Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
102,308,762,900
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
14.00 RINGKASAN AKHIR Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
6.00 : BAB No. 01 - PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG 1.802% 0.754% 41.833% 0.000% 0.000% 0.754% 41.833% 0.147% 0.061% 41.833% 0.000% 0.000% 0.061% 41.833%
7.00 : BAB No. 02 - BANGUNAN BASEMENT 82.849% 55.408% 66.878% 0.000% 0.000% 55.408% 66.878% 6.742% 4.509% 66.878% 0.000% 0.000% 4.509% 66.878%
10.00 : BAB No. 05 - PEKERJAAN LUAR 15.349% 9.554% 62.242% 0.489% 3.184% 10.042% 65.426% 1.249% 0.777% 62.242% 0.040% 3.184% 0.817% 65.426%
12.00 : BAB No. 07 - CADANGAN BIAYA PEKERJAAN (PROVISIONAL SUMS)
100% 65.715% 65.715% 0.489% 0.489% 66.204% 66.204% 8.138% 5.348% 65.715% 0.040% 0.489% 5.387% 66.204%
14.00-Ringks.Akhir 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Peserta Lelang dianjurkan untuk meninjau ke Lokasi Proyek agar dapat mengenal dan mempelajari secara
langsung keadaaan dan karakteristik Pekerjaan. Peserta tender harus sudah memperkirakan dalam penawaran,
biaya-biaya yang mungkin timbul berkaitan dengan pembuatan jalan masuk sementara, keterbatasan tempat
penyimpanan material dan area kerja, kondisi alam di lokasi kerja, jarak terdekat antara struktur bangunan
dengan jalan akses yang ada, ketebatasan lahan untuk penggalian sistem terbuka, peraturan lingkungan setempat
berkaitan dengan proyek dan segala pembatasan yang mungkin timbul di lokasi dan sekitarnya. Tidak ada klaim
yang akan diterima di kemudian hari karena kelalaian memperhitungkan hal-hal tersebut diatas.
Pemborong akan menerima Lokasi Proyek dengan segala kondisinya, terhitung sejak tanggal dimulainya pekerjaan
dan dengan biayanya sendiri harus membersihkan lokasi proyek tersebut dari semua sampah atau puing yang bisa
menghalangi pelaksanaan pekerjaan.
Peserta Lelang tidak boleh melakukan perubahan tulisan/teks apapun terhadap Daftar Uraian Pekerjaan/Rincian
Anggaran Biaya Pekerjaan (Bills of Quantities), kecuali dengan instruksi tertulis Manajer Konstruksi. Perubahan-
perubahan yang yang dibuat oleh peserta tender dianggap tidak sah dan akan diabaikan. Peserta tender yang
melakukannya dapat didiskualifikasi.
Peserta Lelang disarankan untuk mencantumkan harga di setiap jenis pekerjaan seperti tercantum di Daftar
Uraian Pekerjaan / Rincian Anggaran Biaya Pekerjaan (Bills of Quantities), untuk keperluan kelak
memperhitungkan pembayaran kemajuan pekerjaan. Jenis pekerjaan yang tidak mempunyai harga akan dianggap
telah diperhitungkan dan termasuk di bagian lain dalam dokumen tender. Tidak ada tuntutan / klaim di kemudian
hari untuk item pekerjaan yang tidak diberi harga.
Bila peserta Lelang tidak setuju atas kuantitas pekerjaan yang tercantum di Daftar Uraian Pekerjaan atau
kuantitas pekerjaan yang tercantum itu dianggap perlu untuk diubah/dihapuskan/ditambahkan, peserta tender
diijinkan membuat perubahan khusus terhadap Daftar Uraian Pekerjaan, sejauh perubahan DIBUAT DI LEMBAR
TERPISAH, sehingga perubahan tersebut dapat dengan mudah diidentifikasi.
Harga satuan yang dicantumkan di Rincian Anggaran Biaya Pekerjaan, kecuali disebutkan lain, harus sudah
termasuk penyediaan material, alat bantu, upah pekerja, peralatan kerja, pengawasan, biaya umum (overhead),
keuntungan, dan biaya-biaya lain untuk menyelesaikan Pekerjaan berdasarkan persyaratan Lelang.
Jika Peserta Lelang membuat kesalahan penjumlahan atau perkalian atau pengalihan angka, maka sebelum
penandatanganan Kontrak, kekeliruan tersebut harus diperbaiki dan disesuaikan sedemikian rupa sehingga bila
dihitung dengan benar jumlah di Ringkasan Akhir harus sama seperti yang tercantum dalam Surat Tawaran Harga.
Ke Penjumlahan - Rp. -
6-Bab.1-Persiapanzz 6/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Peserta Lelang harus menyerahkan Tawaran Harga yang bersifat harga lumpsum fixed price (harga tetap dan
terpadu).
Nilai harga lelang / kontrak dianggap berdasarkan Gambar-Gambar Rancangan dan Spesifikasi, risalah-risalah
perubahan yang disepakati dan dokumen-dokumen pendukung terkait yang merupakan bagian dari Kontrak.
Kuantitas yang tercantum di Rincian Anggaran Biaya Pekerjaan hanya digunakan untuk acuan umum dan
sepenuhnya menjadi resiko dan tanggung jawab Peserta Tender. Kuantitas tersebut kelak tidak menjadi bagian
dari Kontrak dan tidak akan dihitung ulang, kecuali terjadi perubahan lingkup kerja dari rancangan sebelumnya
(saat Lelang / Kontrak) ke rancangan baru, yang diputuskan oleh Manajer Konstruksi setelah Dokumen Kontrak
ditanda tangani kedua belah pihak.
Bila ada item pekerjaan yang dicantumkan di Rincian Anggaran Biaya Pekerjaan sebagai item "Provisional", maka
kuantitas item pekerjaan ini akan dihitung ulang berdasarkan gambar-gambar rancangan terakhir yang disetujui,
tapi harga satuannya adalah tetap, seperti tercantum di Rincian Anggaran Biaya Pekerjaan.
Jika dalam proses Lelang, Peserta Lelang menemukan perbedaan kuantitas yang cukup besar atau menimbang
perlu untuk menyisipkan item pekerjaan baru di Rincian Anggaran Biaya Pekerjaan untuk Tender, Peserta Lelang
dapat menyertakan Rincian Anggaran Biaya Pekerjaan tambahan di halaman terpisah, yang berisi kuantitas
tambahan atau kurangan dan item pekerjaan baru yang dipertimbangkan perlu ditambahkan.
Lingkup kerja yang merupakan bagian dari Kontrak, secara umum adalah, Pekerjaan Mekanikal, Elektrikal dan
Plumbing, berdasarkan Gambar-Gambar Rancangan dan Spesifikasi Teknis, risalah-risalah perubahan yang
disepakati (bila ada) dan dokumen-dokumen pendukung terkait yang merupakan bagian dari Dokumen Kontrak,
untuk proyek pembangunan Tokyo Riverside Apartement Tower 1 - 6, PIK 2 - Tagerang, yang selanjutnya disebut
Pekerjaan.
Pemborong harus memahami secara menyeluruh karakteristik, kondisi dan situasi dari jenis pekerjaan tersebut di
atas.
Jalan masuk dan keluar lokasi Pekerjaan adalah sesuai dengan ketentuan dari Pemberi Tugas.
2.5 Pekerjaan yang akan dilaksanakan oleh Pemborong lain yang dikontrak langsung oleh Pemberi Tugas.
Berikut ini adalah pekerjaan-pekerjaan yang akan dilaksanakan oleh Pemborong lain yang dikontrak langsung oleh
Pemberi tugas :
Pemborong (untuk pekerjaan tersebut di Item Sub 2.1) harus bekerja sama dengan Pemborong pekerjaan tersebut
di atas, di bawah koordinasi Pemberi Tugas, untuk menyelesaikan pekerjaan masing-masing, terutama pekerjaan-
pekerjaan yang saling berkaitan.
Ke Penjumlahan - Rp. -
6-Bab.1-Persiapanzz 6/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pekerjaan secara keseluruhan akan dinyatakan telah selesai hanya jika Pemberi Tugas , berdasarkan
pertimbangan teknis dan profesional, telah menyatakan bahwa pekerjaan telah selesai dan Berita Acara Serah
Terima Pertama Pekerjaan telah diterbitkan.
Berita Acara Serah Terima Pertama Pekerjaan tidak akan diterbitkan sampai dengan ketentuan di bawah ini
terpenuhi :
(a). Pekerjaan sesuai dengan lingkup kontrak secara keseluruhan diselesaikan, sesuai dengan pendapat Manajer
Konstruksi dan ketentuan kontrak.
(b). Perbaikan bagian pekerjaan yang tercantum di daftar perbaikan cacat pekerjaan (punch list) yang
diterbitkan oleh Manajer Konstruksi, telah diselesaikan dengan baik oleh Pemborong.
(c). Semua sertifikat dan surat ijin, sesuai ketentuan Pemerintah, sebagai syarat untuk diterbitkanya Izin
Penggunaan Bangunan (IPB), telah diberikan kepada Manajer Konstruksi / Pemberi Tugas.
Pemborong, dalam 28 hari kalender setelah diterbitkannya Surat Penunjukan (persetujuan penyerahan Kontrak
kepada Pemborong yang ditunjuk oleh Pemberi Tugas), harus menyerahkan ke Manajer Konstruksi 1 (satu) buah
"Compact Disc" berisi berkas elektronik dan 2 (dua) salinan (fotokopi) Program Kerja yang mencantumkan rencana
Pemborong dalam mengatur dan melaksanakan Pekerjaan sesuai dengan jangka waktu pelaksanaan yang
disepakati dalam kontrak.
Program Kerja ini harus mencantumkan tanggal dimulainya pekerjaan persiapan, tanggal dan jangka waktu
penyerahan dan persetujuan gambar-gambar kerja (gambar kerja), penyerahan dan persetujuan contoh bahan /
material yang digunakan, pemesanan dan penerimaan bahan / material dan peralatan yang dipesan, pengujian
bahan dan pekerjaan dan tanggal serah terima pekerjaan sesuai dengan yang telah ditentukan atau bisa juga
lebih awal dari tanggal yang ditentukan tersebut.
Program Kerja harus dapat memperlihatkan kegiatan mingguan secara rinci agar kelak dapat dievaluasi tiap
minggu antara rencana kerja dan kemajuan kerja yang sebenarnya.
Manajer Konstruksi akan mempelajari dan memeriksa Program Kerja Pemborong, dan jika dianggap perlu, dapat
meminta perbaikan dari program kerja tersebut.
Setelah Program Kerja disetujui, selanjutnya tidak boleh ada perubahan terhadap program kerja tersebut tanpa
persetujuan Manajer Konstruksi.
Program Kerja juga harus menunjukkan hubungan antara Pekerjaan dengan pekerjaan lain terkait yang dikerjakan
oleh Pemborong lain yang ditunjuk langsung oleh Pemberi Tugas, atau hubungan dengan pihak lain yang berkaitan
dengan penyelesaian Pekerjaan.
Data mengenai kondisi kemajuan pekerjaan berikutnya (up dated progress) harus dibuat oleh Pemborong dan
diserahkan tiap minggu ke Manajer Konstruksi. Data ini harus dalam format yang dapat memperlihatkan
perbandingan antara kondisi kemajuan pekerjaan mingguan dengan rencana Program Kerja yang disetujui.
Jika Manajer Konstruksi menilai kemajuan pekerjaan tidak sesuai lagi dengan Program Kerja yang disetujui maka
Manajer Konstruksi berhak meminta Pemborong agar memasukkan rencana percepatan ("catch up" program) yang
menunjukkan perubahan Program Kerja yang diperlukan agar Pekerjaan dapat selesai tepat waktu.
Proses persiapan dan persetujuan Program Kerja termasuk koreksi Manajer Konstruksi tidak melepaskan
Pemborong dari tugas, kewajiban dan tanggung jawabnya, seperti tertulis dalam Dokumen Kontrak.
Ke Penjumlahan - Rp. -
6-Bab.1-Persiapanzz 6/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pemborong dalam jangka waktu 28 hari kalender setelah diterbitkannya Surat Penunjukkan (persetujuan 1,000,000
penyerahan Kontrak kepada Pemborong yang ditunjuk oleh Pemberi Tugas), harus menyerahkan ke Manajer
Konstruksi jadwal pelaksanaan dan kurva S, yang memperlihatkan tahapan pembayaran kepada Pemborong
berdasarkan Kontrak. Jika menurut Manajer Konstruksi jadwal pelaksanaan ini harus diperbaiki, maka Pemborong
harus memperbaiki dan menyerahkan kembali jadwal kerja yang telah diperbaiki tersebut ke Manajer Konstruksi.
Nilai Kontrak yang telah disetujui oleh kedua belah pihak, sudah termasuk, jika ada, bea masuk dan semua jenis
pajak seperti PPN impor, PPh impor, Pajak Penjualan Barang Mewah, PPh dan lainnya. Tidak ada perubahan atau
penyesuaian Nilai Kontrak nantinya karena adanya perubahan peraturan pajak-pajak dan bea masuk tersebut
diatas.
Pajak Penambahan Nilai (PPN) dinyatakan sebagai persentasi terhadap nilai pekerjaan di Ringkasani Akhir, dapat
disesuaikan jika ada perubahan besaran tarif (persentasi) resmi dari Pemerintah. Penyesuaian dimulai di hari saat
tarif baru tersebut diberlakukan .
Jika berdasarakan Peraturan Pemerintah Pemberi Tugas diharuskan memotong pajak atau pungutan sejenis
lainnya atas pembayaran kepada Pemborong, maka Pemberi Tugas berhak melakukan hal tersebut dan Pemberi
Tugas akan memberikan bukti pemotongan pajak tersebut kepada Pemborong.
3.6 Perbedaan
Semua jenis pekerjaan / bagian pekerjaan yang tercantum dalam Gambar-Gambar Rancangan dan Spesifikasi
Teknis, kecuali secara jelas dituliskan tidak termasuk dalam lingkup kerja, harus dianggap ada di keduanya.
Semua ketinggian lantai atau ukuran bangunan yang ada yang terlihat di gambar rancangan, dianggap sudah
benar, namun Pemborong harus tetap melakukan pemeriksaan ulang di Lapangan.
Jika ada perbedaan di Gambar-Gambar Rancangan dan Spesifikasi atau antara keduanya, perbedaan ini harus
segera diberitahukan kepada Manajer Konstruksi agar dapat diputuskan mana yang diambil sebagai pedoman,
dengan mengacu kepada Syarat-Syarat Kontrak, pasal 8.
Tidak akan ada penyesuaian atas Nilai Kontrak "Lumpsum Fixed Price" yang telah disepakati, baik karena adanya
perubahan harga bahan bangunan, peralatan, alat bantu, bahan bakar, tarif listrik, tarif air, tarif telepon, tarif
angkutan ataupun premi asuransi, pajak dan bea masuk (selain PPN), tunjangan dan upah tenaga kerja maupun
yang berhubungan dengan naik turunnya nilai tukar mata uang asing.
3.8 Lembur
Pemborong dianggap sudah memasukkan ke dalam Nilai Kontrak, semua biaya lembur yang dibutuhkan untuk
dapat menyelesaikan pekerjaan sesuai dengan jangka waktu yang disepakati.
Jika Pemborong memutuskan bahwa dibutuhkan kerja lembur, maka Pemborong TIDAK bertanggung jawab atas
tagihan biaya lembur dari Manajer Konstruksi yang pegawai/stafnya harus juga bekerja untuk mengawasi
pekerjaan selama jam lembur tersebut.
Lembur didefinisikan untuk pekerjaan yang dilakukan diluar jam 8:00 pagi sampai 16:00 sore di hari Senin sampai
Jumát dan jam 08:00 pagi sampai jam 13:00 siang di hari Sabtu (atau di luar jam kerja normal, 40 jam kerja per
minggu).
Pemborong bertanggung jawab untuk mempersiapkan dan mendapatkan perizinan, persetujuan dan lisensi resmi -
yang diperlukan untuk menyelesaikan pekerjaan dengan semestinya, dan membayar semua biaya terkait.
Pemborong harus memenuhi semua persyaratan yang diminta secara resmi oleh pihak Pemerintah atau dari kantor
pemerintahan setempat dan membayar semua biaya dan beban yang terkait.
6-Bab.1-Persiapanzz 6/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pekerjaan yang diberi tanda "PROVISIONAL" mengindikasikan bahwa kuantitas atau item pekerjaan tersebut belum
dapat dihitung secara tepat di saat proses lelang dan akan dihitung ulang di saat perhitungan akhir, sesuai dengan
kuantiatas pekerjaan sebenarnya yang dilaksanakan di Lapangan.
4.0 ASURANSI
4.1 Asuransi Pekerjaan dan Asuransi Pihak Ketiga (Third Party Insurance)
Pemborong akan menutup polis asuransi pekerjaan atas semua resiko Pemborong (Contractor's All Risk Insurance 5,000,000
Policy) seperti yang tertulis di syarat-syarat Kontrak.
(b). Masa berlaku dari asuransi adalah dari tanggal mulai Pekerjaan sampai tanggal diterbitkannya Berita Acara
Serah Terima Pertama Pekerjaan (Taking Over Certificate) ditambah jumlah hari yang diperlukan untuk
masa pemeliharaan (Defect Liability Period).
(c). Besarnya nilai yang diasuransikan adalah nilai seluruh pekerjaan ditambah 10% jasa profesional.
(d). Nilai asuransi sudah termasuk biaya pembongkaran dan pembuangan puing untuk mengerjakan perbaikan
pada setiap kerugian atau kerusakan, dan termasuk biaya dan pengeluaran tak terduga yang diperlukan
dan layak ada dalam melakukan pembongkaran dan pembuangan puing bongkaran tersebut.
(e). Polis asuransi menanggung juga kerusakan yang ditimbulkan akibat adanya getaran atau vibrasi.
(f). Polis asuransi pihak ketiga (TPL) mempunyai nilai maksimum sebesar ...................... rupiah
(Rp. ..........................) untuk tiap kecelakaan dengan jumlah kecelakaan tidak terbatas selama masa
asuransi. Bila Pemborong merasa jumlah ini tidak cukup untuk menutupi tanggung jawab dalam kontraknya
maka dibebaskan untuk menambah batas asuransi dengan semua penambahan atau selisih biaya premi
ditanggung sendiri oleh Pemborong.
(g). Polis asuransi pihak ketiga berisi pasal-pasal yang menjelaskan tentang kewajiban antara Pemborong dan
Pemberi Tugas.
Premi atas polis asuransi tersebut ditanggung oleh Pemberi Tugas, tapi biaya resiko sendiri (deductibles)
sepenuhnya akan menjadi tanggung jawab Pemborong. Jika hal ini tidak dibayarkan oleh Pemborong, maka uang
pembayaran pekerjaan yang akan dibayarkan oleh Pemberi Tugas kepada Pemborong, akan dikurangi oleh
Pemberi Tugas, sebesar nilai biaya resiko sendiri (deductibles) yang tertunggak, yang harus ditanggung oleh
Pemborong.
Pemberi Tugas tidak bertanggung jawab atas kerugian/kompensasi/ganti rugi, sesuai dengan Peraturan
Pemerintah, akibat adanya kecelakaan kerja dari pekerja atau siapapun yang dipekerjakan oleh Pemborong, atau
sub-Pemborongnya atau pemasoknya.
Pemborong akan membebaskan Pemberi Tugas dan Pemborong harus memberitahukan kepada para sub-
Pemborongnya agar membebaskan Pemberi Tugas dari semua tanggung jawab yang timbul akibat adanya tuntutan
dari pekerja atau seseorang yang dipekerjakan untuk Pekerjaan, untuk pembayaran kompensasi dari semua biaya
dan pengeluaran yang berkaitan dengan hal ini.
Pemborong harus mengasuransikan pekerjanya, termasuk pekerja dari sub-Pemborongnya dalam program asuransi 10,000,000
Badan Penyelenggara Jaminan Sosial (BPJS) Ketenagakerjaan.
6-Bab.1-Persiapanzz 6/5
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Jika terjadi kecelakaan kerja terhadap pekerja atau seseorang yang dipekerjakan untuk Pekerjaan, yang
dipekerjakan oleh Pemborong atau subPemborong, dan apakah akan ada tuntutan atau tidak, Pemborong harus
tanpa menunda-nunda memberitahu secara tertulis kepada Manajer Konstruksi, kepada pihak asuransi dan pihak
lain yang terkait yang disyaratkan oleh peraturan BPJS Ketenaga kerjaan atau oleh Hukum di Indonesia.
Pemborong harus sudah memperhitungkan biaya manajemen dan persiapan lapangan. 10,000,000
Pemborong harus menyerahkan struktur organisasi lapangan secara detail yang menunjukkan daftar semua staf
pengawas lapangan untuk disetujui oleh Manajer Konstruksi. Daftar tersebut harus termasuk semua detail yang
berkaitan dengan masing-masing personil termasuk tugas, posisi, kewajiban, kualifikasi, pengalaman, umur dan
lamanya bekerja di perusahaan Pemborong tersebut. Diagram struktur organisasi juga harus menunjukkan bahwa
ada staf pengawas yang bertanggung jawab di lapangan selama Masa Pemeliharaan. Penetapan struktur organisasi
dan adanya persetujuan Manajer Konstruksi tidak membatasi tanggung jawab dan kewajiban Pemborong untuk
mencukupi jumlah staf yang terlibat di lapangan, bila dipandang perlu ada penambahan tanpa ada tambahan
biaya dari Pemberi Tugas.
Semua instruksi yang diberikan kepada Wakil dari Pemborong (Manajer Proyek Pemborong) dianggap sebagai
instruksi yang diberikan kepada Pemborong.
Semua staf pengawas lapangan senior harus disetujui oleh Manajer Konstruksi yang tetap memiliki hak dan
kewenangan mutlak untuk membatalkan persetujuannya bila dianggap perlu tanpa memberikan alasan apapun.
Staf pengawas lapangan senior tidak boleh diganti tanpa ada persetujuan terlebih dahulu dari Manajer Konstruksi.
Pemborong harus menyediakan semua peralatan yang dibutuhkan untuk melaksanakan dan menyelesaikan 4,000,000
Pekerjaan.
Pemborong harus menyediakan semua pekerja yang diperlukan untuk melaksanakan dan menyelesaikan pekerjaan.
Pemborong harus bertanggung jawab penuh terhadap semua pekerja yang dipekerjakan.
Pemborong harus mematuhi semua peraturan pemerintah mengenai ketenagakerjaan dan menanggung semua
resiko ada perubahan terhadap peraturan yang sudah ada.
Pemborong harus menyediakan semua biaya-biaya untuk memenuhi kebutuhan pekerja, dan tidak terbatas untuk :
(c). Waktu yang tidak produktif dan biaya lain berkaitan dengan lembur
6-Bab.1-Persiapanzz 6/6
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pemborong harus mempekerjakan staf yang handal dan trampil berkaitan dengan pelaksanaan dan penyelesaian
pekerjaan :
(a). Staf teknis yang handal dan berpengalaman di bidangnya, mandor dan kepala tukang yang kompeten dan 20,000,000
dapat memberikan pengawasan yang sesuai dengan pekerjaan yang harus diawasi.
(b). Buruh yang trampil dan semi trampil yang diperlukan untuk pelaksanaan pekerjaan yang tepat dan
berkesinambungan.
Pemborong harus, bila diminta oleh Manajer Konstruksi, menyerahkan laporan harian kepada Manajer Konstruksi
dengan format yang ditentukan oleh Manajer Konstruksi.
5.5 Bekerja di hari Minggu, hari libur resmi dan malam hari
Pemborong harus memberitahukan Manajer Konstruksi setidaknya 48 jam sebelumnya jika bermaksud akan 5,000,000
bekerja di hari Minggu atau hari libur resmi atau di malam hari.
Untuk bekerja di malam hari, Pemborong harus mendapatkan persetujuan dari Manajer Konstruksi sebelum mulai
bekerja.
Pemborong harus menyediakan biaya berkaitan dengan pemenuhan semua peraturan mengenai keselamatan 5,000,000
kerja, kesehatan dan kesejahteraan pekerja dan orang orang yang dipekerjakan di lapangan.
