REKAPITULASI

REPUBLIK INDONESIA PEKERJAAN :


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PASANGAN BATU MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS :
TAHUN ANGGARAN : 2021
STATUS : BULAN FEBRUARI

VOLUME
NO URAIAN KM (M2) KETERANGAN

1 Lampiran 1 276.60 32.75


2 Lampiran 2 295.50 137.61
Lampiran 3 203.70 119.25
Lampiran 4 125.00 77.46
Lampiran 5 191.00 82.91
Lampiran 6 281.60 134.69
Lampiran 7 219.20 109.74
Lampiran 8 58.50 30.42
Lampiran 9 195.30 98.99
Lampiran 10 166.50 86.58
Lampiran 11 319.20 138.02
Lampiran 12 206.80 82.13
Lampiran 13
Lampiran 14
Lampiran 15
Lampiran 16
Lampiran 17

TOTAL 2,538.90 1,130.55


VOLUME BG NAZAR 1147.5
Mengetahui : - 16.95 Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK - 2.3 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip.
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. L/R Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

TANJONG

1 6+376.00 L 0.20 0.20 0.79


24.00 3.67 3.67
2 6+400.00 L 0.20 0.20 0.74
25.00 3.70 3.70
3 6+425.00 L 0.20 0.20 0.74
25.00 3.60 3.60
4 6+450.00 L 0.20 0.20 0.70
13.20 1.76 1.76 12.73
5 6+463.20 L 0.20 0.20 0.63

1 6+376.00 L 0.60 0.20


24.00 2.88 2.88
2 6+400.00 L 0.60 0.20
25.00 3.00 3.00
3 6+425.00 L 0.60 0.20
25.00 3.00 3.00
4 6+450.00 L 0.60 0.20
13.20 1.58 1.58 10.464
5 6+463.20 L 0.60 0.20

1 6+376.00 L 0.25 0.25 0.19


24.00 1.14 1.14
2 6+400.00 L 0.25 0.25 0.19
25.00 1.13 1.13
3 6+425.00 L 0.25 0.25 0.17
25.00 1.03 1.03
4 6+450.00 L 0.25 0.25 0.16
13.20 0.56 0.56 3.85725
5 6+463.20 L 0.25 0.25 0.18

1 6+600.00 L 0.20 0.20 0.70 0.80 0.20 0.20 0.20 0.70


15.00 2.10 1.50 2.10 5.70
2 6+620.00 L 0.20 0.20 0.70 0.20 0.20 0.20 0.20 0.70

SUB TOTAL (1) 276.60 32.75

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

TANJONG

1 6+542.00 R 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


8.00 1.28 1.60 1.28 4.16
2 6+550.00 R 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 3.95 5.00 3.95 12.90
3 6+575.00 R 0.20 0.20 0.78 1.00 0.20 0.20 0.20 0.78
25.00 3.90 5.00 3.90 12.80
4 6+600.00 R 0.20 0.20 0.78 1.00 0.20 0.20 0.20 0.78
25.00 3.88 5.00 3.88 12.75
5 6+625.00 R 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77
25.00 3.88 5.00 3.88 12.75
6 6+650.00 R 0.20 0.20 0.78 1.00 0.20 0.20 0.20 0.78
25.00 3.95 5.00 3.95 12.90
7 6+675.00 R 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 3.98 5.00 3.98 12.95
8 6+700.00 R 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
6.50 1.03 4.55 1.03 6.62
9 6+706.50 R 0.20 0.20 0.80 1.00 1.20 0.20 0.20 0.80

10 0.00

11 0.00 0.00
- - - -
12 TAMBAHAN 0.00 0.00
- - - -
13 9+074.00 0.20 0.20 0.60 0.70 0.20 0.20 0.20 0.60
131.00 15.72 18.34 15.72 49.78
14 9+205.00 0.20 0.20 0.60 0.70 0.20 0.20 0.20 0.60
- - - -
15 0.00 0.00
0.00 - - - -
16 0.00 0.00
0.00 - - - -
17 0.00 0.00
0.00 - - - -
18 0.00 0.00
0.00 - - -
19 0.00 0.00
0.00 - - - -
20 0.00 0.00
0.00 - - - -
21 0.00 0.00
0.00 - - - -
22 0.00 0.00
0.00 - - - -
23 0.00 0.00
0.00 - - - -
24 0.00 0.00
SUB TOTAL (1) 295.50 137.61

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

JANTANG

1 42+407.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


18.00 2.88 3.60 2.88 9.36
2 42+425.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
3 42+450.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
6.00 0.96 1.20 0.96 3.12 25.48
4 42+456.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
5
- - - -
6 42+459.00 L 0.20 0.20 0.82 1.00 0.20 0.20 0.20 0.82
11.00 1.83 2.20 1.83 5.85
7 42+470.00 L 0.20 0.20 0.84 1.00 0.20 0.20 0.20 0.84

9 42+475.00 L 0.20 0.20 0.83 1.00 0.20 0.20 0.20 0.83


25.00 4.08 5.00 4.08 13.15
10 42+500.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 3.80 4.75 4.00 12.55
11 42+525.00 L 0.18 0.18 0.80 1.00 0.18 0.20 0.20 0.80
25.00 3.90 4.75 4.10 12.75
12 42+550.00 L 0.20 0.20 0.84 1.00 0.20 0.20 0.20 0.84
5.00 0.84 1.00 0.84 2.68
13 42+555.00 L 0.20 0.20 0.84 1.00 0.20 0.20 0.20 0.84
- -
14
- -
15 42+558.00 L 0.20 0.20 0.86 1.00 0.20 0.20 0.20 0.86
17.00 2.82 3.40 2.82 9.04
16 42+575.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
5.90 0.94 1.18 0.94 3.07
17 42+580.90 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80

18
-
19 42+585.00 L 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77
15.80 2.58 3.16 2.58 8.31
20 42+600.80 L 0.20 0.20 0.86 1.00 0.20 0.20 0.20 0.86
6.55 - 6.55
21
6.55 - 6.55
22 42+605.00 L 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77
20.00 3.26 4.00 3.26 10.52
23 42+625.00 L 0.20 0.20 0.86 1.00 0.20 0.20 0.20 0.86
5.00 0.88 1.00 0.88 2.75
24 42+630.00 L 0.20 0.20 0.89 1.00 0.20 0.20 0.20 0.89
SUB TOTAL (1) 203.70 119.25

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

JANTANG

1 42+633.00 L 0.20 0.20 0.90 1.00 0.20 0.20 0.20 0.90


17.00 3.06 3.40 3.06 9.52
2 42+650.00 L 0.20 0.20 0.90 1.00 0.20 0.20 0.20 0.90
- - - -
3 0.00 0.00
- - - -
4 42+654.00 L 0.20 0.20 0.89 1.00 0.20 0.20 0.20 0.89
20.50 3.65 4.10 3.65 11.40
5 42+674.50 L 0.20 0.20 0.89 1.00 0.20 0.20 0.20 0.89
9.20 1.64 1.84 1.64 5.12
6 42+683.70 L 0.20 0.20 0.89 1.00 0.20 0.20 0.20 0.89
- - - -
7 0.00
- - - -
8 42+688.00 L 0.20 0.20 0.90 0.90 0.20 0.20 0.20 0.90
12.00 2.16 2.16 2.16 6.48
9 42+700.00 L 0.20 0.20 0.90 0.90 0.20 0.20 0.20 0.90
10.60 1.85 1.91 1.85 5.62
10 42+710.60 L 0.20 0.20 0.85 0.90 0.20 0.20 0.20 0.85

11

12 42+713.60 L 0.20 0.20 0.80 1.00 2.00 0.20 0.20 0.80


11.40 1.82 12.54 1.82 16.19
13 42+725.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
15.80 2.53 3.16 2.53 8.22
14 42+740.80 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
15 0.00 0.00 0.00
- - - -
16 42+748.50 L 0.20 0.20 0.82 1.00 0.20 0.20 0.20 0.82
26.50 4.29 5.30 4.29 13.89
17 42+775.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
2.00 0.32 0.40 0.32 1.04
18 42+777.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - -
19 0.00 0.00 0.00
- - - -
20 0.00 0.00 0.00
0.00 - - - -
21 0.00 0.00 0.00
0.00 - - - -
22 0.00 0.00 0.00
0.00 - - - -
23 0.00 0.00 0.00
0.00 - - - -
24 0.00 0.00 0.00
SUB TOTAL (1) 125.00 77.46

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

JANTANG

1 42+782.00 L 0.20 0.20 0.81 1.00 0.20 0.20 0.20 0.81


18.00 2.90 3.60 2.90 9.40
2 42+800.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 3.98 5.00 3.98 12.95
3 42+825.00 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
25.00 3.95 5.00 3.95 12.90
4 42+850.00 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
25.00 4.00 5.00 4.00 13.00
5 42+875.00 L 0.20 0.20 0.81 1.00 0.20 0.20 0.20 0.81
14.00 2.27 2.80 2.27 7.34
6 42+889.00 L 0.20 0.20 0.81 1.00 0.20 0.20 0.20 0.81

