Rab Stadion Mini Ok
Rab Stadion Mini Ok
NO. PATLUAS GALIAN (M2) LUAS TIMBUNAN (M2) JARAK (M') VOLUME GALIAN (M3)
51.75
55.05
210.15
603.30
775.05
833.55
827.40
811.95
897.83
1,062.08
819.75
6,947.85
18,335.48
DAFTAR ANALISA HARGA SATUAN
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A.4.1.1.7. MEMBUAT 1 M3 BETON MUTU f’c = 19.3 MPa (K-225). SLUMP (12 ± 2) CM. W/C = 0.58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien
Rp. Rp.
A. TENAGA
Pekerja L01 OH 1.6500 82,000.00 135,300.00
Tukang L02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L03 OH 0.0280 129,000.00 3,612.00
Mandor L04 OH 0.0830 110,000.00 9,130.00
JUMLAH TENAGA KERJA 175,542.00
B. BAHAN
Semen Portland Kg 371.00 1,347.50 499,922.50
Pasir Beton Kg 698.00 132.14 92,235.71
Kerikil (Maks 30 mm) Kg 1,047.00 214.81 224,911.11
Air Liter 215.00 150.00 32,250.00
Jumlah 4,881,256.53
Harga Satuan 4,881,256.53
Jumlah 4,947,123.90
Harga Satuan 4,947,123.90
Jumlah 5,447,082.52
Harga Satuan 5,447,082.52
Jumlah 4,487,385.80
Harga Satuan 4,487,385.80
Analisa 5 1 M3 Sloof Beton Bertulang 20x25cm
Harga Satuan Jumlah Harga
Analisa Uraian Pekerjaan Volume Satuan
Rp. Rp.
Jumlah 5,569,860.56
Harga Satuan 5,569,860.56
Jumlah 6,752,750.68
Harga Satuan 6,752,750.68
Jumlah 7,201,494.40
Harga Satuan 7,201,494.40
Jumlah 8,327,862.07
Harga Satuan 8,327,862.07
Jumlah 15,221,129.26
Harga Satuan 15,221,129.26
Analisa 10 1 M3 Balok Bertulang 35x50
Harga Satuan Jumlah Harga
Analisa Uraian Pekerjaan Volume Satuan
Rp. Rp.
Jumlah 5,908,518.18
Harga Satuan 5,908,518.18
Jumlah 7,140,734.61
Harga Satuan 7,140,734.61
Jumlah 7,968,961.70
Harga Satuan 7,968,961.70
Jumlah 6,509,184.67
Harga Satuan 6,509,184.67
Jumlah 5,654,503.92
Harga Satuan 5,654,503.92
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.7. 1 M2 Pasangan Bata Merah tebal 1/2 Bata Campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien
Rp. Rp.
A. TENAGA
Pekerja L01 OH 0.3000 82,000.00 24,600.00
Tukang L02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L03 OH 0.0200 129,000.00 2,580.00
Mandor L04 OH 0.0150 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,830.00
B. BAHAN
Batu Bata Bh 70.00 880.00 61,600.00
Semen Portland Kg 18.95 1,347.50 25,535.13
Pasir Pasang M3 0.038 185,000.00 7,030.00
A.4.7.1.4 1 M2 Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien
Rp. Rp.
