KEGIATAN
PEKERJAAN
LOKASI
KABUPATEN BATANG
TAHUN ANGGARAN
2021
Konsultan Perencana
TOTAL Rp 104,551,187.41
PPN 10% Rp 10,455,118.74
JUMLAH TOTAL Rp 115,006,306.15
DIBULATKAN Rp 115,000,000.00
Batang, 2021
TOTAL Rp 104,551,187.41
PPN 10% Rp 10,455,118.74
JUMLAH TOTAL Rp 115,006,306.15
DIBULATKAN Rp 115,000,000.00
Batang, 2021
###
###
###
Drs. SUPRIYONO,M.Si. WENI ARY SUSANTI, SE.MM.
NIP. 19650714 199203 1 006 NIP. 19710929 199403 2 004
DAFTAR HARGA SATUAN PEKERJAAN
DAERAH BAWAH
SUMBER DATA : PASAR BEBAS
DAERAH : KABUPATEN BATANG
EDISI SEMESTER I 2020
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN 2018
(Rp)
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
10 A.4.4.1.11 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 135,126.20
A Tenaga 40,225.00
L.01 0.300 OH Pekerja 90,000.00 27,000.00
L.02 0.100 OH Tukang Batu 105,000.00 10,500.00
L.03 0.010 OH Kepala Tukang 115,000.00 1,150.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B Bahan 82,617.00
70.000 Buah Bata Merah 5 x 11 x 22 850.00 59,500.00
8.320 Kg Portland Semen 1,100.00 9,152.00
0.049 m3 Pasir Pasang 285,000.00 13,965.00
C PERALATAN
D Jumlah A+B+C 122,842.00
E Overhead & Profit 10% 12,284.20
F Harga Satuan Pekerjaan (D+E) 135,126.20
3 A.4.6.1.2.2 1.000 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kampas 10,895,225.00
Tenaga 2,668,500.00
L.01 6.000 OH Pekerja 90,000.00 540,000.00
L.02 18.000 OH Tukang Kayu 105,000.00 1,890,000.00
L.03 1.800 OH Kepala Tukang 115,000.00 207,000.00
L.04 0.300 OH Mandor 105,000.00 31,500.00
Bahan 7,236,250.00
1.200 m3 Kayu Kampas , Balok 6,000,000.00 7,200,000.00
1.250 kg Paku 10 cm 17,000.00 21,250.00
1.000 kg Lem Kayu 15,000.00 15,000.00
C PERALATAN
D Jumlah A+B+C 9,904,750.00
E Overhead & Profit 10% 990,475.00
F Harga Satuan Pekerjaan (D+E) 10,895,225.00
8 A.4.6.1.5.3 1.000 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kampas 799,975.00
A Tenaga 444,750.00
L.01 1.000 OH Pekerja 90,000.00 90,000.00
L.02 3.000 OH Tukang Kayu 105,000.00 315,000.00
L.03 0.300 OH Kepala Tukang 115,000.00 34,500.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B Bahan 282,500.00
0.040 m3 Kayu Kampas, papan 6,875,000.00 275,000.00
0.500 kg Lem Kayu 15,000.00 7,500.00
C PERALATAN
D Jumlah A+B+C 727,250.00
E Overhead & Profit 10% 72,725.00
F Harga Satuan Pekerjaan (D+E) 799,975.00
12 A.4.6.1.6.3 1.000 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kampas 577,830.00
A Tenaga 355,800.00
L.01 0.800 OH Pekerja 90,000.00 72,000.00
L.02 2.400 OH Tukang Kayu 105,000.00 252,000.00
L.03 0.240 OH Kepala Tukang 115,000.00 27,600.00
