Tahun Tahun ke I
(F/P,I = 3.81%,n)
2017 0 1
2018 1 1.038145
2019 2 1.077745041
2020 3 1.118855626
2021 4 1.161534373
2022 5 1.205841102
2023 6 1.251837911
2024 7 1.299589268
2025 8 1.349162101
2026 9 1.400625889
2027 10 1.454052764
2028 11 1.509517606
2029 12 1.567098155
2030 13 1.626875114
2031 14 1.688932266
2032 15 1.753356587
2033 16 1.820238374
2034 17 1.889671367
2035 18 1.961752881
2036 19 2.036583945
2037 20 2.114269439
2038 21 2.194918247
2039 22 2.278643404
2040 23 2.365562256
2041 24 2.455796628
2042 25 2.549472991
2043 26 2.646722638
2044 27 2.747681873
2045 28 2.852492198
2046 29 2.961300513
2047 30 3.074259321
2048 31 3.191526943
2049 32 3.313267738
2050 33 3.439652336
2051 34 3.570857874
2052 35 3.707068248
2053 36 3.848474366
2054 37 3.995274421
2055 38 4.147674164
2056 39 4.305887195
Data inflasi selama 3 tahun sejak 2015 sampai 2017
I= 3.8%
Nilai Waktu Without Project Nilai Waktu With Project Saving Nilai Waktu
Tahun
(Rp/Tahun) (Rp/Tahun) (Rp/Tahun)
2018 Rp272,296,225,682.78 Rp185,302,256,844.38 Rp86,993,968,838.40
2019 307,113,563,070.97 205,193,620,899.29 Rp101,919,942,171.68
= Rp59,774,140,000.00
Tabel Persentase BI Rate
Tahun Benefit
15-Jan 7.75%
2,988,707,000,000.00 Rp2,988,707,000,000.00
Rp- Rp-
Rp- Rp-
Rp85,555,287,451.39
Rp97,036,782,017.29
Rp5,159,378,332,041.06
Rp108,213,174,134.63 Rp3,788,788,212,770.65
Rp115,021,052,817.65
Rp124,336,799,462.92 1.36
Rp127,093,558,309.44
Rp128,388,331,749.19
Maka dapat disimpulkan bahwa pembangunan jalan tol Pasuruan-Probo
Rp130,554,619,979.17
dikatakan “LAYAK” secara ekonomi.
Rp130,847,743,033.94
Rp127,254,595,910.01
Rp123,733,181,302.32
Rp123,807,639,848.89
Rp122,281,891,697.45
Rp120,749,364,670.78 Analisis Net Present Value (NPV)
Rp120,095,450,261.61
Rp121,347,227,231.42
Dari tabel disamping maka hasil yang didapatkan adalah sebagai berikut:
Rp122,497,792,420.72
Rp123,911,123,024.12 > Benefit = Rp5,159,378,332,041.06
Rp126,508,299,703.80 > Cost = Rp3,788,788,212,770.65
Rp129,155,229,791.50
Rp131,894,072,607.99 Sehingga didapatkan nilai NPV
Rp134,793,349,828.86
Rp137,257,885,763.85
NPV = B - C
Rp139,997,141,217.20
Rp142,769,967,542.97
NPV = 5,159,378,332,041.06 - 3,788,788,212,770.65
Rp145,268,811,543.96
Rp147,925,223,546.72
Rp150,027,417,576.80 NPV = Rp1,370,590,119,270.41
Rp152,179,068,203.70
Rp153,909,144,883.16 Maka dapat disimpulkan bahwa pembangunan jalan tol Pasuruan – Probo
Rp155,526,670,502.31 dikatakan “LAYAK” secara ekonomi.
Rp156,364,608,105.91
Rp157,451,061,708.98
Rp158,058,902,875.65
Rp157,721,024,175.09
Rp155,129,266,761.24
Rp153,110,020,657.19
Rp147,116,121,940.38
Rp5,159,378,332,041.06
Tabel Aliran Kas dari Aspek Finansial Berdasa
2015
2016
2017
2018 Rp84,836,621,000.00
2019 Rp94,274,731,500.00
2020 Rp99,657,893,500.00
2021 Rp108,578,162,500.00
2022 Rp126,161,624,500.00
> 1 (LAYAK) 2023 Rp133,365,494,500.00
2024 Rp150,860,007,000.00
2025 Rp159,474,161,000.00
angunan jalan tol Pasuruan-Probolinggo
2026 Rp168,580,201,000.00
K” secara ekonomi.
