Total Biaya
No. Komponen biaya
( Rp. )
JUMLAH 600,000,000
7,500,000
25,000,000
7,000,000
19,200,000
28,800,000
8,400,000
1,100,000
1,100,000
25,600,000
8,000,000
1,000,000
300,000
350,000
350,000
350,000
350,000
350,000
350,000
350,000
400,000
135,850,000
III. ANALISIS DAN PENGOLAHAN DATA
Biaya Satuan Total Biaya
No. Komponen Biaya Satuan Volume
(Rp.) ( Rp. )
1. Pengujian Laboratorium
a. Tanah Sample 10 750,000 7,500,000
b. Air Sample 6 1,250,000 7,500,000
c. Benthos Sample 6 450,000 700,000
d. Plankton Sample 6 450,000 700,000
e. Udara, Kebisingan Sample 5 1,500,000 7,500,000
2. Beli Peta Dasar (arsip) Ls -- 7,500,000 7,500,000
3 ATK (Habis Pakai) Ls -- 3,750,000 3,750,000
TOTAL BIAYA ANALISIS DAN PENGOLAHAN DATA 35,150,000