A MATRIAL FABRIKASI
HARGA
NO URAIAN KODE SATUAN SATUAN KETERANGAN
(Rp)
1 Semen isi 50 Kg I-b Zak
2 Batu kali/gunung pecah I-a m3 -
3 Pasir Pasang I-a m3 -
4 Pasir Cor I-a m3
5 Kerikil Alam 2/3 cm I-a m3
6 Kerikil Pecah 2/3 cm I-a m3
7 Tanah urug I-a m3 -
8 Pasir Urug I-a m3 -
9 Bata Klas I I-b Buah
10 Batu Candi I-b m2
11 Balok Kayu Klas III I-b m3
12 Balok Kayu 5/7 Klas III I-b m3
13 Papan Kayu Klas III I-b m3
14 Papan Kayu 3/20 Klas III I-b m3
15 Balok Kayu Klas II I-b m3
16 Papan Kayu Klas II I-b m3
17 Balok Kayu Klas I I-b m3
18 Papan Kayu Klas I I-b m3
19 Minyak bekisting I-b Liter
20 Paku panjang 7-12 cm I-b kg
21 Paku panjang 4-6 cm I-b kg
22 Paku panjang 1-3 cm I-b kg
23 Paku asbes I-b kg
24 Paku Skrup kalsiboard I-b kg
25 Besi beton dia. 6 mm I-b Ljr
26 Besi beton dia. 8 mm I-b Ljr
27 Besi beton dia. 10 mm I-b Ljr
28 Besi beton dia. 12 mm I-b Ljr
29 Besi beton dia. 14 mm I-b Ljr
30 Besi beton dia. 16 mm I-b Ljr
31 Besi beton dia. < 16 mm I-b kg
32 Besi beton dia. > 16 mm I-b kg
33 Kawat ikat beton I-b kg
34 Triplek 120 x 240 x 9 mm I-b Lbr
35 Triplek 122x242x6 mm I-b Lbr
36 Triplek 122x242x3 mm I-b Lbr
37 Eternit 100x100 I-b m2
38 Kalsiboard (120cmx240cmx4mm) I-b Lbr
39 Plywood 100x200x4 mm I-b Lbr
40 Taekwood 100 x 200 x 3 mm I-b Lbr
41 Formika 100x200x3 mm I-b Lbr
42 List gypsum I-b m
43 List plafond kayu 1x5 cm I-b m
44 Dolken / Perancah Dia 10 Cm - 4 M I-a buah
45 Beugel besi kuda-kuda I-b kg
46 Genteng pejaten lokal I-b Buah
47 Bubungan pejaten lokal I-b Buah
48 Seng plat Bjls 30 I-b Lbr
49 Kaca polos 5 mm I-b m2
50 Kaca polos 3 mm I-b m2
51 Kaca ryben 3 mm I-b m2
52 Kunci pintu 2 slag mutu menegah I-b Buah
53 Engsel pintu mutu menegah I-b Buah
54 Engsel jendela mutu menegah I-b Buah
55 Engsel Nilon Buah
56 Grendel besar I-b Buah
57 Grendel kecil I-b Buah
58 Hak angin kecil I-b Buah
59 Expanolet I-b Buah
60 Plamir tembok I-b kg
61 Cat tembok mutu menegah I-b kg
62 Meni kayu klas menengah I-b kg
63 Meni besi klas menegah I-b kg
64 Plamir kayu klas menengah I-b kg
65 Cat kayu klas menengah I-b kg
66 Cat kayu klas menengah I-b kg
67 Cat besi klas menengah I-b kg
68 Cat genteng klas menegah I-b kg
69 Teer I-b kg
70 Lem Kayu I-b Ltr
71 Keramik lantai 40 x 40 polos I-b m2
72 Keramik lantai 40 x 40 motif I-b m2
73 Keramik dinding 20x25 I-b m2
74 Keramik lantai km/wc 20 x 20 polos I-b m2
75 Roster beton 20x20 cm I-b Buah
76 Semen warna I-b kg
77 Kabel NYA 2 x 1,5 mm I-b m
78 Kabel NYA 2 x 2,5 mm I-b m
79 Kabel NYA 3 x 2,5 mm I-b m
80 Pipa kabel I-b Ljr
81 Titik lampu I-b Titik
82 Lampu SL 15 watt I-b Buah
83 Lampu SL 25 watt I-b Buah
84 Saklar tunggal I-b Buah
85 Saklar double I-b Buah
86 Stop kontak tanam I-b Buah
87 Box skering I-b unit
88 Klosed jongkok porselin mutu menegah I-b Buah
89 Ember mandi besar I-b Buah
90 Pipa PVC dia 1/2" I-b Ljr
91 Pipa PVC dia 3/4" I-b Ljr
92 Pipa PVC dia 2" I-b Ljr
