RPD KESELURUHAN
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
1 BIAYA OPERASIONAL KKM
A. ALAT TULIS KANTOR (ATK)
1 Amplop Surat 1 - 1 1 Dos 20,000 20,000
2 Tinta Spidol White board 1 - 1 1 Botol 15,000 15,000
3 Tinta Stempel 1 - 1 1 Botol 10,000 10,000
4 Ballpoint 4 - 4 4 Buah 5,000 20,000
5 Box File 2 - 2 2 Buah 35,000 70,000
6 Buku Double folio 6 - 6 6 Buah 25,000 150,000
7 Kertas Karton Manila 4 - 4 4 Lembar 5,000 20,000
8 Buku Kwitansi 2 - 2 2 Buah 5,000 10,000
9 Selotip Bening 2 - 2 2 Buah 15,000 30,000
10 Cutter Kenko/biasa 1 - 1 1 Buah 15,000 15,000
11 Gunting 1 - 1 1 Buah 15,000 15,000
12 Hecter 1 - 1 1 Buah 15,000 15,000
13 Selotip Kertas 1 - 1 1 Buah 10,000 10,000
14 Kertas HVS Folio 70 gr 4 - 4 4 Rim 65,000 260,000
15 Lakban Double Tip kertas 2 - 2 2 Buah 15,000 30,000
16 Lakban Jilid (Hitam) 2 - 2 2 Buah 15,000 30,000
17 Map plastik (Kancing) 2 - 2 2 Buah 20,000 40,000
18 Map Plastik Skripsi 3 - 3 3 Buah 10,000 30,000
19 Materai 10.000 6 - 6 6 Lembar 11,000 66,000
20 Peluru Hecter 1 - 1 1 Dos 5,000 5,000
21 Penghapus karet 3 - 3 3 Buah 2,000 6,000
22 Pensil 1 - 1 1 Buah 5,000 5,000
23 Refill Cutter 1 - 1 1 Buah 15,000 15,000
24 Spidol besar Snowman Permanen 2 - 2 2 Buah 15,000 30,000
25 Spidol Snowman White Board 2 - 2 2 Buah 15,000 30,000
26 Penggaris Plastik 1 - 1 1 Buah 10,000 10,000
27 Lem Fox 1 - 1 1 Buah 15,000 15,000
JUMLAH 972,000
B. PEMBUATAN/CETAK KELENGKAPAN ADMINSTRASI
1 Pencatatan Ulang Akta Notaris 1 - 1 1 Ls 300,000 300,000
2 Struktur Organisasi KKM 1 - 1 1 Ls 250,000 250,000
3 Papan informasi 1 - 1 1 Ls 350,000 350,000
4 Papan program 1 - 1 1 Ls 250,000 250,000
5 Pembuatan Peta Sosial 1 - 1 1 Ls 250,000 250,000
6 Pembuatan Stempel 1 - 1 1 Ls 100,000 100,000
7 Biaya Rapat dan Fotocopy RKM 1 - 1 1 Ls 1,250,000 1,250,000
8 Biaya Rapat dan foto copy RPD/LPD 1 - 1 1 Ls 200,000 200,000
9 Print Foto Kegiatan 1 - 1 1 Ls 100,000 100,000
10 Biaya Rapat dan foto copy Laporan Akhir 1 - 1 1 Ls 1,250,000 1,250,000
JUMLAH 4,300,000
C. ALAT PELINDUNG DIRI (APD) - -
1 Masker kain 20 - 20 20 Buah 10,000 200,000
2 Hand sanitizer 5 - 5 5 Buah 25,000 125,000
JUMLAH 325,000
D. TRANSPORTASI
1 Pengurusan surat rekomendasi Pencairan 5 - 5 5 Trip/orang 50,000 250,000
2 Pengurusan Pencairan dana (BANK) 6 - 6 6 Trip/orang 30,000 180,000
3 Transport selama kegiatan di lapangan 8 - 8 8 Ls 25,000 200,000
JUMLAH 630,000
JUMLAH BIAYA OPERASIONAL KKM 6,227,000
2 PELATIHAN UNTUK PELAKSANA PROGRAM
1 Teknik SAM 1 1 1 Paket 755,000 755,000
2 Administrasi Pembukuan & Keuangan 1 1 1 Paket 725,000 725,000
3 Kelompok Pengelola & Pemeliharaan 1 1 1 Paket 720,000 720,000
JUMLAH BIAYA PELATIHAN UNTUK PELAKSANA PROGRAM 2,200,000