L.04 0.040 OH Mandor 105,000.00 4,200.00
B Bahan 169,500.00
0.024 m3 Kayu Kampas, papan 6,875,000.00 165,000.00
0.300 kg Lem Kayu 15,000.00 4,500.00
C PERALATAN
D Jumlah A+B+C 525,300.00
E Overhead & Profit 10% 52,530.00
F Harga Satuan Pekerjaan (D+E) 577,830.00
27 A.4.6.1.10.3 1.000 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kampas 817,547.50
A Tenaga 328,475.00
L.01 0.670 OH Pekerja 90,000.00 60,300.00
L.02 2.000 OH Tukang Kayu 105,000.00 210,000.00
L.03 0.200 OH Kepala Tukang 115,000.00 23,000.00
L.04 0.335 OH Mandor 105,000.00 35,175.00
B Bahan 414,750.00
0.060 m3 Kayu kampas, papan 6,875,000.00 412,500.00
0.150 Kg Paku 1 cm - 2,5 cm 15,000.00 2,250.00
C PERALATAN
D Jumlah A+B+C 743,225.00
E Overhead & Profit 10% 74,322.50
F Harga Satuan Pekerjaan (D+E) 817,547.50
37 A.4.6.1.13.3 1.000 m3 Pembuatan & Memasang Konstruksi Kuda-kuda Konvensional Kayu Kampas 9,560,870.00
A Tenaga 1,779,000.00
L.01 4.000 OH Pekerja 90,000.00 360,000.00
L.02 12.000 OH Tukang Kayu 105,000.00 1,260,000.00
L.03 1.200 OH Kepala Tukang 115,000.00 138,000.00
L.04 0.200 OH Mandor 105,000.00 21,000.00
B Bahan 6,912,700.00
1.100 m3 Kayu Kampas, balok 6,000,000.00 6,600,000.00
15.000 Kg Besi Strip tebal 5 cm 14,500.00 217,500.00
5.600 Kg Paku Biasa 12 cm 17,000.00 95,200.00
C PERALATAN
D Jumlah A+B+C 8,691,700.00
E Overhead & Profit 10% 869,170.00
F Harga Satuan Pekerjaan (D+E) 9,560,870.00
44 A.4.6.1.16.1 1.000 m2 Pemasangan Rangka Atap (reng 2/3, kaso 5/7), Kayu Kampas 144,127.50
A Tenaga 21,175.00
L.01 0.100 OH Pekerja 90,000.00 9,000.00
L.02 0.100 OH Tukang Kayu 105,000.00 10,500.00
L.03 0.010 OH Kepala Tukang 115,000.00 1,150.00
L.04 0.005 OH Mandor 105,000.00 525.00
B Bahan 109,850.00
0.014 m3 Kayu Kampas, Kaso-kaso (5x7) cm 6,000,000.00 84,000.00
0.004 m3 Reng (2x3) cm 6,000,000.00 21,600.00
0.250 Kg Paku 5 cm dan 10 cm 17,000.00 4,250.00
C PERALATAN
D Jumlah A+B+C 131,025.00
E Overhead & Profit 10% 13,102.50
F Harga Satuan Pekerjaan (D+E) 144,127.50
55 A.4.6.1.19.3 1.000 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Lokal keras 107,607.50
A Tenaga 56,325.00
L.01 0.150 OH Pekerja 90,000.00 13,500.00
L.02 0.300 OH Tukang Kayu 105,000.00 31,500.00
L.03 0.030 OH Kepala Tukang 115,000.00 3,450.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B Bahan 41,500.00
0.0154 m3 Kayu Lokal keras, balok 2,500,000.00 38,500.00
0.200 Kg Paku Biasa 7 cm - 10 cm 15,000.00 3,000.00
C PERALATAN
D Jumlah A+B+C 97,825.00
E Overhead & Profit 10% 9,782.50
F Harga Satuan Pekerjaan (D+E) 107,607.50
VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON
4 A.4.1.1.4 1.000 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 891,069.14
A Tenaga 137,600.00
L.01 1.200 OH Pekerja 90,000.00 108,000.00
L.02 0.200 OH Tukang Batu 105,000.00 21,000.00
L.03 0.020 OH Kepala Tukang 115,000.00 2,300.00
L.04 0.060 OH Mandor 105,000.00 6,300.00
B Bahan 672,462.86
230.000 Kg Portland Semen 1,100.00 253,000.00
893.000 kg Pasir Beton 285.71 255,142.86
1,027.000 kg Kerikil (maksimum 30 mm) 160.00 164,320.00
200.000 ltr Air 0.00 -
C PERALATAN
D Jumlah A+B+C 810,062.86
E Overhead & Profit 10% 81,006.29
F Harga Satuan Pekerjaan (D+E) 891,069.14
5 A.4.1.1.5 1.000 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,022,662.14
A Tenaga 189,310.00
L.01 1.650 OH Pekerja 90,000.00 148,500.00
L.02 0.275 OH Tukang Batu 105,000.00 28,875.00
L.03 0.028 OH Kepala Tukang 115,000.00 3,220.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B Bahan 740,382.86
326.000 Kg Portland Semen 1,100.00 358,600.00
760.000 Kg Pasir Beton 285.71 217,142.86
1,029.000 Kg Kerikil (maksimum 30 mm) 160.00 164,640.00
215.000 ltr Air 0.00 -
C PERALATAN
D Jumlah A+B+C 929,692.86
E Overhead & Profit 10% 92,969.29
F Harga Satuan Pekerjaan (D+E) 1,022,662.14
A Tenaga 23,077.50
B Bahan 50,000.00
C PERALATAN
E 0 10% 7,307.75
A Tenaga 59,510.00
B Bahan 42,920.00
C PERALATAN
E 0 10% 10,243.00
A Tenaga 11,275.00
B Bahan 23,820.00
C PERALATAN
A Tenaga 107,450.00
B Bahan 82,950.00
C PERALATAN
D Jumlah A + B + C 190,400.00
8 A.4.7.1.5.1 1.000 m2 Pengecatan Bidang Kayu Baru (1 lp Plamir, 1 lp Cat dasar, 3 Lp Cat Penutup) Kw A 64,817.50
A Tenaga 18,100.00
L.01 0.070 OH Pekerja 90,000.00 6,300.00
L.02 0.105 OH Tukang Cat 105,000.00 11,025.00
L.03 0.004 OH Kepala Tukang 115,000.00 460.00
L.04 0.003 OH Mandor 105,000.00 315.00
B Bahan 40,825.00
0.200 kg Cat Menie 35,000.00 7,000.00
0.150 kg Plamir 40,000.00 6,000.00
0.170 kg Cat Dasar 36,500.00 6,205.00
0.350 kg Cat Penutup 57,000.00 19,950.00
0.010 bh Kuas 14,000.00 140.00
0.030 kg Pengencer 11,000.00 330.00
0.200 lbr Amplas 6,000.00 1,200.00
C PERALATAN
D Jumlah A+B+C 58,925.00
E Overhead & Profit 10% 5,892.50
F Harga Satuan Pekerjaan (D+E) 64,817.50
14 A.4.7.1.10.1 1.000 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar,2 lap. Cat Penutup) Interior Kw A 27,339.95
A Tenaga 9,454.50
L.01 0.020 OH Pekerja 90,000.00 1,800.00
L.02 0.063 OH Tukang Cat 105,000.00 6,615.00
L.03 0.0063 OH Kepala Tukang 115,000.00 724.50
L.04 0.003 OH Mandor 105,000.00 315.00
B Bahan 15,400.00
0.100 Kg Plamir 35,000.00 3,500.00
0.100 Kg Cat Dasar 15,000.00 1,500.00
0.260 Kg Cat A Penutup 2 kali 40,000.00 10,400.00
C PERALATAN
D Jumlah A + B + C 24,854.50