8 42+894.00 L 0.20 0.20 0.80 0.20 0.20 0.20 0.20 0.80


6.00 0.97 0.24 0.97 2.18
9 42+900.00 L 0.20 0.20 0.82 0.20 0.20 0.20 0.20 0.82
25.00 4.05 1.00 4.05 9.10
10 42+925.00 L 0.20 0.20 0.80 0.20 0.20 0.20 0.20 0.80
25.00 4.05 0.75 3.04 7.84
11 42+950.00 L 0.20 0.20 0.82 0.10 0.20 0.10 0.10 0.82
25.00 3.98 0.65 2.58 7.21
12 42+975.00 L 0.20 0.20 0.77 0.16 0.20 0.16 0.16 0.77
3.00 0.47 0.11 0.42 1.00
13 42+978.00 L 0.20 0.20 0.79 0.20 0.20 0.20 0.20 0.79
- - - -
14
- - - -
15 0.00 0.00 0.00
0.00 - - - -
16 0.00 0.00 0.00
0.00 - - - -
17 0.00 0.00 0.00
0.00 - - - -
18 0.00 0.00 0.00
0.00 - - -
19 0.00 0.00 0.00
0.00 - - - -
20 0.00 0.00 0.00
0.00 - - - -
21 0.00 0.00 0.00
0.00 - - - -
22 0.00 0.00 0.00
0.00 - - - -
23 0.00 0.00 0.00
0.00 - - - -
24 0.00 0.00 0.00
SUB TOTAL (1) 191.00 82.91

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

BLANG ME

1 44+633.00 L 0.20 0.20 0.57 0.80 0.20 0.20 0.20 0.57


17.00 1.99 2.72 1.99 6.70
2 44+650.00 L 0.20 0.20 0.60 0.80 0.20 0.20 0.20 0.60
25.00 3.00 4.00 3.00 10.00
3 44+675.00 L 0.20 0.20 0.60 0.80 0.20 0.20 0.20 0.60
25.00 2.98 4.00 2.98 9.95
4 44+700.00 L 0.20 0.20 0.59 0.80 0.20 0.20 0.20 0.59
10.00 1.18 1.60 1.18 3.96
5 44+710.00 L 0.20 0.20 0.59 0.80 0.20 0.20 0.20 0.59
- - - -
6 0.00 0.00 0.00
- - - -
7 44+731.70 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
18.30 2.93 3.66 2.93 9.52
8 44+750.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
3.80 0.61 0.76 0.61 1.98
9 44+753.80 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - -
10
- - - -
11 44+775.00 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
22.50 3.40 4.50 3.40 11.30
12 44+797.50 L 0.20 0.20 0.72 1.00 0.20 0.20 0.20 0.72
- - - -
13
- - - -
14 44+875.00 L 0.18 0.18 0.87 1.00 0.20 0.20 0.20 0.87
25.00 4.04 4.93 4.25 13.21
15 44+900.00 L 0.20 0.20 0.83 0.97 0.20 0.20 0.20 0.83
25.00 4.08 4.85 4.08 13.00
16 44+925.00 L 0.20 0.20 0.80 0.97 0.20 0.20 0.20 0.80
25.00 3.98 4.93 3.98 12.88
17 44+950.00 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
2.50 0.40 0.50 0.40 1.29
18 44+952.50 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
- - - -
19
- - - -
20 44+958.00 L 0.20 0.20 0.74 1.00 0.20 0.20 0.20 0.74
17.00 2.41 3.40 2.41 8.23
21 44+975.00 L 0.20 0.20 0.68 1.00 0.20 0.20 0.20 0.68
25.00 3.58 5.00 3.58 12.15
22 45+000.00 L 0.20 0.20 0.75 1.00 0.20 0.20 0.20 0.75
25.00 3.80 5.00 3.80 12.60
23 45+025.00 L 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77
15.50 2.42 3.10 2.42 7.94
24 45+040.50 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
SUB TOTAL (1) 281.60 134.69

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

BLANG ME

1 44+900.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


25.00 4.00 5.00 4.00 13.00
2 44+925.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
16.40 2.62 3.28 2.62 8.53
3 44+941.40 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
4
- - - -
5 44+957.00 L 0.20 0.20 0.76 1.00 0.20 0.20 0.20 0.76
9.40 1.47 1.88 1.47 4.81
6 44+966.40 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
7
- - - -
8 45+144.50 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
5.50 0.88 1.10 0.88 2.86
9 45+150.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 9.00
10 45+175.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
18.00 2.83 3.60 2.83 9.25
11 45+193.00 L 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77
- - - -
12
- - - -
13 45+195.00 L 0.20 0.20 0.78 1.00 0.20 0.20 0.20 0.78
5.00 0.79 1.00 0.79 2.57
14 45+200.00 L 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
18.90 3.01 3.78 3.01 9.79
15 45+218.90 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
16
- - - -
17 45+144.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
6.00 0.96 1.20 0.96 3.12
18 45+150.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
19 45+175.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
20 45+200.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
21 45+225.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
15.00 2.40 3.00 2.40 7.80
22 45+240.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
23
- - - -
24
SUB TOTAL (1) 219.20 109.74

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

BLANG ME

1 45+245.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


5.00 0.80 1.00 0.80 2.60
2 45+250.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
3 45+275.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
4 45+300.00 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
3.50 0.56 0.70 0.56 1.82
5 45+303.50 L 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
6
- - - -
7 0.00 0.00
0.00 - - - -
8 0.00 0.00
0.00 - - - -
9 0.00 0.00
0.00 - - -
10 0.00 0.00
0.00 - - - -
11 0.00 0.00
0.00 - - - -
12 0.00 0.00
0.00 - - - -
13 0.00 0.00
0.00 - - - -
14 0.00 0.00
0.00 - - - -
15 0.00 0.00
0.00 - - - -
16 0.00 0.00
0.00 - - - -
17 0.00 0.00
0.00 - - - -
18 0.00 0.00
0.00 - - -
19 0.00 0.00
0.00 - - - -
20 0.00 0.00
0.00 - - - -
21 0.00 0.00
0.00 - - - -
22 0.00 0.00
0.00 - - - -
23 0.00 0.00
0.00 - - - -
24 0.00 0.00
SUB TOTAL (1) 58.50 30.42

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

LAMGEURIEHEU

1 46+617.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


8.00 1.28 1.60 1.28 4.16
2 46+625.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
7.70 1.23 1.54 1.23 4.00
3 46+632.70 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
4

5 46+642.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


8.00 1.28 1.60 1.28 4.16
6 46+650.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
6.00 0.96 1.20 0.96 3.12
7 46+656.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80

9 46+660.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


15.00 2.40 3.00 5.40
10 46+675.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
11 46+700.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
12 46+725.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 3.98 5.00 3.98 12.95
13 46+750.00 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
3.20 0.50 0.64 0.50 1.64
14 46+753.20 0.20 0.20 0.77 1.00 0.20 0.20 0.20 0.77

15

16 46+754.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


7.40 1.18 1.48 1.18 3.85
17 46+761.40 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80

18 0.00

19 46+775.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


22.00 3.52 4.40 3.52 11.44
20 46+797.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80

21

22 46+802.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


23.00 3.66 4.60 3.66 11.91
23 46+825.00 0.20 0.20 0.79 1.00 0.20 0.20 0.20 0.79
20.00 3.18 4.00 3.18 10.36
24 46+845.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
SUB TOTAL (1) 195.30 98.99

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

LAMGEURIEHEU

1 46+851.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80


24.00 3.84 4.80 3.84 12.48
2 46+875.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
15.00 2.40 3.00 2.40 7.80
3 46+890.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
4
- - - -
5 46+894.50 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
5.50 0.88 1.10 0.88 2.86
6 46+900.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
25.00 4.00 5.00 4.00 13.00
7 46+925.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
24.00 3.84 4.80 3.84 12.48
8 46+949.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
9
- - -
10 46+955.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
20.00 3.20 4.00 3.20 10.40
11 46+975.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
12
- - - -
13 tambahan
- - - -
14 46+975.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
53.00 8.48 10.60 8.48 27.56
15 47+028.00 0.20 0.20 0.80 1.00 0.20 0.20 0.20 0.80
- - - -
16
- - - -
17
- - - -
18
- - -
19
- - - -
20
- - - -
21
- - - -
22
- - - -
23
- - - -
24
SUB TOTAL (1) 166.50 86.58

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

GEURUTE

1 63+775.00 0.17 0.20 0.69 0.80 0.20 0.17 0.17 0.69


25.30 3.35 4.05 3.35 10.74
2 63+800.00 0.20 0.20 0.74 0.80 0.20 0.20 0.20 0.74
25.20 3.86 4.18 3.86 11.89
3 63+825.00 0.20 0.20 0.79 0.86 0.20 0.20 0.20 0.79
26.50 3.79 4.74 3.79 12.32
4 63+850.00 0.20 0.20 0.64 0.93 0.20 0.20 0.20 0.64
25.00 3.43 4.80 3.43 11.65
5 63+875.00 0.20 0.20 0.73 0.99 0.20 0.20 0.20 0.73
25.00 3.33 4.73 3.33 11.38
6 63+900.00 0.20 0.20 0.60 0.90 0.20 0.20 0.20 0.60
25.20 3.10 4.21 3.10 10.41
7 63+925.00 0.20 0.20 0.63 0.77 0.20 0.20 0.20 0.63
25.00 3.18 4.15 3.18 10.50
8 63+950.00 0.20 0.20 0.64 0.89 0.20 0.20 0.20 0.64
24.70 2.79 4.37 2.79 9.95
9 63+975.00 0.15 0.20 0.65 0.88 0.20 0.15 0.15 0.65
19.60 2.25 3.47 2.25 7.96
10 63+995.00 0.20 0.20 0.66 0.89 0.20 0.20 0.20 0.66