93 Pipa PVC dia 3" I-b Ljr
94 Pipa PVC dia 4" I-b Ljr
95 Pipa GI dia 1/2" I-b Ljr
96 Kran air dia 1/2" I-b Buah
97 Wastafel I-b Buah
98 Bak cuci piring I-b Buah
99 Saringan air I-b Buah
100 Elbow PVC dia. 1/2" I-b Buah
101 Elbow PVC dia. 2" I-b Buah
102 Elbow PVC dia. 4" I-b Buah
103 Tee PVC dia. 1/2" I-b Buah
104 Tee PVC dia. 2" I-b Buah
105 Tee PVC dia. 4" I-b Buah
106 Lem Pipa I-b Buah
107 Gergaji Besi I-b Buah
108 Amplas I-b Buah
109 Seal tape I-b Buah
110 Paving block press I-b Buah
111 Asbes gelombang I-b Lbr
112 Seng gelombang BJLS 25 I-b Lbr
113 Paku Seng I-b kg
114 Seng talang BJLS 25 L=60 cm I-b m
115 Papan proyek I-a ls
116 Prasasti & Plakat I-a ls
117 Septiktank Kapasitas 2 m3 I-a ls
118 Peresapan Kapasitas 1 m3 I-a ls
119 Rolling door I-b m2
120 Zingkalum 0,25 mm Color L. 0,75M I-b m2
CSP 10 - 16 X 16 HGS
121 I-b Buah
122 KM dan Penyambungan Daya I-a buah
123 Kilo Meter Air dan Penyambungan Pipa I-a buah
124 Pagar Besi Kotak m2
125 Pintu Besi Kotak m2
126 Baut piles / bh
127 Karet list / m'
128 Kawat bronjong pabrikasi lubang 8 x 10 cm / unit
129 Besi Hollow 2 x 4 cm /m'
130 Allumunium 4,6 X 4" /m'
131 Allumunium Ram /m'
132 Paku gypsum / bh
133 List kaca /m'
134 Sealant /btl
MURAH VERIFIKA
ANYS SM
JAYA SI
3000
5000
25000
35000
25000
25000
25000
75000
90,000 110000 89500 89500
50000
15000
15000
15000
20000
20000
15000
150000
550000
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT-MANDIRI PERDEASAAN
TAHUN ANGGARAN 2013
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
T.A. : 2013
Jumlah Rp 8,000.00
Jumlah Rp 1,600.00
Jumlah Rp 8,000.00
Rp 533,360.00
8 B.6.1 1M3 Galian tanah biasa sedalam 1 m M3 Rp 32,000.00
Tenaga
0.400 HO Pekerja Rp 80,000.00 Rp 32,000.00
0.025 HO Mandor Rp -
Rp 32,000.00
Rp 32,000.00
Rp 42,080.00
Rp 58,800.00
Rp 50,000.00
Rp 100,000.00
Rp 65,840.00
Rp 4,000.00
Rp 40,000.00
Jumlah bahan Rp -
Tenaga
0.600 HO Pekerja Rp 80,000.00 Rp 48,000.00
2.00 HO Tukang kayu Rp 125,000.00 Rp 250,000.00
0.200
0.030
Jumlah ongkos Rp 298,000.00
Jumlah bahan+ ongkos Rp 298,000.00
Jumlah bahan Rp -
Tenaga
0.800 #N/A Pekerja #N/A #N/A
2.50 #N/A Tukang kayu #N/A #N/A
0.250
0.040
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah bahan Rp -
Tenaga
4.000 #N/A Pekerja #N/A #N/A
12.000 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.100 #N/A Pekerja #N/A #N/A
0.100 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.500 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.750 #N/A Tukang kayu #N/A #N/A
0.300 #N/A Pekerja #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.2 #N/A Pekerja #N/A #N/A
0.3 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.2 #N/A Pekerja #N/A #N/A
0.3 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.150 #N/A Pekerja #N/A #N/A
0.250 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.050 HO Pekerja Rp 80,000.00 Rp 4,000.00
0.050 HO Tukang kayu Rp 125,000.00 Rp 6,250.00