3 PEMERIKSAAN KUALITAS AIR
- Pemeriksaan Kualitas Air Sesudah
1 - 1 1 Paket 300,000 300,000
Program
JUMLAH 300,000
4 PEKERJAAN SARANA CTPS DI TEMPAT UMUM
I. BAHAN & MATERIAL
1 Pipa PVC AW Ø ½" 3 - 3 3 Batang 17,000 51,000
2 Knee 90 PVC Ø ½" 3 - 3 3 Buah 4,000 12,000
3 Socket Drat dalam Ø ½" 1 - 1 1 Buah 4,000 4,000
4 Socket Drat luar Ø ½" 1 - 1 1 Buah 4,000 4,000
5 Tee Ø ½" 1 - 1 1 Buah 5,000 5,000
6 Kran Air 1 - 1 1 Buah 16,000 16,000
7 Westafel keramik 1 - 1 1 Buah 450,000 450,000
8 Tempat sabun 1 - 1 1 Buah 45,000 45,000
9 Portland Composite Cemen (PCC) 3 - 3 3 Zak 64,000 192,000
10 Cat Tembok @ 4 Kg 2 - 2 2 Kaleng 75,000 150,000
11 Bata merah 5 x 11 x 22 cm 75 - 75 75 Buah 800 60,000
12 Pasir Pasang 0 - 0.062 0.062 Ret 745,000 46,000
13 Besi Siku 30 x 30 x 3 mm 2 - 2 2 Batang 85,000 170,000
14 Tandom Air 250 L 1 - 1 1 Buah 500,000 500,000
15 Sealtape 2 - 2 2 Buah 3,000 6,000
II. UPAH - -
1 Pekerja 3 - 3 3 HOK 100,000 300,000
2 Tukang 2 - 2 2 HOK 120,000 240,000
JUMLAH BIAYA PEKERJAAN SARANA CTPS DI TEMPAT UMUM 2,251,000
5 PEKERJAAN SARANA AIR MINUM
A PEKERJAAN MENARA AIR
I. BAHAN & MATERIAL
1 Kayu balok 5/7 kls II 30 - 30 30 Batang 50,000 1,500,000
2 Pasir beton 4 - 4 4 Ret 550,000 2,200,000
3 Pasir pasang 5 - 5 5 Ret 745,000 3,725,000
4 Kayu balok kelas I 0.05 - 0.05 0 m3 14,000,000 700,000
5 Kayu papan kelas I 0.13 - 0.13 0 m3 16,927,200 2,130,200
6 Kayu papan kelas II, 2/20 25 - 25 25 Lembar 60,000 1,500,000
7 Batu bata 2140 - 2,140 2,140 Buah 800 1,712,000
8 Kerikil beton/Cipping 2-3 3.5 0 3.5 3.5 Ret 1,190,000 4,165,000
9 Besi Beton Polos Ø 16 SNI 60 - 60 60 Batang 195,000 11,700,000
10 Besi Beton Polos Ø 14 SNI 20 - 20 20 Batang 170,000 3,400,000
11 Besi Beton Polos Ø 12 SNI 150 - 150 150 Batang 125,000 18,750,000
12 Besi Beton Polos Ø 10 SNI 50 - 50 50 Batang 85,000 4,250,000
13 Besi plat 3 MM 1 - 1 1 m2 715,000 715,000
14 Besi siku 40 x 40 x 4 mm 2 - 2 2 m 124,000 248,000
15 BesiHollow Block 40 x 40 x 4 mm 5 - 5 5 Batang 67,000 335,000
16 Cat besi/kayu @ 2 kg 5 - 5 5 Kaleng 64,000 320,000
17 Cat tembok@ 4 kg 5 - 5 5 Kaleng 75,000 375,000
18 Cat pelapis anti bocor @ 4 kg (No drop) 5 - 5 5 Kaleng 185,000 925,000
19 Kaca Bening 5 mm 3 - 3 3 m2 143,000 429,000
20 Kawat beton 52 - 52 52 Kg 20,000 1,040,000
21 Minyak Bekisting 10 - 10 10 Kg 15,000 150,000
22 Paku Biasa 28 - 28 28 Kg 20,000 560,000
23 Plywood tebal 9mm 22 - 22 22 Lembar 120,000 2,640,000
24 Skim coat / A plus @ 20 kg 17 - 17 17 Zak 128,000 2,176,000
25 Portland Composite Cemen (PCC) 123 - 123 123 Zak 64,000 7,872,000
II. ALAT PELINDUNG DIRI (APD) - - -
1 Masker 20 - 20 20 Bh 10,000 200,000
2 Sarung Tangan 20 - 20 20 Bh 20,000 400,000
III. UPAH - - -
1 Tukang 62 - 62 62 HOK 120,000 7,440,000