(a). Helm dan sepatu kerja atau boots harus dipakai selama berada di Lapangan 2,000,000
(b). Keharusan menggunakan alat pelindung, seperti kacamata pelindung, pelindung muka, respirators, sarung 5,000,000
tangan, sabuk pengaman, pelindung pendengaran, masker debu dan asap dan sebagainya.
(c). Melarang meminum minumam beralkohol dan menggunakan Narkotika atau obat terlarang sebelum atau
selama jam kerja baik di dalam ataupun di luar lingkungan proyek.
(d). Lokasi kerja harus dijaga tetap bersih. Semua sampah harus dikumpulkan di satu tempat yang ditentukan 5,000,000
dan dibuang keluar lokasi setiap harinya.
Sebelum memesan material / bahan baku atau barang untuk kebutuhan pekerjaan, Pemborong, atau sub-
Pemborongnya dan pemasoknya, harus meminta persetujuan Manajer Konstruksi terlebih dahulu tentang nama
atau tempat pemesanan, pembuat atau pemasok material / bahan baku atau barang tersebut dan selanjutnya
menyerahkan salinan bukti pemesanannya kepada Manajer Konstruksi.
Contoh material / bahan baku atau barang yang akan digunakan dalam pekerjaan harus diserahkan kepada
Manajer Konstruksi untuk disetujui sebelum material / bahan baku atau barang tersebut dipesan dalam jumlah
besar.
Pencantuman nama pembuat atau jenis material di Gambar Rancangan atau Spesifikasi Teknis harus diartikan
sebagai indikasi kelas atau kualitas dari material / bahan baku atau barang yang disyaratkan; material / bahan
atau barang yang sama kualitasnya bisa diperoleh dari tempat lain dengan tetap mengacu kepada persetujuan
Manajer Konstruksi.
6-Bab.1-Persiapanzz 6/7
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Contoh harus diajukan minimum 30 hari sebelum tanggal yang ditetapkan untuk persetujuan. Dan harus diberikan
kepada Pemberi Tugas dengan tanpa biaya.
Contoh material / bahan baku atau barang yang sudah disetujui harus diberi tanda dan disimpan di lokasi kerja
agar dapat dijadikan rujukan perbandingan dengan pekerjaan yang sedang dikerjakan. Contoh yang sudah
disetujui akan menjadi milik Pemberi Tugas.
Bila ada contoh material / bahan baku atau barang yang ditolak, maka material / bahan baku atau barang yang
ditolak itu harus segera dikeluarkan dari lokasi kerja.
Persetujuan Manajer Konstruksi terhadap contoh material / bahan baku atau barang, tidak membebaskan
Pemborong dari segala kewajiban dan tanggung jawabnya sesuai Kontrak
Pemborong atas biaya sendiri harus melakukan pengujian / testing terhadap semua material / bahan baku atau 2,000,000
barang yang ditentukan oleh Manajer Konstruksi dan harus membayar biaya pengujian / testing yang
diperintahkan oleh Manajer Konstruksi, yang dilaksanakan oleh pihak lain yang independen.
Pemborong bertanggung jawab terhadap keakuratan pekerjaan termasuk penentuan level / ketinggian. Kesalahan
pengukuran letak (setting out) atau penentuan level harus diperbaiki atas biaya Pemborong dan harus sampai bisa
diterima oleh Manajer Konstruksi. Semua konsekuensi kerugian akibat kesalahan pengukuran letak (setting out)
dan penentuan level menjadi tanggung jawab Pemborong.
Perbedaan yang terjadi antara pengukuran di Lapangan dan ukuran rencana yang tertulis di gambar harus
secepatnya diberitahukan kepada Manajer Konstruksi.
Pemborong harus menyediakan semua alat-alat survey dan tim surveyor yang dibutuhkan Manajer Konstruksi
untuk keperluan pemeriksaan ukuran dan level / ketinggian.
5.12 Ukuran
Ukuran yang tercantum harus selalu lebih diutamakan untuk diambil sebagai acuan dibandingkan pengukuran
berdasarkan skala di gambar. Sebelum memulai pekerjaan atau memesan material / bahan baku atau barang
untuk kebutuhan pekerjaan Pemborong harus memastikan semua ukuran yang dibutuhkan. Bila ada perbedaan
harus segera memberitahu Manajer Konstruksi. Tidak ada tuntutan terhadap kerugian akan diijinkan bila menurut
Manajer Konstruksi hal tersebut seharusnya sudah lebih dulu diketahui oleh Pemborong.
Pemborong tidak boleh menggunakan kuantitas yang ada di dokumen ini untuk memesan material / bahan baku
atau barang untuk kebutuhan pekerjaan, sebelum memeriksa ulang dengan cermat dan disesuaikan dengan
kebutuhan yang sebenarnya di Lapangan.
Pemborong harus selalu menyediakan perlindungan untuk pekerjaan, material / bahan baku atau barang terhadap 5,000,000
kemungkinan kerusakan dan kehilangan. Pemborong juga harus menyediakan lampu penerangan yang diperlukan,
pengawas, pagar pengaman dan semua pencegahan terhadap kecelakaan.
Pemborong adalah penanggung jawab tunggal pengamanan terhadap kerusakan atau kehilangan material / bahan
baku atau barang, peralatan termasuk material / bahan baku atau barang yang dibeli langsung oleh Pemberi
Tugas baik yang sudah dipasang ataupun belum.
Pemborong bertanggung jawab memperbaiki kerusakan jalan masuk tersebut bila ada kerusakan yang diakibatkan
oleh Pemborong.
6-Bab.1-Persiapanzz 6/8
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
5.15 Iklan
Pemborong atau sub-Pemborongnya tidak dibolehkan, tanpa seijin Manajer Konstruksi, menambah atau memasang
di semua tempat di lapangan, papan pengumuman, plakat, poster, spanduk atau bahan iklan lainnya selain papan
nama proyek standar yang diharuskan oleh peraturan pemerintah.
Rencana publisitas yang akan dikeluarkan berkaitan dengan proyek, harus diserahkan lebih dulu kepada Manajer
Konstruksi dan Pemberi Tugas untuk dimintakan persetujuan.
Selama masa pemeliharaan, Pemborong atas biaya sendiri harus memperbaiki sesegera mungkin kesalahan atau
kerusakan / cacat Pekerjaan, sesuai pendapat Manajer Konstruksi, yang diakibatkan karena kekeliruan pemilihan
material atau teknik pengerjaan dan harus membebaskan Pemberi Tugas atas biaya perbaikan kerusakan atau
perbaikan cacat pekerjaan yang timbul akibat kekeliruan tersebut.
Pemborong mempunyai hak akses setiap waktu, dengan resiko dan tanggung jawabnya sendiri, untuk memeriksa
pekerjaan yang perlu diperbaiki dan membuat catatan.
Bila Pemborong tidak memperbaiki kesalahan atau kerusakan / cacat pekerjaan dalam jangka waktu tertentu,
Pemberi Tugas dapat memperbaiki atas biaya Pemborong dan tanpa mempengaruhi hak-hak lain yang dimiliki
dalam kontrak.
5.17 Pengiriman Material / Barang ke dan Pengeluaran Material / Barang dari Lapangan
Pemborong harus patuh terhadap peraturan dari pengelola atau polisi setempat dalam hal penggunaan kendaraan 5,000,000
untuk mengantar material/ barang ke atau memindahkan material sisa dan barang berlebih dari lapangan dan
harus sudah menyediakan biaya untuk keperluan tersebut.
Semua material/ barang yang digunakan dalam Pekerjaan harus material/ barang yang baru. Material/ barang
untuk pekerjaan sementara tidak dapat digunakan untuk pekerjaan permanen.
Pemborong harus menyerahkan foto-foto berwarna menunjukkan kemajuan pekerjaan. Foto-foto harus diambil 500,000
setiap bulan sepanjang masa konstruksi untuk menjadi bagian laporan kemajuan pekerjaan bulanan . Setiap
rangkaian foto dalam setiap laporan harus cukup banyak memperlihatkan kemajuan Pekerjaan termasuk
pekerjaan tambah (jika ada) dan masing-masing dicetak dua kali dalam ukuran kartu pos (untuk dua set Laporan)
dan diserahkan kepada Manajer Konstruksi. Masing-masing foto harus diberi nomor, tanggal dan keterangan untuk
menunjukkan informasi secara umum dan posisi dimana foto diambil.
Foto-foto tidak diberikan kepada pihak lain tanpa ijin dari Manajer Konstruksi.
Pemborong diharuskan, atas biaya sendiri, mempersiapkan 2 (dua) set detail gambar kerja dari masing-masing 1,000,000
bagian pekerjaan jika diperlukan untuk acuan perakitan atau pelaksanaan, agar sebelumn dilaksanakan dapat
disetujui lebih dulu oleh Manajer Konstruksi. Gambar-gambar harus diserahkan paling lambat 7 hari sebelum
waktu yang diperlukan untuk persetujuan.
Gambar kerja tersebut harus memperlihatkan posisi seluruh pekerjaan instalasi mekanikal, elektrikal dan
plumbing, termasuk pekerjaan sipil yang diperlukan dalam pekerjaan instalasi tersebut.
Jika Pemborong membuat perubahan-perubahan yang diperlukan, Manajer Konstruksi akan mencatat perubahan-
perubahan tersebut, memberikan persetujuannya, dan akan mengembalikan satu salinan gambar kerja kepada
Pemborong yang akan melaksanakan pekerjaan tersebut. Pemborong harus menyerahkan dua tambahan salinan
gambar-gambar yang telah disetujui kepada Manajer Konstruksi.
6-Bab.1-Persiapanzz 6/9
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Jika Pemborong berkeinginan untuk memodifikasi atau mengubah detail pekerjaan yang desain dan spesifikasinya
di luar tanggung jawab Pemborong, maka Pemborong harus membuat atas biaya sendiri gambar detail akibat
modifikasi atau perubahan tersebut serta harus menyerahkan gambar-gambar yang sudah diubah tersebut kepada
Manajer Konstruksi untuk diperiksa dan disetujui (bila memenuhi ketentuan teknis) sesuai dengan prosedur yang
disepakati.
Persetujuan gambar kerja oleh Manajer Konstruksi tidak membebaskan Pemborong dari tugas, tanggung jawab
dan kewajiban Pemborong, sesuai dengan Kontrak.
Sepanjang masa konstruksi, Pemborong harus menyediakan satu set gambar terlaksana terbaru dari berbagai 1,000,000
bagian pekerjaan yang sudah selesai sesuai Kontrak. Pemborong harus menyerahkan satu set salinan gambar
terlaksana dalam bentuk berkas digital (dalam media disket atau "compact disc"), dua set salinan tercetak dalam
media kertas dan satu set dalam media kalkir sebagai syarat awal diterbitkannya Berita Acara Serah Terima
Pertama Pekerjaan oleh Manajer Konstruksi.
Pemborong harus memberikan perhatian atas semua pertimbangan dalam upaya menghindari timbulnya gangguan 2,000,000
terhadap masyarakat di sekitar lokasi Pekerjaan.
Semua peralatan milik Pemborong seharusnya tidak mengganggu saluran radio dan televisi masyarakat di sekitar
lokasi Pekerjaan.
Pemborong harus selalu berusaha meminimalkan adanya kebisingan dan polusi debu yang timbul akibat
pelaksanaan Pekerjaan. Pemborong harus secara teratur menyiram lokasi yang sangat menimbulkan debu untuk
mengurangi gangguan tersebut.
Semua tuntutan akibat kerusakan atau adanya kompensasi yang timbul dari kegagalan Pemborong mengambil atau
mengantisipasi atau memperhitungkan timbulnya ganguan tersebut, sepenuhnya menjadi tanggung jawab
Pemborong.
Pemborong harus menjamin di lokasi Pekerjaan bebas dari hama tikus, nyamuk dan sejenisnya dan jika diperlukan
harus menyediakan petugas pengendali hama.
Semua peralatan Pemborong termasuk peralatan elektronik jika diperlukan harus diredam dengan alat peredam
suara, saringan, pembatas akustik atau layar sehingga bunyi yang diukur pada jarak 30 m harus kurang dari 75
desibel.
Bila suara yang dihasilkan dari peralatan Pemborong diukur pada jarak 30m melebihi 75 desibel (dBA), maka
penggunaan peralatan tersebut harus dihentikan. Peralatan tidak boleh dipakai sampai digunakan metode khusus
peredaman bunyi atau mesin diganti dengan model lain dimana akan mengurangi bunyi pada level yang tidak
melebihi 75 desibel (dBA) pada jarak 30m.
Penghentian pekerjaan yang diminta oleh Manajer Konstruksi dalam ketentuan ini tidak memberi hak kepada
Pemborong untuk menambah waktu penyelesaian proyek atau bentuk kompensasi apapun.
Ketentuan ini tidak boleh dipakai pada pekerjaan emergency yang diperlukan untuk keselamatan nyawa, atau
untuk keselamatan kerja.
Semua pekerja Pemborong dan sub-Pemborongnya, harus menggunakan tanda pengenal yang sudah disetujui
termasuk foto, dimana harus selalu dipakai selama berada di lapangan, agar dapat dikenali oleh Pemborong dan
Pemberi Tugas.
Pekerja yang tidak memakai tanda pengenal dilarang memasuki area proyek.
6-Bab.1-Persiapanzz 6/10
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pemborong harus menyediakan dan memelihara jalan akses, platform, jembatan dan sebagainya yang bersifat
sementara dan diperlukan untuk pelaksanaan pekerjaan dan harus dibongkar dan dibersihkan di akhir
penyelesaian pekerjaan dan termasuk memperbaiki semua kerusakan.
Batasan untuk jalan sementara, bangunan, jembatan, persimpangan dan sebagainya harus diputuskan sesuai
kesepakatan dengan Manajer Konstruksi dimana diharuskan mengikuti garis jalan permanen dan jalan setapak
yang memungkinkan.
Semua bangunan sementara dibangun harus dengan persetujuan Manajer Konstruksi dan sesuai dengan
persyaratan Pemberi Tugas.
Lokasi bangunan sementara yang diusulkan di lapangan harus tertera pada gambar denah yang disiapkan oleh
Pemborong dan diserahkan kepada Manajer Konstruksi agar disetujui sebelum struktur sementara tersebut
dipindahkan atau dibangun.
Pemborong harus menyediakan, membuat, memelihara dan membersihkan di akhir penyelesaian pekerjaan semua 10,000,000
tempat gudang sementara yang diperlukan untuk menyimpan bahan bangunan dan peralatan.
Pemborong harus menyediakan, membuat, memelihara, membongkar dan membersihkan di akhir penyelesaian 10,000,000
pekerjaan kantor sementara dan akomodasi yang lain termasuk fasilitas kamar mandi yang memadai untuk
digunakan staf lapangan Pemborong dan sub-Pemborongnya.
Pemborong harus menyediakan, menjaga tetap bersih dan memelihara sepanjang masa konstruksi toilet yang
sesuai dan memadai untuk dipakai pekerjanya. Pemborong harus dapat memastikan pekerjanya tidak mengotori
proyek.
Kantor lapangan sementara untuk Pemberi Tugas dan Manajer Konstruksi disiapkan Pemberi Tugas (bukan
tanggung jawab Pemborong).
Pemborong harus memelihara pagar dan gerbang sementara yang ada (existing) untuk mengamankan proyek serta
menambah pagar pada bagian yang belum dipagar. Tetap memperhatikan kekuatan kelayakan pagar sementara
selama proyek berjalan.
7.8 Telepon
Pemborong harus menyediakan saluran telepon untuk digunakan oleh dirinya sendiri. 2,000,000
Pemborong harus membayar semua tagihan telepon yang dipergunakan oleh dirinya sendiri.
Pemborong diminta untuk menyiapkan Handy Talkie (HT) yang akan dipakai selama pelaksanaan pekerjaan.
Pemborong harus menyediakan air bersih yang diperlukan dalam pekerjaan, termasuk yang diperlukan untuk sub- 10,000,000
Pemborongnya.
Pemborong harus menyediakan pompa air, peralatan pendukung, tangki penyimpan dan pipa distribusi yang
diperlukan untuk mendapatkan air yang dibutuhkan.
Pemborong harus menjaga dan mengadaptasi kapanpun dan dimanapun diperlukan sepanjang periode proyek,
membayar semua biaya-biayanya dan membersihkan di akhir penyelesaian proyek.
6-Bab.1-Persiapanzz 6/11
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pemborong harus menyediakan penerangan dan daya listrik sementara yang diperlukan untuk pelaksanaan 10,000,000
pekerjaannya maupun pekerjaan sub-Pemborongnya. Sumber listrik dapat diperoleh dengan melakukan
penyambungan secara sementara ke PLN atau alternatif lain dengan menggunakan peralatan generator listrik di
lokasi proyek.
Pemborong harus menyediakan semua jaringan kabel yang diperlukan untuk memakai lampu dan listrik kerja.
Pemborong harus menjaga dan mengadaptasi kapanpun dan dimanapun jika diperlukan sepanjang masa
konstruksi, membayar semua biaya bulannya dan membersihkan di akhir penyelesaian proyek.
Pemasangan sementara harus sesuai dengan peraturan Perusahaan Listrik Negara (PLN) dan secara internasional
diterima sebagai syarat keamanan yang umum.
Pemborong harus menyediakan perancah dan pijakan kerja (scaffolding, staging), plat, tangga, catwalk dan
sebagainya sesuai dengan yang diperlukan, agar pelaksanaan pekerjaan pada ketinggian berapapun dapat
dikerjakan dengan baik dan harus disesuaikan, diganti dan diadaptasi setiap diperlukan termasuk harus
dikeluarkan dari lokasi pekerjaan di akhir penyelesaian proyek.
Desain dan konstruksi perancah dan pijakan kerja, plat, tangga, catwalk dan sebagainya tersebut harus sesuai
dengan persyaratan peraturan terkait.
Penggunaan karet atau bambu dalam konstruksi perancah dan pijakan kerja, plat, catwalk, tangga dan sebagainya
tidak dibolehkan.
Pemborong harus menyediakan penyangga dan strut dan semacamnya untuk menyangga pekerjaan baru yang
sedang dikerjakan atau bangunan dengan kemiringan yang ada di lapangan.
Pemborong harus menyediakan pompa yang mungkin dibutuhkan untuk menjaga area kerja tetap kering sampai ke
level di bawah penggalian baik akibat adanya hujan, cuaca buruk lainnya, atau sumber lain. Tidak boleh ada air
menggenang sepanjang pelaksanaan pekerjaan.
Pembuangan air harus sesuai dengan peraturan dan persyaratan yang berlaku.
Pemborong harus membuat saluran atau drainase sementara yang diperlukan untuk menyalurkan air dari lokasi
proyek dan menghindari agar air tidak mengalir ke tanah yang berdekatan.
Pemborong harus menjaga keamanan proyek dari resiko kebakaran. Pemborong harus mengambil semua langkah 2,000,000
pengamanan termasuk seperti disyaratkan oleh penjamin pekerjaan dan harus menyediakan peralatan pemadam
kebakaran yang diperlukan seperti ditetapkan Manajer Konstruksi.
Tak berlaku
6-Bab.1-Persiapanzz 6/12
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Pemborong harus menyediakan penutup untuk melindungi pekerjaan dari cuaca buruk.
Pemborong harus menyediakan perlindungan yang memadai untuk semua bagian pekerjaan yang telah selesai 2,000,000
dikerjakan dan semua material yang mungkin bisa rusak dan harus bertanggung jawab memperbaiki kerusakan
yang timbul pada bidang yang telah selesai dikerjakan, bahan bangunan dan material lain milik Pemberi Tugas
sampai sebelum tanggal dikeluarkannya Berita Acara Serah Terima Pertama.
Perlindungan harus diberikan segera setelah pekerjaan selesai dan/atau untuk bahan bangunan dan peralatan
setelah tiba di lapangan dengan jenis perlindungan yang sesuai dengan yang dibutuhkan dan perlindungan ini
harus secara efektif dilaksanakan sepanjang masa konstruksi.
Bila bahan bangunan atau peralatan yang dibawa/dipasang menggunakan penutup atau lapisan pengaman
Pemborong harus memperbaiki, mengganti atau paling tidak menjaga penutup dan lapisan tersebut secara
efektif.
Semua sampah proyek, kemasan bahan/ barang, sisa bahan berlebih dan sebagainya, harus dikeluarkan dari 4,000,000
proyek atau daerah sekitar proyek secepat mungkin setidaknya sekali sehari selama masa konstruksi agar jalan
akses tidak terhambat dan memudahkan pengawasan lapangan.
Pemborong dan Pemborong Khusus/ Spesialis bertanggung jawab membersihkan area kerja masing-masing dan
mengumpulkan sampah/ puing/ sisa-sisa bahan terbuang ketempat pengumpulan khusus. Pemborong
berkewajiban membuang sampah/ puing/ sisa-sisa bahan terbuang dari tempat penampungan ke luar lahan
7.19 Pembersihan
Pemborong, setelah menyelesaikan seluruh pekerjaan harus meninggalkan proyek dan area sekitarnya dalam 4,000,000
kondisi bersih dan rapi, seperti ditetapkan oleh Manajer Konstruksi.
6-Bab.1-Persiapanzz 6/13
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Penjumlahan
6.00 : BAB No. 01 - PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG Dialihkan ke Ringkasan Akhir - Rp. 150,000,000
6-Bab.1-Persiapanzz 6/14
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang
PT. Danata Estima Sarana
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Penjumlahan
### 2.1 - PEKERJAAN TATA UDARA & VENTILASI 5.966% 1.196% 20.043% 0.000% 0.000% 1.196% 20.043% 0.485% 0.097% 20.043% 0.000% 0.000% 0.097% 20.043%
2.2###
- PEKERJAAN PEMADAM KEBAKARAN 20.416% 16.824% 82.405% 0.000% 0.000% 16.824% 82.405% 1.661% 1.369% 82.405% 0.000% 0.000% 1.369% 82.405%
### 2.3 - PEKERJAAN PLUMBING 10.833% 7.684% 70.934% 0.000% 0.000% 7.684% 70.934% 0.882% 0.625% 70.934% 0.000% 0.000% 0.625% 70.934%
### 2.4 - PEKERJAAN ELEKTRIKAL 41.013% 27.086% 66.042% 0.000% 0.000% 27.086% 66.042% 3.337% 2.204% 66.042% 0.000% 0.000% 2.204% 66.042%
### 2.5 - PEKERJAAN ELEKTRONIK 4.621% 0.0262 56.655% 0.000% 0.000% 2.618% 56.655% 0.376% 0.213% 56.655% 0.000% 0.000% 0.213% 56.655%
Summary-Bab.2_Bsmt 7/1
10.00 : BAB No. 05 - PEKERJAAN LUAR
Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
0 Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Penjumlahan
5.1###
- PEKERJAAN PEMADAM KEBAKARAN 0.885% 0.687% 77.626% 0.005% 0.594% 0.692% 78.219% 0.072% 0.056% 77.626% 0.000% 0.594% 0.056% 78.219%
### 5.2 - PEKERJAAN ELEKTRIKAL 14.464% 8.867% 61.301% 0.483% 3.342% 9.350% 64.643% 1.177% 0.722% 61.301% 0.039% 3.342% 0.761% 64.643%
10.00 : BAB No. 05 - PEKERJAAN LUAR 15.349% 9.554% 62.242% 0.489% 3.184% 10.042% 65.426% 1.249% 0.777% 62.242% 0.040% 3.184% 0.817% 65.426%
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Peserta Lelang dianjurkan untuk meninjau ke Lokasi Proyek agar dapat mengenal dan mempelajari
secara langsung keadaaan dan karakteristik Pekerjaan. Peserta tender harus sudah memperkirakan
dalam penawaran, biaya-biaya yang mungkin timbul berkaitan dengan pembuatan jalan masuk
sementara, keterbatasan tempat penyimpanan material dan area kerja, kondisi alam di lokasi kerja,
jarak terdekat antara struktur bangunan dengan jalan akses yang ada, ketebatasan lahan untuk
penggalian sistem terbuka, peraturan lingkungan setempat berkaitan dengan proyek dan segala
pembatasan yang mungkin timbul di lokasi dan sekitarnya. Tidak ada klaim yang akan diterima di
kemudian hari karena kelalaian memperhitungkan hal-hal tersebut diatas.