38 G.6.46 1 M' Membuat ring balok beton bertulang (10 x 15 ) cm M' Rp 409,205.00
6.46.1 Bahan
0.003 m3 Papan kayu klas III Rp 2,500,000.00 Rp 7,500.00
0.020 kg Paku panjang 4-6 cm Rp 30,000.00 Rp 600.00
3.600 kg Besi beton dia. < 16 mm Rp 12,000.00 Rp 43,200.00
0.050 kg Kawat ikat beton Rp 30,000.00 Rp 1,500.00
5.500 Zak Semen isi 50 kg Rp 60,000.00 Rp 330,000.00
0.009 m3 Pasir cor Rp 100,000.00 Rp 900.00
0.015 m3 Kerikil Alam 2/3 cm Rp 375,000.00 Rp 5,625.00
Jumlah Rp 389,325.00
Jumlah bahan Rp -
Tenaga
0.140 #N/A Pekerja #N/A #N/A
0.070 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.7500 #N/A Tukang batu #N/A #N/A
0.1500 #N/A Pekerja #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.0200 #N/A Tukang batu #N/A #N/A
0.0400 #N/A Pekerja #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.150 #N/A Pekerja #N/A #N/A
0.200 #N/A Tukang besi #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.025 #N/A Tukang besi #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.1400 #N/A Pekerja #N/A #N/A
0.0670 #N/A Tukang besi #N/A #N/A
0.0070 HOK Mandor
HOK Kepala Tukang Besi
0.0070
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah bahan Rp -
Tenaga
0.0430 #N/A Pekerja #N/A #N/A
0.0430 #N/A Tukang Las #N/A #N/A
0.0043 HOK Kepala Tukang Las Rp -
0.0021 HOK Mandor Rp -
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah Rp -
Jumlah bahan Rp -
Tenaga
0.0860 #N/A Pekerja #N/A #N/A
0.0860 #N/A Tukang Las #N/A #N/A
0.0080 HOK Kepala Tukang Las Rp -
0.0040 HOK Mandor Rp -
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah bahan Rp -
Tenaga
0.6200 #N/A Pekerja #N/A #N/A
2.0000 #N/A Tukang Las #N/A #N/A
0.2000 HOK Kepala Tukang Las Rp -
0.0300 HOK Mandor Rp -
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah bahan Rp -
Tenaga
0.6200 #N/A Pekerja #N/A #N/A
2.0000 #N/A Tukang Las #N/A #N/A
0.2000 HOK Kepala Tukang Las Rp -
0.0300 HOK Mandor Rp -
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
I.6.3b 1.Unit Daun pintu kaca + teack wood rangka allumunium 70 x 210 M2 #N/A
bahan
5.85000 /m' Allumunium Ram Rp -
4.0000 / bh Baut piles Rp -
0.3628 lbr Triplek 122x242x6 mm Rp -
0.4785 m2 Kaca polos 5 mm Rp -
1.0000 bh Kunci pintu 2 slag mutu menegah Rp -
1.500 bh Engsel Nilon Rp -
Jumlah Rp -
Jumlah bahan Rp -
Tenaga
0.6200 #N/A Pekerja #N/A #N/A
2.0000 #N/A Tukang Las #N/A #N/A
0.2000 HOK Kepala Tukang Las Rp -
0.0300 HOK Mandor Rp -
Jumlah ongkos #N/A
Jumlah bahan+ ongkos #N/A
Jumlah bahan Rp -
Tenaga
0.100 #N/A Pekerja #N/A #N/A
0.050 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.150 #N/A Pekerja #N/A #N/A
0.450 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
1.000 #N/A Pekerja #N/A #N/A
1.500 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
1.000 #N/A Pekerja #N/A #N/A
1.500 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
1.000 #N/A Pekerja #N/A #N/A
