NAMA
Bantuan Rehab Rumah Dhuafa Untuk Fakir Miskin Ingin Jaya, Blang
5
Bintang dan Montasik
21 Maiyanah, Lhib
24 Nurhasanah, Lampisang
27 Syahruddin, Lamjruen
Agung 1 Rp 15,810,000.00
Agung 1 Rp 15,810,000.00
Agung 1 Rp 15,810,000.00
Agung 1 Rp 15,810,000.00
Rp 93,000,000.00
Rp 46,500,000.00
Rp 20,000,000.00
Rp 18,600,000.00
Rp 18,600,000.00
Rp 23,250,000.00
Rp 37,200,000.00
Rp 23,250,000.00
Rp 27,900,000.00
Rp 27,900,000.00
Rp 23,250,000.00
Rp 23,250,000.00
Basri 1 Rp 23,250,000.00
Bg Yus 1 Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Rp 13,950,000.00
Fuadi 1 Rp 23,250,000.00
Fuadi 1 Rp 37,200,000.00
Rp 18,600,000.00
` Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Heri 1 Rp 14,880,000.00
Zahrol 1 Rp 18,600,000.00
Rp 46,500,000.00
Cut Mi 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
TgkAmad 1 Rp 23,250,000.00
Heri 1 Rp 13,950,000.00
Indra 1 Rp 12,090,000.00
Cut 1 Rp 23,250,000.00
Muliadi S 1 Rp 13,950,000.00
Cut 1 Rp 23,250,000.00
Cut 1 Rp 23,250,000.00
Cut Mi 1 Rp 23,250,000.00
Heri 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Rp 18,600,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Cut Mi 1 Rp 13,950,000.00
Heri 1 Rp 13,950,000.00
Nazar 1 Rp 46,500,000.00
Nazar 1 Rp 18,600,000.00
Mahzar 1 Rp 27,900,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 23,250,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 15,810,000.00
Rp 18,600,000.00
Rp 27,900,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Basri 1 Rp 23,250,000.00
Nazar 1 Rp 18,600,000.00
Bg Yus 1 Rp 23,250,000.00
Bg Yus 1 Rp 23,250,000.00
Nazar 1 Rp 27,900,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 18,600,000.00
Basri 1 Rp 23,250,000.00
Bg Yus 1 Rp 18,600,000.00
Rp 18,600,000.00
Bg Yus 1 Rp 23,250,000.00
Nazar 1 Rp 15,810,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 18,600,000.00
Rp 23,250,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 18,600,000.00
Nazar 1 Rp 23,250,000.00
Nazar 1 Rp 18,600,000.00
Rp 15,810,000.00
Nazar 1 Rp 13,950,000.00
Bg Yus 1 Rp 13,950,000.00
Bg Yus 1 Rp 23,250,000.00
Nazar 1 Rp 13,950,000.00
Nazar 1 Rp 13,950,000.00
Rp 15,810,000.00
Bg Yus 1 Rp 15,810,000.00
Nazar 1 Rp 23,250,000.00
Indra 1 Rp 18,600,000.00
Indra 1 Rp 18,600,000.00
Indra 1 Rp 18,600,000.00
Indra 1 Rp 18,600,000.00
Indra 1 Rp 18,600,000.00
113 Rp 2,748,510,000.00
GAMBAR RAB KETERANGAN
1
1
1
1
1
1
Darul Imarah
1 Beton
Darul Imarah
1
Darul Imarah
1 Beton + AC
Darul Imarah
Beton Besar
Beton
1
Beton Besar
1 Baharuddin
1
1
Nasri/Pending
1 Muchramawati
Beton Besar
1
1
1 Rosmawati
49
DATA PROYEK
PEKERJAAN :
PENERIMA :
GAMPONG :
KECAMATAN :
KABUPATEN :
NOMOR KONTRAK :
TANGGAL KONTRAK :
NILAI KONTRAK :
SUMBER DANA :
KECAMATAN :
PROVINSI :
TAHUN ANGGARAN :
KONSULTAN PERENCANA
Nama Perusahaan :
Nama Pimpinan :
Jabatan Pimpinan :
DATA DINAS
Jabatan KPA :
Nama KPA :
Golongan :
NIP :
Jabatan PPTK :
Nama :
Golongan :
NIP :
Jabatan PPTK :
Nama :
Golongan :
NO SK :
KONTRAKTOR PELAKSANA
Nama Perusahaan :
Alamat :
Direktur :
Jabatan Pimpinan :
Nama Staf :
Jabatan :
DATA PROYEK
REHAB RUMAH TAK LAYAK HUNI
A HARIS MUHARSA
TEUBANG PHUI
MONTASIK
ACEH BESAR
KONSULTAN PERENCANA
CV. CREATIVE DESIGN
Burika Vicky, ST
Direktur
………..., ST
Inspector
DATA DINAS
NIP. …………….
