Invoice 7 Paket (85%)
Invoice 7 Paket (85%)
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA 53,000,000 26,500,000 15,900,000 42,400,000.00
II TENAGA SUB PROFESIONAL 7,590,000 3,795,000 2,277,000 6,072,000.00
III TENAGA SUB PROFESIONAL 2,900,000 1,450,000 870,000 2,320,000.00
63,490,000 31,745,000 19,047,000.00 50,792,000.00 58.32%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPAN 9,900,000 4,950,000 2,970,000 7,920,000.00
II BIAYA PERALATAN DAN BAHAN 5,000,000 2,500,000 1,500,000 4,000,000.00
III BIAYA OPERASIONAL KANTOR 1,201,000 600,500 360,300 960,800.00
IV LAPORAN - LAPORAN 7,500,000 3,750,000 2,250,000 6,000,000.00
23,601,000 11,800,500 7,080,300.00 18,880,800.00 21.68%
JUMLAH (I+II) 87,091,000.00 43,545,500.00 26,127,300.00 69,672,800.00 80.00%
PPn (10%) 8,709,100.00 4,354,550.00 2,612,730.00 6,967,280.00
JUMLAH TOTAL 95,800,100.00 47,900,050.00 28,740,030.00 76,640,080.00
DIBULATKAN 95,800,000.00 47,900,000.00 28,700,000.00 76,600,000.00
C JUMLAH INVOICE BULAN LALU 47,900,000.00 47,900,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 76,600,000.00
E JUMLAH INVOICE BRUTO 28,700,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 28,700,000.00
Terbilang : Dua Puluh Delapan Juta Tujuh Ratus Ribu Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 15,000,000 15,000,000 0.50 7,500,000 0.30 4,500,000 0.20 3,000,000
2 Highway Engineer OB 1 x 1 10,000,000 10,000,000 0.50 5,000,000 0.30 3,000,000 0.20 2,000,000
3 Cost & Quantity Engineer OB 1 x 1 8,000,000 8,000,000 0.50 4,000,000 0.30 2,400,000 0.20 1,600,000
4 Ahli Struktur OB 1 x 1 7,000,000 7,000,000 0.50 3,500,000 0.30 2,100,000 0.20 1,400,000
5 Ahli Hidrologi OB 1 x 1 6,500,000 6,500,000 0.50 3,250,000 0.30 1,950,000 0.20 1,300,000
6 Ahli Arsitektur OB 1 x 1 6,500,000 6,500,000 0.50 3,250,000 0.30 1,950,000 0.20 1,300,000
1 Jumlah 53,000,000 26,500,000 15,900,000 10,600,000
II TENAGA SUB PROFESIONAL
1 Surveyor OB 2 x 1 2,545,000 5,090,000 1.00 2,545,000 0.60 1,527,000 0.40 1,018,000
2 Operator CAD/CAM OB 1 x 1 2,500,000 2,500,000 0.50 1,250,000 0.30 750,000 0.20 500,000
Jumlah 7,590,000 3,795,000 2,277,000 1,518,000
III TENAGA PENDUKUNG
1 Operator Komputer 1 x 1 1,200,000 1,200,000 0.50 600,000 0.30 360,000 0.20 240,000
2 Administrator 1 x 1 1,000,000 1,000,000 0.50 500,000 0.30 300,000 0.20 200,000
3 Office Boy 1 x 1 700,000 700,000 0.50 350,000 0.30 210,000 0.20 140,000
Jumlah 2,900,000 1,450,000 870,000 580,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Empat BL 1 x 1 8,400,000 8,400,000 0.50 4,200,000 0.30 2,520,000 0.20 1,680,000
2 Sewa Kendaraan Roda Dua BL 2 x 1 750,000 1,500,000 1.00 750,000 0.60 450,000 0.40 300,000
Jumlah 9,900,000 4,950,000 2,970,000 1,980,000
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 1,000,000
Jumlah 5,000,000 2,500,000 1,500,000 1,000,000
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 1,201,000 1,201,000 0.50 600,500 0.30 360,300 0.20 240,200
Jumlah 1,201,000 600,500 360,300 240,200
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
3 Gambar Rencana Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
5 Foto Dokumentasi Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