2 Pekerja 100 - 100 100 HOK 100,000 10,000,000
JUMLAH 91,557,200
B. PENYELIDIKAN GEOLISTRIK 1 - 1 1 Paket 3,500,000 3,500,000
C. PENGEBORAN SUMUR DALAM 1 - 1 1 Paket 49,434,000 49,434,000
D. PIPA DAN ACCEESSORIES 1 - 1 1 Paket 18,049,000 18,049,000
E. PENGADAAN POMPA SUMERSIBLE 1 - 1 1 Paket 41,325,000 41,325,000
F. PENGADAAN LISTRIK PLN 1 - 1 1 Paket 4,000,000 4,000,000
JUMLAH BIAYA PEKERJAAN SARANA AIR MINUM 210,416,200
TOTAL BIAYA KEGIATAN 218,843,200
Jumlah Pengajuan Rp
218,843,200
(Dua Ratus Delapan Belas Juta Delapan Ratus Empat Puluh Tiga Ribu Dua Ratus Rupiah)
Sidrap,15 Februari 2021
Disetujui : Dibuat Oleh :
Koordinator KKM Tepian Danau Sidenreng Ketua Satlak
Kelurahan Wette'E
RPD KESELURUHAN
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
Mengetahui,
Pejabat Pembuat Komitmen Air Minum
Satker Pelaksanaan Prasarana Permukiman Wilayah I
Provinsi Sulawesi Selatan
Mengetahui,
Pejabat Pembuat Komitmen Air Minum
Satker Pelaksanaan Prasarana Permukiman Wilayah I
RENCANA PENGGUNAAN DANA (RPD)
Kelurahan/Kecamatan/Kabupaten : Wette'E/Panca Lautang/Sidenreng Rappang
RPD KE : I (SATU)
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
Provinsi Sulawesi Selatan
RPD KE : II (DUA)
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
1 BIAYA OPERASIONAL KKM
A. ALAT TULIS KANTOR (ATK)
1 Amplop Surat 1 1 - 1 Dos 20,000 -
2 Tinta Spidol White board 1 1 - 1 Botol 15,000 -
3 Tinta Stempel 1 1 - 1 Botol 10,000 -
4 Ballpoint 4 4 - 4 Buah 5,000 -
5 Box File 2 - 2 2 Buah 35,000 70,000
6 Buku Double folio 6 6 - 6 Buah 25,000 -
7 Kertas Karton Manila 4 - 4 4 Lembar 5,000 20,000
8 Buku Kwitansi 2 1 1 2 Buah 5,000 5,000
9 Selotip Bening 2 - 2 2 Buah 15,000 30,000
10 Cutter Kenko/biasa 1 1 - 1 Buah 15,000 -
11 Gunting 1 1 - 1 Buah 15,000 -
12 Hecter 1 1 - 1 Buah 15,000 -
13 Selotip Kertas 1 - 1 1 Buah 10,000 10,000
14 Kertas HVS Folio 70 gr 4 2 2 4 Rim 65,000 130,000
15 Lakban Double Tip kertas 2 - 2 2 Buah 15,000 30,000
16 Lakban Jilid (Hitam) 2 - 2 2 Buah 15,000 30,000
17 Map plastik (Kancing) 2 2 - 2 Buah 20,000 -
18 Map Plastik Skripsi 3 1 2 3 Buah 10,000 20,000
19 Materai 10.000 6 4 2 6 Lembar 11,000 22,000
20 Peluru Hecter 1 1 - 1 Dos 5,000 -
21 Penghapus karet 3 3 - 3 Buah 2,000 -
22 Pensil 1 1 - 1 Buah 5,000 -
23 Refill Cutter 1 1 - 1 Buah 15,000 -
24 Spidol besar Snowman Permanen 2 2 - 2 Buah 15,000 -
25 Spidol Snowman White Board 2 - 2 2 Buah 15,000 30,000
26 Penggaris Plastik 1 1 - 1 Buah 10,000 -
27 Lem Fox 1 1 - 1 Buah 15,000 -
JUMLAH 397,000
B. PEMBUATAN/CETAK KELENGKAPAN ADMINSTRASI
1 Pencatatan Ulang Akta Notaris 1 1 - 1 Ls 300,000 -
2 Struktur Organisasi KKM 1 1 - 1 Ls 250,000 -
3 Papan informasi 1 1 - 1 Ls 350,000 -