2027 Rp197,739,551,000.00
2028 Rp209,030,519,500.00
2029 Rp234,007,111,000.00
2030 Rp247,368,959,500.00
2031 Rp285,885,438,000.00
Value (NPV) 2032 Rp311,665,263,500.00
2033 Rp335,750,218,000.00
2034 Rp377,086,919,500.00
adalah sebagai berikut:
2035 Rp405,646,114,500.00
2036 Rp440,616,090,000.00
2037 Rp499,811,303,500.00
2038 Rp541,545,080,000.00
2039 Rp581,242,613,500.00
2040 Rp654,637,281,500.00
2041 Rp707,603,376,000.00
2042 Rp792,935,729,000.00
2043 Rp866,587,374,000.00
2044 Rp947,863,643,000.00
2045 Rp1,021,449,532,500.00
> 1 (LAYAK) 2046 Rp1,135,877,059,000.00
2047 Rp1,236,167,834,500.00
ngunan jalan tol Pasuruan – Probolinggo 2048 Rp1,369,445,663,000.00
K” secara ekonomi. 2049 Rp1,487,235,035,500.00
2050 Rp1,667,903,814,500.00
2051 Rp1,807,386,011,500.00
2052 Rp1,988,873,267,000.00
2053 Rp2,185,193,373,000.00
2054 Rp2,394,313,878,000.00
2055 Rp2,623,504,946,000.00
2056 Rp2,871,063,747,000.00
Total
Kas dari Aspek Finansial Berdasarkan Volume Data Volume Lalu Lintas Jalan Tol Hasil Perhitungan Trip Assignment
Rp2,988,707,000,000.00 Rp2,988,707,000,000.00
Rp- Rp-
Rp- Rp-
Present Worth Benefit (Rp) Dari hasil analisis dan perhitungan tabel di atas maka dapat disimpulkan:
Rp79,101,744,522.14
Rp80,782,967,117.56
BCR = Rp4,888,670,821,462.11
Rp82,064,113,855.75 Rp3,788,788,212,770.65
Rp88,907,985,130.60
Rp87,631,384,750.34 = 1.29
Rp92,425,757,265.45
Rp91,098,645,378.15
Rp89,790,597,102.60 NPV = Benefit (Income) - Cost (Outcome)
Rp98,202,045,747.98
Rp96,791,983,677.02 = Rp1,099,882,608,691.46
Rp101,032,580,289.12
Rp99,581,873,152.97
Rp107,307,437,115.68 Maka Proyek pembangunan jalan tol Pasuruan – Probolinggo dikatakan “LAYAK”
Rp109,075,920,832.62 Finansial
Rp109,561,883,481.91
Rp114,732,736,782.03
Rp115,078,953,800.61
Rp116,549,827,741.91
Rp123,270,755,182.37
Rp124,534,963,149.03
Rp124,628,345,047.32
Rp130,876,844,368.27
Rp131,903,000,749.54
Rp137,817,848,508.92
Rp140,437,320,570.28
Rp143,224,970,778.68
Rp143,910,502,622.07
Rp149,214,010,562.06
Rp151,411,343,559.00
Rp156,397,021,681.17
Rp158,367,470,600.05
Rp165,599,901,314.98
Rp167,318,008,805.48
Rp171,672,835,479.08
Rp175,868,088,756.01
Rp179,672,227,115.74
Rp183,562,707,475.78
Rp187,304,452,774.21
Rp4,888,670,821,462.11
Analisis Financial Internal Rate of Return (FIRR)
Tahun Income
maka dapat disimpulkan:
2017 -Rp2,988,707,000,000.00
2018 Rp20,971,614,568.96
2019 Rp27,302,178,040.29
2020 Rp29,331,049,889.17
2021 Rp33,404,603,295.54
2022 Rp42,371,171,986.46
2023 Rp43,386,333,167.50
2024 Rp49,735,728,556.01
2025 Rp50,223,565,790.92
> 1 (LAYAK) 2026 Rp50,553,087,875.29
2027 Rp59,273,082,193.24
2028 Rp59,102,300,435.06
fit (Income) - Cost (Outcome) 2029 Rp63,650,090,150.14
2030 Rp63,143,982,322.68
> 1 (LAYAK) 2031 Rp70,206,145,097.35
2032 Rp72,069,370,526.12
2033 Rp72,742,436,494.65
– Probolinggo dikatakan “LAYAK” Secara 2034 Rp77,073,928,317.07
al 2035 Rp77,379,734,166.57
2036 Rp78,479,035,118.22
2037 Rp83,537,684,308.94
2038 Rp84,229,077,900.36
