JUMLAH
No. URAIAN PEKERJAAN
HARGA (Rp.)
I. BANGUNAN KELAS
I. PEKERJAAN PERSIAPAN Rp. 52,282,397.46
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR Rp. 8,430,194,266.40
III. PEKERJAAN ELEKTRIKAL, MEKANIKAL DAN PLUMBING Rp. 637,439,132.75
II. BANGUNAN ASRAMA
I. PEKERJAAN PERSIAPAN Rp. 25,019,139.34
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR Rp. 5,985,388,484.70
III. PEKERJAAN ELEKTRIKAL, MEKANIKAL DAN PLUMBING Rp. 529,955,009.82
III. BANGUNAN RUANG MAKAN
I. PEKERJAAN PERSIAPAN Rp. 21,233,600.33
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR Rp. 2,086,715,285.58
III. PEKERJAAN ELEKTRIKAL, MEKANIKAL DAN PLUMBING Rp. 122,615,789.20
IV. BANGUNAN DAPUR
I. PEKERJAAN PERSIAPAN Rp. 7,287,027.30
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR Rp. 844,619,384.97
III. PEKERJAAN ELEKTRIKAL, MEKANIKAL DAN PLUMBING Rp. 78,779,099.05
REAL COST Rp. 18,821,528,616.89
PPN 10% Rp. 1,882,152,861.69
JUMLAH Rp. 20,703,681,478.58
DIBULATKAN Rp. 20,703,681,000.00
TERBILANG : Dua Puluh Milyar Tujuh Ratus Tiga Juta Enam Ratus Delapan Puluh Satu Ribu Rupiah
Tabanan, 7 Juni 2016
Kontraktor Pelaksana
PT. TARUMA KARYA UTAMA
I. BANGUNAN KELAS
HARGA SATUAN JUMLAH HARGA TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls Rp 300,000.00 Rp 300,000.00
2 Pembersihan Area Proyek 1,209.00 M2 Rp 6,195.00 Rp 7,489,755.00
3 Pek. Pengukuran dan pemasangan bowplank 370.40 M1 Rp 120,120.53 Rp 44,492,642.46
TOTAL I Rp 52,282,397.46
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K300 13.87 M3 Rp 840,475.85 Rp 11,659,081.05
- Pembesian 1,431.50 Kg Rp 10,630.73 Rp 15,217,834.64
- Bekesting 32.64 M2 Rp 130,347.00 Rp 4,254,526.08
2 Pekerjaan beton pondasi P2
- Beton K300 13.52 M3 Rp 840,475.85 Rp 11,366,595.45
- Pembesian 1,499.20 Kg Rp 10,630.73 Rp 15,937,597.09
- Bekesting 38.64 M2 Rp 130,347.00 Rp 5,036,608.08
3 Pekerjaan beton pondasi P3
- Beton K300 6.05 M3 Rp 840,475.85 Rp 5,083,197.97
- Pembesian 715.33 Kg Rp 10,630.73 Rp 7,604,446.75
- Bekesting 20.16 M2 Rp 130,347.00 Rp 2,627,795.52
4 Pekerjaan beton pondasi P4
- Beton K300 1.80 M3 Rp 840,475.85 Rp 1,512,856.54
- Pembesian 232.13 Kg Rp 10,630.73 Rp 2,467,756.97
- Bekesting 7.20 M2 Rp 130,347.00 Rp 938,498.40
5 Pekerjaan beton sloof (TB1) 20/40
- Beton K300 44.10 M3 Rp 840,475.85 Rp 37,064,985.17
- Pembesian 6,522.86 Kg Rp 10,630.73 Rp 69,342,773.40
- Bekesting 441.00 M2 Rp 139,009.50 Rp 61,303,189.50
6 Pekerjaan beton sloof (TB3) 15/20
- Beton K300 2.15 M3 Rp 840,475.85 Rp 1,804,837.85
- Pembesian 231.64 Kg Rp 10,630.73 Rp 2,462,540.69
- Bekesting 28.63 M2 Rp 139,009.50 Rp 3,980,120.00
7 Pekerjaan pelat lantai 1 t.8cm
- Beton K300 96.72 M3 Rp 840,475.85 Rp 81,293,514.14
- Pembesian Wiremesh M6 1 Lapis 1,209.04 M2 Rp 54,506.24 Rp 65,900,225.31
8 Pekerjaan beton kolom K1 30/30
- Beton K300 15.44 M3 Rp 840,475.85 Rp 12,980,309.09
- Pembesian 4,996.16 Kg Rp 10,630.73 Rp 53,112,807.27
- Bekesting 205.92 M2 Rp 235,454.63 Rp 48,484,816.38
9 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300 7.07 M3 Rp 840,475.85 Rp 5,943,899.87
- Pembesian 2,298.68 Kg Rp 10,630.73 Rp 24,436,632.94
- Bekesting 94.29 M2 Rp 235,454.63 Rp 22,202,005.50
10 Pekerjaan beton plat tangga I
- Beton K300 5.58 M3 Rp 840,475.85 Rp 4,692,736.00
- Pembesian 1,139.43 Kg Rp 10,630.73 Rp 12,113,003.10
- Bekesting 28.47 M2 Rp 216,500.81 Rp 6,164,395.16
11 Pekerjaan beton plat tangga II
- Beton K300 5.58 M3 Rp 840,475.85 Rp 4,692,736.00
- Pembesian 1,139.43 Kg Rp 10,630.73 Rp 12,113,003.10
- Bekesting 28.47 M2 Rp 216,500.81 Rp 6,164,395.16
11 Pekerjaan beton plat topian t=10 cm
- Beton K300 3.71 M3 Rp 840,475.85 Rp 3,118,018.34
- Pembesian 228.53 Kg Rp 10,630.73 Rp 2,429,388.77
- Bekesting 37.10 M2 Rp 271,154.63 Rp 10,059,362.07
12 Pekerjaan beton plat topian t=10 cm tas jendela
- Beton K300 2.93 M3 Rp 840,475.85 Rp 2,460,913.30
- Pembesian 180.36 Kg Rp 10,630.73 Rp 1,917,408.59
- Bekesting 29.28 M2 Rp 271,154.63 Rp 7,939,407.42
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 986.13 M2 Rp 91,841.19 Rp 90,567,444.54
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 74.15 M2 Rp 101,847.19 Rp 7,551,714.22
3 Pek. Pas. List plafond gypsum 7 cm 803.06 M1 Rp 20,175.75 Rp 16,202,257.09
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris 9.00 Unit Rp 1,940,531.25 Rp 17,464,781.25
2 Pek. Pas. Urinoir setara TOTO + Asesoris 3.00 Unit Rp 3,188,931.90 Rp 9,566,795.70
3 Pek. Pas. Wastafel setara TOTO + Asesoris 9.00 Unit Rp 861,052.50 Rp 7,749,472.50
4 Pek. Pas. Floor drain setara TOTO 10.00 Unit Rp 291,060.00 Rp 2,910,600.00
5 Pek. Pas. Jet shower setara TOTO 9.00 Unit Rp 347,130.00 Rp 3,124,170.00
6 Pek. Pas. Towel Bar setara 2.00 Unit Rp 756,630.00 Rp 1,513,260.00
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable 2.55 m1 Rp 238,972.13 Rp 609,378.92
8 Pek. Pas. Bak zink + Asesoris 1.00 Unit Rp 662,130.00 Rp 662,130.00
SUB JUMLAH II.1 Rp 2,588,977,943.02
II.2 PEKERJAAN LANTAI II
A PEKERJAAN BETON
1 Pekerjaan beton balok B1 30/60
- Beton K300 54.41 M3 Rp 840,475.85 Rp 45,726,088.85
- Pembesian 13,968.48 Kg Rp 10,630.73 Rp 148,495,109.41
- Bekesting 453.38 M2 Rp 240,652.13 Rp 109,105,657.17
2 Pekerjaan beton balok B1A 30/60
- Beton K300 7.97 M3 Rp 840,475.85 Rp 6,694,390.18
- Pembesian 1,096.60 Kg Rp 10,630.73 Rp 11,657,690.24
- Bekesting 66.38 M2 Rp 240,652.13 Rp 15,973,284.80
3 Pekerjaan beton balok B2 30/50
- Beton K300 31.41 M3 Rp 10,630.73 Rp 333,911.07
- Pembesian 5,458.08 Kg Rp 10,630.73 Rp 58,023,356.01
- Bekesting 272.22 M2 Rp 240,652.13 Rp 65,510,321.47
4 Pekerjaan beton balok B3 25/40
- Beton K300 12.65 M3 Rp 840,475.85 Rp 10,632,019.56
- Pembesian 2,514.57 Kg Rp 10,630.73 Rp 26,731,670.27
- Bekesting 132.83 M2 Rp 240,652.13 Rp 31,964,618.50
5 Pekerjaan beton balok B4 20/30
- Beton K300 1.89 M3 Rp 840,475.85 Rp 1,591,020.79
- Pembesian 300.91 Kg Rp 10,630.73 Rp 3,198,927.43
- Bekesting 25.24 M2 Rp 240,652.13 Rp 6,074,059.64
6 Pekerjaan beton balok B5 15/30
- Beton K300 1.20 M3 Rp 840,475.85 Rp 1,009,831.74
- Pembesian 190.28 Kg Rp 10,630.73 Rp 2,022,788.31
- Bekesting 20.03 M2 Rp 240,652.13 Rp 4,819,058.80
7 Pekerjaan Pelat Lantai 2 T=12cm
- Beton K300 142.91 M3 Rp 840,475.85 Rp 120,109,714.80
- Pembesian 14,671.76 Kg Rp 10,630.73 Rp 155,971,496.85
- Bekesting 1,190.89 M2 Rp 271,154.63 Rp 322,915,331.37
8 Pekerjaan Pelat Atap Teras T=10 cm
- Beton K300 2.79 M3 Rp 840,475.85 Rp 2,344,927.63
- Pembesian 295.99 Kg Rp 10,630.73 Rp 3,146,567.03
- Bekesting 23.25 M2 Rp 271,154.63 Rp 6,304,345.03
9 Pekerjaan beton kolom K1 30/30
- Beton K300 10.40 M3 Rp 840,475.85 Rp 8,736,746.50
- Pembesian 3,633.83 Kg Rp 10,630.73 Rp 38,630,226.17
- Bekesting 138.60 M2 Rp 235,454.63 Rp 32,634,011.03
10 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300 6.43 M3 Rp 840,475.85 Rp 5,403,545.34
- Pembesian 1,807.81 Kg Rp 10,630.73 Rp 19,218,288.44
- Bekesting 67.46 M2 Rp 235,454.63 Rp 15,883,368.73
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 989.71 M2 Rp 91,841.19 Rp 90,896,575.81
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 74.15 M2 Rp 101,847.19 Rp 7,551,714.22
3 Pek. Pas. List plafond gypsum 7 cm 842.78 M1 Rp 20,175.75 Rp 17,003,813.41
G PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris 9.00 Unit Rp 1,940,531.25 Rp 17,464,781.25
2 Pek. Pas. Urinoir setara TOTO + Asesoris 3.00 Unit Rp 3,188,931.90 Rp 9,566,795.70
3 Pek. Pas. Wastafel setara TOTO + Asesoris 9.00 Unit Rp 861,052.50 Rp 7,749,472.50
4 Pek. Pas. Floor drain setara TOTO 10.00 Unit Rp 291,060.00 Rp 2,910,600.00
5 Pek. Pas. Jet shower setara TOTO 9.00 Unit Rp 347,130.00 Rp 3,124,170.00
6 Pek. Pas. Towel Bar setara 1.00 M2 Rp 756,630.00 Rp 756,630.00
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable 2.55 M1 Rp 238,972.13 Rp 609,378.92
8 Pek. Pas. Bak zink + Asesoris 1.00 Unit Rp 662,130.00 Rp 662,130.00
SUB JUMLAH II.2 Rp 3,085,222,637.33
B PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150 1,537.69 Kg Rp 19,744.20 Rp 30,360,419.41
2 Pek. Pas. Balok baja WF 250/125 24,675.54 Kg Rp 19,744.20 Rp 487,198,816.61
3 Pek. Pas. Balok baja WF 200/100 2,050.05 Kg Rp 19,744.20 Rp 40,476,597.21
4 Pek. Pas. Gording CNP 150 13,639.07 Kg Rp 19,744.20 Rp 269,292,486.41
5 Pek. Pas. Baut angker diameter 16 244.00 Bh Rp 36,141.00 Rp 8,818,404.00
6 Pek. Pas. Baut d-16 2,136.00 bh Rp 11,991.00 Rp 25,612,776.00
7 Pek. Pas. Baut d-12 1,220.00 bh Rp 9,891.00 Rp 12,067,020.00
8 Pek. Pas. Cat zinkcromate 565.27 kg Rp 46,641.00 Rp 26,364,551.92
9 Pek. Pas. Pelat baja t=10mm 1,168.39 Kg Rp 19,744.20 Rp 23,069,004.81
10 Pek. Pas. Usuk baja ringan profil UK 75 1,944.70 M2 Rp 86,887.50 Rp 168,970,121.25
11 Pek. Pas. Reng baja ringan profil UK 30 1,944.70 M2 Rp 66,698.86 Rp 129,709,280.11
12 Pek. Pas. Alluminium foil 1,944.70 M2 Rp 63,894.25 Rp 124,255,147.98
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 352.00 M2 Rp 91,841.19 Rp 32,328,098.88
14 Pek. Pas. Tatab Kayu Kamper 228.80 M1 Rp 38,823.46 Rp 8,882,807.33
15 Pek. Pas. Listplank Kayu Kamper 2x3/30 228.80 M1 Rp 232,900.50 Rp 53,287,634.40
16 Pek. Pas. Genteng Gemini Ex. Good Year 1,944.70 M2 Rp 114,137.63 Rp 221,963,439.34
17 Pek. Pas. Bubungan genteng gemini Ex. Good Year 168.80 M1 Rp 87,234.00 Rp 14,725,099.20
18 Pek. Pas. Murda Paras 4.00 Bh Rp 103,178.88 Rp 412,715.52
19 Pek. Pas. Ikut celedu Paras 6.00 Bh Rp 103,178.88 Rp 619,073.28
C PEKERJAAN FINISHING
1 Pek. Pengecatan plafond gypsum setara dulux 352.00 M2 Rp 36,986.57 Rp 13,019,270.88
2 Pek. Polituran Listplank 114.40 M2 Rp 57,634.50 Rp 6,593,386.80
3 Pek. Polituran Tatab 16.02 M2 Rp 57,634.50 Rp 923,074.15
SUB JUMLAH II.3 Rp 1,834,488,288.22
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P5
- Beton K300 7.04 M3 Rp 840,475.85 Rp 5,916,950.01
- Pembesian 1,142.59 Kg Rp 10,630.73 Rp 12,146,550.16
- Bekesting 35.20 M2 Rp 130,347.00 Rp 4,588,214.40
2 Pekerjaan beton sloof (TB2) 15/30
- Beton K300 9.28 M3 Rp 840,475.85 Rp 7,802,557.59
- Pembesian 2,319.06 Kg Rp 10,630.73 Rp 24,653,335.36
- Bekesting 123.78 M2 Rp 139,009.50 Rp 17,206,595.91
3 Pekerjaan beton kolom K3 20/20
- Beton K300 10.79 M3 Rp 840,475.85 Rp 9,067,053.51
- Pembesian 4,268.69 Kg Rp 10,630.73 Rp 45,379,282.26
- Bekesting 215.76 M2 Rp 235,454.63 Rp 50,801,689.89
4 Pekerjaan beton balok B6 20/40
- Beton K300 14.37 M3 Rp 840,475.85 Rp 12,079,991.36
- Pembesian 2,745.41 Kg Rp 10,630.73 Rp 29,185,645.78
- Bekesting 143.93 M2 Rp 240,652.13 Rp 34,636,579.05
5 Pekerjaan Pelat lantai t.8 cm
- Beton K300 1.13 M3 Rp 840,475.85 Rp 952,763.43
- Pembesian 14.17 M2 Rp 54,506.24 Rp 772,353.43
6 Pekerjaan pelat lantai t.12cm
- Beton K300 20.83 M3 Rp 840,475.85 Rp 17,505,162.14
- Pembesian 2,138.31 Kg Rp 10,630.73 Rp 22,731,769.42
- Bekesting 173.56 M2 Rp 271,154.63 Rp 47,062,681.33
7 Pekerjaan beton balok RB2 20/30
- Beton K300 11.90 M3 Rp 840,475.85 Rp 9,997,964.57
- Pembesian 1,815.47 Kg Rp 10,630.73 Rp 19,299,712.35
- Bekesting 119.16 M2 Rp 240,652.13 Rp 28,675,144.61
8 Pekerjaan Pelat Atap t.12cm
- Beton K300 31.80 M3 Rp 840,475.85 Rp 26,724,651.08
- Pembesian 3,264.50 Kg Rp 10,630.73 Rp 34,703,969.10
- Bekesting 264.98 M2 Rp 271,154.63 Rp 71,849,305.22
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 174.62 M2 Rp 101,847.19 Rp 17,784,555.62
2 Pek. Pas. List plafond gypsum 7 cm 148.84 M1 Rp 20,175.75 Rp 3,002,958.63
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250 1.83 M3 Rp 807,190.85 Rp 1,480,186.23
- Pembesian 126.91 Kg Rp 10,630.73 Rp 1,349,164.45
2 Pekerjaan beton rabat t = 5 cm 0.89 M3 Rp 648,489.19 Rp 578,614.48
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250 3.57 M3 Rp 807,190.85 Rp 2,880,864.16
- Pembesian 98.93 Kg Rp 10,630.73 Rp 1,051,726.11
3 Pekerjaan beton kolom 15/40
- Beton K250 1.12 M3 Rp 807,190.85 Rp 900,824.99
- Pembesian 238.92 Kg Rp 10,630.73 Rp 2,539,926.84
- Bekesting 10.23 M2 Rp 235,454.63 Rp 2,408,700.81
4 Pekerjaan beton balok 30/40
- Beton K250 1.96 M3 Rp 807,190.85 Rp 1,578,865.31
- Pembesian 295.78 Kg Rp 10,630.73 Rp 3,144,353.71
- Bekesting 6.52 M2 Rp 240,652.13 Rp 1,569,051.86
5 Pekerjaan beton balok 20/30
- Beton K250 0.26 M3 Rp 807,190.85 Rp 208,255.24
- Pembesian 33.70 Kg Rp 10,630.73 Rp 358,306.81
- Bekesting 1.29 M2 Rp 240,652.13 Rp 310,441.24
6 Pekerjaan beton dinding t= 15 cm
- Beton K250 9.47 M3 Rp 807,190.85 Rp 7,646,115.37
- Pembesian 591.65 Kg Rp 10,630.73 Rp 6,289,693.43
- Bekesting 63.15 M2 Rp 244,117.13 Rp 15,415,996.44
- Bekesting pas. Batako 63.15 M2 Rp 83,670.30 Rp 5,283,779.45
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250 2.68 M3 Rp 807,190.85 Rp 2,160,648.12
- Pembesian 98.93 Kg Rp 10,630.73 Rp 1,051,726.11
- Bekesting 17.85 M2 Rp 271,154.63 Rp 4,838,754.28
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250 1.65 M3 Rp 807,190.85 Rp 1,333,075.70
- Pembesian 114.30 Kg Rp 10,630.73 Rp 1,215,075.71
2 Pekerjaan beton rabat t = 5 cm 0.71 M3 Rp 648,489.19 Rp 460,103.08
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250 2.84 M3 Rp 807,190.85 Rp 2,290,807.64
- Pembesian 78.67 Kg Rp 10,630.73 Rp 836,312.33
3 Pekerjaan beton kolom 15/40
- Beton K250 1.12 M3 Rp 807,190.85 Rp 900,824.99
- Pembesian 238.92 Kg Rp 10,630.73 Rp 2,539,926.84
- Bekesting 10.23 M2 Rp 235,454.63 Rp 2,408,700.81
4 Pekerjaan beton balok 30/40
- Beton K250 1.76 M3 Rp 807,190.85 Rp 1,421,947.41
- Pembesian 266.38 Kg Rp 10,630.73 Rp 2,831,847.39
- Bekesting 5.87 M2 Rp 240,652.13 Rp 1,413,109.28
5 Pekerjaan beton balok 20/30
- Beton K250 0.26 M3 Rp 807,190.85 Rp 208,255.24
- Pembesian 33.70 Kg Rp 10,630.73 Rp 358,306.81
- Bekesting 1.29 M2 Rp 240,652.13 Rp 310,441.24
6 Pekerjaan beton dinding t= 15 cm
- Beton K250 8.33 M3 Rp 807,190.85 Rp 6,719,863.86
- Pembesian 519.98 Kg Rp 10,630.73 Rp 5,527,759.07
- Bekesting 55.50 M2 Rp 244,117.13 Rp 13,548,500.44
- Bekesting pas. Batako 55.50 M2 Rp 83,670.30 Rp 4,643,701.65
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250 2.13 M3 Rp 807,190.85 Rp 1,718,105.73
- Pembesian 78.67 Kg Rp 10,630.73 Rp 836,312.33
- Bekesting 14.19 M2 Rp 271,154.63 Rp 3,847,684.13
LANTAI 2
Material / Peralatan Utama
1 - Lampu Downlight 9 W 138.00 Bh Rp 175,000.00 Rp 24,150,000.00
2 - Lampu DOWNLIGHT 6 W 16.00 Bh Rp 150,000.00 Rp 2,400,000.00
3 - Lampu Tangga Kotak 10 W 27.00 Bh Rp 225,000.00 Rp 6,075,000.00
4 - Exhaust fan 10.00 Bh Rp 450,000.00 Rp 4,500,000.00
5 - Ceiling Fan 20.00 Bh Rp 700,000.00 Rp 14,000,000.00
6 - Stop kontak 1 Ph, 13 A 100 Watt 44.00 Bh Rp 52,000.00 Rp 2,288,000.00
7 - Saklar Engkel 20.00 Bh Rp 55,000.00 Rp 1,100,000.00
8 - Saklar Seri 28.00 Bh Rp 55,000.00 Rp 1,540,000.00
9 - Kontrol fan 20.00 Bh Rp 350,000.00 Rp 7,000,000.00
EQUIPMENT
1 Pekerjaan Pembuatan Sumur Dalam 50 meter lengkap dengan chasing 1.00 ls Rp 22,000,000.00 Rp 22,000,000.00
2 Pompa Distribusi 1.00 Set Rp 45,000,000.00 Rp 45,000,000.00
- Capasity : 60 liter/mnt
- Head : 40 M
- Daya : 1.1 Kw/380V/50 Hz
3 Pompa Sumur Dalam 1.00 Unit Rp 25,000,000.00 Rp 25,000,000.00
- Kapasitas : 2 m3/jam Head = 100 m
- Daya : 1.15 kW /380 V / 50 Hz
- Lengkap dengan kabel power
4 Pompa Submersibel 1.00 Unit Rp 4,500,000.00 Rp 4,500,000.00
- Capasity : 50 L/M
- Head : 9 M
5 Sand dan Carbon filter kap. 2 m3/jam 1.00 Unit Rp 35,000,000.00 Rp 35,000,000.00
6 Biosave Tank ( BSTP 30 ) 1.00 Unit Rp 100,000,000.00 Rp 100,000,000.00
7 Fire Estinguisher 3.5 Kg 6.00 Unit Rp 1,300,000.00 Rp 7,800,000.00
8 Instalasi Pipa Air Bekas & Kotor dari bahan PVC klas AW
Termasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.