Jumlah 7,500,000 3,750,000 2,250,000 1,500,000
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
NIP. 19690820 200701 1 029 Direktur Utama
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
II TENAGA AHLI MUDA 10,700,000 5,350,000 3,210,000 8,560,000.00
II TENAGA SUB PROFESIONAL/ADM 5,100,000 2,550,000 1,530,000 4,080,000.00
15,800,000 7,900,000 4,740,000.00 12,640,000.00 56.52%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPAN 1,500,000 750,000 450,000 1,200,000.00
II BIAYA PERALATAN DAN BAHAN 713,800 356,900 214,140 571,040.00
III BIAYA OPERASIONAL KANTOR 600,000 300,000 180,000 480,000.00
IV LAPORAN - LAPORAN 3,750,000 1,875,000 1,125,000 3,000,000.00
6,563,800 3,281,900 1,969,140.00 5,251,040.00 23.48%
JUMLAH (I+II) 22,363,800.00 11,181,900.00 6,709,140.00 17,891,040.00 80.00%
PPn (10%) 2,236,380.00 1,118,190.00 670,914.00 1,789,104.00
JUMLAH TOTAL 24,600,180.00 12,300,090.00 7,380,054.00 19,680,144.00
DIBULATKAN 24,600,000.00 12,300,000.00 7,400,000.00 19,600,000.00
C JUMLAH INVOICE BULAN LALU 12,300,000.00 12,300,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 19,600,000.00
E JUMLAH INVOICE BRUTO 7,300,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 7,300,000.00
Terbilang : Tujuh Juta Tiga Ratus Ribu Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 6,500,000 6,500,000 0.50 3,250,000 0.30 1,950,000 0.20 1,300,000
2 Cost & Quantity Engineer OB 1 x 1 4,200,000 4,200,000 0.50 2,100,000 0.30 1,260,000 0.20 840,000
1 Jumlah 10,700,000 5,350,000 3,210,000 2,140,000
II TENAGA SUB PROFESIONAL/ADM
1 Drafman OB 1 x 1 2,500,000 2,500,000 0.50 1,250,000 0.30 750,000 0.20 500,000
2 Surveyor OB 1 x 1 1,800,000 1,800,000 0.50 900,000 0.30 540,000 0.20 360,000
3 Office Boy OB 1 x 1 800,000 800,000 0.50 400,000 0.30 240,000 0.20 160,000
Jumlah 5,100,000 2,550,000 1,530,000 1,020,000
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Dua BL 2 x 1 750,000 1,500,000 1.00 750,000 0.60 450,000 0.40 300,000
Jumlah 1,500,000 750,000 450,000 300,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 713,800 713,800 0.50 356,900 0.30 214,140 0.20 142,760
Jumlah 713,800 356,900 214,140 142,760
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 600,000 600,000 0.50 300,000 0.30 180,000 0.20 120,000
Jumlah 600,000 300,000 180,000 120,000
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
3 Gambar Rencana Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
5 Foto Dokumentasi Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
Jumlah 3,750,000 1,875,000 1,125,000 750,000
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
II TENAGA AHLI MUDA 19,132,000 9,566,000 5,739,600 15,305,600
II TENAGA SUB PROFESIONAL/ADM 5,100,000 2,550,000 1,530,000 4,080,000
24,232,000 12,116,000 7,269,600 19,385,600 53.58%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPAN 6,750,000 3,375,000 2,025,000 5,400,000
II BIAYA PERALATAN DAN BAHAN 750,000 375,000 225,000 600,000
III BIAYA OPERASIONAL KANTOR 700,000 350,000 210,000 560,000
IV LAPORAN - LAPORAN 3,750,000 1,875,000 1,125,000 3,000,000
11,950,000 5,975,000 3,585,000 9,560,000 26.42%
JUMLAH (I+II) 36,182,000.00 18,091,000.00 10,854,600.00 28,945,600.00 80.00%