A. TENAGA
Pekerja L01 OH 0.0700 82,000.00 5,740.00
Tukang L02 OH 0.0090 100,000.00 900.00
Kepala Tukang L03 OH 0.0060 129,000.00 774.00
Mandor L04 OH 0.0030 110,000.00 330.00
JUMLAH TENAGA KERJA 7,744.00
B. BAHAN
Cat Menie Kg 0.2000 32,000.00 6,400.00
Plamir Kayu Kg 0.1500 21,000.00 3,150.00
Cat dasar kayu Kg 0.1700 67,000.00 11,390.00
Cat kayu penutup Kg 0.2600 67,000.00 17,420.00
Kuas Bh 0.0100 27,000.00 270.00
Pengencer Liter 0.0300 27,000.00 810.00
Ampelas' Lembar 0.2000 4,200.00 840.00
JUMLAH HARGA BAHAN 40,280.00
C. PERALATAN
Roller/Kuas bh 0.0100 20,000.00 200.00
-
JUMLAH HARGA ALAT 200.00
4 Cor Beton K250 pakai ready Mix 426.79 m3 A.4.1.1.8. 1,218,302.19 519,956,757.08
5 Kerb beton Pembatas Lintasan 840.00 m Taksir 75,000.00 63,000,000.00
6 Finishing Level Lintasan Yang Sudah Dicor 4,267.88 m2 Taksir 14,000.00 59,750,320.00
Jumlah 1,099,223,308.39
C. PEKERJAAN LINTASAN ATLETIK
1 Pengadaan dan pemasangan lapisan sintetik t=13 mm (standar 4,267.88 m2 Analisa Khusus 1 1,633,397.00 6,971,142,388.36
IAAF)
2 Pengecatan Garis Lintasan Bahan Polyuerthane 2,107.00 m Analisa Khusus 2 78,582.79 165,573,938.53
Jumlah 7,136,716,326.89
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp) (Rp)
1 2 3 4 5 6 7
D. PEKERJAAN PENDUKUNG PERALATAN DAN PERLENGKAPAN ATLETIK
1 Pondasi papan lompat Jauh dan Lompat jangkit 12.00 set Analisa Khusus 3 7,062,915.15 84,754,981.81
2 Papan Tumpuan Lompat jauh 6.00 Bh Analisa Khusus 4 10,291,900.00 61,751,400.00
3 Bak Tumpuan Loncat Galah 2.00 Bh Analisa Khusus 5 4,661,897.00 9,323,794.00
4 Ring Besi Untuk Cakram dan Martil 1.00 Bh Analisa Khusus 7 20,605,982.50 20,605,982.50
5 Ring Besi Untuk Tolak Peluru 2.00 Bh Analisa Khusus 8 9,805,692.00 19,611,384.00
6 Almunium curb 400.00 M' Analisa Khusus 10 312,100.00 124,840,000.00
7 Pondasi dan gawang Pada Bak Air untuk Lari Halang rintang 1.00 Bh Analisa Khusus 9 26,305,300.00 26,305,300.00
Jumlah 347,192,842.31
DAFTAR HARGA UPAH DAN BAHAN KAB. ACEH BESAR
Pekerjaan : PEMBANGUNAN STADION MINI (LAP.SEPAK BOLA DAN FASILITAS ATLETIK)
Harga
No. Uraian Upah/Bahan Satuan
Rp.
A. UPAH
1 L01 Pekerja OH 82,000.00
2 L02 Tukang OH 100,000.00
3 L03 Kepala Tukang OH 129,000.00
4 L04 Mandor OH 110,000.00
5 Instalator Lintasan Atletik OH 250,000.00
6 Pembatu Instalator OH 85,000.00
7 Tenaga Ahli Equiment Atletik OH 200,000.00
B. ALAT
1 Vibrator Jam 65,000.00
2 Pompa beton Jam 275,000.00
C. BAHAN
1 Kayu Balok 5/7 M3 4,300,000.00
2 Paku 2" - 3" Kg 23,000.00
3 Kayu Papan M3 4,300,000.00
4 Pasir Urug M3 103,000.00
5 Semen Portland 40kg Kg 53,900.00
6 Semen Portland 40kg Kg 1,347.50
7 Pasir Pasang M3 185,000.00
8 Pasir Pasang Kg 13,214.29
9 Pasir Beton M3 185,000.00
10 Pasir Beton Kg 132.14
11 Batu gunung/belah M3 196,000.00
10 Kerikil Biasa Untuk Peresapan M3 250,000.00
12 Kerikil /batu pecah (Maks 30 mm) M3 290,000.00
13 Kerikil/batu pecah (Maks 30 mm) Kg 214.81
14 Agregat Kelas B M3 290,000.00
15 Agregat Kelas C M3 261,000.00
15 Sirtu M3 120,000.00
16 Tanah Timbun M3 69,000.00
17 Air Liter 150.00
18 Besi Beton Polos Kg 13,400.00
19 Besi Beton Ulir Kg 15,000.00
20 Besi Siku L40.40.3,8 Kg 110,000.00
21 Kawat Beton Kg 22,000.00
22 Kawat Harmonika Galvanis lubang 43x43 dia kawat 3.4mm M2 105,000.00
23 WireMesh Ø 6mm (Standar Pabrikasi) M2 57,000.00
24 WireMesh Ø 6mm (Standar Pabrikasi) Kg 18,566.78
25 Paku 5-10 cm Kg 23,000.00
26 Minyak Bekisting Liter 19,000.00
27 Kayu Kelas I M3 6,500,000.00
28 Kayu Kelas II M3 5,800,000.00
Harga
No. Uraian Upah/Bahan Satuan
Rp.