Instalasi :
- Pipa dia. 4" 96.00 m' Rp 127,542.38 Rp 12,244,068.90
- Pipa dia. 3" 87.00 m' Rp 127,542.38 Rp 11,096,187.44
- Pipa dia. 2" 18.00 m' Rp 52,481.56 Rp 944,668.07
- Pipa dia.1 1/2" 26.00 m' Rp 35,229.80 Rp 915,974.72
- Pipa dia. 1 1/4" (Vent) 24.00 m' Rp 35,229.80 Rp 845,515.13
- Pipa dia. 1" (Vent) 68.00 m' Rp 35,229.80 Rp 2,395,626.19
- Clean out dia. 100 mm SS 9.00 bh Rp 250,000.00 Rp 2,250,000.00
- Clean out dia. 80 mm SS 9.00 bh Rp 250,000.00 Rp 2,250,000.00
- P -Trap 20.00 bh Rp 45,000.00 Rp 900,000.00
- Fitting 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
- Vent Cup 32 mm 1.00 Bh Rp 45,000.00 Rp 45,000.00
- Galian dan urugan 46.00 m' Rp 35,000.00 Rp 1,610,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 500,000.00 Rp 500,000.00
9 Instalasi Pipa Air Dingin PVC Class AW Sesuai Gambar & Spesifikasi
Instalasi :
- Pipa diameter 1/2" 165.00 m Rp 35,229.80 Rp 5,812,916.48
- Pipa diameter 1" 8.00 m Rp 35,229.80 Rp 281,838.38
- Pipa diameter 1 1/4" 10.00 m Rp 35,229.80 Rp 352,297.97
- Pipa diameter 1 1/2" 58.00 m Rp 35,229.80 Rp 2,043,328.22
- Pipa diameter 2" ( Pipa PPR PN 10 ke Sumur ) Provisional 100.00 m Rp 125,000.00 Rp 12,500,000.00
- Pipa diameter 2" 97.00 m Rp 52,481.56 Rp 5,090,711.26
- Fitting 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
- CHECK Valve Diameter 2" 1.00 Bh Rp 450,000.00 Rp 450,000.00
- CHECK Valve Diameter 11/2" 1.00 Bh Rp 450,000.00 Rp 450,000.00
- Ball Valve Diameter 1" PVC 2.00 Bh Rp 140,000.00 Rp 280,000.00
- Ball Valve Diameter 11/4" PVC 2.00 Bh Rp 350,000.00 Rp 700,000.00
- Ball Valve Diameter 11/2" PVC 8.00 Bh Rp 350,000.00 Rp 2,800,000.00
- Ball Valve Diameter 2" PVC 5.00 Bh Rp 350,000.00 Rp 1,750,000.00
- Floating valve dia. 11/2" 1.00 Bh Rp 1,500,000.00 Rp 1,500,000.00
- Kabel Power Pompa 1.00 Bh Rp 950,000.00 Rp 950,000.00
- WLC water level air 2.00 set Rp 800,000.00 Rp 1,600,000.00
- Galian tanah u/ pasang pipa 49.00 m' Rp 35,000.00 Rp 1,715,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 2,750,000.00 Rp 2,750,000.00
SUB JUMLAH III.3 Rp 326,823,132.75
I. PEKERJAAN PERSIAPAN
1 Pembersihan Area Proyek 1,062.25 M2 Rp 6,195.00 Rp 6,580,638.75
2 Pek. Pengukuran dan pemasangan bowplank 153.50 M1 Rp 120,120.53 Rp 18,438,500.59
TOTAL I Rp 25,019,139.34
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K300 1.73 M3 Rp 840,475.85 Rp 1,457,385.13
- Pembesian 178.94 Kg Rp 10,630.73 Rp 1,902,229.33
- Bekesting 4.08 M2 Rp 130,347.00 Rp 531,815.76
2 Pekerjaan beton pondasi P2
- Beton K300 16.46 M3 Rp 840,475.85 Rp 13,837,594.46
- Pembesian 1825.11 Kg Rp 10,630.73 Rp 19,402,292.11
- Bekesting 47.04 M2 Rp 130,347.00 Rp 6,131,522.88
3 Pekerjaan beton pondasi P3
- Beton K300 3.46 M3 Rp 840,475.85 Rp 2,904,684.55
- Pembesian 408.76 Kg Rp 10,630.73 Rp 4,345,398.14
- Bekesting 11.52 M2 Rp 130,347.00 Rp 1,501,597.44
4 Pekerjaan beton pondasi P4
- Beton K300 1.20 M3 Rp 840,475.85 Rp 1,008,571.03
- Pembesian 154.76 Kg Rp 10,630.73 Rp 1,645,171.31
- Bekesting 4.80 M2 Rp 130,347.00 Rp 625,665.60
5 Pekerjaan beton sloof (TB1) 20/40
- Beton K300 29.20 M3 Rp 840,475.85 Rp 24,541,894.94
- Pembesian 4319.15 Kg Rp 10,630.73 Rp 45,915,738.41
- Bekesting 292.00 M2 Rp 139,009.50 Rp 40,590,774.00
6 Pekerjaan beton sloof (TB3) 15/20
- Beton K300 1.24 M3 Rp 840,475.85 Rp 1,040,845.30
- Pembesian 133.65 Kg Rp 10,630.73 Rp 1,420,833.82
- Bekesting 16.51 M2 Rp 139,009.50 Rp 2,295,324.86
7 Pekerjaan pelat lantai 1 t.8cm
- Beton K300 64.50 M3 Rp 840,475.85 Rp 54,210,692.59
- Pembesian Wiremesh M6 1 Lapis 806.25 Kg Rp 54,506.24 Rp 43,945,656.60
8 Pekerjaan beton kolom K1 30/30
- Beton K300 12.40 M3 Rp 840,475.85 Rp 10,423,581.54
- Pembesian 4011.83 Kg Rp 10,630.73 Rp 42,648,674.23
- Bekesting 165.36 Kg Rp 235,454.63 Rp 38,934,776.79
9 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300 5.99 M3 Rp 840,475.85 Rp 5,035,391.70
- Pembesian 1863.13 Kg Rp 10,630.73 Rp 19,806,470.46
- Bekesting 79.88 Kg Rp 235,454.63 Rp 18,808,492.17
10 Pekerjaan beton plat topian t=10 cm
- Beton K250 2.01 M3 Rp 840,475.85 Rp 1,691,709.80
- Pembesian 95.26 Kg Rp 10,630.73 Rp 1,012,660.90
- Bekesting 20.13 M2 Rp 271,154.63 Rp 5,457,800.29
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 726.39 M2 Rp 91,841.19 Rp 66,712,705.69
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 65.83 M2 Rp 101,847.19 Rp 6,705,007.64
3 Pek. Pas. List plafond gypsum 7 cm 564.58 M1 Rp 20,175.75 Rp 11,390,895.55
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris 5.00 Unit Rp 1,940,531.25 Rp 9,702,656.25
2 Pek. Pas. Kloset Jongkok setara TOTO 4.00 Unit Rp 450,896.25 Rp 1,803,585.00
3 Pek. Pas. Wastafel setara TOTO + Asesoris 5.00 Unit Rp 861,052.50 Rp 4,305,262.50
4 Pek. Pas. Floor drain setara TOTO 10.00 Unit Rp 291,060.00 Rp 2,910,600.00
5 Pek. Pas. Jet shower setara TOTO 5.00 Unit Rp 347,130.00 Rp 1,735,650.00
6 Pek. Pas. Railing Stainless Steel Pada Toilet Difable 2.55 M1 Rp 238,972.13 Rp 609,378.92
7 Pek. Pas. Keran Air 20.00 Unit Rp 42,500.00 Rp 850,000.00
8 Pek. Pas. Bak Fiberglass vol. 0,3 m3 8.00 Unit Rp 236,555.00 Rp 1,892,440.00
SUB JUMLAH II.1 Rp 1,660,424,926.74
PEKERJAAN LANTAI II
A PEKERJAAN BETON
1 Pekerjaan beton balok B1 30/60
- Beton K300 3.15 M3 Rp 840,475.85 Rp 2,647,498.94
- Pembesian 668.77 Kg Rp 10,630.73 Rp 7,109,519.53
- Bekesting 26.25 M2 Rp 240,652.13 Rp 6,317,118.28
2 Pekerjaan beton balok B2 30/50
- Beton K300 52.13 M3 Rp 840,475.85 Rp 43,809,803.90
- Pembesian 10,702.71 Kg Rp 10,630.73 Rp 113,777,582.00
- Bekesting 451.75 M2 Rp 240,652.13 Rp 108,714,597.47
3 Pekerjaan beton balok B3 25/40
- Beton K300 22.75 M3 Rp 840,475.85 Rp 19,120,825.68
- Pembesian 3,446.46 Kg Rp 10,630.73 Rp 36,638,325.96
- Bekesting 238.88 M2 Rp 240,652.13 Rp 57,485,776.36
4 Pekerjaan beton balok B4 20/30
- Beton K300 1.80 M3 Rp 840,475.85 Rp 1,512,856.54
- Pembesian 251.35 Kg Rp 10,630.73 Rp 2,671,979.58
- Bekesting 24.00 M2 Rp 240,652.13 Rp 5,775,651.00
5 Pekerjaan beton balok B5 15/30
- Beton K300 0.36 M3 Rp 840,475.85 Rp 306,353.45
- Pembesian 53.28 Kg Rp 10,630.73 Rp 566,414.60
- Bekesting 6.08 M2 Rp 240,652.13 Rp 1,461,961.66
6 Pekerjaan pelat lantai 2 t.12cm
- Beton K300 96.75 M3 Rp 840,475.85 Rp 81,316,038.89
- Pembesian 9,933.00 Kg Rp 10,630.73 Rp 105,594,991.43
- Bekesting 806.25 M2 Rp 271,154.63 Rp 218,618,416.41
7 Pekerjaan beton kolom K1 30/30
- Beton K300 9.36 M3 Rp 840,475.85 Rp 7,866,854.00
- Pembesian 3,030.82 Kg Rp 10,630.73 Rp 32,219,813.94
- Bekesting 124.80 M2 Rp 235,454.63 Rp 29,384,737.20
8 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300 4.52 M3 Rp 840,475.85 Rp 3,800,295.62
- Pembesian 1,234.95 Kg Rp 10,630.73 Rp 13,128,411.29
- Bekesting 60.29 M2 Rp 235,454.63 Rp 14,195,088.43
9 Pekerjaan beton plat topian t=10 cm
- Beton K250 2.01 M3 Rp 840,475.85 Rp 1,691,709.80
- Pembesian 95.26 Kg Rp 10,630.73 Rp 1,012,660.90
- Bekesting 20.13 M2 Rp 271,154.63 Rp 5,457,800.29
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 726.39 M2 Rp 91,841.19 Rp 66,712,705.69
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 65.83 M2 Rp 101,847.19 Rp 6,705,007.64
3 Pek. Pas. List plafond gypsum 7 cm 574.13 M1 Rp 20,175.75 Rp 11,583,573.96
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris 5.00 Unit Rp 1,940,531.25 Rp 9,702,656.25
2 Pek. Pas. Kloset Jongkok setara TOTO 4.00 Unit Rp 450,896.25 Rp 1,803,585.00
3 Pek. Pas. Wastafel setara TOTO + Asesoris 5.00 Unit Rp 861,052.50 Rp 4,305,262.50
4 Pek. Pas. Floor drain setara TOTO 10.00 Unit Rp 291,060.00 Rp 2,910,600.00
5 Pek. Pas. Jet shower setara TOTO 5.00 Unit Rp 347,130.00 Rp 1,735,650.00
6 Pek. Pas. Railing Stainless Steel Pada Toilet Difable 2.55 M1 Rp 238,972.13 Rp 609,378.92
7 Pek. Pas. Keran Air 20.00 Unit Rp 42,500.00 Rp 850,000.00
8 Pek. Pas. Bak Fiberglass vol. 0,3 m3 8.00 Unit Rp 236,555.00 Rp 1,892,440.00
SUB JUMLAH II.2 Rp 2,035,145,304.30
II.3 PEKERJAAN ATAP
A PEKERJAAN BETON
1 Pekerjaan beton ring balok RB1 25/50
- Beton K300 2.19 M3 Rp 840,475.85 Rp 1,838,540.93
- Pembesian 395.95 Kg Rp 10,630.73 Rp 4,209,262.14
- Bekesting 21.88 M2 Rp 240,652.13 Rp 5,264,265.23
2 Pekerjaan beton ring balok RB2 25/40
- Beton K300 17.95 M3 Rp 840,475.85 Rp 15,086,541.58
- Pembesian 3,469.89 Kg Rp 10,630.73 Rp 36,887,441.05
- Bekesting 188.48 M2 Rp 240,652.13 Rp 45,356,909.26
3 Pekerjaan beton ring balok RB3 20/30
- Beton K300 2.85 M3 Rp 840,475.85 Rp 2,395,356.18
- Pembesian 397.73 Kg Rp 10,630.73 Rp 4,228,184.83
- Bekesting 38.00 M2 Rp 240,652.13 Rp 9,144,780.75
4 Pekerjaan pelat atap t.10cm
- Beton K300 22.58 M3 Rp 840,475.85 Rp 18,978,650.79
- Pembesian 1,843.35 Kg Rp 10,630.73 Rp 19,596,138.84
- Bekesting 225.81 M2 Rp 271,154.63 Rp 61,228,992.02
B PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150 957.90 Kg Rp 19,744.20 Rp 18,913,048.16
2 Pek. Pas. Balok baja WF 250/125 12,094.37 Kg Rp 19,744.20 Rp 238,793,739.13
3 Pek. Pas. Balok baja WF 200/100 700.65 Kg Rp 19,744.20 Rp 13,833,773.73
4 Pek. Pas. Gording CNP 150 5,447.62 Kg Rp 19,744.20 Rp 107,558,819.83
5 Pek. Pas. Baut angker diameter 16 152.00 Bh Rp 36,141.00 Rp 5,493,432.00
6 Pek. Pas. Baut d-16 1,584.00 Bh Rp 11,991.00 Rp 18,993,744.00
7 Pek. Pas. Baut d-12 760.00 Bh Rp 9,891.00 Rp 7,517,160.00
8 Pek. Pas. Cat zinkcromate 275.06 Kg Rp 46,641.00 Rp 12,829,006.30
9 Pek. Pas. Pelat baja t=10mm 934.72 Kg Rp 19,744.20 Rp 18,455,203.85
10 Pek. Pas. Usuk baja ringan profil UK 75 1,142.64 M2 Rp 86,887.50 Rp 99,281,133.00
11 Pek. Pas. Reng baja ringan profil UK 30 1,142.64 M2 Rp 66,698.86 Rp 76,212,789.55
12 Pek. Pas. Alluminium foil 1,142.64 M2 Rp 63,894.25 Rp 73,008,125.82
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 192.00 M2 Rp 91,841.19 Rp 17,633,508.48
14 Pek. Pas. Tatab Kayu Kamper 126.00 M1 Rp 38,823.46 Rp 4,891,755.79
15 Pek. Pas. Listplank Kayu Kamper 2x3/30 126.00 M1 Rp 232,900.50 Rp 29,345,463.00
16 Pek. Pas. Genteng Gemini Ex. Good Year 1,142.64 M2 Rp 114,137.63 Rp 130,418,215.83
17 Pek. Pas. Bubungan genteng gemini Ex. Good Year 89.00 M1 Rp 87,234.00 Rp 7,763,826.00
18 Pek. Pas. Murda Paras 2.00 Bh Rp 103,178.88 Rp 206,357.76
19 Pek. Pas. Ikut celedu Paras 4.00 Bh Rp 103,178.88 Rp 412,715.52
C PEKERJAAN FINISHING
1 Pek. Pengecatan plafond gypsum setara dulux 192.00 M2 Rp 36,986.57 Rp 7,101,420.48
2 Pek. Polituran Listplank 63.00 M2 Rp 57,634.50 Rp 3,630,973.50
3 Pek. Polituran Tatab 8.82 M2 Rp 57,634.50 Rp 508,336.29
SUB JUMLAH II.3 Rp 1,117,017,611.62
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P5
- Beton K300 4.80 M3 Rp 840,475.85 Rp 4,034,284.10
- Pembesian 779.04 Kg Rp 10,630.73 Rp 8,281,738.74
- Bekesting 24.00 M2 Rp 130,347.00 Rp 3,128,328.00
2 Pekerjaan beton sloof (TB2) 15/30
- Beton K300 7.47 M3 Rp 840,475.85 Rp 6,278,354.63
- Pembesian 1,866.11 Kg Rp 10,630.73 Rp 19,838,128.81
- Bekesting 99.60 M2 Rp 139,009.50 Rp 13,845,346.20
3 Pekerjaan beton kolom K3 20/20
- Beton K300 11.54 M3 Rp 840,475.85 Rp 9,699,763.74
- Pembesian 4,566.23 Kg Rp 10,630.73 Rp 48,542,309.05
- Bekesting 230.82 M2 Rp 139,009.50 Rp 32,085,616.75
4 Pekerjaan beton balok B6 20/40
- Beton K300 13.10 M3 Rp 840,475.85 Rp 11,006,535.60
- Pembesian 2,501.51 Kg Rp 10,630.73 Rp 26,592,840.60
- Bekesting 131.16 M2 Rp 904,230.10 Rp 118,595,203.54
5 Pekerjaan Pelat lantai t.8 cm
- Beton K300 0.52 M3 Rp 840,475.85 Rp 437,047.44
- Pembesian 6.50 M2 Rp 130,347.00 Rp 847,255.50
6 Pekerjaan pelat lantai t.12cm
- Beton K300 36.47 M3 Rp 840,475.85 Rp 30,654,810.31
- Pembesian 3,744.58 Kg Rp 10,630.73 Rp 39,807,576.41
- Bekesting 303.94 M2 Rp 271,154.63 Rp 82,415,550.19
7 Pekerjaan beton balok RB2 20/30
- Beton K300 10.56 M3 Rp 840,475.85 Rp 8,875,425.02
- Pembesian 1,611.68 Kg Rp 10,630.73 Rp 17,133,273.71
- Bekesting 105.80 M2 Rp 904,230.10 Rp 95,667,545.02
8 Pekerjaan Pelat Atap t.12cm
- Beton K300 52.29 M3 Rp 840,475.85 Rp 43,946,535.87
- Pembesian 5,368.20 Kg Rp 10,630.73 Rp 57,067,881.59
- Bekesting 435.73 M2 Rp 271,154.63 Rp 118,150,394.56
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4 162.24 M2 Rp 101,847.19 Rp 16,523,789.30
2 Pek. Pas. List plafond gypsum 7 cm 135.88 M1 Rp 20,175.75 Rp 2,741,480.91
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250 1.83 M3 Rp 840,475.85 Rp 1,541,222.60
- Pembesian 126.91 Kg Rp 10,630.73 Rp 1,349,164.45
2 Pekerjaan beton rabat t = 5 cm 0.89 M3 Rp 648,489.19 Rp 578,614.48
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250 3.57 M3 Rp 840,475.85 Rp 2,999,658.32
- Pembesian 98.93 Kg Rp 10,630.73 Rp 1,051,726.11
3 Pekerjaan beton kolom 15/40
- Beton K250 1.12 M3 Rp 840,475.85 Rp 937,971.05
- Pembesian 238.92 Kg Rp 10,630.73 Rp 2,539,926.84
- Bekesting 10.23 M2 Rp 235,454.63 Rp 2,408,700.81
4 Pekerjaan beton balok 30/40
- Beton K250 1.96 M3 Rp 840,475.85 Rp 1,643,970.77
- Pembesian 295.78 Kg Rp 10,630.73 Rp 3,144,353.71
- Bekesting 6.52 M2 Rp 240,652.13 Rp 1,569,051.86
5 Pekerjaan beton balok 20/30
- Beton K250 0.26 M3 Rp 840,475.85 Rp 216,842.77
- Pembesian 33.70 Kg Rp 10,630.73 Rp 358,306.81
- Bekesting 1.29 M2 Rp 240,652.13 Rp 310,441.24
6 Pekerjaan beton dinding t= 15 cm
- Beton K250 9.47 M3 Rp 840,475.85 Rp 7,961,407.53
- Pembesian 591.65 Kg Rp 10,630.73 Rp 6,289,693.43
- Bekesting 63.15 M2 Rp 244,117.13 Rp 15,415,996.44
- Bekesting pas. Batako 63.15 M2 Rp 83,670.30 Rp 5,283,779.45
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250 2.68 M3 Rp 840,475.85 Rp 2,249,743.74
- Pembesian 98.93 Kg Rp 10,630.73 Rp 1,051,726.11