1.500 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
1.000 #N/A Pekerja #N/A #N/A
1.500 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.054 #N/A Pekerja #N/A #N/A
0.090 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.054 #N/A Pekerja #N/A #N/A
0.090 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.081 #N/A Pekerja #N/A #N/A
0.135 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.081 #N/A Pekerja #N/A #N/A
0.135 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.010 #N/A Pekerja #N/A #N/A
0.100 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.023 #N/A Tukang cat #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.010 #N/A Pekerja #N/A #N/A
0.500 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.010 #N/A Pekerja #N/A #N/A
0.100 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.015 #N/A Pekerja #N/A #N/A
0.150 #N/A Tukang kayu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.620 #N/A Pekerja #N/A #N/A
0.350 #N/A Tukang batu #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.100 #N/A Pekerja #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.020 #N/A Pekerja #N/A #N/A
0.063 #N/A Tukang cat #N/A #N/A
Jumlah bahan Rp -
Tenaga
0.028 #N/A Pekerja #N/A #N/A
0.042 #N/A Tukang cat #N/A #N/A
KODE
VOLU
NO GAMBAR SKET URAIAN PERHITUNGAN SAT ANALI KOEF ANALISA KEBUTUHAN
ME
SA
A. PEKERJAAN PERSIAPAN
A.1. Pengukuran dan pemasangan bowplank A.6.4 BAHAN
A.1.1 Bangunan 15.5 x 11 170.5 m2 0.012 Balok Kayu 5/7 Klas III = 2.05 m3
P = 15.5 m 0.02 Paku panjang 7-12 cm = 4.00 kg
L = 11 m 0.007 Papan Kayu 3/20 Klas III = 1.19 m3
TENAGA
0.1 Tukang kayu = 17.00 HOK
0.1 Pekerja = 17.00 HOK
A.2. Media Transparansi
A.2.1 Papan Proyek 1 1 unit Ls BAHAN
n = 1 unit Papan Proyek = 1.00 ls
B. PEKERJAAN TANAH
B.1 Galian Tanah Bangunan Induk 89.5 x 1.00 x 0.65 = 58.18 m3 58.18 m3 B.6.1 TENAGA
P = 89.5 m 0.4 Pekerja = 24.61 HOK
0.65
1.00
Galian Tanah Teras
P = 14 14 x 0.80 x 0.30 = 3.36 m3 3.36 m3
0.30
0.8
Total Volume Galian Tanah 61.54 m3
40
B.2 Urugan Kembali 0.25 x 61.54 15.38 m3 B.6.9 TENAGA
0.192 Pekerja = 2.00 HOK
B.3 Pasir Urug Bawah Pondasi 89.5 x 1.00 x 0.05 18.6 m3 B.6.11 BAHAN
1.2 Pasir Urug = 23.00 m3
0.05
TENAGA
1.00 0.3 Pekerja = 6.00 HOK
B.5 Pas. Pondasi Batu Kali Bangunan Induk 89.5 x 0.55 x 1.15 = 56.609 m3 C.6.4 BAHAN
0.3 Lebar rata-rata 1.1 Batu kali/gunung pecah = 67.80 m3
= 0.3 + 0.8 2.72 Semen isi 50 Kg = 167.00 Zak
2 0.544 Pasir pasang = 33.00 m3
1.15 = 0.55 m
P = 89.5 m TENAGA
1.5 Pekerja = 92.00 HOK
0.8 0.6 Tukang batu = 36.00 HOK
Pas. Pondasi Batu Kali Teras & Pintu Samping 14 x 0.45 x 0.8 = 5.04 m3
0.3 Lebar rata-rata
= 0.3 + 0.6
2
0.8 = 0.45 m
P = 14 m
0.6
Total Pondasi Batu Kali = 61.649 m3
B.6 Tanah Urug Pilihan Bawah Lantai
B.6.1 Bangunan Induk B.6.11a
Ruang Utama 1 (6 m x 11 m) BAHAN
P = 11 m 11 x 6 x 0.4 26.4 m3 1.2 Tanah urug = 66.00 m3
0.4 TENAGA
0.3 Pekerja = 16.00 HOK