E Overhead & Profit 10% 2,485.45
F Harga Satuan Pekerjaan (D+E) 27,339.95
18 A.4.7.1.11.3 1.000 m2 Pengecatan Langit-Langit (1lap.Cat dasar, 1lap Cat Penutup) 23,952.50
A Tenaga 14,575.00
L.01 0.060 OH Pekerja 90,000.00 5,400.00
L.02 0.080 OH Tukang Cat 105,000.00 8,400.00
L.03 0.0040 OH Kepala Tukang 115,000.00 460.00
L.04 0.003 OH Mandor 105,000.00 315.00
B Bahan 7,200.00
0.120 Kg Cat Dasar 15,000.00 1,800.00
0.180 Kg Cat Penutup 30,000.00 5,400.00
C PERALATAN
D Jumlah A + B + C 21,775.00
E Overhead & Profit 10% 2,177.50
F Harga Satuan Pekerjaan (D+E) 23,952.50
DAFTAR HARGA SATUAN BAHAN BANGUNAN
DAERAH BAWAH
: PASAR BEBAS
DAERAH : KABUPATEN BATANG
EDISI SEMESTER I 2020
I BAHAN DASAR
1 BATU KALI Blonos Rp 200,000.00
Bulat Belah m3 Rp 230,000.00
2 KERIKIL
Sawur / Koral m3 -
Beton 0,5/1 m3 Rp 250,000.00
Beton ,1/2 m3 Rp 268,000.00
Beton ,2/3 m3 Rp 300,000.00
3 BATU BATA ex lokal bh Rp 850.00
4 PASIR Urug m3 Rp 198,000.00
Pasang m3 Rp 285,000.00
Beton m3 Rp 400,000.00
6 PORTLAND CEMENT
40 kg zak Rp 44,000.00 1,100
50 kg zak Rp 55,000.00 1,100
II BAHAN PENUTUP ATAP
3 GENTENG TANAH LIAT Rp -
Plentong kecil bh Rp 2,000.00
Nok kerpus Kodok bh Rp 5,000.00
II . B A H A N K A Y U
2 KAMPAS Papan m3 Rp 6,875,000.00
Balok/pesagen m3 Rp 6,000,000.00
III . B A H A N B E S I
1 BESI BETON besi beton polos kg Rp 11,000.00
besi beton ulir kg Rp 11,000.00
1 TEMBOK
Plamur kg Rp 35,000.00
Cat Tembok klas interior (setara Catylac) kg Rp 40,000.00
Cat Kayu A kg Rp 57,000.00
X.BAHAN KACA
1 POLOS 3 mm m2 Rp 83,500.00
5 mm m2 Rp 147,500.00
DAFTAR UPAH PEKERJA
HARGA
NO. JENIS BAHAN SATUAN KET.
(Rp)
1 Pekerja Hr Rp 90,000.00
2 Mandor Hr Rp 105,000.00
10 T u k a n g c a t Hr Rp 105,000.00
11 K e p . t k . c a t Hr Rp 115,000.00
BACKUP DATA PERHITUNGAN
KEGIATAN : PENGAMBANGAN BALAI PENYULUH KB BATANG
PEKERJAAN : REHABILITASI /RENOVASI/OVERHAUL GEDUNG DAN BANGUNAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN : 2021
URAIAN PEKERJAAN
TIPE A
PEK. PONDASI
Galian
tngg lbr pjg
V = 0.75 x 0.70 x 25.00 = 13.13 M3
13.13 m3
Pasir Urug
tngg lbr pjg
V = 0.05 x 0.70 x 25.00 = 0.88 M3
Bawah Keramik tngg lbr pjg
V = 0.05 x 5.00 x 7.50 = 1.88 M3
2.75 m3
pas. Batu belah
lbr.ats lbr.bwh tngg pjg
V1 = 0.30 + 0.70 x 0.70 x 25.00 = 8.75 m3
2.00
Penggurugan kembali
Gedung lbr.ats lbr.bwh tngg pjg Jml
V1 = 0.01 + 0.25 x 0.70 x 25.00 x 2 = 4.55 m3
2.00
PEKERJAAN BETON
Rabat Beton Bawah Keramik
tngg lbr pjg
V = 0.05 x 5.00 x 7.50 = 1.88 M3
SLOOF 12/15
beton lbr tngg pjg
V = 0.12 x 0.15 x 25.00 = 0.45 M3
KOLOM 20/20
beton lbr tngg pjg jml kolom
V = 0.20 x 3.23 x 0.20 x 2.00 = 0.26 M3