11

12 64+044.00 0.20 0.20 0.68 0.93 0.20


6.00 0.84 1.07 0.22 2.13
13 64+050.00 0.20 0.20 0.72 0.86 0.20 0.20 0.20 0.72
25.00 3.20 4.28 3.20 10.68
14 64+075.00 0.20 0.20 0.56 0.85 0.20 0.20 0.20 0.56
2.30 0.26 0.42 0.26 0.93
15 64+078.00 0.20 0.20 0.55 0.96 0.20 0.20 0.20 0.55
-
16
-
17 64+082.00 0.20 0.20 0.68 0.86 0.20 0.20 0.20 0.68
22.90 3.21 3.98 3.21 10.40
18 64+100.00 0.20 0.20 0.72 0.88 0.20 0.20 0.20 0.72
25.00 3.20 4.43 3.20 10.83
19 64+125.00 0.20 0.20 0.56 0.89 0.20 0.20 0.20 0.56
16.50 1.69 2.89 1.69 6.28
20 64+142.00 0.17 0.20 0.55 0.86 0.20 0.17 0.17 0.55
-
21
-
22
-
23
-
24
SUB TOTAL (1) 319.20 138.02

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… ………………………..
Pengawas Lapangan Pelaksana
z
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ITEM PEKERJAAN : PASANGAN BATU
ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN MARET

Sketsa Gambar

400

20 60 20

50
60
400

40
20 60 20 La
20
Lc
50
60
80
40

120 20

20 80 20 T2
80 T1
120
80
20 80 20

20
80 Ld
60
100 Lb
20

60
100

Dinding Sisi Kiri Lantai Dinding Sisi Kanan Total


Panjang
No. Sta. Lebar (a) Lebar (b) Tinggi Volume Lebar Tinggi Volume Lebar (a) Lebar (b) Tinggi Volume Volume Ket.
(m) (m) (m) (m) (m3) (m) (m) (m3) (m) (m) (m) (m3) (m3)

GEURUTE

1 64+340.00 0.20 0.20 0.57 0.77 0.20 0.20 0.20 0.57


10.50 1.27 1.68 1.27 4.22
2 64+350.00 0.20 0.20 0.64 0.83 0.20 0.20 0.20 0.64
25.70 3.11 4.27 3.11 10.49
3 64+375.00 0.20 0.20 0.57 0.83 0.20 0.20 0.20 0.57
15.20 2.08 2.48 2.08 6.64
4 64+396.00 0.20 0.20 0.80 0.80 0.20 0.20 0.20 0.80
- - - -
5 0.00 0.00 0.00
- - - -
6 64+390.00 0.20 0.20 0.73 0.88 0.20 0.20 0.20 0.73
10.30 1.55 1.78 1.55 4.87
7 64+400.00 0.20 0.20 0.77 0.85 0.20 0.20 0.20 0.77
27.10 3.58 4.50 3.58 11.65
8 64+425.00 0.20 0.20 0.55 0.81 0.20 0.20 0.20 0.55
23.70 2.75 3.96 2.75 9.46
9 64+450.00 0.20 0.20 0.61 0.86 0.20 0.20 0.20 0.61
23.00 2.51 3.86 6.37
10 64+475.00 0.20 0.20 0.48 0.82 0.20 0.20 0.20 0.48
27.90 2.96 4.52 2.96 10.43
11 64+500.00 0.20 0.20 0.58 0.80 0.20 0.20 0.20 0.58
28.40 3.46 4.60 3.46 11.53
12 64+525.00 0.20 0.20 0.64 0.82 0.20 0.20 0.20 0.64
15.00 2.00 2.48 2.00 6.47
13 64+540.00 0.20 0.20 0.69 0.83 0.20 0.20 0.20 0.69

14

15

16

17

18

19

20

21

22

23

24
SUB TOTAL (1) 206.80 82.13

Mengetahui Oleh : Dibuat / Diajukan Oleh :

………………………… Pelaksana
Pengawas Lapangan 0
REKAPITULASI
REPUBLIK INDONESIA PEKERJAAN :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PASANGAN BATU MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS :
TAHUN ANGGARAN : 2021
STATUS : BULAN FEBRUARI

VOLUME
NO URAIAN KM (M2) KETERANGAN

1 Lampiran 1 276.60 32.90


2 Lampiran 2 270.50 139.33
3 Lampiran 3 203.00 108.90
4 Lampiran 4 232.10 126.72
5 Lampiran 5 84.00 43.52
6 Lampiran 6 281.60 139.60
7 Lampiran 7 219.20 118.01
8 Lampiran 8 58.50 31.50
9 Lampiran 9 194.00 102.94
10 Lampiran 10 161.50 84.16
11 Lampiran 11 370.60 165.06
12 Lampiran 12 155.40 65.42

TOTAL 2,507.00 1,158.06


VOLUME BG NAZAR 1147.5
Mengetahui : 10.56 Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK - 2.3 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip.
REKAPITULASI
REPUBLIK INDONESIA PEKERJAAN :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PASANGAN BATU MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
STATUS : BULAN JANUARI - MARET
TAHUN : 2021

VOLUME
NO URAIAN KM (M2) KETERANGAN

1 Tanjong 6,376.00 6,706.50 6,817.10 441.10 120.23 (441.10)


2 Lamgaboh 7,175.00 7,305.00 7,281.00 106.00 52.00 (106.00)
3 Jantang 42,407.00 42,978.00 42,926.10 519.10 279.14 (519.10)
4 Blangme 44,633.00 45,303.50 45,192.30 559.30 289.11 (559.30)
5 Lamgeurieheu 46,617.00 47,025.00 46,972.50 355.50 187.10 (355.50)
6 Geurute 63,775.00 64,540.00 64,301.00 526.00 230.48 (526.00)
2,507.00

TOTAL 5,014.00 1,158.06


VOLUME BG NAZAR 1147.5
Mengetahui : 10.56 Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK 2.1 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip. 197310042009111001
BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
TANJONG

1 6 + 376 L 0.20 0.79


0.153 24.00 3.67
2 6 + 400 L 0.20 0.74
0.148 25.00 3.70
3 6 + 425 L 0.20 0.74 DINDING
0.144 25.00 3.60
4 6 + 450 L 0.20 0.70
0.133 13.20 1.76
5 6 + 463 L 0.20 0.63

1 6 + 376 L 0.60 0.20


0.120 24.00 2.88
2 6 + 400 L 0.60 0.20
0.120 25.00 3.00
3 6 + 425 L 0.60 0.20 LANTAI
0.120 25.00 3.00
4 6 + 450 L 0.60 0.20
0.120 13.20 1.58
5 6 + 463 L 0.60 0.20

1 6 + 376 L 0.19 0.25


0.048 24.00 1.14
2 6 + 400 L 0.19 0.25
0.045 25.00 1.13
3 6 + 425 L 0.17 0.25 DINDING
0.041 25.00 1.03
4 6 + 450 L 0.16 0.25
0.043 13.20 0.56
5 6 + 463 L 0.18 0.25

1 6 + 600 L 1.00 0.80 0.80 0.40 0.90 0.70


0.390 15.00 5.85 LANTAI
2 6 + 620 L 1.00 0.80 0.80 0.40 0.90 0.70

Sub Total. 1 276.6 32.90

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(BAIHAQI, A.Md) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
TANJONG

1 6 + 542 R 1.20 0.98 0.80 0.58 1.00 0.80


0.54 8.00 4.30
2 6 + 550 R 1.20 0.97 0.80 0.57 1.00 0.80
0.53 25.00 13.34
3 6 + 575 R 1.19 0.99 0.79 0.59 0.98 0.78
0.52 25.00 13.09
4 6 + 600 R 1.15 0.98 0.75 0.60 0.98 0.78
0.52 25.00 13.05
5 6 + 625 R 1.20 0.99 0.80 0.59 0.97 0.77
0.53 25.00 13.23
6 6 + 650 R 1.19 1.00 0.79 0.60 0.98 0.78
0.54 25.00 13.39
7 6 + 675 R 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.45
8 6 + 700 R 1.20 1.00 0.80 0.60 0.99 0.79
0.54 6.50 3.49 164.50 87.33
9 6 + 707 R 1.20 0.98 0.80 0.58 1.00 0.80

LAMGABOH

8 7 + 175 R 0.90 0.70 0.50 0.30 0.80 0.60


0.40 25.00 10.00
9 7 + 200 R 0.90 0.70 0.50 0.30 0.80 0.60
0.40 25.00 10.00
10 7 + 225 R 0.90 0.70 0.50 0.30 0.80 0.60
0.40 25.00 10.00
11 7 + 250 R 0.90 0.70 0.50 0.30 0.80 0.60
0.40 25.00 10.00
12 7 + 275 R 0.90 0.70 0.50 0.30 0.80 0.60
0.40 25.00 10.00
13 7 + 300 R 0.90 0.70 0.50 0.30 0.80 0.60
0.40 5.00 2.00 52.00
14 7 + 305 R 0.90 0.70 0.50 0.30 0.80 0.60

Sub Total. 2 270.50 139.33

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(BAIHAQI, A.Md) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
JANTANG