6
41
Ruang Utama 2 (5 m x 10m)
P = 10 m 10 x 5 x 0.4 20 m3
0.4
5
Ruang BKAD (3 m x 3 m)
P = 3 m 3 x 3 x 0.4 3.6 m3
0.4
3
Dapur (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.35 1.3125 m3
0.35
1.5
KM/WC (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.35 1.3125 m3
0.35
1.5
Teras Depan (1 m x 5 m)
P = 5 m 5 x 1 x 0.35 1.75 m3
0.35
1
Teras Belakang (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.35 1.3125 m3
0.35
1.5
55.688 m3
6
42
Ruang Utama 2 (5 m x 10m)
P = 10 m 10 x 5 x 0.1 5 m3
0.1
5
Ruang BKAD (3 m x 3 m)
P = 3 m 3 x 3 x 0.1 0.9 m3
0.1
3
Dapur (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.1 0.375 m3
0.1
1.5
KM/WC (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.1 0.375 m3
0.1
1.5
Teras Depan (1 m x 5 m)
P = 5 m 5 x 1 x 0.1 0.5 m3
0.1
1
Teras Belakang (1,5 m x 2,5 m)
P = 2.5 m 2.5 x 1.5 x 0.1 0.375 m3
0.1
1.5
14.125 m3
C. PEKERJAAN LANTAI
C.1 Lantai Keramik 40 x 40 G.69.b.iv BAHAN
C.1.1 Bangunan Induk 1 Keramik lantai 40 x 40 polos = 133.00 m2
Ruang Utama 1 (6 m x 11 m) 0.196 Semen isi 50 kg = 26.00 Zak
P = 11 11 x 6 66 m2 0.0215 Pasir pasang = 2.00 m3
L = 6 0.02 Semen warna 50 kg = 2.00 kg
43
Ruang Utama 2 (5 m x 10m)
P = 10 10 x 5 50 m2 TENAGA
L = 5 0.25 Pekerja = 33.00 HOK
Ruang BKAD (3 m x 3 m) 0.12 Tukang batu = 16.00 HOK
P = 3 3 x 3 9 m2
L = 3
Dapur (1,5 m x 2,5 m)
P = 2.5 2.5 x 1.5 3.75 m2
L = 1.5
Teras Depan (1 m x 5 m)
P = 5 5 x 1 5 m2
L = 1
Teras Belakang (1,5 m x 2,5 m)
P = 2.5 2.5 x 1.5 3.75 m2
L = 1.5
Total Lantai Keramik 40 x 40 = 133.75 m2
C.2 Lantai Keramik 20 x 20 cm
C.2.1 KM/WC 2.5 x 1.5 x 1 3.75 m2 G.69.b.v BAHAN
P = 2.5 m n = 1 1 Keramik lantai km/wc 20 x 20 polos = 4.00 m2
L = 1.5 m 0.105 Semen isi 50 kg = 1.00 zak
3.75 m2 0.025 Pasir pasang = 0.00 m3
0.02 Semen warna 50 kg = 1.00 kg
44
TENAGA
0.5 Pekerja = 1.00 HOK
0.25 Tukang batu = 0.00 HOK
C.3 Keramik dinding 20/25
C.3.1 KM/WC 7.8 x 1.5 x 1 11.7 m2 G.69.c.iv BAHAN
P = 7.8 m n = 1 1 Keramik dinding 20x25 polos = 11.00 m2
T = 1.5 m 0.117 Semen isi 50 kg = 1.00 zak
0.0095 Pasir pasang = 0.00 m3
0.02 Semen warna 50 kg = 0.20 kg
TENAGA
0.5 Pekerja = 5.00 HOK
1 Tukang batu = 11.00 HOK
11.7 m2
D. PEKERJAAN PASANGAN
D.1 Pasangan Bata Merah D.6.11 BAHAN
D.1.1 Bangunan Induk 4 x 87 348 m2 70 Bata Klas I = 27,803 buah
H = 4 m 0.1936 Semen isi 50 Kg = 76.00 zak
P = 87 m 0.045 Pasir pasang = 17.00 m3
TENAGA
0.15 Pekerja = 3.00 HOK
0.45 Tukang kayu = 7.00 HOK
E. PEKERJAAN BETON
E.1 Sloof Bangunan 15/20 89.5 x 0.15 x 0.2 2.685 m3 G.6.39 BAHAN
P = 89.5 m 0.27 Papan kayu klas III = 0.72 m3
b = 0.15 m 2 Paku panjang 4-6 cm = 5.00 kg
h = 0.2 m 0.6 Minyak bekisting = 1.00 Ltr
147.013 Besi beton dia. < 16 mm = 394.73 kg
Besi dia 10 mm = 32.00 Ljr
Besi dia 6 mm = 30.00 Ljr
3 Kawat ikat beton = 8.00 kg
0.2 6.46 Semen isi 50 kg = 17.00 zak
0.52 Pasir cor = 1.39 m3
0.15 0.78 Kerikil Alam 2/3 cm = 2.00 m3
TENAGA