Pemborong akan menerima Lokasi Proyek dengan segala kondisinya, terhitung sejak tanggal
dimulainya pekerjaan dan dengan biayanya sendiri harus membersihkan lokasi proyek tersebut dari
semua sampah atau puing yang bisa menghalangi pelaksanaan pekerjaan.
Peserta Lelang tidak boleh melakukan perubahan tulisan/teks apapun terhadap Daftar Uraian
Pekerjaan/Rincian Anggaran Biaya Pekerjaan (Bills of Quantities), kecuali dengan instruksi tertulis
Manajer Konstruksi. Perubahan-perubahan yang yang dibuat oleh peserta tender dianggap tidak
sah dan akan diabaikan. Peserta tender yang melakukannya dapat didiskualifikasi.
Peserta Lelang disarankan untuk mencantumkan harga di setiap jenis pekerjaan seperti tercantum
di Daftar Uraian Pekerjaan / Rincian Anggaran Biaya Pekerjaan (Bills of Quantities), untuk keperluan
kelak memperhitungkan pembayaran kemajuan pekerjaan. Jenis pekerjaan yang tidak mempunyai
harga akan dianggap telah diperhitungkan dan termasuk di bagian lain dalam dokumen tender.
Tidak ada tuntutan / klaim di kemudian hari untuk item pekerjaan yang tidak diberi harga.
Bila peserta Lelang tidak setuju atas kuantitas pekerjaan yang tercantum di Daftar Uraian Pekerjaan
atau kuantitas pekerjaan yang tercantum itu dianggap perlu untuk diubah/dihapuskan/ditambahkan,
peserta tender diijinkan membuat perubahan khusus terhadap Daftar Uraian Pekerjaan, sejauh
perubahan DIBUAT DI LEMBAR TERPISAH, sehingga perubahan tersebut dapat dengan mudah
diidentifikasi.
1.3 Harga Lelang
Harga satuan yang dicantumkan di Rincian Anggaran Biaya Pekerjaan, kecuali disebutkan lain,
harus sudah termasuk penyediaan material, alat bantu, upah pekerja, peralatan kerja, pengawasan,
biaya umum (overhead), keuntungan, dan biaya-biaya lain untuk menyelesaikan Pekerjaan
berdasarkan persyaratan Lelang.
Jika Peserta Lelang membuat kesalahan penjumlahan atau perkalian atau pengalihan angka, maka
sebelum penandatanganan Kontrak, kekeliruan tersebut harus diperbaiki dan disesuaikan
sedemikian rupa sehingga bila dihitung dengan benar jumlah di Ringkasan Akhir harus sama seperti
yang tercantum dalam Surat Tawaran Harga.
Peserta Lelang harus menyerahkan Tawaran Harga yang bersifat harga lumpsum fixed price (harga
tetap dan terpadu).
Nilai harga lelang / kontrak dianggap berdasarkan Gambar-Gambar Rancangan dan Spesifikasi,
risalah-risalah perubahan yang disepakati dan dokumen-dokumen pendukung terkait yang
merupakan bagian dari Kontrak. Kuantitas yang tercantum di Rincian Anggaran Biaya Pekerjaan
hanya digunakan untuk acuan umum dan sepenuhnya menjadi resiko dan tanggung jawab Peserta
Tender. Kuantitas tersebut kelak tidak menjadi bagian dari Kontrak dan tidak akan dihitung ulang,
kecuali terjadi perubahan lingkup kerja dari rancangan sebelumnya (saat Lelang / Kontrak) ke
rancangan baru, yang diputuskan oleh Manajer Konstruksi setelah Dokumen Kontrak ditanda
tangani kedua belah pihak.
Bila ada item pekerjaan yang dicantumkan di Rincian Anggaran Biaya Pekerjaan sebagai item
"Provisional", maka kuantitas item pekerjaan ini akan dihitung ulang berdasarkan gambar-gambar
rancangan terakhir yang disetujui, tapi harga satuannya adalah tetap, seperti tercantum di Rincian
Anggaran Biaya Pekerjaan.
Jika dalam proses Lelang, Peserta Lelang menemukan perbedaan kuantitas yang cukup besar atau
menimbang perlu untuk menyisipkan item pekerjaan baru di Rincian Anggaran Biaya Pekerjaan
untuk Tender, Peserta Lelang dapat menyertakan Rincian Anggaran Biaya Pekerjaan tambahan di
halaman terpisah, yang berisi kuantitas tambahan atau kurangan dan item pekerjaan baru yang
dipertimbangkan perlu ditambahkan.
Pemborong harus memahami secara menyeluruh karakteristik, kondisi dan situasi dari jenis
pekerjaan tersebut di atas.
2.5 Pekerjaan yang akan dilaksanakan oleh Pemborong lain yang dikontrak langsung oleh Pemberi Tugas.
Berikut ini adalah pekerjaan-pekerjaan yang akan dilaksanakan oleh Pemborong lain yang dikontrak
langsung oleh Pemberi tugas :
a. Pekerjaan Struktur dan Arsitektur
b. Pekerjaan STP
c. Pekerjaan Lift
d. Pekerjaan Genset
e. Pekerjaan - pekerjaan lain yang akan ditentukan kemudian
Pemborong (untuk pekerjaan tersebut di Item Sub 2.1) harus bekerja sama dengan Pemborong
pekerjaan tersebut di atas, di bawah koordinasi Pemberi Tugas, untuk menyelesaikan pekerjaan
masing-masing, terutama pekerjaan-pekerjaan yang saling berkaitan.
6-Bab.1-Persiapan 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Berita Acara Serah Terima Pertama Pekerjaan tidak akan diterbitkan sampai dengan ketentuan di
bawah ini terpenuhi :
(a). Pekerjaan sesuai dengan lingkup kontrak secara keseluruhan diselesaikan, sesuai dengan
pendapat Manajer Konstruksi dan ketentuan kontrak.
(b). Perbaikan bagian pekerjaan yang tercantum di daftar perbaikan cacat pekerjaan (punch
list) yang diterbitkan oleh Manajer Konstruksi, telah diselesaikan dengan baik oleh
Pemborong.
(c). Semua sertifikat dan surat ijin, sesuai ketentuan Pemerintah, sebagai syarat untuk
diterbitkanya Izin Penggunaan Bangunan (IPB), telah diberikan kepada Manajer Konstruksi
/ Pemberi Tugas.
3.2 Program Kerja
Pemborong, dalam 28 hari kalender setelah diterbitkannya Surat Penunjukan (persetujuan
penyerahan Kontrak kepada Pemborong yang ditunjuk oleh Pemberi Tugas), harus menyerahkan ke
Manajer Konstruksi 1 (satu) buah "Compact Disc" berisi berkas elektronik dan 2 (dua) salinan
(fotokopi) Program Kerja yang mencantumkan rencana Pemborong dalam mengatur dan
melaksanakan Pekerjaan sesuai dengan jangka waktu pelaksanaan yang disepakati dalam kontrak.
Program Kerja ini harus mencantumkan tanggal dimulainya pekerjaan persiapan, tanggal dan
jangka waktu penyerahan dan persetujuan gambar-gambar kerja (gambar kerja), penyerahan dan
persetujuan contoh bahan / material yang digunakan, pemesanan dan penerimaan bahan / material
dan peralatan yang dipesan, pengujian bahan dan pekerjaan dan tanggal serah terima pekerjaan
sesuai dengan yang telah ditentukan atau bisa juga lebih awal dari tanggal yang ditentukan tersebut.
Program Kerja harus dapat memperlihatkan kegiatan mingguan secara rinci agar kelak dapat
dievaluasi tiap minggu antara rencana kerja dan kemajuan kerja yang sebenarnya.
Manajer Konstruksi akan mempelajari dan memeriksa Program Kerja Pemborong, dan jika dianggap
perlu, dapat meminta perbaikan dari program kerja tersebut.
Setelah Program Kerja disetujui, selanjutnya tidak boleh ada perubahan terhadap program kerja
tersebut tanpa persetujuan Manajer Konstruksi.
Program Kerja juga harus menunjukkan hubungan antara Pekerjaan dengan pekerjaan lain terkait
yang dikerjakan oleh Pemborong lain yang ditunjuk langsung oleh Pemberi Tugas, atau hubungan
dengan pihak lain yang berkaitan dengan penyelesaian Pekerjaan.
Data mengenai kondisi kemajuan pekerjaan berikutnya (up dated progress) harus dibuat oleh
Pemborong dan diserahkan tiap minggu ke Manajer Konstruksi. Data ini harus dalam format yang
dapat memperlihatkan perbandingan antara kondisi kemajuan pekerjaan mingguan dengan rencana
Program Kerja yang disetujui.
Jika Manajer Konstruksi menilai kemajuan pekerjaan tidak sesuai lagi dengan Program Kerja yang
disetujui maka Manajer Konstruksi berhak meminta Pemborong agar memasukkan rencana
percepatan ("catch up" program) yang menunjukkan perubahan Program Kerja yang diperlukan agar
Pekerjaan dapat selesai tepat waktu.
Pajak Penambahan Nilai (PPN) dinyatakan sebagai persentasi terhadap nilai pekerjaan di
Ringkasani Akhir, dapat disesuaikan jika ada perubahan besaran tarif (persentasi) resmi dari
Pemerintah. Penyesuaian dimulai di hari saat tarif baru tersebut diberlakukan .
Jika berdasarakan Peraturan Pemerintah Pemberi Tugas diharuskan memotong pajak atau
pungutan sejenis lainnya atas pembayaran kepada Pemborong, maka Pemberi Tugas berhak
melakukan hal tersebut dan Pemberi Tugas akan memberikan bukti pemotongan pajak tersebut
kepada Pemborong.
3.6 Perbedaan
Semua jenis pekerjaan / bagian pekerjaan yang tercantum dalam Gambar-Gambar Rancangan dan
Spesifikasi Teknis, kecuali secara jelas dituliskan tidak termasuk dalam lingkup kerja, harus
dianggap ada di keduanya.
Semua ketinggian lantai atau ukuran bangunan yang ada yang terlihat di gambar rancangan,
dianggap sudah benar, namun Pemborong harus tetap melakukan pemeriksaan ulang di Lapangan.
Jika ada perbedaan di Gambar-Gambar Rancangan dan Spesifikasi atau antara keduanya,
perbedaan ini harus segera diberitahukan kepada Manajer Konstruksi agar dapat diputuskan mana
yang diambil sebagai pedoman, dengan mengacu kepada Syarat-Syarat Kontrak, pasal 8.
Jika Pemborong memutuskan bahwa dibutuhkan kerja lembur, maka Pemborong TIDAK
bertanggung jawab atas tagihan biaya lembur dari Manajer Konstruksi yang pegawai/stafnya harus
juga bekerja untuk mengawasi pekerjaan selama jam lembur tersebut.
Lembur didefinisikan untuk pekerjaan yang dilakukan diluar jam 8:00 pagi sampai 16:00 sore di hari
Senin sampai Jumát dan jam 08:00 pagi sampai jam 13:00 siang di hari Sabtu (atau di luar jam kerja
normal, 40 jam kerja per minggu).
6-Bab.1-Persiapan 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Pekerjaan yang diberi tanda "PROVISIONAL" mengindikasikan bahwa kuantitas atau item pekerjaan
tersebut belum dapat dihitung secara tepat di saat proses lelang dan akan dihitung ulang di saat
perhitungan akhir, sesuai dengan kuantiatas pekerjaan sebenarnya yang dilaksanakan di Lapangan.
4.0 ASURANSI
4.1 Asuransi Pekerjaan dan Asuransi Pihak Ketiga (Third Party Insurance)
Pemborong akan menutup polis asuransi pekerjaan atas semua resiko Pemborong (Contractor's All
0.060% 0.003% 5% 0.000% 0% 0.003% 5.000% 0.005% 0.000% 5% 0.000% 0% 0.000% 5.000%
Risk Insurance Policy) seperti yang tertulis di syarat-syarat Kontrak.
Isi dari polis ini, secara umum, sebagai berikut:
(a). Polis asuransi akan menggunakan nama bersama, Pemberi Tugas dan Pemborong.
(b). Masa berlaku dari asuransi adalah dari tanggal mulai Pekerjaan sampai tanggal
diterbitkannya Berita Acara Serah Terima Pertama Pekerjaan (Taking Over Certificate)
ditambah jumlah hari yang diperlukan untuk masa pemeliharaan (Defect Liability Period).
(c). Besarnya nilai yang diasuransikan adalah nilai seluruh pekerjaan ditambah 10% jasa
profesional.
(d). Nilai asuransi sudah termasuk biaya pembongkaran dan pembuangan puing untuk
mengerjakan perbaikan pada setiap kerugian atau kerusakan, dan termasuk biaya dan
pengeluaran tak terduga yang diperlukan dan layak ada dalam melakukan pembongkaran
dan pembuangan puing bongkaran tersebut.
(e). Polis asuransi menanggung juga kerusakan yang ditimbulkan akibat adanya getaran atau vibrasi.
(f). Polis asuransi pihak ketiga (TPL) mempunyai nilai maksimum sebesar ...................... rupiah
(Rp. ..........................) untuk tiap kecelakaan dengan jumlah kecelakaan tidak terbatas
selama masa asuransi. Bila Pemborong merasa jumlah ini tidak cukup untuk menutupi
tanggung jawab dalam kontraknya maka dibebaskan untuk menambah batas asuransi
dengan semua penambahan atau selisih biaya premi ditanggung sendiri oleh Pemborong.
(g). Polis asuransi pihak ketiga berisi pasal-pasal yang menjelaskan tentang kewajiban antara
Pemborong dan Pemberi Tugas.
Premi atas polis asuransi tersebut ditanggung oleh Pemberi Tugas, tapi biaya resiko sendiri
(deductibles) sepenuhnya akan menjadi tanggung jawab Pemborong. Jika hal ini tidak dibayarkan
oleh Pemborong, maka uang pembayaran pekerjaan yang akan dibayarkan oleh Pemberi Tugas
kepada Pemborong, akan dikurangi oleh Pemberi Tugas, sebesar nilai biaya resiko sendiri
(deductibles) yang tertunggak, yang harus ditanggung oleh Pemborong.
Pemborong akan membebaskan Pemberi Tugas dan Pemborong harus memberitahukan kepada
para sub-Pemborongnya agar membebaskan Pemberi Tugas dari semua tanggung jawab yang
timbul akibat adanya tuntutan dari pekerja atau seseorang yang dipekerjakan untuk Pekerjaan,
untuk pembayaran kompensasi dari semua biaya dan pengeluaran yang berkaitan dengan hal ini.
Jika terjadi kecelakaan kerja terhadap pekerja atau seseorang yang dipekerjakan untuk Pekerjaan,
yang dipekerjakan oleh Pemborong atau subPemborong, dan apakah akan ada tuntutan atau tidak,
Pemborong harus tanpa menunda-nunda memberitahu secara tertulis kepada Manajer Konstruksi,
kepada pihak asuransi dan pihak lain yang terkait yang disyaratkan oleh peraturan BPJS Ketenaga
kerjaan atau oleh Hukum di Indonesia.
Pemborong harus sudah memperhitungkan biaya manajemen dan persiapan lapangan. 0.120% 0.060% 50% 0.000% 0% 0.060% 50.000% 0.010% 0.005% 50% 0.000% 0% 0.005% 50.000%
Pemborong harus menyerahkan struktur organisasi lapangan secara detail yang menunjukkan
daftar semua staf pengawas lapangan untuk disetujui oleh Manajer Konstruksi. Daftar tersebut harus
termasuk semua detail yang berkaitan dengan masing-masing personil termasuk tugas, posisi,
kewajiban, kualifikasi, pengalaman, umur dan lamanya bekerja di perusahaan Pemborong tersebut.
Diagram struktur organisasi juga harus menunjukkan bahwa ada staf pengawas yang bertanggung
jawab di lapangan selama Masa Pemeliharaan. Penetapan struktur organisasi dan adanya
persetujuan Manajer Konstruksi tidak membatasi tanggung jawab dan kewajiban Pemborong untuk
mencukupi jumlah staf yang terlibat di lapangan, bila dipandang perlu ada penambahan tanpa ada
tambahan biaya dari Pemberi Tugas.
Semua instruksi yang diberikan kepada Wakil dari Pemborong (Manajer Proyek Pemborong)
dianggap sebagai instruksi yang diberikan kepada Pemborong.
Semua staf pengawas lapangan senior harus disetujui oleh Manajer Konstruksi yang tetap memiliki
hak dan kewenangan mutlak untuk membatalkan persetujuannya bila dianggap perlu tanpa
memberikan alasan apapun.
Staf pengawas lapangan senior tidak boleh diganti tanpa ada persetujuan terlebih dahulu dari
Manajer Konstruksi.
Pemborong harus menyediakan semua peralatan yang dibutuhkan untuk melaksanakan dan 0.048% 0.024% 50% 0.000% 0% 0.024% 50.000% 0.004% 0.002% 50% 0.000% 0% 0.002% 50.000%
menyelesaikan Pekerjaan.
Pemborong harus menyediakan semua pekerja yang diperlukan untuk melaksanakan dan
menyelesaikan pekerjaan.
Pemborong harus bertanggung jawab penuh terhadap semua pekerja yang dipekerjakan.
Pemborong harus mematuhi semua peraturan pemerintah mengenai ketenagakerjaan dan
menanggung semua resiko ada perubahan terhadap peraturan yang sudah ada.
Pemborong harus menyediakan semua biaya-biaya untuk memenuhi kebutuhan pekerja, dan tidak
terbatas untuk :
(a). Hari libur nasional 0.012% 0.006% 50% 0.000% 0% 0.006% 50.000% 0.001% 0.000% 50% 0.000% 0% 0.000% 50.000%
(b). Waktu perjalanan dan biaya transportasi 0.012% 0.006% 50% 0.000% 0% 0.006% 50.000% 0.001% 0.000% 50% 0.000% 0% 0.000% 50.000%
(c). Waktu yang tidak produktif dan biaya lain berkaitan dengan lembur
(d). Insentif dan bonus
6-Bab.1-Persiapan 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
(a). Staf teknis yang handal dan berpengalaman di bidangnya, mandor dan kepala tukang
yang kompeten dan dapat memberikan pengawasan yang sesuai dengan pekerjaan yang 0.240% 0.120% 50% 0.000% 0% 0.120% 50.000% 0.020% 0.010% 50% 0.000% 0% 0.010% 50.000%
harus diawasi.
(b). Buruh yang trampil dan semi trampil yang diperlukan untuk pelaksanaan pekerjaan yang
tepat dan berkesinambungan.
Pemborong harus, bila diminta oleh Manajer Konstruksi, menyerahkan laporan harian kepada
Manajer Konstruksi dengan format yang ditentukan oleh Manajer Konstruksi.
5.5 Bekerja di hari Minggu, hari libur resmi dan malam hari
Untuk bekerja di malam hari, Pemborong harus mendapatkan persetujuan dari Manajer Konstruksi
sebelum mulai bekerja.
Pemborong harus menempatkan petugas keselamatan di lokasi kerja / lapangan. 0.060% 0.030% 50% 0.000% 0% 0.030% 50.000% 0.005% 0.002% 50% 0.000% 0% 0.002% 50.000%
Persetujuan Manajer Konstruksi terhadap contoh material / bahan baku atau barang, tidak
membebaskan Pemborong dari segala kewajiban dan tanggung jawabnya sesuai Kontrak
Pemborong harus menyediakan semua alat-alat survey dan tim surveyor yang dibutuhkan Manajer
Konstruksi untuk keperluan pemeriksaan ukuran dan level / ketinggian.
5.12 Ukuran
Ukuran yang tercantum harus selalu lebih diutamakan untuk diambil sebagai acuan dibandingkan
pengukuran berdasarkan skala di gambar. Sebelum memulai pekerjaan atau memesan material /
bahan baku atau barang untuk kebutuhan pekerjaan Pemborong harus memastikan semua ukuran
yang dibutuhkan. Bila ada perbedaan harus segera memberitahu Manajer Konstruksi. Tidak ada
tuntutan terhadap kerugian akan diijinkan bila menurut Manajer Konstruksi hal tersebut seharusnya
sudah lebih dulu diketahui oleh Pemborong.
Pemborong tidak boleh menggunakan kuantitas yang ada di dokumen ini untuk memesan material /
bahan baku atau barang untuk kebutuhan pekerjaan, sebelum memeriksa ulang dengan cermat dan
disesuaikan dengan kebutuhan yang sebenarnya di Lapangan.
6-Bab.1-Persiapan 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
5.15 Iklan
Pemborong atau sub-Pemborongnya tidak dibolehkan, tanpa seijin Manajer Konstruksi, menambah
atau memasang di semua tempat di lapangan, papan pengumuman, plakat, poster, spanduk atau
bahan iklan lainnya selain papan nama proyek standar yang diharuskan oleh peraturan pemerintah.
Rencana publisitas yang akan dikeluarkan berkaitan dengan proyek, harus diserahkan lebih dulu
kepada Manajer Konstruksi dan Pemberi Tugas untuk dimintakan persetujuan.
5.17 Pengiriman Material / Barang ke dan Pengeluaran Material / Barang dari Lapangan
Pemborong harus patuh terhadap peraturan dari pengelola atau polisi setempat dalam hal
penggunaan kendaraan untuk mengantar material/ barang ke atau memindahkan material sisa dan 0.060% 0.030% 50% 0.000% 0% 0.030% 50.000% 0.005% 0.002% 50% 0.000% 0% 0.002% 50.000%
barang berlebih dari lapangan dan harus sudah menyediakan biaya untuk keperluan tersebut.
Foto-foto tidak diberikan kepada pihak lain tanpa ijin dari Manajer Konstruksi.
Gambar kerja tersebut harus memperlihatkan posisi seluruh pekerjaan instalasi mekanikal, elektrikal
dan plumbing, termasuk pekerjaan sipil yang diperlukan dalam pekerjaan instalasi tersebut.
Jika Pemborong membuat perubahan-perubahan yang diperlukan, Manajer Konstruksi akan
mencatat perubahan-perubahan tersebut, memberikan persetujuannya, dan akan mengembalikan
satu salinan gambar kerja kepada Pemborong yang akan melaksanakan pekerjaan tersebut.
Pemborong harus menyerahkan dua tambahan salinan gambar-gambar yang telah disetujui kepada
Manajer Konstruksi.
Persetujuan gambar kerja oleh Manajer Konstruksi tidak membebaskan Pemborong dari tugas,
tanggung jawab dan kewajiban Pemborong, sesuai dengan Kontrak.
Bila suara yang dihasilkan dari peralatan Pemborong diukur pada jarak 30m melebihi 75 desibel
(dBA), maka penggunaan peralatan tersebut harus dihentikan. Peralatan tidak boleh dipakai sampai
digunakan metode khusus peredaman bunyi atau mesin diganti dengan model lain dimana akan
mengurangi bunyi pada level yang tidak melebihi 75 desibel (dBA) pada jarak 30m.
Penghentian pekerjaan yang diminta oleh Manajer Konstruksi dalam ketentuan ini tidak memberi
hak kepada Pemborong untuk menambah waktu penyelesaian proyek atau bentuk kompensasi
apapun.
Ketentuan ini tidak boleh dipakai pada pekerjaan emergency yang diperlukan untuk keselamatan
nyawa, atau untuk keselamatan kerja.
6-Bab.1-Persiapan 18/5
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
7.8 Telepon
Pemborong harus menyediakan saluran telepon untuk digunakan oleh dirinya sendiri. 0.024% 0.012% 50% 0.000% 0% 0.012% 50.000% 0.002% 0.001% 50% 0.000% 0% 0.001% 50.000%
Pemborong harus membayar semua tagihan telepon yang dipergunakan oleh dirinya sendiri.
Pemborong diminta untuk menyiapkan Handy Talkie (HT) yang akan dipakai selama pelaksanaan
pekerjaan.
Pemborong harus menyediakan pompa air, peralatan pendukung, tangki penyimpan dan pipa
distribusi yang diperlukan untuk mendapatkan air yang dibutuhkan.