1 42 + 407 L 1.19 1.00 0.79 0.60 1.00 0.80


0.54 18.00 9.67
2 42 + 425 L 1.15 1.00 0.75 0.60 1.00 0.80
0.54 25.00 13.41
3 42 + 450 L 1.18 1.00 0.78 0.60 1.00 0.80
0.54 6.00 3.23
4 42 + 456 L 1.18 1.00 0.78 0.60 1.00 0.80
GORONG - GORONG EXIST

5 42 + 459 L 1.20 1.00 0.80 0.60 1.00 0.80


0.54 11.10 5.99
6 42 + 470 L 1.20 1.00 0.80 0.60 1.00 0.80
GORONG - GORONG EXIST

7 42 + 475 L 1.15 1.00 0.75 0.60 1.00 0.80


0.54 25.00 13.44
8 42 + 500 L 1.20 1.00 0.80 0.60 1.00 0.80
0.53 25.00 13.34
9 42 + 525 L 1.15 1.00 0.77 0.60 1.00 0.80
0.53 25.00 13.29
10 42 + 550 L 1.16 1.00 0.76 0.60 1.00 0.80
0.54 4.20 2.25
11 42 + 555 L 1.16 1.00 0.76 0.60 1.00 0.80
GORONG - GORONG EXIST

12 42 + 558 L 1.20 1.00 0.80 0.60 1.00 0.80


0.54 17.00 9.18
13 42 + 575 L 1.20 1.00 0.80 0.60 1.00 0.80
0.54 5.90 3.17
14 42 + 581 L 1.14 1.00 0.74 0.60 1.00 0.80
GORONG - GORONG EXIST

15 42 + 585 L 1.15 1.00 0.75 0.60 0.97 0.77


0.53 15.80 8.33
16 42 + 600 L 1.15 0.97 0.75 0.57 1.00 0.80
GORONG - GORONG EXIST

17 42 + 605 L 1.19 1.00 0.79 0.60 0.97 0.77


0.54 20.00 10.79
18 42 + 625 L 1.14 0.98 0.74 0.58 1.05 0.85
0.56 5.00 2.81
19 42 + 630 L 1.18 0.99 0.78 0.59 1.09 0.89
GORONG - GORONG EXIST

Sub Total. 3 203 108.90

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
JANTANG

20 42 + 633 L 1.17 1.00 0.77 0.60 1.10 0.90


0.58 17.00 9.83
21 42 + 650 L 1.20 1.00 0.80 0.60 1.10 0.90
GORONG - GORONG EXIST

22 42 + 654 L 1.17 0.92 0.77 0.52 1.09 0.89


0.56 20.50 11.54
23 42 + 675 L 1.15 0.90 0.75 0.50 1.09 0.89
0.56 9.20 5.16
24 42 + 684 L 1.15 0.90 0.75 0.50 1.09 0.89
GORONG - GORONG EXIST

25 42 + 688 L 1.17 0.90 0.77 0.50 1.10 0.90


0.57 12.90 7.31
26 42 + 700 L 1.16 0.90 0.76 0.50 1.10 0.90
0.56 10.60 5.93
27 42 + 711 L 1.18 0.94 0.78 0.54 1.05 0.85
GORONG - GORONG EXIST

28 42 + 714 L 1.18 1.00 0.78 0.60 1.00 0.80


0.54 11.40 6.13
29 42 + 725 L 1.17 1.00 0.77 0.60 1.00 0.80
0.54 15.80 8.48
30 42 + 741 L 1.17 1.00 0.77 0.60 1.00 0.80
GORONG - GORONG EXIST

31 42 + 749 L 1.20 1.00 0.80 0.60 1.00 0.80


0.54 26.50 14.26
32 42 + 775 L 1.16 1.00 0.76 0.60 1.00 0.80
0.54 1.70 0.91
33 42 + 777 L 1.16 1.00 0.76 0.60 1.00 0.80
GORONG - GORONG EXIST

34 42 + 782 L 1.17 1.00 0.77 0.60 1.00 0.80


0.54 18.30 9.85
35 42 + 800 L 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.44
36 42 + 825 L 1.19 1.00 0.79 0.60 0.99 0.79
0.53 25.00 13.36
37 42 + 850 L 1.18 1.00 0.78 0.60 0.99 0.79
0.54 25.00 13.40
38 42 + 875 L 1.18 1.00 0.78 0.60 1.00 0.80
0.54 13.20 7.11
39 42 + 889 L 1.20 1.00 0.80 0.60 1.00 0.80

Sub Total. 4 232.1 126.72

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
JANTANG

40 42 + 894 L 1.17 0.99 0.77 0.59 1.00 0.80


0.54 6.00 3.22
41 42 + 900 L 1.19 0.98 0.79 0.58 1.00 0.80
0.54 25.00 13.45
42 42 + 925 L 1.19 1.00 0.79 0.60 1.00 0.80
0.51 25.00 12.85
43 42 + 950 L 1.19 0.90 0.79 0.60 1.00 0.80
0.50 25.00 12.45
44 42 + 975 L 1.18 0.96 0.78 0.60 0.97 0.77
0.52 3.00 1.56
45 42 + 978 L 1.18 1.00 0.78 0.60 0.99 0.79

-0 + 084

Sub Total. 5 84 43.52

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
LAMGEURIEHEU

1 46 + 617 L 1.21 1.01 0.81 0.61 1.00 0.80


0.54 8.00 4.34
2 46 + 625 L 1.20 1.03 0.80 0.63 1.00 0.80
0.54 7.70 4.14
3 46 + 633 L 1.20 1.00 0.80 0.60 0.98 0.78
GORONG - GORONG EXIST

4 46 + 642 L 1.20 1.01 0.80 0.61 0.95 0.75


0.53 8.00 4.23
5 46 + 650 L 1.20 1.05 0.80 0.65 0.98 0.78
0.54 5.70 3.08
6 46 + 656 L 1.20 1.04 0.80 0.64 1.00 0.80
GORONG - GORONG EXIST

7 46 + 660 L 1.20 1.00 0.80 0.60 1.00 0.80


0.54 15.00 8.04
8 46 + 675 L 1.20 1.00 0.80 0.60 0.98 0.78
0.54 25.00 13.40
9 46 + 700 L 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.49
10 46 + 725 L 1.19 1.00 0.79 0.60 1.00 0.80
0.54 25.00 13.45
11 46 + 750 L 1.17 1.00 0.77 0.60 1.00 0.80
0.54 3.20 1.72
12 46 + 753 L 1.17 1.00 0.77 0.60 1.00 0.80
122.599999999994
GORONG - GORONG EXIST
122.599999999994
13 46 + 754 L 1.20 1.00 0.80 0.60 0.98 0.78
0.52 7.40 3.85
14 46 + 761 L 1.20 1.00 0.80 0.60 0.92 0.72
GORONG - GORONG EXIST

15 46 + 775 L 1.20 1.00 0.80 0.60 1.00 0.80


0.53 21.50 11.31
16 46 + 797 L 1.20 1.00 0.80 0.60 0.93 0.73
GORONG - GORONG EXIST

17 46 + 802 L 1.20 1.00 0.80 0.60 0.91 0.71


0.51 23.00 11.76
18 46 + 825 L 1.19 1.00 0.79 0.60 0.95 0.75
0.52 19.50 10.13
19 46 + 845 L 1.20 1.00 0.80 0.60 0.95 0.75

Sub Total. 9 194 102.94

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(KAFRAWI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
LAMGEURIEHEU

20 46 + 851 L 1.20 1.00 0.80 0.60 1.00 0.80


0.53 23.40 12.34
21 46 + 875 L 1.20 0.99 0.80 0.59 0.94 0.74
0.52 14.50 7.50
22 46 + 890 L 1.20 1.00 0.80 0.60 0.95 0.75
GORONG - GORONG EXIST

23 46 + 895 L 1.20 1.00 0.80 0.60 0.94 0.74


0.53 5.40 2.85
24 46 + 900 L 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.45
25 46 + 925 L 1.20 1.00 0.80 0.60 0.99 0.79
0.53 23.20 12.39
26 46 + 949 L 1.20 1.00 0.80 0.60 0.98 0.78
GORONG - GORONG EXIST

27 46 + 955 L 1.20 1.00 0.80 0.60 0.98 0.78


0.51 20.00 10.12 10.12
28 46 + 975 L 1.20 1.00 0.80 0.60 0.92 0.76
0.50 25.00 12.50 35.62
29 47 + 000 L 1.20 1.00 0.80 0.60 0.95 0.75
0.52 25.00 13.00
30 47 + 025 L 1.20 1.00 0.80 0.60 0.95 0.75

0.00

Sub Total. 10 161.5 84.16

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(KAFRAWI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
BLANG ME

1 44 + 633 L 1.00 0.85 0.60 0.45 0.77 0.57


0.42 17.00 7.10
2 44 + 650 L 1.00 0.82 0.60 0.42 0.80 0.60
0.42 25.00 10.55
3 44 + 675 L 1.00 0.82 0.60 0.42 0.80 0.60
0.42 25.00 10.49
4 44 + 700 L 1.00 0.81 0.60 0.41 0.79 0.59
0.41 10.00 4.11
5 44 + 710 L 0.99 0.82 0.59 0.42 0.76 0.56

