Anda di halaman 1dari 4

UJIAN AKIR SEMESTER

METODE PELAKSANAAN KONSTRUKSI

METODE KERJA & TINJAUAN TEKNIS


ERECTION PCI-GIRDER SISTEM PERANCAH LAUNCHER
PROYEK PEMASANGAN BOX GIRDER PADA PEMBANGUNAN JALAN KA
LAYANG ANTARA MEDAN – BANDAR KHALIPAH LINTAS MEDAN –
KUALANAMU ( MBK-6 )
Diajukan untuk memenuhi salah satu tugas Mata Kuliah Metode Pelaksanaan Konstruksi yang
diampu oleh :
Drs. Sutarno, S.T M.T

Disusun Oleh :
Dyah Nugrahaini C.131.018.0106

PROGRAM STUDI TEKNIK SIPIL


FAKULTAS TEKNIK
UNIVERSITAS SEMARANG
2021

i
DAFTAR ISI

HALAMAN JUDUL...............................................................................................................i
DAFTAR ISI...........................................................................................................................ii
DAFTAR GAMBAR..............................................................................................................iii
BAB I PENDAHULUAN
1.1 Latar Belakang..........................................................................................................1
1.2 Maksud dan Tujuan...................................................................................................3
1.3 Lokasi........................................................................................................................3
1.4 Lingkup Pekerjaan....................................................................................................4
BAB II METODE PENYELESAIAN PEKERJAAN
2.1 Tahap Pelaksanaan....................................................................................................6
2.2 Tinjauan Teknis........................................................................................................20
BAB III URAIAN PEKERJAAN UTAMA
3.1 Data Material PCI-Girder.........................................................................................22
3.2 Data Alat...................................................................................................................24
3.3 Waktu........................................................................................................................26
BAB IV URAIAN PEKERJAAN PENUNJANG
4.1 Tinjauan K3..............................................................................................................27
BAB V PENUTUP
5.1 Simpulan...................................................................................................................32
5.2 Saran.........................................................................................................................32

ii
DAFTAR GAMBAR

Gambar 1.1 Stressing girder di bawah.................................................................................2

Gambar 1.2 Stressing girder di atas.....................................................................................2

Gambar 1.3 Site Plan...........................................................................................................4

Gambar 2.1 Rencana Zonasi................................................................................................7

Gambar 2.2 Persiapan Tanah...............................................................................................9

Gambar 2.3 Setting Perancah..............................................................................................10

Gambar 2.4 Setting Beam Launcher....................................................................................11

Gambar 2.5 Ilustrasi Setting Beam Launcher.....................................................................12

Gambar 2.6 Lifting Segmen PCI-Girder.............................................................................13

Gambar 2.7 Lifting Segmen PCI-Girder.............................................................................14

Gambar 2.8 PC I Girder Tahap 1........................................................................................15

Gambar 2.9 Moving PCI Girder..........................................................................................16

Gambar 2.10 Moving PCI Girder........................................................................................17

Gambar 2.11 Moving PCI Girder........................................................................................18

Gambar 2.12 Bracing Tepi Tarik.........................................................................................18

Gambar 2.13 Pemasangan Bracing Pengaku Girder............................................................19

Gambar 2.14 tes Dynamic Cone Penetration (DCP)...........................................................20

Gambar 2.15 Contoh Segmen Perhitungan.........................................................................21

iii
Gambar 3.1 Potongan..........................................................................................................22

Gambar 3.2 Potongan..........................................................................................................23

Gambar 3.3 Perancah Laucher.............................................................................................24

Gambar 3.4 Crane................................................................................................................25

Gambar 4.1 Sarana Pengaman Pekerjaan............................................................................30

Gambar 4.2 Rambu-rambu proyek......................................................................................31

iv