- Bekesting 17.85 M2 Rp 271,154.63 Rp 4,838,754.28
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250 1.65 M3 Rp 840,475.85 Rp 1,388,045.87
- Pembesian 114.30 Kg Rp 10,630.73 Rp 1,215,075.71
2 Pekerjaan beton rabat t = 5 cm 0.71 M3 Rp 648,489.19 Rp 460,103.08
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250 2.84 M3 Rp 840,475.85 Rp 2,385,270.47
- Pembesian 78.67 Kg Rp 10,630.73 Rp 836,312.33
3 Pekerjaan beton kolom 15/40
- Beton K250 1.12 M3 Rp 840,475.85 Rp 937,971.05
- Pembesian 238.92 Kg Rp 10,630.73 Rp 2,539,926.84
- Bekesting 10.23 M2 Rp 235,454.63 Rp 2,408,700.81
4 Pekerjaan beton balok 30/40
- Beton K250 1.76 M3 Rp 840,475.85 Rp 1,480,582.26
- Pembesian 266.38 Kg Rp 10,630.73 Rp 2,831,847.39
- Bekesting 5.87 M2 Rp 240,652.13 Rp 1,413,109.28
5 Pekerjaan beton balok 20/30
- Beton K250 0.26 M3 Rp 840,475.85 Rp 216,842.77
- Pembesian 33.70 Kg Rp 10,630.73 Rp 358,306.81
- Bekesting 1.29 M2 Rp 240,652.13 Rp 310,441.24
6 Pekerjaan beton dinding t= 15 cm
- Beton K250 8.33 M3 Rp 840,475.85 Rp 6,996,961.49
- Pembesian 519.98 Kg Rp 10,630.73 Rp 5,527,759.07
- Bekesting 55.50 M2 Rp 244,117.13 Rp 13,548,500.44
- Bekesting pas. Batako 55.50 M2 Rp 83,670.30 Rp 4,643,701.65
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250 2.13 M3 Rp 840,475.85 Rp 1,788,952.86
- Pembesian 78.67 Kg Rp 10,630.73 Rp 836,312.33
- Bekesting 14.19 M2 Rp 271,154.63 Rp 3,847,684.13
LANTAI 2
Material / Peralatan Utama
1 - Lampu Downlight 9 W 85.00 Bh Rp 175,000.00 Rp 14,875,000.00
2 - Exhaust fan 9.00 Bh Rp 450,000.00 Rp 4,050,000.00
3 - Ceiling Fan 14.00 Bh Rp 700,000.00 Rp 9,800,000.00
4 - Stop kontak 1 Ph, 13 A 100 Watt 27.00 Bh Rp 52,000.00 Rp 1,404,000.00
5 - Saklar Engkel 9.00 Bh Rp 55,000.00 Rp 495,000.00
6 - Saklar Seri 16.00 Bh Rp 55,000.00 Rp 880,000.00
7 - Kontrol fan 14.00 Bh Rp 350,000.00 Rp 4,900,000.00
EQUIPMENT
1 Pekerjaan Pembuatan Sumur Dalam 50 meter lengkap dengan chasing 1.00 ls Rp 22,000,000.00 Rp 22,000,000.00
2 Pompa Distribusi 1.00 Set Rp 45,000,000.00 Rp 45,000,000.00
- Capasity : 60 liter/mnt
- Head : 40 M
- Daya : 1.1 Kw/380V/50 Hz
3 Pompa Sumur Dalam 1.00 Unit Rp 25,000,000.00 Rp 25,000,000.00
- Kapasitas : 2 m3/jam Head = 100 m
- Daya : 1.15 kW /380 V / 50 Hz
- Lengkap dengan kabel power
4 Pompa Submersibel 1.00 Unit Rp 4,500,000.00 Rp 4,500,000.00
- Capasity : 50 L/M
- Head : 9 M
5 Sand dan Carbon filter kap. 2 m3/jam 1.00 Unit Rp 35,000,000.00 Rp 35,000,000.00
6 Biosave Tank ( BSTP 50 ) 1.00 Unit Rp 100,000,000.00 Rp 100,000,000.00
7 Fire Estinguisher 3.5 Kg 6.00 Unit Rp 1,300,000.00 Rp 7,800,000.00
8 Instalasi Pipa Air Bekas & Kotor dari bahan PVC klas AW
Termasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.
Instalasi :
- Pipa dia. 6" 35.00 m' Rp 245,000.00 Rp 8,575,000.00
- Pipa dia. 4" 124.00 m' Rp 127,542.38 Rp 15,815,255.66
- Pipa dia. 3" 72.00 m' Rp 127,542.38 Rp 9,183,051.68
- Pipa dia. 2" 10.00 m' Rp 52,481.56 Rp 524,815.59
- Pipa dia.1 1/2" 26.00 m' Rp 35,229.80 Rp 915,974.72
- Pipa dia. 1 1/4" (Vent) 24.00 m' Rp 35,229.80 Rp 845,515.13
- Pipa dia. 1" (Vent) 60.00 m' Rp 35,229.80 Rp 2,113,787.81
- Clean out dia. 100 mm SS 6.00 bh Rp 250,000.00 Rp 1,500,000.00
- Clean out dia. 80 mm SS 7.00 bh Rp 250,000.00 Rp 1,750,000.00
- P -Trap 20.00 bh Rp 45,000.00 Rp 900,000.00
- Fitting 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
- Vent Cup 32 mm 1.00 Bh Rp 45,000.00 Rp 45,000.00
- Galian dan urugan 48.00 m' Rp 35,000.00 Rp 1,680,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 500,000.00 Rp 500,000.00
9 Instalasi Pipa Air Dingin PVC Class AW Sesuai Gambar & Spesifikasi
Instalasi :
- Pipa diameter 1/2" 198.00 m Rp 35,229.80 Rp 6,975,499.78
- Pipa diameter 1" 10.00 m Rp 35,229.80 Rp 352,297.97
- Pipa diameter 1 1/4" 24.00 m Rp 35,229.80 Rp 845,515.13
- Pipa diameter 1 1/2" 68.00 m Rp 35,229.80 Rp 2,395,626.19
- Pipa diameter 2" ( Pipa PPR PN 10 ke Sumur ) Provisional 100.00 m Rp 125,000.00 Rp 12,500,000.00
- Pipa diameter 2" 45.00 m Rp 52,481.56 Rp 2,361,670.17
- Fitting 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
- CHECK Valve Diameter 2" 1.00 Bh Rp 450,000.00 Rp 450,000.00
- CHECK Valve Diameter 11/2" 1.00 Bh Rp 450,000.00 Rp 450,000.00
- Ball Valve Diameter 1" PVC 2.00 Bh Rp 140,000.00 Rp 280,000.00
- Ball Valve Diameter 11/4" PVC 2.00 Bh Rp 350,000.00 Rp 700,000.00
- Ball Valve Diameter 11/2" PVC 8.00 Bh Rp 350,000.00 Rp 2,800,000.00
- Ball Valve Diameter 2" PVC 5.00 Bh Rp 350,000.00 Rp 1,750,000.00
- Floating valve dia. 11/2" 1.00 Bh Rp 1,500,000.00 Rp 1,500,000.00
- Kabel Power Pompa 1.00 Bh Rp 950,000.00 Rp 950,000.00
- WLC water level air 2.00 set Rp 800,000.00 Rp 1,600,000.00
- Galian tanah u/ pasang pipa 49.00 m' Rp 35,000.00 Rp 1,715,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 2,750,000.00 Rp 2,750,000.00
SUB JUMLAH III.3 Rp 334,524,009.82
I. PEKERJAAN PERSIAPAN
1 Pembersihan Area Proyek 771.12 M2 Rp 6,195.00 Rp 4,777,088.40
2 Pek. Pengukuran dan pemasangan bowplank 137.00 M1 Rp 120,120.53 Rp 16,456,511.93
TOTAL I Rp 21,233,600.33
B. PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K250 5.57 M3 Rp 807,190.85 Rp 4,494,438.68
- Pembesian 535.35 Kg Rp 10,630.73 Rp 5,691,175.64
- Bekesting 27.84 M2 Rp 130,347.00 Rp 3,628,860.48
2 Pekerjaan beton sloof 15/30
- Beton K250 6.29 M3 Rp 807,190.85 Rp 5,078,037.66
- Pembesian 830.62 Kg Rp 10,630.73 Rp 8,830,110.87
- Bekesting 83.88 M2 Rp 139,009.50 Rp 11,660,116.86
3 Pekerjaan beton sloof 15/20
- Beton K250 1.63 M3 Rp 807,190.85 Rp 1,317,335.47
- Pembesian 175.93 Kg Rp 10,630.73 Rp 1,870,259.20
- Bekesting 21.76 M2 Rp 139,009.50 Rp 3,024,846.72
4 Pek. Urugan pasir t = 5 cm dibawah lantai 34.95 M3 Rp 144,165.00 Rp 5,037,925.22
5 Pek. Rabatan lantai t = 8 cm
- Beton K250 55.91 M3 Rp 807,190.85 Rp 45,132,365.37
- Wiremesh M6 1 lapis 698.91 M2 Rp 54,506.24 Rp 38,095,011.22
6 Pekerjaan beton kolom 30/30
- Beton K250 12.08 M3 Rp 807,190.85 Rp 9,752,883.50
- Pembesian 2,316.48 Kg Rp 10,630.73 Rp 24,625,829.96
- Bekesting 161.10 M2 Rp 235,454.63 Rp 37,931,740.09
7 Pekerjaan beton kolom 20/20
- Beton K250 0.86 M3 Rp 807,190.85 Rp 693,538.38
- Pembesian 260.67 Kg Rp 10,630.73 Rp 2,771,071.11
- Bekesting 17.18 M2 Rp 235,454.63 Rp 4,046,052.28
8 Pekerjaan Ring balok 20/30
- Beton K250 8.39 M3 Rp 807,190.85 Rp 6,770,716.88
- Pembesian 1,003.76 Kg Rp 10,630.73 Rp 10,670,739.05
- Bekesting 83.94 M2 Rp 240,652.13 Rp 20,200,339.37
9 Pekerjaan Ring balok 15/20
- Beton K250 1.63 M3 Rp 807,190.85 Rp 1,317,335.47
- Pembesian 209.25 Kg Rp 10,630.73 Rp 2,224,474.95
- Bekesting 21.79 M2 Rp 240,652.13 Rp 5,243,809.80
10 Pekerjaan Plat Topian bawah
a. - Pekerjaan Ring balok 15/20
- Beton K250 3.42 M3 Rp 807,190.85 Rp 2,760,592.72
- Pembesian 438.50 Kg Rp 10,630.73 Rp 4,661,583.54
- Bekesting 45.63 M2 Rp 240,652.13 Rp 10,980,956.46
b. Pekerjaan beton plat topian t=10 cm
- Beton K250 3.42 M3 Rp 807,190.85 Rp 2,760,592.72
- Pembesian 210.75 Kg Rp 10,630.73 Rp 2,240,414.13
- Bekesting 34.20 M2 Rp 271,154.63 Rp 9,273,488.18
11 Pekerjaan Plat Topian Atas
a. - Pekerjaan Ring balok 15/20
- Beton K250 3.42 M3 Rp 807,190.85 Rp 2,760,592.72
- Pembesian 438.50 Kg Rp 10,630.73 Rp 4,661,583.54
- Bekesting 45.63 M2 Rp 240,652.13 Rp 10,980,956.46
b. Pekerjaan beton plat topian t=10 cm
- Beton K250 7.98 M3 Rp 807,190.85 Rp 6,441,383.02
- Pembesian 491.75 Kg Rp 10,630.73 Rp 5,227,632.97
- Bekesting 79.80 M2 Rp 271,154.63 Rp 21,638,139.08
12 Pekerjaan meja wastafel
a. - Pekerjaan Ring balok 15/20
- Beton K250 1.13 M3 Rp 807,190.85 Rp 913,417.17
- Pembesian 145.09 Kg Rp 10,630.73 Rp 1,542,411.68
- Bekesting 15.12 M2 Rp 240,652.13 Rp 3,638,178.83
b. Pekerjaan beton plat t=10 cm
- Beton K250 2.36 M3 Rp 807,190.85 Rp 1,902,952.44
- Pembesian 145.28 Kg Rp 10,630.73 Rp 1,544,379.04
- Bekesting 23.58 M2 Rp 271,154.63 Rp 6,392,470.28
13 Pekerjaan meja wastafel
a. - Pekerjaan Ring balok 15/20
- Beton K250 1.13 M3 Rp 807,190.85 Rp 913,417.17
- Pembesian 145.09 Kg Rp 10,630.73 Rp 1,542,411.68
- Bekesting 15.12 M2 Rp 240,652.13 Rp 3,638,178.83
b. Pekerjaan beton plat t=10 cm
- Beton K250 2.36 M3 Rp 807,190.85 Rp 1,902,952.44
- Pembesian 145.28 Kg Rp 10,630.73 Rp 1,544,379.04
- Bekesting 23.58 M2 Rp 271,154.63 Rp 6,392,470.28
14 Pekerjaan beton tempat duduk
- Beton K250 12.60 M3 Rp 807,190.85 Rp 10,170,604.76
- Pembesian 924.00 Kg Rp 10,630.73 Rp 9,822,789.90
- Bekesting 220.00 M2 Rp 135,577.31 Rp 29,827,008.75
15 Pekerjaan beton meja makan
- Beton K250 14.90 M3 Rp 807,190.85 Rp 12,027,143.73
- Pembesian 942.48 Kg Rp 10,630.73 Rp 10,019,245.70
- Bekesting 216.00 M2 Rp 135,577.31 Rp 29,284,699.50
16 Pekerjaan Pelat Atap Teras T=10 cm
- Beton K250 5.75 M3 Rp 807,190.85 Rp 4,644,576.17
- Pembesian 732.52 Kg Rp 10,630.73 Rp 7,787,245.89
- Bekesting 57.54 M2 Rp 271,154.63 Rp 15,602,237.12
D PEKERJAAN DINDING
1 Pek. Pasangan Batu Bata merah 1 : 5 550.38 M2 Rp 118,798.05 Rp 65,383,766.64
2 Pek. Penebalan Kolom Dengan Bata Merah 68.25 M2 Rp 118,798.05 Rp 8,107,966.91
3 Pek. Kolom Praktis ( 11 x 11 cm ) 100.20 M1 Rp 61,228.05 Rp 6,135,050.23
4 Pek. Balok Latai ( 10 x 15 cm ) 31.86 M1 Rp 83,607.42 Rp 2,663,397.83
5 Pek. Plesteran Dinding Luar Camp. 1:5 355.26 M2 Rp 41,008.59 Rp 14,568,606.70
6 Pek. Plesteran Dinding Dalam Camp. 1:5 745.50 M2 Rp 41,008.59 Rp 30,571,798.86
7 Pek. Plesteran Dinding Pada Pepalihan Kolom 68.25 M2 Rp 41,008.59 Rp 2,798,836.27
8 Pek. Acian dinding luar 355.26 M2 Rp 24,622.50 Rp 8,747,326.32
9 Pek. Acian Dalam 745.50 M2 Rp 24,622.50 Rp 18,356,010.72
10 Pek. Acian Dinding Pada Pepalihan Kolom 68.25 M2 Rp 24,622.50 Rp 1,680,485.63
11 Pek. Acian Pelat Topian 250.80 M2 Rp 24,622.50 Rp 6,175,323.00
12 Pek. Acian Pelat Atap Teras T=10 cm 115.08 M2 Rp 24,622.50 Rp 2,833,557.30
E PEKERJAAN LANTAI
1 Pek. Pas. Keramik 30x30 (A), setara asia tile 602.00 M2 Rp 140,566.36 Rp 84,620,950.91
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip 70.92 M2 Rp 140,566.36 Rp 9,968,966.51
3 Pek. Pas. Plint Keramik 10x30, setara asia tile 164.61 M1 Rp 26,989.26 Rp 4,442,810.64
4 Pek. Pas. Keramik Wastafel Pantry 20/20 cm 23.52 M2 Rp 160,403.25 Rp 3,772,684.44
5 Pek. Pas. Keramik Dinding 20x25 cm 161.20 M2 Rp 158,513.25 Rp 25,552,335.90
6 Pek. Pas. Rubber Floor (C) 30.40 M2 Rp 217,365.75 Rp 6,607,918.80
F PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 720.20 M2 Rp 91,841.19 Rp 66,143,611.75
2 Pek. Pas. List plafond gypsum 7 cm 252.24 M1 Rp 20,175.75 Rp 5,089,030.30
J PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150 655.41 Kg Rp 19,744.20 Rp 12,940,506.63
2 Pek. Pas. Balok baja WF 250/125 10,212.31 Kg Rp 19,744.20 Rp 201,633,930.59
3 Pek. Pas. Balok baja WF 200/100 1,749.03 Kg Rp 19,744.20 Rp 34,533,198.13
4 Pek. Pas. Gording CNP 150 6,589.21 Kg Rp 19,744.20 Rp 130,098,719.57
5 Pek. Pas. Baut angker diameter 16 104.00 Bh Rp 36,141.00 Rp 3,758,664.00
6 Pek. Pas. Baut d-16 1,296.00 bh Rp 11,991.00 Rp 15,540,336.00
7 Pek. Pas. Baut d-12 416.00 bh Rp 9,891.00 Rp 4,114,656.00
8 Pek. Pas. Cat zinkcromate 252.34 kg Rp 46,641.00 Rp 11,769,156.74
9 Pek. Pas. Pelat baja t=10mm 701.04 Kg Rp 19,744.20 Rp 13,841,402.89
10 Pek. Pas. Usuk baja ringan profil UK 75 1,017.35 M2 Rp 86,887.50 Rp 88,395,032.88
11 Pek. Pas. Reng baja ringan profil UK 30 1,017.35 M2 Rp 66,698.86 Rp 67,856,115.60
12 Pek. Pas. Alluminium foil 1,017.35 M2 Rp 63,894.25 Rp 65,002,840.80
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 180.29 M2 Rp 91,841.19 Rp 16,558,231.83
14 Pek. Pas. Tatab Kayu kamper 131.60 M1 Rp 38,823.46 Rp 5,109,167.16
15 Pek. Pas. Listplank Kayu Kamper 3/30 131.60 M1 Rp 116,450.25 Rp 15,324,852.90
16 Pek. Pas. Genteng Kodok karang pilang good year 1,017.35 M2 Rp 114,137.63 Rp 116,117,958.45
17 Pek. Pas. Bubungan karang pilang setara good year 91.00 M1 Rp 87,234.00 Rp 7,938,294.00
18 Pek. Pas. Murda Paras 2.00 Bh Rp 103,178.88 Rp 206,357.76
19 Pek. Pas. Ikut celedu Paras 4.00 Bh Rp 103,178.88 Rp 412,715.52
SUB JUMLAH II.1 Rp 1,966,045,575.43
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P1
- Beton K250 1.34 M3 Rp 807,190.85 Rp 1,084,864.51
- Pembesian 129.22 Kg Rp 10,630.73 Rp 1,373,732.05
- Bekesting 6.72 M2 Rp 130,347.00 Rp 875,931.84
2 Pekerjaan beton sloof 15/30
- Beton K250 1.52 M3 Rp 807,190.85 Rp 1,226,284.35
- Pembesian 200.59 Kg Rp 10,630.73 Rp 2,132,364.40
- Bekesting 20.26 M2 Rp 139,009.50 Rp 2,815,776.43
3 Pekerjaan beton kolom 20/20
- Beton K250 1.50 M3 Rp 807,190.85 Rp 1,213,692.17
- Pembesian 456.17 Kg Rp 10,630.73 Rp 4,849,374.45
- Bekesting 30.07 M2 Rp 235,454.63 Rp 7,080,591.48
4 Pekerjaan Ring balok 15/20
- Beton K250 1.40 M3 Rp 807,190.85 Rp 1,129,905.76
- Pembesian 179.48 Kg Rp 10,630.73 Rp 1,907,977.97
- Bekesting 18.69 M2 Rp 240,652.13 Rp 4,498,750.82
5 Pekerjaan Pelat Atap t.10cm
- Beton K300 9.31 M3 Rp 807,190.85 Rp 7,510,910.90
- Pembesian 1,146.38 Kg Rp 10,630.73 Rp 12,186,808.00
- Bekesting 93.05 M2 Rp 271,154.63 Rp 25,230,937.86
6 Pekerjaan Plat Topian
a. - Pekerjaan Ring balok 15/20
- Beton K250 1.01 M3 Rp 807,190.85 Rp 817,522.90
- Pembesian 129.86 Kg Rp 10,630.73 Rp 1,380,482.99
- Bekesting 13.53 M2 Rp 240,652.13 Rp 3,256,985.86
b. Pekerjaan beton plat topian t=10 cm
- Beton K250 1.01 M3 Rp 807,190.85 Rp 817,522.90
- Pembesian 62.41 Kg Rp 10,630.73 Rp 663,477.03
- Bekesting 10.13 M2 Rp 271,154.63 Rp 2,746,254.04
TOTAL II Rp 2,086,715,285.58
1 Instalasi Pipa Air Bekas & Kotor dari bahan PVC klas AW
Termasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.