6 44 + 732 R 1.20 1.00 0.80 0.60 1.00 0.80


0.54 18.30 9.87
7 44 + 750 R 1.19 1.00 0.79 0.60 1.00 0.80
0.54 3.80 2.05
8 44 + 754 R 1.20 1.00 0.80 0.60 1.00 0.80
9

10 44 + 775 R 1.20 1.00 0.80 0.60 0.99 0.79


0.52 22.50 11.72
11 44 + 798 R 1.18 1.00 0.78 0.60 0.92 0.72

12 44 + 875 L 1.16 1.00 0.80 0.60 1.00 0.80


0.53 25.00 13.15
13 44 + 900 L 1.19 0.97 0.80 0.57 1.00 0.80
0.53 25.00 13.36
14 44 + 925 L 1.20 0.97 0.80 0.57 1.00 0.80
0.53 25.00 13.29
15 44 + 950 L 1.18 1.00 0.80 0.60 0.99 0.79
0.53 2.50 1.32
16 44 + 953 L 1.18 1.00 0.80 0.60 0.99 0.79

17 44 + 958 L 1.20 1.00 0.80 0.60 0.94 0.74


0.50 17.00 8.57
18 44 + 975 L 1.20 1.00 0.80 0.60 0.88 0.68
0.51 25.00 12.65
19 45 + 000 L 1.20 1.00 0.80 0.60 0.95 0.75
0.52 25.00 13.10
20 45 + 025 L 1.20 1.00 0.80 0.60 0.97 0.77
0.53 15.50 8.28
21 45 + 041 L 1.20 1.00 0.80 0.60 1.00 0.80

Sub Total. 6 281.6 139.60

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
BLANG ME

1 44 + 900 R 1.19 1.00 0.79 0.60 1.00 0.80


0.54 25.00 13.49
2 44 + 925 R 1.20 1.00 0.80 0.60 1.00 0.80
0.54 16.40 8.85
3 44 + 941 R 1.19 1.00 0.79 0.60 1.00 0.80

4 44 + 957 R 1.19 1.00 0.79 0.60 1.00 0.80


0.54 9.40 5.07
5 44 + 966 R 1.19 1.00 0.79 0.60 1.00 0.80

6 45 + 145 L 1.20 0.99 0.80 0.59 1.00 0.80


0.54 5.50 2.96
7 45 + 150 L 1.20 0.99 0.80 0.59 1.00 0.80
0.54 25.00 13.48
8 45 + 175 L 1.19 1.00 0.79 0.60 1.00 0.80
0.53 18.00 9.59
9 45 + 193 L 1.19 1.00 0.79 0.60 0.97 0.77

10 45 + 195 L 1.20 1.00 0.80 0.60 0.98 0.78


0.53 5.00 2.67
11 45 + 200 L 1.20 1.00 0.80 0.60 0.99 0.79
0.54 18.90 10.17
12 45 + 219 L 1.20 1.00 0.80 0.60 1.00 0.80

13 45 + 144 R 1.19 1.00 0.79 0.60 1.00 0.80


0.54 6.00 3.23
14 45 + 150 R 1.19 1.00 0.79 0.60 1.00 0.80
0.54 25.00 13.48
15 45 + 175 R 1.19 1.00 0.79 0.60 1.00 0.80
0.54 25.00 13.49
16 45 + 200 R 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.49
17 45 + 225 R 1.19 1.00 0.79 0.60 1.00 0.80
0.54 15.00 8.06
18 45 + 240 R 1.15 1.00 0.75 0.60 1.00 0.80

Sub Total. 7 219.2 118.01

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
BLANG ME

1 45 + 245 R 1.19 1.00 0.79 0.60 1.00 0.80


0.54 5.00 2.70
2 45 + 250 R 1.19 1.00 0.79 0.60 1.00 0.80
0.54 25.00 13.45
3 45 + 275 R 1.18 0.99 0.78 0.59 1.00 0.80
0.54 25.00 13.46
4 45 + 300 R 1.20 1.00 0.80 0.60 1.00 0.80
0.54 3.50 1.89
5 45 + 304 R 1.19 1.00 0.79 0.60 1.00 0.80

Sub Total. 8 58.5 31.50

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
GEURUTE

1 63 + 775 L 0.97 0.80 0.60 0.40 0.89 0.69


0.46 25.30 11.61
2 63 + 800 L 0.99 0.80 0.59 0.40 0.94 0.74
0.50 25.20 12.49
3 63 + 825 L 1.14 0.86 0.74 0.46 0.99 0.79
0.49 26.50 12.92
4 63 + 850 L 1.10 0.93 0.70 0.53 0.84 0.64
0.48 25.00 12.03
5 63 + 875 L 1.12 0.99 0.72 0.59 0.93 0.73
0.47 25.00 11.75
6 63 + 900 L 1.07 0.90 0.67 0.50 0.80 0.60
0.44 25.20 10.96
7 63 + 925 L 1.04 0.77 0.64 0.37 0.83 0.63
0.44 25.00 10.93
8 63 + 950 L 0.96 0.89 0.56 0.49 0.84 0.64
0.43 24.70 10.74
9 63 + 975 L 0.97 0.88 0.62 0.48 0.85 0.65
0.44 19.60 8.64
10 63 + 995 L 1.00 0.89 0.60 0.49 0.86 0.66
SALURAN EXIST

11 64 + 044 L 1.07 0.93 0.67 0.53 0.56 0.36


0.35 6.00 2.08
12 64 + 050 L 1.07 0.86 0.67 0.46 0.59 0.39
0.34 25.00 8.61
13 64 + 075 L 0.95 0.85 0.55 0.45 0.60 0.40
0.34 2.30 0.78
14 64 + 078 L 0.99 0.96 0.59 0.56 0.56 0.36
GORONG - GORONG EXIST

15 64 + 082 L 1.04 0.86 0.64 0.46 0.88 0.68


0.47 22.90 10.84
16 64 + 100 L 1.09 0.88 0.69 0.48 0.92 0.72
0.45 25.00 11.26
17 64 + 125 L 1.03 0.89 0.63 0.49 0.76 0.56
0.42 16.50 6.95
18 64 + 142 L 1.23 0.92 0.86 0.52 0.75 0.55
GORONG - GORONG EXIST

19 64 + 340 L 0.99 0.77 0.59 0.37 0.77 0.57


0.42 10.50 4.43
20 64 + 350 L 1.01 0.83 0.61 0.43 0.84 0.64
0.43 25.70 10.94
21 64 + 375 L 1.00 0.83 0.60 0.43 0.77 0.57
0.47 15.20 7.11
22 64 + 396 L 1.24 0.80 0.84 0.40 1.00 0.80
GORONG - GORONG EXIST

Sub Total. 11 370.6 165.06

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(ADI SURYA) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : REVITALISASI DRAINASE
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PASANGAN BATU DENGAN MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN JANUARI - MARET

GAMBAR / SKETSA

400

20 60 20

50
La
60 Lc
40

20

80 Rumus :
T2
120 T1 V1 = (La+Ld) x T1
20 80 20
2
80

Ld
V2 = (La+Ld) x T2
2
20
Lb
60
100 Volume = (V1 - V2) x Panjang

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
GEURUTE

23 64 + 390 L 1.05 0.88 0.65 0.48 0.93 0.73


0.48 10.30 4.94
24 64 + 400 L 1.02 0.85 0.62 0.45 0.92 0.72
0.44 27.10 11.86
25 64 + 425 L 0.99 0.81 0.59 0.41 0.75 0.55
0.42 23.70 9.86
26 64 + 450 L 1.02 0.86 0.62 0.46 0.81 0.61
0.40 23.00 9.22
27 64 + 475 L 0.96 0.82 0.56 0.42 0.68 0.48
0.39 27.90 10.88
28 64 + 500 L 0.98 0.80 0.58 0.40 0.78 0.58
0.42 28.40 11.97
29 64 + 525 L 0.98 0.82 0.59 0.42 0.84 0.64
0.45 15.00 6.69
30 64 + 540 L 1.00 0.83 0.60 0.43 0.89 0.69

Sub Total. 12 155.4 65.42

DIPERIKSA OLEH: DIBUAT OLEH:


PENGAWAS LAPANGAN PELAKSANA

(ADI SURYA) (AFRIZAL, ST)


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
TANJONG

1 6 + 376 KR 0.20 0.79


0.153 24 3.67
2 6 + 400 KR 0.20 0.74
0.148 25 3.70
3 6 + 425 KR 0.20 0.74 DINDING
0.144 25 3.60
4 6 + 450 KR 0.20 0.70
0.133 13.2 1.76
5 6 + 463 KR 0.20 0.63

1 6 + 376 KR 0.60 0.20


0.12 24 2.88
2 6 + 400 KR 0.60 0.20
0.12 25 3.00
3 6 + 425 KR 0.60 0.20 LANTAI
0.12 25 3.00
4 6 + 450 KR 0.60 0.20
0.12 13.2 1.58
5 6 + 463 KR 0.60 0.20

1 6 + 376 KR 0.60 0.20


0.12 24 2.88
2 6 + 400 KR 0.60 0.20
0.12 25 3.00
3 6 + 425 KR 0.60 0.20 DINDING
0.12 25 3.00
4 6 + 450 KR 0.60 0.20
0.12 13.2 1.58
5 6 + 463 KR 0.60 0.20