4 Papan program 1 1 - 1 Ls 250,000 -
5 Pembuatan Peta Sosial 1 1 - 1 Ls 250,000 -
6 Pembuatan Stempel 1 1 - 1 Ls 100,000 -
7 Biaya Rapat dan Fotocopy RKM 1 1 - 1 Ls 1,250,000 -
8 Biaya Rapat dan foto copy RPD/LPD 1 0.5 0.5 1 Ls 200,000 104,400
9 Print Foto Kegiatan 1 0.5 0.5 1 Ls 100,000 50,000
10 Biaya Rapat dan foto copy Laporan Akhir 1 - 1 1 Ls 1,250,000 1,250,000
JUMLAH 1,404,400
C. ALAT PELINDUNG DIRI (APD) - -
1 Masker kain 20 20 - 20 Buah 10,000 -
2 Hand sanitizer 5 5 - 5 Buah 25,000 -
JUMLAH -
D. TRANSPORTASI
1 Pengurusan surat rekomendasi Pencairan 5 3 2 5 Trip/orang 50,000 100,000
2 Pengurusan Pencairan dana (BANK) 6 3 3 6 Trip/orang 30,000 90,000
3 Transport selama kegiatan di lapangan 8 4 4 8 Ls 25,000 100,000
JUMLAH 290,000
JUMLAH BIAYA OPERASIONAL KKM 2,091,400
2 PELATIHAN UNTUK PELAKSANA PROGRAM
1 Teknik SAM 1 1 - 1 Paket 755,000 -
2 Administrasi Pembukuan & Keuangan 1 1 - 1 Paket 725,000 -
3 Kelompok Pengelola & Pemeliharaan 1 1 - 1 Paket 720,000 -
JUMLAH BIAYA PELATIHAN UNTUK PELAKSANA PROGRAM -
3 PEMERIKSAAN KUALITAS AIR
- Pemeriksaan Kualitas Air Sesudah
1 - 1 1 Paket 300,000 300,000
Program
JUMLAH 300,000
4 PEKERJAAN SARANA CTPS DI TEMPAT UMUM
I. BAHAN & MATERIAL
1 Pipa PVC AW Ø ½" 3 - 3 3 Batang 17,000 51,000
2 Knee 90 PVC Ø ½" 3 - 3 3 Buah 4,000 12,000
3 Socket Drat dalam Ø ½" 1 - 1 1 Buah 4,000 4,000
4 Socket Drat luar Ø ½" 1 - 1 1 Buah 4,000 4,000
5 Tee Ø ½" 1 - 1 1 Buah 5,000 5,000
6 Kran Air 1 - 1 1 Buah 16,000 16,000
7 Westafel keramik 1 - 1 1 Buah 450,000 450,000
8 Tempat sabun 1 - 1 1 Buah 45,000 45,000
9 Portland Composite Cemen (PCC) 3 - 3 3 Zak 64,000 192,000
10 Cat Tembok @ 4 Kg 2 - 2 2 Kaleng 75,000 150,000
11 Bata merah 5 x 11 x 22 cm 75 - 75 75 Buah 800 60,000
12 Pasir Pasang 0 - 0 0.062 Ret 745,000 46,000
13 Besi Siku 30 x 30 x 3 mm 2 - 2 2 Batang 85,000 170,000
14 Tandom Air 250 L 1 - 1 1 Buah 500,000 500,000
15 Sealtape 2 - 2 2 Buah 3,000 6,000
II. UPAH - -
1 Pekerja 3 - 3 3 HOK 100,000 300,000
2 Tukang 2 - 2 2 HOK 120,000 240,000
JUMLAH BIAYA PEKERJAAN SARANA CTPS DI TEMPAT UMUM 2,251,000
5 PEKERJAAN SARANA AIR MINUM
A PEKERJAAN MENARA AIR
I. BAHAN & MATERIAL
1 Kayu balok 5/7 kls II 30 30 - 30 Batang 50,000 -
2 Pasir beton 4 4 - 4 Ret 550,000 -
3 Pasir pasang 5 5 - 5 Ret 745,000 -
4 Kayu balok kelas I 0.05 - 0 0 m3 14,000,000 700,000
5 Kayu papan kelas I 0.13 - 0 0 m3 16,927,200 2,130,200
6 Kayu papan kelas II, 2/20 25 25 - 25 Lembar 60,000 -
7 Batu bata 2140 2,140 - 2,140 Buah 800 -
8 Kerikil beton/Cipping 2-3 3.5 4 - 3.5 Ret 1,190,000 -
9 Besi Beton Polos Ø 16 SNI 60 60 - 60 Batang 195,000 -
10 Besi Beton Polos Ø 14 SNI 20 20 - 20 Batang 170,000 -
