 m3 1 m3 Buah 1.863.000
1 3 2 05 02 06 Tangki air kapasitas 0,5 m3 0,5 m3 Buah 1.277.000
1 3 2 05 02 06 076 Home Theater
1 3 2 05 02 06 Home Theater LG HOME THEATER DH 6530 T Unit 5.674.000
1 3 2 05 02 06 LG HOME THEATRE DH 7530 T Unit 9.800.000
1 3 2 05 02 06 SHARP HOME THEATER HT-CN314DW Unit 4.642.000
1 3 2 05 02 07 ALAT PEMADAM KEBAKARAN
1 3 2 05 02 07 017 Tabung Pemadam Kebakaran
1 3 2 05 02 07 Tabung Pemadam Kebakaran Uk.5 Kg Buah 3.520.000
1 3 2 05 02 07 Tabung Pemadam Kebakaran Uk. 23 Kg Buah 14.927.000
1 3 2 05 03 MEJA DAN KURSI KERJA/RAPAT PEJABAT
1 3 2 05 03 01 MEJA KERJA PEJABAT
1 3 2 05 03 01 004 Meja Kerja Pejabat Eselon II
1 3 2 05 03 01 Meja Kerja Bahan Multiplek dan Teakwood,Profil dan Buah 2.171.000
Ornsmen kayu jati pintu pakai rel kunci sentral
lock, alas meja kaca reben 5 mm Finishing
Melamic ukuran 110x50x65cm type Blok G
Tarikan Merk golvin Merk Victor Seri Ofifix

1 3 2 05 03 01 Meja Kerja Kepala Dinas Merk : Frontline 1 Biro Pabrikan Buah 10.990.700
1 3 2 05 03 01 Meja Biro Eselon II Buah 4.954.600
1 3 2 05 03 01 Meja Kerja Buah 4.954.600
1 3 2 05 03 01 005 Meja Kerja Pejabat Eselon III
1 3 2 05 03 01 Meja Kerja Direktur Set 15.000.000
1 3 2 05 03 01 Meja Biro Eselon III Buah 4.128.900
1 3 2 05 03 01 006 Meja Kerja Pejabat Eselon IV
1 3 2 05 03 01 Meja Biro Eselon IV Buah 3.680.500
1 3 2 05 03 01 007 Meja Kerja Pejabat Eselon V
1 3 2 05 03 01 Meja Biro Eselon V Buah 2.889.500
1 3 2 05 03 01 008 Meja Kerja Pegawai Non Struktural
1 3 2 05 03 01 Meja Staf Tanpa Kaca Buah 1.205.400
1 3 2 05 03 02 MEJA RAPAT PEJABAT
1 3 2 05 03 02 003 Meja Rapat Ketua/Wakil Ketua DPRD
1 3 2 05 03 02 Meja Makan Rumah Wakil Ketua I DPRD Set 47.272.000
1 3 2 05 03 02 Meja Makan Rumah Wakil Ketua II DPRD Set 47.272.000
1 3 2 05 03 02 Meja Konsul Rumah Wakil Ketua II DPRD Buah 11.818.000
1 3 2 05 03 02 Meja Makan Mini Rumah Wakil II DPRD Buah 23.636.000
1 3 2 05 03 02 004 Meja Rapat Pejabat Eselon II
1 3 2 05 03 02 Meja Rapat 27.181.800
1 3 2 05 03 02 005 Meja Rapat Pejabat Eselon III
1 3 2 05 03 02 Meja Rapat 11.300.900
1 3 2 05 03 02 011 Meja Tamu Biasa
1 3 2 05 03 02 Meja Tamu 1.808.100
1 3 2 05 03 02 012 Meja Maket/Peta
1 3 2 05 03 02 Meja maket 1 : 1.000/ cm2 luas meja maket cm2 2.000
1 3 2 05 03 02 Meja maket 1 : 500/ cm2 luas meja maket cm2 2.100
1 3 2 05 03 02 Meja maket 1 : 400/ cm2 luas meja maket cm2 2.300
1 3 2 05 03 02 Meja maket 1 : 300/ cm2 luas meja maket cm2 2.700
1 3 2 05 03 02 Meja maket 1 : 200/ cm2 luas meja maket cm2 2.900
1 3 2 05 03 02 Meja maket 1 : 100/ cm2 luas meja maket cm2 3.100
1 3 2 05 03 02 013 Meja Operator
1 3 2 05 03 02 Meja Komputer cm2 2.363.600
1 3 2 05 03 03 KURSI KERJA PEJABAT
1 3 2 05 03 03 001 Kursi Kerja Menteri/Gubernur/Bupati/Walikota
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 03 03 Kursi Kerja Kursi Kerja Bupati Bahan Kulit Asli, Kaki Cabang Buah 16.120.000
Lima, Roda Nylon, Pembungkus Kursi Leather
atau Kulit asli Ukuran Lebar 71 cm tinggi
sandaran 92 cm dalam 69 cm
1 3 2 05 03 03 002 Kursi Kerja Pejabat Eselon I/Wakil Gubernur/Wakil
Bupati/Wakil Walikota
1 3 2 05 03 03 Kursi Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 3.562.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 64 cm tinggi sandaran
80 cm Dalam 68 cm Type BLM.CN

Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 3.507.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 54 cm tinggi sandaran
49 cm Dalam 55 cm Type BLL.CN

1 3 2 05 03 03 Kursi Kerja Kursi Kerja Wakil Bupati Bahan Kulit Asli, Kaki Buah 14.011.000
Cabang Lima, roda Nylon Ukuran lebar 64 cm
tinggi sandaran 80 cm dalam 68 cm
1 3 2 05 03 03 003 Kursi Kerja Ketua/Wakil Ketua DPRD
1 3 2 05 03 03 Kursi Kerja Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 3.562.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 64 cm tinggi sandaran
80 cm Dalam 68 cm Type BLM.CN

1 3 2 05 03 03 Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 3.507.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 54 cm tinggi sandaran
49 cm Dalam 55 cm Type BLL.CN

1 3 2 05 03 03 Kursi Kerja Setda bahan Ateja / Vinyl Spesifikasi Buah 11.744.000


Sandaran tinggi Cantolever kaki cabang Lima,
Hidrolik, Tangan Pembungkus roda Nylon
Ukuran lebar 64 cm tinggi sandaran 80 cmdalam
68 cm
1 3 2 05 03 03 004 Kursi Kerja Pejabat Eselon II
1 3 2 05 03 03 Kursi Kerja Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 1.815.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 54 cm tinggi sandaran
42cm Dalam 55 cm Type BLL. 2

1 3 2 05 03 03 Kursi Kerja Kadis Rangka Besi, busa cetak Buah 9.371.000


dibungkus kain Fabric tangan kursi Polyurethane
reclyning / tilting, gaslit, kaki cabang lima beroda

1 3 2 05 03 03 Kursi Asisten Bahan Ateja / Vinyl Spesifikasi Buah 9.990.000


Sandaran tinggi Cantolever kaki cabang Lima,
Hidrolik, Tangan Pembungkus roda Nylon
Ukuran lebar 64 cm tinggi sandaran 80 cmdalam
68 cm
1 3 2 05 03 03 005 Kursi Kerja Pejabat Eselon III
1 3 2 05 03 03 Kursi Kerja Kursi Kerja Kabag, Kasubdin, Kabid dan Camat Buah 6.745.000
Rangka Besi, busa cetak dibungkus kain Fabric
tangan kursi polyyurethane reclyning/tilting, gaslit,
kaki cabang lima beroda

1 3 2 05 03 03 006 Kursi Kerja Pejabat Eselon IV


1 3 2 05 03 03 Kursi Kerja Bahan Kulit Asli, Kaki Cabang Lima, Roda Nylon, Buah 3.696.000
Pembungkus Kursi leather atau Kulit asli merk
Achigrama, ukuran lebar 68 cm tinggi sandaran
65 cm dalam 65 cm type MTM UCN

1 3 2 05 03 03 Kursi Kasubbag, Kasi, Kasubid, Sekcam, Lurah, Buah 4.277.000


Kades Rangka Besi, busa cetak dicetak
dibungkus kain Fabric tangan polyurethane
reclyning / tilting,gaslit, kaki cabang lima beroda

1 3 2 05 03 03 007 Kursi Kerja Pejabat Eselon V


1 3 2 05 03 03 Kursi Kerja Kursi Staf Rangka Besi, busa cetak dibungkus Buah 1.421.000
kain Fabric,tanpa tangan kaki cxabang lima
beroda
1 3 2 05 03 03 008 Kursi Kerja Pegawai Non Struktural

1 3 2 05 03 04 KURSI RAPAT PEJABAT


1 3 2 05 03 04 003 Kursi Rapat Ruangan Rapat Ketua/Wakil Ketua DPRD
1 3 2 05 03 04 Kursi Rapat Rumah Jabatan Ketua DPRD Unit 2.954.500
1 3 2 05 03 04 Kursi Santai Rumah Jabatan Wakil Ketua I DPRD Set 11.818.000
1 3 2 05 03 04 004 Kursi Rapat Ruangan Rapat Pejabat Eselon II
1 3 2 05 03 04 Kursi Rapat Type BSD.X4 Loeback Recleaning, Buah 1.815.000
Swivel,Castrol,Gasliff,Armless,Uphols, trory ateja

1 3 2 05 03 04 005 Kursi Rapat Ruangan Rapat Pejabat Eselon III


1 3 2 05 03 04 Kursi Rapat Kursi Rapat Rangka Besi, busa cetak dibungkus Buah 1.922.000
kain Fabric, tanpa tangan kaki Cabang lima
beroda
1 3 2 05 03 04 007 Kursi Rapat Ruangan Rapat Staf
1 3 2 05 03 04 Kursi rapat Revolution SM 711 Buah 2.331.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 05 03 04 Revolution SM 712 Buah 2.331.000
1 3 2 05 03 04 Revolution SM 715 Buah 2.331.000
1 3 2 05 03 04 Revolution SM 717 Buah 2.331.000
1 3 2 05 03 04 Revolution SM 718 Buah 2.425.000
1 3 2 05 03 04 Revolution SM 719 Buah 2.331.000
1 3 2 05 03 04 Revolution SM 720 Buah 2.466.000
1 3 2 05 03 04 Revolution SM 722 Buah 2.444.000
1 3 2 05 03 04 Revolution SM 723 Buah 2.466.000
1 3 2 05 03 04 Revolution SM 725 Buah 2.466.000
1 3 2 05 03 04 Revolution SM 726 Buah 2.331.000
1 3 2 08 01 11 ALAT LABORATURIUM UMUM Revolution SM 726 Buah 2.331.000
1 3 2 08 01 11 040 Tabung Gas N2
1 3 2 08 01 11 Pompa N2 Cair N2 Unit 19.145.000
1 3 2 08 01 11 209 stainless straw
1 3 2 08 01 11 Straw stainless Buah 23.600
1 3 2 06 02 ALAT KOMUNIKASI
1 3 2 06 02 01 ALAT KOMUNIKASI TELEPHONE
1 3 2 06 02 01 004 Telephone Mobile
1 3 2 06 02 01 Smartphone TAB Min 7",Quadcore,RAM 2 GB,Memory Min 9.454.400
8GB,OS Android min Lolipop, Garansi distributor
resmi min 1 tahun
1 3 2 06 02 01 006 Handy Talky (HT)
1 3 2 06 02 01 Handy Talky (HT) Motorola GP328 UHF Frequensi Range UHF : 330-400 MHZ 403-470 Buah 9.480.700
MHz, model AZH25PDCAA3, 12.5/20/25 Khz-5
watt, 16 channel, FCC Type
Handy Talky (HT) Motorola GP328 UHF Frequensi Range UHF : 136-174 MHZ, model Buah 7.393.600
AZH25KDC9AA3, 12.5/20/25 Khz-5 watt, 16
channel, FCC Type Instrinsically safe (IS)
ICOM Handy Talky (IC-V88) Frequensi Range VHF 136-174 MHz Built-in Buah 3.907.000
CTCSS enuder/decoder
1 3 2 10 02 PERALATAN KOMPUTER
1 3 2 10 02 01 PERALATAN MAINFRAME
1 3 2 10 02 01 001 Card Reader (Peralatan Mainframe)
1 3 2 10 02 01 Card Reader (KTP-el) Unit 15.954.300
1 3 2 10 02 02 PERALATAN MINI KOMPUTER
1 3 2 10 02 02 001 Card Reader (Peralatan Mini Komputer)
1 3 2 10 02 02 Card Reader (Peralatan Mini Komputer) Unit 193.400
1 3 2 10 02 02 016 Speaker Komputer
1 3 2 10 02 02 Speaker Bluetooth Anker SoundCore Ace A0 B2C - UN Unit 471.500
Black Iteration
1 3 2 10 02 03 PERALATAN PERSONAL KOMPUTER
1 3 2 10 02 03 001 Komputer
1 3 2 10 02 03 HP PC HP All In One 20-C321D - AMD E2 9000 - Unit 5.518.000
4GB - 500GB - 19,5" - Windows 10 - White
1 3 2 10 02 03 HP HP PC All In One 20-C316D - Intel Core i5-7200 - Unit 10.263.000
4GB - 1TB - 19.45" - Windows 10 - White

1 3 2 10 02 03 HP HP PC 570-P003D - Intel Core i3-7100 - 4GB - Unit 7.994.000


1TB - 18.5" - Windows 10 - Hitam
1 3 2 10 02 03 HP HP PC All In One 24-F0052L - Intel Core i5-8250 Unit 10.469.000
- 4GB - 1TB - VGA - 23.8" - DOS - Putih

1 3 2 10 02 03 HP HP PC All In One 20-C315D - Intel Celeron Dual Unit 5.312.000


Core J3060 - 4GB - 500GB - 20 Inch - Windows
10 - White
1 3 2 10 02 03 HP HP PC All in One 20-c030L - Intel Core i3-6100 - Unit 7.840.000
4GB RAM - 19.45"
1 3 2 10 02 03 HP HP PC AlO 27-A172D-Core i7-6700-16GB-2TB- Unit 23.673.000
27"- Touch - Win10
1 3 2 10 02 03 HP HP PC All In One 20-C317D - Intel Core i3- Unit 7.994.000
7100U - 4GB - 500GB - 19.5 Inch - Windows 10 -
White
1 3 2 10 02 03 HP HP PC All In One 24-F0051D - Intel Core i5- Unit 11.294.000
8250 - 4GB - 1TB - VGA - 23.8" - Windows 10 -
Putih
1 3 2 10 02 03 HP HP PC All In One 22-C0033D - Intel Core i3- Unit 8.406.000
8130 - 4GB - 1TB - 21.5" - Windows 10 - Putih

1 3 2 10 02 03 HP HP PC All In One 24-F0053D - Intel Core i5- Unit 13.048.000


8400 - 4GB - 1TB - VGA - 23.8" Touchscreen -
Windows 10 - Putih
1 3 2 10 02 03 HP HP Pavilion 510-P011D PC Desktop Intel Core i3 Unit 9.222.000
6100T-3.20GHz, RAM 4GB, HDD 1TB,
DVD/RW, Windows 10 - Bundling monitor 18.5"

1 3 2 10 02 03 HP HP PC All In One 20-C303D - Intel Core i5-7200 - Unit 10.366.000


4GB - 1TB - 19.45" - Windows 10 - White

1 3 2 10 02 03 HP HP AIO PC 20 - R123L - i3-4170T - 2GB - Unit 7.505.000


500GB - W10 - 19.5"
1 3 2 10 02 03 HP PC AIO HP 20 - c315d - Celeron J3060 - 4GB - Unit 5.518.000
19.5" - WIN10
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 10 02 03 HP HP Pavilion AIO 23-Q164D Intel Core i7-6700T Unit 17.990.000
Processor (2.8G, 6M Cache) RAM 4GB , HDD
2TB 23 Inchi IPS FULL HD TOUCHSCREEN
AMD R7 A360 2GB DGPU, SuperMulti DVDRW
HP Wireless Kit, Stereo Sound (B&O Play)

1 3 2 10 02 03 HP HP PC All in One 20-C024L - Intel J3710 - 4GB - Unit 5.828.000


19.45" - DOS - Putih
1 3 2 10 02 03 HP HP PC Pro One All in One 400 G2 - Intel Core i3- Unit 10.057.000
6100 - 4GB - 500 - 20" - Windows 10 Pro
DownGrade to Win 7 Pro - Black
1 3 2 10 02 03 LENOVO Lenovo PC All In One 520-24IKL-8EID - Intel Unit 13.151.000
Core i7-7700 - 4GB - 2TB - VGA - 23.8" - DOS -
Grey
1 3 2 10 02 03 LENOVO Lenovo Ideacenter AIO 310-20IAP-0LID Celeron Unit 5.518.000
J3455-4GB DDR3-500GB-W10H-1YR

1 3 2 10 02 03 LENOVO Lenovo Ideacentre 310-20IAP-0KID J3355- Unit 5.261.000


4GBDDR3-500GB-Win10H-19.5
1 3 2 10 02 03 LENOVO Lenovo All in one C4030/21.5"NT/i3- Unit 8.201.000
5005U/4GB/1TB/Nvidia GF820 2GB/DOS
1 3 2 10 02 03 LENOVO Lenovo IC AIO 520-22IKU - 6JID - i3-6006U / Unit 9.231.000
4GB / 1TB / Slim DVDRW / R530 2GB / KBD +
MOUSE / WIN 10 / 21.5"
1 3 2 10 02 03 LENOVO Lenovo Ideacenter AIO 520-22IKU-01ID Black Unit 8.406.000
Ci3-6006U-4GBD4-1TB-Integrated-Windows10-
21.5"-1YR
1 3 2 10 02 03 LENOVO Lenovo Ideacenter AIO 520-22IKU-6AID GREY Unit 10.366.000
Ci5-7200U-4GBD4-1TB-Integrated-Windows10-
21.5"-1YR
1 3 2 10 02 03 LENOVO Lenovo AIO 310-20IAP-J3355 F0CL000KID Unit 5.270.000
Desktop PC - Putih [19.5 Inch/ 4GB/ 500GB/
Win10]
1 3 2 10 02 03 LENOVO LENOVO AIO PC 520 - 24IKL - i7-7700T - 4GB - Unit 14.637.000
1TB - R530 2GB - DOS - 23.8"
1 3 2 10 02 03 LENOVO Lenovo IdeaCentre AIO 520 - 24IKU- 03ID Unit 10.780.000
Desktop PC - i5-7200U 4GB 1TB R530 2GB
DOS 23.8 Inch
1 3 2 10 02 03 LENOVO Lenovo Ideacenter AIO 520s-23IKU-5UID GLD Unit 12.532.000
Ci5-7200U-4GBD4-1TB-GT930A2GB-23-W10H-
1YR
1 3 2 10 02 03 LENOVO Lenovo AIO510-22ISH-(F0CB00SBID) Desktop Unit 8.820.000
PC [i3-7100T/4 GB/1TB/Dos/21.5 Inch]

1 3 2 10 02 03 LENOVO AIO910-27ISH(0EID) i7-6700T/8Gb/1Tb/Nvidia Unit 30.378.000


2Gb/Win10/27"/Touch Screen

1 3 2 10 02 03 LENOVO Lenovo AIO 300-20ISH Intel i3 - 6100T 20" RAM Unit 7.890.000
4GB HDD 500GB F0BV0012ID Bluetooth WIFI
DVD Camera Audio Garansi Resmi

1 3 2 10 02 03 LENOVO Lenovo PC IdeaCentre 310S-08IGM-01ID - Intel Unit 5.931.000


Celeron J400S - 4GB - 1TB - 21.5" - Windows
10
1 3 2 10 02 03 APPLE Apple iMac MMQA2ID - Intel Core i5 - RAM 8GB Unit 14.905.000
- 1TB - 21.5"
1 3 2 10 02 03 APPLE Apple iMac MNDY2ID - Intel Core i5 - RAM 8GB - Unit 17.690.000
1TB - Radeon Pro 555 - 21.5"
1 3 2 10 02 03 APPLE Apple iMac MNE02ID - Intel Core i5 - RAM 8GB - Unit 20.475.000
1TB - Radeon Pro 560 - 21.5"
1 3 2 10 02 03 APPLE Apple iMac MNE92ID - Intel Core i5 - RAM 8GB - Unit 24.188.000
1TB - Radeon Pro 570 - 27"
1 3 2 10 02 03 ASUS Asus AIO V220IAUK-BA019X - Core i3-5005U - Unit 7.981.000
4GB - 500GB - DVD-RW - Windows 10 Home -
21,5" FHD
1 3 2 10 02 03 ASUS PC ASUS AIO V221ICUK-BA163T BLACK + Unit 7.764.000
DVD EKSTERNAL ASUS SLM
1 3 2 10 02 03 ASUS ASUS AIO PC V221ICUK - i5-7200U - 4GB - Unit 9.175.000
1TB - DOS - 21.5"FHD
1 3 2 10 02 03 ASUS Asus K31CD-ID009D Desktop PC i3-6100 - Unit 8.665.000
RAM 4GB - HDD 1TB - Intel HD - Display 18.5" -
Win 10
1 3 2 10 02 03 ASUS Desktop ASUS AIO V220IAUK-BA003F - Core i3- Unit 8.665.000
5005U Processor, Dos, RAM 4GB, HDD 500GB,
DVD RW, 21.5"
1 3 2 10 02 03 ASUS ASUSPRO All In One PC A4110 - Win 10 Ori - Unit 7.159.000
15.6" Touch Screen - Intel Dual Core J3160
2.24GHz - 4GB - 500GB - WiFi
1 3 2 10 02 03 ASUS Asus All-in-One PC EETOP ZN240ICGT- Unit 18.464.000
RA056T - Intel Core i7-7500U - 4 GB RAM - 1
TB - Windows 10 - 23.8" TouchScreen
1 3 2 10 02 03 ASUS Asus All In One PC V221-BA028D / Quad-j4205 Unit 6.030.000
/ 4GB DDR3 / Sata-500 / 21.5"
1 3 2 10 02 03 ASUS ASUS PRO AIO PC A4110 - J3160 - 2GB - Unit 7.272.000
500GB - W10 - 15.6"HD TOUCH
1 3 2 10 02 03 ASUS Asus Desktop PC M32CD - ID015D - 18.5” - Unit 10.109.000
Intel I5/6400 - 4GB RAM - 1 TB - Hitam
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 10 02 03 ASUS All In One PC ASUS V221 -BA028D Intel J4205 Unit 6.034.000
Ram 4GB - HDD 500GB - LCD 21.5 " - DOS

1 3 2 10 02 03 ASUS Asus K31CD-ID001T Desktop PC Dual Core Unit 7.943.000


G4400 - RAM 4GB - HDD 500 Gb - Intel HD -
Display 18.5" - Win10
1 3 2 10 02 03 ASUS ASUS AIO ET2030INT All In One PC Unit 11.088.000
Ci3/1TB/4GB/VGA/19.5Inch Touch Screen
1 3 2 10 02 03 ASUS Asus K31CD-ID007D Desktop PC [Core i3-6100/ Unit 8.562.000
4GB/ 1TB/ Dos /18.5" ]
1 3 2 10 02 03 ASUS Asus AIO V220IAUK-BA019X - Core i3-5005U - Unit 9.232.000
4GB - 500GB - DVD-RW - Windows 10 Home -
21,5" FHD
1 3 2 10 02 03 ACER PC All In One Acer Aspire 21.5 Inch Core I5 Unit 10.366.000
Win10
1 3 2 10 02 03 ACER Resmi Acer All In One C20-720 Intel J3060 Unit 7.087.000
RaM2GB Hdd500GB Dos Screen 19,5"
1 3 2 10 02 03 ACER ALL IN ONE ACER C20-720 | J3060 | 2GB | Unit 5.416.000
500GB | 19.5" | WIN10 | WHITE
1 3 2 10 02 03 ACER ACER Aspire C20-720 ALL IN ONE PC | J3060 | Unit 5.209.000
2GB RAM | 500GB HDD | 19.5 Inchi | DVDRW |
DOS | WHITE
1 3 2 10 02 03 ACER Acer AIO C22-860 i3-7130U-4GB DDR4-1TB Unit 8.201.000
HDD-21.5" FHD-Dos
1 3 2 10 02 03 ACER ACER AIO AC22-860- i3-7130U - 4/1TB - Unit 7.994.000
21.5INC - DOS - DQ.BAESN.001
1 3 2 10 02 03 ACER Acer Aspire ATC-780 - Ci5-7400 - 4GB - 1TB - Unit 10.160.000
GT720 - 19.5" - Win10
1 3 2 10 02 03 ACER PC All In One Acer C20-720 - Celeron J3060 - Unit 5.581.000
RAM 2GB - HD 500GB - Screen 19.5 - DOS
1 3 2 10 02 03 ACER ACER AC20-220 A6-7310/ 2GB/ DOS Unit 5.415.000
1 3 2 10 02 03 ACER ACER ALL IN ONE C22-760 [i3- Unit 8.498.000
6100U,4GB,1TB,21,5",SLIM DESAIN,WIN 10]