PPn (10%) 3,618,200.00 1,809,100.00 1,085,460.00 2,894,560.00
JUMLAH TOTAL 39,800,200.00 19,900,100.00 11,940,060.00 31,840,160.00
DIBULATKAN 39,800,000.00 19,900,000.00 11,940,000.00 31,840,000.00
C JUMLAH INVOICE BULAN LALU 19,900,000.00 19,900,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 31,840,000.00
E JUMLAH INVOICE BRUTO 11,940,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 11,940,000.00
Terbilang : Sebelas Juta Sembilan Ratus Empat Puluh Ribu Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 8,432,000 8,432,000 0.50 4,216,000 0.30 2,529,600 0.20 1,686,400
2 Highway Engineer OB 1 x 1 6,500,000 6,500,000 0.50 3,250,000 0.30 1,950,000 0.20 1,300,000
3 Cost & Quantity Engineer OB 1 x 1 4,200,000 4,200,000 0.50 2,100,000 0.30 1,260,000 0.20 840,000
1 Jumlah 19,132,000 9,566,000 5,739,600 3,826,400
II TENAGA SUB PROFESIONAL
1 Drafman OB 1 x 1 2,500,000 2,500,000 0.50 1,250,000 0.30 750,000 0.20 500,000
2 Surveyor OB 1 x 1 1,800,000 1,800,000 0.50 900,000 0.30 540,000 0.20 360,000
3 Office Boy OB 1 x 1 800,000 800,000 0.50 400,000 0.30 240,000 0.20 160,000
Jumlah 5,100,000 2,550,000 1,530,000 1,020,000
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Empat BL 1 x 1 6,000,000 6,000,000 0.50 3,000,000 0.30 1,800,000 0.20 1,200,000
2 Sewa Kendaraan Roda Dua BL 1 x 1 750,000 750,000 0.50 375,000 0.30 225,000 0.20 150,000
Jumlah 6,750,000 3,375,000 2,025,000 1,350,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 750,000 750,000 0.50 375,000 0.30 225,000 0.20 150,000
Jumlah 750,000 375,000 225,000 150,000
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 700,000 700,000 0.50 350,000 0.30 210,000 0.20 42,000
Jumlah 700,000 350,000 210,000 42,000
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
3 Gambar Rencana Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
5 Foto Dokumentasi Bk/Copy 1 x 5 150,000 750,000 2.50 375,000 1.50 225,000 1.00 150,000
Jumlah 3,750,000 1,875,000 1,125,000 750,000
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA 33,500,000 16,750,000 10,050,000 26,800,000.00
II TENAGA SUB PROFESIONAL 6,050,000 3,025,000 1,815,000 4,840,000.00
III TENAGA PENDUKUNG 2,500,000 1,250,000 750,000 2,000,000.00
42,050,000 21,025,000 12,615,000.00 33,640,000.00 52.56%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPA 8,250,000 4,125,000 2,475,000 6,600,000.00
II BIAYA PERALATAN DAN BAHAN 5,000,000 2,500,000 1,500,000 4,000,000.00
III BIAYA OPERASIONAL KANTOR 1,200,000 600,000 360,000 960,000.00
IV LAPORAN - LAPORAN 7,500,000 3,750,000 2,250,000 6,000,000.00
21,950,000 10,975,000 6,585,000.00 17,560,000.00 27.44%
JUMLAH (I+II) 64,000,000.00 32,000,000.00 19,200,000.00 51,200,000.00 80.00%
PPn (10%) 6,400,000.00 3,200,000.00 1,920,000.00 5,120,000.00
JUMLAH TOTAL 70,400,000.00 35,200,000.00 21,120,000.00 56,320,000.00
DIBULATKAN 70,400,000.00 35,200,000.00 21,100,000.00 56,300,000.00
C JUMLAH INVOICE BULAN LALU 35,200,000.00 35,200,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 56,300,000.00
E JUMLAH INVOICE BRUTO 21,100,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 21,100,000.00