29 Kayu Kelas III M3 4,300,000.00
Harga
No. Uraian Upah/Bahan Satuan
Rp.
30 Kayu Kelas IV M3 3,300,000.00
31 Besi Strip Tebal 5 mm Kg 18,000.00
32 Multiplek 9 mm Lembar 218,000.00
33 Multiplek 6 mm Lembar 138,000.00
34 Dolken Kayu (sembarang keras) 8-10 cm x 4 m Batang 50,000.00
35 Kloset duduk lengkap asesoris TOTO Bh 2,500,000.00
36 Kloset Jongkok Bh 435,000.00
37 Urinoir Keramik Bh 1,300,000.00
38 Wastafel lengkap asesoris Bh 415,000.00
39 Floor Drain Bh 25,000.00
40 Stop Kran Bh 75,000.00
41 Bak Mandi fibre glass, uk. Besar Bh 250,000.00
42 Sealtape Bh 5,000.00
43 Seng gelombang Lbr 72,000.00
44 Seng plat Lbr 65,000.00
45 Jet Shower Buah 250,000.00
46 Plamur Kg 25,000.00
47 Cat dasar Kg 28,000.00
48 Cat Penutup Kg 28,000.00
49 Cat Menie Kg 32,000.00
50 Plamir kayu Kg 21,000.00
51 Cat Dasar kayu Kg 67,000.00
52 Cat Penutup kayu Kg 67,000.00
53 Pengecer /tiner Liter 27,000.00
54 Amplase Lembar 4,200.00
55 Kuas bh 27,000.00
56 Seng Spandek 0.4 mm M2 95,000.00
57 Nok genteng metal M' 45,000.00
58 Pipa PVC 1/2" M' 6,000.00
59 Pipa PVC 3/4" M' 6,833.33
60 Pipa PVC 1" M' 10,166.67
61 Pipa PVC 2" M' 21,500.00
62 Pipa PVC 3" M' 28,333.33
63 Pipa PVC 4" M' 45,833.33
64 Pipa PVC 6" M' 283,333.33
64 Pipa Galvanis 3" Btng 850,000.00
65 Pipa Galvanis 4" Btng 1,200,000.00
66 Skrup fixer bh 3,000.00
67 Sealant Kg 180,000.00
68 Batu bata bh 880.00
69 Keramik Lantai 40cm x 40 cm bh 13,666.67
70 Granit Lantai 60 cm x 60 cm anti gores M2 290,000.00
71 Keramik Lantai 20 cm x20 cm bh 2,720.00
72 Keramik Dinding 20cm x 40 cm bh 6,800.00
73 Keramik 10cm x 20 cm bh 2,000.00
74 Batu Alam bh 31,666.67
75 Semen warna Kg 4,660.00
76 Shower Spray toto THX 20 NBW Bh 300,000.00
77 Lem pipa Liter 160,000.00
78 Lem kayu kg 35,000.00
79 Lempengan Rumput m2 37,000.00
80 Kunci Pintu Bh 154,000.00
81 Engsel Pintu Pasang 20,000.00
82 Engsel Jendela Pasang 20,000.00
Harga
No. Uraian Upah/Bahan Satuan
Rp.