Pemborong harus menjaga dan mengadaptasi kapanpun dan dimanapun diperlukan sepanjang
periode proyek, membayar semua biaya-biayanya dan membersihkan di akhir penyelesaian proyek.
Pemborong harus menyediakan semua jaringan kabel yang diperlukan untuk memakai lampu dan
listrik kerja.
Pemborong harus menjaga dan mengadaptasi kapanpun dan dimanapun jika diperlukan sepanjang
masa konstruksi, membayar semua biaya bulannya dan membersihkan di akhir penyelesaian
proyek.
Pemasangan sementara harus sesuai dengan peraturan Perusahaan Listrik Negara (PLN) dan
secara internasional diterima sebagai syarat keamanan yang umum.
Desain dan konstruksi perancah dan pijakan kerja, plat, tangga, catwalk dan sebagainya tersebut
harus sesuai dengan persyaratan peraturan terkait.
Penggunaan karet atau bambu dalam konstruksi perancah dan pijakan kerja, plat, catwalk, tangga
dan sebagainya tidak dibolehkan.
Pembuangan air harus sesuai dengan peraturan dan persyaratan yang berlaku.
6-Bab.1-Persiapan 18/6
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan Minggu Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % ) Bobot Lalu ( % ) ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Bila bahan bangunan atau peralatan yang dibawa/dipasang menggunakan penutup atau lapisan
pengaman Pemborong harus memperbaiki, mengganti atau paling tidak menjaga penutup dan
lapisan tersebut secara efektif.
Pemborong dan Pemborong Khusus/ Spesialis bertanggung jawab membersihkan area kerja
masing-masing dan mengumpulkan sampah/ puing/ sisa-sisa bahan terbuang ketempat
pengumpulan khusus. Pemborong berkewajiban membuang sampah/ puing/ sisa-sisa bahan
terbuang dari tempat penampungan ke luar lahan
7.19 Pembersihan
Pemborong, setelah menyelesaikan seluruh pekerjaan harus meninggalkan proyek dan area
sekitarnya dalam kondisi bersih dan rapi, seperti ditetapkan oleh Manajer Konstruksi. 0.048% 0.022% 45% 0.000% 0% 0.022% 45.000% 0.004% 0.002% 45% 0.000% 0% 0.002% 45.000%
Penjumlahan
6-Bab.1-Persiapan 18/7
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
BAB No. 2.1 - PEKERJAAN TATA UDARA & VENTILASI
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Kuantitas Unit Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama AC unit; single
split system; termasuk thermostat, pipa refrigerant, drain lengkap dengan pendukung dan
semua aksesoris yang diperlukan; sesuai dengan gambar dan spesifikasi.
LANTAI BASEMENT
A PEST CONTROL GUDANG, IU-OU/T1/BS/PC,kap 91.790 Btu/Hr; 10.57 Kw/ 380 V/3 1 unit 0.039% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Ph/50 Hz/ Duct Conected - Single Split Type
B MUSHOLAH PRIA, IU-OU/T1/BS/MP 1~4. ENG,kap 91.790 Btu/Hr; 10.57 Kw/ 380 V/3 4 unit 0.157% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.013% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Ph/50 Hz/ Duct Conected - Single Split Type
C MUSHOLAH WANITA, IU-OU/T1/BS/MW 1~3,kap 91.790 Btu/Hr; 10.57 Kw/ 380 V/3 3 unit 0.118% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Ph/50 Hz/ Duct Conected - Single Split Type
D POS KEAMANAN, IU/T1/BS/R.SC - 01,kap 23.555 Btu/Hr; 2.4 Kw/ 220 V/1 Ph/50 Hz/
1 unit 0.012% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Casette - Single Split Type
E R. VENDOR SECURITY . IU/T1/BS/R.VSC - 01,kap 16.698 Btu/Hr; 1.9 Kw/ 220 V/1 1 unit 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Ph/50 Hz/ Casette - Single Split Type
F R. KONTROL CCTV, FIRE ALARM & LIFT, IU/T1/BS/R.KTL,kap 58.013 Btu/Hr; 10.57 1 unit 0.027% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Kw/ 380 V/3 Ph/50 Hz/ Duct Conected - Single Split Type
G MAIL BOX, IU/T1,T6/BS/MB,kap 23.770 Btu/Hr; 2.4 Kw/ 220 V/1 Ph/50 Hz/ Casette - 2 unit 0.024% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Single Split Type
H R. ENGINEERING, IU/T1/BS/R. ENG,kap 91.790 Btu/Hr; 10.57 Kw/ 380 V/3 Ph/50 Hz/
1 unit 0.039% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Duct Conected - Single Split Type
I WET TRASH, IU/T1/BS/R.WT,kap 5.490 Btu/Hr; 0.61 Kw/ 220 V/1 Ph/50 Hz/ Casette - - unit 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Single Split Type
J LOBBY ESCALATOR, IU-OU/T1/BS/LO.ES - 01,kap 23.555 Btu/Hr; 2.4 Kw/ 220 V/1 1 unit 0.012% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Ph/50 Hz/ Single Split Type
K KANTOR MANAGEMENT POM. IU-OU/T1/BS/R.KMP - 01,kap 16.698 Btu/Hr; 1.9 Kw/ 1 unit 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
220 V/1 Ph/50 Hz/ Casette - Single Split Type
L R. MEETING, FIRE ALARM & LIFT, IU-OU/T1/BS/R.MT,kap 58.013 Btu/Hr; 10.57 Kw/
- unit 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
380 V/3 Ph/50 Hz/ Duct Conected - Single Split Type
M R. MEETING. IU-OU/T4/BS/R.MT,kap 47.960 Btu/Hr; 5 Kw/ 380 V/3 Ph/50 Hz/ Casette - 1 unit 0.024% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Single Split Type
N WAREHOUSE, IU-OU/T1/BS/WRH,kap 23.770 Btu/Hr; 2.4 Kw/ 220 V/1 Ph/50 Hz/ 1 unit 0.012% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Casette - Single Split Type
Bab.2.1-VAC_Bsmt 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.1.2 INSTALASI PIPA PENDINGIN
Pengadaan dan pemasangan serta pengujian pekerjaan pipa refrigerant, bahan dari pipa
tembaga Type L lengkap dengan isolasi termasuk kabel power dari indoor ke outdoor unit
AC sesuai jalur yang telah ditentukan, termasuk fitting, penggantung, pendukung dan
semua aksesoris yang diperlukan seperti yang dijelaskan dan tercantum pada gambar dan
spesifikasi teknis
A IU/OU-T2/BS/MP 1~4/gas dia. 15,88 mm ; liquid dia. 9,5 mm + Kabel power (IU ke OU)
Insulated 5 unit 0.011% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
B IU/OU-T2/BS/MW 1~3/gas dia. 15,88 mm ; liquid dia. 9,5 mm + Kabel power (IU ke OU)
53 unit 0.120% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
C IU/OU-T2/BS/WT/gas dia. 9,5 mm ; liquid dia. 6,4 mm + Kabel power (IU ke OU) 21 unit 0.027% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
D IU/T1/BS/R.SC - 01/gas dia. 15,9 mm ; liquid dia. 9,5 mm + Kabel power (IU ke OU)
12 unit 0.027% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
E IU/T1/BS/R.VSC - 01/gas dia. 12,7 mm ; liquid dia. 6,4 mm + Kabel power (IU ke OU)
7 unit 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
F IU/T1/BS/R.KTL/gas dia. 34,92 mm ; liquid dia. 15,88 mm + Kabel power (IU ke OU)
34 unit 0.212% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.017% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
G IU/T1,T3,T6/BS/MB/gas dia. 28,58 mm ; liquid dia. 15,88 mm + Kabel power (IU ke OU) 35 unit 0.171% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.014% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
H IU/T1,T3,T5/BS/R. ENG/gas dia. 34,92 mm ; liquid dia. 15,88 mm + Kabel power (IU ke 12 unit 0.075% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.006% 0.000% 0% 0.000% 0% 0.000% 0.0000%
OU) Insulated
I IU/T1,T2/BS/R.WT/gas dia. 9,5 mm ; liquid dia. 6,4 mm + Kabel power (IU ke OU) - unit 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
J IU/OU-T2/BS/LO.ES/gas dia. 25,4 mm ; liquid dia. 12,7 mm + Kabel power (IU ke OU)
10 unit 0.041% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
K IU/OU-T2/BS/KMP/gas dia. 28,58 mm ; liquid dia. 15,88 mm + Kabel power (IU ke OU)
24 unit 0.117% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
L IU/OU-T2/BS/R.MT/gas dia. 19,05 mm ; liquid dia. 9,5 mm + Kabel power (IU ke OU)
14 unit 0.039% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
M IU/OU-T2/BS/WRH/gas dia. 25,4 mm ; liquid dia. 12,7 mm + Kabel power (IU ke OU)
25 unit 0.102% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
M IU-OU/T4/BS/PC/gas dia. 12,7 mm ; liquid dia. 6,4 mm + Kabel power (IU ke OU)
2 unit 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Insulated
Bab.2.1-VAC_Bsmt 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.1.3 INSTALASI PIPA DRAIN
Pengadaan dan pemasangan serta pengujian pekerjaan pipa drain, bahan PVC class D
lengkap dengan isolasi, fitting, penggantung, pendukung dan semua aksesoris yang
diperlukan seperti yang dijelaskan dan tercantum pada gambar dan spesifikasi teknis
LANTAI BASEMENT
T/BS/R.KTL,Pipa drain PVC class D c/w isolasi
A Pipa dan Fitting : 20 mm 19 m 0.009% 0.004% 50% 0.000% 0% 0.004% 50.0000% 0.001% 0.000% 50% 0.000% 0% 0.000% 50.0000%
B Pipa dan Fitting : 25 mm - m
T/BS/R.ENG,Pipa drain PVC class D c/w isolasi
C Pipa dan Fitting : 20 mm 12 m 0.006% 0.003% 50% 0.000% 0% 0.003% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
IU/OU-T/BS/VSC,Pipa drain PVC class D c/w isolasi
D Pipa dan Fitting : 20 mm - m
E Pipa dan Fitting : 25 mm - m
T/BS/R.SC,Pipa drain PVC class D c/w isolasi
F Pipa dan Fitting : 20 mm 26 m 0.012% 0.006% 50% 0.000% 0% 0.006% 50.0000% 0.001% 0.000% 50% 0.000% 0% 0.000% 50.0000%
T/BS/MB,Pipa drain PVC class D c/w isolasi
G Pipa dan Fitting : 20 mm 16 m 0.008% 0.004% 50% 0.000% 0% 0.004% 50.0000% 0.001% 0.000% 50% 0.000% 0% 0.000% 50.0000%
T3/BS/LO.ES,Pipa drain PVC class D c/w isolasi
H Pipa dan Fitting : 20 mm - m
T4/BS/KMP,Pipa drain PVC class D c/w isolasi
I Pipa dan Fitting : 25 mm 23 m 0.013% 0.007% 50% 0.000% 0% 0.007% 50.0000% 0.001% 0.001% 50% 0.000% 0% 0.001% 50.0000%
T4/BS/R.MT,Pipa drain PVC class D c/w isolasi
J Pipa dan Fitting : 20 mm 12 m 0.006% 0.003% 50% 0.000% 0% 0.003% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
K Pipa dan Fitting : 32 mm 5 m 0.003% 0.001% 50% 0.000% 0% 0.001% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
T4/BS/WH,Pipa drain PVC class D c/w isolasi
L Pipa dan Fitting : 20 mm 10 m 0.005% 0.002% 50% 0.000% 0% 0.002% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
T4/BS/PC,Pipa drain PVC class D c/w isolasi
M Pipa dan Fitting : 20 mm 1 m 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
N PEST CONTROL GUDANG, IU-OU/T1/BS/PC
Pipa dan Fitting : 20 mm 2 m 0.001% 0.000% 50% 0.000% 0% 0.000% 50.0000% 0.000% 0.000% 50% 0.000% 0% 0.000% 50.0000%
Bab.2.1-VAC_Bsmt 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.1.4 INSTALASI DUCTING
IU-T2/BS/R.KTL
Return Air Duct
A 550 x 300 mm 6 m² 0.024% 0.012% 50% 0.000% 0% 0.012% 50.0000% 0.002% 0.001% 50% 0.000% 0% 0.001% 50.0000%
Fresh Air Duct, (tanpa Isolasi)
B 250 X 200 mm 12 m² 0.042% 0.021% 50% 0.000% 0% 0.021% 50.0000% 0.003% 0.002% 50% 0.000% 0% 0.002% 50.0000%
Supply Air Duct
C 700 x 350 mm 10 m² 0.039% 0.020% 50% 0.000% 0% 0.020% 50.0000% 0.003% 0.002% 50% 0.000% 0% 0.002% 50.0000%
D 550 X 300 mm 26 m² 0.102% 0.051% 50% 0.000% 0% 0.051% 50.0000% 0.008% 0.004% 50% 0.000% 0% 0.004% 50.0000%
E 400 X 250 mm 22 m² 0.086% 0.043% 50% 0.000% 0% 0.043% 50.0000% 0.007% 0.004% 50% 0.000% 0% 0.004% 50.0000%
F 300 X 200 mm 22 m² 0.086% 0.043% 50% 0.000% 0% 0.043% 50.0000% 0.007% 0.004% 50% 0.000% 0% 0.004% 50.0000%
IU-T2/BS/R.ENG
Return Air Duct
G 550 x 300 mm 6 m² 0.024% 0.012% 50% 0.000% 0% 0.012% 50.0000% 0.002% 0.001% 50% 0.000% 0% 0.001% 50.0000%
Bab.2.1-VAC_Bsmt 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.1.5 INSTALASI KISI UDARA ( GRILLE / DIFFUSER )
Pengadaan dan pemasangan serta pengujian pekerjaan instalasi kisi udara (grille/ diffuser)
damper, penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT
IU-T1/BS/R.KTL
A Plenum Box, dengan ukuran (mm : …. x …. x … 2 set 0.038% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
B Drain Pan, dengan ukuran (mm) : …. x …. x … 2 set 0.012% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
IU-T1/BS/R.ENG
I Plenum Box, dengan ukuran (mm : …. x …. x … 2 set 0.038% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Bab.2.1-VAC_Bsmt 18/5
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.1 INSTALASI PENYEJUK UDARA
RINGKASAN
Bab.2.1-VAC_Bsmt 18/6
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2 INSTALASI VENTILASI UDARA
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T1/BS/R.TR.A - unit
Lokasi : Ruang Trafo A
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,772 CFM
Static Pressure : 0,23 Inch WG
Eficiency : 69 %
Sound Pressure Level : 58 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
B EF-T1/BS/R.TR.B - unit
Lokasi : Ruang Trafo B
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,454 CFM
Static Pressure : 0,23 Inch WG
Eficiency : 72 %
Sound Pressure Level : 58 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
C EF-T2,T4,T5,T8,T9/BS/R.TR 2 unit 0.081% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Ruang Trafo
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,000 CFM
Static Pressure : 0,28 Inch WG
Eficiency : 65 %
Sound Pressure Level : 62 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
D EF-T1/BS/R.PUTM.A - unit
Lokasi : PUTM A
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,388 CFM
Static Pressure : 0,27 Inch WG
Eficiency : 71 %
Sound Pressure Level : 58 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
E EF-T1/BS/R.PUTM.B - unit
Lokasi : PUTM B
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,123 CFM
Static Pressure : 0,33 Inch WG
Eficiency : 74 %
Sound Pressure Level : 58 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
F EF-T2,T4,T5,T8,T9/BS/R.PUTM 1 unit 0.025% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : PUTM
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 1,958 CFM
Static Pressure : 0,27 Inch WG
Eficiency : 68 %
Sound Pressure Level : 51 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
G EF-T2,T4,T5,T8,T9/BS/R.PUTR 1 unit 0.025% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : PUTR
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 2,075 CFM
Static Pressure : 0,22 Inch WG
Eficiency : 65 %
Sound Pressure Level : 51 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/7
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI UDARA
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T1/BS/R.KG - unit
Lokasi : R. Kontrol Genset
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 2,133 CFM
Static Pressure : 0,14 Inch WG
Eficiency : 64 %
Sound Pressure Level : 65 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
B EF-T1/BS/R.PKG - unit
Lokasi : R. PKG
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 4,070 CFM
Static Pressure : 0,25 Inch WG
Eficiency : 58 %
Sound Pressure Level : 65 dB
Putaran : 1,440 RPM
Daya : 0,41 KW/380 V/3 Ph/50 Hz
C EF-T1/BS/R.GS1. A~C - unit
Lokasi : R. GENSET 1 1850 Kva
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 7,400 CFM
Static Pressure : 0,14 Inch WG
Eficiency : 51 %
Sound Pressure Level : 62 dB
Putaran : 1,440 RPM
Daya : 0,41 KW/380 V/3 Ph/50 Hz
D EF-T1/BS/R.GS2. A~C - unit
Lokasi : R. GENSET 1 2000 Kva
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 8,000 CFM
Static Pressure : 0,14 Inch WG
Eficiency : 51 %
Sound Pressure Level : 62 dB
Putaran : 1,440 RPM
Daya : 0,41 KW/380 V/3 Ph/50 Hz
E EF-T1 s/d T10/BS/STO - 1 2 unit 0.043% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Storage 1
Tipe : Ceilling Mounted
Fungsi : Exhaust
Kapasitas Udara : 314 CFM
Static Pressure : 0,14 Inch WG
Eficiency : - %
Sound Pressure Level : -- dB
Putaran : 1,380 RPM
Daya : 0,06 KW/380 V/3 Ph/50 Hz
F EF-T1 s/d T10/BS/STO - 2 2 unit 0.043% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Storage 2
Tipe : Ceilling Mounted
Fungsi : Exhaust
Kapasitas Udara : 314 CFM
Static Pressure : 0,14 Inch WG
Eficiency : - %
Sound Pressure Level : -- dB
Putaran : 1,380 RPM
Daya : 0,06 KW/380 V/3 Ph/50 Hz
G EF-T1,T3,T6,T9/BS/STO - 3 1 unit 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Storage 3
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 652 CFM
Static Pressure : 0,14 Inch WG
Eficiency : - %
Sound Pressure Level : -- dB
Putaran : 1,020 RPM
Daya : 0,103 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/8
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T8/BS/STO - 3 - unit
Lokasi : Storage 3
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 729 CFM
Static Pressure : 0,14 Inch WG
Eficiency : - %
Sound Pressure Level : -- dB
Putaran : 1,020 RPM
Daya : 0,103 KW/380 V/3 Ph/50 Hz
B EF-T1,T3,T6,T9/BS/DT 1 unit 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Dry Trash
Tipe : Wall Mounted
Fungsi : Supply
Kapasitas Udara : 424 CFM
Static Pressure : 0,09 Inch WG
Eficiency : -- %
Sound Pressure Level : 65 dB
Putaran : 1,320 RPM
Daya : 0,03 KW/220 V/1 Ph/50 Hz
C EF-T1/BS/BC - unit
Lokasi : Bin Center
Tipe : Axial Adj. Pitch
Fungsi : Supply
Kapasitas Udara : 1,432 CFM
Static Pressure : 0,37 Inch WG
Eficiency : 66 %
Sound Pressure Level : 65 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
D EF-T10/BS/LK - unit
Lokasi : Locker
Tipe : Ceilling Mounted
Fungsi : Supply
Kapasitas Udara : 367 CFM
Static Pressure : 0,09 Inch WG
Eficiency : -- %
Sound Pressure Level : 65 dB
Putaran : 1,320 RPM
Daya : 0,09 KW/380 V/3 Ph/50 Hz
E EF-T2,T4,T6,T8/BS/LO.1 1 unit 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Locker 1
Tipe : Wall Mounted
Fungsi : Supply
Kapasitas Udara : 294 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 40 dB
Putaran : 1,380 RPM
Daya : 0,06 KW/240 V/1 Ph/50 Hz
F EF-T2,T4,T6,T8/BS/LO.2 1 unit 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Locker 2
Tipe : Wall Mounted
Fungsi : Supply
Kapasitas Udara : 294 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 40 dB
Putaran : 1,380 RPM
Daya : 0,06 KW/240 V/1 Ph/50 Hz
G EF-T7,T9/BS/LS - unit
Lokasi : Locker Security
Tipe : Ceilling Mounted
Fungsi : Exhaust
Kapasitas Udara : 379 CFM
Static Pressure : 0,15 Inch WG
Eficiency : -- %
Sound Pressure Level : 40 dB
Putaran : 1,020 RPM
Daya : 0,6 KW/220 V/1 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/9
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T1,T3,T4,T5,T6,T7,T8,T10/BS/TO 2 unit 0.045% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Toilet
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 538 CFM
Static Pressure : 0,37 Inch WG
Eficiency : 61 %
Sound Pressure Level : 45 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/220 V/1 Ph/50 Hz
B EF-T2,T4,T6/BS/TO 1 unit 0.019% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Toilet
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 970 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 63 %
Sound Pressure Level : 47 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/220 V/1 Ph/50 Hz
C EF-T7,T10/BS/TO - unit
Lokasi : Toilet
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 1,236 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 63 %
Sound Pressure Level : 47 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
D EF-T1/BS/PNL 1 unit 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : R. Panel
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 136 CFM
Static Pressure : 0,034 Inch WG
Eficiency : - %
Sound Pressure Level : 65 dB
Putaran : 1,260 RPM
Daya : 0,034 KW/220 V/1 Ph/50 Hz
E EF-T2,T4,T6,T7,T10/BS/STP - unit
Lokasi : STP
Tipe : Exhaust
Fungsi : Axial Adj. Pitch
Kapasitas Udara : 15,601 CFM
Static Pressure : 0,22 Inch WG
Eficiency : 78 %
Sound Pressure Level : 71 dB
Putaran : 1,440 RPM
Daya : 1,65 KW/380 V/3 Ph/50 Hz
F IF-T2,T4,T6,T7,T10/BS/STP - unit
Lokasi : STP
Tipe : Intake
Fungsi : Axial Adj. Pitch
Kapasitas Udara : 14,041 CFM
Static Pressure : 0,27 Inch WG
Eficiency : 74 %
Sound Pressure Level : 67 dB
Putaran : 1,440 RPM
Daya : 1,65 KW/380 V/3 Ph/50 Hz
G EF-T3,T5/BS/KC 1 unit 0.041% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.003% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Kitchen & Storage
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,573 CFM
Static Pressure : 0,3 Inch WG
Eficiency : 72 %
Sound Pressure Level : 58 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/10
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T2,T4,T6,T8,T9/BS/LS 1 unit 0.019% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Landscape & Gudang
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 423 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 47 dB
Putaran : 1,320 RPM
Daya : 0,09 KW/220 V/1 Ph/50 Hz
B EF-T2,T4,T6,T8,T9/BS/HK 1 unit 0.019% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : House Kepping & Gudang
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 1,236 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 51 dB
Putaran : 1,080 RPM
Daya : 0,17 KW/220 V/1 Ph/50 Hz
C EF-T2,T4,T6,T8,T9/BS/SP 1 unit 0.019% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Scure Parking
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 391 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 40 dB
Putaran : 1,380 RPM
Daya : 0,06 KW/380 V/3 Ph/50 Hz
D EF-T1/BS/PNL 2 unit 0.014% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : R. Panel
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 136 CFM
Static Pressure : 0,14 Inch W
Eficiency : - %
Sound Pressure Level : 42 dB
Putaran : 1,260 RPM
Daya : 0,034 KW/220 V/1 Ph/50 Hz
E EF-T2,T4,T6,T7,T9/BS/WS 1 unit 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : Workshop
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 950 CFM
Static Pressure : 0,18 Inch WG
Eficiency : 66 %
Sound Pressure Level : 48 dB
Putaran : 14,400 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
F EF-T2,T4,T6,T7,T10/BS/STP - unit
Lokasi : STP
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 15,601 CFM
Static Pressure : 0,22 Inch WG
Eficiency : 78 %
Sound Pressure Level : 71 dB
Putaran : 1,440 RPM
Daya : 1,65 KW/380 V/3 Ph/50 Hz
G IF-T2,T4,T6,T7,T10/BS/STP - unit
Lokasi : STP
Tipe : Axial Adj. Pitch
Fungsi : Intake
Kapasitas Udara : 14,041 CFM
Static Pressure : 0,27 Inch WG
Eficiency : 74 %
Sound Pressure Level : 67 dB
Putaran : 1,440 RPM
Daya : 1,65 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/11
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
LANTAI BASEMENT 1
A EF-T9/BS/TO - unit
Lokasi : Toilet Pria, Wanita & Difable
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 538 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 61 %
Sound Pressure Level : 48 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/220 V/1 Ph/50 Hz
B EF-T2,T4,T5,T8,T9/BS/R.CB 1 unit 0.105% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.009% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Lokasi : R. CB
Tipe : Axial Jet Fan
Fungsi : Exhaust
Kapasitas Udara : 1,254 CFM
Static Pressure : 0,16 Inch WG
Eficiency : 55 %
Sound Pressure Level : 52 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