11 Besi Beton Polos Ø 12 SNI 150 18 132 150 Batang 125,000 16,500,000
12 Besi Beton Polos Ø 10 SNI 50 50 - 50 Batang 85,000 -
13 Besi plat 3 MM 1 - 1 1 m2 715,000 715,000
14 Besi siku 40 x 40 x 4 mm 2 - 2 2 m 124,000 248,000
15 BesiHollow Block 40 x 40 x 4 mm 5 - 5 5 Batang 67,000 335,000
16 Cat besi/kayu @ 2 kg 5 - 5 5 Kaleng 64,000 320,000
17 Cat tembok@ 4 kg 5 - 5 5 Kaleng 75,000 375,000
18 Cat pelapis anti bocor @ 4 kg (No drop) 5 - 5 5 Kaleng 185,000 925,000
19 Kaca Bening 5 mm 3 - 3 3 m2 143,000 429,000
20 Kawat beton 52 52 - 52 Kg 20,000 -
21 Minyak Bekisting 10 10 - 10 Kg 15,000 -
22 Paku Biasa 28 28 - 28 Kg 20,000 -
23 Plywood tebal 9mm 22 - 22 22 Lembar 120,000 2,640,000
24 Skim coat / A plus @ 20 kg 17 - 17 17 Zak 128,000 2,176,000
25 Portland Composite Cemen (PCC) 123 90 33 123 Zak 64,000 2,112,000
II. ALAT PELINDUNG DIRI (APD) - - -
1 Masker 20 20 - 20 Bh 10,000 -
2 Sarung Tangan 20 20 - 20 Bh 20,000 -
III. UPAH - - - -
1 Tukang 62 22 40 62 HOK 120,000 4,800,000
2 Pekerja 100 30 70 100 HOK 100,000 7,000,000
JUMLAH 41,405,200
B. PENYELIDIKAN GEOLISTRIK 1 1 - 1 Paket 3,500,000 -
C. PENGEBORAN SUMUR DALAM 1 1 - 1 Paket 49,434,000 -
D. PIPA DAN ACCEESSORIES 1 - 1 1 Paket 18,049,000 18,049,000
E. PENGADAAN POMPA SUMERSIBLE 1 - 1 1 Paket 41,325,000 41,325,000
F. PENGADAAN LISTRIK PLN 1 - 1 1 Paket 4,000,000 4,000,000
JUMLAH BIAYA PEKERJAAN SARANA AIR MINUM 107,330,200
TOTAL BIAYA KEGIATAN 109,421,600
Jumlah Pengajuan Rp
109,421,600
(Seratus Sembilan Juta Empat Ratus Dua Puluh Satu Ribu Enam Ratus Rupiah)
Sidrap, ……………………. 2021
Disetujui : Dibuat Oleh :
Koordinator KKM Tepian Danau Sidenreng Ketua Satlak
Kelurahan Wette'E
RPD KE : II (DUA)
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
Mengetahui,
Pejabat Pembuat Komitmen Air Minum
Satker Pelaksanaan Prasarana Permukiman Wilayah I
Provinsi Sulawesi Selatan
Diketahui Oleh :
District Coordinator
Roms 15 Kab. Sidenreng Rappang
RENCANA PENARIKAN DANA BANK (RPDB)
RPDB KE : I.A
KKM : Tepian Danau Sidenreng Kecamatan : Panca Lautang
Kelurahan : Wette'e Kabupaten : Sidenreng Rappang
Volume
Unit/ Harga
No. Uraian Real. s/d Pengajuan Jumlah Jumlah
Kebutuhan Satuan Satuan
Tahap Lalu Sekarang Kumulatif
1 2 3 4 5 6=4+5 7 8 9=5*8
Diketahui Oleh :
District Coordinator
Roms 15 Kab. Sidenreng Rappang
43,800,000
INCASH 10,943,000
11,200,000
24,500,000
43,800,000
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE II APRIL
1 MINGGU KE III APRIL
1 MINGGU KE II APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE IV APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE II APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE III APRIL
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
1 MINGGU KE I MEI
47