83 Pacok Jendela Bh 18,200.00
84 Tarikan Jendela Bh 8,000.00
85 Hak Angin Steenless Bh 19,000.00
86 Lampu TL 2 X 36 Watt termasuk cover Bh 420,000.00
87 Lampu HE 45 Watt Bh 53,000.00
88 Lampu HE 14 Watt Bh 35,000.00
89 Kabel NYA 2.5 Rol 442,750.00
90 Saklar Tunggal stara Panasonic Bh 29,000.00
91 Saklar Ganda stara Panasonic Bh 43,000.00
92 Stop Kontak stara Panasonic Bh 27,000.00
93 Eksosfans Bh 800,000.00
94 Ijuk Kg 18,000.00
95 Kaca Polos 5 mm M2 155,000.00
Bahan Khusus Atletik
1 Cat Polyurethane Kg 144,375.00
2 PU Adhesive Kg 130,360.00
3 Shockpad 10 mm m2 275,100.00
4 Seal coat Kg 217,140.00
5 PU wear coat Kg 298,750.00
6 Granule / EPDM Kg 97,020.00
SEWA ALAT BERAT
1 Wheel Loader Jam 250,000.00
2 Dump Truck Jam 150,000.00
3 Motor Grader Jam 250,000.00
4 Tandem Roller Jam 220,000.00
5 Water Tanker Jam 150,000.00
pengurangan K1 1 0.33 2
2 0.99 2
3 1.65 2
4 2.31 2
5 2.97 2
6 3.63 2
7 4.29 2
8 4.95 2
9 5.61 2
10 6.27 2
11 6.93 2
0.66
1.98
3.3
4.62
5.94
7.26
8.58
9.9
11.22
12.54
13.86
79.86
Berat Besi (kg/m)
6 0.222
7 0.302
8 0.395
10 0.617
12 0.888
14 1.208
16 1.578
18 1.998
19 2.226
20 2.466
21 2.719
22 2.984
1 Tapak 180x180
D14
b= 1.800 m h= 0.300 m Lb = 1.85 m
Spasi = 0.125 m
D14 = 1.208 kg/m n= 15.81 btg
D14 = 1.208 kg/m n= 15.40 btg
Teromol 2Ø14 = 1.208 kg/m n= 2.00 btg
berat tul. Ulir b = 81.412 kg » 2.19 M2 Bekistg
berat tul. Ulir Lb = 70.041 kg » 1.10
berat tul. Ulir tromol = 2.238 kg »
153.691
2 Tapak 250x150
D14
b= 1.500 m h= 0.300 m Lb = 2.22 m
Spasi = 0.125 m
D14 = 1.208 kg/m n= 18.78 btg
D14 = 1.208 kg/m n= 13.00 btg
Teromol 2D14 = 1.208 kg/m n= 2.00 btg
berat tul. Ulir 14 b = 83.050 kg » 2.23 M2 Bekistg
berat tul. Ulir14 Lb = 70.762 kg » 1.12
berat tul. Ulir tromol = 2.685 kg »
156.498
3 Tapak 60x60
Ø12
b= 0.600 m h= 0.200 m Lb = 8.33 m
Spasi = 0.125 m
Ø12 = 0.888 kg/m n= 67.67 btg
Ø12 = 0.888 kg/m n= 5.80 btg
Teromol 2Ø12 = 0.888 kg/m n= 2.00 btg
berat tul. Ulir 14 b = 87.710 kg » 3.57 M2 Bekistg
berat tul. Ulir14 Lb = 85.101 kg » 1.79
berat tul. Ulir tromol = 7.398 kg »
180.210
4 Sloof 30/40
tulang 5D14,2D12, behel Ø10 - 10 cm
b= 0.300 m h= 0.400 m Lb = 8.33 m
Spasi = 0.10-0.15 m Panjang behel = 1.14 m
D14 = 1.208 kg/m n= 5.00 btg
D12 = 0.888 kg/m n= 2.00 btg
Ø10 = 0.617 kg/m n= 70.44 btg
berat tul. Ulir 14 = 52.868 kg » 6.67 M2 Bekistg
berat tul. Ulir 12 = 14.797 kg
total ulir 67.665
berat tul. Polos = 49.512 kg » 3.33
117.177
5 Sloof 20/25
5Ø12,Ø8 - 10 cm
b= 0.180 m h= 0.250 m Lb = 22.22 m
Spasi = 0.10-0.15 m Ls = 0.60 m
Ø12 = 0.888 kg/m n= 5.00 btg
Ø8 = 0.395 kg/m n= 186.19 btg
berat tul. Polos = 103.578 kg » 11.11 M2 Bekistg
berat tul. Polos = 44.079 kg » 5.56
147.658
6 Kolom 40/50
