Anda di halaman 1dari 1

PRICE LIST HARGA PEKERJAAN CIVIL

RINCIAN BIAYA PEKERJAAN

VOL. Unit Price


NO URAIAN PEKERJAAN
QTY UNIT Rp

1 Pekerjaan Bekasting (include material) 1.00 M2 350,000

2 Pekerjaan Pembesian (Upah Borong) 1.00 Kg 2,500

3 Pekerjaan Pengecoran (Include Tool) 1.00 M3 150,000

4 Lantai Kerja / LC (Upah Borong) 1.00 M2 17,000

5 Finishing / Coating (include material) 1.00 M2 35,000

6 Potong Pancang D.400 (Upah Borong) 1.00 Point 115,000

7 Potong Pancang D.500 (Upah Borong) 1.00 Point 125,000

8 Potong Pancang D.600 (Upah Borong) 1.00 Point 135,000

Hormat Kami,
PT. BANDA JAYA UTAMA

LUKY PRIAMBODO
General Manager

Hal. 1 dari 1

Anda mungkin juga menyukai