1 3 2 10 02 03 ACER Acer PC AIO AZ1-211 E1-7010/ 2Gb Unit 5.983.000


Memorry/500Gb Hdd/19.5"/Dos
1 3 2 10 02 03 ACER Acer AIO Aspire U27-880 - 27' Touch screen/ i7 Unit 23.158.000
7500U / 8GB / 1TB/ Win10
1 3 2 10 02 03 ACER Acer PC AIO-AZ20-780(NEW) W10 Unit 8.975.000
1 3 2 10 02 03 ACER ACER AC22-860 i3-7130U WIN Unit 8.406.000
1 3 2 10 02 03 ACER Acer PC AMTC605 - 15,6" - Intel G3250 - 2GB Unit 6.240.000
RAM - HDD 500GB - Hitam - LED Acer
1 3 2 10 02 03 ACER Acer PC ATC 707 - 19,5" - Intel Core i5 4460 - Unit 10.572.000
4GB RAM - HDD 1TB - VGA Nvidia Geforce
GT720 2GB - LED - Hitam - khusus Jogja
1 3 2 10 02 03 ACER ACER ASPIRE TC708 PDC Unit 5.931.000
G4400/4G/500GB/DOS/ SKYLAKE
1 3 2 10 02 03 ACER ACER AC22-760 i3-7100U (silver) DOS Unit 7.994.000
1 3 2 10 02 03 002 CPU (Peralatan Personal Komputer)
1 3 2 10 02 03 HP Business Desktop 280MT G3 NonWindows Processor: Intel Core i5-7500 Set 10.044.000
[HPDT2WB81PA] RAM: 4GB DDR4
HDD: 1TB
ODD: DVDRW
VGA: Intel HD Graphics
Konektivitas: Wifi + Bluetooth
Sistem Operasi: Non OS
1 3 2 10 02 03 LENOVO ThinkCentre M710q (Core i7-7700T) Processor: Intel Core i7-7700T Set 17.041.500
RAM: 4GB DDR4
HDD: 500GB
VGA: integrated
Sistem Operasi: Windows 10 Pro
1 3 2 10 02 03 LENOVO ThinkCentre M710 Mini Tower (5Y) 10MAA08BIA Processor: i3-6100 Set 12.172.500
RAM: 4GB DDR4
HDD: 1TB
VGA: Intel HD Graphics
ODD: DVDRW
Konektivitas: Gigabit LAN
Sistem Operasi: Windows 10 Professional
1 3 2 10 02 03 003 Monitor
1 3 2 10 02 03 SAMSUNG QLED UHD Monitor 28 Inch LU28H750U Screen size: 28" Unit 8.231.200
Resolution: 3840 x 2160
Aspect ratio: 1000:1
Brightness: 300cm/m2
Response time: 1ms
Aspect ratio: 16:9
Input connector: HDMI; Display port;
Headphones
1 3 2 10 02 03 ASUS LED Monitor 24 Inch VG248QE 24” Unit 5.240.100
1920 x 1080
0.2768 mm
80000000:1
350 cd/m²
LED WideScreen
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 10 02 03 SAMSUNG LED Monitor 24 Inch LS24F350FHEXXD 24 inch Unit 2.363.600
1920x1080
250 cd/m²
4GTG
D-Sub
HDMI
1 3 2 10 02 03 004 Printer (Peralatan Personal Komputer)
1 3 2 10 02 03 Printer EPSON Printer [L210] Unit 4.268.000
1 3 2 10 02 03 EPSON Printer (1-300) Unit 3.624.000
1 3 2 10 02 03 EPSON Printer [LX-310] Unit 3.183.000
1 3 2 10 02 03 EPSON Printer [L565] Unit 6.004.000
1 3 2 10 02 03 EPSON Printer [1-355] Unit 5.209.000
1 3 2 10 02 03 EPSON Printer [1-1110) Unit 2.865.000
1 3 2 10 02 03 EPSON Printer [1-350] Unit 4.413.000
1 3 2 10 02 03 EPSON Stylus Photo [T60] Unit 4.196.000
1 3 2 10 02 03 EPSON LQ-2191 Unit 10.634.000
1 3 2 10 02 03 EPSON Acul-aser M1401 Unit 2.250.000
1 3 2 10 02 03 EPSON Printer (K100] Unit 2.170.000
1 3 2 10 02 03 EPSON Printer [K200] Unit 3.617.000
1 3 2 10 02 03 EPSON Printer [M100) Unit 3.762.000
1 3 2 10 02 03 EPSON LX-51 Unit 4.341.000
1 3 2 10 02 03 EPSON Printer [K300] Unit 5.570.000
1 3 2 10 02 03 EPSON Stylus Office Unit 6.764.000
1 3 2 10 02 03 FUJI [P215 B] Unit 941.000
1 3 2 10 02 03 FUJI XEROX DocuPrint Unit 2.315.000
1 3 2 10 02 03 FUJI XEROX DocuPrint Unit 3.906.000
1 3 2 10 02 03 FUJI XEROX DocuPrint Unit 4.138.000
1 3 2 10 02 03 BROTHER Printer [MFC- Unit 3.617.000
1 3 2 10 02 03 BROTHER DCP-7065DN Unit 4.109.000
1 3 2 10 02 03 BROTHER MFC-7860DW Unit 5.787.000
1 3 2 10 02 03 BROTHER 3170CDW Unit 6.004.000
1 3 2 10 02 03 HP HP Deskjet 2622 All in One Wifi Printer - Putih 1.031.000

1 3 2 10 02 03 HP Deskjet Ink Advantage 2135 - Putih 1.011.000


1 3 2 10 02 03 Printer All In One 3In1 HP Deskjet D2135 Murah 774.000
Irit
1 3 2 10 02 03 HP DeskJet Ink Advantage 2135 All-in-One 671.000
Printer
1 3 2 10 02 03 HP Deskjet GT 5810 2.574.000
1 3 2 10 02 03 HP Deskjet Ink Advantage 3775 - Putih 1.393.000
1 3 2 10 02 03 Hp Laser Jet Pro - M102A - White 1.816.000
1 3 2 10 02 03 HP Officejet 7612 Wide Format e-All-In-One - 485.000
Hitam
1 3 2 10 02 03 HP Ink Tank 415 Wireless - Hitam 3.080.000
1 3 2 10 02 03 HP Officejet 200 - Abu Abu 3.817.000
1 3 2 10 02 03 Printer A3 HP Officejet Pro 7720 - Putih 3.456.000
1 3 2 10 02 03 HP Officejet Pro 8720 - Putih 4.642.000
1 3 2 10 02 03 CANON Canon Printer Multifunction MG2570S - Hitam - 1.027.000
Khusus
1 3 2 10 02 03 Canon Pixma MP287 - Print - Scan - Copy - 1.444.000
Hitam
1 3 2 10 02 03 Canon Printer Pixma G2000 (Hitam) - Khusus 2.641.000
Jabodetabek
1 3 2 10 02 03 CANON PIXMA MX497 - Hitam. 1.393.000
1 3 2 10 02 03 CANON PIXMA G2000 - Hitam 2.321.000
1 3 2 10 02 03 Canon Multifunction Inkjet Printer MX497 - Hitam 1.702.000

1 3 2 10 02 03 Canon Pixma Ink Efficient G4000 Printer 4.075.000


1 3 2 10 02 03 Canon PIXMA TS5170 Multifunction Inkjet 2.321.000
Printer - Black
1 3 2 10 02 03 Printer Canon PIXMA MP287 Infus Multi 2.992.000
Function All In One
1 3 2 10 02 03 BROTHER Brother DCP-T300 2.475.000
1 3 2 10 02 03 Printer BROTHER MFC-J3720 9.057.000
1 3 2 10 02 03 Brother Printer Inkjet Multifungsi DCP-T510W 4.116.000
Wireless - Hitam
1 3 2 10 02 03 Printer Brother T300w 3.714.000
1 3 2 10 02 03 BROTHER PRINTER INKJET 7.015.000
MULTIFUNCTION MFC J3530DW A3 FAKS WI-
FI DUPLEX
1 3 2 10 02 03 Brother Printer Inkjet Multifungsi MFC-J3530DW 8.139.000
Wireless - Fax + ADF + Automatic Duplex -
Hitam
1 3 2 10 02 03 BROTHER PRINTER INKJET MFCJ3720 ALL- 7.118.000
IN-ONE FAKS WI-FI ADF A3
1 3 2 10 02 03 Brother Printer - DCP-1616NW - White 3.085.000
1 3 2 10 02 03 BROTHER PRINTER MULTIFUNCTION MFC 5.148.000
T810W FAKS ADF INK TANK COLOR
1 3 2 10 02 03 Printer KTP-el Unit 59.090.000
1 3 2 10 02 03 005 Scanner (Peralatan Personal Komputer)
1 3 2 10 02 03 Scanner EPSON WorkForce GT- Unit 8.825.000
1 3 2 10 02 03 EPSON Scanner (GT-S85) Unit 20.254.000
1 3 2 10 02 03 AVISION Unit 12.711.000
1 3 2 10 02 03 Canon Scan LIDE 121 Unit 1.061.000
1 3 2 10 02 03 HP Scan Jet 201 Unit 1.001.000
1 3 2 10 02 03 Scaner DS620 Portable Unit 2.684.000
1 3 2 10 02 03 Fingerprint Scanner (untuk KTP-el) Support USB 2.0 dan Windows Unit 25.999.600
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 10 02 03 Iris Scanner (untuk KTP-el) Support Windows Unit 25.999.600
1 3 2 10 02 03 Signature pad (untuk KTP-el) Unit 17.727.000
1 3 2 10 02 03 Scanner (untuk KTP-el) Unit 11.818.000
1 3 2 10 02 03 010 Keyboard (Peralatan Personal Komputer)
1 3 2 10 02 03 Keyboard Logitech Unit 212.700
1 3 2 10 02 03 011 CD Writter
1 3 2 10 02 03 CD RW 50 Pcs 700 MB Pcs 225.800
1 3 2 10 02 03 012 DVD Writer
1 3 2 10 02 03 DVD RW VERBATIM DVD -/+RW 4.7GB Spindle 10 Pcs Pcs 169.100

1 3 2 10 02 03 015 LAN Card


1 3 2 10 02 03 LAN CArd PCI-E x1, x4, x8, x16 cocok untuk Mikrotik/Linux, Unit 709.000
Windows, Vmware dan teaming diskless warnet
(ccboot/cyberindo)
1 3 2 10 02 03 016 External CD/ DVD Drive (ROM)
1 3 2 10 02 03 External CD/ DVD Drive (ROM) External CD DVD Player2. Color: Black3. Unit 688.900
Interface: USB3.04. Power: Powered by
USB5.Compatible Operation Systems:
Windows98/SE/ME/2000/XP/VISTA/Win7/Win8/
for MAC OS 8.6 and more7. Supportive Installing
Systems: XP, Win7, Win88. Suitable Range: PC,
Lap Top, Comprehensive Computer, Super PC,
Internet PC and disk reader9. Reading Speed:
DVD-ROM 8x; CD-ROM 24x10. Writing
Speeding: DVD-R; DVD R 8X; DVD-RW 4X; CD-
R 24X11. Supportive Disk Format: 12cm12.

1 3 2 10 02 03 017 External Floppy Disk Drive


1 3 2 10 02 03 External Floppy Disk Drive External Disk Usb Floppy Unit 353.500
1 3 2 10 02 03 Yahe 3.5 Eksternal USB FDD Drive Floppy Disk Unit 646.700
Portabel 1.44 MB 2HD untuk PC Windows
98/ME/2000/XP /VISTA/Windows 7/8/10, untuk
Mac. -Intl
1 3 2 10 02 03 018 External/ Portable Hardisk
1 3 2 10 02 03 External/ Portable Hardisk TOSHIBA Canvio Connect II Portable Hard Drive Unit 854.000
500GB
1 3 2 10 02 03 TOSHIBA Canvio Ready 3.0 Portable Hard Drive Unit 913.900
1TB
1 3 2 10 02 03 SEAGATE Backup Plus SLIM USB 3.0 2TB Unit 1.287.300
1 3 2 10 02 03 SEAGATE Backup Plus Portable USB 3.0 4TB Unit 2.241.400

1 3 2 10 02 03 SEAGATE Backup Plus Portable USB 3.0 5TB Unit 2.613.800

1 3 2 10 02 03 WD My Passport SSD 1TB Unit 5.347.200


1 3 2 10 02 03 Setara TOSHIBA dan SEAGATE 1 TB Unit 1.536.300
1 3 2 10 02 04 PERALATAN JARINGAN
1 3 2 10 02 04 001 Server
1 3 2 10 02 04 Server Komputer CISCO UCS Unit 84.469.000
1 3 2 10 02 04 Server Komputer HP DDR3-1333,DVD-ROM, GbE Unit 47.582.000
1 3 2 10 02 04 Server Komputer HP RDIMM DDR3-1333,DVD- Unit 59.692.000
1 3 2 10 02 04 Server Komputer HP ProLiant DL380eG8- Unit 41.376.000
1 3 2 10 02 04 Server KTP-el Set 94.544.000
1 3 2 10 02 04 UPS Server Set 53.181.000
1 3 2 10 02 04 UPS Set 3.545.000
1 3 2 10 02 04 Software anti virus server Set 8.095.300
1 3 2 10 02 04 Sistem operasi server Set 33.681.300
1 3 2 10 02 04 004 Modem
1 3 2 10 02 04 Modem MODEM USB TELKOMSEL FLASH 3G/HSDPA Unit 199.000
ALL GSM 28Mbps
1 3 2 10 02 04 MODEM FLASH TELKOMSEL 42MBPS Unit 241.300
1 3 2 10 02 04 PAKET MODEM 4G + ROUTER WIRELESS Unit 808.600
TP LINK 3420
1 3 2 10 02 04 MODEM WIFI 4G LTE TELKOMSEL FLASH Unit 411.500
1 3 2 10 02 04 TP-LINK N600 Wireless Dual Band Gigabit Unit 1.288.300
ADSL2+ Modem Router TD-W8980
1 3 2 10 02 04 028 KVM Keyboard Video Monitor
1 3 2 10 02 04 028 KVM Keyboard Video Monitor (KTP-el) 41.363.000
1 3 2 10 02 04 029 Mobile Modem GSM/ CDMA
1 3 2 10 02 04 Modem Wifi Telkomsel LTE 437.200
1 3 2 10 02 04 Huawei 707.800
1 3 2 18 RAMBU - RAMBU
1 3 2 18 01 RAMBU-RAMBU LALU LINTAS DARAT
1 3 2 18 01 02 RAMBU TIDAK BERSUAR
1 3 2 18 01 02 001 Rambu Jalan
1 3 2 18 01 02 Rambu Jalan Uk. 45 x 60 Pcs 230.400
1 3 2 18 01 02 Uk. 50 x 25 Pcs 112.200
1 3 2 18 01 02 Uk. 60 x 60 Pcs 289.500
1 3 2 18 01 02 Rambu Spanduk Minigasi DRK Unit 709.000
1 3 2 18 01 02 Rambu Petunjuk Jalan Unit 2.363.600
1 3 2 18 01 02
1 3 2 18 01 02 003 Rambu Cermin
1 3 2 18 01 02 003 Rambu cermin Unit 1.772.700
1 3 2 18 01 02 009 Rambu-rambu Petunjuk/Penuntun
1 3 2 18 01 02 Mata Kucing Buah 189.700
1 3 2 18 01 02 010 Guardrail
1 3 2 18 01 02 Guard rail beam 4,32 m Set 1.258.000
1 3 2 18 01 02 Guard rail beam 4,00 m Set 1.153.500
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 19 01 PERALATAN OLAH RAGA
1 3 2 19 01 PERALATAN OLAH RAGA
1 3 2 19 01 01 PERALATAN OLAH RAGA ATLETIK
1 3 2 19 01 01 001 Lempar Cakram
1 3 2 19 01 01 Lempar Cakram Cakram unit 46.000
1 3 2 19 01 01 002 Lempar Lembing
1 3 2 19 01 01 Lempar Lembing 1kg unit 46.000
1 3 2 19 01 01 003 Tolak Peluru
1 3 2 19 01 01 Tolak Peluru 1 Kg Buah 310.000
1 3 2 19 01 02 PERALATAN PERMAINAN
1 3 2 19 01 02 001 Alat Tenis Meja
1 3 2 19 01 01 Bed Pimpong Shield Buah 61.900
1 3 2 19 01 01 D-Hapines Buah 72.200
1 3 2 19 01 01 Meja Pimpong Dalam Negeri/Lokal(roda 8) Buah 2.579.500
1 3 2 19 01 01 Besi Net Tenis Meja unit 154.700
1 3 2 19 01 01 Net Pimpong Butterply unit 103.100
1 3 2 19 01 02 002 Alat Volley
1 3 2 19 01 01 Net Volly Net Volly GTO Buah 515.900
1 3 2 19 01 01 Net Volly Campur Buah 206.300
1 3 2 19 01 01 Net Volly Paradiso Buah 154.700
1 3 2 19 01 01 Net Volly Supra Buah 155.000
1 3 2 19 01 01 Net Volly Molten Buah 361.100
1 3 2 19 01 01 Tiang Net Volly Tiang Volly 3 Dem 1.065.000
1 3 2 19 01 02 004 Alat Badminton
1 3 2 19 01 01 Net - Yonga Buah 289.000
1 3 2 19 01 01 - Supra Buah 283.700
1 3 2 19 01 02 005 Sepatu Roda
1 3 2 19 01 02 Sepatu Roda Buah 1.324.800
1 3 2 19 01 02 009 Keranjang Bola/Ring
1 3 2 19 01 02 Ring Basket unit 206.300
1 3 2 19 01 02 Papan Ring Basket unit 309.500
1 3 2 19 01 02 013 Raket Tenis
1 3 2 19 01 02 Raket Tenis Head/Wilson Blx Buah 4.642.000
1 3 2 19 01 02 014 Raket Badminton
1 3 2 19 01 02 Raket Badminton Yonex Buah 361.100
1 3 2 19 01 02 Toalson Buah 722.200
1 3 2 19 01 02 Linniong Buah 515.900
1 3 2 19 01 02 015 Net Tenis
1 3 2 19 01 02 Net Tennis - Supra GTO Buah 929.000
1 3 2 19 01 02 016 Net Takrau
1 3 2 19 01 02 Net Tennis - Supra GTO Buah 929.000
1 3 2 19 01 02 017 Net Badminton
1 3 2 19 01 02 Net Badminton - Supra GTO Buah 283.700
1 3 2 19 01 06 PERALATAN OLAH RAGA LAINNYA
1 3 2 19 01 06 001 Catur
1 3 2 19 01 06 Catur - Kayu Ukuran Kecil Set 88.000
1 3 2 19 01 06 - Kayu Ukuran Besar Set 425.000
1 3 2 19 01 06 002 Sepeda Olah Raga
1 ASET
1 3 ASET TETAP
1 3 5 ASET TETAP LAINNYA
1 3 5 01 BAHAN PERPUSTAKAAN
1 3 5 02 02 ALAT BERCORAK KEBUDAYAAN
1 3 5 02 02 01 PAHATAN
1 3 5 02 02 01 001 Pahatan Batu
1 3 5 02 02 01 Pahatan batu 5 inchi Buah 62.000
1 3 5 02 02 01 002 Pahatan Kayu
1 3 5 02 02 01 Pahatan kayu set 160.000
1 3 5 02 03 TANDA PENGHARGAAN
1 3 5 02 03 01 TANDA PENGHARGAAN BIDANG OLAH RAGA
1 3 5 02 03 01 001 Piala
1 3 5 02 03 01 Piala Tropi 1 Part Buah 62.000
1 3 5 02 03 01 Tropi 2 Part Buah 73.000
1 3 5 02 03 01 Tropi 3 Part Buah 103.100
1 3 5 02 03 01 Tropi 2 Kaki Buah 284.000
1 3 5 02 03 01 Tropi 4 Kaki Buah 413.000
1 3 5 02 03 01 Tropy Piala peserta lomba Set 3.611.300
1 3 5 02 03 01 Tropy Piala peserta lomba Set 3.611.300
1 3 5 02 03 01 Piagam + Figura Set 61.900
1 3 5 02 03 01 Simbolis hadiah voucher lomba foto Setreoform Set 51.500
1 3 5 02 03 01 Tropy (Piala bergilir) lomba memasak berbahan serba ikan Buah 2.579.500

1 3 5 02 03 01 Tropy (Piala bergilir) lomba memasak berbahan serba ikan

- Juara I,II,III Menu keluarga 3.611.300


- Juara I,II,III Menu balita 3.611.300
- Juara I,II,III Menu Kudapan 3.611.300
1 3 5 02 03 01 Tropy (Piala bergilir) lomba peternak dan ternak Buah 2.579.500
terbaik/kontes ternak
1 3 5 02 03 01 Plakat (Piala bergilir) lomba peternak dan ternak Buah 1.857.200
terbaik/kontes ternak
1 3 5 02 03 01 002 Medali
1 3 5 02 03 01 Medali Buah 250.000
1 3 5 02 03 01 003 Piagam
1 3 5 02 03 01 Piagam kertas+Disain+cetak Lembar 26.000
1 3 5 02 03 01 Sertfikat Peserta lomba masak berbahan serba ikan Buah 51.500
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 5 02 03 01 Simbolis hadiah voucher lomba foto Setreoform Set 51.500
1 3 5 02 03 01 004 Cinderamata
1 3 5 02 03 01 Cinderamata pisah sambut Emas putih 22 karat, permata berlian Set 10.318.000
1 3 5 02 03 01 Plakat type biasa Hand made, kotak warna kuning, kombinasi Set 773.800
orange, merah, biru, cream, motif benang emas,
bahan kain songket, uk.17 cm x 19 cm, plakat
bahan acrilic 3mm, lambang Kabupaten Siak,
motif pucuk rebung dan tulisan kenang-
kenangan dari Kabupaten Siak

1 3 5 02 03 01 Lukisan Sultan Siak Hand Made, Bingkai warna silver, bahan kain Set 1.547.700
kanvas, cat, acrilic; warna, uk. 40 cm x 60 cm,
motif lukisan Sultan Siak Ke XII
1 3 5 02 03 01
1 3 5 03 HEWAN
1 3 5 03 02 TERNAK
1 3 5 03 02 01 TERNAK POTONG
1 3 5 03 02 02 TERNAK PERAH
1 3 5 03 02 02 001 Sapi Perah
1 3 5 03 02 02 Daging Sapi Murni Daging dan Tulang Kg 175.000
1 3 5 03 02 03 TERNAK UNGGAS
1 3 5 03 02 03 001 Ayam
1 3 5 03 02 03 Ayam Kampung Hidup Sehat Kg 41.000
1 3 5 03 02 03 Ayam Potong Segar dan bersih Kg 32.000
1 3 5 04 BIOTA PERAIRAN
1 3 5 04 01 IKAN BERSIRIP (PISCES/IKAN BERSIRIP)
1 3 5 04 01 01 IKAN BUDIDAYA
1 3 5 04 01 01 001 Ikan Air Tawar Budidaya
1 3 5 04 01 01 Ikan Mas Segar Kg 29.000
1 3 5 04 01 01 Ikan Mujair Segar dan bersih Kg 32.000
1 3 5 04 01 01 002 Ikan Air Laut Budidaya
1 3 5 04 01 01 Ikan Bandeng Segar Kg 51.000
1 3 5 04 01 01 Ikan kembung Segar dan bersih Kg 46.000
1 3 5 04 01 01 Ikan Tongkol Segar Kg 44.000
1 3 2 07 ALAT KEDOKTERAN DAN KESEHATAN
1 3 2 07 01 ALAT KEDOKTERAN
1 3 2 07 01 01 ALAT KEDOKTERAN UMUM
1 3 2 07 01 01 001 Sterilisator
1 3 2 07 01 01 Sterilisator 2 Pintu Fortune Kode : ZTP-78E unit 1.702.000
1 3 2 07 01 01 SterilisatSterilisator 2 Pintu Fortune or Kering 2 Pintu Kode : Corona ZTP80A unit 1.888.000
1 3 2 07 01 01 002 Minor Surgical Set (Alat Kedokteran Umum)
1 3 2 07 01 01 Minor Surgery Set Renz RENZ German 15 item set 423.000
1 3 2 07 01 01 Minor Surgery Set 12 item set 258.000
1 3 2 07 01 01 003 Diagnostik Set
1 3 2 07 01 01 Diagnostik set set 991.000
1 3 2 07 01 01 004 Stetoscope
1 3 2 07 01 01 Stetoscope Dual Head Deluxe GEA dewasa Stetoscope Dual Head Merk GEA, type Deluxe unit 135.000