tulang 12D16,behel Ø10 - 10 cm
b= 0.400 m h= 0.500 m Lb = 5.00 m
Spasi = 0.100 m Ls = 1.54 m
D16 = 1.578 kg/m n= 12.00 btg
Ø10 = 0.617 kg/m n= 51.00 btg
berat tul. Ulir = 99.435 kg » 9.00 M2 Bekistg
berat tul. Polos = 48.423 kg » 4.50
total besi 147.858
7 Kolom 40/40
tulang 10D16,behel Ø10 - 10 cm
b= 0.400 m h= 0.400 m Lb = 6.25 m
Spasi = 0.100 m Ls = 1.34 m
D16 = 1.578 kg/m n= 10.00 btg
Ø10 = 0.617 kg/m n= 63.50 btg
berat tul. Ulir = 103.578 kg » 10.00 M2 Bekistg
berat tul. Polos = 52.461 kg » 5.00
total besi 156.039
8 Kolom 25/25
6Ø12, Ø8 - 10 cm
b= 0.250 m h= 0.250 m Lb = 16.00 m
Spasi = 0.10-0.15 m Ls = 0.74 m
Ø12 = 0.888 kg/m n= 6.00 btg
Ø8 = 0.395 kg/m n= 134.33 btg
berat tul. Polos = 89.492 kg » 16.00 M2 Bekistg
berat tul. Polos = 39.224 kg » 8.00
128.716
9 Kolom 13/13
4Ø12, Ø8 - 10 cm
b= 0.130 m h= 0.130 m Lb = 59.17 m
Spasi = 0.10-0.15 m Ls = 0.26 m
Ø12 = 0.888 kg/m n= 4.00 btg
Ø8 = 0.395 kg/m n= 494.10 btg
berat tul. Polos = 220.640 kg » 30.77 M2 Bekistg
berat tul. Polos = 50.690 kg » 15.38
271.330
10 Balok 35/50
tulang 7D14,2D12, behel Ø10 - 10 cm
b= 0.350 m h= 0.500 m Lb = 5.71 m
Spasi = 0.10-0.15 m Panjang behel = 1.44 m
D16 = 1.578 kg/m n= 7.00 btg
D12 = 0.888 kg/m n= 2.00 btg
Ø10 = 0.617 kg/m n= 48.62 btg
berat tul. Ulir 14 = 66.290 kg » 7.71 M2 Bekistg
berat tul. Ulir 12 = 10.146 kg
total ulir 76.437
berat tul. Polos = 43.165 kg » 3.86
119.601
11 Balok 30/40
tulang 7D14,2D12, behel Ø10 - 10 cm
b= 0.300 m h= 0.400 m Lb = 8.33 m
Spasi = 0.10-0.15 m Panjang behel = 1.14 m
D16 = 1.578 kg/m n= 7.00 btg
D12 = 0.888 kg/m n= 2.00 btg
Ø10 = 0.617 kg/m n= 70.44 btg
berat tul. Ulir 14 = 96.673 kg » 9.17 M2 Bekistg
berat tul. Ulir 12 = 14.797 kg
total ulir 111.470
berat tul. Polos = 49.512 kg » 4.58
160.982
12 Balok 25/30
tulang 4D14,2D12, behel Ø10 - 10 cm
b= 0.250 m h= 0.300 m Lb = 13.33 m
Spasi = 0.10-0.15 m Panjang behel = 0.84 m
D16 = 1.578 kg/m n= 4.00 btg
D12 = 0.888 kg/m n= 2.00 btg
Ø10 = 0.617 kg/m n= 112.11 btg
berat tul. Ulir 14 = 88.387 kg » 11.33 M2 Bekistg
berat tul. Ulir 12 = 23.675 kg
total ulir 112.062
berat tul. Polos = 58.061 kg » 5.67
170.123
13 Balok 30/50
tulang 7D14,2D12, behel Ø10 - 10 cm
b= 0.300 m h= 0.500 m Lb = 6.67 m
Spasi = 0.10-0.15 m Panjang behel = 1.34 m
D16 = 1.578 kg/m n= 7.00 btg
D12 = 0.888 kg/m n= 2.00 btg
Ø10 = 0.617 kg/m n= 56.56 btg
berat tul. Ulir 14 = 77.338 kg » 8.67 M2 Bekistg
berat tul. Ulir 12 = 11.838 kg
total ulir 89.176
berat tul. Polos = 46.724 kg » 4.33
135.900
14 Plat Beton/Lantai
Ø12
b= 1.000 m h= 0.300 m Lb = 3.33 m 3.33
Spasi = 0.150 m
Ø12 = 0.888 kg/m n= 23.22 btg
Ø12 = 0.888 kg/m n= 7.67 btg
berat tul. Polos = 46.182 kg » 3.33 M2 Bekistg
berat tul. Polos = 47.011 kg » 1.67