Plat Wastafel
beton lbr tngg pjg
V = 0.10 x 0.80 x 0.60 = 0.05 M3
PEKERJAAN PASANGAN
Pas. Bata lbr tngg
V = 15.92 x 4.23 = 67.34 M2
lbr tngg
V = 4.64 x 1.00 = 4.64 M2
Gunungan lbr tngg jml
V = 6.00 x 2.00 x 2.00 = 12.00 M2
2
Wastafel lbr tngg jml
V = 1.20 x 1.00 x - = 0.00 M2
83.98 M2
Pengurangan
Luas Pintu lbr tngg
V = 0.85 x 2.50 = 2.13 M2
lbr tngg jml
V = 1.20 x 2.50 x 1.00 = 3.00 M2
Luas Jendela lbr tngg jml
V = 0.85 x 1.84 x 4.00 = 6.26 M2
11.38 M2
Luas Toatal = 72.60 M2
Plesteran
lbr tngg jml
V = 17.00 x 4.50 2.00 = 153.00 M2
lbr tngg
V = 5.00 x 1.00 = 5.00 M2
Gunungan lbr tngg jml sisi jml
V = 7.00 x 2.00 x 2.00 x 2.00 = 28.00 M2
2
Wastafel lbr tngg jml
V = 1.20 x 0.00 x 2.00 = 0.00 M2
Kolom lbr tngg jml jml sisi
V = 0.20 x 3.50 x 4.00 x 2.00 = 5.60 M2
Balok Latiu lbr tngg jml jml sisi
V = 0.80 x 3.00 x 1.00 x 1.00 = 2.40 M2
194.00 M2
URAIAN PEKERJAAN
Pengurangan
Luas Pintu lbr tngg jml jml
V = 0.85 x 2.50 x 1.00 x 2.00 = 4.25 M2
lbr tngg jml jml
V = 1.20 x 2.50 x 1.00 x 2.00 = 6.00 M2
Luas Jendela lbr tngg jml jml
V = 0.85 x 1.84 x 4.00 x 2.00 = 12.51 M2
22.76 M2
Luas Toatal = 171.24 M2
URAIAN PEKERJAAN
SLOOF 12/15
beton lbr tngg pjg
V = 0.12 x 0.15 x 6.00 = 0.11 M3
KOLOM 15/15
beton lbr tngg pjg jml kolom
V = 0.15 x 1.33 x 0.15 x 2.00 = 0.06 M3
Dibuat Oleh,
Konsultan Perencana
CV. TIGA PUSAKA DISAIN
RANU ARIANTO, ST
Direktur
BACKUP DATA PERHITUNGAN
KEGIATAN : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!
URAIAN PEKERJAAN
plesteran
tngg pjg jml sisi
V1 = 1.60 x 6.00 x 2.00 = 19.20 m2
lbr pjg
V2 = 0.15 x 6.00 = 0.90 m2
20.10 M2
acian
tngg pjg jml sisi
V1 = 1.60 x 6.00 x 2.00 = 19.20 m2
lbr pjg
V2 = 0.15 x 6.00 = 0.90 m2
20.10 M2
PENGECATAN
cat dinding
tngg pjg jml sisi
V1 = 1.60 x 6.00 x 2.00 = 19.20 m2
lbr pjg
V2 = 0.15 x 6.00 = 0.90 m2
20.10 M2
Dibuat Oleh,
Konsultan Perencana
CV. TIGA PUSAKA DISAIN
RANU ARIANTO, ST
Direktur
BACKUP DATA PERHITUNGAN
KEGIATAN : PENGAMBANGAN BALAI PENYULUH KB BATANG
PEKERJAAN : REHABILITASI /RENOVASI/OVERHAUL GEDUNG DAN BANGUNAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN : 2021
URAIAN PEKERJAAN
TIPE A
PEK. PONDASI
Galian
tngg lbr pjg
V = 1.05 x 0.70 x 42.00
Pasir Urug
tngg lbr pjg
V = 0.10 x 0.70 x 42.00
Bawah Keramik tngg lbr pjg
V = 0.05 x 7.00 x 8.00
tngg lbr pjg
V = 0.05 x 2.00 x 8.00
Penggurugan kembali
Gedung lbr.ats lbr.bwh tngg pjg Jml
V1 = 0.01 + 0.25 x 0.95 x 42.00 x 2
2.00
Tanah Urug tngg lbr pjg
V = 1.00 x 8.00 x 9.00
PEKERJAAN BETON
Rabat Beton Bawah Keramik
tngg lbr pjg
V = 0.05 x 7.00 x 8.00
tngg lbr pjg
V = 0.05 x 2.00 x 8.00
SLOOF 12/15
beton lbr tngg pjg