1 3 2 07 01 01 Stetoskop Riester Dewasa Riester Dewasa Deplux / Stetoscope Riester unit 480.000
1 3 2 07 01 01 Stetoskop Littmann Bisa digunakan untuk dewasa dan anak Stetoskop / stetoscope Classic III Hunter Green unit 1.393.000
littman
1 3 2 07 01 01 Stetoskop Anak Berkarakter Toonscope - Kids Stetoscope unit 362.000
1 3 2 07 01 01 005 TensiMeter
1 3 2 07 01 01 TensiMeter OMRON Hem 8712 Digital / cek tekanan darah / unit 630.000
tensi darah
1 3 2 07 01 01 TensiMeter Omron HEM 7130 unit 681.000
1 3 2 07 01 01 TensiMeter Digital MEDIDOCTORS Automatic Blood Pressure unit 413.000
Monitor
1 3 2 07 01 01 007 Head Lamp (Alat Kedokteran Umum)
1 3 2 07 01 01 Headlamp Dokter THT Merk Ryne Made in jerman Senter Kepala Listrik unit 774.000
+ Baterai charge
1 3 2 07 01 01 Headlamp Dokter THT magnifying glass 9892 B unit 258.000
1 3 2 07 01 01 008 Waskom
1 3 2 07 01 01 Waskom 22 cm stainless steel unit 47.000
1 3 2 07 01 01 Waskom bengkok 23 cm Nerbeken unit 57.000
1 3 2 07 01 01 Waskom Cucing Com Kom Waskom Baskom Tutup unit 114.000
Stainless Steel Utk Kapas Alkohol
1 3 2 07 01 01 009 Timbangan Badan
1 3 2 07 01 01 Timbangan Smic Timbangan Tinggi Badan SMIC ZT-120 unit 2.062.000
1 3 2 07 01 01 Timbangan Badan Manual Gea BR2015 unit 145.000
1 3 2 07 01 01 Timbangan Badan Digital Kriss menggunakan baterai 2 x AAA unit 351.000
1 3 2 07 01 01 Timbangan Badan Digital Multi Fungsi 6 In 1 Universal unit 609.000
1 3 2 07 01 01 Timbangan Badan Injak unit 609.000
1 3 2 07 01 01 010 Timbangan Bayi
1 3 2 07 01 01 Timbangan Bayi Digital Onemed - OD231B / OD-231B unit 714.000
1 3 2 07 01 01 Timbangan Bayi Digital OneMed OD231-B unit 1.238.000
1 3 2 07 01 01 Timbangan Bayi Digital SERENITY SR-30D unit 1.078.000
1 3 2 07 01 01 Timbangan Bayi Digital Laica Multiwarna Made in italy unit 2.579.000
1 3 2 07 01 01 Timbangan Bayi manual Gea / Baby Scale unit 460.000
1 3 2 07 01 01 011 Kocher
1 3 2 07 01 01 Kocher Bengkok 14cm unit 47.000
1 3 2 07 01 01 Setengah Kocher 16 Cm Jmc Japan/ 1/2 Kocher/ Instrumen unit 57.000
Pemecah Ketuban
1 3 2 07 01 01 Kocher Lurus 14cm steinless steel unit 37.000
1 3 2 07 01 01 kocer bengkok, klaim kocer Renz ukuran 20cm unit 485.000
1 3 2 07 01 01 Koher Lurus, pean, Klem Kocher Renz 26/ 27/26,5 cm /26cm/26,5cm /27cm unit 929.000
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 07 01 01 012 Metal Chatheeter
1 3 2 07 01 01 Metal chatheter Urin Cateter Besi stainless steel Catheter Urine unit 47.000
12 FR
1 3 2 07 01 01 014 Anaromische Pinset
1 3 2 07 01 01 Pinset Anatomis Untuk Perawat Multiwarna ID15EPD-Noi unit 47.000
1 3 2 07 01 01 Pinset Anatomis Pinset Anatomis Renz 18 cm Anatomys Pinset Anatomis Renz 18 cm Anatomys Anatomi unit 217.000
Anatomi dressing forcep Renz dressing forcep Renz
1 3 2 07 01 01 Pinset Anatomis Renz 25 cm / 26 cm Anatomical anatomi unit 475.000
Dressing Forcep
1 3 2 07 01 01 Pinset Anatomis Renz 30 cm 31 cm Anatomical anatomi Dressing unit 578.000
Forcep
1 3 2 07 01 01 Pinset 18 cm unit 106.300
1 3 2 07 01 01 Pinset 14 cm unit 82.700
1 3 2 07 01 01 016 Naalvoeder
1 3 2 07 01 01 Nald voeder 14 cm / needle holder 14 cm / nal fuder 14cm / unit 37.000
nal puder
1 3 2 07 01 01 Nald Voeder Merk Renz 20 cm mayo Hegar nald vuder unit 155.000
Nalvuder
1 3 2 07 01 01 Nald voeder Merk Saffa 14 Cm unit 26.000
1 3 2 07 01 01 Nald Voeder Merk : Renz Made in : Germany Alat Operasi unit 1.599.000
Klem Gunting Bedah
1 3 2 07 01 01 018 Instrumen Cabinet
1 3 2 07 01 01 Ailite Dry Cabinet Dry Box GD2-60 60L-Dehumidifier 20% -60% - unit 2.744.000
Teknologi TECOOLING refrigeration -
Sensitivitas tinggi
1 3 2 07 01 01 Ailite Dry Cabinet Dry Box G-120 120L - Dehumidifier 20% -60%- unit 4.333.000
Teknologi TECOOLING refrigeration- 4mm
ketebelan kaca- Sensitivitas tinggi
1 3 2 07 01 01 025 Ambubag
1 3 2 07 01 01 AmbuBag Merk Nesco Mrm PVC (Dewasa,anak,bayi) set 207.000
1 3 2 07 01 01 ambubag Manual silicone set 542.000
1 3 2 07 01 01 047 Centrifuge
1 3 2 07 01 01 Centrifuge Centrifuge tubes 50 mL – tabung sentrifuse 50 unit 227.000
mL with sealing point
1 3 2 07 01 01 Tabung sentrifuse. ASTM centrifuge Tube. ASTM D91. Tabung sentrifuse. ASTM D91ASTM centrifuge unit 2.063.000
Conical bottom tubes. cylindrical, conical bottom ASTM D
91.Brand Cat No. : 3620-38 Length max. 203
mm,
1 3 2 07 01 01 Centrifuge Digital Made in China Tabung sentrifuse. ASTM D91 unit 13.823.000
1 3 2 07 01 01 049 Clinical ThermoMeter (Alat Kedokteran Umum)
1 3 2 07 01 01 Clinical Armpit THERMOMeter Display range: 36 C, 37 C, 38 C, 39 C, 40 unit 21.000
C Resolution: 1 C / 1.
1 3 2 07 01 01 Clinical ThermoMeter IQ BabyTermoMeter Bayi Infrared (IQ- Pengukuran telinga dan dahi - Pengukuran unit 558.000
809) denyut jantung - Pengukuran suhu ruangan -
Tampilan tanggal - 30 set kapasitas memori-
Fungsi berbicara- Konversi Celsius/Fahrenheit
1 3 2 07 01 01 050 Co2 Analyzer
1 3 2 07 01 01 CO2 Analyzer Alat Detektor O2 Meter Gas Detector Analyzer unit 4.653.000
Carbon Dioxide
1 3 2 07 01 01 CO2 Analyzer Digital CO2 Carbon Dioxide Gas Karbon 5.364.000
Dioksida Monitor Analyzer HT2000
1 3 2 07 01 01 118 Pulse OxiMeter
1 3 2 07 01 01 Pulse OxiMeter Finger Pulse Blood Oxygen Spo2 Monitor AccuMed CMS-50DL Pulse OxiMeter Finger unit 465.000
Pulse Blood Oxygen SpO2 Monitor w/Carrying
case, Landyard Silicon Case & Battery

1 3 2 07 01 01 Pulse OxiMeter Rotated OLED Layar Light ACurio AS-301 Finger unit 434.000
1 3 2 07 01 01 Pulse OxiMeter Oximetry Blood Oxygen Bluetooth Fingertip Pulse OxiMeter Oximetry unit 774.000
Blood Oxygen Saturation Monitor and Pulse Rate
Monitor for Apple and Android
1 3 2 07 01 01 Pulse oxiMeter Rotatable OLED Layar Acurio AS-301 Finger unit 434.000
1 3 2 07 01 01 119 Reflex Hammer (Alat Kedokteran Umum)
1 3 2 07 01 01 Reflex Hammer Berliner Riester unit 480.000
1 3 2 07 01 01 Reflex Hammer Multifunction Neurological Reflex Hammer unit 124.000
Percussor with Brush Pin
1 3 2 07 01 01 Reflex Hammer Neurological unit 114.000
1 3 2 07 01 01 Reflex Hammer Palu Reflek Hamer Reflek Hammer Reflex unit 542.000
Segitiga Kapak Berliner Riester
1 3 2 07 01 01 120 Respirator (Alat Kedokteran Umum)
1 3 2 07 01 01 Masker Respirator NP 306 Double Filter RC 203 Anti Asap. Debu unit 83.000
Dan Chemical
1 3 2 07 01 01 Masker Respirator NP 305 SINGLE Filter RC 203 Anti Asap. Debu unit 78.000
Dan Chemical
1 3 2 07 01 01 Masker Respirator Full Face Safety Industrial Gas Mask Complete unit 723.000

1 3 2 07 01 01 126 Kursi Roda


1 3 2 07 01 01 Kursi Roda GEA FS609 unit 1.707.700
1 3 2 07 01 01 Kursi Roda 3 in 1 FS 609GC unit 2.438.000
1 3 2 07 01 01 Kursi Roda Kawamura Jepang - Rollator Wheelchair unit 9.265.300
Convertible
1 3 2 07 01 01 Kursi Roda Kawamura KA6 - Kursi Roda Travel unit 8.045.600
1 3 2 07 01 01 Kursi Roda Gea FS 868 unit 2.377.700
1 3 2 07 01 01 Kursi Roda Siwa - Kursi Roda 4 in 1 Avico (Besi) unit 4.145.700
1 3 2 07 01 01 132 Suction Pump
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 07 01 01 Suction Pump Thomas 1632GL Capacity: Plastic Bottle cc/Type unit 5.674.000
1200cc/Autoclavable Glass Bottle GL cc/Type
800cc/Autoclavable Service-free Life: 5000-8000
Hours Vacuum Pump Type: Oil-less Diaphragm

1 3 2 07 01 01 Suction Pump Apparatus 2 Tabung YX930D. Botol suction unit 4.642.000


overflow automatic cut off system, tekanan vakum
dapat dikontrol secara opsional dari 0,02 sampai
0,09 Mpa 150 ~ 680mmHg
1 3 2 07 01 01 Suction Pump Portable GC Power Supply: AC 220-+10% unit 2.373.000
Frekwensi: 50Hz-+2% Noise: 65dB Suction
Rote: 18L/min7E-A
1 3 2 07 01 01 Suction Pump azumi Tegangan : AC220V 50Hz Max nilai unit 2.115.000
tekanan negatif e 0.075MPa Volume Reservoir :
e 1000ml
1 3 2 07 01 01 Suction Pump General Care-SB2209T GC-071Jenis : Suction unit 2.682.000
Pump ApparatusTipe : Penyedot Reak

1 3 2 07 01 01 143 Syringe Pump (Alat Kedokteran Umum)


1 3 2 07 01 01 Syringe Pump Terumo, TE-331 unit 8.459.000
1 3 2 07 01 01 Syringe Pump TERUMO TE-332 USED unit 8.768.000
1 3 2 07 01 01 Syringe Pump Aitecs SP-10S unit 8.871.000
1 3 2 07 01 01 Syringe Pump ARGUS 606S unit 12.636.000
1 3 2 07 01 01 Syringe Pump SK 500 II Mindray unit 12.378.000
1 3 2 07 01 01 144 Temperatur Monitor
1 3 2 07 01 01 Lutron MHT-381SD Humidity / Temperature unit 3.250.000
Monitor Temperatur Alat Ukur Kelembaban Suhu
Digital Akurasi Akurat Presisi ASLI MHT381SD
Original MHT 381SD
1 3 2 07 01 01 152 USG
1 3 2 07 01 01 USG GE Voluson 730Pro kelengkapan : Probe 4D 448.703.000
Probe Convex Probe transvaginal Printer B/W
sony Printer color selphy
1 3 2 07 01 01 USG SG 4 Dimensi Main Unit 4D Probe Transvaginal 216.615.000
Probe Trolly Printer Canon LED TV dan UPS

1 3 2 07 01 01 154 UV Sterilizer
1 3 2 07 01 01 Uv sterilizer 1.599.000
1 3 2 07 01 01 Uv sterilizer Coby 2.476.000
1 3 2 07 01 02 ALAT KEDOKTERAN GIGI
1 3 2 07 01 02 022 Amalgamator
1 3 2 07 01 02 Amalgamator malgamator RockMix unit 9.851.000
1 3 2 07 01 02 Amalgamator Dental HL-AH G8 NV-907 unit 3.198.000
1 3 2 07 01 02 030 Bond Seater
1 3 2 07 01 02 Band Seater Mk. 556 Pembersih Penghilang Sisa Lem unit 155.000
Penekan Molar Band Dental Instrument gigi
1 3 2 07 01 02 031 Boor Gigi
1 3 2 07 01 02 Boor Gigi Micromotor Mikromotor Bor Gigi unit 2.786.000
1 3 2 07 01 02 134 Distal End Cutter
1 3 2 07 01 02 Distal End Cutter Distal End Cutter Made In Usa unit 1.341.000
1 3 2 07 01 02 Distal End Cutter Distal end Wire cutter SS Germany. unit 465.000
1 3 2 07 01 02 Distal End Cutter Merk Compact Tang Potong Kawat Behel Gigi unit 465.000

1 3 2 07 01 01 ALAT KEDOKTERAN KELUARGA BERENCANA


1 3 2 07 01 01 002 Tromol Gaas
1 3 2 07 01 01 Rrc Ss Tromol Gaas Dressing Drum Dia 18cmx20 unit 287.000
1 3 2 07 01 01 005 Uterin Dressing
1 3 2 07 01 01 Uterine Dressing Forcep Marwa 25 Cm unit 83.000
1 3 2 07 01 01 Uterine Dressing Forceps Klem Uterus 25cm Jerman Korentang unit 124.000
Lurus MAIER
1 3 2 07 01 01 Uterine Dressing MERK : Forceps Renz Klem Uterus 25cm unit 300.000
Korentang Lurus MAIER
1 3 2 07 01 03 006 Speculum
1 3 2 07 01 03 Speculum Vagina Steril Disposible Plastik Cocor Bebek unit 26.000
1 3 2 07 01 03 Speculum Cocor Bebek Merk Marwa Size L unit 114.000
1 3 2 07 01 4 ALAT KEDOKTERAN BEDAH
1 3 2 07 01 04 001 Minor Surgeri Set
1 3 2 07 01 04 Minor Set Or Minor Surgery Lengkap Set 351.000
1 3 2 07 01 04 Minor Set Hecting Set Minor Surgery Set Sirkum Set Lengkap Set 568.000
Lengkap 17itm
1 3 2 07 01 04 Minor Set Or Minor Surgery Lengkap Set 465.000
1 3 2 07 01 04 013 Electro Surgery Unit
1 3 2 07 01 04 Electro Surgery Unit Alsa Italy alat electro cauter unit, merk Alsa italy. tersedia unit 27.851.000
150 Watt dan 350 Watt monopolar dan bipolar

1 3 2 07 01 04 Electro Surgery Unit DOCTANZ 400 WATT unit 58.796.000


1 3 2 07 01 04 018 Colposcope (Alat Kedokteran Bedah)
1 3 2 07 01 04 Colposcope LED Light Source Microscope COP.33.JII-L unit 71.174.000
1 3 2 07 01 04 031 Anuscopy Set
1 3 2 07 01 04 Anuscope Kelly 22x100 Size M RENZ Set 1.238.000
1 3 2 07 01 04 Anoscope Saffa Alat Anuscopy Pemeriksaan Kolon S M L Set 516.000

1 3 2 07 01 04 Anoscope Anoscope Hirschman S Kecil Alat Anoscopy Set 1.135.000


Anuskopi
1 3 2 07 01 04 038 Biopsi Tang
1 3 2 07 01 04 Biopsi Tang tang biopsy made in pakistan bahan stenliss Set 1.135.000
1 3 2 07 01 04 045 Canule
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 3 2 07 01 04 005 NASAL CANULE DEWASA-SELANG OKSIGEN DEWASA- Set 16.000
SELANG O2
1 3 2 15 03 02 005 Tenda
1 3 2 15 03 02 Tenda pos jaga Rangka pipa besi, kain terpal standar TNI, Logo Set 5.066.900
dan tulisan SATPOL - PP sablon/printing, uk. 2,5
x3
1 3 2 15 03 02 Tenda regu Rangka pipa besi, kain terpal standar TNI, Logo Set 10.495.800
dan tulisan SATPOL - PP sablon/printing, uk. 4 x
6
1 3 2 15 03 02 Tenda Pleton Rangka pipa besi, kain terpal standar TNI, Logo Set 18.096.300
dan tulisan SATPOL - PP sablon/printing, uk. 6 x
14
1 5 ASET LANCAR
1 5 2 KEMITRAAN DENGAN PIHAK KETIGA
1 5 2 01 KEMITRAAN DENGAN PIHAK KETIGA
1 5 2 01 01 KEMITRAAN DENGAN PIHAK KETIGA
1 5 2 01 01 01 SEWA
1 5 2 01 01 01 001 Sewa Tanah
1 5 2 01 01 01
1 5 2 01 01 01 002 Sewa Peralatan dan Mesin
1 5 2 01 01 01 Sewa tenda dan Kelengkapan acara pekan panutan PBB Kegiatan 23.636.000
1 5 2 01 01 01 Sewa Sound system dan orgen tunggal Kec 4.136.300
0 5 2 01 01 01 Sewa Sound Set 4.727.200
1 5 2 01 01 01 Sewa Sound 20.000 watt Kegiatan 23.636.000
1 5 2 01 01 01 15.000 wat Kegiatan 17.727.000
1 5 2 01 01 01 10.000 wat Kegiatan 11.818.000
1 5 2 01 01 01 5.000 watt Kegiatan 5.909.000
1 5 2 01 01 01 Kursi sofa VIP Unit 147.700
1 5 2 01 01 01 Meja sofa VIP Unit 177.200
1 5 2 01 01 01 Kursi furtura sampul Unit 17.700
1 5 2 01 01 01 Kursi furtura tidak sampul Unit 11.800
1 5 2 01 01 01 Kursi plastik sampul Unit 9.400
1 5 2 01 01 01 Kursi plastik tidak sampul Unit 8.200
1 5 2 01 01 01 Meja hidang Unit 354.500
1 5 2 01 01 01 Meja bulat Unit 354.500
1 5 2 01 01 01 Ambal Unit 236.300
1 5 2 01 01 01 Karpet Permeter 23.600
1 5 2 01 01 01 Kipas blower Unit 590.900
1 5 2 01 01 01 Floring (lantai tenda) Permeter 59.000
1 5 2 01 01 01 Meja prasasti Unit 354.500
1 5 2 01 01 01 Dekor Permeter 35.400
1 5 2 01 01 01 Pagar stainless steel Set 1.772.700
1 5 2 01 01 01 Sewa pakain adat Komplit Set 413.600
1 5 2 01 01 01 Sewa pakain melayu Set 295.400
1 5 2 01 01 01 Sewa bus Jemput antar dari bandara - Siak PP Hari 3.545.400
1 5 2 01 01 01 Siak - Pekanbaru Hari 1.772.700
1 5 2 01 01 01 Sewa mobil Hari 827.200
1 5 2 01 01 01 Sewa mobil Bulan 11.227.100
1 5 2 01 01 01 Sewa sofa dan perlengkapan Unit 1.004.500
1 5 2 01 01 01 Sewa meja panjang Unit 413.600
1 5 2 01 01 01 Sewa kamera Unit 4.136.300
1 5 2 01 01 01 Asphalt mixing plant T/Jam 9.546.053
1 5 2 01 01 01 Asphalt finisher Ton 906.532
1 5 2 01 01 01 Asphalt sprayer Liter 152.211
1 5 2 01 01 01 Bulldozer 100-150 hp 867.601
1 5 2 01 01 01 Compressor 4000-6500 l\m CPM/(L/m) 271.087
1 5 2 01 01 01 Concrete mixer 0.3-0.6 m3 Liter 116.697
1 5 2 01 01 01 Crane 10-15 ton Ton 584.348
1 5 2 01 01 01 Dump truck 3.5 ton Ton 417.072
1 5 2 01 01 01 Dump truck 8 ton Ton 422.316
1 5 2 01 01 01 Excavator 80-140 hp M3 585.930
1 5 2 01 01 01 Pick up ton 287.636
1 5 2 01 01 01 Generator set KVA 656.806
1 5 2 01 01 01 Motor grader >100 hp Jam 635.328
1 5 2 01 01 01 Track loader 75-100 hp M3 339.731
1 5 2 01 01 01 Wheel loader 1.0-1.6 m3 M3 569.665
1 5 2 01 01 01 Three wheel roller 6-8 t Ton 408.484
1 5 2 01 01 01 Tandem roller 6-8 t Ton 408.484
1 5 2 01 01 01 Tire roller 8-10 t Ton 408.484
1 5 2 01 01 01 Vibratory roller 5-8 t Ton 446.352
1 5 2 01 01 01 Concrete vibrator Jam 68.295
1 5 2 01 01 01 Stone crusher T/Jam 1.238.938
1 5 2 01 01 01 Water pump 70-100 mm Jam 71.972
1 5 2 01 01 01 Truck tangki 3000-4500 l Liter 334.685
1 5 2 01 01 01 Pedestrian roller Ton 103.913
1 5 2 01 01 01 Tamper Ton 68.788
1 5 2 01 01 01 Jack hammer Jam 60.883
1 5 2 01 01 01 Fulvi mixer Jam 1.157.778
1 5 2 01 01 01 Concrete pump M3 390.149
1 5 2 01 01 01 Trailer 20 ton Ton 792.813
1 5 2 01 01 01 Pile driver + hammer Ton 493.079
1 5 2 01 01 01 Crane on track 35 ton Ton 537.679
1 5 2 01 01 01 Welding set Amp 156.998
1 5 2 01 01 01 Bore pile machine Meter 885.159
1 5 2 01 01 01 Asphalt liquid mixer Liter 98.327
1 5 2 01 01 01 Tronton Ton 666.785
1 5 2 01 01 01 Cold milling m 1.782.259
DAFTAR STANDAR SATUAN HARGA (SSH)
A K J O RO SRO SSRO SPESIFIKASI SATUAN HARGA 2019
(Rp)
1 5 2 01 01 01 Rock drill breaker Jam 340.625
1 5 2 01 01 01 Cold recycler M 6.559.889
1 5 2 01 01 01 Hot recycler M 7.464.752
1 5 2 01 01 01 Aggregat (chip) spreader M 642.928
1 5 2 01 01 01 Asphalt distributor Liter 445.898
1 5 2 01 01 01 Slip form paver M 623.081
1 5 2 01 01 01 Concrete pan mixer Liter 763.426
1 5 2 01 01 01 Concrete breaker m3/jam 1.001.454
1 5 2 01 01 01 Aspahlt tanker liter 687.903
1 5 2 01 01 01 Cement tanker liter 616.623
1 5 2 01 01 01 Condrete mixer (350) liter 111.000
1 5 2 01 01 01 Vibrating rammer KG 72.338
1 5 2 01 01 01 Truk mixer (agitator) M3 752.434
1 5 2 01 01 01 Bore pile machine CM 736.316
1 5 2 01 01 01 Crane on track 75-100 ton Ton 736.195
1 5 2 01 01 01 Blending equipment Ton 274.311
1 5 2 01 01 01 Asphalt liquid mixer Liter 183.726
1 5 2 01 01 01 Bar bender Jam 36.186
1 5 2 01 01 01 Bar cutter Jam 36.186
1 5 2 01 01 01 Breaker m3/jam 245.506
1 5 2 01 01 01 Grouting pump Ton 294.516
1 5 2 01 01 01 Jack hidrolic Ton 56.816
1 5 2 01 01 01 Mesin las Ton 58.542
1 5 2 01 01 01 Pile driver leader, 75 kw kw 221.000
1 5 2 01 01 01 Pile hammer Jam 79.726
1 5 2 01 01 01 Pile hammer, 2,5 ton Ton 51.915
1 5 2 01 01 01 Stressing jack Ton 267.560
1 5 2 01 01 01 Welding machine, 300 a Jam 61.717
1 5 2 01 01 01 Alat bantu Ls 500
1 5 2 01 01 01 003 Sewa Gedung dan Bangunan
1 5 2 01 01 01 Tenda datar 5 x 6 m Semi balon Permeter 47.200
1 5 2 01 01 01 4x6m Permeter 53.100
1 5 2 01 01 01 4 x 6 m Semi balon Permeter 47.200
1 5 2 01 01 01 Tenda kerucut 5 x 5 m Semi balon Permeter 59.000
1 5 2 01 01 01 3 x 3 m Balon Unit 413.600
1 5 2 01 01 01 Pentas podium 4x6m Permeter 1.772.700
1 5 2 01 01 01 Pentas kerucut podium 5x5m Set 2.954.500
1 5 2 01 01 01 Pentas podium 3x3m Set 649.900
1 5 2 01 01 01 Panggung (pentas) VIP Permeter 177.200
1 5 2 01 01 01 Sewa rumah Tahun 17.727.000
1 5 2 01 01 01 Sewa ruko/Kantor/Gudang Tahun 29.545.000

BUPATI SIAK

ALFEDRI
LAMPIRAN II : Keputusan Bupati Siak
Nomor : /HK/KPTS/2019
Tanggal : September 2019

DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,400 157.248 62.899,20
Tukang Kayu L.02.04 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,020 200.448 4.008,96
JUMLAH TENAGA KERJA 108.933,12
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1,250 20.000 25.000,00
Semen portland Kg 5,000 1.592 7.960,00
Pasir beton m3 0,005 436.200 2.181,00
Koral beton m3 0,009 467.400 4.206,60
Kayu 5/7 m3 0,072 3.200.000 230.400,00
Paku biasa Kg 0,060 21.200 1.272,00
Residu Liter 0,400 15.680 6.272,00
JUMLAH HARGA BAHAN 277.291,60
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 386.224,72
E Overhead & Profit 10% 0,100 38.622,47
F Harga Satuan Pekerjaan (D+E) - 424.847,00

(K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Kayu L.02.04 OH 0,400 190.080 76.032,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,020 200.448 4.008,96
JUMLAH TENAGA KERJA 115.499,52
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1,250 20.000 25.000,00
Semen portland Kg 2,500 1.592 3.980,00
Seng gelombang Lbr 1,200 47.000 56.400,00
Pasir beton m3 0,005 436.200 2.181,00
Koral beton m3 0,009 467.400 4.206,60
Kayu 5/7 m3 0,072 3.200.000 230.400,00
Paku biasa Kg 0,060 21.200 1.272,00
Meni besi Liter 0,450 28.850 12.982,50
JUMLAH HARGA BAHAN 336.422,10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 451.921,62
E Overhead & Profit 10% 0,100 45.192,16
F Harga Satuan Pekerjaan (D+E) - 497.113,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Kayu L.02.04 OH 0,300 190.080 57.024,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,020 200.448 4.008,96
JUMLAH TENAGA KERJA 96.491,52
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1,000 20.000 20.000,00
Semen portland Kg 2,000 1.592 3.184,00
Kawat duri M’ 25,000 134.000 3.350.000,00
Pasir beton m3 0,005 436.200 2.181,00
Koral beton m3 0,009 467.400 4.206,60
Paku biasa 2” - 5” Kg 0,060 21.200 1.272,00
JUMLAH HARGA BAHAN 3.477.335,12
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3.525.580,88
E Overhead & Profit 10% 0,100 352.558,09
F Harga Satuan Pekerjaan (D+E) - 3.878.138,00

Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang Kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 37.739,52
B BAHAN - -
Kayu balok 5/7 m3 0,120 3.200.000 384.000,00
Paku 2”-3” Kg 0,020 21.200 424,00
Kayu papan 3/20 m3 0,007 3.200.000 22.400,00
JUMLAH HARGA BAHAN 466.578,24
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 474.440,64
E Overhead & Profit 10% 0,100 47.444,06
F Harga Satuan Pekerjaan (D+E) - 521.884,00

