Anda di halaman 1dari 1

C:\Users\User\Pictures\logo.

png

130
Dinding Pas. Bata

UNIVERSITAS 17 AGUSTUS 1945


Keramik 40 x 40 SAMARINDA
FAKULTAS TEKNIK
Program Studi Teknik Arsitektur
Spesi
MATAKULIAH
Cor Rabat t= 10 cm
100 300 100
±0.00 Pasir Urug t= 10 cm
LANTAI STRUKTUR DAN
±0.00 -0.05 KONSTRUKSI

180 150 10010070


-0.07 SPESI -0.10
RABAT
-0.17
PASIR URUG
BANGUNAN 1
-0.27
Sloof 20 x 25
-0.42
SLOOF
JUDUL TUGAS
-0.42 Tanah Dasar
Pondasi Batu Gunung

1620
RUMAH TINGGAL
PRIBADI

720
Urugan Tanah NPM GANJIL

DOSEN PEMBIMBING I
-1.32
PONDASI BATU
Anstamping DOSEN PEMBIMBING 1

100 200
-1.52 ANSTAMPING
PASIR URUG Pasir Urug
-1.62
MAHDALENA RISNAWATI, S.T., M.T.
300
900
1000
DOSEN PEMBIMBING II
DOSEN PEMBIMBING II
-- DETAILPONDASIA
--
Skala 1 : 20

KHOIRUL HUDA, S.T., M.T.


130
Dinding Pas. Bata NAMA

Keramik 40 x 40
NAMA : UMI NURDAYANI
NIM : 20.11.1001.7312.001

Cor Rabat t= 10 cm
±0.00 Pasir Urug t= 10 cm NAMA GAMBAR SKALA
±0.00 LANTAI

150 10010070
-0.07 SPESI
-0.17 RABAT DETAIL PONDASI 1 : 20
-0.27 PASIR URUG
Sloof 20 x 25
-0.42
SLOOF

Pondasi Batu Gunung

1620
Catatan

900
Urugan Tanah

-1.32 PONDASI BATU


Anstamping

100 200
-1.52
ANSTAMPING
PASIR URUG Pasir Urug
-1.62
300
900
1000
-- DETAILPONDASIB
--
Skala 1 : 20
Kode Jumlah Halaman
Gambar Halaman

STR ST1-06

Anda mungkin juga menyukai