93.193
PEKERJAAN Analisa Khusus 1
KHUSUS M2 Pekerjaan Lapisan Sintetik prefebricated mat t=13mm 1,633,397
BAHAN
PU Adhesive Kg 1.1000 130,360 143,396
Shockpad 10 mm m2 1.0000 275,100 275,100
Seal coat Kg 0.5000 217,140 108,570
PU wear coat Kg 2.1000 298,750 627,375
Granule / EPDM Kg 2.8000 97,020 271,656
Alat bantu kerja Jam 0.2000 200,000 40,000
JUMLAH HARGA BAHAN 1,466,097
TENAGA
Tenaga ahli pasang Sintetik Oh 0.4000 250,000 100,000
Pekerja Oh 0.1500 82,000 12,300
Mandor Oh 0.5000 110,000 55,000
JUMLAH HARGA TENAGA 167,300
JUMLAH HARGA TENAGA DAN BAHAN 1,633,397
HARGA SATUAN PEKERJAAN 1,633,397
Analisa Khusus 2
M1 Pekerjaan Pengecatan Garis Lintasan 78,583
BAHAN
Cat Polyurethane Kg 0.0600 Rp 144,375 8,663
Analisa Khusus 7
1 bh Discus ring & hammer ring and adjust ring dia 3.15 m/Ring Besi Untuk Cakram dan Martil 20,605,983
BAHAN
Discus ring & hammer ring and adjust ring dia 3.15 m bh 1.0000 18,000,000 18,000,000
Semen Portland zak 16.3000 53,900 878,570
Pasir beton m3 1.0925 185,000 202,113
Koral beton m3 1.8700 290,000 542,300
JUMLAH HARGA BAHAN 19,622,983
TENAGA
Tenaga ahli built in equipment Oh 3.0000 200,000 600,000
Pekerja Oh 4.0000 82,000 328,000
Mandor Oh 0.5000 110,000 55,000
JUMLAH HARGA TENAGA 983,000
JUMLAH HARGA TENAGA DAN BAHAN 20,605,983
HARGA SATUAN PEKERJAAN 20,605,983
Analisa Khusus 8
1 bh Shot put ring with concrete floor dia 2.50 m/Ring Besi Untuk Tolak Peluru 9,805,692
BAHAN
Shot put ring dia 2.50 m bh 1.0000 8,000,000 8,000,000
Semen Portland zak 9.7800 53,900 527,142
Pasir beton m3 0.7900 185,000 146,150
Koral beton m3 0.8600 290,000 249,400
JUMLAH HARGA BAHAN 8,922,692
TENAGA
Tenaga ahli built in equipment Oh 2.5000 200,000 500,000
Pekerja Oh 4.0000 82,000 328,000
Mandor Oh 0.5000 110,000 55,000
JUMLAH HARGA TENAGA 883,000
JUMLAH HARGA TENAGA DAN BAHAN 9,805,692
HARGA SATUAN PEKERJAAN 9,805,692
Analisa Khusus 9
1 Set Water jump high hurdle /Pondasi dan gawang Pada Bak Air untuk Lari Halang rintang 26,305,300
BAHAN
Water jump high hurdle set 1.0000 25,000,000 25,000,000
JUMLAH HARGA BAHAN 25,000,000
TENAGA
Tenaga ahli built in equipment Oh 4.5000 200,000 900,000
Pekerja Oh 4.5000 82,000 369,000
Mandor Oh 0.3300 110,000 36,300
JUMLAH HARGA TENAGA 1,305,300
JUMLAH HARGA TENAGA DAN BAHAN 26,305,300
HARGA SATUAN PEKERJAAN 26,305,300
Analisa Khusus 10
1 M' Alumunium Curb 312,100
BAHAN
Alumunium Curb M' 1.0000 150,000 150,000
JUMLAH HARGA BAHAN 150,000
TENAGA
Tenaga ahli built in equipment Oh 0.4500 200,000 90,000
Pekerja Oh 0.4500 82,000 36,900
Mandor Oh 0.3200 110,000 35,200
JUMLAH HARGA TENAGA 162,100
JUMLAH HARGA TENAGA DAN BAHAN 312,100
HARGA SATUAN PEKERJAAN 312,100
1.6
352000
563,200.00