Instalasi :
- Pipa dia. 3" 132.00 m' Rp 127,542.38 Rp 16,835,594.74
- Pipa dia.1 1/2" 72.00 m' Rp 35,229.80 Rp 2,536,545.38
- Pipa dia. 1 1/4" (Vent) 18.00 m' Rp 35,229.80 Rp 634,136.34
- Clean out dia. 80 mm SS 4.00 bh Rp 250,000.00 Rp 1,000,000.00
- Fitting 1.00 Ls Rp 7,500,000.00 Rp 7,500,000.00
- Vent Cup 32 mm 4.00 Bh Rp 45,000.00 Rp 180,000.00
- Galian dan urugan 110.00 m' Rp 35,000.00 Rp 3,850,000.00
- Resapan dari Buis Beton dia. 100 mm 2.00 Bh Rp 900,000.00 Rp 1,800,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 500,000.00 Rp 500,000.00
2 Instalasi Pipa Air Dingin PVC Class AW Sesuai Gambar & Spesifikasi
Instalasi :
- Pipa diameter 1/2" 144.00 m Rp 35,229.80 Rp 5,073,090.75
- Pipa diameter 1 1/4" 68.00 m Rp 35,229.80 Rp 2,395,626.19
- Pipa diameter 1 1/2" 16.00 m Rp 35,229.80 Rp 563,676.75
- Pipa diameter 2" 102.00 m Rp 52,481.56 Rp 5,353,119.06
- Fitting 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
- Ball Valve Diameter 11/2" PVC 4.00 Bh Rp 450,000.00 Rp 1,800,000.00
- Ball Valve Diameter 2" PVC 1.00 Bh Rp 140,000.00 Rp 140,000.00
- Galian tanah u/ pasang pipa 60.00 m' Rp 35,000.00 Rp 2,100,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 2,750,000.00 Rp 2,750,000.00
SUB JUMLAH III.3 Rp 58,011,789.20
TOTAL III Rp 122,615,789.20
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : Belanja Modal Konstruksi Pengembangan Pembangunan SLB di Jimbaran
LOKASI : JIMBARAN, BADUNG - BALI
TAHUN : 2016
I. PEKERJAAN PERSIAPAN
1 Pembersihan Area Proyek 168.00 M2 Rp 6,195.00 Rp 1,040,760.00
2 Pek. Pengukuran dan pemasangan bowplank 52.00 M1 Rp 120,120.53 Rp 6,246,267.30
TOTAL I Rp 7,287,027.30
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K250 1.92 M3 Rp 807,190.85 Rp 1,549,806.44
- Pembesian 205.70 Kg Rp 10,630.73 Rp 2,186,757.14
- Bekesting 9.60 M2 Rp 130,347.00 Rp 1,251,331.20
2 Pekerjaan beton sloof (TB1) 15/30 cm
- Beton K250 2.34 M3 Rp 807,190.85 Rp 1,888,826.60
- Pembesian 309.31 Kg Rp 10,630.73 Rp 3,288,226.76
- Bekesting 31.20 M2 Rp 139,009.50 Rp 4,337,096.40
3 Pekerjaan beton sloof (TB2) 15/20 cm
- Beton K250 1.68 M3 Rp 807,190.85 Rp 1,356,080.64
- Pembesian 181.26 Kg Rp 10,630.73 Rp 1,926,903.95
- Bekesting 22.40 M2 Rp 139,009.50 Rp 3,113,812.80
4 Pek. Rabatan lantai t = 8 cm
- Beton K250 14.14 M2 Rp 807,190.85 Rp 11,410,449.91
- Wiremesh M6 1 lapis 176.70 M2 Rp 54,506.24 Rp 9,631,252.74
5 Pek. beton kolom 30/30 cm
- Beton K250 5.97 M3 Rp 807,190.85 Rp 4,816,507.83
- Pembesian 1,205.05 Kg Rp 10,630.73 Rp 12,810,550.91
- Bekesting 79.56 M2 Rp 235,454.63 Rp 18,732,769.97
6 Pek. ring balok 20/30 cm
- Beton K250 3.12 M3 Rp 807,190.85 Rp 2,518,435.47
- Pembesian 435.38 Kg Rp 10,630.73 Rp 4,628,351.90
- Bekesting 41.60 M2 Rp 240,652.13 Rp 10,011,128.40
7 Pek. ring balok 15/20
- Beton K250 1.98 M3 Rp 807,190.85 Rp 1,598,237.89
- Pembesian 186.98 Kg Rp 10,630.73 Rp 1,987,748.91
- Bekesting 33.00 M2 Rp 240,652.13 Rp 7,941,520.13
8 Pek. plat topian konsol bawah
a - Pek. ring balok 15/20
- Beton K250 1.92 M3 Rp 807,190.85 Rp 1,549,806.44
- Pembesian 246.45 Kg Rp 10,630.73 Rp 2,619,968.75
- Bekesting 35.20 M2 Rp 240,652.13 Rp 8,470,954.80
b - Pekerjaan beton plat topian t=10 cm
- Beton K250 1.92 M3 Rp 807,190.85 Rp 1,549,806.44
- Pembesian 141.93 Kg Rp 10,630.73 Rp 1,508,780.53
- Bekesting 19.20 M2 Rp 271,154.63 Rp 5,206,168.80
9 Pek. Plat beton topian konsol atas
a - Pek. ring balok 15/20 cm
- Beton K250 1.56 M3 Rp 807,190.85 Rp 1,259,217.73
- Pembesian 200.02 Kg Rp 10,630.73 Rp 2,126,336.35
- Bekesting 28.60 M2 Rp 240,652.13 Rp 6,882,650.78
b - Pek. beton plat topian t=10 cm
- Beton K250 3.64 M3 Rp 807,190.85 Rp 2,938,174.71
- Pembesian 269.07 Kg Rp 10,630.73 Rp 2,860,396.42
- Bekesting 36.40 M2 Rp 271,154.63 Rp 9,870,028.35
10 Pek. plat atap koridor penghubung
a - Pekerjaan ring balok 15/20 cm
- Beton K250 0.36 M3 Rp 807,190.85 Rp 290,588.71
- Pembesian 46.43 Kg Rp 10,630.73 Rp 493,632.40
- Bekesting 6.60 M2 Rp 240,652.13 Rp 1,588,304.03
b - Pek. beton plat topian t=10 cm
- Beton K250 2.20 M3 Rp 807,190.85 Rp 1,775,819.88
- Pembesian 271.04 Kg Rp 10,630.73 Rp 2,881,351.70
- Bekesting 22.00 M2 Rp 271,154.63 Rp 5,965,401.75
11 Pek. meja beton dapur
a - Pekerjaan ring balok 15/20 cm
- Beton K250 0.21 M3 Rp 807,190.85 Rp 169,510.08
- Pembesian 26.93 Kg Rp 10,630.73 Rp 286,237.59
- Bekesting 3.85 M2 Rp 240,652.13 Rp 926,510.68
b - Pek. beton plat topian t=10 cm
- Beton K250 0.70 M3 Rp 807,190.85 Rp 565,033.60
- Pembesian 43.12 Kg Rp 10,630.73 Rp 458,396.86
- Bekesting 7.00 M2 Rp 271,154.63 Rp 1,898,082.38
C PEKERJAAN DINDING
1 Pek. Pasangan batu bata merah 1 : 5 312.41 M2 Rp 118,798.05 Rp 37,113,109.56
2 Pek. Pasangan batu bata merah penebalan kolom 7.02 M2 Rp 118,798.05 Rp 833,962.31
3 Pek. Kolom praktis ( 11 x 11 cm ) 81.95 M1 Rp 61,228.05 Rp 5,017,638.39
4 Pek. Balok latai (10x15) cm 23.86 M1 Rp 83,607.42 Rp 1,994,872.93
5 Pek. Plesteran Camp. 1:5 624.81 M2 Rp 41,008.59 Rp 25,622,580.40
6 Pek. Acian dinding luar 229.31 M2 Rp 24,622.50 Rp 5,646,283.97
7 Pek. Acian dinding dalam 293.70 M2 Rp 24,622.50 Rp 7,231,531.73
8 Pek. Acian plat & topian beton 156.80 M2 Rp 24,622.50 Rp 3,860,808.00
D PEKERJAAN LANTAI
1 Pek. Pas. Keramik 30/30 cm (A) warna putih setara asia tile 147.13 M2 Rp 140,566.36 Rp 20,680,826.25
2 Pek. Pas. Keramik 30/30 cm (B) warna putih setara asia tile anti slip 21.27 M2 Rp 140,566.36 Rp 2,990,197.97
3 Pek. Pas. Keramik dinding 20x25 cm setara asia tile 8.91 M2 Rp 158,513.25 Rp 1,412,353.06
4 Pek. Pas. Plint dinding Keramik 10/30 warna putih setara asia tile 110.68 M1 Rp 26,989.26 Rp 2,987,117.72
5 Pek. Pas. Keramik meja pantry 20/20 cm setara asia tile 5.78 M2 Rp 160,403.25 Rp 927,130.79
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon Kalsiboard 4,5 mm, rangka holow 4x4 cm 216.97 M2 Rp 101,847.19 Rp 22,098,252.44
2 Pek. Pas. List plafond gypsum 7 cm 251.95 M1 Rp 20,175.75 Rp 5,083,280.21
I PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris 1.00 Unit 1,940,531.25 Rp 1,940,531.25
2 Pek. Pas. Wastafel setara TOTO + Asesoris 3.00 Unit 861,052.50 Rp 2,583,157.50
3 Pek. Pas. Floor drain setara TOTO 1.00 Unit 291,060.00 Rp 291,060.00
4 Pek. Pas. Jet shower setara TOTO 1.00 Unit 347,130.00 Rp 347,130.00
5 Pek. Pas. Keran Air Setara TOTO 3.00 Unit 187,425.00 Rp 562,275.00
6 Pek. Pas. Bak Zink 1.00 Unit 662,130.00 Rp 662,130.00
H PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150 302.50 Kg Rp 19,744.20 Rp 5,972,541.52
2 Pek. Pas. Balok baja WF 250/125 9,650.45 Kg Rp 19,744.20 Rp 190,540,434.63
3 Pek. Pas. Balok baja WF 200/100 435.96 Kg Rp 19,744.20 Rp 8,607,681.43
4 Pek. Pas. Gording CNP 150 1,751.78 Kg Rp 19,744.20 Rp 34,587,542.06
5 Pek. Pas. Baut angker diameter 16 48.00 Bh Rp 36,141.00 Rp 1,734,768.00
6 Pek. Pas. Baut d-16 960.00 Bh Rp 11,991.00 Rp 11,511,360.00
7 Pek. Pas. Baut d-12 192.00 Bh Rp 9,891.00 Rp 1,899,072.00
8 Pek. Pas. Cat zinkcromate 199.06 Kg Rp 46,641.00 Rp 9,284,308.02
9 Pek. Pas. Pelat baja t=10mm 467.36 Kg Rp 19,744.20 Rp 9,227,601.93
10 Pek. Pas. Usuk baja ringan profil UK 75 260.76 M2 Rp 86,887.50 Rp 22,656,549.90
11 Pek. Pas. Reng baja ringan profil UK 30 260.76 M2 Rp 66,698.86 Rp 17,392,215.59
12 Pek. Pas. Alluminium foil 260.76 M2 Rp 63,894.25 Rp 16,660,892.12
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4 83.71 M2 Rp 91,841.19 Rp 7,687,750.49
14 Pek. Pas. Tatab Kayu kamper 61.10 M1 Rp 38,823.46 Rp 2,372,113.32
15 Pek. Pas. Listplank Kayu Kamper 3/30 61.10 M1 Rp 116,450.25 Rp 7,115,110.28
16 Pek. Pas. Genteng Kodok karang pilang good year 260.76 M2 Rp 114,137.63 Rp 29,762,218.92
17 Pek. Pas. Bubungan karang pilang setara good year 64.31 M1 Rp 87,234.00 Rp 5,610,018.54
18 Pek. Pas. Murda Paras 2.00 Bh Rp 103,178.88 Rp 206,357.76
19 Pek. Pas. Ikut celedu Paras 4.00 Bh Rp 103,178.88 Rp 412,715.52
TOTAL II Rp 844,619,384.97
A PEKERJAAN PANEL
Pengadaan Dan Pemasangan Panel Lengkap Dengan Terminasi
Grounding, Dan Alat Bantu lainya
1 - PP. Dapur 1.00 Unit Rp 6,000,000.00 Rp 6,000,000.00
2 - Grounding 1.00 Unit Rp 900,000.00 Rp 900,000.00
1 Instalasi Pipa Air Bekas & Kotor dari bahan PVC klas AW
Termasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.
Instalasi :
- Pipa dia. 4" 8.00 m' Rp 127,542.38 Rp 1,020,339.08
- Pipa dia. 3" 14.00 m' Rp 127,542.38 Rp 1,785,593.38
- Pipa dia. 1 1/4" (Vent) 4.00 m' Rp 35,229.80 Rp 140,919.19
- Fitting 1.00 Ls Rp 500,000.00 Rp 500,000.00
- Grease trap kap.1000 liter 1.00 Bh Rp 15,000,000.00 Rp 15,000,000.00
- P -Trap 1.00 bh Rp 45,000.00 Rp 45,000.00
- Galian dan urugan 110.00 m' Rp 35,000.00 Rp 3,850,000.00
- Bio Septik tank kap. 400 Liter/day 1.00 Bh Rp 23,000,000.00 Rp 23,000,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 500,000.00 Rp 500,000.00
2 Instalasi Pipa Air Dingin PVC Class AW Sesuai Gambar & Spesifikasi
Instalasi :
- Pipa diameter 1/2" 38.00 m Rp 35,229.80 Rp 1,338,732.28
- Pipa diameter 1" 24.00 m Rp 35,229.80 Rp 845,515.13
- Fitting 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
- Ball Valve Diameter 1" PVC 1.00 Bh Rp 140,000.00 Rp 140,000.00
- Material bantu, Support dan hanger 1.00 Lot Rp 800,000.00 Rp 800,000.00
TOTAL III Rp 78,779,099.05
PEKERJAAN: Belanja Modal Konstruksi Pengembangan Pembangunan SLB di Jimbara
LOKASI : JIMBARAN, BADUNG - BALI
TAHUN : 2016
NO URAIAN PEKERJAAN
I. BANGUNAN KELAS
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Pembersihan Area Proyek
3 Pek. Pengukuran dan pemasangan bowplank
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR
II.1 PEKERJAAN LANTAI I
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus bangunan
2 Pek. Galian pondasi telapak / pile cap
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pondasi Telapak
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5 pada pondasi menerus
7 Pek. Pasangan pondasi batu kali camp. 1:5 Pada Tangga dan Ramp
8 Pek. Urugan Tanah Kembali
9 Pek. Urugan Tanah Peninggian Lantai
10 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton pondasi P2
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton pondasi P3
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton pondasi P4
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton sloof (TB1) 20/40
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton sloof (TB3) 15/20
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan pelat lantai 1 t.8cm
- Beton K300
- Pembesian Wiremesh M6 1 Lapis
8 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton plat tangga I
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat tangga II
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat topian t=10 cm
- Beton K300
- Pembesian
- Bekesting
12 Pekerjaan beton plat topian t=10 cm tas jendela
- Beton K300
- Pembesian
- Bekesting
C PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
5 Pek. Plesteran Dinding Luar Camp. 1:5
6 Pek. Plesteran Dinding Dalam Camp. 1:5
7 Pek. Plesteran Dinding Pada Pepalihan Kolom
8 Pek. Acian Luar
9 Pek. Acian Dalam
10 Pek. Acian Dinding Pada Pepalihan Kolom
11 Pek. Acian Pelat Topian
D PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Keramik 30x30 (A), Pada Tangga setara asia tile
4 Pek. Pas. Plint Keramik 10x30, setara asia tile
5 Pek. Pas. Keramik Meja Pantry 20/20 cm
6 Pek. Pas. Keramik Dinding 20x25 cm
7 Pek. Pas. Rubber Floor (C)
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
F PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan kunci Pintu Biasa
14 Pek. Pasangan kunci Pintu Kaca
15 Pek. Pasangan kunci Pintu Dorong
16 Pek. Pasangan kunci slot tanam
17 Pek. Pasangan kait angin
18 Pek. Pasangan grendel jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
G PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan Dan Siripan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
10 Pek. Railing Ramp Stainless Steel
11 Pek. Railing Tangga Stainless Steel
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.2 PEKERJAAN LANTAI II
A PEKERJAAN BETON
1 Pekerjaan beton balok B1 30/60
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton balok B1A 30/60
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton balok B2 30/50
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B3 25/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton balok B4 20/30
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton balok B5 15/30
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan Pelat Lantai 2 T=12cm
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap Teras T=10 cm
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
4 Pek. Plesteran Dinding Luar Camp. 1:5
5 Pek. Plesteran Dinding Dalam Camp. 1:5
6 Pek. Plesteran Dinding Pada Pepalihan Kolom
7 Pek. Acian Luar
8 Pek. Acian Dalam
9 Pek. Acian Dinding Pada Pepalihan Kolom
C PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Plint Keramik 10x30, setara asia tile
4 Pek. Pas. Keramik meja pantry 20/20 cm
5 Pek. Pas. Keramik dinding 20x25 cm
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan Kunci Pintu Biasa
14 Pek. Pasangan Kunci Pintu Kaca
15 Pek. Pasangan Kunci Pintu Dorong
16 Pek. Pasangan Kunci Slot Tanam
17 Pek. Pasangan Kait Angin
18 Pek. Pasangan Grendel Jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
F PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
G PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.3 PEKERJAAN ATAP
A PEKERJAAN BETON
1 Pekerjaan beton ring balok RB1 25/50
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150
2 Pek. Pas. Balok baja WF 250/125
3 Pek. Pas. Balok baja WF 200/100
4 Pek. Pas. Gording CNP 150
5 Pek. Pas. Baut angker diameter 16
6 Pek. Pas. Baut d-16
7 Pek. Pas. Baut d-12
8 Pek. Pas. Cat zinkcromate
9 Pek. Pas. Pelat baja t=10mm
10 Pek. Pas. Usuk baja ringan profil UK 75
11 Pek. Pas. Reng baja ringan profil UK 30
12 Pek. Pas. Alluminium foil
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
14 Pek. Pas. Tatab Kayu Kamper
15 Pek. Pas. Listplank Kayu Kamper 2x3/30
16 Pek. Pas. Genteng Gemini Ex. Good Year
17 Pek. Pas. Bubungan genteng gemini Ex. Good Year
18 Pek. Pas. Murda Paras
19 Pek. Pas. Ikut celedu Paras
C PEKERJAAN FINISHING
1 Pek. Pengecatan plafond gypsum setara dulux
2 Pek. Polituran Listplank
3 Pek. Polituran Tatab
II.4 PEKERJAAN RAAM
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus raam
2 Pek. Galian pondasi telapak / pile cap P5
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pile cap
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5
7 Pek. Urugan Tanah Kembali
8 Pek. Urugan Tanah Peninggian Lantai
9 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P5
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton sloof (TB2) 15/30
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton kolom K3 20/20
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B6 20/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan Pelat lantai t.8 cm
- Beton K300
- Pembesian
6 Pekerjaan pelat lantai t.12cm
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan beton balok RB2 20/30
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap t.12cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Bata Merah 1:5
2 Pek. Balok Praktis ( 10 x 15 cm )
3 Pek. Plesteran
4 Pek. Acian
C PEKERJAAN LAPISAN LANTAI DAN DINDING
3 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
4 Pek. Pas. Rubber Floor (C)
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
2 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior Pada Dinding setara dulux weathershield warna putih
2 Pek. Fin. Cat ekterior Pada Kolom setara dulux weathershield warna putih
3 Pek. Fin. Cat wateproofing setara aquaproof
4 Pek. Pas. Railing Stainless Steel
II.5 PEKERJAAN GROUND TANK
A PEKERJAAN PERSIAPAN, TANAH DAN PONDASI
1 Pembersihan Area Proyek
2 Pek. Pengukuran dan pemasangan bowplank
3 Pek. Galian groundtank
4 Pek. Galian untuk sloof groundtank
5 Pek. Urugan pasir t = 5 cm lantai groundtank
6 Pek. Urugan pasir t = 5 cm pada sloof
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250
- Pembesian
2 Pekerjaan beton rabat t = 5 cm
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250
- Pembesian
3 Pekerjaan beton kolom 15/40
- Beton K250
- Pembesian
- Bekesting
4 Pekerjaan beton balok 30/40
- Beton K250
- Pembesian
- Bekesting
5 Pekerjaan beton balok 20/30
- Beton K250
- Pembesian
- Bekesting
6 Pekerjaan beton dinding t= 15 cm
- Beton K250
- Pembesian
- Bekesting
- Bekesting pas. Batako
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250
- Pembesian
- Bekesting
C PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Pas. Keramik 20x20, setara asia tile
2 Pek. Pas. keramik dinding 20x25, setara asia tile
1 Mandor
2 Kepala Tukang Lapangan
3 Kepala Tukang Besi
4 Kepala Tukang Batu
5 Kepala Tukang Kayu
6 Kepala Tukang Cat
7 Kepala Tukang Paras Bali
8 Kepala Tukang Ukir
9 Tukang Aluminium
10 Tukang Batu
11 Tukang Besi
12 Tukang Kayu
13 Tukang Cat
14 Tukang Politur
15 Tukang Ukir
16 Tukang Paras Bali
17 Pekerja Terlatih
18 Pekerja Semi Terlatih
19 Pekerja / Pekerja Tidak Terlatih
20 Tukang Gali
21 Tukang Listrik
22 Tukang Pipa/ Tukang Ledeng
23 Kepala Tukang Pipa/ Tukang Ledeng
24 Tukang Las
25 Tukang Masak Aspal
26 Tukang Cor Aspal
Real Cost 18,821,528,616.89
PPN 1% 1,882,152,861.69
JML 20,703,681,478.58
J A D
nan SLB di Jimbaran
VOL. SAT.