C JF-T1 s/d T10/BS 18 unit 1.890% 0.378% 20% 0.000% 0% 0.378% 20.0000% 0.154% 0.031% 20% 0.000% 0% 0.031% 20.0000%
Lokasi : Parkiran
Tipe : Axial Jet Fan
Fungsi : Dilution
Kapasitas Udara : 882 CFM
Static Pressure : 0,23 Inch WG
Eficiency : 65 %
Sound Pressure Level : 65 dB
Putaran : 2,460 RPM
Daya : 0,23 KW/220 V/1 Ph/50 Hz
CLUB HOUSE
A EF-BS/KT - unit
Lokasi : KITCHEN
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 5,381 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 68 %
Sound Pressure Level : 59 dB
Putaran : 1,440 RPM
Daya : 0,61 KW/380 V/3 Ph/50 Hz
B IF-BS/KT - unit
Lokasi : KITCHEN
Tipe : Axial Adj. Pitch
Fungsi : Intake
Kapasitas Udara : 4,305 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 68 %
Sound Pressure Level : 54 dB
Putaran : 1,440 RPM
Daya : 0,61 KW/380 V/3 Ph/50 Hz
C EF-BS/TO - unit
Lokasi : Toilet A
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 469 CFM
Static Pressure : 0,18 Inch WG
Eficiency : 56 %
Sound Pressure Level : 40 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
D EF-BS/TO.LW - unit
Lokasi : Toilet dan Loker Wanita
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 3,347 CFM
Static Pressure : 0,27 Inch WG
Eficiency : 70 %
Sound Pressure Level : 59 dB
Putaran : 1,440 RPM
Daya : 0,40 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/12
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
CLUB HOUSE
A EF-BS/STO - unit
Lokasi : Storage
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 1,379 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 55 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/240 V/1 Ph/50 Hz
B EF-BS/TO.LP - unit
Lokasi : Toilet dan Loker Pria
Tipe : Axial Adj. Pitch
Fungsi : Exhaust
Kapasitas Udara : 2,990 CFM
Static Pressure : 0,24 Inch WG
Eficiency : 67 %
Sound Pressure Level : 57 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
C EF-BS/NM A~B - unit
Lokasi : NO NAME
Tipe : Wall Mounted
Fungsi : Exhaust
Kapasitas Udara : 1,107 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 55 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/240 V/1 Ph/50 Hz
D EF-BS/PUTM.PMR
Lokasi : PUTM R.POMPA
Tipe : Wall Mounted - unit
Fungsi : Exhaust
Kapasitas Udara : 774 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 40 dB
Putaran : 1,440 RPM
Daya : 0,10 KW/240 V/1 Ph/50 Hz
E EF-BS/PUTR.PMR
Lokasi : PUTR R. Pompa dan CB
Tipe : Axial Adj. Pitch - unit
Fungsi : Exhaust
Kapasitas Udara : 1,762 CFM
Static Pressure : 0,19 Inch WG
Eficiency : 67 %
Sound Pressure Level : 50 dB
Putaran : 1,440 RPM
Daya : 0,37 KW/380 V/3 Ph/50 Hz
F EF-BS/TR.PMR
Lokasi : Trafo R. Pompa
Tipe : Wall Mounted - unit
Fungsi : Exhaust
Kapasitas Udara : 691 CFM
Static Pressure : 0,14 Inch WG
Eficiency : -- %
Sound Pressure Level : 48 dB
Putaran : 1,440 RPM
Daya : 0,41 KW/240 V/1 Ph/50 Hz
G EF-BS/R.PMP
Lokasi : Ruang Pompa
Tipe : Axial Adj. Pitch - unit
Fungsi : Exhaust
Kapasitas Udara : 5,107 CFM
Static Pressure : 0,22 Inch WG
Eficiency : 75 %
Sound Pressure Level : 66 dB
Putaran : 1,440 RPM
Daya : 1,1 KW/380 V/3 Ph/50 Hz
###
Bab.2.1-VAC_Bsmt 18/13
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.1 PERALATAN UTAMA VENTILASI MEKANIS
Pengadaan dan pemasangan serta pengujian pada semua peralatan utama ventilasi
mekanis contohnya, Exhaust Air Fan, Fresh Air Fan dan lain-lain lengkap dengan semua
alat pendukung dan material bantu serta semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
CLUB HOUSE
A IF-BS/R.PMP - unit
Lokasi : Storage 1
Tipe : Axial Adj. Pitch
Fungsi : Intake
Kapasitas Udara : 4,086 CFM
Static Pressure :: 0,22 Inch
Eficiency 75 % WG
Sound Pressure Level : 65 dB
Putaran : 1,440 RPM
Daya : 1,1 KW/380 V/3 Ph/50 Hz
Halaman 2.1/5
Halaman 2.1/6
Halaman 2.1/7
Halaman 2.1/8
Halaman 2.1/9
Halaman 2.1/10
Halaman 2.1/11
Halaman 2.1/12
Bab.2.1-VAC_Bsmt 18/14
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.2 INSTALASI DUCTING
Pengadaan dan pemasangan serta pengujian pekerjaan ducting BJLS, termasuk coating,
penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang tercantum dan
dijelaskan dalam gambar dan spesifikasi teknis
AREA BASEMENT
EF-T1/BS/BC
EF-T1/BS/R.TR.A
Exhaust Air Duct, (tanpa Isolasi)
D 800 X 350 mm - m²
E 600 X 350 mm - m²
F 450 X 300 mm - m²
EF-T1/BS/R.TR.B
Exhaust Air Duct, (tanpa Isolasi)
G 750 x 350 mm - m²
H 600 X 350 mm - m²
I 400 X 300 mm - m²
EF-T2,T4,T5,T8,T9/BS/R.TR
Exhaust Air Duct, (tanpa Isolasi)
J 800 X 300 mm 4 m² 0.019% 0.012% 65% 0.000% 0% 0.012% 65.0000% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
K 500 X 300 mm 6 m² 0.021% 0.014% 65% 0.000% 0% 0.014% 65.0000% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T1/BS/R.PUTM.A
Exhaust Air Duct, (tanpa Isolasi)
L 750 x 350 mm - m²
M 600 X 350 mm - m²
N 400 X 300 mm - m²
EF-T1/BS/R.PUTM.B
Exhaust Air Duct, (tanpa Isolasi)
O 750 x 350 mm - m²
P 600 X 350 mm - m²
Q 400 X 300 mm - m²
EF-T2,T4,T5,T8,T9/BS/R.PUTM
Exhaust Air Duct, (tanpa Isolasi)
R 550 x 300 mm 5 m² 0.018% 0.011% 65% 0.000% 0% 0.011% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
S 400 X 300 mm 4 m² 0.014% 0.009% 65% 0.000% 0% 0.009% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T2,T4,T5,T8,T9/BS/R.PUTR
Exhaust Air Duct, (tanpa Isolasi)
T 600 X 300 mm 5 m² 0.020% 0.013% 65% 0.000% 0% 0.013% 65.0000% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
U 400 X 300 mm 5 m² 0.018% 0.011% 65% 0.000% 0% 0.011% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T1/BS/R.KG
Exhaust Air Duct, (tanpa Isolasi)
V 600 X 300 mm - m²
W 400 X 300 mm - m²
X 350 X 250 mm - m²
EF-T2,T4,T5,T8,T9/BS/R.CB
Exhaust Air Duct, (tanpa Isolasi)
Y 400 X 300 mm 3 m² 0.011% 0.007% 65% 0.000% 0% 0.007% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
Z 300 X 250 mm 4 m² 0.014% 0.009% 65% 0.000% 0% 0.009% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T2,T4,T6,T7,T9/BS/WS
Exhaust Air Duct, (tanpa Isolasi)
AA 400 X 250 mm 8 m² 0.028% 0.018% 65% 0.000% 0% 0.018% 65.0000% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
AB 300 X 200 mm 3 m² 0.011% 0.007% 65% 0.000% 0% 0.007% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T2,T4,T6,T7,T10/BS/STP
Exhaust Air Duct, (tanpa Isolasi)
AC 1800 x 500 mm - unit
AD 1500 x 500 mm - unit
AE 1400 x 400 mm - unit
AF 950 x 350 mm - unit
IF-T2,T4,T6,T7,T10/BS/STP
Exhaust Air Duct, (tanpa Isolasi)
AG 1700 x 500 mm - m²
AH 1400 x 450 mm - m²
AI 1300 x 400 mm - m²
AJ 1000 x 350 mm - m²
EF-T2,T4,T6,T7,T10/BS/TO
Exhaust Air Duct, (tanpa Isolasi)
AK 400 X 250 mm 4 m² 0.014% 0.009% 65% 0.000% 0% 0.009% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
AL 300 X 200 mm 4 m² 0.014% 0.009% 65% 0.000% 0% 0.009% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
AM 300 X 150 mm 3 m² 0.011% 0.007% 65% 0.000% 0% 0.007% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
AN 150 X 150 mm 3 m² 0.011% 0.007% 65% 0.000% 0% 0.007% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
###
Bab.2.1-VAC_Bsmt 18/15
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.2 INSTALASI DUCTING
Pengadaan dan pemasangan serta pengujian pekerjaan ducting BJLS, termasuk coating,
penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang tercantum dan
dijelaskan dalam gambar dan spesifikasi teknis
BASEMENT 1…(Lanjutan…)
EF-T3,T5/BS/KC
Exhaust Air Duct, (tanpa Isolasi)
A 800 X 350 mm 10 m² 0.035% 0.023% 65% 0.000% 0% 0.023% 65.0000% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
B 650 x 350 mm 11 m² 0.039% 0.025% 65% 0.000% 0% 0.025% 65.0000% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
C 550 X 300 mm 9 m² 0.032% 0.021% 65% 0.000% 0% 0.021% 65.0000% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
D 350 X 300 mm 7 m² 0.025% 0.016% 65% 0.000% 0% 0.016% 65.0000% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
EF-T1,T3,T6,T8,T9/BS/STO.3
Exhaust Air Duct, (tanpa Isolasi)
M 400 X 250 mm 4 m² 0.014% 0.009% 65% 0.000% 0% 0.009% 65.0000% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
N 250 X 200 mm 2 m² 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
EF-T3,T5,T7,T10/BS/KN.1
Exhaust Air Duct, (tanpa Isolasi)
O Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
P Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.2
Exhaust Air Duct, (tanpa Isolasi)
Q Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
R Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.3
Exhaust Air Duct, (tanpa Isolasi)
S Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
T Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.4
Exhaust Air Duct, (tanpa Isolasi)
U Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
V Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.5
Exhaust Air Duct, (tanpa Isolasi)
W Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
X Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.6
Exhaust Air Duct, (tanpa Isolasi)
Y Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
Z Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5,T7,T10/BS/KN.7
Exhaust Air Duct, (tanpa Isolasi)
AA Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AB Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5/BS/KN.8
Exhaust Air Duct, (tanpa Isolasi)
AC Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AD Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5/BS/KN.9
Exhaust Air Duct, (tanpa Isolasi)
AE Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AF Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5/BS/KN.10
Exhaust Air Duct, (tanpa Isolasi)
AG Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AL Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5/BS/KN.11
Exhaust Air Duct, (tanpa Isolasi)
AM Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AN Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
EF-T3,T5/BS/KN.12
Exhaust Air Duct, (tanpa Isolasi)
AO Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
AP Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 55% 0.000% 0% 0.000% 55.0000% 0.000% 0.000% 55% 0.000% 0% 0.000% 55.0000%
###
Bab.2.1-VAC_Bsmt 18/16
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.2 INSTALASI DUCTING
Pengadaan dan pemasangan serta pengujian pekerjaan ducting BJLS, termasuk coating,
penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang tercantum dan
dijelaskan dalam gambar dan spesifikasi teknis
BASEMENT 1…(Lanjutan…)
EF-T3,T5/BS/KN.13
Exhaust Air Duct, (tanpa Isolasi)
A Pipa Class D diameter : 100 mm 4 m 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
B Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
EF-T3,T5/BS/KN.14
Exhaust Air Duct, (tanpa Isolasi)
C Pipa Class D diameter : 100 mm 10 m 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000% 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000%
D Fitting Class D diameter : 100 mm 1 bh 0.001% 0.000% 65% 0.000% 0% 0.000% 65.0000% 0.000% 0.000% 65% 0.000% 0% 0.000% 65.0000%
EF-T10/BS/LK
CLUB HOUSE
EF-BS/KT
IF-BS/KT
Exhaust Air Duct, (tanpa Isolasi)
I 800 X 400 mm - m²
EF-BS/TO
Exhaust Air Duct, (tanpa Isolasi)
J 300 X 200 mm - m²
K 250 X 200 mm - m²
L 200 X 150 mm - m²
M 150 X 150 mm - m²
EF-BS/TO.LW
Exhaust Air Duct, (tanpa Isolasi)
N 900 x 300 mm - m²
O 600 X 300 mm - m²
P 400 X 250 mm - m²
Q 300 X 250 mm - m²
R 250 X 200 mm - m²
S 200 X 200 mm - m²
EF-BS/TO.LP
Exhaust Air Duct, (tanpa Isolasi)
T 800 X 250 mm - m²
U 650 X 250 mm - m²
V 500 X 250 mm - m²
W 350 X 200 mm - m²
X 250 X 200 mm - m²
Y 200 X 150 mm - m²
###
Bab.2.1-VAC_Bsmt 18/17
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.2 INSTALASI DUCTING
Penjumlahan
Halaman 2.1/13
Halaman 2.1/14
Halaman 2.1/15
Bab.2.1-VAC_Bsmt 18/18
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.3 INSTALASI KISI UDARA ( GRILLE / DIFFUSER )
Pengadaan dan pemasangan serta pengujian pekerjaan instalasi kisi udara (grille/ diffuser)
damper, penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
AREA BASEMENT
EF-T1/BS/BC
aksesoris
A EAG @ 518 Cfm : 400 x 300 mm - bh
B EAL : 800 x 500 mm - bh
EF-T1/BS/R.TR.A
aksesoris
C SAG @ 1.257 Cfm : 700 x 400 mm - bh
D EAL : 1,200 x 800 mm - bh
EF-T1/BS/R.TR.B
aksesoris
E SAG @ 1.151 Cfm : 650 x 400 mm - bh
F EAL : 1,500 x 600 mm - bh
EF-T2,T4,T5,T8,T9/BS/R.TR
aksesoris
G EAG @ 1500 Cfm : 800 x 400 mm 2 bh 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
H EAL : 1,300 x 600 mm 1 bh 0.011% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T1/BS/R.PUTM.A
aksesoris
I SAG @ 1.129 Cfm : 600 x 400 mm - bh
J EAL : 1,400 x 600 mm - bh
EF-T1/BS/R.PUTM.B
aksesoris
K SAG @ 1.129 Cfm : 600 x 400 mm - bh
L EAL : 1,300 x 600 mm - bh
EF-T2,T4,T5,T8,T9/BS/R.PUTM
aksesoris
M EAG @ 992 Cfm : 650 x 300 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
N EAL : 950 x 400 mm 1 bh 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T2,T4,T5,T8,T9/BS/R.PUTR
aksesoris
O EAG @ 1.037 Cfm : 650 x 350 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
P EAL : 1,200 x 450 mm 1 bh 0.009% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T1/BS/R.KG
aksesoris
Q SAG @ 711 Cfm : 550 x 350 mm - bh
R EAL : 1,000 x 500 mm - bh
EF-T2,T4,T5,T8,T9/BS/R.CB
aksesoris
S EAG @ 612 Cfm : 500 x 300 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
T EAL : 900 x 350 mm 1 bh 0.005% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T2,T4,T6,T7,T9/BS/WS
aksesoris
U EAG @ 475 Cfm : 400 x 250 mm 2 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
V EAL : 750 x 300 mm 1 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T2,T4,T6,T7,T10/BS/STP
aksesoris
W SAG @ 3.908 Cfm : 1,350 x 650 mm - unit
X EAL : 3,000 x 1,300 mm - unit
IF-T2,T4,T6,T7,T10/BS/STP
aksesoris
Y EAG @ 893 Cfm : 150 x 150 mm - bh
Z EAL : 750 x 300 mm - bh
EF-T2,T4,T6,T7,T10/BS/TO
aksesoris
AA EAG @ 992 Cfm : 650 x 300 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
AB EAL : 950 x 400 mm 1 bh 0.008% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T3,T5/BS/KC
aksesoris
AC EAG @ 893 Cfm : 150 x 150 mm 9 bh 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
AD EAL : 750 x 300 mm 1 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T1 s/d T10/BS/STO.1
Exhaust Air Duct, (tanpa Isolasi)
aksesoris
AE EAL : 100 x 100 mm 2 bh 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
AF EAL : 300 x 250 mm 2 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
AG DG : 700 x 100 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
###
Bab.2.1-VAC_Bsmt 18/19
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.3 INSTALASI KISI UDARA ( GRILLE / DIFFUSER )
Pengadaan dan pemasangan serta pengujian pekerjaan instalasi kisi udara (grille/ diffuser)
damper, penggantung, pendukung dan semua aksesoris yang diperlukan seperti yang
tercantum dan dijelaskan dalam gambar dan spesifikasi teknis
BASEMENT 1…(Lanjutan…)
EF-T1 s/d T10/BS/STO.2
aksesoris
A EAL : 100 x 100 mm 2 bh 0.002% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
B EAL : 300 x 250 mm 2 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
C DG : 700 x 100 mm 2 bh 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.001% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T1,T3,T6,T8,T9/BS/STO.3
aksesoris
D EAG @ 364 Cfm : 400 x 200 mm 2 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
E EAL : 600 x 300 mm 1 bh 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000% 0.000% 0.000% 0% 0.000% 0% 0.000% 0.0000%
EF-T10/BS/LK
aksesoris
F SAD @386 Cfm : 250 x 250 mm - bh
G EAL : 750 x 400 mm - bh
CLUB HOUSE
EF-BS/KT
aksesoris
H EAG @ 2.691 Cfm : 1,200 x 500 mm - bh
I EAL : 2,000 x 700 mm - bh
IF-BS/KT
aksesoris
J SAG @ 2.153 Cfm : 1,000 x 500 mm - bh
K FAL : 1,600 x 700 mm - bh
EF-BS/TO
aksesoris
L EAG @ 186 Cfm : 200 x 200 mm - bh
M EAL : 500 x 250 mm - bh
EF-BS/TO.LW
aksesoris
N EAG @ 186 Cfm : 200 x 200 mm - bh
O EAL : 1,200 x 700 mm - bh
EF-BS/TO.LP
aksesoris
P SAG @ 176 Cfm : 600 x 400 mm - bh
Q EAL : 1,200 x 650 mm - bh
###
Bab.2.1-VAC_Bsmt 18/20
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.2.3 INSTALASI KISI UDARA ( GRILLE / DIFFUSER )
Penjumlahan
Halaman 2.1/17
Halaman 2.1/19
Bab.2.1-VAC_Bsmt 18/21
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.1.3 PENDUKUNG 1 item
Lengkapi pekerjaan pendukung berikut ini; semua
sesuai dengan ketentuan spesifikasi
A menyiapkan pekerjaan pemberian tanda posisi
lubang, pasak, bobok dan lainnya di struktur
bangunan
B menyiapkan pengujian terhadap instalasi secara
keseluruhan (testing & comissioning)
C menyiapkan semua identifikasi bagian-bagian
pekerjaan sesuai dengan kebutuhan
D menyiapkan semua gambar-gambar instalasi yang
diperlukan
E menyiapkan semua petunjuk operasi dan
perDatan yang diperlukan
F menyiapkan semua gambar-gambar terlaksana
yang diperlukan
Bab.2.1-VAC_Bsmt 18/22
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
RINGKASAN
2.1.3 - PENDUKUNG
Bab.2.1-VAC_Bsmt 18/23
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
Progress Pekerjaan Progress Pekerjaan Minggu Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Kuantitas Unit
Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
A Pipa FH-HZ : dia. 200 mm 17 m 0.167% 0.142% 85% 0.000% 0% 0.142% 85% 0.014% 0.012% 85% 0.000% 0% 0.012% 85%
B - Fitting Pipa : dia. 200 mm 2 bh 0.031% 0.026% 85% 0.000% 0% 0.026% 85% 0.003% 0.002% 85% 0.000% 0% 0.002% 85%
C Pipa FH-LZ : dia. 200 mm 17 m 0.167% 0.142% 85% 0.000% 0% 0.142% 85% 0.014% 0.012% 85% 0.000% 0% 0.012% 85%
D - Fitting Pipa : dia. 200 mm 2 bh 0.031% 0.026% 85% 0.000% 0% 0.026% 85% 0.003% 0.002% 85% 0.000% 0% 0.002% 85%
E Pipa FH-HZ : dia. 150 mm 17 m 0.112% 0.095% 85% 0.000% 0% 0.095% 85% 0.009% 0.008% 85% 0.000% 0% 0.008% 85%
F - Fitting Pipa : dia. 150 mm 2 bh 0.016% 0.013% 85% 0.000% 0% 0.013% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
G Pipa FH-LZ : dia. 150 mm 17 m 0.112% 0.095% 85% 0.000% 0% 0.095% 85% 0.009% 0.008% 85% 0.000% 0% 0.008% 85%
H - Fitting Pipa : dia. 150 mm 2 bh 0.016% 0.013% 85% 0.000% 0% 0.013% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
I Pipa FH-HZ : dia. 150 mm 552 m 3.644% 3.097% 85% 0.000% 0% 3.097% 85% 0.297% 0.252% 85% 0.000% 0% 0.252% 85%
J - Fitting pipa : dia. 150 mm 50 bh 0.389% 0.331% 85% 0.000% 0% 0.331% 85% 0.032% 0.027% 85% 0.000% 0% 0.027% 85%
K Pipa FH-LZ : dia. 150 mm 552 m 3.644% 3.097% 85% 0.000% 0% 3.097% 85% 0.297% 0.252% 85% 0.000% 0% 0.252% 85%
L - Fitting pipa : dia. 150 mm 50 bh 0.389% 0.331% 85% 0.000% 0% 0.331% 85% 0.032% 0.027% 85% 0.000% 0% 0.027% 85%
M Butterfly Valve : dia. 150 mm 24 bh 1.057% 0.899% 85% 0.000% 0% 0.899% 85% 0.086% 0.073% 85% 0.000% 0% 0.073% 85%
N Gate Valve : dia. 25 mm 24 bh 0.047% 0.040% 85% 0.000% 0% 0.040% 85% 0.004% 0.003% 85% 0.000% 0% 0.003% 85%
U Indoor Hidrant c/w : 8 bh 0.731% 0.439% 60% 0.000% 0% 0.439% 60% 0.059% 0.036% 60% 0.000% 0% 0.036% 60%
- Box Type Custom (Lihat Gambar Detail Peralatan - FH 0502 WO)
- Hose Rack
- Variable Spray Type Nozzle dia. 40
- Hydrant Valve dia. 40 Macchino Coupling
- Line Hose dia. 40 mm x 30 m
V Outdoor Hidrant c/w : 3 bh 0.158% 0.095% 60% 0.000% 0% 0.095% 60% 0.013% 0.008% 60% 0.000% 0% 0.008% 60%
- Box Type Custom (Lihat Gambar Detail Peralatan - PK 302)
- Hose Rack slang dia. 65 chromium plated bronze
- Hydrant nozzle variable sray dia. 65
- Hydrant Valve, chronium plated dia. 65 vander heide
- Fire a-one dia. 65 mm x 30 m (couplings vander heide)
W Pipa FH : dia. 100 mm 110 m 0.432% 0.367% 85% 0.000% 0% 0.367% 85% 0.035% 0.030% 85% 0.000% 0% 0.030% 85%
X Pipa FH : dia. 65 mm 16 m 0.036% 0.030% 85% 0.000% 0% 0.030% 85% 0.003% 0.002% 85% 0.000% 0% 0.002% 85%
Y Pipa FH : dia. 40 mm 8 m 0.009% 0.008% 85% 0.000% 0% 0.008% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
Z - Fitting pipa : dia. 100 mm 12 bh 0.046% 0.039% 85% 0.000% 0% 0.039% 85% 0.004% 0.003% 85% 0.000% 0% 0.003% 85%
AA - Fitting pipa : dia. 65 mm 8 bh 0.018% 0.015% 85% 0.000% 0% 0.015% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
AB Landing Valve : dia. 65 mm 8 bh 0.066% 0.056% 85% 0.000% 0% 0.056% 85% 0.005% 0.005% 85% 0.000% 0% 0.005% 85%
AC Gate Valve : dia. 40 mm 8 bh 0.026% 0.022% 85% 0.000% 0% 0.022% 85% 0.002% 0.002% 85% 0.000% 0% 0.002% 85%
Bab.2.2-PK_Bsmt 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.2.2 PEKERJAAN SPRINKLER
Pemipaan (Vertikal)
P Pipa SP-HZ : dia. 150 mm 20 m 0.096% 0.082% 85% 0.000% 0% 0.082% 85% 0.008% 0.007% 85% 0.000% 0% 0.007% 85%
Q - Fitting pipa : dia. 150 mm 6 bh 0.018% 0.016% 85% 0.000% 0% 0.016% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
R Pipa SP-LZ : dia. 150 mm 20 m 0.096% 0.082% 85% 0.000% 0% 0.082% 85% 0.008% 0.007% 85% 0.000% 0% 0.007% 85%
S - Fitting pipa : dia. 150 mm 6 bh 0.018% 0.016% 85% 0.000% 0% 0.016% 85% 0.001% 0.001% 85% 0.000% 0% 0.001% 85%
T Kepala Sprinkler : Pendant Type 105 bh 0.100% 0.085% 85% 0.000% 0% 0.085% 85% 0.008% 0.007% 85% 0.000% 0% 0.007% 85%
U Kepala Sprinkler : Upright Type 827 bh 0.785% 0.667% 85% 0.000% 0% 0.667% 85% 0.064% 0.054% 85% 0.000% 0% 0.054% 85%
V Branch Control Valve (BCV) 4 bh 0.307% 0.261% 85% 0.000% 0% 0.261% 85% 0.025% 0.021% 85% 0.000% 0% 0.021% 85%
Bab.2.2-PK_Bsmt 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.2.3 PEKERJAAN DRAIN SPRINKLER
Pengadaan dan pemasangan serta pengujian untuk pemipaan
drain sprinkler, bahan dari pipa black steel Class Medium,
termasuk fitting pipa dan katup, sesuai lokasi yang ditentukan
lengkap dengan pendukung, penggantung dan semua aksesoris
yang diperlukan seperti yang tercantum dan dijelaskan dalam
gambar dan spesifikasi teknis
C Test Drain Valve S : dia. 25 mm 4 set 0.084% 0.072% 85% 0.000% 0% 0.072% 85% 0.007% 0.006% 85% 0.000% 0% 0.006% 85%
A Portable Fire Extinguisher (PFE) 39 bh 0.264% 0.000% 0% 0.000% 0% 0.000% 0% 0.021% 0.000% 0% 0.000% 0% 0.000% 0%
Type : Dry Powder
Capacity : 3 kg
Portable Fire Extinguisher (PFE) 2 bh 0.111% 0.000% 0% 0.000% 0% 0.000% 0% 0.009% 0.000% 0% 0.000% 0% 0.000% 0%
Type : CO2
Capacity : 25 kg
Bab.2.2-PK_Bsmt 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.2.5 PENDUKUNG 1 item
RINGKASAN
Bab.2.2-PK_Bsmt 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Kuantitas Unit Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
Pengadaan, Pemasangan dan pengujian peralatan utama sesuai packing list, menempatkannya di
lokasi yang ditentukan, termasuk pondasi, buffer, pengggantung, berikut peralatan keselamatan
dan alat-alat yang sesuai dengan gambar, ketentuan teknis dan petunjuk pabrik.