1 6 + 600 KR 0.20 0.20 1.00 0.80 0.20


0.04 15 0.60 LANTAI
2 6 + 620 KR 0.20 0.20 1.00 0.80 0.20

Sub Total. 1 276.6 34.2556


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
TANJONG

1 6 + 542 1.20 0.98 0.80 0.58 1.00 0.80


0.5375 8 4.3
2 6 + 550 1.20 0.97 0.80 0.57 1.00 0.80
0.5375 25 13.4375
3 6 + 575 1.19 0.99 0.79 0.59 1.00 0.80
0.5365 25 13.4125
4 6 + 600 1.15 1.00 0.75 0.60 1.00 0.80
0.537 25 13.425
5 6 + 625 1.20 0.99 0.80 0.59 1.00 0.80
0.539 25 13.475
6 6 + 650 1.19 1.00 0.79 0.60 1.00 0.80
0.5395 25 13.4875 164.5
7 6 + 675 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5 86.4
8 6 + 700 1.20 1.00 0.80 0.60 1.00 0.80
0.539 6.5 3.5035 88.541
9 6 + 707 1.20 0.98 0.80 0.58 1.00 0.80

Sub Total. 2 164.5 88.541


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
JANTANG

1 42 + 408 KR 1.2 1.00 0.80 0.60 1.00 0.80


0.54 17 9.18
2 42 + 425 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
3 42 + 450 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
4 42 + 475 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
5 42 + 500 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
6 42 + 525 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
7 42 + 550 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
8 42 + 575 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
9 42 + 600 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
10 42 + 625 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
11 42 + 650 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
12 42 + 675 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
13 42 + 700 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
14 42 + 725 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
15 42 + 750 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
16 42 + 775 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
17 42 + 800 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
18 42 + 825 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
19 42 + 850 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
20 42 + 875 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 25 13.5
21 42 + 900 KR 1.2 1.00 0.80 0.60 1.00 0.80
0.54 16 8.64
22 42 + 916 KR 1.2 1.00 0.80 0.60 1.00 0.80
23

24

25

26

Sub Total. 3 508 274.32


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
BLANG ME

1 44 + 630 KR 1.00 0.80 0.60 0.40 0.80 0.60


0.42 20 8.40
2 44 + 650 KR 1.00 0.80 0.60 0.40 0.80 0.60
0.42 25 10.50
3 44 + 675 KR 1.00 0.80 0.60 0.40 0.80 0.60
0.42 25 10.50 80
4 44 + 700 KR 1.00 0.80 0.60 0.40 0.80 0.60
0.42 10 4.20 33.6
5 44 + 710 KR 1.00 0.80 0.60 0.40 0.80 0.60
6

7 44 + 875 KR 1.20 1.00 0.80 0.60 1.00 0.80


0.54 25 13.50
8 44 + 900 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
9 44 + 925 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
10 44 + 950 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
11 44 + 975 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
12 45 + 000 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50 169
13 45 + 025 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 19 10.26 91.26
14 45 + 044 KR 1.20 1.00 0.80 0.60 1.00 0.80
15

16 45 + 145 KR 1.20 1.00 0.80 0.60 1.00 0.80


0.54 5 2.70
17 45 + 150 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
18 45 + 175 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50 74
19 45 + 200 KR 1.20 1.00 0.80 0.60 1.00 0.80
0.54 19 10.26 39.96
20 45 + 215 KR 1.20 1.00 0.80 0.60 1.00 0.80

1 44 + 730 KN 1.20 1.00 0.80 0.60 1.00 0.80


0.54 20 10.80
2 44 + 750 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 15 8.10 51
3 44 + 775 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 16 8.64 27.54
4 44 + 800 KN 1.20 1.00 0.80 0.60 1.00 0.80

Sub Total. 2 374 192.36


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
BLANG ME

1 44 + 900 KN 1.20 1.00 0.80 0.60 1.00 0.80


0.54 25 13.50
2 44 + 925 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 20 10.80 57
3 44 + 950 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 12 6.48 30.78
4 44 + 968 KN 1.20 1.00 0.80 0.60 1.00 0.80

1 45 + 145 KN 1.20 1.00 0.80 0.60 1.00 0.80


0.54 5 2.70
2 45 + 150 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
3 45 + 175 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
4 45 + 200 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
5 45 + 225 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
6 45 + 250 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25 13.50
7 45 + 275 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 13 7.02 147
8 45 + 300 KN 1.20 1.00 0.80 0.60 1.00 0.80
0.54 4 2.16 79.38
9 45 + 304 KN 1.20 1.00 0.80 0.60 1.00 0.80

Sub Total. 2 204 110.16


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
LAMGEURIEHEU

1 46 + 617 1.20 1.00 0.80 0.60 1.00 0.80


0.54 8.00 4.32
2 46 + 625 1.20 1.00 0.80 0.60 1.00 0.80
0.54 7.70 4.158
3 46 + 633 1.20 1.00 0.80 0.60 1.00 0.80

4 46 + 642 1.20 1.00 0.80 0.60 1.00 0.80


0.54 8.00 4.32
5 46 + 650 1.20 1.00 0.80 0.60 1.00 0.80
0.54 5.70 3.078
6 46 + 656 1.20 1.00 0.80 0.60 1.00 0.80

7 46 + 660 1.20 1.00 0.80 0.60 1.00 0.80


0.54 15.00 8.1
8 46 + 675 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.5
9 46 + 700 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.5
10 46 + 725 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.5
11 46 + 750 1.20 1.00 0.80 0.60 1.00 0.80
0.54 3.20 1.728
12 46 + 753 1.20 1.00 0.80 0.60 1.00 0.80
122.599999999994

122.599999999994
13 46 + 754 1.20 1.00 0.80 0.60 1.00 0.80
0.54 7.40 3.996
14 46 + 761 1.20 1.00 0.80 0.60 1.00 0.80

1 46 + 775 1.20 1.00 0.80 0.60 1.00 0.80


0.54 21.50 11.61
2 46 + 797 1.20 1.00 0.80 0.60 1.00 0.80

1 46 + 802 1.20 1.00 0.80 0.60 1.00 0.80


0.54 23.00 12.42
2 46 + 825 1.20 1.00 0.80 0.60 1.00 0.80
0.54 19.50 10.53
3 46 + 845 1.20 1.00 0.80 0.60 1.00 0.80

Sub Total. 2 194 104.76


BACK UP DATA
REPUBLIK INDONESIA RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN
RAKYAT PAKET : PADAT KARYA RUTIN JALAN
DIREKTORAT JENDERAL BINA MARGA ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II TAHUN ANGGARAN : 2021
PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH STATUS : BULAN FEBRUARI

GAMBAR / SKETSA
LOKASI TANJONG

400
La Lb
20 60 20

50
60

40

20

80
T1
120

20 80 20

80

T2
Lc
20

60

PERHITUNGAN 100

DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc T1 T2 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e f g h i j k l = (j x k) m
LAMGEURIEHEU

4 46 + 851 1.20 1.00 0.80 0.60 1.00 0.80


0.54 23.40 12.636
5 46 + 875 1.20 1.00 0.80 0.60 1.00 0.80
0.54 14.50 7.83
6 46 + 890 1.20 1.00 0.80 0.60 1.00 0.80

1 46 + 895 1.20 1.00 0.80 0.60 1.00 0.80


0.54 5.40 2.916
2 46 + 900 1.20 1.00 0.80 0.60 1.00 0.80
0.54 25.00 13.5
3 46 + 925 1.20 1.00 0.80 0.60 1.00 0.80
0.54 23.20 12.528
4 46 + 949 1.20 1.00 0.80 0.60 1.00 0.80

1 46 + 955 1.20 1.00 0.80 0.60 1.00 0.80


0.54 14.00 7.56
2 46 + 969 1.20 1.00 0.80 0.60 1.00 0.80

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

0 0.00 0

Sub Total. 2 105.5 56.97 299.5 161.73


REKAPITULASI
REPUBLIK INDONESIA PEKERJAAN :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PLAT BETON
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS #VALUE!
STATUS #VALUE!
TAHUN #VALUE!

VOLUME
NO URAIAN (M3) KETERANGAN

1 Lampiran 1 13.69

TOTAL - 13.69
VOLUME BG NAZAR
Mengetahui : Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK - 2.1 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip. 197310042009111001
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

DATA : BACK UP DATA REVITALISASI SALURAN


PEKERJAAN : PLAT BETON
TANGGAL : 2021

PLAT BETON
Gambar Sket

Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

LEBAR TINGGI PANJANG TOTAL


NO STA POSISI KET
Lebar.1 Lebar.2 Tinggi.1 Tinggi.2 (M)
(M3)

TANJONG
1 06+065 KR 1.00 1.00 0.20 0.20 3.00 0.60
2 06+135 KR 1.00 1.00 0.20 0.20 3.00 0.60 MEUNASAH
3 06+145 KR 1.00 1.00 0.20 0.20 3.00 0.60
4 06+150 KR 1.00 1.00 0.20 0.20 6.00 1.20
5 06+550 KN 1.00 1.00 0.20 0.20 3.00 0.60

LAMGABOH
1 07+197 KN 0.90 1.00 0.20 0.20 1.50 0.29
2 07+199 KN 0.90 1.00 0.20 0.20 1.50 0.29
3 07+217 KN 0.90 1.00 0.20 0.20 3.00 0.57
4 07+227 KN 0.90 1.00 0.20 0.20 3.00 0.57
5 07+243 KN 0.90 1.00 0.20 0.20 3.00 0.57
6 07+255 KN 0.90 1.00 0.20 0.20 3.00 0.57
7 07+275 KN 0.90 1.00 0.20 0.20 4.00 0.76 SDN KEUDE BING