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
###
J A D W A L P E L A K
BOBOT
0.002
0.040
0.236
0.095
0.045
0.019
0.004
0.149
0.760
0.049
0.011
0.430
0.046
0.062
0.081
0.023
0.060
0.085
0.027
0.027
0.040
0.014
0.008
0.013
0.005
0.197
0.368
0.326
0.010
0.013
0.021
0.432
0.350
0.069
0.282
0.258
0.032
0.130
0.118
0.025
0.064
0.033
0.025
0.064
0.033
0.017
0.013
0.053
0.013
0.010
0.042
1.117
0.078
0.079
0.089
0.034
0.737
0.027
0.021
0.424
0.016
0.038
0.785
0.071
0.026
0.106
0.001
0.118
0.008
0.481
0.040
0.086
1.617
0.280
0.203
0.097
0.007
0.027
0.023
0.017
0.083
0.045
0.013
0.005
0.034
0.004
0.003
0.016
0.163
0.125
0.104
0.032
0.003
0.002
0.006
0.037
0.098
0.637
0.018
0.031
0.194
0.015
0.049
0.052
0.029
0.018
0.093
0.051
0.041
0.015
0.017
0.008
0.003
0.004
0.243
0.789
0.580
0.036
0.062
0.085
0.002
0.308
0.348
0.056
0.142
0.170
0.008
0.017
0.032
0.005
0.011
0.026
0.638
0.829
1.716
0.012
0.017
0.033
0.046
0.205
0.173
0.029
0.102
0.084
1.426
0.071
0.100
0.096
0.059
0.925
0.025
0.035
0.537
0.015
0.844
0.012
0.112
0.001
0.118
0.483
0.040
0.090
1.734
0.288
0.220
0.106
0.007
0.027
0.023
0.017
0.090
0.045
0.013
0.005
0.034
0.009
0.003
0.018
0.177
0.135
0.108
0.033
0.003
0.002
0.006
0.065
0.027
0.807
0.018
0.031
0.194
0.015
0.051
0.056
0.093
0.051
0.041
0.015
0.017
0.004
0.003
0.004
0.133
0.207
0.380
0.161
2.589
0.215
1.431
0.047
0.136
0.064
0.140
0.123
0.898
0.689
0.660
0.172
0.047
0.283
1.179
0.078
0.002
0.003
0.069
0.035
0.005
0.003
0.009
0.001
0.001
0.005
0.025
0.001
0.002
0.001
0.031
0.065
0.024
0.041
0.131
0.091
0.048
0.241
0.270
0.064
0.155
0.184
0.005
0.004
0.093
0.121
0.250
0.053
0.103
0.152
0.142
0.184
0.382
0.165
0.127
0.114
0.068
0.067
0.099
0.094
0.016
0.124
0.051
0.045
0.182
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.015
0.006
0.005
0.013
0.013
0.008
0.017
0.008
0.001
0.002
0.002
0.041
0.033
0.082
0.028
0.011
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.012
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
0.036
0.029
0.072
0.025
0.009
0.004
0.020
0.011
0.047
0.002
0.019
0.064
0.032
0.032
0.032
0.016
0.005
0.013
0.010
0.012
0.003
0.029
0.121
0.010
0.022
0.024
0.060
0.014
0.006
0.007
0.001
0.030
0.135
0.050
0.051
0.010
0.017
0.128
0.013
0.032
0.024
0.074
0.012
0.006
0.008
0.037
0.188
0.050
0.046
0.010
0.021
0.001
0.005
0.001
0.001
0.019
0.072
0.037
0.001
0.005
Rp 21,960,000.00 0.117
Rp 48,000,000.00 0.239
Rp 28,000,000.00 0.133
Rp 4,500,000.00 0.024
Rp 38,000,000.00 0.186
Rp 119,000,000.00 0.531
Rp 1,287,000.00 0.041
Rp 121,000.00 0.065
Rp 95,400.00 0.059
Rp 62,000.00 0.005
Rp 56,200.00 0.005
Rp 39,400.00 0.004
Rp 29,000.00 0.013
Rp 325,000.00 0.012
Rp 298,000.00 0.012
Rp 52,700.00 0.005
Rp 8,218,000.00 0.040
Rp 52,700.00 0.000
Rp 29,300.00 0.009
Rp 800,000.00 0.003
Rp 20,000.00 0.031
Rp 29,000.00 0.001
Rp 39,400.00 0.002
Rp 56,200.00 0.011
Rp 145,000.00 0.066
Rp 62,000.00 0.027
Rp 3,889,700.00 0.016
Rp 524,000.00 0.002
Rp 498,000.00 0.002
Rp 156,000.00 0.001
Rp 215,000.00 0.004
Rp 267,000.00 0.015
Rp 325,000.00 0.009
Rp 1,230,000.00 0.008
Rp 750,000.00 0.005
Rp 645,000.00 0.009
Rp 50,000.00 0.009
Rp 2,500,000.00 0.015
Rp 125,000.00 0.023
Rp 250,000.00 0.032
0.035
0.098
0.062
0.029
0.047
0.103
0.630
0.010
0.296
0.008
0.010
0.003
0.074
0.103
0.033
0.015
0.023
0.008
0.005
0.009
0.003
0.130
0.244
0.216
0.006
0.008
0.012
0.288
0.233
0.055
0.227
0.207
0.027
0.105
0.100
0.009
0.005
0.029
0.570
0.045
0.066
0.067
0.327
0.040
0.174
0.160
0.064
0.044
0.532
0.070
0.058
0.146
0.354
0.036
0.061
0.821
0.127
0.090
0.044
0.025
0.073
0.259
0.057
0.007
0.036
0.029
0.033
0.002
0.020
0.011
0.001
0.001
0.071
0.054
0.060
0.022
0.001
0.001
0.005
0.152
0.261
0.012
0.039
0.143
0.013
0.022
0.023
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.014
0.038
0.034
0.233
0.605
0.578
0.102
0.195
0.305
0.008
0.014
0.031
0.002
0.003
0.008
0.432
0.561
1.162
0.042
0.171
0.156
0.020
0.070
0.075
0.009
0.005
0.029
0.742
0.043
0.081
0.096
0.416
0.058
0.227
0.025
0.037
0.022
0.026
0.536
0.307
0.013
0.146
0.354
0.036
0.062
0.818
0.133
0.096
0.047
0.007
0.017
0.274
0.023
0.008
0.039
0.030
0.013
0.002
0.021
0.004
0.001
0.001
0.076
0.058
0.033
0.022
0.001
0.001
0.005
0.192
0.341
0.045
0.048
0.143
0.013
0.023
0.024
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.010
0.022
0.028
0.080
0.196
0.241
0.013
0.022
0.049
0.101
0.104
0.325
0.100
1.269
0.073
0.571
0.029
0.101
0.040
0.068
0.098
0.527
0.405
0.388
0.094
0.026
0.156
0.693
0.041
0.001
0.002
0.038
0.019
0.003
0.002
0.006
0.000
0.001
0.002
0.012
0.001
0.001
0.000
0.021
0.044
0.017
0.033
0.105
0.074
0.052
0.258
0.170
0.058
0.141
0.630
0.002
0.005
0.163
0.212
0.438
0.047
0.091
0.508
0.233
0.303
0.628
0.150
0.116
0.104
0.062
0.046
0.116
0.088
0.015
0.114
0.055
0.073
0.166
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.016
0.006
0.005
0.013
0.013
0.009
0.017
0.008
0.001
0.002
0.002
0.042
0.033
0.082
0.028
0.012
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.013
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
0.037
0.029
0.072
0.025
0.010
0.004
0.020
0.011
0.047
0.002
0.019
0.064
0.032
0.016
0.005
0.010
0.003
0.011
0.080
0.017
0.022
0.048
0.013
0.003
0.004
0.024
0.089
0.017
0.026
0.048
0.009
0.013
0.079
0.022
0.052
0.007
0.003
0.005
0.026
0.088
0.026
0.028
0.009
0.015
0.001
0.005
0.001
0.001
0.008
0.024
0.037
0.001
0.005
0.117
0.239
0.133
0.024
0.186
0.531
0.041
0.046
0.084
0.049
0.003
0.005
0.004
0.011
0.008
0.009
0.005
0.040
0.000
0.009
0.003
0.037
0.002
0.004
0.013
0.066
0.013
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.025
0.016
0.025
0.087
0.031
0.007
0.006
0.001
0.048
0.258
0.004
0.234
0.024
0.030
0.019
0.027
0.047
0.062
0.007
0.010
0.016
0.027
0.240
0.202
0.052
0.131
0.202
0.004
0.015
0.021
0.036
0.057
0.107
0.007
0.012
0.028
0.015
0.025
0.058
0.015
0.012
0.049
0.015
0.025
0.058
0.034
0.028
0.115
0.005
0.008
0.019
0.010
0.008
0.034
0.005
0.008
0.019
0.010
0.008
0.034
0.054
0.052
0.158
0.064
0.053
0.156
0.025
0.041
0.083
0.347
0.043
0.033
0.014
0.077
0.162
0.015
0.046
0.098
0.009
0.033
0.015
0.450
0.053
0.024
0.020
0.136
0.035
0.351
0.027
0.167
0.020
0.017
0.005
0.001
0.009
0.005
0.002
0.002
0.017
0.013
0.007
0.002
0.085
0.016
0.115
0.049
0.039
0.142
0.004
0.004
0.146
0.007
0.069
1.071
0.183
0.691
0.020
0.083
0.022
0.063
0.074
0.470
0.361
0.345
0.088
0.027
0.081
0.617
0.042
0.001
0.002
0.006
0.002
0.001
0.000
0.009
0.046
0.001
0.021
0.002
0.006
0.007
0.005
0.007
0.011
0.015
0.006
0.026
0.038
0.006
0.010
0.024
0.040
0.065
0.134
0.004
0.007
0.017
0.004
0.004
0.015
0.013
0.009
0.005
0.046
0.010
0.004
0.016
0.032
0.005
0.003
0.082
0.030
0.001
0.002
0.001
0.091
0.006
0.004
0.008
0.011
0.024
0.037
0.001
0.005
0.089
0.013
0.003
0.005
0.040
0.001
0.020
0.010
0.003
0.027
0.013
0.003
0.028
0.016
0.010
0.001
0.011
0.015
0.006
0.033
0.017
0.002
0.003
0.000
0.026
0.147
0.002
0.059
0.007
0.008
0.012
0.007
0.010
0.017
0.023
0.007
0.010
0.017
0.061
0.051
0.026
0.068
0.100
0.013
0.025
0.053
0.008
0.011
0.042
0.008
0.014
0.045
0.008
0.008
0.028
0.007
0.011
0.037
0.016
0.015
0.052
0.002
0.003
0.008
0.009
0.015
0.032
0.001
0.002
0.005
0.003
0.002
0.010
0.197
0.004
0.027
0.011
0.136
0.030
0.038
0.021
0.110
0.016
0.008
0.016
0.005
0.117
0.027
0.058
0.084
0.016
0.005
0.007
0.008
0.009
0.001
0.019
0.002
0.002
0.027
0.009
0.001
0.001
0.019
0.014
0.011
0.055
0.058
0.026
0.007
0.043
0.010
0.014
0.002
0.002
0.003
0.004
0.032
1.012
0.046
0.184
0.009
0.061
0.010
0.049
0.049
0.120
0.092
0.089
0.041
0.013
0.038
0.158
0.030
0.001
0.002
0.032
0.005
0.003
0.031
0.007
0.003
0.003
0.000
0.001
0.034
0.012
0.011
0.008
0.005
0.009
0.001
0.003
0.080
0.000
0.020
0.122
0.003
0.007
0.004
0.008
0.001
0.004
100.000
RENCANA
RENCANA KOMULATIF
REALISASI
REALISASI KOMULATIF
E L A K S A N A A N P E K E R J
0.002
0.040
0.236
0.047 0.047
0.023 0.023
0.009 0.009
0.002 0.002
0.149
0.380 0.380
0.025 0.025
0.005 0.005
0.430
0.046
0.062
0.040 0.040
0.023
0.060
0.042 0.042
0.027
0.027
0.020 0.020
0.014
0.008
0.013
0.005
0.197
0.184 0.184
0.163 0.163
0.010
0.007 0.007
0.011 0.011
0.432
0.350
0.034 0.034
0.141 0.141
0.129 0.129
0.032
0.065 0.065
0.059 0.059
0.025
0.064
0.033
0.025
0.064
0.033
0.243
0.263 0.263 0.263
0.193 0.193 0.193
0.036
0.021 0.021 0.021
0.028 0.028 0.028
0.002
0.103 0.103 0.103
0.116 0.116 0.116
0.056
0.047 0.047 0.047
0.057 0.057 0.057
0.008
0.006 0.006 0.006
0.011 0.011 0.011
0.005
0.004 0.004 0.004
0.009 0.009 0.009
0.638
0.414 0.414
0.858 0.858
0.012
0.008 0.008
0.033
0.046
0.205
0.173
0.029
0.102
0.084
0.133
0.207
0.380
0.863
0.072
0.477
0.047
0.003
0.009
0.001
0.001
0.005
0.025
0.001
0.002
0.001
0.031
0.065
0.024
0.041
0.131
0.091
0.048
0.241
0.270
0.064
0.155
0.184
0.005
0.004
0.093
0.121
0.250
0.053
0.103
0.152
0.142
0.184
0.382
0.082 0.082
0.064 0.064
0.057 0.057
0.034 0.034
0.033 0.033
0.049 0.049
0.094
0.016
0.062
0.026
0.065
0.059
0.005
0.005
0.004
0.013
0.012
0.012
0.035
0.098
0.062
0.029
0.023 0.023
0.103
0.315 0.315
0.010
0.296
0.008
0.005 0.005
0.003
0.074
0.052 0.052
0.033
0.015
0.012 0.012
0.008
0.005
0.004 0.004
0.003
0.130
0.244
0.108 0.108
0.006
0.008
0.006 0.006
0.288
0.233
0.055
0.113 0.113
0.207
0.027
0.053 0.053
0.100
0.014
0.013 0.013 0.013
0.011 0.011 0.011
0.233
0.151 0.151 0.151 0.151
0.144 0.144 0.144 0.144
0.102
0.049 0.049 0.049 0.049
0.076 0.076 0.076 0.076
0.008
0.005 0.005 0.005
0.010 0.010 0.010
0.002
0.001 0.001 0.001
0.003 0.003 0.003
0.432
0.187 0.187 0.187
0.387 0.387 0.387
0.042
0.171
0.156
0.020
0.070
0.075
0.002
0.006
0.000
0.001
0.002
0.012
0.001
0.001
0.000
0.021
0.044
0.017
0.033
0.053 0.053
0.074
0.052
0.129 0.129
0.085 0.085
0.058
0.141
0.630
0.002
0.005
0.163
0.212
0.438
0.152
0.314
0.046
0.084
0.049
0.003
0.040
0.009
0.025
0.087
0.031
0.007
0.006
0.001
0.048
0.258
0.004
0.234
0.024
0.030
0.019
0.027
0.023 0.023
0.031 0.031
0.007
0.005 0.005
0.008 0.008
0.027
0.240
0.202
0.052
0.065 0.065
0.101 0.101
0.004
0.007 0.007
0.011 0.011
0.036
0.028 0.028
0.054 0.054
0.116
0.011
0.023 0.023 0.023
0.357 0.357 0.357
0.061 0.061 0.061
0.691
0.020
0.028 0.028 0.028
0.022
0.031 0.031
0.025 0.025 0.025
0.470
0.361
0.345
0.027
0.081
0.617
0.006
0.002
0.001
0.000
0.009
0.046
0.001
0.021
0.002
0.006
0.007
0.005
0.007
0.011
0.015
0.006
0.026
0.038
0.006
0.010
0.024
0.040
0.065
0.134
0.004
0.007
0.017
0.004
0.004
0.015
0.013
0.089
0.013
0.003
0.005
0.040
0.001
0.020
0.010
0.003
1.543 4.608 4.990 4.761 5.066 5.132 5.409 5.085
0 1.543 6.150 11.140 15.901 20.968 26.100 31.509 36.595
K E R J A A N
0.013
0.010
0.042
0.241 0.241
0.040
0.043 0.043
0.809 0.809
0.280
0.203
0.049 0.049
0.007
0.027
0.023
0.017
0.041 0.041
0.045
0.013
0.005
0.034
0.004
0.003
0.016
0.081 0.081
0.062 0.062
0.104
0.032
0.003
0.002
0.006
0.037
0.049
0.159
0.018
0.031
0.093
0.051
0.041
0.015
0.017
0.008
0.004
0.357 0.357 0.357 0.357
0.071
0.025 0.025 0.025 0.025
0.048 0.048
0.020 0.020 0.020
0.231 0.231 0.231 0.231
0.012 0.012
0.012 0.012 0.012
0.179 0.179 0.179
0.007 0.007
0.422
0.012
0.056
0.241
0.020
0.045
0.161
0.863 0.863
0.072 0.072
0.477 0.477
0.069
0.035
0.005
0.062
0.026
0.045
0.182
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.015
0.006
0.005
0.013
0.013
0.008
0.017
0.008
0.001
0.002
0.002
0.041
0.033
0.082
0.028
0.011
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.012
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
0.036
0.029
0.072
0.025
0.009
0.004
0.020
0.011
0.047
0.002
0.019
0.016
0.013
0.010
0.012
0.003
0.029
0.135
0.050
0.051
0.010
0.017
0.050
0.046
0.019
0.072
0.037
0.001
0.005
0.117
0.239
0.133
0.024
0.186
0.531
0.041
0.005
0.040
0.000
0.009
0.003
0.015 0.015
0.001
0.002
0.011
0.066
0.027
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.023
0.032
0.004 0.004
0.003 0.003
0.014 0.014
0.266
0.070
0.029
0.146
0.177 0.177
0.036
0.061
0.152
0.130
0.004 0.004
0.003 0.003
0.014 0.014
0.247 0.247 0.247
0.043
0.027 0.027 0.027
0.048 0.048
0.139 0.139 0.139
0.029 0.029
0.076 0.076 0.076
0.025
0.037
0.011 0.011
0.013 0.013
0.177
0.036
0.031
0.010
0.011 0.011
0.014 0.014
0.080
0.098 0.098
0.120 0.120
0.013
0.011 0.011
0.024 0.024
0.101
0.052 0.052
0.163 0.163
0.100
0.423 0.423 0.423
0.024 0.024 0.024
0.190 0.190 0.190
0.029
0.034 0.034 0.034
0.013 0.013 0.013
0.068
0.033 0.033 0.033
0.264 0.264
0.202 0.202
0.194 0.194
0.094
0.026
0.156
0.693
0.041
0.001
0.002
0.038
0.019
0.003
0.047
0.091
0.508
0.233
0.152
0.314
0.075 0.075
0.116
0.052 0.052
0.031 0.031
0.046
0.116
0.088
0.015
0.114
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.016
0.006
0.005
0.013
0.013
0.009
0.017
0.008
0.001
0.002
0.002
0.042
0.033
0.082
0.028
0.012
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.013
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
-
0.037
0.029
0.072
0.025
-
0.010
0.004
0.020
0.064
0.032
0.016
0.005
0.010
0.003
0.011
0.089
0.017
0.026
0.048
0.009
0.013
0.088
0.026
0.028
0.009
0.015
0.008
0.024
0.037
0.001
0.005
0.117
0.531
0.005
0.004
0.011
0.008
0.009
0.005
0.000
0.003
0.037
0.002
0.004
0.013
0.025
0.007
0.012
0.028
0.015
0.025
0.058
0.015
0.012
0.049
0.015
0.025
0.058
0.034
0.028
0.115
0.005
0.008
0.019
0.010
0.008
0.034
0.005
0.008
0.019
0.010
0.008
0.034
0.054
0.052
0.158
0.064
0.053
0.156
0.025
0.041
0.083
0.116 0.116
0.043
0.011 0.011
0.014
0.077
0.081 0.081
0.015
0.023 0.023
0.049 0.049
0.009
0.016 0.016
0.015
0.225 0.225
0.053
0.012 0.012
0.020
0.068 0.068
0.035
0.351
0.027
0.167
0.020
0.017
0.005
0.001
0.009
0.005
0.002
0.002
0.017
0.013
0.007
0.002
0.085
0.016
0.057 0.057
0.049
0.039
0.142
0.004
0.004
0.146
0.007
0.088
0.042
0.001
0.002
0.009
0.005
0.046
0.010
0.004
0.016
0.032
0.005
0.003
0.082
0.030
0.001
0.002
0.001
0.091
0.006
0.004
0.008
0.011
0.024
0.037
0.001
0.005
0.027
0.013
0.003
0.028
0.016
0.010
0.001
0.011
0.015
0.006
0.033
0.017
0.002