4.85 Pekerja = 13.00 HOK
0.35 Tukang batu = 0.00 HOK
1.56 Tukang kayu = 4.00 HOK
1.4 Tukang besi = 3.00 HOK
47
TENAGA
7.3 Pekerja = 21.00 HOK
0.35 Tukang batu = 2.00 HOK
3.3 Tukang kayu = 9.00 HOK
2.1 Tukang besi = 6.00 HOK
2.97 m3
0
Teras Belakang 0 x 2 x 0.1 0 m3
P = 0 m Hitungan Besi Beton
L = 2 m Tul.Bg = 2 m
t = 0.1 m Tul.Pok = 0 m
Tut.Tot = 2 m
Bs Beton = 1
2
0
49
Teras Belakang 0 x 1.5 x 0.1 0 m3
P = 0 m Hitungan Besi Beton
L = 1.5 m Tul.Bg = 1.5 m
t = 0.1 m Tul.Pok = 0 m
Tut.Tot = 1.5 m
Bs Beton = 1
1.5
Total Besi Beton 34
0
2.012 m3
TENAGA
5.960 Pekerja = 0.00 HOK
0.350 Tukang batu = 0.00 HOK
2.800 Tukang kayu = 0.00 HOK
1.400 Tukang besi = 0.00 HOK
1.4 0.14
F.1.2 Kusen Pintu Singgle (P2)
n = 7 bh 4.9 x 0.07 x 0.14 x 7 0.3361 m3
(1 Ls)
4.9
0.07
2
Beton Balok Late = 0 m'
0.14
0.9
F.1.3 Kusen Pintu (P3)
n = 6 bh 4.8 x 0.07 x 0.14 x 6 0.2822 m3
(6 Ls)
28.8
0.07
2
Beton Balok Late = 0 m'
50
0.14
0.8
F.1.4 Kusen Pintu Singgle Lapis Alumunium (P3)
n = 2 bh 4.8 x 0.07 x 0.14 x 2 0.0941 m3
(2 Ls)
0.07
2 9.6
(2 Ls)
0.07
1.8 79.2
0.07
1.3
Beton Balok Late = 5.9 m'
0.14
0.8 0.8
0.07
1.2
18.8
0.14 Beton Balok Late = 38 m'
2.3
F.1.7 Kusen Jendela (J4)
n = 1 bh 7.8 x 0.07 x 0.14 x 1 0.0764 m3
(2 Ls)
0.3 2.5
0.4 0.14
F.1.9 Ventilasi (V2)
n = 0 bh 3.6 x 0.07 x 0.14 x 0 0 m3
(2 Ls)
0.07
0.4 3.6
2.1335 m3
TOTAL PANJANG KUSEN ALLUMUNIUM = 167.7 m' 167.7 m' I.6.1 BAHAN
1.1 Allumunium 4,6 X 4" = 184.47 /m'
2 Baut piles = 335.40 / bh
0.06 Sealant = 10.06 /btl
TENAGA
52
0.043 Pekerja = 8.00 HOK
0.043 Tukang Las = 8.00 HOK
0.8
F.1.3 Daun Pintu Doble (P3)
n = 2 bh 0.8 x 2 x 2 9.6 3.2 m2
19.2 m'
0.8 20 m2
F.1.4 Daun Pintu Singgle Lapis Alumunium (P3) Pek. Pintu Seng
n = 2 bh 0.8 x 2 x 2 3.2 m2 F.6.22 BAHAN
0.0196 Papan kayu klas II = 0.06 m3
1 Triplek 122x242x3 mm = 4.00 lbr
2 0.3 Paku panjang 4-6 cm = 0.90 kg
1 Seng plat BJLS 30 = 4.00 Lbr
0.8 TENAGA
F.1.5 Daun Jendela Singgle (J1) 0.75 Tukang kayu = 2.00 HOK
n = 9 bh Jendela 1 0.75 x 1.77 x 9 5.04 11.948 m2 F.6.8 0.3 Pekerja = 0.00 HOK
15.12 m'
1.77
0.75
F.1.6 Daun Jendela Doble (J2) Pek. Ram Jendela
n = 4 bh Jendela 1 0.8 x 1.22 x 4 4.04 3.904 m2 F.6.10 BAHAN
Jendela 2 0 x 1.22 x 4 2.44 0 m2 0.035 Papan kayu klas II = 0.88 m3
6.48
1.22 25.92 m' TENAGA
0.8 Pekerja = 20.00 HOK
2 Tukang kayu = 50.00 HOK
0.8 0
54
F.1.7 Daun Jendela (J3)
n = 2 bh 0.7 x 1.3 x 3 x 2 5.46 m2
12
1.3 48 m'
0.7
3
F.1.8 Daun Jendela (J4) Pek. Kaca Jendela
n = 1 bh 0.82 x 1.2 x 4 x 1 3.936 m2 BAHAN
1.1 Kaca polos 3 mm = 27.00 m2
16.16 m'
1.2 TENAGA
Total Panjang Pintu = 53.6 m 0.015 Pekerja = 1.00 HOK
Total Panjang Jendela = 105.2 m 0.15 Tukang kayu = 3.00 HOK
0.82
TENAGA
0.086 Pekerja = 2.00 HOK
0.086 Tukang Las = 2.00 HOK
TENAGA
0.086 Pekerja = 3.00 HOK
0.086 Tukang Las = 3.00 HOK
TENAGA
0.62 Pekerja = 2.00 HOK
2 Tukang Las = 4.00 HOK
TENAGA
0.015 Pekerja = 1.00 HOK
0.15 Tukang kayu = 6.00 HOK
TENAGA