BLANG ME
1 44+775 KR 1.20 1.20 0.20 0.20 3.00 0.72
2 44+900 KR 1.20 1.20 0.20 0.20 3.00 0.72
3 44+925 KR 1.20 1.20 0.20 0.20 3.00 0.72
4 44+975 KR 1.20 1.20 0.20 0.20 3.00 0.72
5 44+995 KR 1.20 1.20 0.20 0.20 3.00 0.72
6 45+025 KR 1.20 1.20 0.20 0.20 3.00 0.72
7 45+175 KN 1.20 1.20 0.20 0.20 3.00 0.72
8 45+250 KN 1.20 1.20 0.20 0.20 3.00 0.72
9 45+275 KN 1.20 1.20 0.20 0.20 3.00 0.72

Sub. Total 1 18.00 13.69


DIPERIKSA OLEH: DIBUAT OLEH:
PENGAWAS LAPANGAN PELAKSANA

(BAIHAQI) (AFRIZAL, ST)


REKAPITULASI
REPUBLIK INDONESIA PEKERJAAN :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA BAJA TULANGAN
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS : BTS. KOTA BANDA ACEH - BTS. ACEH JAYA
STATUS : BULAN JANUARI - MARET
TAHUN : 2021

VOLUME
NO URAIAN (M2) KETERANGAN

1 Tanjong 189.73
2 Blangme 395.84
3 Blangme 197.92
4 Lamgaboh 141.37
5 Lamgaboh 65.60

TOTAL - 990.47
VOLUME BG NAZAR 1147.5
Mengetahui : - 157.03 Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK 2.1 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip. 197310042009111001
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

BACK UP DATA REVITALISASI SALURAN


DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan Polos BjTP 280
Gambar Sket
Pembesian Plat Beton
Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

STATION / DIAMETER DIMENSI TULANGAN JUMLAH JUMLAH PENJANG BERAT JUMLAH VOLUME
NO KET
KODE MM a b c d e f g 40 D h i PANJANG BATANG TOTAL JENIS SISI ( R / L ) Kg
TANJONG
10.00 0.05 0.95 0.05 1.05 21.00 22.05 0.616 1.00 13.58
1 06+065
10.00 0.05 2.95 0.05 3.05 7.00 21.35 0.616 1.00 13.15

10.00 0.05 0.15 0.95 0.15 0.95 0.05 2.30 21.00 48.30 0.616 1.00 29.75
2 06+135 MENASAH
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 7.00 44.10 0.616 1.00 27.17

10.00 0.05 0.95 0.05 1.05 21.00 22.05 0.616 1.00 13.58
3 06+145
10.00 0.05 2.95 0.05 3.05 7.00 21.35 0.616 1.00 13.15

10.00 0.05 0.95 0.05 1.05 41.00 43.05 0.616 1.00 26.52
4 06+150
10.00 0.05 5.95 0.05 6.05 7.00 42.35 0.616 1.00 26.09

10.00 0.05 0.95 0.05 1.05 21.00 22.05 0.616 1.00 13.58
5 06+550 TOKO
10.00 0.05 2.95 0.05 3.05 7.00 21.35 0.616 1.00 13.15

JUMLAH 189.73

DIBUAT OLEH: DIBUAT OLEH:


PELAKSANA PELAKSANA

(BAIHAQI) (AFRIZAL, ST)


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

BACK UP DATA REVITALISASI SALURAN


DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan Polos BjTP 280
Gambar Sket
Pembesian Plat Beton
Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

STATION / DIAMETER DIMENSI TULANGAN JUMLAH JUMLAH PENJANG BERAT JUMLAH VOLUME
NO KET
KODE MM a b c d e f g 40 D h i PANJANG BATANG TOTAL JENIS SISI ( R / L ) Kg
BLANG ME
10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
1 44+775
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
2 44+900
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
3 44+925
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
4 44+975
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
5 44+995
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
6 45+025
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

JUMLAH 395.84

DIBUAT OLEH: DIBUAT OLEH:


PELAKSANA PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

BACK UP DATA REVITALISASI SALURAN


DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan Polos BjTP 280
Gambar Sket
Pembesian Plat Beton
Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

STATION / DIAMETER DIMENSI TULANGAN JUMLAH JUMLAH PENJANG BERAT JUMLAH VOLUME
NO KET
KODE MM a b c d e f g 40 D h i PANJANG BATANG TOTAL JENIS SISI ( R / L ) Kg
BLANG ME
10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
7 45+175
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
8 45+250
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

10.00 0.05 0.15 1.15 0.15 1.15 0.05 2.70 21.00 56.70 0.616 1.00 34.93
9 45+275
10.00 0.05 0.15 2.95 0.15 2.95 0.05 6.30 8.00 50.40 0.616 1.00 31.05

JUMLAH 197.92

DIBUAT OLEH: DIBUAT OLEH:


PELAKSANA PELAKSANA

(JAFRIADI) (AFRIZAL, ST)


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

BACK UP DATA REVITALISASI SALURAN


DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan Polos BjTP 280
Gambar Sket
Pembesian Plat Beton
Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

STATION / DIAMETER DIMENSI TULANGAN JUMLAH JUMLAH PENJANG BERAT JUMLAH VOLUME
NO KET
KODE MM a b c d e f g 40 D h i PANJANG BATANG TOTAL JENIS SISI ( R / L ) Kg
LAMGABOH
10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
1 07+197
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
2 07+199
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
3 07+217
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
4 07+227
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
5 07+243
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

10.00 0.05 0.85 0.05 0.95 21.00 19.95 0.616 1.00 12.29
6 07+255
10.00 0.05 2.95 0.05 3.05 6.00 18.30 0.616 1.00 11.27

JUMLAH 141.37

DIBUAT OLEH: DIBUAT OLEH:


PELAKSANA PELAKSANA

(BAIHAQI) (AFRIZAL, ST)


REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.1 PROVINSI ACEH

BACK UP DATA REVITALISASI SALURAN


DIVISI 7. STRUKTUR
7.3.(1) Baja Tulangan Polos BjTP 280
Gambar Sket
Pembesian Plat Beton
Ø10 - 15 Ø10 - 15
Ø10 - 15 Ø10 - 15

1.00 - 1.20 1.00 - 1.20


0.20 0.20

STATION / DIAMETER DIMENSI TULANGAN JUMLAH JUMLAH PENJANG BERAT JUMLAH VOLUME
NO KET
KODE MM a b c d e f g 40 D h i PANJANG BATANG TOTAL JENIS SISI ( R / L ) Kg
LAMGABOH
10.00 0.05 0.15 0.85 0.15 0.85 0.05 2.10 27.00 56.70 0.616 1.00 34.93
7 07+275
10.00 0.05 0.15 3.95 0.15 3.95 0.05 8.30 6.00 49.80 0.616 1.00 30.68

JUMLAH 65.60

DIBUAT OLEH: DIBUAT OLEH:


PELAKSANA PELAKSANA

(BAIHAQI) (AFRIZAL, ST)


REKAPITULASI
REPUBLIK INDONESIA PEKERJAAN :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PASANGAN BATU MORTAR
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH RUAS :
TAHUN ANGGARAN : 2021
STATUS : BULAN FEBRUARI

VOLUME
NO URAIAN KM (M2) KETERANGAN

1 Lampiran 1 1,147.71
2 Lampiran 2

TOTAL 1,147.71

Mengetahui : Di periksa Oleh :


Kepala Tata Usaha Ka. Pelaksana Swakelola
PPK - 2.3 PROVINSI ACEH

Eka Minarti, ST. MT Syahrial


Nip. 198502132010122004 Nip.
BACK UP DATA
REPUBLIK INDONESIA RUAS :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I ITEM PEKERJAAN : PENGECATANPEMBERSIHAN SALURAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
STATUS : BULAN FEBRUARI

GAMBAR / SKETSA

400

20 60 20

50
60 400

40
20 60 20
La
20
50
Lc
60

80
40

20
120

20 80 20
80
T2
T1
120

80 20 80 20

20
80
Ld
60
100
Lb
20

60
100

PERHITUNGAN
DIMENSI
Luas Panjang VOLUME
NO. URAIAN L/R La Lb Lc Ld T1 T2 KET
(m') (m') (m') (m') (m') (m') (m') (M') ( Mᶾ )
a b c d e=d f

6 + 375 S/D 6 + 462 L 0.20 0.80 0.16 87.3 13.97 SELESAI

Lantai 0.60 0.20 0.12 87.3 10.48 SELESAI

Peninggian 0.20 0.20 0.04 87.3 3.49 SELESAI


1 TANJONG
6 + 462 S/D 6 + 600 L 0.20 0.80 0.16 25 4.00 SELESAI

0.00 0.00 - 25 - 31.94

6 + 543 S/D 6 + 703 R 1.20 1.00 0.80 0.60 1.00 0.80 0.54 160 86.40 SISA 30 M

0 + 000 S/D 0 + 000 R 0.90 0.70 0.50 0.30 0.80 0.60 0.40 103 41.20 LAMGABOH RENCANA TAMBAHAN
0.21
2 42 + 408 S/D 42 + 979 L 1.20 1.00 0.80 0.60 1.00 0.80 0.54 508 274.32 JANTANG SISA 50 LANTAI