0.003
0.000
0.026
0.147
0.002
0.059
0.007
0.008
0.012
0.007
0.010
0.017
0.023
0.007
0.010
0.017
0.061
0.051
0.026
0.068
0.100
0.013
0.025
0.053
0.008
0.011
0.042
0.008
0.014
0.045
0.008
0.008
0.028
0.007
0.011
0.037
0.016
0.015
0.052
0.099 0.099
0.004
0.027
0.011
0.045 0.045
0.016 0.016
0.506 0.506
0.023 0.023
0.184
0.009
0.031 0.031
0.010
0.049
0.025 0.025
0.120
0.092
0.089
0.041
0.013
0.038
0.158
0.030
0.001
0.002
0.003
0.012
0.011
0.005
0.009
0.001
0.003
0.080
0.000
0.020
0.122
0.003
0.007
0.004
0.008
0.001
0.004
0.097 0.097
0.015
0.016 0.016 0.016
0.017 0.017 0.017
0.029
0.018
0.003
0.422
0.056
0.001
0.118
0.241
0.020
0.045
0.867 0.867
0.288
0.220
0.106
0.007
0.027
0.023
0.017
0.090
0.045
0
0.013
0.005 0
0.034
0.009
0.003
0.018
0.089 0.089
0.068 0.068
0.108
0.033
0.003
0.002
0.006
0.065
0.027
0.807
0.018
0.031
0.194
0.015
0.051
0.056
0.093
0.051
0.041
0.015
0.017
0.004
0.003
0.004
0.064
0.032
0.032
0.032
0.005
0.121
0.010
0.022
0.024
0.060
0.014
0.006
0.007
0.001
0.030
0.128
0.013
0.032
0.024
0.074
0.012
0.006
0.008
0.037
0.188
0.010
0.021
0.001
0.005
0.001
0.001
0.266
0.029
0.821
0.127
0.090
0.044
0.025
0.073
0.259
0.057
0.007
0.018 0.018
0.029
0.033
0.002
0.020
0.011
0.001
0.001
0.036 0.036
0.027 0.027
0.060
0.022
0.001
0.001
0.005
0.130
0.012
0.039
0.143
0.013
0.011 0.011
0.011 0.011
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
M
A
S
P
E
M
E
L
I
P
E
M
E
L
I
H
A
R
A
A
N
P
E
0.268 0.268 K
0.153 0.153 E
0.013 R
A
0.146 J
K
A
H
0.177 A
I
N
R
0.031
1
P
0.818 8
E
0.133 0
L
0.096
A
0.047 (
K
0.007
S
0.017 S
A
0.274 E
N
0.023 R
A
0.008 A
A
0.039 T
N
0.030 U
0.013 S
P
0.002
E
0.021 D
K
0.004 E
E
0.001 L
R
0.001 A
J
P
A
A
A
N
K
E
E
L
R
A
J
0.076 P
A
0.058 A
A
0.033 N
N
0.022
0.001 P
0.001 U
0.005 L
U
0.192 H
0.114 0.114 0.114
0.045 )
0.048
0.071 0.071 H
0.013 A
0.012 0.012 R
0.012 0.012 I
0.052 K
0.010 A
0.023 L
0.015 E
0.009 N
0.003 D
0.005 E
0.010 R
0.055
0.073
0.166
0.011
0.047
0.002
0.019
0.080
0.017
0.022
0.048
0.013
0.003
0.004
0.024
0.079
0.022
0.052
0.007
0.003
0.005
0.026
0.001
0.005
0.001
0.001
0.239
0.133
0.024
0.186
0.041
0.066
0.013
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.016
0.002
0.003
0.008
0.009
0.015
0.032
0.001
0.002
0.005
0.003
0.002
0.010
0.045
0.030
0.038
0.021
0.110
0.016
0.008
0.016
0.005
0.117
0.027
0.058
0.084
0.016
0.005
0.007
0.008
0.009
0.001
0.019
0.002
0.002
0.027
0.009
0.001
0.001
0.019
0.014
0.011
0.055
0.058
0.026
0.007
0.043
0.010
0.014
0.002
0.002
0.003
0.004
0.032
0.005
0.031
0.007
0.003
0.003
0.000
0.001
0.034
0.008
4.845 4.764 4.070 1.946 1.095
88.125 92.888 96.959 98.905 100.000
Tabanan, 7 Juni 2016
Kontraktor Pelaksana
PT. TARUMA KARYA UTAMA
RENCANA :
REALISASI :
PEKERJAAN: Belanja Modal Konstruksi Pengembangan Pembangunan SLB di Jimbara
LOKASI : JIMBARAN, BADUNG - BALI
TAHUN : 2016
NO URAIAN PEKERJAAN
I. BANGUNAN KELAS
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Pembersihan Area Proyek
3 Pek. Pengukuran dan pemasangan bowplank
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR
II.1 PEKERJAAN LANTAI I
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus bangunan
2 Pek. Galian pondasi telapak / pile cap
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pondasi Telapak
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5 pada pondasi menerus
7 Pek. Pasangan pondasi batu kali camp. 1:5 Pada Tangga dan Ramp
8 Pek. Urugan Tanah Kembali
9 Pek. Urugan Tanah Peninggian Lantai
10 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton pondasi P2
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton pondasi P3
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton pondasi P4
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton sloof (TB1) 20/40
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton sloof (TB3) 15/20
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan pelat lantai 1 t.8cm
- Beton K300
- Pembesian Wiremesh M6 1 Lapis
8 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton plat tangga I
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat tangga II
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat topian t=10 cm
- Beton K300
- Pembesian
- Bekesting
12 Pekerjaan beton plat topian t=10 cm tas jendela
- Beton K300
- Pembesian
- Bekesting
C PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
5 Pek. Plesteran Dinding Luar Camp. 1:5
6 Pek. Plesteran Dinding Dalam Camp. 1:5
7 Pek. Plesteran Dinding Pada Pepalihan Kolom
8 Pek. Acian Luar
9 Pek. Acian Dalam
10 Pek. Acian Dinding Pada Pepalihan Kolom
11 Pek. Acian Pelat Topian
D PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Keramik 30x30 (A), Pada Tangga setara asia tile
4 Pek. Pas. Plint Keramik 10x30, setara asia tile
5 Pek. Pas. Keramik Meja Pantry 20/20 cm
6 Pek. Pas. Keramik Dinding 20x25 cm
7 Pek. Pas. Rubber Floor (C)
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
F PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan kunci Pintu Biasa
14 Pek. Pasangan kunci Pintu Kaca
15 Pek. Pasangan kunci Pintu Dorong
16 Pek. Pasangan kunci slot tanam
17 Pek. Pasangan kait angin
18 Pek. Pasangan grendel jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
G PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan Dan Siripan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
10 Pek. Railing Ramp Stainless Steel
11 Pek. Railing Tangga Stainless Steel
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.2 PEKERJAAN LANTAI II
A PEKERJAAN BETON
1 Pekerjaan beton balok B1 30/60
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton balok B1A 30/60
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton balok B2 30/50
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B3 25/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton balok B4 20/30
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton balok B5 15/30
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan Pelat Lantai 2 T=12cm
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap Teras T=10 cm
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
4 Pek. Plesteran Dinding Luar Camp. 1:5
5 Pek. Plesteran Dinding Dalam Camp. 1:5
6 Pek. Plesteran Dinding Pada Pepalihan Kolom
7 Pek. Acian Luar
8 Pek. Acian Dalam
9 Pek. Acian Dinding Pada Pepalihan Kolom
C PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Plint Keramik 10x30, setara asia tile
4 Pek. Pas. Keramik meja pantry 20/20 cm
5 Pek. Pas. Keramik dinding 20x25 cm
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan Kunci Pintu Biasa
14 Pek. Pasangan Kunci Pintu Kaca
15 Pek. Pasangan Kunci Pintu Dorong
16 Pek. Pasangan Kunci Slot Tanam
17 Pek. Pasangan Kait Angin
18 Pek. Pasangan Grendel Jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
F PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
G PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.3 PEKERJAAN ATAP
A PEKERJAAN BETON
1 Pekerjaan beton ring balok RB1 25/50
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150
2 Pek. Pas. Balok baja WF 250/125
3 Pek. Pas. Balok baja WF 200/100
4 Pek. Pas. Gording CNP 150
5 Pek. Pas. Baut angker diameter 16
6 Pek. Pas. Baut d-16
7 Pek. Pas. Baut d-12
8 Pek. Pas. Cat zinkcromate
9 Pek. Pas. Pelat baja t=10mm
10 Pek. Pas. Usuk baja ringan profil UK 75
11 Pek. Pas. Reng baja ringan profil UK 30
12 Pek. Pas. Alluminium foil
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
14 Pek. Pas. Tatab Kayu Kamper
15 Pek. Pas. Listplank Kayu Kamper 2x3/30
16 Pek. Pas. Genteng Gemini Ex. Good Year
17 Pek. Pas. Bubungan genteng gemini Ex. Good Year
18 Pek. Pas. Murda Paras
19 Pek. Pas. Ikut celedu Paras
C PEKERJAAN FINISHING
1 Pek. Pengecatan plafond gypsum setara dulux
2 Pek. Polituran Listplank
3 Pek. Polituran Tatab
II.4 PEKERJAAN RAAM
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus raam
2 Pek. Galian pondasi telapak / pile cap P5
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pile cap
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5
7 Pek. Urugan Tanah Kembali
8 Pek. Urugan Tanah Peninggian Lantai
9 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P5
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton sloof (TB2) 15/30
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton kolom K3 20/20
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B6 20/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan Pelat lantai t.8 cm
- Beton K300
- Pembesian
6 Pekerjaan pelat lantai t.12cm
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan beton balok RB2 20/30
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap t.12cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Bata Merah 1:5
2 Pek. Balok Praktis ( 10 x 15 cm )
3 Pek. Plesteran
4 Pek. Acian
C PEKERJAAN LAPISAN LANTAI DAN DINDING
3 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
4 Pek. Pas. Rubber Floor (C)
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
2 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior Pada Dinding setara dulux weathershield warna putih
2 Pek. Fin. Cat ekterior Pada Kolom setara dulux weathershield warna putih
3 Pek. Fin. Cat wateproofing setara aquaproof
4 Pek. Pas. Railing Stainless Steel
II.5 PEKERJAAN GROUND TANK
A PEKERJAAN PERSIAPAN, TANAH DAN PONDASI
1 Pembersihan Area Proyek
2 Pek. Pengukuran dan pemasangan bowplank
3 Pek. Galian groundtank
4 Pek. Galian untuk sloof groundtank
5 Pek. Urugan pasir t = 5 cm lantai groundtank
6 Pek. Urugan pasir t = 5 cm pada sloof
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250
- Pembesian
2 Pekerjaan beton rabat t = 5 cm
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250
- Pembesian
3 Pekerjaan beton kolom 15/40
- Beton K250
- Pembesian
- Bekesting
4 Pekerjaan beton balok 30/40
- Beton K250
- Pembesian
- Bekesting
5 Pekerjaan beton balok 20/30
- Beton K250
- Pembesian
- Bekesting
6 Pekerjaan beton dinding t= 15 cm
- Beton K250
- Pembesian
- Bekesting
- Bekesting pas. Batako
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250
- Pembesian
- Bekesting
C PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Pas. Keramik 20x20, setara asia tile
2 Pek. Pas. keramik dinding 20x25, setara asia tile
Alat
Bahan
Tenaga Kerja
BULAN I
VOL. SAT. BOBOT
MINGGU 1 2 3 4
HARI 7 7 7 7
7.07 M3 0.032
2298.68 Kg 0.130 0.065
94.29 M2 0.118 0.059
5.58 M3 0.025
1139.43 Kg 0.064
28.47 M2 0.033
5.58 M3 0.025
1139.43 Kg 0.064
28.47 M2 0.033
3.71 M3 0.017
228.53 Kg 0.013
37.10 M2 0.053
2.93 M3 0.013
180.36 Kg 0.010
29.28 M2 0.042
1769.58 M2 1.117
123.86 M2 0.078
243.00 M1 0.079
200.99 M1 0.089
157.12 M2 0.034
3382.03 M2 0.737
123.86 M2 0.027
157.12 M2 0.021
3241.93 M2 0.424
123.86 M2 0.016
289.12 M2 0.038
1050.72 M2 0.785
95.00 M2 0.071
34.81 M2 0.026
741.15 M1 0.106
0.91 M2 0.001
140.10 M2 0.118
7.17 M2 0.008
986.13 M2 0.481
74.15 M2 0.040
803.06 M1 0.086
1131.81 M1 1.617
80.61 M2 0.280
84.28 M2 0.203
113.32 M2 0.097
3.44 M2 0.007
5.56 M2 0.027
8.00 Unit 0.023
55.00 Psg 0.017
394.00 Psg 0.083
37.00 Set 0.045
4.00 Set 0.013
3.00 Set 0.005
37.00 Set 0.034
2.00 Set 0.004
3.00 Set 0.003
36.00 Bh 0.016
788.00 Bh 0.163
394.00 Bh 0.125
57.00 Bh 0.104
57.00 Bh 0.032
3.00 Bh 0.003
3.00 Bh 0.002
16.50 M2 0.006
157.12 M2 0.037
412.98 M2 0.098
3241.93 M2 0.637
103.84 M2 0.018
140.10 M2 0.031
986.13 M2 0.194
74.15 M2 0.015
161.21 M2 0.049
168.56 M2 0.052
6.24 M2 0.029
3.89 M2 0.018
54.41 M3 0.243
13,968.48 Kg 0.789
453.38 M2 0.580
7.97 M3 0.036
1,096.60 Kg 0.062
66.38 M2 0.085
31.41 M3 0.002
5,458.08 Kg 0.308
272.22 M2 0.348
12.65 M3 0.056
2,514.57 Kg 0.142
132.83 M2 0.170
1.89 M3 0.008
300.91 Kg 0.017
25.24 M2 0.032
1.20 M3 0.005
190.28 Kg 0.011
20.03 M2 0.026
142.91 M3 0.638
14,671.76 Kg 0.829
1,190.89 M2 1.716
2.79 M3 0.012
295.99 Kg 0.017
23.25 M2 0.033
10.40 M3 0.046
3,633.83 Kg 0.205
138.60 M2 0.173
6.43 M3 0.029
1,807.81 Kg 0.102
67.46 M2 0.084
2,259.28 M2 1.426
112.88 M2 0.071
306.00 M1 0.100
217.16 M1 0.096
271.32 M2 0.059
4,247.24 M2 0.925
112.88 M2 0.025
271.32 M2 0.035
4,107.14 M2 0.537
112.88 M2 0.015
1,129.96 M2 0.844
15.76 M2 0.012
780.88 M1 0.112
0.91 M2 0.001
140.10 M2 0.118
989.71 M2 0.483
74.15 M2 0.040
842.78 M1 0.090
1,213.44 M1 1.734
83.10 M2 0.288
91.38 M2 0.220
122.83 M2 0.106
3.44 M2 0.007
5.56 M2 0.027
8.00 Unit 0.023
57.00 Psg 0.017
428.00 Psg 0.090
37.00 Set 0.045
4.00 Set 0.013
3.00 Set 0.005
37.00 set 0.034
4.00 set 0.009
3.00 set 0.003
40.00 Bh 0.018
856.00 Bh 0.177
428.00 Bh 0.135
59.00 Bh 0.108
59.00 Bh 0.033
3.00 Bh 0.003
3.00 Bh 0.002
16.50 M2 0.006
271.32 M2 0.065
112.88 M2 0.027
4,107.14 M2 0.807
103.84 M2 0.018
140.10 M2 0.031
989.71 M2 0.194
74.15 M2 0.015
166.20 M2 0.051
182.75 M2 0.056
29.75 M3 0.133
3,662.80 Kg 0.207
297.51 M2 0.380
1,537.69 Kg 0.161
24,675.54 Kg 2.589
2,050.05 Kg 0.215
13,639.07 Kg 1.431
244.00 Bh 0.047
2,136.00 bh 0.136
1,220.00 bh 0.064
565.27 kg 0.140
1,168.39 Kg 0.123
1,944.70 M2 0.898
1,944.70 M2 0.689
1,944.70 M2 0.660
352.00 M2 0.172
228.80 M1 0.047
228.80 M1 0.283
1,944.70 M2 1.179
168.80 M1 0.078
4.00 Bh 0.002
6.00 Bh 0.003
352.00 M2 0.069
114.40 M2 0.035
16.02 M2 0.005
31.80 M3 0.142
3264.50 Kg 0.184
264.98 M2 0.382
89.25 M2 0.067
85.37 M2 0.099
174.62 M2 0.094
148.84 M1 0.016
522.12 M2 0.124
215.76 M2 0.051
264.98 M2 0.045
143.44 M1 0.182
17.85 M2 0.001
16.90 M1 0.011
55.32 M3 0.019
1.83 M3 0.000
0.89 M3 0.001
0.20 M3 0.000
1.83 M3 0.008
126.91 Kg 0.007
0.89 M3 0.003
3.57 M3 0.015
98.93 Kg 0.006
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.96 M3 0.008
295.78 Kg 0.017
6.52 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
9.47 M3 0.041
591.65 Kg 0.033
63.15 M2 0.082
63.15 M2 0.028
2.68 M3 0.011
98.93 Kg 0.006
17.85 M2 0.026
17.85 M2 0.013
63.15 M2 0.053
98.84 M2 0.022
14.37 M2 0.000
15.28 M1 0.010
43.99 M3 0.015