0.015 Pekerja = 1.00 HOK
0.15 Tukang kayu = 4.00 HOK
56
F.3.5 Engsel Jendela n = 24 bh 24 x 2 48 buah L.6.6 BAHAN
1 Engsel jendela mutu menegah = 48.00 buah
TENAGA
0.01 Pekerja = 1.00 HOK
0.1 Tukang kayu = 4.00 HOK
TENAGA
0.015 Pekerja = 1.00 HOK
0.15 Tukang kayu = 7.00 HOK
F.3.7 Hak Angin n = 24 bh 24 x 2 48 buah L.6.9 BAHAN
1 Hak angin kecil = 48.00 buah
TENAGA
0.015 Pekerja = 1.00 HOK
0.15 Tukang kayu = 7.00 HOK
G. PEKERJAAN KAYU KAP
G.1 Kuda-kuda Bentang 9 m = 0 bh F.6.28 BAHAN
Balok Tarik P = 9 m 9 x 0.08 x 0.12 x 0 0 m3 1.1 Balok kayu klas II = 1.40 m3
Kaki Kuda-kuda P = 5.5 m n = 2 bh 5.5 x 0.08 x 0.12 x 0 0 m3 15 Beugel besi kuda-kuda = 19.00 kg
Tiang Kuda-kuda P = 3.2 m 3.2 x 0.08 x 0.12 x 0 0 m3 0.8 Paku panjang 7-12 cm = 1.00 kg
Makelar 1 P = 2.2 m n = 2 bh 2.2 x 0.08 x 0.12 x 0 0 m3
2 P = 1.1 m n = 2 bh 1.1 x 0.08 x 0.12 x 0 0 m3 TENAGA
Skur 1 P = 2.6 m n = 2 bh 2.6 x 0.08 x 0.12 x 0 0 m3 4 Pekerja = 5.00 HOK
2 P = 1.8 m n = 2 bh 1.8 x 0.08 x 0.12 x 0 0 m3 12 Tukang kayu = 15.00 HOK
Gapit 1 P = 3.2 m n = 2 bh 3.2 x 0.06 x 0.12 x 0 0 m3
2 P = 6 m n = 2 bh 6 x 0.06 x 0.12 x 0 0 m3
G.2 1/2 Kuda-kuda Bentang 4,5 m = 0 bh
Balok Tarik P = 4.5 m 4.5 x 0.08 x 0.12 x 0 0 m3
Kaki Kuda-kuda P = 5.5 m 5.5 x 0.08 x 0.12 x 0 0 m3
Makelar 1 P = 2.2 m 2.2 x 0.08 x 0.12 x 0 0 m3
2 P = 1.1 m 1.1 x 0.08 x 0.12 x 0 0 m3
Tiang kuda-kuda P = 3.2 m 3.2 x 0.08 x 0.12 x 0 0 m3
Skur 1 P = 2.6 m 2.6 x 0.08 x 0.12 x 0 0 m3
2 P = 1.8 m 1.8 x 0.08 x 0.12 x 0 0 m3
Gapit 1 P = 1.6 m n = 2 bh 1.6 x 0.06 x 0.12 x 0 0 m3
2 P = 3 m n = 2 bh 3 x 0.06 x 0.12 x 0 0 m3
Nok P = 0m 0 x 0.08 x 0.12 0 m3
Gording P = 133 m 133 x 0.08 x 0.12 1.2768 m3
Jurai P = 0m 0 x 0.08 x 0.12 0 m3
Penyokong Jurai P = 0m n = 4 0 x 0.08 x 0.12 0 m3
Balok Tarik Penyokong Jurai P = 0m n = 4 0 x 0.08 x 0.12 0 m3
Kait Angin P = 0m 0 x 0.06 x 0.12 0 m3
Murplat P = 0m 0 x 0.08 x 0.12 0 m3
57
G.3 Konsol Penopang Gording = 0 bh
Kayu Konsol P = 0m 0 x 0.08 x 0.12 x 0 0 m3
1.2768 m3
BAHAN
0.012 Balok kayu klas II = 1.78 m3
0.1 Paku panjang 7-12 cm = 14.00 kg
TENAGA
0.15 Pekerja = 22.00 HOK
0.25 Tukang kayu = 37.00 HOK
149 m2
TENAGA
0.02 Pekerja = 17.00 HOK
0.063 Tukang cat = 55.00 HOK
Nok P = 0m 0 x 0.4 0 m2
Gording P = 0 m 0 x 0.4 0 m2
Jurai P = 0m 0 x 0.4 0 m2
Penyokong Jurai P = 0m n = 4 0 x 0.4 0 m2
Balok Tarik Penyokong Jurai P = 0m n = 4 0 x 0.4 0 m2
Kait Angin P = 0m 0 x 0.36 0 m2
Murplat P = 0m 0 x 0.4 0 m2
G.3 Konsol Penopang Gording = 0 bh
Kayu Konsol P = 0m 0 x 0.4 x 0 0 m2
0 m2
61
I PEKERJAAN AIR DAN SANITAIRE
I.1 Closed Jongkok 1 1 buah J.6.2 Kloset jongkok porselin
BAHAN
1 Klosed jongkok porselin mutu menegah= 1.00 buah
0.12 Semen isi 50 kg = 1.00 zak
0.01 Pasir pasang = 0.01 m3
Ember mandi besar = 2.00 buah
TENAGA
1 Pekerja = 1.00 HOK
1.5 Tukang batu = 1.50 HOK
I.2 Kran Air dia 1/2 inch 3 3 buah J.6.35 Kran diameter ½"
BAHAN
1 Kran air dia 1/2" = 3.00 buah