V = 0.12 x 0.15 x 42.00
KOLOM 18/18
beton lbr tngg pjg jml kolom
V = 0.18 x 3.23 x 0.18 x 8.00
KOLOM 20/20
beton lbr tngg pjg jml kolom
V = 0.20 x 3.23 x 0.20 x 4.00
PEKERJAAN PASANGAN
Pas. Bata lbr tngg
V = 28.32 x 3.23
Gunungan lbr tngg jml
V = 7.00 x 2.00 x 2.00
2
Tempat Duduk lbr tngg
V = 10.00 x 0.60
Pengurangan
Luas Pintu lbr tngg
V = 1.00 x 2.00
lbr tngg jml
V = 2.00 x 1.65 x 5.00
Luas Toatal
Plesteran
lbr tngg jml
V = 30.00 x 3.50 2.00
Gunungan lbr tngg jml sisi jml
V = 7.00 x 2.00 x 2.00 x 2.00
2
Tempat Duduk lbr tngg jml
V = 10.00 x 0.60 x 2.00
Kolom lbr tngg jml jml sisi
V = 0.20 x 3.50 x 4.00 x 4.00
Balok Konsol lbr tngg jml jml sisi
V = 0.70 x 9.77 x 2.00 x 1.00
Balok Tusuk lbr tngg jml jml sisi
V = 0.70 x 8.20 x 2.00 x 1.00
Pengurangan
Luas Pintu lbr tngg jml
V = 1.00 x 2.00 x 2.00
lbr tngg jml jml
V = 2.00 x 1.65 x 5.00 x 2.00
Luas Toatal
Pekerjaan Kayu
Kusen
Pintu lbr tngg pjg jml
V = 0.12 x 0.06 x 7.40 x 1.00
Jendelan' lbr tngg pjg jml
V = 0.12 x 0.06 x 10.50 x 2.00
Boven
lbr tngg jml
V = 2.00 x 0.60 x 2.00
Rangka Plafond
Gedung lbr Pjg
V = 7.50 x 6.70
Teras lbr Pjg
V = 2.01 x 7.70
Kuda Kuda
lbr tngg pjg jml
V = 0.12 x 0.08 x 28.32 x 2.00
List Plafond
Gedung jml Pjg
V = 1.00 x 30.00
Teras jml Pjg
V = 1.00 x 20.62
Pekerjaan Pengecatan
Plafon
GRC
Gedung lbr Pjg
V = 7.50 x 6.70
Teras lbr Pjg
V = 2.01 x 7.70
Dinding
lbr tngg jml
V = 30.00 x 3.50 2.00
Gunungan lbr tngg jml sisi jml
V = 7.00 x 2.00 x 2.00 x 2.00
2
Tempat Duduk lbr tngg jml
V = 10.00 x 0.60 x 2.00
Kolom lbr tngg jml jml sisi
V = 0.20 x 3.50 x 4.00 x 4.00
Balok Konsol lbr tngg jml jml sisi
V = 0.70 x 9.77 x 2.00 x 1.00
Balok Tusuk lbr tngg jml jml sisi
V = 0.70 x 8.20 x 2.00 x 1.00
Pengurangan
Luas Pintu lbr tngg jml
V = 1.00 x 2.00 x 2.00
lbr tngg jml jml
V = 2.00 x 1.65 x 5.00 x 2.00
Luas Toatal
Kayu
Pintu lbr Pjg
V = 0.36 x 7.40
Jendela lbr Pjg jml
V = 0.36 x 10.50 x 5.00
Daun Pintu lbr Pjg
V = 0.90 x 2.10
Daun jendela lbr tngg jml sisi jml
V = 0.10 x 2.40 x 3.00 5.00
List Plank lbr Pjg jml
V = 0.20 x 38.80 x 2.00
Pavingisasi
Paving Hollan K - 175
lbr Pjg
V = 1.20 x 10.00
lbr Pjg jml
V = 0.15 x 1.20 x 4.00
Galian
Kansten Bata lbr Pjg tngg jml
V = 0.15 x 10.00 x 0.19 x 2.00
Tangga lbr Pjg tngg jml
V = 0.15 x 1.60 x 0.15 x 5.00
Pasir Urug
Kansten Bata lbr Pjg tngg jml
V = 0.05 x 10.00 x 0.1 x 2.00
Tangga lbr Pjg tngg jml
V = 0.05 x 1.60 x 0.1 x 5.00
RJAAN
= 30.87 M3
= 2.94 M3
= 2.80 M3
= 0.80 M3
6.54
= 19.95 m3
19.95 M3
= 10.37 m3
= 0.00 M3
0
= 2.80 M3
= 0.80 M3
3.60
= 0.76 M3
= 103.57 kg
= 34.92 kg
138.50 KG
= 12.60 M2
= 0.09 M3
= 17.26 kg
= 5.25 kg
22.51 KG
= 1.55 M2