1.65 M3 0.000
0.71 M3 0.001
0.18 M3 0.000
1.65 M3 0.007
114.30 Kg 0.006
0.71 M3 0.002
2.84 M3 0.012
78.67 Kg 0.004
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.76 M3 0.008
266.38 Kg 0.015
5.87 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
8.33 M3 0.036
519.98 Kg 0.029
55.50 M2 0.072
55.50 M2 0.025
2.13 M3 0.009
78.67 Kg 0.004
14.19 M2 0.020
14.19 M2 0.011
55.50 M2 0.047
83.88 M2 0.019
25.00 m 0.013
28.00 m 0.010
32.00 m 0.012
8.00 m 0.003
78.00 m 0.029
130.00 Bh 0.121
16.00 Bh 0.010
21.00 Bh 0.022
10.00 Bh 0.024
16.00 Bh 0.060
49.00 Bh 0.014
20.00 Bh 0.006
24.00 Bh 0.007
4.00 Bh 0.001
16.00 Bh 0.030
138.00 Bh 0.128
16.00 Bh 0.013
27.00 Bh 0.032
10.00 Bh 0.024
20.00 Bh 0.074
44.00 Bh 0.012
20.00 Bh 0.006
28.00 Bh 0.008
20.00 Bh 0.037
1.00 ls 0.117
1.00 Set 0.239
165.00 m 0.031
8.00 m 0.001
10.00 m 0.002
58.00 m 0.011
100.00 m 0.066
97.00 m 0.027
1.00 Ls 0.016
1.00 Bh 0.002
1.00 Bh 0.002
2.00 Bh 0.001
2.00 Bh 0.004
8.00 Bh 0.015
5.00 Bh 0.009
1.00 Bh 0.008
1.00 Bh 0.005
2.00 set 0.009
49.00 m' 0.009
1.00 Lot 0.015
2.01 M3 0.009
95.26 Kg 0.005
20.13 M2 0.029
903.09 M2 0.570
100.72 M1 0.045
201.50 M1 0.066
305.36 M2 0.067
1500.83 M2 0.327
305.36 M2 0.040
1327.27 M2 0.174
253.09 M2 0.160
291.56 M2 0.064
332.81 M2 0.044
712.50 M2 0.532
93.75 M2 0.070
401.20 M1 0.058
173.56 M2 0.146
726.39 M2 0.354
65.83 M2 0.036
564.58 M1 0.061
574.52 M1 0.821
36.55 M2 0.127
37.43 M2 0.090
51.07 M2 0.044
12.00 M2 0.025
14.72 M2 0.073
68.00 Unit 0.259
20.00 Unit 0.057
24.00 Psg 0.007
172.00 Psg 0.036
24.00 Set 0.029
10.00 Set 0.033
1.00 Set 0.002
21.00 set 0.020
5.00 set 0.011
1.00 set 0.001
2.00 Bh 0.001
344.00 Bh 0.071
172.00 Bh 0.054
33.00 Bh 0.060
39.00 Bh 0.022
1.00 Bh 0.001
1.00 Bh 0.001
13.12 M2 0.005
638.17 M2 0.152
1327.27 M2 0.261
73.15 M2 0.012
173.56 M2 0.039
726.39 M2 0.143
65.83 M2 0.013
73.10 M2 0.022
74.86 M2 0.023
52.13 M3 0.233
10,702.71 Kg 0.605 0.151
451.75 M2 0.578 0.144
22.75 M3 0.102
3,446.46 Kg 0.195 0.049
238.88 M2 0.305 0.076
1.80 M3 0.008
251.35 Kg 0.014
24.00 M2 0.031
0.36 M3 0.002
53.28 Kg 0.003
6.08 M2 0.008
96.75 M3 0.432
9,933.00 Kg 0.561
806.25 M2 1.162
9.36 M3 0.042
3,030.82 Kg 0.171
124.80 M2 0.156
4.52 M3 0.020
1,234.95 Kg 0.070
60.29 M2 0.075
2.01 M3 0.009
95.26 Kg 0.005
20.13 M2 0.029
1,175.18 M2 0.742
97.73 M1 0.043
250.25 M1 0.081
440.18 M2 0.096
1,910.18 M2 0.416
440.18 M2 0.058
1,736.62 M2 0.227
40.16 M2 0.025
170.21 M2 0.037
170.21 M2 0.022
195.03 M2 0.026
717.60 M2 0.536
410.45 M1 0.307
93.75 M2 0.013
173.56 M2 0.146
726.39 M2 0.354
65.83 M2 0.036
574.13 M1 0.062
572.68 M1 0.818
38.20 M2 0.133
39.79 M2 0.096
54.21 M2 0.047
3.51 M2 0.007
3.51 M2 0.017
72.00 Unit 0.274
8.00 Unit 0.023
25.00 Psg 0.008
183.00 Psg 0.039
25.00 Set 0.030
4.00 Set 0.013
1.00 Set 0.002
23.00 set 0.021
2.00 set 0.004
1.00 set 0.001
2.00 Bh 0.001
366.00 Bh 0.076
183.00 Bh 0.058
18.00 Bh 0.033
39.00 Bh 0.022
1.00 Bh 0.001
1.00 Bh 0.001
13.12 M2 0.005
805.42 M2 0.192
1,736.62 M2 0.341
267.75 M2 0.045
216.75 M2 0.048
726.39 M2 0.143
65.83 M2 0.013
76.40 M2 0.023
79.58 M2 0.024
2.19 M3 0.010
395.95 Kg 0.022
21.88 M2 0.028
17.95 M3 0.080
3,469.89 Kg 0.196
188.48 M2 0.241
2.85 M3 0.013
397.73 Kg 0.022
38.00 M2 0.049
22.58 M3 0.101
1,843.35 Kg 0.104
225.81 M2 0.325
957.90 Kg 0.100
12,094.37 Kg 1.269
700.65 Kg 0.073
5,447.62 Kg 0.571
152.00 Bh 0.029
1,584.00 Bh 0.101
760.00 Bh 0.040
275.06 Kg 0.068
934.72 Kg 0.098
1,142.64 M2 0.527
1,142.64 M2 0.405
1,142.64 M2 0.388
192.00 M2 0.094
126.00 M1 0.026
126.00 M1 0.156
1,142.64 M2 0.693
89.00 M1 0.041
2.00 Bh 0.001
4.00 Bh 0.002
192.00 M2 0.038
63.00 M2 0.019
8.82 M2 0.003
13.10 M3 0.058
2501.51 Kg 0.141
131.16 M2 0.630
36.47 M3 0.163
3744.58 Kg 0.212
303.94 M2 0.438
10.56 M3 0.047
1611.68 Kg 0.091
105.80 M2 0.508
52.29 M3 0.233
5368.20 Kg 0.303
435.73 M2 0.628
238.20 M2 0.150
261.76 M1 0.116
476.40 M2 0.104
476.40 M2 0.062
61.99 M2 0.046
100.25 M2 0.116
162.24 M2 0.088
135.88 M1 0.015
476.40 M2 0.114
230.82 M2 0.055
435.73 M2 0.073
130.88 M1 0.166
17.85 M2 0.001
16.90 M1 0.011
55.32 M3 0.019
1.83 M3 0.000
0.89 M3 0.001
0.20 M3 0.000
1.83 M3 0.008
126.91 Kg 0.007
0.89 M3 0.003
3.57 M3 0.016
98.93 Kg 0.006
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.96 M3 0.009
295.78 Kg 0.017
6.52 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
9.47 M3 0.042
591.65 Kg 0.033
63.15 M2 0.082
63.15 M2 0.028
2.68 M3 0.012
98.93 Kg 0.006
17.85 M2 0.026
17.85 M2 0.013
63.15 M2 0.053
98.84 M2 0.022
14.37 M2 0.000
15.28 M1 0.010
43.99 M3 0.015
1.65 M3 0.000
0.71 M3 0.001
0.18 M3 0.000
1.65 M3 0.007
114.30 Kg 0.006
0.71 M3 0.002
2.84 M3 0.013
78.67 Kg 0.004
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.76 M3 0.008
266.38 Kg 0.015
5.87 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
8.33 M3 0.037
519.98 Kg 0.029
55.50 M2 0.072
55.50 M2 0.025
2.13 M3 0.010
78.67 Kg 0.004
14.19 M2 0.020
14.19 M2 0.011
55.50 M2 0.047
83.88 M2 0.019
20.00 m 0.010
8.00 m 0.003
30.00 m 0.011
86.00 Bh 0.080
16.00 Bh 0.017
9.00 Bh 0.022
13.00 Bh 0.048
46.00 Bh 0.013
10.00 Bh 0.003
15.00 Bh 0.004
13.00 Bh 0.024
85.00 Bh 0.079
9.00 Bh 0.022
14.00 Bh 0.052
27.00 Bh 0.007
9.00 Bh 0.003
16.00 Bh 0.005
14.00 Bh 0.026
2.00 Bh 0.001
2.00 Ttk 0.005
1.00 Lot 0.001
1.00 Lot 0.001
1.00 ls 0.117
1.00 Set 0.239
198.00 m 0.037
10.00 m 0.002
24.00 m 0.004
68.00 m 0.013
100.00 m 0.066
45.00 m 0.013
1.00 Ls 0.016
1.00 Bh 0.002
1.00 Bh 0.002
2.00 Bh 0.001
2.00 Bh 0.004
8.00 Bh 0.015
5.00 Bh 0.009
1.00 Bh 0.008
1.00 Bh 0.005
2.00 set 0.009
49.00 m' 0.009
1.00 Lot 0.015
1.63 M3 0.007
209.25 Kg 0.012
21.79 M2 0.028
3.42 M3 0.015
438.50 Kg 0.025
45.63 M2 0.058
3.42 M3 0.015
210.75 Kg 0.012
34.20 M2 0.049
3.42 M3 0.015
438.50 Kg 0.025
45.63 M2 0.058
7.98 M3 0.034
491.75 Kg 0.028
79.80 M2 0.115
1.13 M3 0.005
145.09 Kg 0.008
15.12 M2 0.019
2.36 M3 0.010
145.28 Kg 0.008
23.58 M2 0.034
1.13 M3 0.005
145.09 Kg 0.008
15.12 M2 0.019
2.36 M3 0.010
145.28 Kg 0.008
23.58 M2 0.034
12.60 M3 0.054
924.00 Kg 0.052
220.00 M2 0.158
14.90 M3 0.064
942.48 Kg 0.053
216.00 M2 0.156
5.75 M3 0.025
732.52 Kg 0.041
57.54 M2 0.083
550.38 M2 0.347
68.25 M2 0.043
100.20 M1 0.033
31.86 M1 0.014
355.26 M2 0.077
745.50 M2 0.162
68.25 M2 0.015
355.26 M2 0.046
745.50 M2 0.098
68.25 M2 0.009
250.80 M2 0.033
115.08 M2 0.015
602.00 M2 0.450
70.92 M2 0.053
164.61 M1 0.024
23.52 M2 0.020
161.20 M2 0.136
30.40 M2 0.035
720.20 M2 0.351
252.24 M1 0.027
116.73 M1 0.167
5.80 M2 0.020
7.12 M2 0.017
6.12 M2 0.005
4.00 Psg 0.001
42.00 Psg 0.009
4.00 Set 0.005
2.00 Set 0.002
4.00 Bh 0.002
84.00 Bh 0.017
42.00 Bh 0.013
4.00 Bh 0.007
4.00 Bh 0.002
355.26 M2 0.085
68.25 M2 0.016
584.30 M2 0.115
218.74 M2 0.049
229.08 M2 0.039
720.20 M2 0.142
11.59 M2 0.004
14.24 M2 0.004
62.22 M2 0.046
40.51 M2 0.010
18.20 M2 0.004
93.05 M2 0.016
6.00 m 0.003
88.00 Bh 0.082
8.00 Bh 0.030
4.00 Bh 0.001
6.00 Bh 0.002
4.00 Bh 0.001
144.00 m 0.027
68.00 m 0.013
16.00 m 0.003
102.00 m 0.028
1.00 Ls 0.016
4.00 Bh 0.010
1.00 Bh 0.001
60.00 m' 0.011
1.00 Lot 0.015
168.00 M2 0.006
52.00 M1 0.033
69.84 M3 0.017
7.68 M3 0.002
4.32 M3 0.003
0.38 M3 0.000
17.29 M3 0.026
49.35 M3 0.147
25.84 M3 0.002
83.05 M3 0.059
8.84 M3 0.007
1.92 M3 0.008
205.70 Kg 0.012
9.60 M2 0.007
2.34 M3 0.010
309.31 Kg 0.017
31.20 M2 0.023
1.68 M3 0.007
181.26 Kg 0.010
22.40 M2 0.017
14.14 M2 0.061
176.70 M2 0.051
5.97 M3 0.026
1,205.05 Kg 0.068
79.56 M2 0.100
3.12 M3 0.013
435.38 Kg 0.025
41.60 M2 0.053
1.98 M3 0.008
186.98 Kg 0.011
33.00 M2 0.042
1.92 M3 0.008
246.45 Kg 0.014
35.20 M2 0.045
1.92 M3 0.008
141.93 Kg 0.008
19.20 M2 0.028
1.56 M3 0.007
200.02 Kg 0.011
28.60 M2 0.037
3.64 M3 0.016
269.07 Kg 0.015
36.40 M2 0.052
0.36 M3 0.002
46.43 Kg 0.003
6.60 M2 0.008
2.20 M3 0.009
271.04 Kg 0.015
22.00 M2 0.032
0.21 M3 0.001
26.93 Kg 0.002
3.85 M2 0.005
0.70 M3 0.003
43.12 Kg 0.002
7.00 M2 0.010
312.41 M2 0.197
7.02 M2 0.004
81.95 M1 0.027
23.86 M1 0.011
624.81 M2 0.136
229.31 M2 0.030
293.70 M2 0.038
156.80 M2 0.021
147.13 M2 0.110
21.27 M2 0.016
8.91 M2 0.008
110.68 M1 0.016
5.78 M2 0.005
216.97 M2 0.117
251.95 M1 0.027
40.48 M1 0.058
24.21 M2 0.084
6.70 M2 0.016
16.00 Psg 0.005
35.00 Psg 0.007
8.83 M2 0.008
10.00 set 0.009
1.00 set 0.001
16.00 set 0.019
1.00 set 0.002
5.00 Bh 0.002
15.00 Bh 0.027
15.00 Bh 0.009
1.00 Bh 0.001
1.00 Bh 0.001
61.82 M2 0.019
70.00 Bh 0.014
35.00 Bh 0.011
229.31 M2 0.055
293.70 M2 0.058
154.42 M2 0.026
29.91 M2 0.007
216.97 M2 0.043
302.50 Kg 0.032
9,650.45 Kg 1.012
435.96 Kg 0.046
1,751.78 Kg 0.184
48.00 Bh 0.009
960.00 Bh 0.061
192.00 Bh 0.010
199.06 Kg 0.049
467.36 Kg 0.049
260.76 M2 0.120
260.76 M2 0.092
260.76 M2 0.089
83.71 M2 0.041
61.10 M1 0.013
61.10 M1 0.038
260.76 M2 0.158
64.31 M1 0.030
2.00 Bh 0.001
4.00 Bh 0.002
6.00 M1 0.003
33.00 Bh 0.031
3.00 Bh 0.007
11.00 Bh 0.003
9.00 Bh 0.003
1.00 Bh 0.000
2.00 Bh 0.001
0.032
0.065
0.059
0.025
0.064
0.033
0.025
0.064
0.033
0.017
0.013
0.053
0.013
0.010
0.042
0.141
0.243
0.263 0.263 0.263
0.193 0.193 0.193
0.036
0.021 0.021 0.021
0.028 0.028 0.028
0.002
0.103 0.103 0.103
0.116 0.116 0.116
0.056
0.047 0.047 0.047
0.057 0.057 0.057
0.008
0.006 0.006 0.006
0.011 0.011 0.011
0.005
0.004 0.004 0.004
0.009 0.009 0.009
0.638
0.414 0.414
0.858 0.858
0.012
0.008 0.008
0.033
0.046
0.205
0.173
0.029
0.102
0.084
0.357 0.357
0.025 0.025
0.048
0.231
0.133
0.207
0.380
0.161
0.863 0.863 0.863
0.072 0.072 0.072
0.477 0.477 0.477
0.047
0.045 0.045 0.045
0.021 0.021 0.021
0.070 0.070
0.041 0.041 0.041
0.449 0.449
0.345 0.345
0.660
0.172
0.047
0.283
0.590 0.590
0.039 0.039
0.002
0.003
0.069
0.035
0.005
0.142
0.184
0.382
0.057
0.034 0.034
0.033 0.033
0.049 0.049
0.094
0.016
0.062 0.062
0.026 0.026
0.045
0.182
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.015
0.006
0.005
0.013
0.013
0.008
0.017
0.008
0.001
0.002
0.002
0.041
0.033
0.082
0.028
0.011
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.012
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
0.036
0.029
0.072
0.025
0.009
0.004
0.020
0.011
0.047
0.002
0.019
0.016
0.050
0.051
0.019
0.072
0.037
0.001
0.005
0.117
0.239
0.133
0.024
0.186
0.041
0.015
0.001
0.002
0.011
0.066
0.027
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.032
0.004 0.004
0.003 0.003
0.014 0.014
0.233
0.151 0.151 0.151
0.144 0.144 0.144
0.102
0.049 0.049 0.049
0.076 0.076 0.076
0.008
0.005 0.005 0.005
0.010 0.010 0.010
0.002
0.001 0.001 0.001
0.003 0.003 0.003
0.432
0.187 0.187 0.187
0.387 0.387 0.387
0.042
0.171
0.156
0.020
0.070
0.075
0.004 0.004
0.003 0.003
0.014 0.014
0.247 0.247 0.247
0.043
0.027 0.027 0.027
0.048 0.048
0.139 0.139
0.029
0.025
0.037
0.011
0.010
0.011 0.011
0.014 0.014
0.080
0.098 0.098
0.120 0.120
0.013
0.011 0.011
0.024 0.024
0.101
0.052 0.052
0.163 0.163
0.100
0.423
0.024
0.190
0.029
0.034
0.013
0.068
0.033
0.058
0.141
0.630
0.163
0.212
0.438
0.047
0.091
0.508
0.233
0.152 0.152
0.314 0.314
0.075 0.075
0.116
0.052 0.052
0.031 0.031
0.088
0.015
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.016
0.006
0.005
0.013
0.013
0.009
0.017
0.008
0.001
0.002
0.002
0.042
0.033
0.082
0.028
0.012
0.006
0.026
0.026
0.048
0.026
0.028
0.008
0.024
0.037
0.001
0.005
0.037
0.002
0.004
0.013
0.025
0.007
0.012
0.028
0.015
0.025
0.058
0.015
0.012
0.049
0.015
0.025
0.058
0.034
0.028
0.115
0.005
0.008
0.019
0.010
0.008
0.034
0.005
0.008
0.019
0.010
0.008
0.034
0.054
0.052
0.158
0.064
0.053
0.156
0.025
0.041
0.083
0.116 0.116 0.116
0.043
0.011 0.011 0.011
0.014
0.077
0.081 0.081
0.015
0.023 0.023
0.049 0.049
0.009
0.016 0.016
0.015
0.225
0.053
0.012
0.020
0.068
0.351
0.027
0.146
0.023
0.357
0.061
0.691
0.028
0.022
0.031
0.025
0.470
0.361
0.345
0.088
0.027
0.081
0.617
0.042
0.001
0.002
0.009
0.005
0.091
0.006
0.004
0.008
0.011
0.024
0.037
0.001
0.005
0.027
0.013
0.003
0.028
0.016
0.010
0.001
0.011
0.015
0.006
0.033
0.017
0.002
0.003
0.000
0.026
0.147
0.002
0.059
0.007
0.008
0.012
0.007
0.010
0.017
0.023
0.007
0.010
0.017
0.061
0.051
0.026
0.068
0.100
0.013
0.025
0.053
0.016 0.016
0.506 0.506
0.023 0.023
0.184
0.009
0.031 0.031
0.010
0.025 0.025
0.005
0.009
0.001
0.003
0.080
0.000
0.020
0.122
0.003
5.066 5.132 5.409 5.085 4.903 5.092 5.200 5.530 5.781
20.968 26.100 31.509 36.595 41.497 46.589 51.789 57.318 63.100
E K E R J A A N
0.241 0.241
0.040
0.043 0.043
0.809 0.809
0.280
0.203
0.049 0.049
0.007
0.027
0.023
0.017
0.041 0.041
0.045
0.013
0.005
0.034
0.004
0.003
0.016
0.081 0.081
0.062 0.062
0.104
0.032
0.003
0.002
0.006
0.037
0.049 0.049
0.159 0.159 0.159 0.159
0.018
0.031
0.097 0.097
0.015
0.016 0.016 0.016
0.017 0.017 0.017
0.029
0.018
0.093
0.051
0.041
0.015
0.017
0.008
0.003
0.004
0.357 0.357
0.071
0.025 0.025
0.048
0.020 0.020 0.020
0.231 0.231 0.231
0.012 0.012
0.012 0.012 0.012
0.179 0.179 0.179
0.007 0.007
0.422 0.422
0.012
0.056 0.056
0.001
0.118
0.241 0.241
0.020 0.020
0.045 0.045
0.867 0.867
0.288
0.220
0.106
0.007
0.027
0.023
0.017
0.090
0.045
0.013
0.005
0.034
0.009
0.003
0.018
0.089 0.089
0.068 0.068
0.108
0.033
0.003
0.002
0.006
0.065
0.027
0.807
0.018
0.031
0.194
0.015
0.051
0.056
0.093
0.051
0.041
0.015
0.017
0.004
0.003
0.004
0.064
0.032
0.032
0.032
0.005
0.013
0.010
0.012
0.003
0.029
0.121
0.010
0.022
0.024
0.060
0.014
0.006
0.007
0.001
0.030
0.135
0.010
0.017
0.128
0.013
0.032
0.024
0.074
0.012
0.006
0.008
0.037
0.188
0.050
0.046
0.010
0.021
0.001
0.005
0.001
0.001
0.531
0.005
0.040
0.000
0.009
0.003
0.015
0.023
0.082
0.013
0.043 0.043
0.032
0.015 0.015
0.266 0.266
0.070
0.029 0.029
0.146
0.177 0.177
0.036
0.061
0.821
0.127
0.090
0.044
0.025
0.073
0.259
0.057
0.007
0.018 0.018
0.029
0.033
0.002
0.020
0.011
0.001
0.001
0.036 0.036
0.027 0.027
0.060
0.022
0.001
0.001
0.005
0.152
0.130 0.130
0.012
0.039
0.143
0.013
0.011 0.011
0.011 0.011
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.139
0.029