NO.SK.814.1/A.3/374/2020
KONTRAKTOR PELAKSANA
CV. ……………
JL. T. Hasan Dek No. 175 Beurawe - Banda Aceh
………... ST
Direktur
……………………………
Pelaksana Lapangan
Chief Inspektor
Inspektor
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0060 105,000.00 630.00
2 Tukang L.02 OH 0.1200 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0600 150,000.00 9,000.00
4 Mandor L.04 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 25,380.00
B BAHAN
1 Seng Spandek 0,25 m2 1.1000 50,000.00 55,000.00
2 Screw Cteks / Baut Seng Bh 8.0000 100.00 800.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0060 105,000.00 630.00
2 Tukang L.02 OH 0.1200 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0600 150,000.00 9,000.00
4 Mandor L.04 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 25,380.00
B BAHAN
1 Nok / Rabung Spandek 0,25 m1 1.1000 20,000.00 22,000.00
2 Screw Cteks / Baut Seng Bh 6.0000 100.00 600.00
Hal. 32 of 46
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.1200 105,000.00 12,600.00
2 Tukang L.02 OH 0.0600 125,000.00 7,500.00
3 Kepala Tukang L.03 OH 0.0060 150,000.00 900.00
4 Mandor L.04 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 21,750.00
B BAHAN
1 Seng Gelombang BJLS 0,3 8" Lbr 0.7000 115,000.00 80,500.00
2 Paku Kayu Kg 0.0200 24,000.00 480.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.1500 105,000.00 15,750.00
2 Tukang L.02 OH 0.0700 125,000.00 8,750.00
3 Kepala Tukang L.03 OH 0.0070 150,000.00 1,050.00
4 Mandor L.04 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
1 Nok / Rabung Seng BJLS Lbr 0.3000 12,000.00 3,600.00
2 Paku Kayu Kg 0.0400 24,000.00 960.00
Hal. 33 of 46
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 4.0000 105,000.00 420,000.00
2 Tukang L.02 OH 12.0000 125,000.00 1,500,000.00
3 Kepala Tukang L.03 OH 1.2000 150,000.00 180,000.00
4 Mandor L.04 OH 0.2000 125,000.00 25,000.00
JUMLAH TENAGA KERJA 2,125,000.00
B BAHAN
1 Kayu Kelas III m3 1.1000 3,500,000.00 3,850,000.00
2 besi strip tebal 5 mm Kg 15.0000 8,500.00 127,500.00
3 Paku Kayu Kg 5.0000 24,000.00 120,000.00
JUMLAH HARGA BAHAN 4,097,500.00
C PERALATAN
Hal. 34 of 46
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 6.7000 105,000.00 703,500.00
2 Tukang L.02 OH 20.1000 125,000.00 2,512,500.00
3 Kepala Tukang L.03 OH 2.0100 150,000.00 301,500.00
4 Mandor L.04 OH 0.3350 125,000.00 41,875.00
JUMLAH TENAGA KERJA 3,559,375.00
B BAHAN
1 Kayu Kelas III m3 1.1000 3,500,000.00 3,850,000.00
2 besi strip tebal 5 mm Kg 15.0000 8,500.00 127,500.00
3 Paku Kayu Kg 3.0000 24,000.00 72,000.00
JUMLAH HARGA BAHAN 4,049,500.00
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0250 105,000.00 2,625.00
2 Tukang L.02 OH 0.0500 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
4 Mandor L.04 OH 0.0013 125,000.00 156.25
JUMLAH TENAGA KERJA 9,781.25
B BAHAN
1 Balok Kayu 10/10 cm Kelas II M' 0.2500 160,000.00 40,000.00
2 Paku Kayu kg 0.1000 24,000.00 2,400.00
Hal. 35 of 46
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Total (Rp)
(Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0250 105,000.00 2,625.00
2 Tukang L.02 OH 0.0500 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.0050 150,000.00 750.00
4 Mandor L.04 OH 0.0013 125,000.00 156.25
JUMLAH TENAGA KERJA 9,781.25
B BAHAN
1 Balok Kayu 5/7 cm Kelas II M' 0.2500 56,000.00 14,000.00
2 Paku Kayu kg 0.1000 24,000.00 2,400.00
Hal. 36 of 46
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN
NO DAFTAR BAHAN SATUAN
(Rp.)
HARGA SATUAN
NO DAFTAR UPAH SATUAN
(Rp.)
