Anda di halaman 1dari 2

LAPORAN PEMAKAIAN ANGGARAN

PEMASANGAN KAWAT DURI DI SAMPING MASJID KE ARAH RT 5

No. Item Pekerjaan Qty Satuan Harga Satuan Total

1 Kawat duri 9 roll 90,000 810,000


2 Besi siku 4x4 8 batang 98,000 784,000
3 Dynabolt 110 pcs 1,500 165,000
4 Kawat galvanis 2 roll 25,000 50,000
5 Zinkromate 1 kaleng 65,000 65,000
6 Tinner 1 liter 15,000 15,000
7 Kuas 1 pcs 10,000 10,000
8 Fitting 1 pcs 12,000 12,000
9 Supir 1 nos 10,000 10,000
10 Konsumsi 2 nos 15,000 30,000
11 Las siku "Pak Marno" 8 batang 50,000 400,000
12 Jasa pasang kawat duri 120 m' 12,000 1,440,000

Total 3,791,000

Bekasi, 4 Maret 2021


Dibuat oleh

Pria Rose Adi


(team pembangunan RW 12)
LAPORAN PEMAKAIAN ANGGARAN
PEMASANGAN KAWAT DURI DARI RT 5 KE ARAH DANAU DAN DARI RT 1 KE ARAH IXORA

No. Item Pekerjaan Qty Satuan Harga Satuan Total

1 Kawat duri 10 roll 90,000 900,000


2 Besi siku 4x4 6 batang 98,000 588,000
3 Dynabolt 62 pcs 1,500 93,000
4 Zinkromate 1 kaleng 65,000 65,000
5 Tinner 2 liter 15,000 30,000
6 Kuas 1 pcs 10,000 10,000
7 Supir 1 nos 10,000 10,000
8 Las siku "Pak Marno" 6 batang 50,000 300,000
9 Jasa pasang kawat duri 95 m' 12,000 1,140,000

Total 3,136,000

Bekasi, 24 Oktober 2021


Dibuat oleh

Pria Rose Adi


(team pembangunan RW 12)