Anda di halaman 1dari 2

INSTALLATION INSTRUCTIONS

STEEL TRACK FESTOON SYSTEM for ROUND CABLE/HOSE

CROSS ARMS
TRACK BRACKET­–THREE PIECES
Support festoon track
Supports track to cross arms

END STOP
Insert into track
at end of run
BEAM CLAMPS
Fasten cross arms to I-beam
Includes track nuts

CROSS
ARM

TOW ARM

TOW TROLLEY
Last trolley on moving
end of system.

TRACK SPLICE
Raised lance in rail to align
with notch in bracket to hold
track together
FIXED CABLE
CLAMP
Secures cable and
acts as stop on
“non-moving “ end CABLE/HOSE SADDLE
One at each trolley or clamp. Be sure
saddle size matches cable/hose o.d.
Lance in track as stop

CROSS
ARM
ANCHOR BRACKET
Use one at each end of track

INSTALLATION
1. Clamp cross arms to supporting I-beam. Spacing between arms must not exceed 6’ (1.8m) on center. Securely tighten clamps.
2. Hang festoon rail sections from bottom of arms using anchor brackets (one each end of system) and track brackets. Use track
splices to join track sections. NOTE: Raised lance in track mates with notch of splice.
3. Carefully level and align track. Festoon track must be parallel to crane track. Shim or adjust cross arms as required. Securely
tighten all set screws on anchor brackets and splice brackets.
4. Insert end stop into end of track opposite cable fixing end. Clamp tightly in place.
5. Insert tow trolley into cable fixing end of track followed by intermediate trolleys. (See illustration above).
6. Insert fixed cable clamp into track with stop angle on clamping bar facing in. Securely tighten in place.
7. Install cable or hose. Number of trolleys in kit assumes 3’ loop depth (measured cable saddles to bottom of loops) when trolleys are
pushed together. NOTE: Check to make sure saddles are correct size for cable/hose to be installed. See Components, over.
8. Insert tow arm through opening in tow trolley and bolt or weld tow arm to crane. Tow arm must be centered within opening and
perpendicular to festoon rail.
INDIVIDUAL COMPONENTS
1.0 dia. 3.1
(25) 1.0 (79)
1.6 (25)
(40)
1.80
(46)
B
B

Dia.
Range A
D Dia.
Range A D

ROUND CABLE FIXED CLAMP ROUND CABLE INTERMEDIATE TROLLEY


Catalog Cable O.D. Catalog Cable O.D.
B D Wgt. B D Wgt.
Number Range-A Number Range-A
C35-RE-12 0.60”-0.94” 1.40” 3.90” 2 lbs C35-RC-12 0.60”-0.94” 1.25” 3.90” 1 lbs
C35-RE-13 0.95”-1.25” 1.65” 5.60” 2 lbs C35-RC-13 0.95”-1.25” 1.50” 5.60” 1 lbs

1.0 dia. 1.0 5.0


(25) (25) (127)

1.8
(46) ROUND CABLE TOW TROLLEY
Catalog Cable O.D.
3.6 B 2.6 B D Wgt.
(92) (70)
1.75
(44) Number Range-A
C35-RT-12 0.60”-0.94” 6.70” 3.90” 3 lbs
C35-RT-13 0.95”-1.25” 6.90” 5.60” 3 lbs

Dia.
Range A
D

TOW ARM END STOP TRACK SPLICE


F-CTA-F F-CTS F-CTJ
Wgt: 3.00 lbs Wgt: 0.30 lbs Wgt: 1.00 lbs

BEAM CLAMP TRACK BRACKET STEEL TRACK


F-CTC-A F-CTH
LENGTH WGT. CATALOG
Wgt: 0.25 lbs Wgt: 0.50 lbs DESCRIPTIONS
ft lbs NUMBER
Festoon Track 10’ 10.50 C35-TR-10
Cross Arm 2.5’ 3.00 C35-TR-2.5

Standard lengths shown. Sections may be cut to required


length.

Gleason Reel Corp.


P.O. Box 26
600 S. Clark Street
Mayville, WI 53050
Workplace Solutions www.hubbell-gleason.com Bulletin No. 630379.b

Anda mungkin juga menyukai