2039 Rp83,953,566,679.27
2040 Rp88,205,541,966.67
2041 Rp88,452,155,361.68
2042 Rp92,184,634,912.03
2043 Rp93,408,838,988.02
2044 Rp94,670,961,362.73
2045 Rp94,385,775,084.24
2046 Rp97,246,516,653.15
2047 Rp97,877,756,047.36
2048 Rp100,325,649,777.11
2049 Rp100,672,017,836.14
2050 Rp104,418,183,837.45
2051 Rp104,467,627,332.84
2052 Rp106,163,963,795.73
2053 Rp107,682,992,623.53
2054 Rp108,887,498,379.35
2055 Rp110,082,830,744.64
2056 Rp111,126,914,950.49
ernal Rate of Return (FIRR)
Dari hasil perhitungan didapatkan tingkat
NPV
pengembalian suku bunga (IRR) = 8,63%
-Rp2,988,707,000,000.00
-Rp2,835,326,382,219.58
-Rp2,791,940,049,052.08
-Rp2,742,204,320,496.07
-Rp2,691,980,754,705.15
-Rp2,641,427,666,829.86
-Rp2,582,154,584,636.62
-Rp2,523,052,284,201.56
-Rp2,459,402,194,051.42
-Rp2,396,258,211,728.74
-Rp2,326,052,066,631.39
-Rp2,253,982,696,105.27
-Rp2,181,240,259,610.62
-Rp2,104,166,331,293.55
-Rp2,026,786,597,126.98
-Rp1,948,307,562,008.76
-Rp1,864,769,877,699.82
-Rp1,780,540,799,799.46
-Rp1,696,587,233,120.19
-Rp1,608,381,691,153.52
-Rp1,519,929,535,791.84
-Rp1,427,744,900,879.81
-Rp1,334,336,061,891.79
-Rp1,239,665,100,529.06
-Rp1,145,279,325,444.82
-Rp1,048,032,808,791.67
-Rp950,155,052,744.31
-Rp849,829,402,967.20
-Rp749,157,385,131.06
-Rp644,739,201,293.61
-Rp540,271,573,960.77
-Rp434,107,610,165.04
-Rp326,424,617,541.51
-Rp217,537,119,162.16
-Rp107,454,288,417.52
Rp-
Analisis Payback Period (PP)
2017 0 -2,988,707,000,000.00
2018 1 21,242,327,673.38
2019 2 28,011,590,399.70
2020 3 30,481,639,175.40
2021 4 35,163,108,781.48
2022 5 45,177,444,268.81
2023 6 46,856,987,676.41
2024 7 54,407,671,415.63
2025 8 55,650,546,683.68
2026 9 56,738,756,828.03
2027 10 67,384,479,058.41
2028 11 68,057,655,761.34
2029 12 74,240,666,148.62
2030 13 74,601,067,427.56
2031 14 84,015,310,565.18
2032 15 87,358,320,319.34
2033 16 89,312,372,513.81
2034 17 95,852,073,874.71
2035 18 97,474,606,101.48
2036 19 100,135,517,532.94
2037 20 107,966,037,038.80
2038 21 110,264,829,681.83
2039 22 111,322,859,297.02
2040 23 118,470,797,048.64
2041 24 120,335,590,661.31
2042 25 127,032,384,557.19
2043 26 130,380,943,925.31
2044 27 133,848,395,818.33
2045 28 135,167,775,386.31
2046 29 141,062,283,535.71
2047 30 143,810,665,678.96
2048 31 149,310,142,538.94
2049 32 151,759,657,880.02
2050 33 159,438,770,573.70
2051 34 161,573,364,757.66
2052 35 166,316,524,012.58
2053 36 170,873,858,950.42
2054 37 175,015,602,588.38
2055 38 179,220,866,424.63
2056 39 183,256,116,129.78
-21,242,327,673.38
Period (PP)
-2,967,464,672,326.62
-2,939,453,081,926.92 ® Payback Period < Lama konsesi = 39 tahun
-2,908,971,442,751.52
Maka Proyek pembangunan Jalan Tol Pasuruan –
-2,873,808,333,970.04
Probolinggo dikatakan “LAYAK” Secara Finansial
-2,828,630,889,701.23
-2,781,773,902,024.82
-2,727,366,230,609.19
-2,671,715,683,925.51
-2,614,976,927,097.48
-2,547,592,448,039.07
-2,479,534,792,277.73
-2,405,294,126,129.11
-2,330,693,058,701.55
-2,246,677,748,136.37