Pengadaan, Pemasangan dan pengujian peralatan utama sesuai packing list, menempatkannya di
lokasi yang ditentukan, termasuk pondasi, buffer, pengggantung, berikut peralatan keselamatan
dan alat-alat yang sesuai dengan gambar, ketentuan teknis dan petunjuk pabrik.
A Sewage Pit 22 unit 0.574% 0.287% 50% 0.000% 0% 0.287% 50% 0.047% 0.023% 50% 0.000% 0% 0.023% 50.0000%
Kode Gambar : Sewage Pit 1,2,4,5,7,9,11,12,13,15 & 18
Fungsi : Sewage Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 1000 x 1500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 125 LPM
Total Head (Pressure) : 1,5 BAR
Power : 2 x 1,25 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Lengkap dengan Panel kontrol, base plate,
Efisiensi Minimum : 45-75 % getaran, aksesoris dan semua
isolator
Quick Discharge Connector : Cast Iron yang diperlukan seperti yang
aksesoris
Operasional : Duty/Standby
dijelaskan dan ditunjukkan dalam gambar
Lain-lain : dan spesifikasi teknis
B Sewage Pit 2 unit 0.052% 0.026% 50% 0.000% 0% 0.026% 50% 0.004% 0.002% 50% 0.000% 0% 0.002% 50.0000%
Kode Gambar : Sewage Pit 3
Fungsi : Sewage Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 1000 x 1500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 140 LPM
Total Head (Pressure) : 1,5 BAR
Power : 2 x 1,4 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
C Sewage Pit 8 unit 0.209% 0.104% 50% 0.000% 0% 0.104% 50% 0.017% 0.008% 50% 0.000% 0% 0.008% 50.0000%
Kode Gambar : Sewage Pit 6,8,10 & 17
Fungsi : Sewage Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 1000 x 1750 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 150 LPM
Total Head (Pressure) : 1,5 BAR
Power : 2 x 1,5 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
D Sewage Pit 4 unit 0.104% 0.052% 50% 0.000% 0% 0.052% 50% 0.008% 0.004% 50% 0.000% 0% 0.004% 50.0000%
Kode Gambar : Sewage Pit 16 & 14
Fungsi : Sewage Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 1500 x 1500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 170 LPM
Total Head (Pressure) : 1,5 BAR
Power : 2 x 1,8 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
Pengadaan, Pemasangan dan pengujian peralatan utama sesuai packing list, menempatkannya di
lokasi yang ditentukan, termasuk pondasi, buffer, pengggantung, berikut peralatan keselamatan
dan alat-alat yang sesuai dengan gambar, ketentuan teknis dan petunjuk pabrik.
A Sewage Pit 2 unit 0.052% 0.026% 50% 0.000% 0% 0.026% 50% 0.004% 0.002% 50% 0.000% 0% 0.002% 50.0000%
Kode Gambar : Sewage Pit 19
Fungsi : Sewage Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 1000 x 1500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 200 LPM
Total Head (Pressure) : 1,5 BAR
Power : 2 x 2 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain :
Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
Pengadaan, Pemasangan dan pengujian peralatan utama sesuai packing list, menempatkannya di
lokasi yang ditentukan, termasuk pondasi, buffer, pengggantung, berikut peralatan keselamatan
dan alat-alat yang sesuai dengan gambar, ketentuan teknis dan petunjuk pabrik.
A Sump Pit 10 unit 0.261% 0.131% 50% 0.000% 0% 0.131% 50% 0.021% 0.011% 50% 0.000% 0% 0.011% 50.0000%
Kode Gambar : Sump Pit 1 s/d 86
Fungsi : Sum Pump
Type : Submersible
Jumlah Pompa : 1 unit
Dim : 1000 x 1000 x 1000 mm
Kondisi Operasi
Kapasitas Pompa : 1 x 50 LPM
Total Head (Pressure) : 1,5 BAR
Power : 1 x 0,5 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Automatic ON-OFF
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
B Sum Pit 1 unit
Kode Gambar : Sump Pit 1 (Longpond)
Fungsi : Sump Pump
Type : Submersible
Jumlah Pompa : 6 unit
Dim : .... x .... x .... mm
Kondisi Operasi
Kapasitas Pompa : 6 x @5,5 M³/Min
Total Head (Pressure) : 1,5 BAR
Power : 6 x 19,6 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Paralel Alternate
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
C Sump Pit 2 unit
Kode Gambar : Sump Pit 2
Fungsi : Sum Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 2000 x 2000 x 1500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 0,336 m³/min
Total Head (Pressure) : 1,5 BAR
Power : 2 x 1,82 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
D Sump Pit 2 unit
Kode Gambar : Sump Pit 3
Fungsi : Sum Pump
Type : Submersible
Jumlah Pompa : 2 unit
Dim : 1500 x 500 x 2500 mm
Kondisi Operasi
Kapasitas Pompa : 2 x 1,54 m³/min
Total Head (Pressure) : 1,5 BAR
Power : 2 x 5,88 kW, 380V/3Ph/50Hz
Putaran : ... RPM
Suhu Kerja Pompa : ... C0
Efisiensi Minimum : 45-75 %
Quick Discharge Connector : Cast Iron
Operasional : Duty/Standby
Lain-lain : Lengkap dengan Panel kontrol, base plate,
isolator getaran, aksesoris dan semua
aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar
dan spesifikasi teknis
Pengadaan, Pemasangan dan pengujian peralatan utama sesuai packing list, menempatkannya di
lokasi yang ditentukan, termasuk pondasi, buffer, pengggantung, berikut peralatan keselamatan
dan alat-alat yang sesuai dengan gambar, ketentuan teknis dan petunjuk pabrik.
Pengadaan dan pemasangan serta pengujian instalasi pipa air bersih, pipa PPR PN-10 dan,
lengkap dengan fitting, katup, pendukung dan semua aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar dan spesifikasi teknis
Pemipaan dari Header Pompa Transfer 1 ke Tower 1
A Pipa PPR PN10 (CW/T) : dia. 100 mm (4") - m
B Pipa PPR PN10 (CW/T) : dia. 80 mm (3") - m
C Fitting PPR PN25 (CW/T) : dia. 100 mm (4") - bh
D Fitting PPR PN25 (CW/T) : dia. 80 mm (3") - bh
E Butterfly Valve class 15K : dia. 100 mm - bh
Pemipaan dari Header Pompa Transfer 2 ke Tower 2
F Pipa PPR PN10 (CW/T) : dia. 100 mm (4") - m
G Pipa PPR PN10 (CW/T) : dia. 80 mm (3") - m
H Fitting PPR PN25 (CW/T) : dia. 100 mm (4") - bh
I Fitting PPR PN25 (CW/T) : dia. 80 mm (3") - bh
J Butterfly Valve class 15K : dia. 100 mm - bh
Pemipaan dari Header Pompa Transfer 1 ke Tower 3
K Pipa PPR PN10 (CW/T) : dia. 100 mm (4") - m
L Pipa PPR PN10 (CW/T) : dia. 80 mm (3") - m
M Fitting PPR PN25 (CW/T) : dia. 100 mm (4") - bh
N Fitting PPR PN25 (CW/T) : dia. 80 mm (3") - bh
O Butterfly Valve class 15K : dia. 100 mm - bh
Pengadaan dan pemasangan Anti Water Hammer lengkap dengan Check Valve, Stop Valve,
Water Mur, Lengkap dengan Fitting.sesuai dengan gambar dan spesifikasi teknis.
BD Water Hammer Tower 5 s/d 6 : dia. 80 mm 2 set 0.358% 0.304% 85% 0.000% 0% 0.304% 85% 0.029% 0.025% 85% 0.000% 0% 0.025% 85.0000%
Pengadaan dan pemasangan serta pengujian instalasi pipa air bersih, pipa PPR PN-10 dan,
lengkap dengan fitting, katup, pendukung dan semua aksesoris yang diperlukan seperti yang
dijelaskan dan ditunjukkan dalam gambar dan spesifikasi teknis
Pemipaan Air Bekas dari Central Grease Trap 7,8 & 9 ke STP 3
BB Pipa Cast Iron (KD) : dia. 250 mm 59 m 1.064% 0.830% 78% 0.000% 0% 0.830% 78% 0.087% 0.068% 78% 0.000% 0% 0.068% 78.0000%
BC Pipa Cast Iron (KD) : dia. 65 mm 137 m 0.413% 0.322% 78% 0.000% 0% 0.322% 78% 0.034% 0.026% 78% 0.000% 0% 0.026% 78.0000%
BD Fitting Cast Iron (KD) : dia. 250 mm 9 bh 0.207% 0.162% 78% 0.000% 0% 0.162% 78% 0.017% 0.013% 78% 0.000% 0% 0.013% 78.0000%
BE Fitting Cast Iron (KD) : dia. 65 mm 13 bh 0.031% 0.024% 78% 0.000% 0% 0.024% 78% 0.002% 0.002% 78% 0.000% 0% 0.002% 78.0000%
BF Ceilling CO (KD) : dia. 250 mm 2 bh 0.022% 0.007% 30% 0.000% 0% 0.007% 30% 0.002% 0.001% 30% 0.000% 0% 0.001% 30.0000%
BG Butterfly Valve class 15K : dia. 65 mm 6 bh 0.047% 0.019% 40% 0.000% 0% 0.019% 40% 0.004% 0.002% 40% 0.000% 0% 0.002% 40.0000%
BH Check Valve class 15K : dia. 65 mm 6 bh 0.087% 0.035% 40% 0.000% 0% 0.035% 40% 0.007% 0.003% 40% 0.000% 0% 0.003% 40.0000%
Pengadaan dan pemasangan serta pengujian instalasi pipa air bekas, pipa PVC class AW, GIP
medium dan pipa Cast Iron, lengkap dengan fitting, katup, pendukung dan semua aksesoris yang
diperlukan seperti yang dijelaskan dan ditunjukkan dalam gambar dan spesifikasi teknis
Pengadaan dan pemasangan serta pengujian pipa air kotor, pipa PVC class AW, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pemipaan Air Kotor dari Tower 1 & 2 ke STP 1
A Pipa pvc class AW (SW) : dia. 400 mm - m
B Pipa pvc class AW (SW) : dia. 100 mm - m
C Fitting pvc class D (SW) : dia. 400 mm - bh
D Fitting pvc class D (SW) : dia. 100 mm - bh
E Ceilling CO (SW) : dia. 400 mm - bh
F Ceilling CO (SW) : dia. 100 mm - bh
Pemipaan Air Kotor dari Sewage Pit 1 ke STP 1
G Pipa pvc class AW (SW) : dia. 65 mm - m
H Fitting pvc class D (SW) : dia. 65 mm - bh
I Butterfly Valve class 15K : dia. 65 mm - bh
J Check Valve class 15K : dia. 65 mm - bh
Pemipaan Air Kotor dari Sewage Pit 2 ke STP 1
K Pipa pvc class AW (SW) : dia. 65 mm - m
L Fitting pvc class D (SW) : dia. 65 mm - bh
M Butterfly Valve class 15K : dia. 65 mm - bh
N Check Valve class 15K : dia. 65 mm - bh
O Ceilling CO (SW) : dia. 65 mm - bh
Pemipaan Air Kotor dari Sewage Pit 3 ke STP 1
P Pipa pvc class AW (SW) : dia. 65 mm - m
Q Fitting pvc class D (SW) : dia. 65 mm - bh
R Butterfly Valve class 15K : dia. 65 mm - bh
S Check Valve class 15K : dia. 65 mm - bh
Pemipaan Air Kotor dari Tower 3 & 4 ke STP 2
T Pipa pvc class AW (SW) : dia. 400 mm - m
U Fitting pvc class D (SW) : dia. 400 mm - bh
V Ceilling CO (SW) : dia. 400 mm - bh
Pemipaan Air Kotor dari Sewage Pit 4 ke STP 2
W Pipa pvc class AW (SW) : dia. 65 mm - m
X Fitting pvc class D (SW) : dia. 65 mm - bh
Y Butterfly Valve class 15K : dia. 65 mm - bh
Z Check Valve class 15K : dia. 65 mm - bh
AA Ceilling CO (SW) : dia. 65 mm - bh
Pemipaan Air Kotor dari Sewage Pit 5 ke STP 2
AB Pipa pvc class AW (SW) : dia. 80 mm - m
AC Fitting pvc class D (SW) : dia. 80 mm - bh
AD Butterfly Valve class 15K : dia. 80 mm - bh
AE Check Valve class 15K : dia. 80 mm - bh
Pemipaan Air Kotor dari Sewage Pit 6 ke STP 2
AF Pipa pvc class AW (SW) : dia. 65 mm - m
AG Fitting pvc class D (SW) : dia. 65 mm - bh
AH Butterfly Valve class 15K : dia. 65 mm - bh
AI Check Valve class 15K : dia. 65 mm - bh
AJ Ceilling CO (SW) : dia. 65 mm - bh
Pengadaan dan pemasangan serta pengujian pipa air kotor, pipa PVC class AW, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pemipaan Air Kotor dari Tower 9 & 10 ke STP 5
A Pipa pvc class AW (SW) : dia. 400 mm m
B Pipa pvc class AW (SW) : dia. 100 mm m
C Fitting pvc class D (SW) : dia. 400 mm bh
D Fitting pvc class D (SW) : dia. 100 mm bh
E Ceilling CO (SW) : dia. 400 mm bh
Pemipaan Air Kotor dari Sewage Pit 15 ke STP 5
F Pipa pvc class AW (SW) : dia. 65 mm m
G Pipa&Fitting pvc class AW (SW) : dia. 50 mm m
H Fitting pvc class D (SW) : dia. 65 mm bh
I Butterfly Valve Bronzes 150 psi : dia. 50 mm bh
J Check Valve Bronzes 150 psi : dia. 50 mm bh
K Ceilling CO (SW) : dia. 65 mm bh
Pemipaan Air Kotor dari Sewage Pit 16 & 17 ke STP 5
L Pipa pvc class AW (SW) : dia. 65 mm m
M Pipa&Fitting pvc class AW (SW) : dia. 50 mm m
N Fitting pvc class D (SW) : dia. 65 mm bh
O Butterfly Valve class 15K : dia. 65 mm bh
P Butterfly Valve Bronzes 150 psi : dia. 50 mm bh
Q Check Valve class 15K : dia. 65 mm bh
R Check Valve Bronzes 150 psi : dia. 50 mm bh
Pemipaan Air Kotor dari Tower 11 ke STP 6
S Pipa pvc class AW (SW) : dia. 300 mm m
T Pipa pvc class AW (SW) : dia. 100 mm m
U Fitting pvc class D (SW) : dia. 300 mm bh
V Fitting pvc class D (SW) : dia. 100 mm bh
W Ceilling CO (SW) : dia. 300 mm bh
Pemipaan Air Kotor dari Sewage Pit 11 ke STP 6
X Pipa&Fitting pvc class AW (SW) : dia. 50 mm m
Y Butterfly Valve Bronzes 150 psi : dia. 50 mm bh
Z Check Valve Bronzes 150 psi : dia. 50 mm bh
Pemipaan Air Kotor dari Sewage Pit 12 ke STP 6
AA Pipa pvc class AW (SW) : dia. 100 mm m
AB Pipa pvc class AW (SW) : dia. 65 mm m
AC Fitting pvc class D (SW) : dia. 100 mm bh
AD Fitting pvc class D (SW) : dia. 65 mm bh
AE Butterfly Valve class 15K : dia. 65 mm bh
AF Check Valve class 15K : dia. 65 mm bh
AG Ceilling CO (SW) : dia. 100 mm bh
Pemipaan Air Kotor dari STP 1 & 2 ke Danau
AH Pipa pvc class AW (SW) : dia. 150 mm - m
AI Pipa pvc class AW (SW) : dia. 100 mm - m
AJ Fitting pvc class D (SW) : dia. 150 mm - bh
AK Fitting pvc class D (SW) : dia. 100 mm - bh
Pengadaan dan pemasangan serta pengujian pipa vent, pipa PVC class D, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pengadaan dan pemasangan serta pengujian pipa air hujan, pipa PVC class AW, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pengadaan dan pemasangan serta pengujian pipa air hujan, pipa PVC class AW, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pemipaan Air Hujan dari Sump Pit 15 s/d 17 & 19 ke Pembuangan
A Pipa pvc class AW (RW) : dia. 65 mm - m
B Pipa&Fitting pvc class AW (RW) : dia. 50 mm - m
C Fitting pvc class D (RW) : dia. 65 mm - bh
D Butterfly Valve Bronzes 150 psi : dia. 50 mm - bh
E Check Valve Bronzes 150 psi : dia. 50 mm - bh
Pemipaan Air Hujan dari Sump Pit 18,20 s/d 24 & 62 ke Pembuangan
F Pipa pvc class AW (RW) : dia. 80 mm - m
G Pipa pvc class AW (RW) : dia. 65 mm - m
H Pipa&Fitting pvc class AW (RW) : dia. 50 mm - m
I Fitting pvc class D (RW) : dia. 80 mm - bh
J Fitting pvc class D (RW) : dia. 65 mm - bh
K Butterfly Valve Bronzes 150 psi : dia. 50 mm - bh
L Check Valve Bronzes 150 psi : dia. 50 mm - bh
Pemipaan Air Hujan dari Sump Pit 30 s/d 32 & 34 s/d 38 ke Pembuangan
T Pipa pvc class AW (RW) : dia. 80 mm 26 m 0.020% 0.016% 78% 0.000% 0% 0.016% 78% 0.002% 0.001% 78% 0.000% 0% 0.001% 78.0000%
U Pipa pvc class AW (RW) : dia. 65 mm 58 m 0.035% 0.027% 78% 0.000% 0% 0.027% 78% 0.003% 0.002% 78% 0.000% 0% 0.002% 78.0000%
V Pipa&Fitting pvc class AW (RW) : dia. 50 mm 106 m 0.047% 0.037% 78% 0.000% 0% 0.037% 78% 0.004% 0.003% 78% 0.000% 0% 0.003% 78.0000%
W Fitting pvc class D (RW) : dia. 80 mm 6 bh 0.002% 0.002% 78% 0.000% 0% 0.002% 78% 0.000% 0.000% 78% 0.000% 0% 0.000% 78.0000%
X Fitting pvc class D (RW) : dia. 65 mm 6 bh 0.002% 0.001% 78% 0.000% 0% 0.001% 78% 0.000% 0.000% 78% 0.000% 0% 0.000% 78.0000%
Y Butterfly Valve Bronzes 150 psi : dia. 50 mm 7 bh 0.037% 0.022% 60% 0.000% 0% 0.022% 60% 0.003% 0.002% 60% 0.000% 0% 0.002% 60.0000%
Z Check Valve Bronzes 150 psi : dia. 50 mm 7 bh 0.038% 0.023% 60% 0.000% 0% 0.023% 60% 0.003% 0.002% 60% 0.000% 0% 0.002% 60.0000%
Pengadaan dan pemasangan serta pengujian pipa air hujan, pipa PVC class AW, lengkap dengan
peralatan, pendukung dan semua aksesoris yang diperlukan seperti yang ditunjukkan dan
dijelaskan dalam gambar dan spesifikasi teknis
Pemipaan Air Hujan dari Sump Pit 30,37 & 72 ke Pembuangan
A Pipa pvc class AW (RW) : dia. 65 mm - m
B Pipa&Fitting pvc class AW (RW) : dia. 50 mm - m
C Fitting pvc class D (RW) : dia. 65 mm - bh
D Butterfly Valve Bronzes 150 psi : dia. 50 mm - bh
E Check Valve Bronzes 150 psi : dia. 50 mm - bh
F Ceilling CO (RW) : dia. 65 mm - bh
Pemipaan Air Hujan dari Gutter Tower 1 s/d 6 ke Pembuangan
G Pipa pvc class AW (RW) : dia. 100 mm - m
H Fitting pvc class D (RW) : dia. 100 mm - bh
I Floor Drain : dia. 100 mm - bh
J Floor CO : dia. 100 mm - bh
Pengadaan dan pemasangan serta pengujian panel listrik tegangan rendah pada sistem 380/220
volt, 3 ph, 50 Hz termasuk box panel dengan pengunci, lengkap dengan busbar untuk phase,
netral dan ground dan semua komponen (misalnya switch, instrumen dan metering) sesuai lokasi
yang ditentukan termasuk pondasi, penggantung dan semua aksesoris yang diperlukan seperti
yang dijelaskan dan tercantum pada gambar dan spesifikasi teknis
A - PC-P.Effluent 1 s/d 17 (Central Grease Trap) 1,5kW 6 unit 0.072% 0.000% 0% 0.000% 0% 0.000% 0% 0.006% 0.000% 0% 0.000% 0% 0.000% 0.0000%
B - PC-P.Sewage Pit 1,2,4,5,7,9,11,12,13,15, & 18 (1,25 kW) 6 unit 0.072% 0.000% 0% 0.000% 0% 0.000% 0% 0.006% 0.000% 0% 0.000% 0% 0.000% 0.0000%
C - PC-P.Sewage Pit 3 (1,4 kW) - unit
D - PC-P.Sewage Pit 6,8,10 & 17 (1,5 kW) - unit
E - PC-P.Sewage Pit 16 & 14 (1,8 kW) - unit
F - PC-P.Sewage Pit 19 (2 kW) - unit
G - PC-P.Sump Pit (0,5 kW) 10 unit 0.120% 0.000% 0% 0.000% 0% 0.000% 0% 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000%
H - PC-P.Sump Pit 1 (Longpond) 19,6 kW 1 unit
I - PC-P.Sump Pump 5 (10,9 kW) 1 unit
J - PC-P.Sump Pump 3 (5,88 kW) 1 unit
K - PC-P.Sump Pump 2 (1,82 kW) 1 unit
L - PC-P.Sump Pump 4 (13,4 kW) 1 unit
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah pada sistem 380/220
volt, lengkap dengan penyambungan dan terminasi, serta cable gland, sepatu kabel, isolasi, dan
semua aksesoris yang diperlukan seperti yang dijelaskan dan tercantum pada gambar dan
spesifikasi teknis
Kabel Dari SDP-Pompa T8 ke :
A - PC-P.Sump Pit 24 : Kabel NYY 4 x 2,5 mm² m
B - PC-P.Sump Pit 25 : Kabel NYY 4 x 2,5 mm² m
C - PC-P.Sump Pit 29 : Kabel NYY 4 x 2,5 mm² m
D - PC-P.Sump Pit 31 : Kabel NYY 4 x 2,5 mm² m
E - PC-P.Effluent 15 : Kabel NYY 4 x 2,5 mm² m
F - PC-P.Effluent 17 : Kabel NYY 4 x 2,5 mm² m
G - PC-P.Sewage 17 : Kabel NYY 4 x 2,5 mm² m
H - PC-P.Sump Pit NN.42 : Kabel NYY 4 x 2,5 mm² m
I - PC-P.Sump Pit NN.43 : Kabel NYY 4 x 2,5 mm² m
J - PC-P.Sump Pit NN.44 : Kabel NYY 4 x 2,5 mm² m
Kabel Dari SDP-Pompa T9 ke :
K - PC-P.Sump Pit 23 : Kabel NYY 4 x 2,5 mm² m
L - PC-P.Sump Pit 30 : Kabel NYY 4 x 2,5 mm² m
M - PC-P.Sump Pit 32 : Kabel NYY 4 x 2,5 mm² m
N - PC-P.Effluent 13 : Kabel NYY 4 x 2,5 mm² m
O - PC-P.Effluent 14 : Kabel NYY 4 x 2,5 mm² m
P - PC-P.Sewage 15 : Kabel NYY 4 x 2,5 mm² m
Q - PC-P.Sump Pit NN.47 : Kabel NYY 4 x 2,5 mm² m
R - PC-P.Sump Pit NN.48 : Kabel NYY 4 x 2,5 mm² m
S - PC-P.Sump Pit NN.49 : Kabel NYY 4 x 2,5 mm² m
Kabel Dari SDP-Pompa T10 ke :
T - PC-P.Sump Pit 21 : Kabel NYY 4 x 2,5 mm² m
U - PC-P.Sump Pit 22 : Kabel NYY 4 x 2,5 mm² m
V - PC-P.Sump Pit 33 : Kabel NYY 4 x 2,5 mm² m
W - PC-P.Effluent 12 : Kabel NYY 4 x 2,5 mm² m
X - PC-P.Sewage 13 : Kabel NYY 4 x 2,5 mm² m
Y - PC-P.Sewage 14 : Kabel NYY 4 x 2,5 mm² m
Z - PC-P.Sump Pit NN.51 : Kabel NYY 4 x 2,5 mm² m
AA - PC-P.Sump Pit NN.52 : Kabel NYY 4 x 2,5 mm² m
Kabel Dari PC-P.Sump Pit 1 ke :
AB - P.Sump Pit 1 A (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
AC - P.Sump Pit 1 B (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
AD - P.Sump Pit 1 C (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
AE - P.Sump Pit 1 D (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
AF - P.Sump Pit 1 E (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
AG - P.Sump Pit 1 F (19,6 kW) : Kabel 2x(NYY 3x10 mm²)+NYA 10 mm² 7 m
Kabel Dari PC-P.Sump Pit 2 ke :
AH - P.Sump Pit 2 A (1,82 kW) Duty : Kabel NYY 4x2,5 mm² + NYA 2,5 mm² 5 m
AI - P.Sump Pit 2 B (1,82 kW) Standby : Kabel NYY 4x2,5 mm² + NYA 2,5 mm² 5 m
Kabel Dari PC-P.Sump Pit 3 ke :
AJ - P.Sump Pit 3 A (5,88 kW) Duty : Kabel 2 X (NYY 3x4 mm²) + NYA 4 mm² 5 m
AK - P.Sump Pit 3 B (5,88 kW) Standby : Kabel 2 X (NYY 3x4 mm²) + NYA 4 mm² 5 m
Kabel Dari PC-P.Sump Pit 4 ke :
AL - P.Sump Pit 4 A (13,4 kW) Duty : Kabel 2 X (NYY 3x6 mm²) + NYA 6 mm² 5 m
AM - P.Sump Pit 4 B (13,4 kW) Standby : Kabel 2 X (NYY 3x6 mm²) + NYA 6 mm² 5 m
Kabel Dari PC-P.Sump Pit 5 ke :