(K3) Pembuatan 1 m2 kantor sementara lantai plesteran


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2,000 157.248 314.496,00
Tukang Kayu L.02.04 OH 2,000 190.080 380.160,00
Tukang batu L.02.03 OH 1,000 190.080 190.080,00
Kepala Tukang L.03.01 OH 0,300 200.448 60.134,40
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 954.892,80
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1,250 20.000 25.000,00
Kayu balok 5/7 m3 0,180 3.200.000 576.000,00
Paku biasa Kg 0,080 21.200 1.696,00
Besi strip Kg 1,100 15.750 17.325,00
Semen portland Kg 35,000 1.592 55.720,00
Pasir pasang m3 0,150 361.300 54.195,00
Pasir beton m3 0,100 436.200 43.620,00
Koral beton m3 0,150 467.400 70.110,00
Bata merah Bh 30,000 800 24.000,00
Seng plat Lbr 0,250 23.000 5.750,00
Jendela naco Bh 0,200 80.400 16.080,00
Kaca polos m2 0,080 103.600 8.288,00
Kunci tanam Bh 0,150 323.000 48.450,00
Plywood 4 mm Lbr 0,060 80.000 4.800,00
JUMLAH HARGA BAHAN 221.098,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.540.958,80
E Overhead & Profit 10% 0,100 154.095,88
F Harga Satuan Pekerjaan (D+E) - 1.695.054,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang Kayu L.02.04 OH 1,500 190.080 285.120,00
Kepala tukang L.03.01 OH 0,150 200.448 30.067,20
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 482.457,60
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 3,000 20.000 60.000,00
Kayu m3 0,276 3.200.000 883.200,00
Paku biasa Kg 0,700 21.200 14.840,00
Seng gelombang Lbr 1,500 47.000 70.500,00
JUMLAH HARGA BAHAN 1.028.540,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.510.997,60
E Overhead & Profit 10% 0,100 151.099,76
F Harga Satuan Pekerjaan (D+E) - 1.662.097,00

(K3) Pembuatan 1 m2 gudang semen dan peralatan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang Kayu L.02.04 OH 2,000 190.080 380.160,00
Kepala Tukang L.03.01 OH 0,200 200.448 40.089,60
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 587.520,00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1,700 20.000 34.000,00
Kayu m3 0,210 3.200.000 672.000,00
Paku biasa Kg 0,300 21.200 6.360,00
Semen portland Kg 10,500 1.592 16.716,00
Pasir beton m3 0,030 436.200 13.086,00
Koral beton m3 0,050 467.400 23.370,00
Seng gelombang Lbr 1,500 47.000 70.500,00
Seng plat Lbr 0,250 23.000 5.750,00
JUMLAH HARGA BAHAN 129.422,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.073.122,00
E Overhead & Profit 10% 0,100 107.312,20
F Harga Satuan Pekerjaan (D+E) - 1.180.434,00

(K3) Pembuatan 1 m2 bedeng pekerja


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang Kayu L.02.04 OH 2,000 190.080 380.160,00
Kepala Tukang L.03.01 OH 0,200 200.448 40.089,60
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 587.520,00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1,250 20.000 25.000,00
Kayu m3 0,186 3.200.000 595.200,00
Paku biasa Kg 0,300 21.200 6.360,00
Semen portland Kg 18,000 1.592 28.656,00
Pasir beton m3 0,030 436.200 13.086,00
Koral beton m3 0,050 467.400 23.370,00
Seng gelombang Lbr 1,500 47.000 70.500,00
Plywood 4 mm Lbr 1,350 80.000 108.000,00
JUMLAH HARGA BAHAN 243.612,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.144.412,00
E Overhead & Profit 10% 0,100 114.441,20
F Harga Satuan Pekerjaan (D+E) - 1.258.853,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 25.747,20
B BAHAN -
JUMLAH HARGA BAHAN
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 25.747,20
E Overhead & Profit 10% 0,100 2.574,72
F Harga Satuan Pekerjaan (D+E) - 28.321,00

(K3) Pembuatan 1 m2 steger/perancah dari bambu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang Kayu L.02.04 OH 2,000 190.080 380.160,00
Kepala Tukang L.03.01 OH 0,200 200.448 40.089,60
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 587.520,00
B BAHAN
Bambu diameter 6 - 8 / 600 cm Batang 1,250 22.000 27.500,00
Tali ijuk Kg 0,186 5.900 1.097,40
JUMLAH HARGA BAHAN 28.597,40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 616.117,40
E Overhead & Profit 10% 0,100 61.611,74
F Harga Satuan Pekerjaan (D+E) - 677.729,00

Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Tukang Kayu L.02.04 OH 0,300 190.080 57.024,00
Kepala Tukang L.03.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 63.037,44
B BAHAN - -
Kayu papan kelas III m3 0,036 3.200.000 115.200,00
Kayu balok 5/7 kelas III m3 0,021 3.200.000 67.200,00
Paku biasa kg 0,080 21.200 1.696,00
JUMLAH HARGA BAHAN 184.096,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 247.133,44
E Overhead & Profit 10% 0,100 24.713,34
F Harga Satuan Pekerjaan (D+E) - 271.846,00

Pembuatan 1 m2 jalan sementara


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 158.250,24
B BAHAN - -
Batu belah m3 0,150 276.650 41.497,50
Batu pecah m3 0,090 671.600 60.444,00
Pasir pasang m3 0,010 361.300 3.613,00
JUMLAH HARGA BAHAN 105.554,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 263.804,74
E Overhead & Profit 10% 0,100 26.380,47
F Harga Satuan Pekerjaan (D+E) - 290.185,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pembongkaran 1 m3 beton bertulang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,333 157.248 209.674,48
Mandor L.04.01 OH 0,666 200.448 133.498,37
JUMLAH TENAGA KERJA 343.172,85
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 343.172,85
E Overhead & Profit 10% 0,100 34.317,29
F Harga Satuan Pekerjaan (D+E) - 377.490,00

Pembongkaran 1 m3 dinding tembok bata


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,667 157.248 104.837,24
Mandor L.04.01 OH 0,333 200.448 66.749,18
JUMLAH TENAGA KERJA 171.586,43
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171.586,43
E Overhead & Profit 10% 0,100 17.158,64
F Harga Satuan Pekerjaan (D+E) - 188.745,00

Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,042 157.248 6.604,42
Tukang L.02.01 OH 0,004 190.080 760,32
Kepala Tukang L.03.01 OH 0,002 200.448 400,90
Mandor L.04.01 OH 0,042 200.448 8.418,82
JUMLAH TENAGA KERJA 16.184,45
B BAHAN - -
Kawat jaring Lbr 0,143 29.500 4.230,30
JUMLAH HARGA BAHAN 4.230,30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 20.414,75
E Overhead & Profit 10% 0,100 2.041,47
F Harga Satuan Pekerjaan (D+E) - 22.456,00

Penggalian 1 m3 tanah biasa sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,750 157.248 117.936,00
Mandor L.04.01 OH 0,025 200.448 5.011,20
JUMLAH TENAGA KERJA 122.947,20
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 122.947,20
E Overhead & Profit 10% 0,100 12.294,72
F Harga Satuan Pekerjaan (D+E) - 135.241,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,900 157.248 141.523,20
Mandor L.04.01 OH 0,045 200.448 9.020,16
JUMLAH TENAGA KERJA 150.543,36
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 150.543,36
E Overhead & Profit 10% 0,100 15.054,34
F Harga Satuan Pekerjaan (D+E) - 165.597,00

Menggali 1 m3 tanah biasa sedalam 3 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,050 157.248 165.110,40
Mandor L.04.01 OH 0,067 200.448 13.430,02
JUMLAH TENAGA KERJA 178.540,42
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 178.540,42
E Overhead & Profit 10% 0,100 17.854,04
F Harga Satuan Pekerjaan (D+E) - 196.394,00

Menggali 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Mandor L.04.01 OH 0,032 200.448 6.414,34
JUMLAH TENAGA KERJA 163.662,34
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 163.662,34
E Overhead & Profit 10% 0,100 16.366,23
F Harga Satuan Pekerjaan (D+E) - 180.028,00

Menggali 1 m3 tanah cadas sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Mandor L.04.01 OH 0,060 200.448 12.026,88
JUMLAH TENAGA KERJA 247.898,88
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 247.898,88
E Overhead & Profit 10% 0,100 24.789,89
F Harga Satuan Pekerjaan (D+E) - 272.688,00

Menggali 1 m3 tanah lumpur sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,200 157.248 188.697,60
Mandor L.04.01 OH 0,045 200.448 9.020,16
JUMLAH TENAGA KERJA 197.717,76
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 197.717,76
E Overhead & Profit 10% 0,100 19.771,78
F Harga Satuan Pekerjaan (D+E) - 217.489,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,050 157.248 7.862,40
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 8.864,64
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8.864,64
E Overhead & Profit 10% 0,100 886,46
F Harga Satuan Pekerjaan (D+E) - 9.751,00

(K3) Pembuangan 1 m3 tanah sejauh 30 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,330 157.248 51.891,84
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 53.896,32
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53.896,32
E Overhead & Profit 10% 0,100 5.389,63
F Harga Satuan Pekerjaan (D+E) - 59.285,00

Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Mandor L.04.01 OH 0,025 200.448 5.011,20
JUMLAH TENAGA KERJA 44.323,20
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 44.323,20
E Overhead & Profit 10% 0,100 4.432,32
F Harga Satuan Pekerjaan (D+E) - 48.755,00

(K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,500 157.248 78.624,00
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 88.646,40
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 88.646,40
E Overhead & Profit 10% 0,100 8.864,64
F Harga Satuan Pekerjaan (D+E) - 97.511,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 49.178,88
B BAHAN - -
Pasir urug M3 1,200 274.100 328.920,00
JUMLAH HARGA BAHAN 328.920,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 378.098,88
E Overhead & Profit 10% 0,100 37.809,89
F Harga Satuan Pekerjaan (D+E) - 415.908,00

Pengurugan 1 m3 sirtu padat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Mandor L.04.01 OH 0,025 200.448 5.011,20
JUMLAH TENAGA KERJA 44.323,20
B BAHAN - -
Sirtu m3 1,200 398.700 478.440,00
JUMLAH HARGA BAHAN 478.440,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 522.763,20
E Overhead & Profit 10% 0,100 52.276,32
F Harga Satuan Pekerjaan (D+E) - 575.039,00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Tukang Batu L.02.03 OH 0,750 190.080 142.560,00
Kepala Tukang L.03.01 OH 0,075 200.448 15.033,60
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 408.499,20
B BAHAN - -
Batu belah m3 1,200 276.650 331.980,00
Semen portland Kg 202,000 1.592 321.584,00
Pasir Pasang m3 0,485 361.300 175.230,50
JUMLAH HARGA BAHAN 828.794,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.237.293,70
E Overhead & Profit 10% 0,100 123.729,37
F Harga Satuan Pekerjaan (D+E) - 1.361.023,00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Tukang Batu L.02.03 OH 0,750 190.080 142.560,00
Kepala Tukang L.03.01 OH 0,075 200.448 15.033,60
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 408.499,20
B BAHAN - -
Batu belah m3 1,200 276.650 331.980,00
Semen portland Kg 163,000 1.592 259.496,00
Pasir Pasang m3 0,520 361.300 187.876,00
JUMLAH HARGA BAHAN 779.352,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.187.851,20
E Overhead & Profit 10% 0,100 118.785,12
F Harga Satuan Pekerjaan (D+E) - 1.306.636,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Tukang Batu L.02.03 OH 0,750 190.080 142.560,00
Kepala Tukang L.03.01 OH 0,075 200.448 15.033,60
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 408.499,20
B BAHAN - -
Batu belah m3 1,200 276.650 331.980,00
Semen portland Kg 136,000 1.592 216.512,00
Pasir Pasang m3 0,544 361.300 196.547,20
JUMLAH HARGA BAHAN 745.039,20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.153.538,40
E Overhead & Profit 10% 0,100 115.353,84
F Harga Satuan Pekerjaan (D+E) - 1.268.892,00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Tukang Batu L.02.03 OH 0,750 190.080 142.560,00
Kepala Tukang L.03.01 OH 0,075 200.448 15.033,60
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 408.499,20
B BAHAN - -
Batu belah m3 1,200 276.650 331.980,00
Semen portland Kg 117,000 1.592 186.264,00
Pasir Pasang m3 0,561 361.300 202.689,30
JUMLAH HARGA BAHAN 720.933,30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.129.432,50
E Overhead & Profit 10% 0,100 112.943,25
F Harga Satuan Pekerjaan (D+E) - 1.242.375,00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,500 157.248 235.872,00
Tukang Batu L.02.03 OH 0,750 190.080 142.560,00
Kepala Tukang L.03.01 OH 0,075 200.448 15.033,60
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 408.499,20
B BAHAN - -
Batu belah m3 1,200 276.650 331.980,00
Semen portland Kg 91,000 1.592 144.872,00
Pasir Pasang m3 0,584 361.300 210.999,20
JUMLAH HARGA BAHAN 687.851,20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.096.350,40
E Overhead & Profit 10% 0,100 109.635,04
F Harga Satuan Pekerjaan (D+E) - 1.205.985,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 247,000 1.592 393.224,00
Pasir Beton kg 869,000 312 270.755,57
Kerikil (Maks 30 mm) kg 999,000 346 345.876,00
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.009.855,57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.343.836,50
E Overhead & Profit 10% 0,100 134.383,65
F Harga Satuan Pekerjaan (D+E) - 1.478.220,00

Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 276,000 1.592 439.392,00
Pasir Beton kg 828,000 312 257.981,14
Kerikil (Maks 30 mm) kg 1.012,000 346 350.376,89
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.047.750,03
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.381.730,96
E Overhead & Profit 10% 0,100 138.173,10
F Harga Satuan Pekerjaan (D+E) - 1.519.904,00

Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 299,000 1.592 476.008,00
Pasir Beton kg 799,000 312 248.945,57
Kerikil (Maks 30 mm) kg 1.017,000 346 352.108,00
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.077.061,57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.411.042,50
E Overhead & Profit 10% 0,100 141.104,25
F Harga Satuan Pekerjaan (D+E) - 1.552.146,00
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,200 157.248 188.697,60
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,060 200.448 12.026,88
JUMLAH TENAGA KERJA 242.749,44
B BAHAN
Semen portland kg 230,000 1.592 366.160,00
Pasir Beton kg 893,000 312 278.233,29
Kerikil (Maks 30 mm) kg 1.027,000 346 355.570,22
Air Liter 200,000 - -
JUMLAH HARGA BAHAN 999.963,51
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.242.712,95
E Overhead & Profit 10% 0,100 124.271,29
F Harga Satuan Pekerjaan (D+E) - 1.366.984,00

Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 326,000 1.592 518.992,00
Pasir Beton kg 760,000 312 236.794,29
Kerikil (Maks 30 mm) kg 1.029,000 346 356.262,67
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.112.048,95
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.446.029,88
E Overhead & Profit 10% 0,100 144.602,99
F Harga Satuan Pekerjaan (D+E) - 1.590.632,00

Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 352,000 1.592 560.384,00
Pasir Beton kg 731,000 312 227.758,71
Kerikil (Maks 30 mm) kg 1.031,000 346 356.955,11
Air Liter 215,000 -
JUMLAH HARGA BAHAN 1.145.097,83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.479.078,75
E Overhead & Profit 10% 0,100 147.907,88
F Harga Satuan Pekerjaan (D+E) - 1.626.986,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 371,000 1.592 590.632,00
Pasir Beton kg 698,000 312 217.476,86
Kerikil (Maks 30 mm) kg 1.047,000 346 362.494,67
Air Liter 215,000 -
JUMLAH HARGA BAHAN 1.170.603,52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.504.584,45
E Overhead & Profit 10% 0,100 150.458,45
F Harga Satuan Pekerjaan (D+E) - 1.655.042,00

Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 384,000 1.592 611.328,00
Pasir Beton kg 692,000 312 215.607,43
Kerikil (Maks 30 mm) kg 1.039,000 346 359.724,89
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.186.660,32
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.520.641,25
E Overhead & Profit 10% 0,100 152.064,12
F Harga Satuan Pekerjaan (D+E) - 1.672.705,00

Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 406,000 1.592 646.352,00
Pasir Beton kg 684,000 312 213.114,86
Kerikil (Maks 30 mm) kg 1.026,000 346 355.224,00
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.214.690,86
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.548.671,79
E Overhead & Profit 10% 0,100 154.867,18
F Harga Satuan Pekerjaan (D+E) - 1.703.538,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,650 157.248 259.459,20
Tukang Batu L.02.03 OH 0,275 190.080 52.272,00
Kepala Tukang L.03.01 OH 0,028 200.448 5.612,54
Mandor L.04.01 OH 0,083 200.448 16.637,18
JUMLAH TENAGA KERJA 333.980,93
B BAHAN
Semen portland kg 413,000 1.592 657.496,00
Pasir Beton kg 681,000 312 212.180,14
Kerikil (Maks 30 mm) kg 1.021,000 346 353.492,89
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.223.169,03
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.557.149,96
E Overhead & Profit 10% 0,100 155.715,00
F Harga Satuan Pekerjaan (D+E) - 1.712.864,00

Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2,100 157.248 330.220,80
Tukang Batu L.02.03 OH 0,350 190.080 66.528,00
Kepala Tukang L.03.01 OH 0,035 200.448 7.015,68
Mandor L.04.01 OH 0,105 200.448 21.047,04
JUMLAH TENAGA KERJA 424.811,52
B BAHAN
Semen portland kg 439,000 1.592 698.888,00
Pasir Beton kg 670,000 312 208.752,86
Kerikil (Maks 30 mm) kg 1.006,000 346 348.299,56
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.255.940,41
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.680.751,93
E Overhead & Profit 10% 0,100 168.075,19
F Harga Satuan Pekerjaan (D+E) - 1.848.827,00

Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2,100 157.248 330.220,80
Tukang Batu L.02.03 OH 0,350 190.080 66.528,00
Kepala Tukang L.03.01 OH 0,035 200.448 7.015,68
Mandor L.04.01 OH 0,105 200.448 21.047,04
JUMLAH TENAGA KERJA 424.811,52
B BAHAN
Semen portland kg 448,000 1.592 713.216,00
Pasir Beton kg 667,000 312 207.818,14
Kerikil (Maks 30 mm) kg 1.000,000 346 346.222,22
Air Liter 215,000 - -
JUMLAH HARGA BAHAN 1.267.256,37
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.692.067,89
E Overhead & Profit 10% 0,100 169.206,79
F Harga Satuan Pekerjaan (D+E) - 1.861.274,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,070 157.248 11.007,36
Tukang Besi L.02.05 OH 0,070 190.080 13.305,60
Kepala Tukang L.03.01 OH 0,007 200.448 1.403,14
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 26.517,89
B BAHAN
Besi beton (polos/ulir) kg 10,500 1.690 17.745,00
Kawat beton kg 0,150 2.590 388,50
JUMLAH HARGA BAHAN 18.133,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 44.651,39
E Overhead & Profit 10% 0,100 4.465,14
F Harga Satuan Pekerjaan (D+E) - 49.116,00

Pemasangan 10 kg kabel presstressed polos/strands


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,050 157.248 7.862,40
Tukang Besi L.02.05 OH 0,050 190.080 9.504,00
Kepala Tukang L.03.01 OH 0,005 200.448 1.002,24
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 18.969,98
B BAHAN
Besi beton (polos/ulir) kg 10,500 1.690 17.745,00
Kawat beton kg 0,100 2.590 259,00
JUMLAH HARGA BAHAN 18.004,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 36.973,98
E Overhead & Profit 10% 0,100 3.697,40
F Harga Satuan Pekerjaan (D+E) - 40.671,00

Pemasangan 10 kg jaring kawat baja (wiremesh)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,025 157.248 3.931,20
Tukang Besi L.02.05 OH 0,025 190.080 4.752,00
Kepala Tukang L.03.01 OH 0,025 200.448 5.011,20
Mandor L.04.01 OH 0,001 200.448 200,45
JUMLAH TENAGA KERJA 13.894,85
B BAHAN
Jaring kawat baja dilas kg 10,200 3.350 34.170,00
Kawat beton kg 0,050 2.590 129,50
JUMLAH HARGA BAHAN 34.299,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 48.194,35
E Overhead & Profit 10% 0,100 4.819,43
F Harga Satuan Pekerjaan (D+E) - 53.013,00

(K3) Pemasangan 1 m2 bekisting untuk pondasi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,520 157.248 81.768,96
Tukang Kayu L.02.04 OH 0,260 190.080 49.420,80
Kepala Tukang L.03.01 OH 0,026 200.448 5.211,65
Mandor L.04.01 OH 0,026 200.448 5.211,65
JUMLAH TENAGA KERJA 141.613,06
B BAHAN
Kayu kelas III m3 0,040 3.200.000 128.000,00
Paku 5 - 10 cm kg 0,300 21.200 6.360,00
Minyak bekisting Liter 0,100 17.700 1.770,00
JUMLAH HARGA BAHAN 136.130,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 277.743,06
E Overhead & Profit 10% 0,100 27.774,31
F Harga Satuan Pekerjaan (D+E) - 305.517,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pemasangan 1 m2 bekisting untuk sloof


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,520 157.248 81.768,96
Tukang Kayu L.02.04 OH 0,260 190.080 49.420,80
Kepala Tukang L.03.01 OH 0,026 200.448 5.211,65
Mandor L.04.01 OH 0,026 200.448 5.211,65
JUMLAH TENAGA KERJA 141.613,06
B BAHAN
Kayu kelas III m3 0,045 3.200.000 144.000,00
Paku 5 - 10 cm kg 0,300 21.200 6.360,00
Minyak bekisting Liter 0,100 17.700 1.770,00
JUMLAH HARGA BAHAN 152.130,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 293.743,06
E Overhead & Profit 10% 0,100 29.374,31
F Harga Satuan Pekerjaan (D+E) - 323.117,00

(K3) Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,660 157.248 103.783,68
Tukang Kayu L.02.04 OH 0,330 190.080 62.726,40
Kepala Tukang L.03.01 OH 0,033 200.448 6.614,78
Mandor L.04.01 OH 0,033 200.448 6.614,78
JUMLAH TENAGA KERJA 179.739,65
B BAHAN
Kayu kelas III m3 0,040 3.200.000 128.000,00
Paku 5 - 12 cm kg 0,400 21.200 8.480,00
Minyak bekisting Liter 0,200 17.700 3.540,00
Balok kayu kelas II m3 0,015 4.000.000 60.000,00
Plywood 9 mm Lbr 0,350 171.300 59.955,00
Dolken kayu Ø 8-10/400 cm Batang 2,000 20.000 40.000,00
JUMLAH HARGA BAHAN 299.975,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 479.714,65
E Overhead & Profit 10% 0,100 47.971,46
F Harga Satuan Pekerjaan (D+E) - 527.686,00

(K3) Pemasangan 1 m2 bekisting untuk balok


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,660 157.248 103.783,68
Tukang Kayu L.02.04 OH 0,330 190.080 62.726,40
Kepala Tukang L.03.01 OH 0,033 200.448 6.614,78
Mandor L.04.01 OH 0,033 200.448 6.614,78
JUMLAH TENAGA KERJA 179.739,65
B BAHAN
Kayu kelas III m3 0,040 3.200.000 128.000,00
Paku 5 - 12 cm kg 0,400 21.200 8.480,00
Minyak bekisting Liter 0,200 17.700 3.540,00
Balok kayu kelas II m3 0,018 4.000.000 72.000,00
Plywood 9 mm Lbr 0,350 171.300 59.955,00
Dolken kayu Ø 8-10/400 cm Batang 2,000 20.000 40.000,00
JUMLAH HARGA BAHAN 311.975,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 491.714,65
E Overhead & Profit 10% 0,100 49.171,46
F Harga Satuan Pekerjaan (D+E) - 540.886,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pemasangan 1 m2 bekisting untuk lantai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,660 157.248 103.783,68
Tukang Kayu L.02.04 OH 0,330 190.080 62.726,40
Kepala Tukang L.03.01 OH 0,033 200.448 6.614,78
Mandor L.04.01 OH 0,033 200.448 6.614,78
JUMLAH TENAGA KERJA 179.739,65
B BAHAN
Kayu kelas III m3 0,040 3.200.000 128.000,00
Paku 5 - 12 cm kg 0,400 21.200 8.480,00
Minyak bekisting Liter 0,200 17.700 3.540,00
Balok kayu kelas II m3 0,015 4.000.000 60.000,00
Plywood 9 mm Lbr 0,350 171.300 59.955,00
Dolken kayu Ø 8-10/400 cm Batang 6,000 20.000 120.000,00
JUMLAH HARGA BAHAN 379.975,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 559.714,65
E Overhead & Profit 10% 0,100 55.971,46
F Harga Satuan Pekerjaan (D+E) - 615.686,00

(K3) Pemasangan 1 m2 bekisting untuk dinding


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,660 157.248 103.783,68
Tukang Kayu L.02.04 OH 0,330 190.080 62.726,40
Kepala Tukang L.03.01 OH 0,033 200.448 6.614,78
Mandor L.04.01 OH 0,033 200.448 6.614,78
JUMLAH TENAGA KERJA 179.739,65
B BAHAN
Kayu kelas III m3 0,030 3.200.000 96.000,00
Paku 5 - 12 cm kg 0,400 21.200 8.480,00
Minyak bekisting Liter 0,200 17.700 3.540,00
Balok kayu kelas II m3 0,020 4.000.000 80.000,00
Plywood 9 mm Lbr 0,350 171.300 59.955,00
Dolken kayu Ø 8-10/400 cm Batang 3,000 20.000 60.000,00
Penjaga jarak bekisting / spacer Buah 4,000 17.700 70.800,00
JUMLAH HARGA BAHAN 378.775,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 558.514,65
E Overhead & Profit 10% 0,100 55.851,46
F Harga Satuan Pekerjaan (D+E) - 614.366,00