= 0.84 M3
= 69.05 kg
= 31.09 kg
100.14 KG
= 9.30 M2
= 0.52 M3
= 34.52 kg
= 17.23 kg
51.75 KG
= 10.34 M2
= 0.37 M3
= 24.09 kg
= 12.09 kg
36.18 KG
= 1.47 M2
= 4.88 M2
6.35 M2
= 0.21 M3
= 30.33 kg
= 8.79 kg
39.12 KG
= 0.03 M2
= 16.40 M2
16.43 M2
= 0.60 M3
= 103.57 kg
= 31.07 kg
134.64 KG
= 10.08 M2
= 91.47 M2
= 14.00 M2
6.00 M2
111.47 M2
2.666667
= 2.00 M2 5.333333
= 16.50 M2
18.50 M2
= 92.97 M2
= 210.00 M2
= 28.00 M2
M2
= 12.00 M2
= 11.20 M2
= 13.68 M2
= 11.48 M2
286.36 M2
= 4.00 M2
= 33.00 M2
37.00 M2
= 249.36 M2
= 11.20 M
= 11.20 M
22.40 M
= 0.05 M3
= 0.15 M3
0.20 M3
= 1.89 M2
= 1.44 M2
= 2.40 M2
2.40 M2
= 50.25 M2
= 15.47 M2
65.72
= 0.54 M3
= 0.50 M3
= 108.36 M2
= 38.80 M2
= 117.51 M2
= 10.20 M2
= 50.25 M2
= 15.47 M2
65.72
= 30.00 M
= 20.62 M
50.62 M
= 51.59 M2
= 13.09 M2
64.68 m2
= 2.00 M2
= 5.74 M2
= 50.25 M2
= 15.47 M2
65.72
= 210.00 M2
= 28.00 M2
M2
= 12.00 M2
= 11.20 M2
= 13.68 M2
= 11.48 M2
286.36 M2
= 4.00 M2
= 33.00 M2
37.00 M2
= 249.36 M2
= 2.66 M2
= 18.90 M2
= 1.89 M2
= 3.60 M2
= 15.52 M2
42.57 M2
= 12.00 M2
= 0.72 M2
12.72 m2
= 0.57 M2
= 0.18 M2
0.75 m2
= 0.10 M2
= 0.04 M2
0.14 m2
= 5.00 M2
= 2.70 M2
7.70 m2
= 5.40 M2
= 3.33 M2
8.73 m2
G BALOK 12/12
0.50
0.25
PEKERJAAN TAMBA
KEGIATAN : PENGAMBANGAN BALAI PENYULUH KB BATANG
I PEKERJAAN PERSIAPAN
1 Pek. Pasang Papan Nama Kegiatan 150,000.00 ls
2 Pek. Pembersihan Lahan dan Bongkaran 2,000,000.00 ls
Sub Total
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Biasa 77,137.00 m3
2 Pek. Pasir Urug 292,215.00 m3
3 Pek. Pas. Batu Belah 1 PC : 6 PP 874,318.50 m3
4 Pek. Urugan Tanah Kembali 55,275.00 m3
5 Pek. #NAME? #NAME? m3
6 ### Perataan dan Pemadatan Tanah 700,000.00 ls
Sub Total
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pas Batu Bata 1 : 6 PC 135,126.20 m2
2 Pek. Plesteran 1 PC : 6 PP 64,462.86 m2
3 Pek. Acian 20,000.00 m2
4 Pek. Skoningan ( Kolom ) 10,000.00 m
Sub Total
IV PEKERJAAN BETON
1 Pek. Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3- 891,069.14 m3
6)cm, w/c = 0,87
2 Pek. Sloof 12/15
a. Beton K-175 1,022,662.14 m3
b. Tulangan Besi 14,671.25 kg
c. Begisting Asumsi 3x Pakai 114,004.00 m2
3 Pek. Kolom Praktis 12/12
a. Beton K-175 1,022,662.14 m3
b. Tulangan Besi 14,671.25 kg
c. Begisting Asumsi 3x Pakai 114,004.00 m2
4 Pek. Kolom 20/20
a. Beton K-175 1,022,662.14 m3
b. Tulangan Besi 14,671.25 kg
c. #NAME? 114,004.00 m2
5 ### #NAME?
a. #NAME? 1,022,662.14 m3
b. #NAME? 14,671.25 kg
c. Begisting Asumsi 3x Pakai 114,004.00 m2
6 Pek. Balok Latiu 15/25
a. Beton K-175 1,022,662.14 m3
b. Tulangan Besi 14,671.25 kg
c. Begisting Asumsi 2x Pakai 197,791.00 m2
7 ### #NAME?