AN - P.Sump Pit 5 A (10,9 kW) Duty : Kabel 2 X (NYY 3x6 mm²) + NYA 6 mm² 5 m
AO - P.Sump Pit 5 B (10,9 kW) Standby : Kabel 2 X (NYY 3x6 mm²) + NYA 6 mm² 5 m
2.3.9 PENDUKUNG
RINGKASAN
10.833% 7.684% 70.934% 0.000% 0.000% 7.684% 70.934% 0.882% 0.625% 70.934% 0.000% 0.000% 0.625% 70.934%
###
###
BAB No. 2.4 - PEKERJAAN ELEKTRIKAL
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
Kuantitas unit
(%) % % % % % % (%) % % % % % %
A SDP-EMERGENCY T1 - unit
B SDP-EMERGENCY T2 - unit
C SDP-EMERGENCY T3 - unit
D SDP-EMERGENCY T4 - unit
E SDP-EMERGENCY T5 1 unit 1.234% 1.049% 85% 0.000% 0% 1.049% 85% 0.100% 0.085% 85% 0.000% 0% 0.085% 85%
F SDP-EMERGENCY T6 1 unit 1.204% 1.023% 85% 0.000% 0% 1.023% 85% 0.098% 0.083% 85% 0.000% 0% 0.083% 85%
G P.FAN-SB.T1 - unit
H P.FAN-SB.T2 - unit
I P.FAN-SB.T3 - unit
J P.FAN-SB.T4 - unit
K P.FAN-SB.T5 1 unit 1.106% 0.011% 1% 0.000% 0% 0.011% 1% 0.090% 0.001% 1% 0.000% 0% 0.001% 1%
L P.FAN-SB.T6 1 unit 1.027% 0.010% 1% 0.000% 0% 0.010% 1% 0.084% 0.001% 1% 0.000% 0% 0.001% 1%
M SDP-POMPA T1 - unit
N SDP-POMPA T2 - unit
O SDP-POMPA T3 - unit
P SDP-POMPA T4 - unit
Q SDP-POMPA T5 1 unit 0.556% 0.006% 1% 0.000% 0% 0.006% 1% 0.045% 0.000% 1% 0.000% 0% 0.000% 1%
R SDP-POMPA T6 1 unit 0.617% 0.006% 1% 0.000% 0% 0.006% 1% 0.050% 0.001% 1% 0.000% 0% 0.001% 1%
S - PP - P. SUMPIT - unit
T - PC - SUMPIT 1 - unit
U - PC - SUMPIT 2 - unit
V - PC - SUMPIT 3 - unit
W - PC - SUMPIT 4 - unit
X - PC - SUMPIT 5 - unit
Y - PC - SUMPIT 34 - unit
Z - PC - SEWAGE 16 - unit
AA - PC - SEWAGE 20 - unit
AB - PP-P.TRANSFER T1 - unit
AC - PC - P. TRANSFER T1 - unit
AD - PC - P. TRANSFER T2 - unit
AE - PC - P. TRANSFER T3 - unit
AF - PC - P. TRANSFER T4 - unit
AG - PC - P. TRANSFER T5 1 unit
AH - PC - P. TRANSFER T6 1 unit
Bab.2.4-EL_Bsmt 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.1 PANEL TEGANGAN RENDAH
Bab.2.4-EL_Bsmt 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.1 PANEL TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian panel listrik tegangan rendah
pada sistem 380/220 volt, 3 ph, 50 Hz (Lanjutan ...)
A - PC - P. SEWAGE 18 - unit
B - PC - P. SEWAGE 19 - unit
C - PC - SUMPIT NN.37 - unit
D - PC - SUMPIT NN.38 - unit
E - PC - SUMPIT NN.39 - unit
F - PC - SUMPIT NN.40 - unit
G - PC - SUMPIT NN.41 - unit
H - P. FAN - SB.T7 - unit
I - SDP - POMPA T8 - unit
J - PC - P. SUMPIT 24 - unit
K - PC - P. SUMPIT 25 - unit
L - PC - P. SUMPIT 29 - unit
M - PC - P. SUMPIT 31 - unit
N - PC - P. EFFLUENT 15 - unit
O - PC - P. EFFLUENT 17 - unit
P - PC - P. SEWAGE 17 - unit
Q - PC - SUMPIT NN.42 - unit
R - PC - SUMPIT NN.43 - unit
S - PC - SUMPIT NN.44 - unit
T - PC - P. SEWAGE 17 - unit
U - PC - SUMPIT NN.42 - unit
V - PC - SUMPIT NN.43 - unit
W - PC - SUMPIT NN.44 - unit
Bab.2.4-EL_Bsmt 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.1 PANEL TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian panel listrik tegangan rendah
pada sistem 380/220 volt, 3 ph, 50 Hz (Lanjutan ...)
A - SDP - POMPA T9 - unit
B - PC - P. SUMPIT 23 - unit
C - PC - P. SUMPIT 30 - unit
D - PC - P. SUMPIT 32 - unit
E - PC - P. SUMPIT 34 - unit
F - PC - P. EFFLUENT 13 - unit
G - PC - P. EFFLUENT 14 - unit
H - PC - P. SEWAGE 15 - unit
I - PC - SUMPIT NN.46 - unit
J - PC - SUMPIT NN.47 - unit
K - PC - SUMPIT NN.48 - unit
L - PC - SUMPIT NN.49 - unit
M - SDP - POMPA T10 - unit
N - PC - P. SUMPIT 21 - unit
O - PC - P. SUMPIT 22 - unit
P - PC - P. SUMPIT 33 - unit
Q - PC - P. EFFLUENT 12 - unit
R - PC - P. SEWAGE 13 - unit
S - PC - P. SEWAGE 14 - unit
T - PC - SUMPIT NN.51 - unit
U - PC - SUMPIT NN.52 - unit
Bab.2.4-EL_Bsmt 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.1 PANEL TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian panel listrik tegangan rendah
pada sistem 380/220 volt, 3 ph, 50 Hz (Lanjutan ...)
A - SDP - POMPA T11 - unit
B - PC - P. SUMPIT 19 - unit
C - PC - P. SUMPIT 20 - unit
D - PC - P. SUMPIT 35 - unit
E - PC - P. SUMPIT 36 - unit
F - PC - P. EFFLUENT 18 - unit
G - PC - P. EFFLUENT 11 - unit
H - PC - P. SEWAGE 10 - unit
I - PC - P. SEWAGE 11 - unit
J - PC - P. SEWAGE 12 - unit
K - PL-SB.T1 - unit
L PL-SB.T2 - unit
M PL-SB.T3 - unit
N PL-SB.T4 - unit
O PL-SB.T5 1 unit 0.611% 0.244% 40% 0.000% 0% 0.244% 40% 0.050% 0.020% 40% 0.000% 0% 0.020% 40%
P PL-SB.T6 1 unit 0.631% 0.253% 40% 0.000% 0% 0.253% 40% 0.051% 0.021% 40% 0.000% 0% 0.021% 40%
Q PL-SB.T7 - unit
R PL-SB.T8 - unit
S PL-SB.T9 - unit
T PL-SB.T10 - unit
U PL-SB.T11 - unit
V Panel Temporary ( untuk instalasi penerangan Tower 1 s/d 7 ) ( provisional - unit
Bab.2.4-EL_Bsmt 18/5
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt, lengkap dengan penyambungan dan terminasi,
serta cable gland, sepatu kabel, isolasi, dan semua aksesoris yang diperlukan
seperti yang dijelaskan dan tercantum pada gambar dan spesifikasi teknis
Bab.2.4-EL_Bsmt 18/6
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/7
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/8
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/9
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/10
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/11
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/12
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/13
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/14
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.4-EL_Bsmt 18/15
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Bab.2.4-EL_Bsmt 18/16
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/17
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Kabel dari SDP-Pompa T8 ke:
A PC - EFFLUENT 15 : NYY 4 x 2,5 mm² - m
B PC - EFFLUENT 17 : NYY 4 x 2,5 mm² - m
C PC - SEWAGE 17 : NYY 4 x 2,5 mm² - m
D PC - SUMPIT NN.42 : NYY 4 x 2,5 mm² - m
E PC - SUMPIT NN.43 : NYY 4 x 2,5 mm² - m
F PC - SUMPIT NN.44 : NYY 4 x 2,5 mm² - m
Bab.2.4-EL_Bsmt 18/18
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/19
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/20
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Pengadaan dan pemasangan serta pengujian untuk kabel tegangan rendah
pada sistem 380/220 volt (Lanjutan......)
Bab.2.4-EL_Bsmt 18/21
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.4-EL_Bsmt 18/22
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.3 KABEL FEEDER TEGANGAN RENDAH
Penjumlahan
Halaman 2.4/7
Halaman 2.4/8
Halaman 2.4/9
Halaman 2.4/10
Halaman 2.4/11
Halaman 2.4/12
Halaman 2.4/13
Halaman 2.4/14
Halaman 2.4/15
Halaman 2.4/16
Halaman 2.4/17
Halaman 2.4/18
Halaman 2.4/19
Halaman 2.4/20
Halaman 2.4/21
Halaman 2.4/22
Halaman 2.4/23
Bab.2.4-EL_Bsmt 18/23
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.4 PERLENGKAPAN PENERANGAN, SAKLAR & STOP KONTAK
Kabel Instalasi
N Instalasi Penerangan, NYA 2 x 1,5 mm² dlm conduit 488 ttk 1.069% 0.909% 85% 0.000% 0% 0.909% 85% 0.087% 0.074% 85% 0.000% 0% 0.074% 85%
O Instalasi Stop Kontak, NYA 3 x 2,5 mm² dlm conduit 36 ttk 0.104% 0.089% 85% 0.000% 0% 0.089% 85% 0.008% 0.007% 85% 0.000% 0% 0.007% 85%
Bab.2.4-EL_Bsmt 18/24
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.5 RAK KABEL
Pengadaan dan pemasangan Rak kabel di lokasi dan jalur yang ditentukan
lengkap dengan fitting, jointing, penggantung, pendukung dan semua
aksesoris yang diperlukan seperti yang tercantum dan dijelaskan dalam
gambar dan spesifikasi teknis
Kabel Ladder
A W 1000 x L100 693 m 2.847% 2.704% 95% 0.000% 0% 2.704% 95% 0.232% 0.220% 95% 0.000% 0% 0.220% 95%
Kabel Cage
B W 400 x L 100 240 m 0.657% 0.624% 95% 0.000% 0% 0.624% 95% 0.053% 0.051% 95% 0.000% 0% 0.051% 95%
Kabel Cage
D W 100 x L50 160 m 0.217% 0.206% 95% 0.000% 0% 0.206% 95% 0.018% 0.017% 95% 0.000% 0% 0.017% 95%
E W 200 x L100 112 m 0.219% 0.208% 95% 0.000% 0% 0.208% 95% 0.018% 0.017% 95% 0.000% 0% 0.017% 95%
F W 300 x L100 103 m 0.264% 0.250% 95% 0.000% 0% 0.250% 95% 0.021% 0.020% 95% 0.000% 0% 0.020% 95%
G W 400 x L100 211 m 0.577% 0.548% 95% 0.000% 0% 0.548% 95% 0.047% 0.045% 95% 0.000% 0% 0.045% 95%
Kabel Tray
H W 600 x L100 97 m 0.319% 0.303% 95% 0.000% 0% 0.303% 95% 0.026% 0.025% 95% 0.000% 0% 0.025% 95%
Bab.2.4-EL_Bsmt 18/25
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Bab.2.4-EL_Bsmt 18/26
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Bab.2.4-EL_Bsmt 18/27
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari Bak Kontrol Lift T2.B ke:
A GTB Tower 2 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari GTB Tower. 2 ke:
B PC-LS.2B-02 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
C PC-LP.2B-05~2B.08 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
D PC-LP.2B-05~2B.08 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
E PC-LP.2B-05~2B.08 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
F PC-LP.2B-05~2B.08 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari Bak Kontrol Lift T3.A ke:
G GTB Tower 3 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari 'GTB Tower 3 ke:
H PC-LS.3A-01 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
I PC-LP.3A-01~3A.04 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
J PC-LP.3A-01~3A.04 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
K PC-LP.3A-01~3A.04 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
L PC-LP.3A-01~3A.04 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari Bak Kontrol Lift T3.B ke:
M PC-LIFT DS : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
N GTB Tower 3 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari GTB Tower. 3 ke:
O PC-LS.3B-02 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Q PC-LP.3B-05~3B.08 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
R PC-LP.3B-05~3B.08 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
S PC-LP.3B-05~3B.08 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
T PC-LP.3B-05~3B.08 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari Bak Kontrol Lift T4.A ke:
U GTB Tower 4 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Bab.2.4-EL_Bsmt 18/28
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari 'GTB Tower 4 ke:
A PC-LS.4A-01 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
B PC-LP.4A-01~4A.04 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
C PC-LP.4A-01~4A.04 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
D PC-LP.4A-01~4A.04 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
E PC-LP.4A-01~4A.04 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari Bak Kontrol Lift T4.B ke:
F GTB Tower 4 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari GTB Tower. 4 ke:
G PC-LS.4B-02 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
H PC-LP.4B-05~4B.08 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
I PC-LP.4B-05~4B.08 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
J PC-LP.4B-05~4B.08 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
K PC-LP.4B-05~4B.08 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² - m
Dari Bak Kontrol Lift T5.A ke:
L GTB Tower 5 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 50 m
Dari 'GTB Tower 5 ke:
M PC-LS.5A-01 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
N PC-LP.5A-01~5A.04 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
O PC-LP.5A-01~5A.04 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
P PC-LP.5A-01~5A.04 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
Q PC-LP.5A-01~5A.04 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
Dari Bak Kontrol Lift T5.B ke:
R GTB Tower 5 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 50 m
Dari GTB Tower. 5 ke:
S PC-LS.5B-02 : Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
T PC-LP.5B-05~5B.08 (1): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
U PC-LP.5B-05~5B.08 (2): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
V PC-LP.5B-05~5B.08 (3): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
W PC-LP.5B-05~5B.08 (4): Kabel Coaxial 50 mm² didlm pipa Pvc 20 mm² 136 m
Bab.2.4-EL_Bsmt 18/29
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Bab.2.4-EL_Bsmt 18/30
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari SDP-EMG T3 ke
K PL - TK1.T3.A : Kabel BC 120 mm² (jadi Al) - m
L PL - TK2.T3.A : Kabel BC 120 mm² (jadi Al) - m
M PL - TK3.T3.B : Kabel BC 120 mm² (jadi Al) - m
N PL - TK4.T3.B : Kabel BC 120 mm² (jadi Al) - m
Bab.2.4-EL_Bsmt 18/31
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari GTB Body Basement
A PP - STP.T4 : Kabel BC 120 mm² (jadi Al) - m
B P U T R - T4 : Kabel BC 120 mm² (jadi Al) - m
C GTB Lantai 1 : Kabel BC 120 mm² (jadi Al) - m
D GTB Basement Tower 4: Kabel BC 120 mm² (jadi Al) - m
Dari GTB Lantai 1 tower 4
E SDP-RETAIL T4 : Kabel BC 120 mm² (jadi Al) - m
F PL- 1.T4 : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Basemen Ke
G SDP-EMG T4 : Kabel BC 120 mm² (jadi Al) - m
H SDP - POMPA T4 : Kabel BC 120 mm² (jadi Al) - m
Dari SDP-EMG T4 ke
I PL - TK1.T4.A : Kabel BC 120 mm² (jadi Al) - m
J PL - TK2.T4.A : Kabel BC 120 mm² (jadi Al) - m
K PL - TK3.T4.B : Kabel BC 120 mm² (jadi Al) - m
L PL - TK4.T4.B : Kabel BC 120 mm² (jadi Al) - m
Bab.2.4-EL_Bsmt 18/32
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari SDP-EMG T5 ke
A PL - TK1.T5.A : Kabel BC 120 mm² (jadi Al) 465 m 0.279% 0.167% 60% 0.000% 0% 0.167% 60% 0.023% 0.014% 60% 0.000% 0% 0.014% 60%
B PL - TK2.T5.A : Kabel BC 120 mm² (jadi Al) 274 m 0.164% 0.099% 60% 0.000% 0% 0.099% 60% 0.013% 0.008% 60% 0.000% 0% 0.008% 60%
C PL - TK3.T5.B : Kabel BC 120 mm² (jadi Al) 364 m 0.218% 0.131% 60% 0.000% 0% 0.131% 60% 0.018% 0.011% 60% 0.000% 0% 0.011% 60%
D PL - TK4.T5.B : Kabel BC 120 mm² (jadi Al) 104 m 0.062% 0.037% 60% 0.000% 0% 0.037% 60% 0.005% 0.003% 60% 0.000% 0% 0.003% 60%
Bab.2.4-EL_Bsmt 18/33
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari GTB Body tower 7 ke
A GTB TOWER 7 (Lantai 1: Kabel BC 120 mm² (jadi Al) - m
Dari GTB TOWER 7 (Lanta :
B PL - 1.T7 : Kabel BC 120 mm² (jadi Al) - m
C SDP-RETAIL.T7 : Kabel BC 120 mm² (jadi Al) - m
Dari SDP-RETAIL T7 ke
D RETAIL 1 : Kabel BC 120 mm² (jadi Al) - m
E RETAIL 2 : Kabel BC 120 mm² (jadi Al) - m
F RETAIL 3 : Kabel BC 120 mm² (jadi Al) - m
G RETAIL 4 : Kabel BC 120 mm² (jadi Al) - m
H RETAIL 5 : Kabel BC 120 mm² (jadi Al) - m
I RETAIL 6 : Kabel BC 120 mm² (jadi Al) - m
J RETAIL 7 : Kabel BC 120 mm² (jadi Al) - m
K ANCHOR : Kabel BC 120 mm² (jadi Al) - m
L RETAIL 8 : Kabel BC 120 mm² (jadi Al) - m
M RETAIL 9 : Kabel BC 120 mm² (jadi Al) - m
N RETAIL 10 : Kabel BC 120 mm² (jadi Al) - m
O PL - 1.T7 : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Basemen Ke
P SDP-EMG T7 : Kabel BC 120 mm² (jadi Al) - m
Q SDP - POMPA T7 : Kabel BC 120 mm² (jadi Al) - m
Kabel dari SDP - RETAIL.T8 ke:
R RETAIL 1 : Kabel BC 120 mm² (jadi Al) - m
S RETAIL 2 : Kabel BC 120 mm² (jadi Al) - m
T RETAIL 3 : Kabel BC 120 mm² (jadi Al) - m
U RETAIL 4 : Kabel BC 120 mm² (jadi Al) - m
V RETAIL 5 : Kabel BC 120 mm² (jadi Al) - m
W RETAIL 6 : Kabel BC 120 mm² (jadi Al) - m
X RETAIL 7 : Kabel BC 120 mm² (jadi Al) - m
Y RETAIL 8 : Kabel BC 120 mm² (jadi Al) - m
Z RETAIL 9 : Kabel BC 120 mm² (jadi Al) - m
AA RETAIL 10 : Kabel BC 120 mm² (jadi Al) - m
AB RETAIL 11 : Kabel BC 120 mm² (jadi Al) - m
AC RETAIL 12 : Kabel BC 120 mm² (jadi Al) - m
AD RETAIL 13 : Kabel BC 120 mm² (jadi Al) - m
AE RETAIL 14 : Kabel BC 120 mm² (jadi Al) - m
AF RETAIL 15 : Kabel BC 120 mm² (jadi Al) - m
AG RETAIL 16 : Kabel BC 120 mm² (jadi Al) - m
AH RETAIL 17 : Kabel BC 120 mm² (jadi Al) - m
AI RETAIL 18 : Kabel BC 120 mm² (jadi Al) - m
AJ RETAIL 19 : Kabel BC 120 mm² (jadi Al) - m
AK NO NAME 2 : Kabel BC 120 mm² (jadi Al) - m
AL NO NAME 3 : Kabel BC 120 mm² (jadi Al) - m
AM NO NAME 4 : Kabel BC 120 mm² (jadi Al) - m
AN NO NAME 5 : Kabel BC 120 mm² (jadi Al) - m
AO NO NAME 6 : Kabel BC 120 mm² (jadi Al) - m
AP PL - 1.T8 : Kabel BC 120 mm² (jadi Al) - m
Bab.2.4-EL_Bsmt 18/34
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Kabel dari SDP-Emergency T8 ke:
A SDP-EMERGENCY ATAP : Kabel BC 120 mm² (jadi Al) - m
B SDP-EMERGENCY ATAP : Kabel BC 120 mm² (jadi Al) - m
C PL - TK1.T8.A : Kabel BC 120 mm² (jadi Al) - m
D PL - TK2.T8.A : Kabel BC 120 mm² (jadi Al) - m
E PL - TK3.T8.B : Kabel BC 120 mm² (jadi Al) - m
F PL - TK4.T8.B : Kabel BC 120 mm² (jadi Al) - m
G PL - 17.T8.A : Kabel BC 120 mm² (jadi Al) - m
H PL - 17.T8.B : Kabel BC 120 mm² (jadi Al) - m
Dari BK Body PUTR-9 ke
I GTB Body tower 9 : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Body tower 9 ke
J PUTR-T9 : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Tower 9 ke
K SDP - POMPA T9 : Kabel BC 120 mm² (jadi Al) - m
L SDP-EMG T9 : Kabel BC 120 mm² (jadi Al) - m
Dari SDP-EMG T9 ke
M PL - TK1.T9.A : Kabel BC 120 mm² (jadi Al) - m
N PL - TK2.T9.A : Kabel BC 120 mm² (jadi Al) - m
O PL - TK3.T9.B : Kabel BC 120 mm² (jadi Al) - m
P PL - TK4.T9.B : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Body tower 9 ke
Q GTB TOWER 9 (Lantai 1: Kabel BC 120 mm² (jadi Al) - m
Dari GTB TOWER 9 (Lantai 1) ke
R PL - 1.T9 : Kabel BC 120 mm² (jadi Al) - m
S SDP-RETAIL.T9 : Kabel BC 120 mm² (jadi Al) - m
Dari SDP-RETAIL T9 ke
T PL - RETAIL-1 : Kabel BC 120 mm² (jadi Al) - m
U PL - RETAIL-2 : Kabel BC 120 mm² (jadi Al) - m
V PL - RETAIL-3 : Kabel BC 120 mm² (jadi Al) - m
W PL - RETAIL-4 : Kabel BC 120 mm² (jadi Al) - m
X PL - RETAIL-5 : Kabel BC 120 mm² (jadi Al) - m
Y PL - RETAIL-6 : Kabel BC 120 mm² (jadi Al) - m
Z PL - RETAIL-7 : Kabel BC 120 mm² (jadi Al) - m
AA PL - RETAIL-8 : Kabel BC 120 mm² (jadi Al) - m
Bab.2.4-EL_Bsmt 18/35
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Dari SDP-RETAIL T9 ke
A PL - RETAIL-9 : Kabel BC 120 mm² (jadi Al) - m
B PL - RETAIL-10 : Kabel BC 120 mm² (jadi Al) - m
C PL - RETAIL-11 : Kabel BC 120 mm² (jadi Al) - m
D PL - RETAIL-12 : Kabel BC 120 mm² (jadi Al) - m
E PL - RETAIL-13 : Kabel BC 120 mm² (jadi Al) - m
F PL - RETAIL-14 : Kabel BC 120 mm² (jadi Al) - m
G PL - RETAIL-15 : Kabel BC 120 mm² (jadi Al) - m
H PL - RETAIL-16 : Kabel BC 120 mm² (jadi Al) - m
I PL - RETAIL-17 : Kabel BC 120 mm² (jadi Al) - m
J PL - RETAIL-18 : Kabel BC 120 mm² (jadi Al) - m
K PL - RETAIL-19 : Kabel BC 120 mm² (jadi Al) - m
L PL - RETAIL-20 : Kabel BC 120 mm² (jadi Al) - m
M PL - RETAIL-21 : Kabel BC 120 mm² (jadi Al) - m
N PL - RETAIL-22 : Kabel BC 120 mm² (jadi Al) - m
O PL - RETAIL-23 : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Basemen Ke
P SDP-EMG T9 : Kabel BC 120 mm² (jadi Al) - m
Q SDP - POMPA T9 : Kabel BC 120 mm² (jadi Al) - m
Dari BK. Star Trafo T1 ke
R Transformator T1 : Kabel NYY 1 x 95 mm² (Al) - m
Dari Transformator T1 ke
S GTB Body Basement : Kabel BC 120 mm² (jadi Al) - m
Dari GTB Body Basement (T1)Ke
T PUTM-T1&T2 : Kabel BC 120 mm² (jadi Al) - m
Bab.2.4-EL_Bsmt 18/36
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Bab.2.4-EL_Bsmt 18/37
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.6 SISTEM PENTANAHAN
Pengadaan dan pemasangan serta pengujian sistem pentanahan (Lanjutan...)