(K3) Pemasangan 1 m2 bekisting untuk tangga


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,660 157.248 103.783,68
Tukang Kayu L.02.04 OH 0,330 190.080 62.726,40
Kepala Tukang L.03.01 OH 0,033 200.448 6.614,78
Mandor L.04.01 OH 0,033 200.448 6.614,78
JUMLAH TENAGA KERJA 179.739,65
B BAHAN
Kayu kelas III m3 0,030 3.200.000 96.000,00
Paku 5 - 12 cm kg 0,400 21.200 8.480,00
Minyak bekisting Liter 0,150 17.700 2.655,00
Balok kayu kelas II m3 0,015 4.000.000 60.000,00
Plywood 9 mm Lbr 0,350 171.300 59.955,00
Dolken kayu Ø 8-10/400 cm Batang 2,000 20.000 40.000,00
JUMLAH HARGA BAHAN 267.090,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 446.829,65
E Overhead & Profit 10% 0,100 44.682,96
F Harga Satuan Pekerjaan (D+E) - 491.512,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 jembatan untuk pengecoran beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang Kayu L.02.04 OH 0,050 190.080 9.504,00
Kepala Tukang L.03.01 OH 0,005 200.448 1.002,24
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 35.697,02
B BAHAN
Kayu kelas III (papan) m3 0,026 3.200.000 84.480,00
Paku 5 - 12 cm kg 0,600 21.200 12.720,00
Dolken kayu Ø 8-10/400 cm Batang 0,500 20.000 10.000,00
JUMLAH HARGA BAHAN 107.200,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 142.897,02
E Overhead & Profit 10% 0,100 14.289,70
F Harga Satuan Pekerjaan (D+E) - 157.186,00

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5,300 157.248 833.414,40
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,300 190.080 247.104,00
Tukang besi L.02.05 OH 1,050 190.080 199.584,00
Kepala tukang L.03.01 OH 0,262 200.448 52.517,38
Mandor L.04.01 OH 0,265 200.448 53.118,72
JUMLAH TENAGA KERJA 1.438.010,50
B BAHAN
Kayu kelas III m3 0,200 3.200.000 640.000,00
Paku Biasa kg 1,500 21.200 31.800,00
Minyak bekisting Liter 0,400 17.700 7.080,00
Besi beton (polos/ulir) kg 157,500 16.900 2.661.750,00
Kawat beton kg 2,250 25.900 58.275,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
JUMLAH HARGA BAHAN 4.547.959,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 5.985.969,50
E Overhead & Profit 10% 0,100 598.596,95
F Harga Satuan Pekerjaan (D+E) - 6.584.566,00

Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5,650 157.248 888.451,20
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,560 190.080 296.524,80
Tukang besi L.02.05 OH 1,400 190.080 266.112,00
Kepala tukang L.03.01 OH 0,323 200.448 64.744,70
Mandor L.04.01 OH 0,283 200.448 56.726,78
JUMLAH TENAGA KERJA 1.624.831,49
B BAHAN
Kayu kelas III m3 0,270 3.200.000 864.000,00
Paku Biasa kg 2,000 21.200 42.400,00
Minyak bekisting Liter 0,600 17.700 10.620,00
Besi beton (polos/ulir) kg 210,000 16.900 3.549.000,00
Kawat beton kg 3,000 25.900 77.700,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
JUMLAH HARGA BAHAN 5.692.774,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7.317.605,49
E Overhead & Profit 10% 0,100 731.760,55
F Harga Satuan Pekerjaan (D+E) - 8.049.366,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7,050 157.248 1.108.598,40
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,650 190.080 313.632,00
Tukang besi L.02.05 OH 2,100 190.080 399.168,00
Kepala tukang L.03.01 OH 0,403 200.448 80.780,54
Mandor L.04.01 OH 0,353 200.448 70.758,14
JUMLAH TENAGA KERJA 2.025.209,09
B BAHAN
Kayu kelas III m3 0,400 3.200.000 1.280.000,00
Paku Biasa kg 4,000 21.200 84.800,00
Minyak bekisting Liter 2,000 17.700 35.400,00
Besi beton (polos/ulir) kg 315,000 16.900 5.323.500,00
Kawat beton kg 4,500 25.900 116.550,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
Kayu kelas II balok M3 0,150 4.000.000 600.000,00
Plywood 9 mm Lbr 3,500 171.300 599.550,00
Dolken kayu Ø 8-10/400 cm Batang 20,000 20.000 400.000,00
JUMLAH HARGA BAHAN 9.588.854,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 11.614.063,09
E Overhead & Profit 10% 0,100 1.161.406,31
F Harga Satuan Pekerjaan (D+E) - 12.775.469,00

Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6,350 157.248 998.524,80
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,650 190.080 313.632,00
Tukang besi L.02.05 OH 1,400 190.080 266.112,00
Kepala tukang L.03.01 OH 0,333 200.448 66.749,18
Mandor L.04.01 OH 0,318 200.448 63.742,46
JUMLAH TENAGA KERJA 1.761.032,45
B BAHAN
Kayu kelas III m3 0,320 3.200.000 1.024.000,00
Paku Biasa kg 3,200 21.200 67.840,00
Minyak bekisting Liter 1,600 17.700 28.320,00
Besi beton (polos/ulir) kg 210,000 16.900 3.549.000,00
Kawat beton kg 3,000 25.900 77.700,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
Kayu kelas II balok m3 0,140 4.000.000 560.000,00
Plywood 9 mm Lembar 2,800 171.300 479.640,00
Dolken kayu Ø 8-10/400 cm Batang 16,000 20.000 320.000,00
JUMLAH HARGA BAHAN 7.255.554,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 9.016.586,45
E Overhead & Profit 10% 0,100 901.658,64
F Harga Satuan Pekerjaan (D+E) - 9.918.245,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5,300 157.248 833.414,40
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,300 190.080 247.104,00
Tukang besi L.02.05 OH 1,050 190.080 199.584,00
Kepala tukang L.03.01 OH 0,265 200.448 53.118,72
Mandor L.04.01 OH 0,265 200.448 53.118,72
JUMLAH TENAGA KERJA 1.438.611,84
B BAHAN
Kayu kelas III m3 0,320 3.200.000 1.024.000,00
Paku Biasa kg 3,200 21.200 67.840,00
Minyak bekisting Liter 1,600 17.700 28.320,00
Besi beton (polos/ulir) kg 157,500 16.900 2.661.750,00
Kawat beton kg 2,250 25.900 58.275,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
Kayu kelas II balok m3 0,120 4.000.000 480.000,00
Plywood 9 mm Lembar 2,800 171.300 479.640,00
Dolken kayu Ø 8-10/400 cm Batang 32,000 20.000 640.000,00
JUMLAH HARGA BAHAN 6.588.879,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8.027.490,84
E Overhead & Profit 10% 0,100 802.749,08
F Harga Satuan Pekerjaan (D+E) - 8.830.239,00

Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,530 157.248 83.341,44
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,300 190.080 247.104,00
Tukang besi L.02.05 OH 1,050 190.080 199.584,00
Kepala tukang L.03.01 OH 0,262 200.448 52.517,38
Mandor L.04.01 OH 0,265 200.448 53.118,72
JUMLAH TENAGA KERJA 687.937,54
B BAHAN
Kayu kelas III m3 0,240 3.200.000 768.000,00
Paku Biasa kg 3,200 21.200 67.840,00
Minyak bekisting Liter 1,600 17.700 28.320,00
Besi beton (polos/ulir) kg 157,500 16.900 2.661.750,00
Kawat beton kg 2,250 25.900 58.275,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
Kayu kelas II balok m3 0,160 4.000.000 640.000,00
Plywood 9 mm Lembar 2,800 171.300 479.640,00
Dolken kayu Ø 8-10/400 cm Batang 24,000 20.000 480.000,00
JUMLAH HARGA BAHAN 6.332.879,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7.020.816,54
E Overhead & Profit 10% 0,100 702.081,65
F Harga Satuan Pekerjaan (D+E) - 7.722.898,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5,650 157.248 888.451,20
Tukang batu L.02.03 OH 0,275 190.080 52.272,00
Tukang kayu L.02.04 OH 1,560 190.080 296.524,80
Tukang besi L.02.05 OH 1,400 190.080 266.112,00
Kepala tukang L.03.01 OH 0,323 200.448 64.744,70
Mandor L.04.01 OH 0,283 200.448 56.726,78
JUMLAH TENAGA KERJA 1.624.831,49
B BAHAN
Kayu kelas III m3 0,250 3.200.000 800.000,00
Paku Biasa kg 3,000 21.200 63.600,00
Minyak bekisting Liter 1,200 17.700 21.240,00
Besi beton (polos/ulir) kg 210,000 16.900 3.549.000,00
Kawat beton kg 3,000 25.900 77.700,00
Semen portland kg 336,000 1.592 534.912,00
Pasir Beton m3 0,540 436.200 235.548,00
Kerikil m3 0,810 467.400 378.594,00
Kayu kelas II balok m3 0,105 4.000.000 420.000,00
Plywood 9 mm Lembar 2,500 171.300 428.250,00
Dolken kayu Ø 8-10/400 cm Batang 14,000 20.000 280.000,00
JUMLAH HARGA BAHAN 6.788.844,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8.413.675,49
E Overhead & Profit 10% 0,100 841.367,55
F Harga Satuan Pekerjaan (D+E) - 9.255.043,00

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,180 157.248 28.304,64
Tukang batu L.02.03 OH 0,020 190.080 3.801,60
Tukang kayu L.02.04 OH 0,020 190.080 3.801,60
Tukang besi L.02.05 OH 0,020 190.080 3.801,60
Kepala tukang L.03.01 OH 0,006 200.448 1.202,69
Mandor L.04.01 OH 0,009 200.448 1.804,03
JUMLAH TENAGA KERJA 42.716,16
B BAHAN
Kayu kelas III m3 0,002 3.200.000 6.400,00
Paku Biasa kg 0,010 21.200 212,00
Minyak bekisting Liter 1,200 17.700 21.240,00
Besi beton (polos/ulir) kg 3,000 16.900 50.700,00
Kawat beton kg 0,450 25.900 11.655,00
Semen portland kg 4,000 1.592 6.368,00
Pasir Beton m3 0,006 436.200 2.617,20
Kerikil m3 0,009 467.400 4.206,60
JUMLAH HARGA BAHAN 103.398,80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 146.114,96
E Overhead & Profit 10% 0,100 14.611,50
F Harga Satuan Pekerjaan (D+E) - 160.726,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,297 157.248 46.702,66
Tukang batu L.02.03 OH 0,033 190.080 6.272,64
Tukang kayu L.02.04 OH 0,033 190.080 6.272,64
Tukang besi L.02.05 OH 0,033 190.080 6.272,64
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 70.531,78
B BAHAN
Kayu kelas III m3 0,003 3.200.000 9.600,00
Paku Biasa kg 0,020 21.200 424,00
Minyak bekisting Liter 1,200 17.700 21.240,00
Besi beton (polos/ulir) kg 3,600 16.900 60.840,00
Kawat beton kg 0,050 25.900 1.295,00
Semen portland kg 5,500 1.592 8.756,00
Pasir Beton m3 0,009 436.200 3.925,80
Kerikil m3 0,015 467.400 7.011,00
JUMLAH HARGA BAHAN 113.091,80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 183.623,58
E Overhead & Profit 10% 0,100 18.362,36
F Harga Satuan Pekerjaan (D+E) - 201.985,00

Pengerjaan 10 cm pengelasan dengan las listrik


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,040 157.248 6.289,92
Tukang Besi Konstruksi L.02.06 OH 0,020 190.080 3.801,60
Kepala tukang L.03.01 OH 0,002 200.448 400,90
Mandor L.04.01 OH 0,002 200.448 400,90
JUMLAH TENAGA KERJA 10.893,31
B BAHAN
Kawat las listrik Kg 0,400 33.500 13.400,00
Solar Liter 0,300 14.800 4.440,00
Minyak pelumas Liter 0,040 30.500 1.220,00
JUMLAH HARGA BAHAN 19.060,00
C PERALATAN
Sewa alat Las Listrik Jam 0,170 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 29.953,31
E Overhead & Profit 10% 0,100 2.995,33
F Harga Satuan Pekerjaan (D+E) - 32.948,00

Pemasangan 1 m2 rolling door alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang Alumunium L.02.02 OH 1,000 190.080 190.080,00
Kepala tukang L.03.01 OH 0,100 200.448 20.044,80
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 377.395,20
B BAHAN
Rolling dor alluminium m2 1,000 511.300 511.300,00
JUMLAH HARGA BAHAN 511.300,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 888.695,20
E Overhead & Profit 10% 0,100 88.869,52
F Harga Satuan Pekerjaan (D+E) - 977.564,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang L.02.01 OH 0,300 190.080 57.024,00
Kepala tukang L.03.01 OH 0,030 200.448 6.013,44
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 88.228,22
B BAHAN
Seng plat m 1,050 87.700 92.085,00
Paku Biasa kg 0,010 21.200 212,00
Besi strip kg 0,500 15.750 7.875,00
JUMLAH HARGA BAHAN 100.172,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 188.400,22
E Overhead & Profit 10% 0,100 18.840,02
F Harga Satuan Pekerjaan (D+E) - 207.240,00

Pemasangan 1m2 dinding bata merah tebal 1 batu campuran 1 SP : 2 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 142.387,20
B BAHAN
Bata merah m3 140,000 800 112.000,00
Semen portland Kg 43,500 1.592 69.252,00
Pasir Pasang m3 0,080 361.300 28.904,00
JUMLAH HARGA BAHAN 210.156,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 352.543,20
E Overhead & Profit 10% 0,100 35.254,32
F Harga Satuan Pekerjaan (D+E) - 387.797,00

Pemasangan 1m2 dinding bata merah tebal 1 batu campuran 1 SP : 3 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 142.387,20
B BAHAN
Bata merah m3 140,000 800 112.000,00
Semen portland Kg 32,950 1.592 52.456,40
Pasir Pasang m3 0,091 361.300 32.878,30
JUMLAH HARGA BAHAN 197.334,70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 339.721,90
E Overhead & Profit 10% 0,100 33.972,19
F Harga Satuan Pekerjaan (D+E) - 373.694,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1m2 dinding bata merah tebal 1 batu campuran 1 SP : 4 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 142.387,20
B BAHAN
Bata merah m3 140,000 800 112.000,00
Semen portland Kg 26,550 1.592 42.267,60
Pasir Pasang m3 0,093 361.300 33.600,90
JUMLAH HARGA BAHAN 187.868,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 330.255,70
E Overhead & Profit 10% 0,100 33.025,57
F Harga Satuan Pekerjaan (D+E) - 363.281,00

Pemasangan 1m2 dinding bata merah tebal 1 batu campuran 1 SP : 5 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 142.387,20
B BAHAN
Bata merah m3 140,000 800 112.000,00
Semen portland Kg 22,200 1.592 35.342,40
Pasir Pasang m3 0,102 361.300 36.852,60
JUMLAH HARGA BAHAN 184.195,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 326.582,20
E Overhead & Profit 10% 0,100 32.658,22
F Harga Satuan Pekerjaan (D+E) - 359.240,00

Pemasangan 1m2 Dinding Bata Merah tebal 1 batu campuran 1 SP : 6 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 142.387,20
B BAHAN
Bata merah m3 140,000 800 112.000,00
Semen portland Kg 18,500 1.592 29.452,00
Pasir Pasang m3 0,122 361.300 44.078,60
JUMLAH HARGA BAHAN 185.530,60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 327.917,80
E Overhead & Profit 10% 0,100 32.791,78
F Harga Satuan Pekerjaan (D+E) - 360.709,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 18,950 1.592 30.168,40
Pasir Pasang m3 0,038 361.300 13.729,40
JUMLAH HARGA BAHAN 99.897,80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171.091,40
E Overhead & Profit 10% 0,100 17.109,14
F Harga Satuan Pekerjaan (D+E) - 188.200,00

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 14,370 1.592 22.877,04
Pasir Pasang m3 0,040 361.300 14.452,00
JUMLAH HARGA BAHAN 93.329,04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 164.522,64
E Overhead & Profit 10% 0,100 16.452,26
F Harga Satuan Pekerjaan (D+E) - 180.974,00

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 11,500 1.592 18.308,00
Pasir Pasang m3 0,043 361.300 15.535,90
JUMLAH HARGA BAHAN 89.843,90
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 161.037,50
E Overhead & Profit 10% 0,100 16.103,75
F Harga Satuan Pekerjaan (D+E) - 177.141,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1 SP : 5 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 9,680 1.592 15.410,56
Pasir Pasang m3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 87.669,06
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 158.862,66
E Overhead & Profit 10% 0,100 15.886,27
F Harga Satuan Pekerjaan (D+E) - 174.748,00

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1 SP : 6 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 8,320 1.592 13.245,44
Pasir Pasang m3 0,049 361.300 17.703,70
JUMLAH HARGA BAHAN - 86.949,14
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 158.142,74
E Overhead & Profit 10% 0,100 15.814,27
F Harga Satuan Pekerjaan (D+E) - 173.957,00

Pemasangan 1m2 dinding bata merah tebal ½ batu campuran 1SP : 8 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Bata merah m3 70,000 800 56.000,00
Semen portland Kg 6,500 1.592 10.348,00
Pasir Pasang m3 0,050 361.300 18.065,00
JUMLAH HARGA BAHAN 84.413,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 155.606,60
E Overhead & Profit 10% 0,100 15.560,66
F Harga Satuan Pekerjaan (D+E) - 171.167,00

Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 15,504 1.592 24.682,37
Pasir Pasang m3 0,016 361.300 5.780,80
JUMLAH HARGA BAHAN 30.463,17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 112.163,01
E Overhead & Profit 10% 0,100 11.216,30
F Harga Satuan Pekerjaan (D+E) - 123.379,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 10,224 1.592 16.276,61
Pasir Pasang m3 0,020 361.300 7.226,00
JUMLAH HARGA BAHAN 23.502,61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 105.202,45
E Overhead & Profit 10% 0,100 10.520,24
F Harga Satuan Pekerjaan (D+E) - 115.722,00

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 7,776 1.592 12.379,39
Pasir Pasang m3 0,023 361.300 8.309,90
JUMLAH HARGA BAHAN 20.689,29
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102.389,13
E Overhead & Profit 10% 0,100 10.238,91
F Harga Satuan Pekerjaan (D+E) - 112.628,00

Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 6,240 1.592 9.934,08
Pasir Pasang m3 0,024 361.300 8.671,20
JUMLAH HARGA BAHAN 18.605,28
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 100.305,12
E Overhead & Profit 10% 0,100 10.030,51
F Harga Satuan Pekerjaan (D+E) - 110.335,00

Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 5,184 1.592 8.252,93
Pasir Pasang m3 0,026 361.300 9.393,80
JUMLAH HARGA BAHAN 17.646,73
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 99.346,57
E Overhead & Profit 10% 0,100 9.934,66
F Harga Satuan Pekerjaan (D+E) - 109.281,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 4,416 1.592 7.030,27
Pasir Pasang m3 0,027 361.300 9.755,10
JUMLAH HARGA BAHAN 16.785,37
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 98.485,21
E Overhead & Profit 10% 0,100 9.848,52
F Harga Satuan Pekerjaan (D+E) - 108.333,00

Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 3,936 1.592 6.266,11
Pasir Pasang m3 0,028 361.300 10.116,40
JUMLAH HARGA BAHAN 16.382,51
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 98.082,35
E Overhead & Profit 10% 0,100 9.808,24
F Harga Satuan Pekerjaan (D+E) - 107.890,00

Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 3,456 1.592 5.501,95
Pasir Pasang m3 0,029 361.300 10.477,70
JUMLAH HARGA BAHAN 15.979,65
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 97.679,49
E Overhead & Profit 10% 0,100 9.767,95
F Harga Satuan Pekerjaan (D+E) - 107.447,00

Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,400 157.248 62.899,20
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,022 200.448 4.409,86
JUMLAH TENAGA KERJA 109.334,02
B BAHAN
Semen portland Kg 13,632 1.592 21.702,14
Pasir Pasang m3 0,027 361.300 9.755,10
JUMLAH HARGA BAHAN 31.457,24
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 140.791,26
E Overhead & Profit 10% 0,100 14.079,13
F Harga Satuan Pekerjaan (D+E) - 154.870,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,260 157.248 40.884,48
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,013 200.448 2.605,82
JUMLAH TENAGA KERJA 85.515,26
B BAHAN
Semen portland Kg 10,368 1.592 16.505,86
Pasir Pasang m3 0,031 361.300 11.200,30
JUMLAH HARGA BAHAN 27.706,16
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 113.221,42
E Overhead & Profit 10% 0,100 11.322,14
F Harga Satuan Pekerjaan (D+E) - 124.543,00

Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,400 157.248 62.899,20
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,022 200.448 4.409,86
JUMLAH TENAGA KERJA 109.334,02
B BAHAN
Semen portland Kg 8,320 1.592 13.245,44
Pasir Pasang m3 0,032 361.300 11.561,60
JUMLAH HARGA BAHAN 24.807,04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 134.141,06
E Overhead & Profit 10% 0,100 13.414,11
F Harga Satuan Pekerjaan (D+E) - 147.555,00

Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,400 157.248 62.899,20
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,022 200.448 4.409,86
JUMLAH TENAGA KERJA 109.334,02
B BAHAN
Semen portland Kg 6,912 1.592 11.003,90
Pasir Pasang m3 0,035 361.300 12.645,50
JUMLAH HARGA BAHAN 23.649,40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 132.983,42
E Overhead & Profit 10% 0,100 13.298,34
F Harga Satuan Pekerjaan (D+E) - 146.281,00

Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,400 157.248 62.899,20
Tukang Batu L.02.03 OH 0,200 190.080 38.016,00
Kepala Tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,022 200.448 4.409,86
JUMLAH TENAGA KERJA 109.334,02
B BAHAN
Semen portland Kg 5,888 1.592 9.373,70
Pasir Pasang m3 0,036 361.300 13.006,80
JUMLAH HARGA BAHAN 22.380,50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 131.714,51
E Overhead & Profit 10% 0,100 13.171,45
F Harga Satuan Pekerjaan (D+E) - 144.885,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang Batu L.02.03 OH 0,075 190.080 14.256,00
Kepala Tukang L.03.01 OH 0,008 200.448 1.603,58
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 41.050,37
B BAHAN
Semen portland Kg 5,184 1.592 8.252,93
Pasir Pasang m3 0,026 361.300 9.393,80
JUMLAH HARGA BAHAN 17.646,73
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 58.697,10
E Overhead & Profit 10% 0,100 5.869,71
F Harga Satuan Pekerjaan (D+E) - 64.566,00

Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,080 157.248 12.579,84
Tukang Batu L.02.03 OH 0,400 190.080 76.032,00
Kepala Tukang L.03.01 OH 0,040 200.448 8.017,92
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 97.431,55
B BAHAN
Semen portland Kg 0,500 1.592 796,00
Pasir Pasang m3 0,013 361.300 4.696,90
JUMLAH HARGA BAHAN 5.492,90
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102.924,45
E Overhead & Profit 10% 0,100 10.292,45
F Harga Satuan Pekerjaan (D+E) - 113.216,00

Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 71.193,60
B BAHAN
Semen portland Kg 4,320 1.592 6.877,44
Pasir Pasang m3 0,006 361.300 2.167,80
JUMLAH HARGA BAHAN 9.045,24
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 80.238,84
E Overhead & Profit 10% 0,100 8.023,88
F Harga Satuan Pekerjaan (D+E) - 88.262,00

Pemasangan 1 m2 finishing siar pasangan bata merah


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang Batu L.02.03 OH 0,075 190.080 14.256,00
Kepala Tukang L.03.01 OH 0,008 200.448 1.603,58
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 41.050,37
B BAHAN
Semen portland Kg 3,108 1.592 4.947,94
JUMLAH HARGA BAHAN 4.947,94
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 45.998,30
E Overhead & Profit 10% 0,100 4.599,83
F Harga Satuan Pekerjaan (D+E) - 50.598,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 finishing siar pasangan conblock ekspose


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,070 157.248 11.007,36
Tukang Batu L.02.03 OH 0,035 190.080 6.652,80
Kepala Tukang L.03.01 OH 0,004 200.448 801,79
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 19.263,74
B BAHAN
Semen portland Kg 1,600 1.592 2.547,20
JUMLAH HARGA BAHAN 2.547,20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 21.810,94
E Overhead & Profit 10% 0,100 2.181,09
F Harga Satuan Pekerjaan (D+E) - 23.992,00

Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen portland Kg 6,340 1.592 10.093,28
Pasir Pasang m3 0,012 361.300 4.335,60
JUMLAH HARGA BAHAN 14.428,88
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 96.128,72
E Overhead & Profit 10% 0,100 9.612,87
F Harga Satuan Pekerjaan (D+E) - 105.741,00

Pemasangan 1 m2 acian.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 54.466,56
B BAHAN
Semen portland Kg 3,250 1.592 5.174,00
JUMLAH HARGA BAHAN 5.174,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 59.640,56
E Overhead & Profit 10% 0,100 5.964,06
F Harga Satuan Pekerjaan (D+E) - 65.604,00

Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,300 157.248 47.174,40
Tukang Batu L.02.03 OH 0,150 190.080 28.512,00
Kepala Tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,015 200.448 3.006,72
JUMLAH TENAGA KERJA 81.699,84
B BAHAN
Semen mortar pasangan Kg 16,000 9.570 153.120,00
JUMLAH HARGA BAHAN 153.120,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 234.819,84
E Overhead & Profit 10% 0,100 23.481,98
F Harga Satuan Pekerjaan (D+E) - 258.301,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Batu L.02.03 OH 0,100 190.080 19.008,00
Kepala Tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 54.466,56
B BAHAN
Semen mortar Acian Kg 3,600 9.570 34.452,00
JUMLAH HARGA BAHAN 34.452,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 88.918,56
E Overhead & Profit 10% 0,100 8.891,86
F Harga Satuan Pekerjaan (D+E) - 97.810,00

Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Batu L.02.03 OH 0,125 190.080 23.760,00
Kepala tukang L.03.01 OH 0,013 200.448 2.605,82
Mandor L.04.01 OH 0,013 200.448 2.605,82
JUMLAH TENAGA KERJA 68.283,65
B BAHAN
ubin warna ukuran 40cm x40 cm Bh 6,630 20.833 138.125,00
Semen portland kg 9,800 1.592 15.601,60
Semen Warna Kg 1,300 24.800 32.240,00
Pasir Pasang M3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 202.225,10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 270.508,75
E Overhead & Profit 10% 0,100 27.050,87
F Harga Satuan Pekerjaan (D+E) - 297.559,00

Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,260 157.248 40.884,48
Tukang Batu L.02.03 OH 0,130 190.080 24.710,40
Kepala tukang L.03.01 OH 0,013 200.448 2.605,82
Mandor L.04.01 OH 0,013 200.448 2.605,82
JUMLAH TENAGA KERJA 70.806,53
B BAHAN
ubin warna ukuran 30cm x30cm Bh 11,870 7.091 84.169,09
Semen portland kg 10,000 1.592 15.920,00
Semen Warna Kg 1,500 24.800 37.200,00
Pasir Pasang M3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 153.547,59
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 224.354,12
E Overhead & Profit 10% 0,100 22.435,41
F Harga Satuan Pekerjaan (D+E) - 246.789,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,270 157.248 42.456,96
Tukang Batu L.02.03 OH 0,135 190.080 25.660,80
Kepala tukang L.03.01 OH 0,014 200.448 2.806,27
Mandor L.04.01 OH 0,014 200.448 2.806,27
JUMLAH TENAGA KERJA 73.730,30
B BAHAN
ubin warna ukuran 20cm x20cm Bh 26,500 3.520 93.280,00
Semen portland kg 10,400 1.592 16.556,80
Semen Warna Kg 1,620 24.800 40.176,00
Pasir Pasang M3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 166.271,30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 240.001,60
E Overhead & Profit 10% 0,100 24.000,16
F Harga Satuan Pekerjaan (D+E) - 264.001,00

Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Batu L.02.03 OH 0,125 190.080 23.760,00
Kepala tukang L.03.01 OH 0,013 200.448 2.605,82
Mandor L.04.01 OH 0,013 200.448 2.605,82
JUMLAH TENAGA KERJA 68.283,65
B BAHAN
ubin granit ukuran 40cm x40cm Bh 6,630 36.333 240.890,00
Semen portland kg 9,800 1.592 15.601,60
Semen Warna Kg 1,300 24.800 32.240,00
Pasir Pasang M3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 304.990,10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 373.273,75
E Overhead & Profit 10% 0,100 37.327,37
F Harga Satuan Pekerjaan (D+E) - 410.601,00

Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,260 157.248 40.884,48
Tukang Batu L.02.03 OH 0,130 190.080 24.710,40
Kepala tukang L.03.01 OH 0,013 200.448 2.605,82
Mandor L.04.01 OH 0,013 200.448 2.605,82
JUMLAH TENAGA KERJA 70.806,53
B BAHAN
ubin granit ukuran 30cm x30cm Bh 11,870 17.818 211.501,82
Semen portland kg 10,000 1.592 15.920,00
Semen Warna Kg 1,500 24.800 37.200,00
Pasir Pasang M3 0,045 361.300 16.258,50
JUMLAH HARGA BAHAN 280.880,32
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 351.686,85
E Overhead & Profit 10% 0,100 35.168,68
F Harga Satuan Pekerjaan (D+E) - 386.855,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,700 157.248 110.073,60
Tukang Batu L.02.03 OH 0,350 190.080 66.528,00
Kepala tukang L.03.01 OH 0,035 200.448 7.015,68
Mandor L.04.01 OH 0,035 200.448 7.015,68
JUMLAH TENAGA KERJA 190.632,96
B BAHAN
keramik ukuran 30cm x 30cm Bh 11,870 6.818 80.931,82
Semen portland Kg 10,000 1.592 15.920,00
Pasir Pasang M3 0,045 24.800 1.116,00
Semen Warna Kg 1,500 361.300 541.950,00
JUMLAH HARGA BAHAN 639.917,82
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 830.550,78
E Overhead & Profit 10% 0,100 83.055,08
F Harga Satuan Pekerjaan (D+E) - 913.605,00

Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,700 157.248 110.073,60
Tukang Batu L.02.03 OH 0,350 190.080 66.528,00
Kepala tukang L.03.01 OH 0,035 200.448 7.015,68
Mandor L.04.01 OH 0,035 200.448 7.015,68
JUMLAH TENAGA KERJA 190.632,96
B BAHAN
Keramik ukuran 20cm x 20cm Bh 26,500 3.400 90.100,00
Semen portland Kg 10,400 1.592 16.556,80
Pasir Pasang M3 0,045 24.800 1.116,00
Semen Warna Kg 1,620 361.300 585.306,00
JUMLAH HARGA BAHAN 693.078,80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 883.711,76
E Overhead & Profit 10% 0,100 88.371,18
F Harga Satuan Pekerjaan (D+E) - 972.082,00

Pemasangan 1 m2 dinding keramik 20cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,900 157.248 141.523,20
Tukang Batu L.02.03 OH 0,450 190.080 85.536,00
Kepala tukang L.03.01 OH 0,045 200.448 9.020,16
Mandor L.04.01 OH 0,045 200.448 9.020,16
JUMLAH TENAGA KERJA 245.099,52
B BAHAN
keramik Dinding 20cm x 20cm Bh 26,500 3.520 93.280,00
Semen portland Kg 9,300 1.592 14.805,60
Pasir Pasang M3 0,018 24.800 446,40
Semen Warna Kg 1,940 361.300 700.922,00
JUMLAH HARGA BAHAN 809.454,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.054.553,52
E Overhead & Profit 10% 0,100 105.455,35
F Harga Satuan Pekerjaan (D+E) - 1.160.008,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 wallpaper lebar 50 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,350 157.248 55.036,80
Tukang Batu L.02.03 OH 0,175 190.080 33.264,00
Kepala tukang L.03.01 OH 0,017 200.448 3.407,62
Mandor L.04.01 OH 0,002 200.448 400,90
JUMLAH TENAGA KERJA 92.109,31
B BAHAN
wallpaper lebar 50 cm m 2,200 59.080 129.976,00
Lem Putih Kg 0,250 29.500 7.375,00
JUMLAH HARGA BAHAN 137.351,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 229.460,31
E Overhead & Profit 10% 0,100 22.946,03
F Harga Satuan Pekerjaan (D+E) - 252.406,00

Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,120 157.248 18.869,76
Tukang Batu L.02.03 OH 0,120 190.080 22.809,60
Kepala tukang L.03.01 OH 0,012 200.448 2.405,38
Mandor L.04.01 OH 0,006 200.448 1.202,69
JUMLAH TENAGA KERJA 45.287,42
B BAHAN
Kayu Papan kelas I M3 0,003 4.800.000 14.400,00
Paku skrup Kg 0,050 28.300 1.415,00
JUMLAH HARGA BAHAN 15.815,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 61.102,42
E Overhead & Profit 10% 0,100 6.110,24
F Harga Satuan Pekerjaan (D+E) - 67.212,00

Pemasangan 1 m2 paving block natural tebal 6 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Kayu L.02.04 OH 0,250 190.080 47.520,00
Kepala tukang L.03.01 OH 0,025 200.448 5.011,20
Mandor L.04.01 OH 0,003 200.448 501,12
JUMLAH TENAGA KERJA 92.344,32
B BAHAN
Paving block 6 cm M2 1,010 129.900 131.199,00
Pasir beton M3 0,050 436.200 21.810,00
JUMLAH HARGA BAHAN 153.009,00
C PERALATAN -
Peralatan Kerja Paving Blok % 0,100 153.009 15.300,90
JUMLAH HARGA ALAT 15.300,90
D Jumlah (A+B+C) - 260.654,22
E Overhead & Profit 10% 0,100 26.065,42
F Harga Satuan Pekerjaan (D+E) - 286.719,00

Pemasangan 1 m2 paving block natural tebal 8 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Kayu L.02.04 OH 0,250 190.080 47.520,00
Kepala tukang L.03.01 OH 0,025 200.448 5.011,20
Mandor L.04.01 OH 0,003 200.448 501,12
JUMLAH TENAGA KERJA 92.344,32
B BAHAN
Paving block 8 cm natural M2 1,010 135.900 137.259,00
Pasir beton M3 0,070 436.200 30.534,00
JUMLAH HARGA BAHAN 167.793,00
C PERALATAN -
Peralatan Kerja Paving Blok % 0,100 167.793 16.779,30
JUMLAH HARGA ALAT 16.779,30
D Jumlah (A+B+C) - 276.916,62
E Overhead & Profit 10% 0,100 27.691,66
F Harga Satuan Pekerjaan (D+E) - 304.608,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 paving block berwarna tebal 6 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Kayu L.02.04 OH 0,250 190.080 47.520,00
Kepala tukang L.03.01 OH 0,025 200.448 5.011,20
Mandor L.04.01 OH 0,003 200.448 501,12
JUMLAH TENAGA KERJA 92.344,32
B BAHAN
Paving block 6cm berwarna M2 1,010 141.800 143.218,00
Pasir beton M3 0,050 436.200 21.810,00
JUMLAH HARGA BAHAN 165.028,00
C PERALATAN -
Peralatan Kerja Paving Blok % 0,100 165.028 16.502,80
JUMLAH HARGA ALAT 16.502,80
D Jumlah (A+B+C) - 273.875,12
E Overhead & Profit 10% 0,100 27.387,51
F Harga Satuan Pekerjaan (D+E) - 301.262,00

Pemasangan 1 m2 paving block berwarna tebal 8 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,250 157.248 39.312,00
Tukang Kayu L.02.04 OH 0,250 190.080 47.520,00
Kepala tukang L.03.01 OH 0,025 200.448 5.011,20
Mandor L.04.01 OH 0,003 200.448 501,12
JUMLAH TENAGA KERJA 92.344,32
B BAHAN
Paving block 8 cm berwarna M2 1,010 147.700 149.177,00
Pasir beton M3 0,070 436.200 30.534,00
JUMLAH HARGA BAHAN 179.711,00
C PERALATAN -
Peralatan Kerja Paving Blok % 0,100 179.711 17.971,10
JUMLAH HARGA ALAT 17.971,10
D Jumlah (A+B+C) - 290.026,42
E Overhead & Profit 10% 0,100 29.002,64
F Harga Satuan Pekerjaan (D+E) - 319.029,00

Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 37.739,52
B BAHAN
Akustik 60 x 120 Lembar 1,500 59.000 88.500,00
Paku tripleks kg 0,050 29.300 1.465,00
JUMLAH HARGA BAHAN 89.965,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 127.704,52
E Overhead & Profit 10% 0,100 12.770,45
F Harga Satuan Pekerjaan (D+E) - 140.474,00

Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 37.739,52
B BAHAN
Tripleks Lembar 0,375 107.000 40.125,00
Paku tripleks kg 0,030 29.300 879,00
JUMLAH HARGA BAHAN 41.004,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 78.743,52
E Overhead & Profit 10% 0,100 7.874,35
F Harga Satuan Pekerjaan (D+E) - 86.617,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,800 157.248 125.798,40
Tukang kayu L.02.04 OH 0,800 190.080 152.064,00
Kepala tukang L.03.01 OH 0,080 200.448 16.035,84
Mandor L.04.01 OH 0,040 200.448 8.017,92
JUMLAH TENAGA KERJA 301.916,16
B BAHAN
Kayu papan m3 0,015 3.200.000 48.000,00
Paku tripleks kg 0,010 29.300 293,00
JUMLAH HARGA BAHAN 48.293,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 350.209,16
E Overhead & Profit 10% 0,100 35.020,92
F Harga Satuan Pekerjaan (D+E) - 385.230,00

Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,050 190.080 9.504,00
Kepala tukang L.03.01 OH 0,005 200.448 1.002,24
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 27.233,28
B BAHAN
Gypsum board 9 mm (1200 x 2400 mm) Lembar 0,364 100.400 36.545,60
Paku skrup kg 0,110 28.300 3.113,00
JUMLAH HARGA BAHAN 39.658,60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 66.891,88
E Overhead & Profit 10% 0,100 6.689,19
F Harga Satuan Pekerjaan (D+E) - 73.581,00

Pemasangan 1 m’ list langit-langit kayu profil


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,050 157.248 7.862,40
Tukang Kayu L.02.04 OH 0,050 190.080 9.504,00
Kepala tukang L.03.01 OH 0,005 200.448 1.002,24
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 18.969,98
B BAHAN
List kayu profil m 1,050 22.000 23.100,00
Paku Biasa kg 0,010 21.200 212,00
JUMLAH HARGA BAHAN 23.312,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 42.281,98
E Overhead & Profit 10% 0,100 4.228,20
F Harga Satuan Pekerjaan (D+E) - 46.510,00

Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,001 200.448 200,45
JUMLAH TENAGA KERJA 52.662,53
B BAHAN
Genteng metal Bh 1,300 47.800 62.140,00
Paku biasa ½”-1” Kg 0,200 21.200 4.240,00
JUMLAH HARGA BAHAN 66.380,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 119.042,53
E Overhead & Profit 10% 0,100 11.904,25
F Harga Satuan Pekerjaan (D+E) - 130.946,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang Kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,001 200.448 200,45
JUMLAH TENAGA KERJA 52.662,53
B BAHAN
Genteng metal Bh 2,000 47.800 95.600,00
Paku biasa ½”-1” Kg 0,200 21.200 4.240,00
JUMLAH HARGA BAHAN 99.840,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 152.502,53
E Overhead & Profit 10% 0,100 15.250,25
F Harga Satuan Pekerjaan (D+E) - 167.752,00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7,000 157.248 1.100.736,00
Tukang kayu L.02.04 OH 21,000 190.080 3.991.680,00
Kepala tukang L.03.01 OH 2,100 200.448 420.940,80
Mandor L.04.01 OH 0,350 200.448 70.156,80
JUMLAH TENAGA KERJA 5.583.513,60
B BAHAN
Balok kayu m3 1,100 4.800.000 5.280.000,00
Paku Biasa Kg 1,250 21.200 26.500,00
Lem Kayu/Karet Kg 1,000 25.000 25.000,00
JUMLAH HARGA BAHAN 5.331.500,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10.915.013,60
E Overhead & Profit 10% 0,100 1.091.501,36
F Harga Satuan Pekerjaan (D+E) - 12.006.514,00

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6,000 157.248 943.488,00
Tukang kayu L.02.04 OH 18,000 190.080 3.421.440,00
Kepala tukang L.03.01 OH 1,800 200.448 360.806,40
Mandor L.04.01 OH 0,300 200.448 60.134,40
JUMLAH TENAGA KERJA 4.785.868,80
B BAHAN
Balok kayu m3 1,200 4.000.000 4.800.000,00
Paku Biasa Kg 1,250 21.200 26.500,00
Lem Kayu/Karet Kg 1,000 25.000 25.000,00
JUMLAH HARGA BAHAN 4.851.500,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 9.637.368,80
E Overhead & Profit 10% 0,100 963.736,88
F Harga Satuan Pekerjaan (D+E) - 10.601.105,00

Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,350 157.248 55.036,80
Tukang kayu L.02.04 OH 1,050 190.080 199.584,00
Kepala tukang L.03.01 OH 0,105 200.448 21.047,04
Mandor L.04.01 OH 0,018 200.448 3.608,06
JUMLAH TENAGA KERJA 279.275,90
B BAHAN
kayu Papan m3 0,040 4.000.000 160.000,00
Paku Biasa Kg 0,050 21.200 1.060,00
JUMLAH HARGA BAHAN 161.060,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 440.335,90
E Overhead & Profit 10% 0,100 44.033,59
F Harga Satuan Pekerjaan (D+E) - 484.369,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,350 157.248 55.036,80
Tukang kayu L.02.04 OH 1,050 190.080 199.584,00
Kepala tukang L.03.01 OH 0,105 200.448 21.047,04
Mandor L.04.01 OH 0,018 200.448 3.608,06
JUMLAH TENAGA KERJA 279.275,90
B BAHAN
kayu Papan m3 0,040 3.200.000 128.000,00
Paku Biasa Kg 0,050 21.200 1.060,00
JUMLAH HARGA BAHAN 129.060,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 408.335,90
E Overhead & Profit 10% 0,100 40.833,59
F Harga Satuan Pekerjaan (D+E) - 449.169,00

Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang kayu L.02.04 OH 3,000 190.080 570.240,00
Kepala tukang L.03.01 OH 0,300 200.448 60.134,40
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 797.644,80
B BAHAN
kayu Papan m3 0,040 4.800.000 192.000,00
Lem Kayu/Karet Kg 0,500 21.200 10.600,00
JUMLAH HARGA BAHAN 202.600,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.000.244,80
E Overhead & Profit 10% 0,100 100.024,48
F Harga Satuan Pekerjaan (D+E) - 1.100.269,00

Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,800 157.248 125.798,40
Tukang kayu L.02.04 OH 2,400 190.080 456.192,00
Kepala tukang L.03.01 OH 0,240 200.448 48.107,52
Mandor L.04.01 OH 0,040 200.448 8.017,92
JUMLAH TENAGA KERJA 638.115,84
B BAHAN
kayu Papan m3 0,024 4.800.000 115.200,00
Lem Kayu/Karet Kg 0,300 21.200 6.360,00
JUMLAH HARGA BAHAN 121.560,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 759.675,84
E Overhead & Profit 10% 0,100 75.967,58
F Harga Satuan Pekerjaan (D+E) - 835.643,00

Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang kayu L.02.04 OH 3,000 190.080 570.240,00
Kepala tukang L.03.01 OH 0,300 200.448 60.134,40
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 797.644,80
B BAHAN
kayu Papan m3 0,064 4.800.000 307.200,00
Lem Kayu/Karet Kg 0,500 21.200 10.600,00
JUMLAH HARGA BAHAN 317.800,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.115.444,80
E Overhead & Profit 10% 0,100 111.544,48
F Harga Satuan Pekerjaan (D+E) - 1.226.989,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,700 157.248 110.073,60
Tukang kayu L.02.04 OH 2,100 190.080 399.168,00
Kepala tukang L.03.01 OH 0,210 200.448 42.094,08
Mandor L.04.01 OH 0,035 200.448 7.015,68
JUMLAH TENAGA KERJA 558.351,36
B BAHAN
kayu Papan m3 0,025 4.800.000 120.000,00
Paku Biasa kg 0,030 21.200 636,00
Lem Kayu/Karet kg 0,500 21.200 10.600,00
Plywood 4 mm Lembar 1,000 80.000 80.000,00
JUMLAH HARGA BAHAN 211.236,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 769.587,36
E Overhead & Profit 10% 0,100 76.958,74
F Harga Satuan Pekerjaan (D+E) - 846.546,00

Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,800 157.248 125.798,40
Tukang kayu L.02.04 OH 2,400 190.080 456.192,00
Kepala tukang L.03.01 OH 0,240 200.448 48.107,52
Mandor L.04.01 OH 0,040 200.448 8.017,92
JUMLAH TENAGA KERJA 638.115,84
B BAHAN
kayu Papan m3 0,026 4.800.000 122.880,00
Paku Biasa kg 0,030 21.200 636,00
Lem Kayu/Karet kg 0,500 21.200 10.600,00
Plywood 4 mm Lembar 1,000 80.000 80.000,00
JUMLAH HARGA BAHAN 214.116,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 852.231,84
E Overhead & Profit 10% 0,100 85.223,18
F Harga Satuan Pekerjaan (D+E) - 937.455,00

Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,670 157.248 105.356,16
Tukang kayu L.02.04 OH 2,000 190.080 380.160,00
Kepala tukang L.03.01 OH 0,200 200.448 40.089,60
Mandor L.04.01 OH 0,335 200.448 67.150,08
JUMLAH TENAGA KERJA 592.755,84
B BAHAN
Kayu Papan m3 0,060 4.800.000 288.000,00
Paku Biasa kg 0,150 21.200 3.180,00
JUMLAH HARGA BAHAN 291.180,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 883.935,84
E Overhead & Profit 10% 0,100 88.393,58
F Harga Satuan Pekerjaan (D+E) - 972.329,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,800 157.248 125.798,40
Tukang kayu L.02.04 OH 2,400 190.080 456.192,00
Kepala tukang L.03.01 OH 0,240 200.448 48.107,52
Mandor L.04.01 OH 0,040 200.448 8.017,92
JUMLAH TENAGA KERJA 638.115,84
B BAHAN
Kayu Papan m3 0,025 4.800.000 120.000,00
Paku Biasa kg 0,030 21.200 636,00
Lem Kayu/Karet kg 0,300 21.200 6.360,00
Teakwood 4 mm 90 x 220 cm Lembar 1,000 171.300 171.300,00
JUMLAH HARGA BAHAN 298.296,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 936.411,84
E Overhead & Profit 10% 0,100 93.641,18
F Harga Satuan Pekerjaan (D+E) - 1.030.053,00

Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4,000 157.248 628.992,00
Tukang kayu L.02.04 OH 12,000 190.080 2.280.960,00
Kepala tukang L.03.01 OH 1,200 200.448 240.537,60
Mandor L.04.01 OH 0,200 200.448 40.089,60
JUMLAH TENAGA KERJA 3.190.579,20
B BAHAN
Balok kayu m3 1,100 4.800.000 5.280.000,00
Besi strip kg 15,000 15.750 236.250,00
Paku Biasa kg 5,600 21.200 118.720,00
JUMLAH HARGA BAHAN 5.634.970,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8.825.549,20
E Overhead & Profit 10% 0,100 882.554,92
F Harga Satuan Pekerjaan (D+E) - 9.708.104,00

Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6,700 157.248 1.053.561,60
Tukang kayu L.02.04 OH 20,100 190.080 3.820.608,00
Kepala tukang L.03.01 OH 2,010 200.448 402.900,48
Mandor L.04.01 OH 0,335 200.448 67.150,08
JUMLAH TENAGA KERJA 5.344.220,16
B BAHAN
Balok kayu m3 1,200 4.800.000 5.760.000,00
Besi strip kg 15,000 15.750 236.250,00
Paku Biasa kg 5,600 21.200 118.720,00
JUMLAH HARGA BAHAN 6.114.970,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 11.459.190,16
E Overhead & Profit 10% 0,100 1.145.919,02
F Harga Satuan Pekerjaan (D+E) - 12.605.109,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6,700 157.248 1.053.561,60
Tukang kayu L.02.04 OH 20,100 190.080 3.820.608,00
Kepala tukang L.03.01 OH 2,010 200.448 402.900,48
Mandor L.04.01 OH 0,335 200.448 67.150,08
JUMLAH TENAGA KERJA 5.344.220,16
B BAHAN
Balok kayu m3 1,100 4.000.000 4.400.000,00
Besi strip kg 15,000 15.750 236.250,00
Paku Biasa kg 3,000 21.200 63.600,00
JUMLAH HARGA BAHAN 4.699.850,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10.044.070,16
E Overhead & Profit 10% 0,100 1.004.407,02
F Harga Satuan Pekerjaan (D+E) - 11.048.477,00

Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 37.739,52
B BAHAN
Kayu 5/7 m3 0,014 4.000.000 56.000,00
Reng 2 x 3 cm m3 0,036 4.000.000 144.000,00
Paku Biasa kg 0,250 21.200 5.300,00
JUMLAH HARGA BAHAN 205.300,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 243.039,52
E Overhead & Profit 10% 0,100 24.303,95
F Harga Satuan Pekerjaan (D+E) - 267.343,00

Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 37.739,52
B BAHAN
Kayu 5/7 m3 0,014 4.000.000 56.000,00
Reng (3 x 4) cm m3 0,057 4.000.000 228.000,00
Paku Biasa kg 0,250 21.200 5.300,00
JUMLAH HARGA BAHAN 289.300,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 327.039,52
E Overhead & Profit 10% 0,100 32.703,95
F Harga Satuan Pekerjaan (D+E) - 359.743,00

Pemasangan 1 m2 rangka atap sirap, kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,120 157.248 18.869,76
Tukang kayu L.02.04 OH 0,120 190.080 22.809,60
Kepala tukang L.03.01 OH 0,012 200.448 2.405,38
Mandor L.04.01 OH 0,006 200.448 1.202,69
JUMLAH TENAGA KERJA 45.287,42
B BAHAN
Kayu kelas II m3 0,014 4.000.000 56.000,00
Paku Biasa m3 0,057 21.200 1.208,40
JUMLAH HARGA BAHAN 57.208,40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102.495,82
E Overhead & Profit 10% 0,100 10.249,58
F Harga Satuan Pekerjaan (D+E) - 112.745,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang kayu L.02.04 OH 0,300 190.080 57.024,00
Kepala tukang L.03.01 OH 0,030 200.448 6.013,44
Mandor L.04.01 OH 0,075 200.448 15.033,60
JUMLAH TENAGA KERJA 101.658,24
B BAHAN
Kayu 5/7 m3 0,015 4.000.000 61.600,00
Paku Biasa kg 0,200 21.200 4.240,00
JUMLAH HARGA BAHAN 65.840,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 167.498,24
E Overhead & Profit 10% 0,100 16.749,82
F Harga Satuan Pekerjaan (D+E) - 184.248,00

Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang kayu L.02.04 OH 0,300 190.080 57.024,00
Kepala tukang L.03.01 OH 0,030 200.448 6.013,44
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 96.491,52
B BAHAN
Kayu 5/7 m3 0,016 4.000.000 65.200,00
Paku Biasa kg 0,250 21.200 5.300,00
JUMLAH HARGA BAHAN 70.500,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 166.991,52
E Overhead & Profit 10% 0,100 16.699,15
F Harga Satuan Pekerjaan (D+E) - 183.690,00

Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,200 190.080 38.016,00
Kepala tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 58.752,00
B BAHAN
Kayu Papan m3 0,011 4.800.000 51.840,00
Paku Biasa kg 0,100 21.200 2.120,00
JUMLAH HARGA BAHAN 53.960,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 112.712,00
E Overhead & Profit 10% 0,100 11.271,20
F Harga Satuan Pekerjaan (D+E) - 123.983,00

Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,200 190.080 38.016,00
Kepala tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 58.752,00
B BAHAN
Kayu Papan m3 0,011 4.800.000 52.800,00
Paku Biasa kg 0,050 21.200 1.060,00
JUMLAH HARGA BAHAN 53.860,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 112.612,00
E Overhead & Profit 10% 0,100 11.261,20
F Harga Satuan Pekerjaan (D+E) - 123.873,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang kayu L.02.04 OH 0,450 190.080 85.536,00
Kepala tukang L.03.01 OH 0,045 200.448 9.020,16
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 119.746,94
B BAHAN
Balok kayu m3 0,028 4.000.000 112.000,00
Paku Biasa kg 0,150 21.200 3.180,00
JUMLAH HARGA BAHAN 115.180,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 234.926,94
E Overhead & Profit 10% 0,100 23.492,69
F Harga Satuan Pekerjaan (D+E) - 258.419,00

Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Tukang kayu L.02.04 OH 0,450 190.080 85.536,00
Kepala tukang L.03.01 OH 0,045 200.448 9.020,16
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 119.746,94
B BAHAN
Balok kayu, 6 x 12 m3 0,028 4.000.000 112.000,00
Paku Biasa kg 0,150 21.200 3.180,00
Teakwood 4 mm, 120 x 240 Lembar 0,860 80.000 68.800,00
Lem Kayu/Karet kg 0,560 25.000 14.000,00
JUMLAH HARGA BAHAN 197.980,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 317.726,94
E Overhead & Profit 10% 0,100 31.772,69
F Harga Satuan Pekerjaan (D+E) - 349.499,00

Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,200 157.248 31.449,60
Tukang kayu L.02.04 OH 0,600 190.080 114.048,00
Kepala tukang L.03.01 OH 0,060 200.448 12.026,88
Mandor L.04.01 OH 0,010 200.448 2.004,48
JUMLAH TENAGA KERJA 159.528,96
B BAHAN
Balok kayu, 6 x 12 m3 0,028 4.000.000 112.000,00
Paku Biasa kg 0,150 21.200 3.180,00
Plywood 4 mm Lembar 0,860 80.000 68.800,00
Lem Kayu/Karet kg 0,560 25.000 14.000,00
JUMLAH HARGA BAHAN 197.980,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 357.508,96
E Overhead & Profit 10% 0,100 35.750,90
F Harga Satuan Pekerjaan (D+E) - 393.259,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kelas I


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,600 157.248 94.348,80
Tukang kayu L.02.04 OH 1,800 190.080 342.144,00
Kepala tukang L.03.01 OH 0,180 200.448 36.080,64
Mandor L.04.01 OH 0,030 200.448 6.013,44
JUMLAH TENAGA KERJA 478.586,88
B BAHAN
Kayu Papan m3 0,007 4.800.000 33.600,00
Paku Biasa kg 0,100 21.200 2.120,00
Paku skrup kg 0,150 28.300 4.245,00
JUMLAH HARGA BAHAN 39.965,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 518.551,88
E Overhead & Profit 10% 0,100 51.855,19
F Harga Satuan Pekerjaan (D+E) - 570.407,00

Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,025 157.248 3.931,20
Tukang kayu L.02.04 OH 0,075 190.080 14.256,00
Kepala tukang L.03.01 OH 0,008 200.448 1.603,58
Mandor L.04.01 OH 0,001 200.448 200,45
JUMLAH TENAGA KERJA 19.991,23
B BAHAN
Plywood 4 mm m3 0,400 80.000 32.000,00
Paku Biasa kg 0,050 21.200 1.060,00
JUMLAH HARGA BAHAN 33.060,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53.051,23
E Overhead & Profit 10% 0,100 5.305,12
F Harga Satuan Pekerjaan (D+E) - 58.356,00

Pemasangan 1 buah kunci tanam biasa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,010 157.248 1.572,48
Tukang kayu L.02.04 OH 0,500 190.080 95.040,00
Kepala tukang L.03.01 OH 0,050 200.448 10.022,40
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 107.637,12
B BAHAN
Kunci tanam biasa Bh 1,000 346.000 346.000,00
JUMLAH HARGA BAHAN 346.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 453.637,12
E Overhead & Profit 10% 0,100 45.363,71
F Harga Satuan Pekerjaan (D+E) - 499.000,00

Pemasangan 1 buah kunci kamar mandi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,005 157.248 786,24
Tukang kayu L.02.04 OH 0,500 190.080 95.040,00
Kepala tukang L.03.01 OH 0,050 200.448 10.022,40
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 106.449,98
B BAHAN
Kunci tanam KM Bh 1,000 323.000 323.000,00
JUMLAH HARGA BAHAN 323.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 429.449,98
E Overhead & Profit 10% 0,100 42.945,00
F Harga Satuan Pekerjaan (D+E) - 472.394,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,015 157.248 2.358,72
Tukang kayu L.02.04 OH 0,150 190.080 28.512,00
Kepala tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,001 200.448 160,36
JUMLAH TENAGA KERJA 34.037,80
B BAHAN
Engsel pintu Bh 1,000 317.000 317.000,00
JUMLAH HARGA BAHAN 317.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 351.037,80
E Overhead & Profit 10% 0,100 35.103,78
F Harga Satuan Pekerjaan (D+E) - 386.141,00

Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,010 157.248 1.572,48
Tukang kayu L.02.04 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,001 200.448 100,22
JUMLAH TENAGA KERJA 22.685,18
B BAHAN
Engsel kupu-kupu Bh 1,000 58.000 58.000,00
JUMLAH HARGA BAHAN 58.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 80.685,18
E Overhead & Profit 10% 0,100 8.068,52
F Harga Satuan Pekerjaan (D+E) - 88.753,00

Pemasangan 1 buah engsel angin


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
A TENAGA - -
Pekerja L.01.01 OH 0,100 157.248 15.724,80
Tukang kayu L.02.04 OH 0,200 190.080 38.016,00
Kepala tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,001 200.448 100,22
JUMLAH TENAGA KERJA 57.849,98
B BAHAN
Engsel angin Bh 1,000 58.000 58.000,00
JUMLAH HARGA BAHAN 58.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 115.849,98
E Overhead & Profit 10% 0,100 11.585,00
F Harga Satuan Pekerjaan (D+E) - 127.434,00

Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,015 157.248 2.358,72
Tukang kayu L.02.04 OH 0,150 190.080 28.512,00
Kepala tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 35.481,02
B BAHAN
Kait angin Bh 1,000 45.000 45.000,00
JUMLAH HARGA BAHAN 45.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 80.481,02
E Overhead & Profit 10% 0,100 8.048,10
F Harga Satuan Pekerjaan (D+E) - 88.529,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 buah door closer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,050 157.248 7.862,40
Tukang kayu L.02.04 OH 0,500 190.080 95.040,00
Kepala tukang L.03.01 OH 0,050 200.448 10.022,40
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 113.526,14
B BAHAN
Door closer set 1,000 709.000 709.000,00
JUMLAH HARGA BAHAN 709.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 822.526,14
E Overhead & Profit 10% 0,100 82.252,61
F Harga Satuan Pekerjaan (D+E) - 904.778,00

Pemasangan 1 m2 kaca tebal 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,015 157.248 2.358,72
Tukang kayu L.02.04 OH 0,150 190.080 28.512,00
Kepala tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,001 200.448 160,36
JUMLAH TENAGA KERJA 34.037,80
B BAHAN
Kaca tebal 3mm m2 1,100 95.700 105.270,00
SEalant Kg 0,050 20.600 1.030,00
JUMLAH HARGA BAHAN 106.300,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 140.337,80
E Overhead & Profit 10% 0,100 14.033,78
F Harga Satuan Pekerjaan (D+E) - 154.371,00

Pemasangan 1 m2 kaca tebal 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,015 157.248 2.358,72
Tukang kayu L.02.04 OH 0,150 190.080 28.512,00
Kepala tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,001 200.448 160,36
JUMLAH TENAGA KERJA 34.037,80
B BAHAN
Kaca tebal 5 mm m2 1,100 103.600 113.960,00
SEalant Kg 0,050 20.600 1.030,00
JUMLAH HARGA BAHAN 114.990,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 149.027,80
E Overhead & Profit 10% 0,100 14.902,78
F Harga Satuan Pekerjaan (D+E) - 163.930,00

Pemasangan 1 m2 kaca tebal 8 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,017 157.248 2.673,22
Tukang kayu L.02.04 OH 0,170 190.080 32.313,60
Kepala tukang L.03.01 OH 0,017 200.448 3.407,62
Mandor L.04.01 OH 0,001 200.448 180,40
JUMLAH TENAGA KERJA 38.574,84
B BAHAN
Kaca tebal 8 mm m2 1,100 103.600 113.960,00
SEalant Kg 0,070 20.600 1.442,00
JUMLAH HARGA BAHAN 115.402,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 153.976,84
E Overhead & Profit 10% 0,100 15.397,68
F Harga Satuan Pekerjaan (D+E) - 169.374,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m2 kaca cermin tebal 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,015 157.248 2.358,72
Tukang kayu L.02.04 OH 0,150 190.080 28.512,00
Kepala tukang L.03.01 OH 0,015 200.448 3.006,72
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 35.481,02
B BAHAN
Kaca cermin 5 mm m2 1,100 253.800 279.180,00
JUMLAH HARGA BAHAN 279.180,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 314.661,02
E Overhead & Profit 10% 0,100 31.466,10
F Harga Satuan Pekerjaan (D+E) - 346.127,00

1 m2 Pengikisan/pengerokan permukaan cat lama


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 24.188,54
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 24.188,54
E Overhead & Profit 10% 0,100 2.418,85
F Harga Satuan Pekerjaan (D+E) - 26.607,00

1 m2 Pencucian bidang permukaan tembok yang pernah dicat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 24.188,54
B BAHAN
Sabun Kg 0,050 24.200 1.210,00
JUMLAH HARGA BAHAN 1.210,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 25.398,54
E Overhead & Profit 10% 0,100 2.539,85
F Harga Satuan Pekerjaan (D+E) - 27.938,00

1 m2 Pengerokan karat pada permukaan baja cara manual


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,150 157.248 23.587,20
Mandor L.04.01 OH 0,008 200.448 1.603,58
JUMLAH TENAGA KERJA 25.190,78
B BAHAN
Sabun Kg 0,050 24.200 1.210,00
JUMLAH HARGA BAHAN 1.210,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 26.400,78
E Overhead & Profit 10% 0,100 2.640,08
F Harga Satuan Pekerjaan (D+E) - 29.040,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,070 157.248 11.007,36
Tukang cat L.02.08 OH 0,009 190.080 1.710,72
Kepala tukang L.03.01 OH 0,006 200.448 1.202,69
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 14.522,11
B BAHAN
Cat menie Kg 0,200 28.850 5.770,00
Plamuur Kg 0,150 25.700 3.855,00
Cat dasar Kayu Kg 0,170 61.000 10.370,00
Cat Penutup Kayu Kg 0,260 198.500 51.610,00
Kuas Bh 0,010 21.200 212,00
Pengencer Kg 0,030 - -
Ampelas Lbr 0,200 14.100 2.820,00
JUMLAH HARGA BAHAN 74.637,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 89.159,11
E Overhead & Profit 10% 0,100 8.915,91
F Harga Satuan Pekerjaan (D+E) - 98.075,00

Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,070 157.248 11.007,36
Tukang cat L.02.08 OH 0,105 190.080 19.958,40
Kepala tukang L.03.01 OH 0,004 200.448 801,79
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 32.368,90
B BAHAN
Cat menie Kg 0,200 28.850 5.770,00
Plamuur Kg 0,150 25.700 3.855,00
Cat dasar Kayu Kg 0,170 61.000 10.370,00
Cat Penutup Kayu Kg 0,350 198.500 69.475,00
Kuas Bh 0,010 21.200 212,00
Pengencer Kg 0,030 - -
Ampelas Lbr 0,200 14.100 2.820,00
JUMLAH HARGA BAHAN 92.502,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 124.870,90
E Overhead & Profit 10% 0,100 12.487,09
F Harga Satuan Pekerjaan (D+E) - 137.357,00

Pelaburan 1 m2 bidang kayu dengan vernis


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,160 157.248 25.159,68
Tukang cat L.02.08 OH 0,160 190.080 30.412,80
Kepala tukang L.03.01 OH 0,016 200.448 3.207,17
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 59.380,99
B BAHAN
Vernis L 0,150 69.200 10.380,00
Dempul Kg 0,050 73.200 3.660,00
Ampelas Lbr 0,100 14.100 1.410,00
JUMLAH HARGA BAHAN 15.450,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 74.830,99
E Overhead & Profit 10% 0,100 7.483,10
F Harga Satuan Pekerjaan (D+E) - 82.314,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,020 157.248 3.144,96
Tukang cat L.02.08 OH 0,063 190.080 11.975,04
Kepala tukang L.03.01 OH 0,006 200.448 1.262,82
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 16.984,17
B BAHAN
Plamuur Kg 0,100 25.700 2.570,00
Cat dasar Tembok Kg 0,100 61.000 6.100,00
Cat Penutup Tembok Kg 0,260 198.500 51.610,00
JUMLAH HARGA BAHAN 60.280,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 77.264,17
E Overhead & Profit 10% 0,100 7.726,42
F Harga Satuan Pekerjaan (D+E) - 84.990,00

Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,028 157.248 4.402,94
Tukang cat L.02.08 OH 0,042 190.080 7.983,36
Kepala tukang L.03.01 OH 0,004 200.448 841,88
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 13.829,53
B BAHAN
Cat dasar Tembok Kg 0,120 61.000 7.320,00
Cat Penutup Tembok Kg 0,180 198.500 35.730,00
JUMLAH HARGA BAHAN 43.050,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 56.879,53
E Overhead & Profit 10% 0,100 5.687,95
F Harga Satuan Pekerjaan (D+E) - 62.567,00

Pengecatan 1 m2 permukaan baja dengan menie besi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,020 157.248 3.144,96
Tukang cat L.02.08 OH 0,200 190.080 38.016,00
Kepala tukang L.03.01 OH 0,020 200.448 4.008,96
Mandor L.04.01 OH 0,003 200.448 501,12
JUMLAH TENAGA KERJA 45.671,04
B BAHAN
Menie besi Kg 0,100 34.600 3.460,00

JUMLAH HARGA BAHAN 3.460,00


C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 49.131,04
E Overhead & Profit 10% 0,100 4.913,10
F Harga Satuan Pekerjaan (D+E) - 54.044,00

(K3) Pemasangan 1 buah closet duduk/monoblock


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3,300 157.248 518.918,40
Tukang batu L.02.03 OH 1,100 190.080 209.088,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,160 200.448 32.071,68
JUMLAH TENAGA KERJA 762.082,56
B BAHAN
Closet duduk Unit 1,000 4.431.700 4.431.700,00
Perlengkapan % 0,060 265.902 15.954,12
JUMLAH HARGA BAHAN 4.697.602 15.954,12
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2.993.886,68
E Overhead & Profit 10% 0,100 299.388,67
F Harga Satuan Pekerjaan (D+E) - 3.293.275,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 buah closet jongkok porslen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang batu L.02.03 OH 1,500 190.080 285.120,00
Kepala tukang L.03.01 OH 0,150 200.448 30.067,20
Mandor L.04.01 OH 0,160 200.448 32.071,68
JUMLAH TENAGA KERJA 504.506,88
B BAHAN
Closet jongkok Unit 1,000 519.000 519.000,00
Semen portland Kg 6,000 1.592 9.552,00
Pasir pasang M3 0,010 361.300 3.613,00
JUMLAH HARGA BAHAN 532.165,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.036.671,88
E Overhead & Profit 10% 0,100 103.667,19
F Harga Satuan Pekerjaan (D+E) - 1.140.339,00

Pemasangan 1 buah closet jongkok teraso


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang batu L.02.03 OH 1,500 190.080 285.120,00
Kepala tukang L.03.01 OH 0,150 200.448 30.067,20
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 482.457,60
B BAHAN
Closet jongkok Unit 1,000 519.000 519.000,00
Semen portland Kg 6,000 1.592 9.552,00
Pasir pasang M3 0,010 361.300 3.613,00
Bata merah Bh 7,000 800 5.600,00
JUMLAH HARGA BAHAN 537.765,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.020.222,60
E Overhead & Profit 10% 0,100 102.022,26
F Harga Satuan Pekerjaan (D+E) - 1.122.244,00

(K3) Pemasangan 1 buah urinoir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,000 157.248 157.248,00
Tukang batu L.02.03 OH 1,000 190.080 190.080,00
Kepala tukang L.03.01 OH 0,100 200.448 20.044,80
Mandor L.04.01 OH 0,050 200.448 10.022,40
JUMLAH TENAGA KERJA 377.395,20
B BAHAN
Urinoir Unit 1,000 4.035.000 4.035.000,00
Semen portland Kg 6,000 1.592 9.552,00
Pasir pasang M3 0,010 361.300 3.613,00
Perlengkapan % 30,000 1.210.500 1.210.500,00
JUMLAH HARGA BAHAN 5.258.665,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 5.636.060,20
E Overhead & Profit 10% 0,100 563.606,02
F Harga Satuan Pekerjaan (D+E) - 6.199.666,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

(K3) Pemasangan 1 buah wastafel


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1,200 157.248 188.697,60
Tukang batu L.02.03 OH 1,450 190.080 275.616,00
Kepala tukang L.03.01 OH 0,150 200.448 30.067,20
Mandor L.04.01 OH 0,060 200.448 12.026,88
JUMLAH TENAGA KERJA 506.407,68
B BAHAN
Wastafel Unit 1,200 680.000 816.000,00
Semen portland Kg 6,000 1.592 9.552,00
Pasir pasang M3 0,010 361.300 3.613,00
Perlengkapan % 12,000 204.000 2.448.000,00
JUMLAH HARGA BAHAN 3.277.165,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3.783.572,68
E Overhead & Profit 10% 0,100 378.357,27
F Harga Satuan Pekerjaan (D+E) - 4.161.929,00

Pemasangan 1 buah floor drain


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,010 157.248 1.572,48
Tukang batu L.02.03 OH 0,100 190.080 19.008,00
Kepala tukang L.03.01 OH 0,010 200.448 2.004,48
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 23.587,20
B BAHAN
Floor drain Unit 1,000 527.000 527.000,00
JUMLAH HARGA BAHAN 527.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 550.587,20
E Overhead & Profit 10% 0,100 55.058,72
F Harga Satuan Pekerjaan (D+E) - 605.645,00

Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2,160 157.248 339.655,68
Tukang batu L.02.03 OH 0,720 190.080 136.857,60
Kepala tukang L.03.01 OH 0,072 200.448 14.432,26
Mandor L.04.01 OH 0,011 200.448 2.204,93
JUMLAH TENAGA KERJA 493.150,46
B BAHAN
Bata merah bh 40,000 800 32.000,00
Semen portland Kg 44,000 1.592 70.048,00
Pasir pasang M3 0,070 361.300 25.291,00
Pasir beton M3 0,060 436.200 26.172,00
Kerikil M3 0,070 467.400 32.718,00
Baja tulangan Kg 1,600 17.200 27.520,00
JUMLAH HARGA BAHAN 213.749,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 706.899,46
E Overhead & Profit 10% 0,100 70.689,95
F Harga Satuan Pekerjaan (D+E) - 777.589,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3,200 157.248 503.193,60
Tukang batu L.02.03 OH 1,150 190.080 218.592,00
Kepala tukang L.03.01 OH 0,011 200.448 2.204,93
Mandor L.04.01 OH 0,016 200.448 3.207,17
JUMLAH TENAGA KERJA 727.197,70
B BAHAN
Bata merah bh 70,000 800 56.000,00
Semen portland Kg 77,000 1.592 122.584,00
Pasir pasang M3 0,130 361.300 46.969,00
Pasir beton M3 0,090 436.200 39.258,00
Kerikil M3 0,020 467.400 9.348,00
Baja tulangan Kg 2,600 17.200 44.720,00
JUMLAH HARGA BAHAN 318.879,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.046.076,70
E Overhead & Profit 10% 0,100 104.607,67
F Harga Satuan Pekerjaan (D+E) - 1.150.684,00

Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3,200 157.248 503.193,60
Tukang batu L.02.03 OH 1,150 190.080 218.592,00
Kepala tukang L.03.01 OH 0,011 200.448 2.204,93
Mandor L.04.01 OH 0,016 200.448 3.207,17
JUMLAH TENAGA KERJA 727.197,70
B BAHAN
Bata merah bh 123,000 800 98.400,00
Semen portland Kg 114,000 1.592 181.488,00
Pasir pasang M3 0,184 361.300 66.479,20
Pasir beton M3 0,120 436.200 52.344,00
Kerikil M3 0,033 467.400 15.424,20
Baja tulangan Kg 4,850 17.200 83.420,00
JUMLAH HARGA BAHAN 497.555,40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1.224.753,10
E Overhead & Profit 10% 0,100 122.475,31
F Harga Satuan Pekerjaan (D+E) - 1.347.228,00

Pemasangan 1 m’ pipa galvanis diameter ½”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,054 157.248 8.491,39
Tukang batu L.02.03 OH 0,090 190.080 17.107,20
Kepala tukang L.03.01 OH 0,009 200.448 1.804,03
Mandor L.04.01 OH 0,027 200.448 5.412,10
JUMLAH TENAGA KERJA 32.814,72
B BAHAN
Pipa galvanis ½” M 1,200 -
Perlengkapan % 35,000 - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32.814,72
E Overhead & Profit 10% 0,100 3.281,47
F Harga Satuan Pekerjaan (D+E) - 36.096,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 buah kran diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,010 157.248 1.572,48
Tukang batu L.02.03 OH 0,400 190.080 76.032,00
Kepala tukang L.03.01 OH 0,040 200.448 8.017,92
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 86.624,64
B BAHAN
Kran air M 1,000 -
Sealtape Buah 0,025 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 86.624,64
E Overhead & Profit 10% 0,100 8.662,46
F Harga Satuan Pekerjaan (D+E) - 95.287,00

Pemasangan 1 m’ pipa galvanis diameter 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,054 157.248 8.491,39
Tukang batu L.02.03 OH 0,090 190.080 17.107,20
Kepala tukang L.03.01 OH 0,009 200.448 1.804,03
Mandor L.04.01 OH 0,027 200.448 5.412,10
JUMLAH TENAGA KERJA 32.814,72
B BAHAN
Pipa galvanis 3/4” M 1,200 -
Perlengkapan % 35,000 - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32.814,72
E Overhead & Profit 10% 0,100 3.281,47
F Harga Satuan Pekerjaan (D+E) - 36.096,00

Pemasangan 1 m’ pipa galvanis diameter 1 ½”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,108 157.248 16.982,78
Tukang batu L.02.03 OH 0,180 190.080 34.214,40
Kepala tukang L.03.01 OH 0,018 200.448 3.608,06
Mandor L.04.01 OH 0,005 200.448 1.002,24
JUMLAH TENAGA KERJA 55.807,49
B BAHAN
Pipa galvanis 11/2” M 1,200 57.350 68.820,00
Perlengkapan % 35,000 688 24.087,00
JUMLAH HARGA BAHAN 92.907,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 148.714,49
E Overhead & Profit 10% 0,100 14.871,45
F Harga Satuan Pekerjaan (D+E) - 163.585,00

Pemasangan 1 m’ pipa galvanis diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,135 157.248 21.228,48
Tukang batu L.02.03 OH 0,225 190.080 42.768,00
Kepala tukang L.03.01 OH 0,023 200.448 4.610,30
Mandor L.04.01 OH 0,007 200.448 1.403,14
JUMLAH TENAGA KERJA 70.009,92
B BAHAN
Pipa galvanis 3” M 1,200 119.700 143.640,00
Perlengkapan % 35,000 1.436 50.274,00
JUMLAH HARGA BAHAN 193.914,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 263.923,92
E Overhead & Profit 10% 0,100 26.392,39
F Harga Satuan Pekerjaan (D+E) - 290.316,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m’ pipa galvanis diameter 4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,135 157.248 21.228,48
Tukang batu L.02.03 OH 0,225 190.080 42.768,00
Kepala tukang L.03.01 OH 0,023 200.448 4.610,30
Mandor L.04.01 OH 0,007 200.448 1.403,14
JUMLAH TENAGA KERJA 70.009,92
B BAHAN
Pipa galvanis 4” M 1,200 155.000 186.000,00
Perlengkapan % 35,000 1.860 65.100,00
JUMLAH HARGA BAHAN 251.100,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 321.109,92
E Overhead & Profit 10% 0,100 32.110,99
F Harga Satuan Pekerjaan (D+E) - 353.220,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,036 157.248 5.660,93
Tukang batu L.02.03 OH 0,060 190.080 11.404,80
Kepala tukang L.03.01 OH 0,006 200.448 1.202,69
Mandor L.04.01 OH 0,002 200.448 400,90
JUMLAH TENAGA KERJA 18.669,31
B BAHAN
Pipa PVC 1/2” M 1,200 29.000 34.800,00
Perlengkapan % 35,000 348 12.180,00
JUMLAH HARGA BAHAN 46.980,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 65.649,31
E Overhead & Profit 10% 0,100 6.564,93
F Harga Satuan Pekerjaan (D+E) - 72.214,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,036 157.248 5.660,93
Tukang batu L.02.03 OH 0,060 190.080 11.404,80
Kepala tukang L.03.01 OH 0,006 200.448 1.202,69
Mandor L.04.01 OH 0,002 200.448 400,90
JUMLAH TENAGA KERJA 18.669,31
B BAHAN
Pipa PVC 3/4” M 1,200 35.000 42.000,00
Perlengkapan % 35,000 420 14.700,00
JUMLAH HARGA BAHAN 56.700,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 75.369,31
E Overhead & Profit 10% 0,100 7.536,93
F Harga Satuan Pekerjaan (D+E) - 82.906,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,036 157.248 5.660,93
Tukang batu L.02.03 OH 0,060 190.080 11.404,80
Kepala tukang L.03.01 OH 0,006 200.448 1.202,69
Mandor L.04.01 OH 0,002 200.448 400,90
JUMLAH TENAGA KERJA 18.669,31
B BAHAN
Pipa PVC 1” M 1,200 48.000 57.600,00
Perlengkapan % 35,000 576 20.160,00
JUMLAH HARGA BAHAN 77.760,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 96.429,31
E Overhead & Profit 10% 0,100 9.642,93
F Harga Satuan Pekerjaan (D+E) - 106.072,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,054 157.248 8.491,39
Tukang batu L.02.03 OH 0,090 190.080 17.107,20
Kepala tukang L.03.01 OH 0,009 200.448 1.804,03
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 28.003,97
B BAHAN
Pipa PVC 11/2” M 1,200 83.000 99.600,00
Perlengkapan % 35,000 996 34.860,00
JUMLAH HARGA BAHAN 134.460,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 162.463,97
E Overhead & Profit 10% 0,100 16.246,40
F Harga Satuan Pekerjaan (D+E) - 178.710,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,054 157.248 8.491,39
Tukang batu L.02.03 OH 0,090 190.080 17.107,20
Kepala tukang L.03.01 OH 0,009 200.448 1.804,03
Mandor L.04.01 OH 0,003 200.448 601,34
JUMLAH TENAGA KERJA 28.003,97
B BAHAN
Pipa PVC 2” M 1,200 102.000 122.400,00
Perlengkapan % 35,000 1.224 42.840,00
JUMLAH HARGA BAHAN 165.240,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 193.243,97
E Overhead & Profit 10% 0,100 19.324,40
F Harga Satuan Pekerjaan (D+E) - 212.568,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,081 157.248 12.737,09
Tukang batu L.02.03 OH 0,135 190.080 25.660,80
Kepala tukang L.03.01 OH 0,014 200.448 2.706,05
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 41.905,73
B BAHAN
Pipa PVC 21/2” M 1,200 150.000 180.000,00
Perlengkapan % 35,000 1.800 63.000,00
JUMLAH HARGA BAHAN 243.000,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 284.905,73
E Overhead & Profit 10% 0,100 28.490,57
F Harga Satuan Pekerjaan (D+E) - 313.396,00

Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,081 157.248 12.737,09
Tukang batu L.02.03 OH 0,135 190.080 25.660,80
Kepala tukang L.03.01 OH 0,014 200.448 2.706,05
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 41.905,73
B BAHAN
Pipa PVC 3” M 1,200 197.000 236.400,00
Perlengkapan % 35,000 2.364 82.740,00
JUMLAH HARGA BAHAN 319.140,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 361.045,73
E Overhead & Profit 10% 0,100 36.104,57
F Harga Satuan Pekerjaan (D+E) - 397.150,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0,081 157.248 12.737,09
Tukang batu L.02.03 OH 0,135 190.080 25.660,80
Kepala tukang L.03.01 OH 0,014 200.448 2.706,05
Mandor L.04.01 OH 0,004 200.448 801,79
JUMLAH TENAGA KERJA 41.905,73
B BAHAN
Pipa PVC 4” M 1,200 319.000 382.800,00
Perlengkapan % 35,000 3.828 133.980,00
JUMLAH HARGA BAHAN 516.780,00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 558.685,73
E Overhead & Profit 10% 0,100 55.868,57
F Harga Satuan Pekerjaan (D+E) - 614.554,00

Galian untuk Selokan Drainase dan Saluran Air


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,0777 19.656 1.527,87
Mandor L03 jam 0,0389 25.056 973,80
JUMLAH TENAGA KERJA 2.501,67
B BAHAN
-
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
Excavator E10 jam 0,0389 585.930 22.772,26
Alat Bantu Ls 1,0000 500 500,00
-
JUMLAH HARGA ALAT 23.272,26
D Jumlah (A+B+C) 25.773,94
E Overhead & Profit 10% 0,100 2.577,39
F Harga Satuan Pekerjaan (D+E) - 28.351,00

Penyiapan Badan Jalan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,0112 19.656 220,63
Mandor L02 jam 0,0028 25.056 70,31
JUMLAH TENAGA KERJA 290,94
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Motor Grader E13 jam 0,0028 635.328 1.782,81
Vibro Roller E19 jam 0,0005 446.352 210,07
Alat Bantu Ls 1,0000 500 500,00

JUMLAH HARGA ALAT 2.492,88


D Jumlah (A+B+C) 2.783,81
E Overhead & Profit 10% 0,100 278,38
F Harga Satuan Pekerjaan (D+E) - 3.062,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Lapis Pondasi Agregat Kelas S


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,0595 19.656 1.168,87
Mandor L03 jam 0,0085 25.056 212,86
JUMLAH TENAGA KERJA 1.381,73
B BAHAN
Aggregat Kelas S M27 M3 1,2586 485.900 611.558,25

JUMLAH HARGA BAHAN 611.558,25


C PERALATAN
Wheel Loader E15 jam 0,0085 569.665 4.839,43
Dump Truck E09 jam 0,3273 422.316 138.207,88
Motor Grader E13 jam 0,0043 635.328 2.706,16
Tandem Roller E17 jam 0,0054 408.484 2.187,33
Truck Tangki E23 jam 0,0141 334.685 4.704,41
Alat Bantu Ls 1,0000 500 500,00

JUMLAH HARGA ALAT 153.145,21


D Jumlah (A+B+C) 766.085,19
E Overhead & Profit 10% 0,100 76.608,52
F Harga Satuan Pekerjaan (D+E) - 842.693,00

Lapis Pondasi Agregat Kelas B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,0595 19.656 1.168,87
Mandor L03 jam 0,0085 25.056 212,86
JUMLAH TENAGA KERJA 1.381,73
B BAHAN
Agregat Kelas B M27 M3 1,2586 634.400 798.461,72

JUMLAH HARGA BAHAN 798.461,72


C PERALATAN
Wheel Loader E15 jam 0,0085 569.665 4.839,43
Dump Truck E09 jam 0,3273 422.316 138.207,88
Motor Grader E13 jam 0,0043 635.328 2.706,16
Vibratory Roller E19 jam 0,0107 408.484 4.374,67
Truck Tangki E23 jam 0,0141 334.685 4.704,41
Alat Bantu Ls 1,0000 500 500,00

JUMLAH HARGA ALAT 155.332,55


D Jumlah (A+B+C) 955.176,00
E Overhead & Profit 10% 0,100 95.517,60
F Harga Satuan Pekerjaan (D+E) - 1.050.693,00

Laston Lapis Antara (AC-BC)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,2008 19.656 3.946,99
Mandor L03 jam 0,0201 25.056 503,13

JUMLAH TENAGA KERJA 4.450,12


B BAHAN
Lolos screen2 ukuran (9.5 - 19,0) M27 M3 0,4770 663.300 316.422,33
Lolos screen2 ukuran (0 - 5) M3 0,189 646.900 122.264,10
Filler M05 Kg 19,740 300 5.922,00
Aspal M10 Kg 59,740 14.700 878.178,00

JUMLAH HARGA BAHAN 1.322.786,43


C PERALATAN
Wheel Loader E15 jam 0,0096 569.665 5.452,48
AMP E01 jam 0,0201 9.546.053 191.687,80
Genset E12 jam 0,0201 656.806 13.188,87
Dump Truck E09 jam 0,4201 422.316 177.431,26
Asphalt Finisher E02 jam 0,0092 906.532 8.302,98
Tandem Roller E17 jam 0,0090 408.484 3.682,87
P. Tyre Roller E18 jam 0,004 408.484 1.580,14
Alat Bantu Ls 1,000 500 500,00
-
JUMLAH HARGA ALAT 401.826,41
D Jumlah (A+B+C) 1.729.062,96
E Overhead & Profit 10% 0,100 172.906,30
F Harga Satuan Pekerjaan (D+E) - 1.901.969,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Baja Tulangan U 24 Polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Biasa L01 jam 0,1050 19.656 2.063,88
Tukang L02 jam 0,0350 23.760 831,60
Mandor L03 jam 0,0350 25.056 876,96

JUMLAH TENAGA KERJA 3.772,44


B BAHAN
Baja Tulangan (Polos) U24 M39a Kg 1,1000 17.200 18.920,00
Kawat Beton M14 Kg 0,003 25.900 64,75

JUMLAH HARGA BAHAN 18.984,75


C PERALATAN
Alat Bantu Ls 1,000 500 500,00
-
JUMLAH HARGA ALAT 500,00
D Jumlah (A+B+C) 23.257,19
E Overhead & Profit 10% 0,100 2.325,72
F Harga Satuan Pekerjaan (D+E) - 25.582,00

Stabilisasi Dengan Tanaman


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L01 jam 0,1400 19.656 2.751,84
Mandor L03 jam 0,0350 25.056 876,96

JUMLAH TENAGA KERJA 3.628,80


B BAHAN
Gebalan Rumput M32 M3 1,1000 34.100 37.510,00
Tanah Hitam M102 M3 0,0550 230.500 12.677,50

JUMLAH HARGA BAHAN 50.187,50


C PERALATAN
Alat Bantu Ls 1,000 500 500,00
-
JUMLAH HARGA ALAT 500,00
D Jumlah (A+B+C) 54.316,30
E Overhead & Profit 10% 0,100 5.431,63
F Harga Satuan Pekerjaan (D+E) - 59.747,00

Marka Jalan Termoplastik


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Biasa L01 jam 0,6000 19.656 11.793,60
Tukang L02 jam 0,2250 23.760 5.346,00
Mandor L03 jam 0,0750 25.056 1.879,20

JUMLAH TENAGA KERJA 19.018,80


B BAHAN
Cat Marka Thermoplastic M17B Kg 1,9500 58.500 114.075,00
Thinner M33 Liter 1,0500 53.000 55.650,00
Glass Bead M34 Kg 0,4500 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN
Compressor E05 jam 0,075 271.087 20.331,50
Dump Truck E09 jam 0,075 422.316 31.673,68
Alat Bantu Ls 1,000 500 500,00
-
JUMLAH HARGA ALAT 52.505,18
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% 0,100 #REF!
F Harga Satuan Pekerjaan (D+E) - #REF!
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Pengecatan Kerb
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Biasa L01 jam 0,4667 19.656 9.172,80
Mandor L03 jam 0,0467 25.056 1.169,28

JUMLAH TENAGA KERJA 10.342,08


B BAHAN
Cat Kg 0,2363 78.400 18.522,00

JUMLAH HARGA BAHAN 18.522,00


C PERALATAN
Alat Bantu Ls 1,000 500 500,00
-
JUMLAH HARGA ALAT 500,00
D Jumlah (A+B+C) 29.364,08
E Overhead & Profit 10% 0,100 2.936,41
F Harga Satuan Pekerjaan (D+E) - 32.300,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)

Membuat 1 m3 beton mutu f’= 20 MPa + Bekisitng


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Jam 4,096 19.656 80.518,55
Kepala Tukang Jam 2,048 25.056 51.319,52
Mandor Jam 0,683 25.056 17.106,51
JUMLAH TENAGA KERJA 148.944,58
B BAHAN
Semen Kg 422,300 1.592 672.301,60
Pasir beton M3 0,541 436.200 236.051,31
Agregat Kasar M3 0,744 467.400 347.745,60
Kayu Perancah M3 0,200 3.200.000 640.000,00
Paku Kg 1,600 21.200 33.920,00

JUMLAH HARGA BAHAN 1.930.018,51


C PERALATAN - -
Conc. Mixer jam 0,683 116.697 79.672,74
Truck Tangki jam 0,038 334.685 12.769,11
Conc. Vibrator jam 0,683 68.295 46.627,16
Alat Bantu Ls 1,000 500 500,00

JUMLAH HARGA ALAT 139.569,01


D Jumlah (A+B+C) - 2.218.532,10
E Overhead & Profit 10% 0,100 221.853,21
F Harga Satuan Pekerjaan (D+E) - 2.440.385,00

Membuat 1 m3 beton mutu f’= 10 MPa + Bekisitng


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Jam 1,365 19.656 26.839,52
Kepala Tukang Jam 1,365 25.056 34.213,01
Mandor Jam 0,683 25.056 17.106,51
JUMLAH TENAGA KERJA 78.159,04
B BAHAN
Semen Kg 311,060 1.592 495.207,52
Pasir beton M3 0,511 436.200 223.015,64
Agregat Kasar M3 0,905 467.400 423.113,85
Kayu Perancah M3 0,050 3.200.000 160.000,00
Paku Kg 0,400 21.200 8.480,00

JUMLAH HARGA BAHAN 1.309.817,01


C PERALATAN - -
Conc. Mixer jam 0,683 116.697 79.672,74
Truck Tangki jam 0,038 334.685 12.769,11
Alat Bantu Ls 1,000 500 500,00

JUMLAH HARGA ALAT 92.941,85


D Jumlah (A+B+C) - 1.480.917,89
E Overhead & Profit 10% 0,100 148.091,79
F Harga Satuan Pekerjaan (D+E) - 1.629.009,00
DAFTAR HARGA SATUAN POKOK PEKERJAAN (HSPK)
Membuat 1 m3 beton mutu f’= 25 MPa + Bekisitng
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Jam 0,803 19.656 15.787,95
Kepala Tukang Jam 1,104 25.056 27.672,29
Mandor Jam 0,100 25.056 2.515,66
JUMLAH TENAGA KERJA 45.975,90
B BAHAN
Semen Kg 469,680 1.592 747.730,56
Pasir beton M3 0,510 436.200 222.311,01
Agregat Kasar M3 0,744 467.400 347.745,60
Kayu Perancah M3 0,200 3.200.000 640.000,00
Paku Kg 1,600 21.200 33.920,00

JUMLAH HARGA BAHAN 1.991.707,17


C PERALATAN - -
Conc. Pan Mixer jam 0,100 763.426 76.649,23
Truck Mixer jam 0,779 752.434 586.068,97
Truck Tangki jam 0,038 334.685 12.769,11
Conc. Vibrator jam 0,100 68.295 6.856,94
Alat Bantu Ls 1,000 500 500,00

JUMLAH HARGA ALAT 682.844,25


D Jumlah (A+B+C) - 2.720.527,32
E Overhead & Profit 10% 0,100 272.052,73
F Harga Satuan Pekerjaan (D+E) - 2.992.580,00

Membuat 1 m3 beton mutu f’= 15 MPa + Bekisitng


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Jam 4,096 19.656 80.518,55
Kepala Tukang Jam 1,365 25.056 34.213,01
Mandor Jam 0,683 25.056 17.106,51
JUMLAH TENAGA KERJA 131.838,07
B BAHAN
Semen Kg 327,540 1.592 521.443,68
Pasir beton M3 0,502 436.200 219.140,17
Agregat Kasar M3 0,905 467.400 423.113,85
Kayu Perancah M3 0,100 3.200.000 320.000,00
Paku Kg 0,800 21.200 16.960,00

JUMLAH HARGA BAHAN 1.500.657,70


C PERALATAN - -
Conc. Mixer jam 0,683 116.697 79.672,74
Truck Tangki jam 0,038 334.685 12.769,11
Conc. Vibrator jam 0,683 68.295 46.627,16
Alat Bantu Ls 1,000 500 500,00

JUMLAH HARGA ALAT 139.569,01


D Jumlah (A+B+C) - 1.772.064,79
E Overhead & Profit 10% 0,100 177.206,48
F Harga Satuan Pekerjaan (D+E) - 1.949.271,00

BUPATI SIAK

ALFEDRI
LAMPIRAN III : Keputusan Bupati Siak
Nomor : /HK/KPTS/2019
Tanggal : September 2019

DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 424.847

2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 497.113

3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 3.878.138

4 Pengukuran dan pemasangan 1 m’ Bouwplank 521.884

5 (K3) Pembuatan 1 m2 kantor sementara lantai plesteran 1.695.054

6 (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1.662.097

7 (K3) Pembuatan 1 m2 gudang semen dan peralatan 1.180.434

8 (K3) Pembuatan 1 m2 bedeng pekerja 1.258.853

9 (K3) Pembersihan 1 m2 lapangan dan perataan 28.321

10 (K3) Pembuatan 1 m2 steger/perancah dari bambu 677.729

11 Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm 271.846

12 Pembuatan 1 m2 jalan sementara 290.185

13 Pembongkaran 1 m3 beton bertulang 377.490

14 Pembongkaran 1 m3 dinding tembok bata 188.745

15 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 22.456

1 Penggalian 1 m3 tanah biasa sedalam 1 m 135.241

2 Penggalian 1 m3 tanah biasa sedalam 2 m 165.597

3 Menggali 1 m3 tanah biasa sedalam 3 m 196.394

4 Menggali 1 m3 tanah keras sedalam 1 m 180.028

5 Menggali 1 m3 tanah cadas sedalam 1 m 272.688

6 Menggali 1 m3 tanah lumpur sedalam 1 m 217.489

7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 9.751

8 (K3) Pembuangan 1 m3 tanah sejauh 30 meter 59.285

9 Pengurugan kembali 1 m3 galian tanah (1/3 Galian;-Tanah Biasa Sedalam 1 M) 48.755

10 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) 97.511

11 Pengurugan 1 m3 dengan pasir urug 415.908

12 Pengurugan 1 m3 sirtu padat 575.039

1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 1.361.023

2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 1.306.636

3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 1.268.892

4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP 1.242.375

5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 1.205.985

1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 1.478.220

2 Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125) 1.519.904


DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150) 1.552.146

4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 087 1.366.984

5 Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 1.590.632

6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 1.626.986

7 Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 1.655.042

8 Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 1.672.705

9 Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53 1.703.538

10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52 1.712.864

11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49 1.848.827

12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48 1.861.274

13 Pembesian 10 kg dengan besi polos atau besi ulir 49.116

14 Pemasangan 10 kg kabel presstressed polos/strands 40.671

15 Pemasangan 10 kg jaring kawat baja (wiremesh) 53.013

16 (K3) Pemasangan 1 m2 bekisting untuk pondasi 305.517

17 (K3) Pemasangan 1 m2 bekisting untuk sloof 323.117

18 (K3) Pemasangan 1 m2 bekisting untuk kolom 527.686

19 (K3) Pemasangan 1 m2 bekisting untuk balok 540.886

20 (K3) Pemasangan 1 m2 bekisting untuk lantai 615.686

21 (K3) Pemasangan 1 m2 bekisting untuk dinding 614.366

22 (K3) Pemasangan 1 m2 bekisting untuk tangga 491.512

23 Pemasangan 1 m2 jembatan untuk pengecoran beton 157.186

24 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 6.584.566

25 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) 8.049.366

26 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) 12.775.469

27 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 9.918.245

28 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 8.830.239

29 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 7.722.898

30 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) 9.255.043

31 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 160.726

32 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 201.985

1 Pengerjaan 10 cm pengelasan dengan las listrik 32.948

2 Pemasangan 1 m2 rolling door alluminium 977.564

3 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 207.240

1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP 387.797

2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP 373.694

3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP 363.281

4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP 359.240

5 Pemasangan 1 m2 dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP 360.709


DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 188.200

7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 180.974

8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 177.141

9 Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP 174.748

10 Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP 173.957

11 Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP 171.167

1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. 123.379

2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. 115.722

3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 112.628

4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 110.335

5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 109.281

6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 108.333

7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 107.890

8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 107.447

9 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 154.870

10 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 124.543

11 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. 147.555

12 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 146.281

13 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 144.885

15 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 64.566

16 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 113.216

17 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 88.262

18 Pemasangan 1 m2 finishing siar pasangan bata merah 50.598

19 Pemasangan 1 m2 finishing siar pasangan conblock ekspose 23.992

20 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. 105.741

21 Pemasangan 1 m2 acian. 65.604

22 Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) 258.301

23 Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) 97.810

1 Pemasangan 1 m2 lantai ubin warna ukuran 40cm x40 cm 297.559

2 Pemasangan 1 m2 lantai ubin warna ukuran 30cm x30cm 246.789

3 Pemasangan 1 m2 lantai ubin warna ukuran 20cm x20cm 264.001

4 Pemasangan 1 m2 lantai ubin granit ukuran 40cm x40cm 410.601

5 Pemasangan 1 m2 lantai ubin granit ukuran 30cm x30cm 386.855

6 Pemasangan 1 m2 lantai keramik ukuran 30cm x 30cm 913.605

7 Pemasangan 1 m2 lantai keramik ukuran 20cm x 20cm 972.082

8 Pemasangan 1 m2 dinding keramik 20cm x 20cm 1.160.008

9 Pemasangan 1 m2 wallpaper lebar 50 cm 252.406

10 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 67.212


DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

11 Pemasangan 1 m2 paving block natural tebal 6 cm 286.719

12 Pemasangan 1 m2 paving block natural tebal 8 cm 304.608

13 Pemasangan 1 m2 paving block berwarna tebal 6 cm 301.262

14 Pemasangan 1 m2 paving block berwarna tebal 8 cm 319.029

1 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 140.474

2 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 86.617

3 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 385.230

4 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 73.581

6 Pemasangan 1 m’ list langit-langit kayu profil 46.510

1 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 130.946

2 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai 167.752

1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 12.006.514

2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 10.601.105

3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 484.369

4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 449.169

5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 1.100.269

6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 835.643

7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 1.226.989

8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup 846.546

9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 937.455

10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 972.329

11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 1.030.053

12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 745.908

13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 9.708.104

14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 12.605.109

15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 11.048.477

16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 267.343

17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 359.743

18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II 112.745

19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 184.248

20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 183.690

21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 123.983

22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 123.873

23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 258.419

24 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II 349.499

25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 393.259

26 Pemasangan 1 m2 dinding lambrisering dari Kayu Papan kelas I 570.407


DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 58.356

1 Pemasangan 1 buah kunci tanam biasa 499.000

2 Pemasangan 1 buah kunci kamar mandi 472.394

4 Pemasangan 1 buah engsel pintu 386.141

5 Pemasangan 1 buah engsel jendela kupu-kupu 88.753

6 Pemasangan 1 buah engsel angin 127.434

7 Pemasangan 1 buah kait angin 88.529

8 Pemasangan 1 buah door closer 904.778

9 Pemasangan 1 m2 kaca tebal 3 mm 154.371

10 Pemasangan 1 m2 kaca tebal 5 mm 163.930

11 Pemasangan 1 m2 kaca tebal 8 mm 169.374

12 Pemasangan 1 m2 kaca cermin tebal 5 mm 346.127

1 Pengikisan/pengerokan 1 m2 permukaan cat lama 26.607

2 Pencucian 1 m2 bidang permukaan tembok yang pernah dicat 27.938

3 Pengerokan 1 m2 karat pada permukaan baja cara manual 29.040

4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 98.075

5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup) 137.357

6 Pelaburan 1 m2 bidang kayu dengan vernis 82.314

7 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 84.990

8 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 62.567

9 Pengecatan 1 m2 permukaan baja dengan menie besi 54.044

1 (K3) Pemasangan 1 buah closet duduk/monoblock 3.293.275

2 Pemasangan 1 buah closet jongkok porslen 1.140.339

3 Pemasangan 1 buah closet jongkok teraso 1.122.244

4 (K3) Pemasangan 1 buah urinoir 6.199.666

5 (K3) Pemasangan 1 buah wastafel 4.161.929

6 Pemasangan 1 buah floor drain 605.645

7 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 777.589

8 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 1.150.684

9 Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm 1.347.228

10 Pemasangan 1 m’ pipa galvanis diameter ½” 36.096

11 Pemasangan 1 buah kran diameter ½” atau 3/4” 95.287

12 Pemasangan 1 m’ pipa galvanis diameter 3/4” 36.096

14 Pemasangan 1 m’ pipa galvanis diameter 1 ½” 163.585

15 Pemasangan 1 m’ pipa galvanis diameter 3” 290.316

16 Pemasangan 1 m’ pipa galvanis diameter 4” 353.220


DAFTAR ANALISA STANDAR BELANJA (ASB)

No Jenis Pekerjaan Harga (Rp)

1 Membuat 1 m3 beton mutu f’= 20 MPa + Bekisitng 2.440.385

2 Membuat 1 m3 beton mutu f’= 10 MPa + Bekisitng 1.629.009

3 Membuat 1 m3 beton mutu f’= 25 MPa + Bekisitng 2.992.580

4 Membuat 1 m3 beton mutu f’= 15 MPa + Bekisitng 1.949.271

BUPATI SIAK

ALFEDRI
HARGA UPAH KERJA

NO NAMA UPAH PEKERJAAN SAT Harga Upah (Rp)

1 MANDOR OH 200.448
2 KEPALA TUKANG OH 200.448
3 TUKANG OH 190.080
4 PEKERJA OH 157.248
5 PEKERJA TERAMPIL OH 157.600
6 OPERATOR OH 216.864
7 PEMBANTU OPERATOR OH 178.848
8 SOPIR / DRIVER OH 206.496
9 PEMBANTU SUPIR OH 173.664
10 KOORDINATOR SWAKELOLA OH 200.448
11 TENAGA PELAKSANA / PENGAWAS (SWAKELOLA) OH 190.080
12 TENAGA KEAMANAN ALAT (SWAKELOLA) OH 157.248
13 TRANSPORTASI TENAGA PELAKSANA / PENGAWAS (SWAKELOLA) OH 157.248
14 KEPALA MEKANIK OH 216.864
15 PEMBANTU MEKANIK OH 190.080

BUPATI SIAK

ALFEDRI
ANGKA INDEKS RATA-RATA UNTUK SETIAP KECAMATAN DI
KABUPATEN SIAK

INDEKS RATA-RATA
NO KECAMATAN TAHUN ANGGARAN 2019
(%)
1 SIAK 100,00
2 BUNGA RAYA 100,06
3 MEMPURA 100,70
4 SUNGAI MANDAU 110,79
5 SUNGAI APIT 109,92
6 SABAK AUH 107,93
7 PUSAKO 110,79
8 DAYUN 102,78
9 MINAS 99,80
10 KANDIS 99,81
11 KOTO GASIB 102,29
12 LUBUK DALAM 100,54
13 KERINCI KANAN 99,98
14 TUALANG 101,82

INDEKS UNTUK DESA TERPENCIL

KECAMATAN INDEKS AWAL INDEKS TOTAL INDEKS


NO
DESA (%) TAMBAHAN (%)
1 SUNGAI APIT 109,92
TELUK LANUS PENYENGAT 2 111,92
2 KANDIS 99,81
DESA........... 2 101,81
3 SUNGAI MANDAU 110,79
DESA.......... 2 112,79

Anda mungkin juga menyukai