FINDING REPORT
Site Location : The Stature Jakarta Time of Inspection : 13:30 WIB
Inspected by : SHE: Wahyu, MK: Hasan, Owner :
Date of Inspection : 8/25/2020 Inspected Area : Lt.7, Lt.8, Lt.9, Lt.10 Tower Resi
4 Lt. 7 RE Terdapat papan pada pintu lift Segera di singkirkan agar tidak terjatuh Aldo 29 Aug 2020 close
7 Lt. 7 RE Pintu Panel listrik pengok Segera dilakukan perbaikan Tim Mekanik 29 Aug 2020 close
8 Lt. 7 RE Railing tidak terpasang Segera dipasang railing Argya/Aldo 29 Aug 2020 close
terdapat material pipa railing material pipa railing harus digunakan sesuai
10 Lt. 7 RE 29 Aug 2020 close
yang pengokpengok kegunaannya
15 Lt. 7 RE Sisa puing pada parimeter Segera dilakukan housekeeping Aldo 29 Aug 2020 close
Done
25 Lt. 9 RE Terdapat Material Segera dilakuakn housekeeping Aldo 29 Aug 2020 close
Done
Done
33 Lt. 9 RE Sampah pada Asago Segera dilakukan housekeeping Aldo 29 Aug 2020 close
Done
Done
36 Lt. 9 RE Stak besi Segera di potong stak besinya Algo / Latengga 29 Aug 2020 close
Location of Target Corrective Photo of Corrective Status
No Description of Finding Photo of Finding Corrective Action PIC
Finding Closure Date Action Status Action Taken Remarks
Done
Akses tangga Lt. 9 Terdapat besi hollow Diberikan sign agar orang yang lewat
38 Inotech 29 Aug 2020 close
ke Lt. 10 melintang pada akses tangga melihat