44 + 631 S/D 44 + 710 L 1.00 0.80 0.60 0.40 0.80 0.60 0.42 80 33.60 SELESAI

44 + 875 S/D 45 + 042 L 1.20 1.00 0.80 0.60 1.00 0.80 0.54 169 91.26 SISA 30 M

45 + 145 S/D 45 + 215 L 1.20 1.00 0.80 0.60 1.00 0.80 0.54 74 39.96 SISA 10 M

3 BLANG ME
44 + 730 44 + 800 R 1.20 1.00 0.80 0.60 1.00 0.80 0.54 51 27.54 SISA 25 M

44 + 900 44 + 968 R 1.20 1.00 0.80 0.60 1.00 0.80 0.54 57 30.78 SELESAI

45 + 145 45 + 304 R 1.20 1.00 0.80 0.60 1.00 0.80 0.54 147 79.38 SISA 10 M

4 46 + 650 S/D 47 + 020 L 1.20 1.00 0.80 0.60 1.00 0.80 0.54 300 162.00 LAMGEREHE SISA 90 M

63 + 775 S/D 64 + 045 L 1.00 0.80 0.60 0.40 0.80 0.60 0.42 318.5 133.77 SISA 150 M
5 GERUTE
64 + 345 64 + 535 1.00 0.80 0.60 0.40 0.80 0.60 0.42 207 86.94 SELESAI

4 0 + 000 S/D 47 + 020 L 1.20 1.00 0.80 0.60 1.00 0.80 0.54 53 28.62 LAMGEREHE RENCANA TAMBAHAN

2,365.01 1,147.71 SISA 345.00


VOLUME YG HRS DIPENUHI (DARI NAZAR) 1,147.50

0.21 0.9852
-40.594

316
250
318.5
884.5
Mengetahui : Di periksa Oleh : Di periksa Oleh :
Kepala Tata Usaha Ka. Pelaksana Swakelola Pelaksana

Eka Minarti, ST. MT Syahrial ( Afrizal, ST )


Nip. 198502132010122004 Nip.
eriksa Oleh : Dibuat Oleh :
Pengawas Lapangan
MENGETAHUI OLEH :
KOOR. PENGAWAS LAPANGAN
PPK 2.3 PROVINSI ACEH

Afrizal, ST ) ………..

Eka Minarti, ST. MT


Nip. 198502132010122004
RENCANA MORTAR REVITALISASI
PANJANG PLAT/ VOLUME
Panjang sudah di
NO STA POSISI GORONG2 kurangi Gorong KETERANGAN
(M') (M') (Mᶾ)

1 06+375 - 06+462 KR 87.3 87.3000000000002 TANJONG


06+462 - 06+600 KN 137.7 68.85 68.8499999999999 TANJONG
06+543 - 06+703 KN 160 160 TANJONG
- 0

2 42+408 - 42+979 571 63 508 JANTANG

3 44+631 - 44+710 79 79 BLANG ME.1


4 44+875 - 45+042 167 167 BLANG ME.2
4 45+145 - 45+215 70 74 BLANG ME.3

5 46+650 - 47+025 375 56 319 LAMGEREHE

6 63+775 - 460 460 GERUTE

7 87+176 - 87+279 102.6 102.600000000006 KUALA UNGA

2,210 2,026
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PPK 2.1 PROVINSI ACEH

REKAPITULASI
PEMBERSIHAN SALURAN
BULAN FEBRUARI 2021

PAKET PADAT KARYA RUTIN JALAN

VOLUME
NO NAMA RUAS KM
(M')

1. BTS. KOTA BANDA ACEH - CALANG 13+555 - 39+088 8,165.90

TOTAL VOLUME 8,165.90


PAKET : PADAT KARYA RUTIN JALAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL RUAS : BTS. KOTA BANDA ACEH - CALANG
WILAYAH II PROVINSI ACEH TAHUN ANGGARA: 2021
PPK 2.1 PROVINSI ACEH ITEM PEKERJAAN: PEMBERSIHAN SALURAN
STATUS : FEBRUARI 2021

BACK UP DATA

TUMPUKAN SAMPAH
PADA SALURAN

Panjang Volume
No. Uraian KET.
(m1) (m1)
a b c d=c e
JALUR KIRI
1. 29 + 808.60 S/D 31 + 961.50 2,138.30 2,138.30

2. 31 + 975.00 S/D 32 + 515.00 540.00 540.00

3. 32 + 577.00 S/D 33 + 376.00 783.00 783.00

4. 34 + 040.00 S/D 34 + 340.00 300.00 300.00

5. 34 + 875.00 S/D 36 + 900.00 2,000.00 2,000.00

6. 37 + 425.00 S/D 37 + 877.00 438.00 438.00

7. 37 + 605.00 S/D 37 + 775.00 170.00 170.00

8. 37 + 751.20 S/D 37 + 973.00 221.80 221.80

9. 38 + 133.40 S/D 39 + 088.10 954.70 954.70

Subtotal 7,545.80 M1

Di ketahui : Di periksa Oleh : Dibuat Oleh :


Kepala Tata Usaha Ka. Pelaksana Swakelola Pelaksana/ Perencana Swakelola

Ermansyah, ST Azhari, ST Firman Hidayat, ST


PAKET : PADAT KARYA RUTIN JALAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL RUAS : BTS. KOTA BANDA ACEH - CALANG
WILAYAH II PROVINSI ACEH TAHUN ANGGARA: 2021
PPK 2.1 PROVINSI ACEH ITEM PEKERJAAN: PEMBERSIHAN SALURAN
STATUS : FEBRUARI 2021

BACK UP DATA

TUMPUKAN SAMPAH
PADA SALURAN

Panjang Volume
No. Uraian KET.
(m1) (m1)
a b c d=c e
Nip. 19660602 2009111001 Nip. 19670515 200701 1 001

JALUR KANAN
1. 13 + 555.00 S/D 13 + 665.40 38.60 38.60

2. 13 + 727.00 S/D 14 + 128.20 371.50 371.50

3. 33 + 825.00 S/D 34 + 035.00 210.00 210.00

Subtotal 620.10 M1
TOTAL JALUR KANAN 8,165.90 M1

Di ketahui : Di periksa Oleh : Dibuat Oleh :


Kepala Tata Usaha Ka. Pelaksana Swakelola Pelaksana/ Perencana Swakelola
PAKET : PADAT KARYA RUTIN JALAN
SATUAN KERJA PELAKSANAAN JALAN NASIONAL RUAS : BTS. KOTA BANDA ACEH - CALANG
WILAYAH II PROVINSI ACEH TAHUN ANGGARA: 2021
PPK 2.1 PROVINSI ACEH ITEM PEKERJAAN: PEMBERSIHAN SALURAN
STATUS : FEBRUARI 2021

BACK UP DATA

TUMPUKAN SAMPAH
PADA SALURAN

Panjang Volume
No. Uraian KET.
(m1) (m1)
a b c d=c e

Ermansyah, ST Azhari, ST Firman Hidayat, ST


Nip. 19660602 2009111001 Nip. 19670515 200701 1 001
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL - I
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH - II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) 2.3 PROVINSI ACEH

DATA : BACK UP DATA PADAT KARYA


TANGGAL : 2020

SALURAN MORTAR
Gambar Sket
LHONG

0.20 0.60 0.20

0.30 - 0.60

0.20

0.80

DINDING KR DINDING KN LANTAI LUAS PANJANG TOTAL


NO URAIAN POSISI KET
Tebal Tinggi Tebal Tinggi Lebar Tinggi (M2) (M) (M3)

1 44 + 650 KR 0.20 0.60 0.20 0.60 0.80 0.20


0.40 25.00 10.00
44 + 675 KR 0.20 0.60 0.20 0.60 0.80 0.20
0.40 25.00 10.00
2 44 + 700 KR 0.20 0.60 0.20 0.60 0.80 0.20
0.40 25.00 10.00
3 44 + 725 KR 0.20 0.60 0.20 0.60 0.80 0.20
0.40 25.00 10.00
4 44 + 750 KR 0.20 0.60 0.20 0.60 0.80 0.20
0.40 5.00 2.00
5 44 + 755 KR 0.20 0.60 0.20 0.60 0.80 0.20

Sub. Total 1 1.20 105.00 42.00

Dibuat Oleh:

Jafriadi
Pengawas Lapangan
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL I

SATUAN KERJA PELAKSANAAN JALAN NASIONAL


WILAYAH II PROVINSI ACEH

PPK 2.3 PROVINSI ACEH

DATA
PT. ARENA BUDAYA

TAHUN ANGGARAN 2020


OPNAME PEMBERSIHAN SALURAN
REPUBLIK INDONESIA RUAS :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA PAKET : PADAT KARYA RUTIN JALAN
BALAI PELAKSANAAN JALAN NASIONAL - I ITEM PEKERJAAN : SALURAN MORTAR
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI ACEH
PEJABAT PEMBUAT KOMITMEN (PPK) - 2.3 PROVINSI ACEH TAHUN ANGGARAN : 2021
TGL :

GAMBAR / SKETSA

La Lc Lb

Ld
PERHITUNGAN
DIMENSI
Panjang VOLUME
NO. STA L/R
(M') ( Mᶾ )
a b c j k
La Lb

Lc
T