Bab.2.4-EL_Bsmt 18/38
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.4-EL_Bsmt 18/39
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.4.7 PENDUKUNG 1 item
Lengkapi pekerjaan pendukung berikut ini; semua sesuai dengan ketentuan spesifikasi
A menyiapkan pekerjaan pemberian tanda posisi lubang, pasak, bobok dan lainnya di struktur bangunan
B menyiapkan pengujian terhadap instalasi secara keseluruhan (testing & comissioning)
C menyiapkan semua identifikasi bagian-bagian pekerjaan sesuai dengan kebutuhan
D menyiapkan semua gambar-gambar instalasi yang diperlukan
E menyiapkan semua petunjuk operasi dan perawatan yang diperlukan
F menyiapkan semua gambar-gambar terlaksana yang diperlukan
2.4.7 PENDUKUNG
Bab.2.4-EL_Bsmt 18/40
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
RINGKASAN
2.4.7 - PENDUKUNG
Bab.2.4-EL_Bsmt 18/41
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
###
###
BAB No. 2.5 - PEKERJAAN ELEKTRONIK
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
Kuantitas Unit
(%) % % % % % % (%) % % % % % %
Bab.2.5-EC_Bsmt 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Dari MDF-FA di ruang kontrol (Loop-1) ke : 100 m 0.136% 0.088% 65% 0.000% 0% 0.088% 65% 0.011% 0.007% 65% 0.000% 0% 0.007% 65.0000%
A JBFA-Tower 1 Besment.
Dari JBFA.Lantai.3 -Tower 1 kembali ke : 658 m 0.893% 0.581% 65% 0.000% 0% 0.581% 65% 0.073% 0.047% 65% 0.000% 0% 0.047% 65.0000%
B JBFA-Lantai-1 . Tower.1
Bab.2.5-EC_Bsmt 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Kabel Instalasi :
E Detectors : NYA 2 x 1,5 mm² dlm Conduit dia.20 mm² 193 ttk 0.303% 0.243% 80% 0.000% 0% 0.243% 80% 0.025% 0.020% 80% 0.000% 0% 0.020% 80.0000%
F Detectors tangga darurat : NYA 2 x 1,5 mm² dlm Conduit dia.20 mm² 7 ttk 0.014% 0.012% 80% 0.000% 0% 0.012% 80% 0.001% 0.001% 80% 0.000% 0% 0.001% 80.0000%
Bab.2.5-EC_Bsmt 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.5-EC_Bsmt 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.5-EC_Bsmt 18/5
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
A JBSS 2 bh 0.011% 0.007% 60% 0.000% 0% 0.007% 60% 0.001% 0.001% 60% 0.000% 0% 0.001% 60.0000%
Bab.2.5-EC_Bsmt 18/6
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.5-EC_Bsmt 18/7
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
A Ceiling Speaker, 3 Watt : EVAC 50 bh 0.091% 0.000% 0% 0.000% 0% 0.000% 0% 0.007% 0.000% 0% 0.000% 0% 0.000% 0.0000%
B Wall Speaker, 6 Watt 5 bh 0.044% 0.000% 0% 0.000% 0% 0.000% 0% 0.004% 0.000% 0% 0.000% 0% 0.000% 0.0000%
C Coloum Speaker , 10 Watt : AREA PARKIR (ZONA CAR CALL) 47 bh 0.257% 0.000% 0% 0.000% 0% 0.000% 0% 0.021% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Kabel Instalasi :
D Ceiling Speaker, 3 Watt : NYMHY 2x1,5 mm² dlm PVC Conduit dia.20 mm² 50 ttk 0.094% 0.071% 75% 0.000% 0% 0.071% 75% 0.008% 0.006% 75% 0.000% 0% 0.006% 75.0000%
E Wall Speaker, 6 Watt : NYMHY 2x1,5 mm² dlm PVC Conduit dia.20 mm² 5 ttk 0.014% 0.010% 75% 0.000% 0% 0.010% 75% 0.001% 0.001% 75% 0.000% 0% 0.001% 75.0000%
F Column Speaker : NYMHY 2x1,5 mm² dlm PVC Conduit dia.20 mm² 47 ttk 0.144% 0.108% 75% 0.000% 0% 0.108% 75% 0.012% 0.009% 75% 0.000% 0% 0.009% 75.0000%
Bab.2.5-EC_Bsmt 18/8
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Penjumlahan
Bab.2.5-EC_Bsmt 18/9
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
CCTV Camera
A Infrared Dome Camera V/F 10 bh
B Kamera Berwarna (Tipe tetap) 15 bh
C Stop Kontak : 10 A, 220V/ 1Phasa/ 50 Hz 25 bh
Bab.2.5-EC_Bsmt 18/10
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
43x Fiber
Kabel Feeder dari Rack 12 U At Control Room ke :
Optic Single
Wallmount Rack 12U Mode 4
B : 80 m
Core In PVC
-Passive Optical Splitter 1:2 : HI Conduit
1 unit
-Fiber Terminal BOX (FTB) : Ø 20mm
1 unit
-ONU 16FE + 16Pots : 1 unit
Bab.2.5-EC_Bsmt 18/11
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
PERLENGKAPAN
Pengadaan & INSTALASI
dan pemasangan ACCESS
kabel instalasiCONTROL
access control lengkap dengan conduit,
penyambungan dan semua aksesoris yang
diperlukan, sesuai dengan gambar dan
spesfikasi
Accessories & Instalasi
Bab.2.5-EC_Bsmt 18/12
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
Bab.2.5-EC_Bsmt 18/13
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
2.5.7 PENDUKUNG
2.5.7 PENDUKUNG
Bab.2.5-EC_Bsmt 18/14
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
RINGKASAN
2.5.7 - PENDUKUNG
4.621% 2.618% 56.655% 0.000% 0.000% 2.618% 56.655% 0.376% 0.213% 56.655% 0.000% 0.000% 0.213% 56.655%
BAB No. 2.5 - PEKERJAAN ELEKTRONIK
Bab.2.5-EC_Bsmt 18/15
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
BAB No. 5.1 - PEKERJAAN PEMADAM KEBAKARAN
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) s/d Minggu Ini ( % )
Item Uraian Pekerjaan Kuantitas Unit Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
(%) % % % % % % (%) % % % % % %
E Out door Hydrant Box (OHB) 2 set 0.105% 0.063% 60% 0.005% 5% 0.068% 65% 0.009% 0.005% 60% 0.000% 5% 0.006% 65%
Aksesories Lainnya
F Butterfly Valve : dia. 100 mm 2 bh 0.098% 0.078% 80% 0.000% 0% 0.078% 80% 0.008% 0.006% 80% 0.000% 0% 0.006% 80%
G ORF : dia. 100 mm 2 bh 0.035% 0.028% 80% 0.000% 0% 0.028% 80% 0.003% 0.002% 80% 0.000% 0% 0.002% 80%
Pemipaan Siamese connection
Bab.5.1-PK_Pek.LUAR 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
9.1.1 PEKERJAAN HYDRANT
Pemipaan PILAR HYDRANT
Bab.5.1-PK_Pek.LUAR 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
5.1.1 PEKERJAAN HYDRANT
Penjumlahan
Halaman 9.1/1
Halaman 9.1/2
Bab.5.1-PK_Pek.LUAR 18/3
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
9.1.2 PENDUKUNG 1 item
Lengkapi pekerjaan pendukung berikut ini; semua
sesuai dengan ketentuan spesifikasi
A menyiapkan pekerjaan pemberian tanda posisi
lubang, pasak, bobok dan lainnya di struktur
bangunan
B menyiapkan pengujian terhadap instalasi secara
keseluruhan (testing & comissioning)
C menyiapkan semua identifikasi bagian-bagian
pekerjaan sesuai dengan kebutuhan
D menyiapkan semua gambar-gambar instalasi yang
diperlukan
E menyiapkan semua petunjuk operasi dan
perawatan yang diperlukan
F menyiapkan semua gambar-gambar terlaksana
yang diperlukan
9.1.2 PENDUKUNG
RINGKASAN
BAB No. 5.1 - PEKERJAAN PEMADAM KEBAKARAN
9.1.1 - PEKERJAAN HYDRANT
9.1.2 - PENDUKUNG
BAB No. 5.1 - PEKERJAAN PEMADAM KEBAKARAN 0.885% 0.687% 77.6256% 0.005% 0.5936% 0.692% 78.2192% 0.072% 0.056% 77.6256% 0.000% 0.5936% 0.056% 78.2192%
Bab.5.1-PK_Pek.LUAR 18/4
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
8,325,411,801
102,308,762,900
Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d Progress Pekerjaan Progress Pekerjaan Progress Pekerjaan s/d
Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % ) Bobot Minggu Lalu ( % ) Minggu ini ( % ) Minggu Ini ( % )
Item Uraian Pekerjaan
Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress Bobot Progress
Kuantitas Unit (%) % % % % % % (%) % % % % % %
Bab.5.2-EL_Pek.LUAR 18/1
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - Tangerang PT. Citrasejati Primalestari
P.03 - Pekerjaan Mekanikal, Elektrikal & Plumbing (MEP)
5.2.3 PERLENGKAPAN PENERANGAN LUAR
Perlengkapan Penerangan
A Lampu In-Ground UpLight 35 Watt 200 bh 1.922% 1.153% 60% 0.096% 5% 1.249% 65% 0.156% 0.094% 60% 0.008% 5% 0.102% 65.0000%
B Lampu Bollards Light 18 Watt 38 bh 0.264% 0.158% 60% 0.013% 5% 0.172% 65% 0.021% 0.013% 60% 0.001% 5% 0.014% 65.0000%
C Lampu Pole Light 72 W 60 bh 5.477% 3.286% 60% 0.274% 5% 3.560% 65% 0.446% 0.267% 60% 0.022% 5% 0.290% 65.0000%
D Lampu Up Light 35 Watt 165 bh 1.439% 0.863% 60% 0.072% 5% 0.935% 65% 0.117% 0.070% 60% 0.006% 5% 0.076% 65.0000%
E Lampu Wall Recessed Light 6 W 20 bh 0.129% 0.078% 60% 0.006% 5% 0.084% 65% 0.011% 0.006% 60% 0.001% 5% 0.007% 65.0000%
F Lampu Led Strip Light 13,4 W/m 78 m 0.145% 0.087% 60% 0.007% 5% 0.095% 65% 0.012% 0.007% 60% 0.001% 5% 0.008% 65.0000%
G Lampu Flood Light 70 W 2 bh 0.028% 0.017% 60% 0.001% 5% 0.018% 65% 0.002% 0.001% 60% 0.000% 5% 0.001% 65.0000%
H Lampu Under water 7 Watt 5 bh 0.117% 0.000% 0% 0.000% 0% 0.000% 0% 0.010% 0.000% 0% 0.000% 0% 0.000% 0.0000%
Kabel Instalasi
I Instalasi Penerangan, In Ground Uplight: NYFGbY 5 x 4 mm² 90 ttk 0.773% 0.502% 65% 0.000% 0% 0.502% 65% 0.063% 0.041% 65% 0.000% 0% 0.041% 65.0000%
J Instalasi Penerangan, In Ground Uplight : NYFGbY 4 x 4 mm² 60 ttk 0.422% 0.274% 65% 0.000% 0% 0.274% 65% 0.034% 0.022% 65% 0.000% 0% 0.022% 65.0000%
K Instalasi Penerangan, In Ground Uplight: : NYFGbY 3 x 4 mm² 50 ttk 0.328% 0.213% 65% 0.000% 0% 0.213% 65% 0.027% 0.017% 65% 0.000% 0% 0.017% 65.0000%
L Instalasi Penerangan, Bollards Light: NYFGbY 5 x 4 mm² 23 ttk 0.198% 0.128% 65% 0.000% 0% 0.128% 65% 0.016% 0.010% 65% 0.000% 0% 0.010% 65.0000%
M Instalasi Penerangan, Bollards Light : NYFGbY 4 x 4 mm² 9 ttk 0.063% 0.041% 65% 0.000% 0% 0.041% 65% 0.005% 0.003% 65% 0.000% 0% 0.003% 65.0000%
N Instalasi Penerangan, Bollards Light: : NYFGbY 3 x 4 mm² 6 ttk 0.039% 0.026% 65% 0.000% 0% 0.026% 65% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
O Instalasi Penerangan, Up Light: NYFGbY 5 x 4 mm² 85 ttk 0.730% 0.474% 65% 0.000% 0% 0.474% 65% 0.059% 0.039% 65% 0.000% 0% 0.039% 65.0000%
P Instalasi Penerangan, Up Light : NYFGbY 4 x 4 mm² 45 ttk 0.316% 0.206% 65% 0.000% 0% 0.206% 65% 0.026% 0.017% 65% 0.000% 0% 0.017% 65.0000%
Q Instalasi Penerangan, Up Light: : NYFGbY 3 x 4 mm² 35 ttk 0.230% 0.149% 65% 0.000% 0% 0.149% 65% 0.019% 0.012% 65% 0.000% 0% 0.012% 65.0000%
R Instalasi Penerangan, Pole Light: NYFGbY 5 x 4 mm² 42 ttk 0.361% 0.234% 65% 0.000% 0% 0.234% 65% 0.029% 0.019% 65% 0.000% 0% 0.019% 65.0000%
S Instalasi Penerangan, Pole Light : NYFGbY 4 x 4 mm² 10 ttk 0.070% 0.046% 65% 0.000% 0% 0.046% 65% 0.006% 0.004% 65% 0.000% 0% 0.004% 65.0000%
T Instalasi Penerangan, Pole Light: : NYFGbY 3 x 4 mm² 8 ttk 0.052% 0.034% 65% 0.000% 0% 0.034% 65% 0.004% 0.003% 65% 0.000% 0% 0.003% 65.0000%
U Instalasi Penerangan, Wall Recessed Light: NYFGbY 5 x 4 mm² 10 ttk 0.086% 0.056% 65% 0.000% 0% 0.056% 65% 0.007% 0.005% 65% 0.000% 0% 0.005% 65.0000%
V Instalasi Penerangan, Wall Recessed Light: NYFGbY 4 x 4 mm² 6 ttk 0.042% 0.027% 65% 0.000% 0% 0.027% 65% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
W Instalasi Penerangan, Wall Recessed Light: NYFGbY 3 x 4 mm² 4 ttk 0.026% 0.017% 65% 0.000% 0% 0.017% 65% 0.002% 0.001% 65% 0.000% 0% 0.001% 65.0000%
X Instalasi Penerangan, Led Strip Light: NYFGbY 5 x 4 mm² 78 ttk 0.670% 0.435% 65% 0.000% 0% 0.435% 65% 0.055% 0.035% 65% 0.000% 0% 0.035% 65.0000%
Y Instalasi Penerangan, Led Strip Light: NYFGbY 4 x 4 mm² - m 0.000% 0.000% 0% 0.000% 0% 0.000% 0%
Z Instalasi Penerangan, Led Strip Light: NYFGbY 3 x 4 mm² - m 0.000% 0.000% 0% 0.000% 0% 0.000% 0%
AA Instalasi Penerangan, Led Flood Light: NYFGbY 3 x 4 mm² 2 ttk 0.013% 0.009% 65% 0.000% 0% 0.009% 65% 0.001% 0.001% 65% 0.000% 0% 0.001% 65.0000%
AB Instalasi Penerangan, Flood: NYFGbY 5 x 4 mm² - ttk 0.000% 0.000% 0% 0.000% 0% 0.000% 0%
AC Instalasi Penerangan, Flood: NYFGbY 4 x 4 mm² - ttk 0.000% 0.000% 0% 0.000% 0% 0.000% 0%
AD Instalasi Penerangan, Flood: NYFGbY 3 x 4 mm² 5 ttk 0.033% 0.021% 65% 0.000% 0% 0.021% 65% 0.003% 0.002% 65% 0.000% 0% 0.002% 65.0000%
5.2.4 PENDUKUNG
RINGKASAN
BAB No. 5.2 - PEKERJAAN ELEKTRIKAL
5.2.1 - PANEL TEGANGAN RENDAH
5.2.2 - KABEL FEEDER TEGANGAN RENDAH
5.2.3 - PERLENGKAPAN PENERANGAN LUAR
5.2.4 - PENDUKUNG
BAB No. 5.2 - PEKERJAAN ELEKTRIKAL 14.464% 8.867% 61.3013% 0.483% 3.3421% 9.350% 64.6434% 1.177% 0.722% 61.3013% 0.039% 3.3421% 0.761% 64.6434%
Bab.5.2-EL_Pek.LUAR 18/2
PQS.09_2018 : "Tokyo Riverside Apartment" Tower 1-6, PIK.2 - TangerangP.03 - Pekerjaan Mekanikal, Elektrikal & PlumbingPT.
(MEP)
Danata Estima Sarana
Penjumlahan
5.1###
- PEKERJAAN PEMADAM KEBAKARAN Rp. 60,919,300 12,747,600
10.00 : BAB No. 05 - PEKERJAAN LUAR Di alihkan Ke Rekapitulasi Akhir - Rp. 1,154,142,300.00 123,732,600.00
Summary-Bab.5_Pek.LUARz 14/3