1. Kandang Budidaya Volume Satuan Harga Satuan (Rp) Nilai (Rp)
a. Kayu 30 Buah 25,000 750,000 b. Papan 50 Lembar 45,000 2,250,000 c. Atap Rumpia 200 Lembar 5,000 1,000,000 d. Paku 6 Kg 25,000 150,000 e. Jaring Paranet 125 Meter 25,000 3,125,000 SUB TOTAL 7,275,000 2. Bahan Habis Pakai Volume Satuan Harga Satuan (Rp) Nilai (Rp) a. Sprayer 2 Unit 250,000 500,000 b. Termometer 1 Buah 125,000 125,000 c. Timbangan 1 Buah 250,000 250,000 d. Emergency Lamp 4 Buah 125,000 500,000 e. Ember 2 Buah 10,000 20,000 f. Pisau 5 Buah 10,000 50,000 g. Keranjang 10 Buah 40,000 400,000 h. Sapu 2 Buah 25,000 50,000 i. Ragi 20 Bungkus 25,000 500,000 j. Handscoon 100 Buah 5,000 500,000 k. Buku catatan 2 Buah 5,000 10,000 l. Pulpen 2 Buah 5,000 10,000 m. Plastik Pengemasan 10 Buah 25,000 250,000 n. Papan alas Tulis 2 Buah 15,000 30,000 SUB TOTAL 3,195,000 3. Perjalanan Volume Satuan Harga Satuan (Rp) Nilai (Rp) a. Keperluan pembelian bahan 4 Hari 20,000 80,000 b. Keperluan Uji coba 10 Hari 20,000 200,000 (kampus-lokasi uji coba) c. Uang makan tim 10 Hari 75,000 750,000 SUB TOTAL 1,030,000 4. Lain-lain Volume Satuan Harga Satuan (Rp) Nilai (Rp) Sewa tempat 1 Tahun 1,000,000 1,000,000 SUB TOTAL 1,000,000 TOTAL 1+2+3+4 12,500,000 Dua Belas Juta lima Ratus Ribu