Terbilang : Dua Puluh Satu Juta Seratus Ribu Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 10,000,000 10,000,000 0.50 5,000,000 0.30 3,000,000 0.20 2,000,000
2 Highway Engineer OB 1 x 1 7,500,000 7,500,000 0.50 3,750,000 0.30 2,250,000 0.20 1,500,000
3 Cost & Quantity Engineer OB 1 x 1 6,000,000 6,000,000 0.50 3,000,000 0.30 1,800,000 0.20 1,200,000
4 Ahli Struktur OB 1 x 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 1,000,000
5 Ahli Arsitektur OB 1 x 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 1,000,000
1 Jumlah 33,500,000 16,750,000 10,050,000 6,700,000
II TENAGA SUB PROFESIONAL
1 Surveyor OB 2 x 1 2,250,000 4,500,000 1.00 2,250,000 0.60 1,350,000 0.40 900,000
2 Operator CAD/CAM OB 1 x 1 1,550,000 1,550,000 0.50 775,000 0.30 465,000 0.20 310,000
Jumlah 6,050,000 3,025,000 1,815,000 1,210,000
III TENAGA PENDUKUNG
1 Operator Komputer OB 1 x 1 1,000,000 1,000,000 0.50 500,000 0.30 300,000 0.20 200,000
2 Administrator OB 1 x 1 800,000 800,000 0.50 400,000 0.30 240,000 0.20 160,000
3 Office Boy OB 1 x 1 700,000 700,000 0.50 350,000 0.30 210,000 0.20 140,000
Jumlah 2,500,000 1,250,000 750,000 500,000
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Empat BL 1 x 1 7,500,000 7,500,000 0.50 3,750,000 0.30 2,250,000 0.20 1,500,000
2 Sewa Kendaraan Roda Dua BL 1 x 1 750,000 750,000 0.50 375,000 0.30 225,000 0.20 150,000
Jumlah 8,250,000 4,125,000 2,475,000 1,650,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 1,000,000
Jumlah 5,000,000 2,500,000 1,500,000 1,000,000
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 1,200,000 1,200,000 0.50 600,000 0.30 360,000 0.20 240,000
Jumlah 1,200,000 600,000 360,000 240,000
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
3 Gambar Rencana Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
5 Foto Dokumentasi Bk/Copy 1 x 5 300,000 1,500,000 2.50 750,000 1.50 450,000 1.00 300,000
Jumlah 7,500,000 3,750,000 2,250,000 1,500,000
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA 51,080,000 25,540,000 15,324,000 40,864,000.00
II TENAGA SUB PROFESIONAL 8,000,000 4,000,000 2,400,000 6,400,000.00
III TENAGA PENDUKUNG 2,750,000 1,375,000 825,000 2,200,000.00
61,830,000 30,915,000 18,549,000.00 49,464,000.00 54.52%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPAN 9,900,000 4,950,000 2,970,000 7,920,000.00
II BIAYA PERALATAN DAN BAHAN 5,000,000 2,500,000 1,500,000 4,000,000.00
III BIAYA OPERASIONAL KANTOR 1,498,000 749,000 449,400 1,198,400.00
IV LAPORAN - LAPORAN 12,500,000 6,250,000 3,750,000 10,000,000.00
28,898,000 14,449,000 8,669,400.00 23,118,400.00 25.48%
JUMLAH (I+II) 90,728,000.00 45,364,000.00 27,218,400.00 72,582,400.00 80.00%
PPn (10%) 9,072,800.00 4,536,400.00 2,721,840.00 7,258,240.00
JUMLAH TOTAL 99,800,800.00 49,900,400.00 29,940,240.00 79,840,640.00
DIBULATKAN 99,800,000.00 49,900,000.00 29,900,000.00 79,800,000.00
C JUMLAH INVOICE BULAN LALU 49,900,000.00 49,900,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 79,800,000.00
E JUMLAH INVOICE BRUTO 29,900,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 29,900,000.00
Terbilang : Dua Puluh Sembilan Juta Sembilan Ratus Ribu Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH HARGA JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
(Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 14,000,000 14,000,000 0.50 7,000,000 0.30 4,200,000 0.20 2,800,000
2 Highway Engineer OB 1 x 1 8,500,000 8,500,000 0.50 4,250,000 0.30 2,550,000 0.20 1,700,000
3 Cost & Quantity Engineer OB 1 x 1 7,500,000 7,500,000 0.50 3,750,000 0.30 2,250,000 0.20 1,500,000
4 Ahli Struktur OB 1 x 1 7,080,000 7,080,000 0.50 3,540,000 0.30 2,124,000 0.20 1,416,000
5 Ahli Hidrologi OB 1 x 1 7,000,000 7,000,000 0.50 3,500,000 0.30 2,100,000 0.20 1,400,000
6 Ahli Arsitektur OB 1 x 1 7,000,000 7,000,000 0.50 3,500,000 0.30 2,100,000 0.20 1,400,000
Jumlah 51,080,000 25,540,000 15,324,000 10,216,000
II TENAGA SUB PROFESIONAL
1 Operator CAD/CAM OB 1 x 1 3,000,000 3,000,000 0.50 1,500,000 0.30 900,000 0.20 600,000
2 Surveyor OB 2 x 1 2,500,000 5,000,000 1.00 2,500,000 0.60 1,500,000 0.40 1,000,000
Jumlah 8,000,000 4,000,000 2,400,000 1,600,000
III TENAGA PENDUKUNG
1 Operator Komputer OB 1 x 1 1,100,000 1,100,000 0.50 550,000 0.30 330,000 0.20 220,000
2 Administrator OB 1 x 1 950,000 950,000 0.50 475,000 0.30 285,000 0.20 190,000
3 Office Boy OB 1 x 1 700,000 700,000 0.50 350,000 0.30 210,000 0.20 140,000
Jumlah 2,750,000 1,375,000 825,000 550,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH HARGA JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
(Rp) (Rp) HARGA (Rp)
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Empat BL 1 x 1 8,400,000 8,400,000 0.50 4,200,000 0.30 2,520,000 0.20 1,680,000
2 Sewa Kendaraan Roda Dua BL 2 x 1 750,000 1,500,000 1.00 750,000 0.60 450,000 0.40 300,000
Jumlah 9,900,000 4,950,000 2,970,000 1,980,000
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 1,000,000
Jumlah 5,000,000 2,500,000 1,500,000 1,000,000
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 1,498,000 1,498,000 0.50 749,000 0.30 449,400 0.20 299,600
Jumlah 1,498,000 749,000 449,400 299,600
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 500,000 2,500,000 2.50 1,250,000 1.50 750,000 1.00 500,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 500,000 2,500,000 2.50 1,250,000 1.50 750,000 1.00 500,000
3 Gambar Rencana Bk/Copy 1 x 5 500,000 2,500,000 2.50 1,250,000 1.50 750,000 1.00 500,000
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 500,000 2,500,000 2.50 1,250,000 1.50 750,000 1.00 500,000
5 Foto Dokumentasi Bk/Copy 1 x 5 500,000 2,500,000 2.50 1,250,000 1.50 750,000 1.00 500,000
Jumlah 12,500,000 6,250,000 3,750,000 2,500,000
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH HARGA JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
(Rp) (Rp) HARGA (Rp)
NIP. 19690820 200701 1 029 Direktur Utama
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
JUMLAH
INVOICE INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA
BULAN LALU INI BULANAN INI E (%)
KONTRAK (Rp)
1 2 3 4 5 6 7
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA 30,500,000 15,250,000.00 9,150,000 24,400,000.00
II TENAGA SUB PROFESIONAL 3,600,000 1,800,000.00 1,080,000 2,880,000.00
III TENAGA PENDUKUNG 2,500,000 1,250,000.00 750,000 2,000,000.00
36,600,000 18,300,000 10,980,000.00 29,280,000.00 50.72%
B BIAYA LANGSUNG NON PERSONIL