1 Pekerja OH 105,000.00
2 Tukang OH 125,000.00
3 Kepala Tukang OH 150,000.00
4 Mandor OH 125,000.00
RENCANA ANGGARAN BIAYA
(RAB)
1 2 3 4 6 7 8
I. PEKERJAAN PERSIAPAN
Jumlah I. 3,500,000.00
Terbilang : Tiga Belas Juta Sembilan Ratus Lima Puluh Ribu Rupiah
Gambar :
I. PEKERJAAN PERSIAPAN
1 Pembongkaran Atap 1.00 Ls
2 Pembobokan Dinding Tombak Layar 1.00 Ls
3 Administrasi, Dokumentasi dan Pelaporan 1.00 Ls
###
BACK UP DATA
PEKERJAAN : REHABILITASI RUMAH GURU
NO KONTRAK : -
NILAI KONTRAK : -
TANGGAL KONTRAK : -
SUMBER DANA : -
TAHUN ANGGARAN : -
LOKASI : -
PELAKSANA : -
SUPERVISI : -
Gambar :
PANJANG (m)
Ø BERAT PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI (mm) (Kg/m) Steek (m) (Batang) Lapis PANJANG (Kg)
Hook Overlap
a b c d e 4D 40 D
40 D
PANJANG (m)
NO KODE TYPE/SKETS JENIS BESI Ø (mm) BERAT (Kg/m) PANJANG TOTAL Jlh Besi UNIT PANJANG BERAT TOTAL
Overlap (m) (Batang) (Kg)
a b c d e Hook Steek ( 40
( 4 D) ( 40 D ) D) OK
PEMBESIAN TULANGAN POKOK
- Besi Ulir
Atas Ulir 16 1.578 1.00 0.13 - - 1.13 3.00 2.00 6.8 10.70
Tengah Ulir 16 1.578 1.00 0.13 - - 1.13 2.00 2.00 4.5 7.13
Bawah Ulir 16 1.578 1.00 0.13 - - 1.13 3.00 2.00 6.8 10.70
JUMLAH BERAT BESI TULANGAN UTAMA 28.53
PEMBESIAN TULANGAN SENGKANG DIMENSI POT BESI
a b c d
- Besi Polos Polos 10 0.617 0.36 0.36 0.36 0.36 0.08 - 1.52 9.00 2.00 27.36 16.88
PANJANG (m)
PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI Ø (mm) BERAT (Kg/m) (m) (Batang) UNIT PANJANG (Kg)
PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI Ø (mm) BERAT (Kg/m) Overlap (m) (Batang) UNIT PANJANG (Kg)
Hook Steek ( 40
a b c d e ( 4 D) ( 40 D ) D) OK
PEMBESIAN TULANGAN POKOK
- Besi Ulir
Atas Ulir 16 1.578 5.30 0.13 - - 5.43 3.00 2.00 32.6 51.41
Tengah Ulir 16 1.578 5.30 0.13 - - 5.43 2.00 2.00 21.7 34.27
Bawah Ulir 16 1.578 5.30 0.13 - - 5.43 3.00 2.00 32.6 51.41
JUMLAH BERAT BESI TULANGAN UTAMA 137.10
PEMBESIAN TULANGAN SENGKANG DIMENSI POT BESI
a b c d
- Besi Polos Polos 10 0.617 0.36 0.36 0.36 0.36 0.08 - 1.52 43.00 2.00 130.72 80.65
PANJANG (m)
Ø BERAT PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI (mm) (Kg/m) Steek (m) (Batang) UNIT PANJANG (Kg)
Hook Overlap
a b c d e
4D 40 D 40 D
- Besi Polos Polos 10 0.617 0.36 0.36 0.36 0.36 0.08 - 1.52 61.00 4.00 370.88 228.83
PANJANG (m)
Ø BERAT PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI (mm) (Kg/m) Steek (m) (Batang) UNIT PANJANG (Kg)
Hook Overlap
a b c d e 4D 40 D
40 D
- Besi Polos Polos 10 0.617 0.36 0.21 0.36 0.21 0.08 - 1.22 93.00 1.00 113.46 70.00
PANJANG (m)
Ø BERAT PANJANG TOTAL Jlh Besi BERAT TOTAL
NO KODE TYPE/SKETS JENIS BESI (mm) (Kg/m) Steek (m) (Batang) UNIT PANJANG (Kg)
Hook Overlap
a b c d e 4D 40 D
40 D
- Besi Polos Polos 10 0.617 0.36 0.21 0.36 0.21 0.08 - 1.22 145.00 1.00 176.90 109.15