a. #NAME? 1,022,662.14 m3
b. #NAME? 14,671.25 kg
c. #NAME? 197,791.00 m2
8 Pek. Ring Balok 12/12
a. Beton K-175 1,022,662.14 m3
b. #NAME? 14,671.25 kg
c. #NAME? 114,004.00 m2
Sub Total
V PEKERJAAN KAYU
1 Pek. Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kampas 10,895,225.00 m3
2 Pek. Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kampas 799,975.00 m2
3 Pek. Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kampas 577,830.00 m2
4 Pek. #NAME? #NAME? m2
5 Pek. Pemasangan Rangka Langit-langit (50x1,00) m, kayu Lokal keras 107,607.50 m2
Sub Total
VI PEKERJAAN PENUTUP ATAP
1 Pek. #NAME? #NAME? m2
2 Pek. Pemasangan Atap Genteng Plentong Kecil 80,385.25 m2
3 Pek. Pemasangan Genteng Bubung Plentong 112,673.00 m2
Sub Total
VII PEKERJAAN PENUTUP LANGIT - LANGIT
1 Pek. Pemasangan Langit-langit GRC (1,00x1,00) m, tebal 4 mm 38,604.50 m2
2 Pek. List Plafond 25,000.00 m2
Sub Total
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Kramik Lantai 40X40 cm Putih polos 209,440.00 m2
2 Pek. #NAME? #NAME? m2
Sub Total
IX PEKERJAAN ELEKTRONIKAL
1 Pek. Instalasi Lamp Siaran 1 : 2 110,000.00 bh
2 Pek. Instalasi Stop Kontak 110,000.00 bh
3 Pek. Pemasangan Stop Kontak 25,000.00 bh
4 Pek. Pemasangan Saklar Ganda 25,000.00 bh
5 Pek. Pemasangan Lampu 14 Watt 45,000.00 bh
Sub Total
X PEKERJAAN KACA DAN KUNCI
1 Pek. Pemasangan kunci tanam 2 slag type A 125,000.00 bh
2 Pek. Pemasangan engsel pintu type A 45,000.00 Set
3 Pek. Pemasangan engsel jendela type A 36,000.00 Set
4 Pek. Pemasangan kait angin 10,000.00 bh
5 Pek. Pemasangan grendel 10,000.00 bh
6 Pek. Pemasangan kaca tebal 5mm 199,269.12 m2
Sub Total
XI PAVINGISASI
1 Pek. Pemasangan Paving Block t=6cm K-175 199,085.15 m2
2 Pek. Galian Tanah Biasa 77,137.00 m3
Pek. Pasir Urug 292,215.00 m3
3 Pek. Kansten Bata Merah 135,126.20 m2
4 Pek. Plesteran 1 PC : 6 PP 64,462.86 m2
5 Pek. Acian 20,000.00 m2
Pek. Pengecatan Kanstin 27,339.95 m2
Sub Total
XII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Bidang Kayu Baru (1 lp Plamir, 1 lp Cat dasar, 3 Lp Cat 64,817.50 m2
Penutup) Kw A
2 Pek. Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar,2 lap. Cat 27,339.95 m2
Penutup) Interior Kw A
3 Pek. Pengecatan Langit-Langit (1lap.Cat dasar, 1lap Cat Penutup) 23,952.50 m2
Sub Total
JUMLAH
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
`
PEKERJAAN TAMBAH KURANG ( CCO )
- - -
- - -
- -
- 17.75 1,368,796.07
(1,107,494.85) 3.79 1,107,494.85
(9,792,367.20) - -
- 5.82 321,921.60
#NAME? - #NAME?
- 1.00 700,000.00
#NAME? #NAME?
- - -
- - -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
- - -
- - -
- - -
- - -
- - -
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
- - -
- - -
- - -
- - -
- #NAME?
- - -
- - -
- - -
#NAME? #NAME? #NAME?
- - -
- #NAME?
- - -
- - -
- -
- - -
#NAME? #NAME? #NAME?
#NAME? #NAME?
- - -
- - -
- - -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- 12.72 2,532,363.11
- 0.75 57,852.75
- 0.14 40,910.10
- 7.70 1,040,471.74
- 8.73 562,760.77
- 8.73 174,600.00
- 5.79 158,217.48
- 4,567,175.95
- - -
- - -
- - -
- - -
- - -
- -