I SEWA PERALATAN KANTOR DAN LAPA 8,250,000 4,125,000.00 2,475,000 6,600,000.00
III BIAYA PERALATAN DAN BAHAN 5,000,000 2,500,000.00 1,500,000 4,000,000.00
III BIAYA OPERASIONAL KANTOR 1,000,000 500,000.00 300,000 800,000.00
IV LAPORAN - LAPORAN 6,877,500 3,438,750.00 2,063,250 5,502,000.00
21,127,500 10,563,750 6,338,250.00 16,902,000.00 29.28%
JUMLAH (I+II) 57,727,500.00 28,863,750.00 17,318,250.00 46,182,000.00 80.00%
PPn (10%) 5,772,750.00 2,886,375.00 1,731,825.00 4,618,200.00
JUMLAH TOTAL 63,500,250.00 31,750,125.00 19,050,075.00 50,800,200.00
DIBULATKAN 63,500,000.00 31,800,000.00 19,100,000.00 50,800,000.00
C JUMLAH INVOICE BULAN LALU 31,800,000.00 31,800,000.00
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 50,800,000.00
E JUMLAH INVOICE BRUTO 19,000,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 19,000,000.00
Terbilang : Sembilan Belas Juta Rupiah
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 9,500,000 9,500,000 0.50 4,750,000 0.30 2,850,000 0.20 1,900,000
2 Highway Engineer OB 1 x 1 6,500,000 6,500,000 0.50 3,250,000 0.30 1,950,000 0.20 1,300,000
3 Cost & Quantity Engineer OB 1 x 1 5,500,000 5,500,000 0.50 2,750,000 0.30 1,650,000 0.20 1,100,000
4 Ahli Struktur OB 1 x 1 4,500,000 4,500,000 0.50 2,250,000 0.30 1,350,000 0.20 900,000
5 Ahli Arsitektur OB 1 x 1 4,500,000 4,500,000 0.50 2,250,000 0.30 1,350,000 0.20 900,000
1 Jumlah 30,500,000 15,250,000 9,150,000 6,100,000
II TENAGA SUB PROFESIONAL
1 Surveyor OB 1 x 1 2,000,000 2,000,000 0.50 1,000,000 0.30 600,000 0.20 400,000
2 Operator CAD/CAM OB 1 x 1 1,600,000 1,600,000 0.50 800,000 0.30 480,000 0.20 320,000
Jumlah 3,600,000 1,800,000 1,080,000 720,000
III TENAGA PENDUKUNG
1 Operator Komputer OB 1 x 1 1,000,000 1,000,000 0.50 500,000 0.30 300,000 0.20 200,000
2 Administrator OB 1 x 1 800,000 800,000 0.50 400,000 0.30 240,000 0.20 160,000
3 Office Boy OB 1 x 1 700,000 700,000 0.50 350,000 0.30 210,000 0.20 140,000
Jumlah 2,500,000 1,250,000 750,000 500,000
INVOICE 02
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Empat BL 1 x 1 7,500,000 7,500,000 0.50 3,750,000 0.30 2,250,000 0.20 1,500,000
2 Sewa Kendaraan Roda Dua BL 1 x 1 750,000 750,000 0.50 375,000 0.30 225,000 0.20 150,000
Jumlah 8,250,000 4,125,000 2,475,000 1,650,000
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 5,000,000 5,000,000 0.50 2,500,000 0.30 1,500,000 0.20 300,000
Jumlah 5,000,000 2,500,000 1,500,000 300,000
III BIAYA OPERASIONAL KANTOR
1 Telepon, Listrik dan Air Ls 1 1,000,000 1,000,000 0.50 500,000 0.30 300,000 0.20 60,000
Jumlah 1,000,000 500,000 300,000 60,000
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 275,000 1,375,000 2.50 687,500 1.50 412,500 1.00 275,000
2 Spesifikasi Teknis Bk/Copy 1 x 5 275,000 1,375,000 2.50 687,500 1.50 412,500 1.00 275,000
3 Gambar Rencana Bk/Copy 1 x 5 275,500 1,377,500 2.50 688,750 1.50 413,250 1.00 275,500
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 275,000 1,375,000 2.50 687,500 1.50 412,500 1.00 275,000
5 Foto Dokumentasi Bk/Copy 1 x 5 275,000 1,375,000 2.50 687,500 1.50 412,500 1.00 275,000
Jumlah 6,877,500 3,438,750 2,063,250 1,375,500
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
