LIST PEKERJAAN QTY SATUAN UP 20%

PEKERJAAN PEMAGERAN PANEL 3,100 M 3,720


PEKERJAAN CUT & FILL 170,000 M2 204,000
PEKERJAAN JALAN AREA DEPAN (ASPAL) 9,680 M2 11,616
PEKERJAAN JALAN AREA BELAKANG (PAPING) 4,345 M2 5,214
DRAINASE AREA DEPAN (GUTTER TUTUP) 968 M 1,162
DRAINASE AREA BELAKANG (GUTTER OPEN) 1,097 M 1,316
FAN 36" 1KW 160 UNIT
LAMPU KANDANG (1 KANDANG 176 BH) 1,760
-
-
-
-
-
-
-
-
-
KEBUTUHAN
LISTRIK

160 KW 750
20 KW 9

44
4
176 1760 1.76
2.2