0.025 Seal tape = 1.00 buah
TENAGA
0.01 Pekerja = 1.00 HOK
0.1 Tukang batu = 1.00 HOK
TENAGA
1 Pekerja = 0.00 HOK
1.5 Tukang batu = 0.00 HOK
TENAGA
0.1 Pekerja = 1.00 HOK
1.5 Tukang batu = 2.00 HOK
I.5 Pipa PVC dia 1/2" 23 23 m J.6.29.a Pipa PVC diameter 1/2"
BAHAN
0.25 Pipa PVC dia 1/2" = 5.00 Ljr
TENAGA
0.054 Pekerja = 1.00 HOK
0.09 Tukang batu = 2.00 HOK
62
I.6 Avour 1 1 buah J.6.35a Saringan air
BAHAN
1 Saringan air = 1.00 Buah
1 Seal tape = 1.00 Buah
TENAGA
0.01 Pekerja = 1.00 HOK
0.1 Tukang batu = 1.00 HOK
I.8 Pipa PVC dia 4" (Septiktank) 12 12 m J.6.32 Pipa PVC diameter 4"
BAHAN
0.25 Pipa PVC dia 4" = 3.00 Ljr
TENAGA
0.081 Pekerja = 0.00 HOK
0.135 Tukang batu = 1.00 HOK
I.9 Pipa PVC dia 3" (air kotor) 23 23 m J.6.31 Pipa PVC diameter 3"
BAHAN
0.25 Pipa PVC dia 3" = 5.75 Ljr
TENAGA
0.081 Pekerja = 1.00 HOK
0.135 Tukang batu = 3.00 HOK
0.40
0.40
Galian Tanah Tembok Belakang
P = 0m 0 x 0.80 x 0.60 = 0 m3 0 m3
0.60
0.8
Total Volume Galian Tanah 17.76 m3
A.2 Urugan Kembali 0.25 x 17.76 4.44 m3 B.6.9 TENAGA
0.25 x 17.76 4.44 m4 0.192 Pekerja = 0.00 HOK
A.3 Pasir Urug Bawah Pondasi P = 111 111 x 0.80 x 0.05 4.44 m3 B.6.11 BAHAN
1.2 Pasir Urug = 6.00 m3
0.05 111 x 0.80 x 0.05 Depan 4.44 m3
TENAGA
0.80 0.3 Pekerja = 2.00 HOK
B. PEKERJAAN PASANGAN
B.1 Pas. Batu Kosong 0 x 0.8 x 0.2 0 m3 C.6.14 BAHAN
P = 0 m 1.2 Batu kali/gunung pecah = 0.00 m3
111 x 0.8 x 0.20 Bepan 17.76 m3 0.3 Pasir urug = 0.00 m3
0.2
TENAGA
0.8 0.78 Pekerja = 0.00 HOK
0.39 Tukang batu = 0.00 HOK
B.2 Pas. Pondasi Batu Kali 111 x 0.45 x 0.8 = Dep/Bel 39.96 m3 C.6.4 BAHAN
0.3 Lebar rata-rata 19.98 1.1 Batu kali/gunung pecah = 21.90 m3
= 0.3 + 0.6 2.72 Semen isi 50 Kg = 54.00 Zak
2 111 x 0.45 x 0.8 Depan m3 0.544 Pasir pasang = 10.00 m3
0.8 = 0.45 m
P = 111 m TENAGA
1.50 Pekerja = 29.00 HOK
0.6 0.60 Tukang batu = 11.00 HOK
Total Pondasi Batu Kali = 19.98 m3
G.6.40 BAHAN
C.2 Kolom Pilar 10/10 1.75 x 0.1 x 0.1 x 36 0.63 m3 0.4 Papan kayu klas III = 0.25 m3
P = 1.75 m n = 36 bh Hitungan Besi Beton 4 Paku panjang 4-6 cm = 2.00 kg
b = 0.10 m Besi 10 = 22 2 Minyak bekisting = 1.00 Ltr
h = 0.10 m Besi 6 = 21 193.027 Besi beton dia. < 16 mm = 573.29 kg
Besi dia 10 mm = 22 Ljr
Besi dia 6 mm = 21.00 Ljr
0.1 4.5 Kawat ikat beton = 2.00 kg
6.46 Semen isi 50 kg = 4.00 Zak
0.1 0.52 Pasir cor = 0.32 m3
0.78 Kerikil Alam 2/3 cm = 0.40 m3
0.15 Balok kayu klas III = 0.08 m3
0.35 Triplek 122x242x6 mm = 1.00 Lbr
20 Dolken / Perancah Dia 10 Cm - 4 M = 12.00 buah
TENAGA
7.3 Pekerja = 4.00 HOK
0.35 Tukang batu = 1.00 HOK
3.3 Tukang kayu = 3.00 HOK
2.1 Tukang besi = 2.00 HOK
Urugan Halaman
1 = P = 0 t = 0.3 0 x 14 x 0.3 = 0 B.6.11a BAHAN
L = 14 1.2 Tanah urug = 0.00 m3
2 = P = 0 0 x 3 x 0.3 = 0 TENAGA
L = 2 + 4 = 3 0.3 Pekerja = 0.00 HOK
2
3 = P = 0 0 x 1 x 0.3 = 0
L = 1
4 = P = 0 0 x 2 x 0.3 = 0
L = 2 0 m3
#REF! ###
67
#REF!
68
KET
69
Lonjor
Lonjor
RENCANA ANGGARAN BIAYA ( RAB )