NIP. 19690820 200701 1 029 Direktur Utama
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
JUMLAH INVOICE
INVOICE BULAN INVOICE S/D PERSENTAS
NO URAIAN KEGIATAN HARGA BULAN
INI BULANAN INI E (%)
KONTRAK (Rp) LALU
1 2 3 4 5 6 7
I BIAYA LANGSUNG PERSONIL
A TENAGA AHLI MUDA 23,000,000 19,550,000 19,550,000.00
B TENAGA SUB PROFESIONAL/ADM 4,800,000 4,080,000 4,080,000.00
27,800,000 23,630,000.00 23,630,000.00 69.31%
II BIAYA LANGSUNG NON PERSONIL
A SEWA PERALATAN KANTOR DAN LAPA 741,000 629,850 629,850.00
B BIAYA PERALATAN DAN BAHAN 1,000,000 850,000 850,000.00
C BIAYA OPERASIONAL KANTOR 800,000 680,000 680,000.00
D LAPORAN - LAPORAN 3,750,000 3,187,500 3,187,500.00
6,291,000 5,347,350.00 5,347,350.00 15.69%
JUMLAH (I+II) 34,091,000.00 - 28,977,350.00 28,977,350.00 85.00%
PPn (10%) 3,409,100.00 - 2,897,735.00 2,897,735.00
JUMLAH TOTAL 37,500,100.00 - 31,875,085.00 31,875,085.00
DIBULATKAN 37,500,000.00 - 31,875,000.00 31,875,000.00
C JUMLAH INVOICE BULAN LALU -
D JUMLAH INVOICE KOTOR SAMPAI DENGAN BULAN INI 31,875,000.00
E JUMLAH INVOICE BRUTO 31,875,000.00
F JUMLAH POTONGAN-POTONGAN :
a. Potongan Uang Muka 30% x E
b. Potongan Retensi
G JUMLAH INVOICE YANG DIBAYAR BULAN INI 31,875,000.00
Terbilang : Tiga Puluh Satu Juta Delapan Ratus Tujuh Puluh Lima Ribu Rupiah
INVOICE 01
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
A BIAYA LANGSUNG PERSONIL
I TENAGA AHLI MUDA
1 Team Leader OB 1 x 1 7,000,000 7,000,000 0.85 5,950,000 0.2 1,050,000
2 Highway Engineer OB 1 x 1 5,000,000 5,000,000 0.85 4,250,000 0.2 750,000
3 Ahli Struktur OB 1 x 1 4,000,000 4,000,000 0.85 3,400,000 0.2 600,000
4 Ahli Arsitektur OB 1 x 1 3,000,000 3,000,000 0.85 2,550,000 0.2 450,000
5 Cost & Quantity Engineer OB 1 x 1 4,000,000 4,000,000 0.85 3,400,000 0.2 600,000
1 Jumlah 23,000,000 19,550,000 3,450,000
II TENAGA SUB PROFESIONAL
1 Drafman OB 1 x 1 2,500,000 2,500,000 0.85 2,125,000 0.2 375,000
2 Surveyor OB 1 x 1 1,500,000 1,500,000 0.85 1,275,000 0.2 225,000
3 Office Boy OB 1 x 1 800,000 800,000 0.85 680,000 0.2 120,000
Jumlah 4,800,000 4,080,000 720,000
B BIAYA LANGSUNG NON PERSONIL
SEWA PERALATAN KANTOR DAN
I
LAPANGAN
1 Sewa Kendaraan Roda Dua BL 1 x 1 741,000 741,000 0.85 629,850 0.15 111,150
Jumlah 741,000 629,850 111,150
INVOICE 01
NO. URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BULAN LALU BULAN INI SISA KONTRAK
JUMLAH JUMLAH HARGA JUMLAH
VOLUME VOLUME VOLUME
HARGA (Rp) (Rp) HARGA (Rp)
II BIAYA PERALATAN DAN BAHAN
1 ATK, Kertas A3, A4 dan Tinta Printer Ls 1 1,000,000 1,000,000 0.85 850,000 0.15 150,000
Jumlah 1,000,000 850,000 150,000
III BIAYA OPERASIONAL KANTOR
1 BIAYA OPERASIONAL KANTOR Ls 1 800,000 800,000 0.85 680,000 0.15 120,000
Jumlah 800,000 680,000 120,000
IV LAPORAN - LAPORAN
1 Rencana Anggaran Biaya Bk/Copy 1 x 5 150,000 750,000 4.25 637,500 0.8 112,500
2 Spesifikasi Teknis Bk/Copy 1 x 5 150,000 750,000 4.25 637,500 0.8 112,500
3 Gambar Rencana Bk/Copy 1 x 5 150,000 750,000 4.25 637,500 0.8 112,500
4 Kerangka Acuan Kerja Bk/Copy 1 x 5 150,000 750,000 4.25 637,500 0.8 112,500
5 Foto Dokumentasi Bk/Copy 1 x 5 150,000 750,000 4.25 637,500 0.8 112,500
Jumlah 3,750,000 3,187,500 562,500