-2,159,319,427,817.03
-2,070,007,055,303.22
-1,974,154,981,428.51
-1,876,680,375,327.03
-1,776,544,857,794.09
-1,668,578,820,755.29
-1,558,313,991,073.46
-1,446,991,131,776.44
-1,328,520,334,727.80
-1,208,184,744,066.49
-1,081,152,359,509.30
-950,771,415,583.99
-816,923,019,765.66
-681,755,244,379.35
-540,692,960,843.64
-396,882,295,164.68
-247,572,152,625.74
-95,812,494,745.72
63,626,275,827.98
225,199,640,585.64
391,516,164,598.22
562,390,023,548.64
737,405,626,137.02
916,626,492,561.65
1,099,882,608,691.43
Tabel Aliran Kas dari Aspek Finansial Berdasarkan Data Volume Lalu Lintas Ja
Inflation
Tahun Benefit Total Cost
(F/P,I = 3.81%,n)
2015 Rp2,988,707,000,000.00
2016 Rp-
2017 Rp-
Discount Rate
Present Worth Cost (Rp) Present Worth Benefit (Rp)
(P/F,I = 7.25%,n)
Rp2,988,707,000,000.00 Rp-
0 Rp-
0 Rp-
BCR = Rp10,370,782,909,823.00
Rp3,788,788,212,770.65
2017
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
2052
2053
2054
2055
2056
Analisis Payback Period (PP)
0 -Rp2,988,707,000,000.00 -Rp2,988,707,000,000.00
1 Rp128,550,068,465.92 -Rp2,860,156,931,534.08
2 Rp139,162,322,682.19 -Rp2,720,994,608,851.89
3 Rp139,081,999,622.60 -Rp2,581,912,609,229.29
4 Rp144,475,254,321.25 -Rp2,437,437,354,908.04
5 Rp161,804,136,498.25 -Rp2,275,633,218,409.79
6 Rp160,793,311,063.48 -Rp2,114,839,907,346.31
7 Rp174,329,196,322.06 -Rp1,940,510,711,024.25
8 Rp172,800,735,190.85 -Rp1,767,709,975,833.40
9 Rp171,177,654,640.79 -Rp1,596,532,321,192.61
10 Rp190,689,559,707.29 -Rp1,405,842,761,485.32
11 Rp188,497,546,171.27 -Rp1,217,345,215,314.05
12 Rp199,555,098,127.97 -Rp1,017,790,117,186.08
13 Rp196,997,561,909.48 -Rp820,792,555,276.60
14 Rp214,029,922,793.83 -Rp606,762,632,482.77
15 Rp219,017,778,917.75 -Rp387,744,853,565.02
16 Rp220,309,819,815.31 -Rp167,435,033,749.71
17 Rp231,164,979,895.47 Rp63,729,946,145.76
18 Rp231,914,660,312.23 Rp295,644,606,457.99
19 Rp235,683,114,487.00 Rp531,327,720,944.99
20 Rp249,388,946,010.21 Rp780,716,666,955.20
21 Rp252,426,383,296.09 Rp1,033,143,050,251.29
22 Rp252,220,573,650.01 Rp1,285,363,623,901.30
23 Rp264,465,371,376.35 Rp1,549,828,995,277.65
24 Rp266,667,930,448.41 Rp1,816,496,925,726.06
25 Rp277,920,311,114.02 Rp2,094,417,236,840.08
26 Rp283,207,208,634.69 Rp2,377,624,445,474.77
27 Rp287,135,013,583.39 Rp2,664,759,459,058.16
28 Rp288,250,680,671.89 Rp2,953,010,139,730.05
29 Rp297,762,082,376.82 Rp3,250,772,222,106.87
30 Rp301,779,098,974.97 Rp3,552,551,321,081.84
31 Rp310,414,084,739.23 Rp3,862,965,405,821.07
32 Rp313,777,264,138.03 Rp4,176,742,669,959.10
33 Rp327,222,579,160.83 Rp4,503,965,249,119.93
34 Rp329,872,104,821.79 Rp4,833,837,353,941.72
35 Rp336,818,366,526.46 Rp5,170,655,720,468.18
36 Rp343,360,195,830.69 Rp5,514,015,916,298.87
37 Rp350,356,105,098.16 Rp5,864,372,021,397.03
38 Rp356,114,142,660.24 Rp6,220,486,164,057.27
39 Rp361,508,532,995.11 Rp6,581,994,697,052.38
Dari hasil perhitungan didapatkan waktu pengembalian
Investasi (Payback Period) selama 17 Tahun 3 Bulan 10
Hari