0.076 0.076 0.076
0.011
0.013 0.013
0.268 0.268
0.153 0.153
0.013
0.146
0.177 0.177
0.036
0.031 0.031
0.818
0.133
0.096
0.047
0.007
0.017
0.274
0.023
0.008
0.039
0.030
0.013
0.002
0.021
0.004
0.001
0.001
0.076
0.058
0.033
0.022
0.001
0.001
0.005
0.192
0.114 0.114 0.114
0.045
0.048
0.071 0.071
0.013
0.012 0.012
0.012 0.012
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.423 0.423
0.024 0.024
0.190 0.190
0.034 0.034
0.013 0.013
0.033 0.033
0.264 0.264
0.202 0.202
0.194 0.194
0.094
0.026
0.156
0.693
0.041
0.001
0.002
0.038
0.019
0.003
0.046
0.116
0.114
0.055
0.073
0.166
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.013
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
-
0.037
0.029
0.072
0.025
-
0.010
0.004
0.020
0.011
0.047
0.002
0.019
0.064
0.032
0.016
0.005
0.010
0.003
0.011
0.080
0.017
0.022
0.048
0.013
0.003
0.004
0.024
0.089
0.017
0.009
0.013
0.079
0.022
0.052
0.007
0.003
0.005
0.026
0.088
0.009
0.015
0.001
0.005
0.001
0.001
0.117
0.239
0.133
0.024
0.186
0.531
0.041
0.005
0.004
0.011
0.008
0.009
0.005
0.000
0.003
0.066
0.013
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.016
0.225
0.012
0.068
0.035
0.167
0.020
0.017
0.005
0.001
0.009
0.005
0.002
0.002
0.017
0.013
0.007
0.002
0.085
0.016
0.057 0.057
0.049
0.039
0.142
0.004
0.004
0.007
0.046
0.010
0.004
0.016
0.032
0.005
0.003
0.082
0.030
0.001
0.002
0.001
0.008
0.011
0.042
0.008
0.014
0.045
0.008
0.008
0.028
0.007
0.011
0.037
0.016
0.015
0.052
0.002
0.003
0.008
0.009
0.015
0.032
0.001
0.002
0.005
0.003
0.002
0.010
0.099 0.099
0.004
0.027
0.011
0.045 0.045 0.045
0.030
0.038
0.021
0.110
0.016
0.008
0.016
0.005
0.117
0.027
0.058
0.084
0.016
0.005
0.007
0.008
0.009
0.001
0.019
0.002
0.002
0.027
0.009
0.001
0.001
0.019
0.014
0.011
0.055
0.058
0.026
0.007
0.043
0.010
0.014
0.002
0.002
0.003
0.004
0.049
0.120
0.092
0.089
0.041
0.013
0.038
0.158
0.030
0.001
0.002
0.032
0.005
0.003
0.031
0.007
0.003
0.003
0.000
0.001
0.034
0.012
0.011
0.008
0.007
0.004
0.008
0.001
0.004
RENCANA :
REALISASI :
0
0
M
A
S
P
E
M
E
L
I
P
E
M
E
L
I
H
A
R
A
A
N
P
E
K
E
R
A
J
K
A
H
A
I
N
R
1
P
8
E
0
L
A
(
K
S
S
A
E
N
R
A
A
A
T
N
U
S
P
E
D
K
E
E
L
R
A
J
P
A
A
A
N
K
E
E
L
R
A
J
P
A
A
A
N
N
P
U
L
U
H
H
A
R
I
K
A
L
E
N
D
E
R
Tabanan, 7 Juni 2016
Kontraktor Pelaksana
PT. TARUMA KARYA UTAMA
NO URAIAN PEKERJAAN
I. BANGUNAN KELAS
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Pembersihan Area Proyek
3 Pek. Pengukuran dan pemasangan bowplank
II. PEKERJAAN ARSITEKTURAL DAN STRUKTUR
II.1 PEKERJAAN LANTAI I
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus bangunan
2 Pek. Galian pondasi telapak / pile cap
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pondasi Telapak
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5 pada pondasi menerus
7 Pek. Pasangan pondasi batu kali camp. 1:5 Pada Tangga dan Ramp
8 Pek. Urugan Tanah Kembali
9 Pek. Urugan Tanah Peninggian Lantai
10 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan beton pondasi P1
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton pondasi P2
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton pondasi P3
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton pondasi P4
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton sloof (TB1) 20/40
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton sloof (TB3) 15/20
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan pelat lantai 1 t.8cm
- Beton K300
- Pembesian Wiremesh M6 1 Lapis
8 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton plat tangga I
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat tangga II
- Beton K300
- Pembesian
- Bekesting
11 Pekerjaan beton plat topian t=10 cm
- Beton K300
- Pembesian
- Bekesting
12 Pekerjaan beton plat topian t=10 cm tas jendela
- Beton K300
- Pembesian
- Bekesting
C PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
5 Pek. Plesteran Dinding Luar Camp. 1:5
6 Pek. Plesteran Dinding Dalam Camp. 1:5
7 Pek. Plesteran Dinding Pada Pepalihan Kolom
8 Pek. Acian Luar
9 Pek. Acian Dalam
10 Pek. Acian Dinding Pada Pepalihan Kolom
11 Pek. Acian Pelat Topian
D PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Keramik 30x30 (A), Pada Tangga setara asia tile
4 Pek. Pas. Plint Keramik 10x30, setara asia tile
5 Pek. Pas. Keramik Meja Pantry 20/20 cm
6 Pek. Pas. Keramik Dinding 20x25 cm
7 Pek. Pas. Rubber Floor (C)
E PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
F PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan kunci Pintu Biasa
14 Pek. Pasangan kunci Pintu Kaca
15 Pek. Pasangan kunci Pintu Dorong
16 Pek. Pasangan kunci slot tanam
17 Pek. Pasangan kait angin
18 Pek. Pasangan grendel jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
G PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan Dan Siripan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
10 Pek. Railing Ramp Stainless Steel
11 Pek. Railing Tangga Stainless Steel
H PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.2 PEKERJAAN LANTAI II
A PEKERJAAN BETON
1 Pekerjaan beton balok B1 30/60
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton balok B1A 30/60
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton balok B2 30/50
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B3 25/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan beton balok B4 20/30
- Beton K300
- Pembesian
- Bekesting
6 Pekerjaan beton balok B5 15/30
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan Pelat Lantai 2 T=12cm
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap Teras T=10 cm
- Beton K300
- Pembesian
- Bekesting
9 Pekerjaan beton kolom K1 30/30
- Beton K300
- Pembesian
- Bekesting
10 Pekerjaan beton kolom bulat K2 dia. 30cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Dinding Bata Merah Camp. 1:5
2 Pek. Penebalan Kolom Dengan Bata Merah
3 Pek. Kolom Praktis ( 11 x 11 cm )
4 Pek. Balok Latai ( 10 x 15 cm )
4 Pek. Plesteran Dinding Luar Camp. 1:5
5 Pek. Plesteran Dinding Dalam Camp. 1:5
6 Pek. Plesteran Dinding Pada Pepalihan Kolom
7 Pek. Acian Luar
8 Pek. Acian Dalam
9 Pek. Acian Dinding Pada Pepalihan Kolom
C PEKERJAAN LAPISAN LANTAI DAN DINDING
1 Pek. Pas. Keramik 30x30 (A), setara asia tile
2 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
3 Pek. Pas. Plint Keramik 10x30, setara asia tile
4 Pek. Pas. Keramik meja pantry 20/20 cm
5 Pek. Pas. Keramik dinding 20x25 cm
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
2 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
3 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4" warna coklat setara YKK
2 Pek. Daun pintu panil kayu kamper
3 Pek. Daun jendela kaca kayu kamper
4 Pek. Pasangan kaca mati 5 mm
5 Pek. Pasangan kaca mati 8 mm
6 Pek. Pasangan kaca Tempered 12 mm
7 Pek. Pasangan Engsel Pivot
8 Pek. Pasangan Engsel Pintu
9 Pek. Pasangan Engsel Jendela
10 Pek. Pasangan Handle Pintu Biasa
11 Pek. Pasangan Handle Pintu Kaca
12 Pek. Pasangan Handle Pintu Dorong
13 Pek. Pasangan Kunci Pintu Biasa
14 Pek. Pasangan Kunci Pintu Kaca
15 Pek. Pasangan Kunci Pintu Dorong
16 Pek. Pasangan Kunci Slot Tanam
17 Pek. Pasangan Kait Angin
18 Pek. Pasangan Grendel Jendela
19 Pek. Pasangan door closer
20 Pek. Pasangan door stoper
21 Pek. Pasangan rel atas Pintu Dorong
22 Pek. Pasangan rel bawah Pintu Dorong
23 Pek. Lapisan Kulit jeruk Pada Pintu Toilet
F PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior setara dulux weathershield warna Putih
2 Pek. Fin. Cat ekterior setara dulux weathershield Pada Pepalihan
3 Pek. Fin. Cat interior setara dulux warna putih
4 Pek. Cat wateproofing setara Aquaproof
5 Pek. Waterproofing Semen Base Setara Sika
6 Pek. Pengecatan plafond gypsum setara dulux
7 Pek. Pengecatan plafond kalsiboard setara dulux
8 Pek. Polituran pintu panil
9 Pek. Polituran jendela
G PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk setara TOTO + Asesoris
2 Pek. Pas. Urinoir setara TOTO + Asesoris
3 Pek. Pas. Wastafel setara TOTO + Asesoris
4 Pek. Pas. Floor drain setara TOTO
5 Pek. Pas. Jet shower setara TOTO
6 Pek. Pas. Towel Bar setara
7 Pek. Pas. Railing Stainless Steel Pada Toilet Difable
8 Pek. Pas. Bak zink + Asesoris
II.3 PEKERJAAN ATAP
A PEKERJAAN BETON
1 Pekerjaan beton ring balok RB1 25/50
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN ATAP
1 Pek. Pas. Kolom baja WF 150/150
2 Pek. Pas. Balok baja WF 250/125
3 Pek. Pas. Balok baja WF 200/100
4 Pek. Pas. Gording CNP 150
5 Pek. Pas. Baut angker diameter 16
6 Pek. Pas. Baut d-16
7 Pek. Pas. Baut d-12
8 Pek. Pas. Cat zinkcromate
9 Pek. Pas. Pelat baja t=10mm
10 Pek. Pas. Usuk baja ringan profil UK 75
11 Pek. Pas. Reng baja ringan profil UK 30
12 Pek. Pas. Alluminium foil
13 Pek. Pas. Plafon gypsum 9 mm. rangka holow 4x4
14 Pek. Pas. Tatab Kayu Kamper
15 Pek. Pas. Listplank Kayu Kamper 2x3/30
16 Pek. Pas. Genteng Gemini Ex. Good Year
17 Pek. Pas. Bubungan genteng gemini Ex. Good Year
18 Pek. Pas. Murda Paras
19 Pek. Pas. Ikut celedu Paras
C PEKERJAAN FINISHING
1 Pek. Pengecatan plafond gypsum setara dulux
2 Pek. Polituran Listplank
3 Pek. Polituran Tatab
II.4 PEKERJAAN RAAM
A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian pondasi menerus raam
2 Pek. Galian pondasi telapak / pile cap P5
3 Pek. Urugan pasir t = 5 cm di bawah pondasi menerus
4 Pek. Urugan pasir t = 5 cm di bawah pile cap
5 Pek. Pasangan batu kosong t = 20 cm
6 Pek. Pasangan pondasi batu kali camp. 1:5
7 Pek. Urugan Tanah Kembali
8 Pek. Urugan Tanah Peninggian Lantai
9 Pek. Urugan pasir t = 5 cm dibawah rabatan lantai
B PEKERJAAN BETON
1 Pekerjaan Beton Pondasi P5
- Beton K300
- Pembesian
- Bekesting
2 Pekerjaan beton sloof (TB2) 15/30
- Beton K300
- Pembesian
- Bekesting
3 Pekerjaan beton kolom K3 20/20
- Beton K300
- Pembesian
- Bekesting
4 Pekerjaan beton balok B6 20/40
- Beton K300
- Pembesian
- Bekesting
5 Pekerjaan Pelat lantai t.8 cm
- Beton K300
- Pembesian
6 Pekerjaan pelat lantai t.12cm
- Beton K300
- Pembesian
- Bekesting
7 Pekerjaan beton balok RB2 20/30
- Beton K300
- Pembesian
- Bekesting
8 Pekerjaan Pelat Atap t.12cm
- Beton K300
- Pembesian
- Bekesting
B PEKERJAAN PASANGAN DINDING
1 Pek. Pas. Bata Merah 1:5
2 Pek. Balok Praktis ( 10 x 15 cm )
3 Pek. Plesteran
4 Pek. Acian
C PEKERJAAN LAPISAN LANTAI DAN DINDING
3 Pek. Pas. Keramik 30x30 (B), setara asia tile anti slip
4 Pek. Pas. Rubber Floor (C)
D PEKERJAAN PLAFOND
1 Pek. Pas. Plafon kalsiboard 4.5 mm. rangka holow 4x4
2 Pek. Pas. List plafond gypsum 7 cm
E PEKERJAAN FINISHING DAN WATERPROOFING
1 Pek. Fin. Cat ekterior Pada Dinding setara dulux weathershield warna putih
2 Pek. Fin. Cat ekterior Pada Kolom setara dulux weathershield warna putih
3 Pek. Fin. Cat wateproofing setara aquaproof
4 Pek. Pas. Railing Stainless Steel
II.5 PEKERJAAN GROUND TANK
A PEKERJAAN PERSIAPAN, TANAH DAN PONDASI
1 Pembersihan Area Proyek
2 Pek. Pengukuran dan pemasangan bowplank
3 Pek. Galian groundtank
4 Pek. Galian untuk sloof groundtank
5 Pek. Urugan pasir t = 5 cm lantai groundtank
6 Pek. Urugan pasir t = 5 cm pada sloof
B PEKERJAAN BETON
1 Pekerjaan beton sloof 25/45
- Beton K250
- Pembesian
2 Pekerjaan beton rabat t = 5 cm
3 Pekerjaan beton plat lantai t = 20 cm
- Beton K250
- Pembesian
3 Pekerjaan beton kolom 15/40
- Beton K250
- Pembesian
- Bekesting
4 Pekerjaan beton balok 30/40
- Beton K250
- Pembesian
- Bekesting
5 Pekerjaan beton balok 20/30
- Beton K250
- Pembesian
- Bekesting
6 Pekerjaan beton dinding t= 15 cm
- Beton K250
- Pembesian
- Bekesting
- Bekesting pas. Batako
7 Pekerjaan beton plat lantai t = 15 cm
- Beton K250
- Pembesian
- Bekesting
C PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Pas. Keramik 20x20, setara asia tile
2 Pek. Pas. keramik dinding 20x25, setara asia tile
BAHAN
Pasir Urug
Batu Kali
Semen
Mandor
Pekerja
Real Cost 18,821,528,616.89
PPN 1% 1,882,152,861.69
JML 20,703,681,478.58
J A D W A L P E L A
nan SLB di Jimbaran
BULAN I
VOL. SAT. BOBOT
MINGGU 1 2 3 4
HARI 7 7 7 7
7.07 M3 0.032
2298.68 Kg 0.130 0.065
94.29 M2 0.118 0.059
5.58 M3 0.025
1139.43 Kg 0.064
28.47 M2 0.033
5.58 M3 0.025
1139.43 Kg 0.064
28.47 M2 0.033
3.71 M3 0.017
228.53 Kg 0.013
37.10 M2 0.053
2.93 M3 0.013
180.36 Kg 0.010
29.28 M2 0.042
1769.58 M2 1.117
123.86 M2 0.078
243.00 M1 0.079
200.99 M1 0.089
157.12 M2 0.034
3382.03 M2 0.737
123.86 M2 0.027
157.12 M2 0.021
3241.93 M2 0.424
123.86 M2 0.016
289.12 M2 0.038
1050.72 M2 0.785
95.00 M2 0.071
34.81 M2 0.026
741.15 M1 0.106
0.91 M2 0.001
140.10 M2 0.118
7.17 M2 0.008
986.13 M2 0.481
74.15 M2 0.040
803.06 M1 0.086
1131.81 M1 1.617
80.61 M2 0.280
84.28 M2 0.203
113.32 M2 0.097
3.44 M2 0.007
5.56 M2 0.027
8.00 Unit 0.023
55.00 Psg 0.017
394.00 Psg 0.083
37.00 Set 0.045
4.00 Set 0.013
3.00 Set 0.005
37.00 Set 0.034
2.00 Set 0.004
3.00 Set 0.003
36.00 Bh 0.016
788.00 Bh 0.163
394.00 Bh 0.125
57.00 Bh 0.104
57.00 Bh 0.032
3.00 Bh 0.003
3.00 Bh 0.002
16.50 M2 0.006
157.12 M2 0.037
412.98 M2 0.098
3241.93 M2 0.637
103.84 M2 0.018
140.10 M2 0.031
986.13 M2 0.194
74.15 M2 0.015
161.21 M2 0.049
168.56 M2 0.052
6.24 M2 0.029
3.89 M2 0.018
54.41 M3 0.243
13,968.48 Kg 0.789
453.38 M2 0.580
7.97 M3 0.036
1,096.60 Kg 0.062
66.38 M2 0.085
31.41 M3 0.002
5,458.08 Kg 0.308
272.22 M2 0.348
12.65 M3 0.056
2,514.57 Kg 0.142
132.83 M2 0.170
1.89 M3 0.008
300.91 Kg 0.017
25.24 M2 0.032
1.20 M3 0.005
190.28 Kg 0.011
20.03 M2 0.026
142.91 M3 0.638
14,671.76 Kg 0.829
1,190.89 M2 1.716
2.79 M3 0.012
295.99 Kg 0.017
23.25 M2 0.033
10.40 M3 0.046
3,633.83 Kg 0.205
138.60 M2 0.173
6.43 M3 0.029
1,807.81 Kg 0.102
67.46 M2 0.084
2,259.28 M2 1.426
112.88 M2 0.071
306.00 M1 0.100
217.16 M1 0.096
271.32 M2 0.059
4,247.24 M2 0.925
112.88 M2 0.025
271.32 M2 0.035
4,107.14 M2 0.537
112.88 M2 0.015
1,129.96 M2 0.844
15.76 M2 0.012
780.88 M1 0.112
0.91 M2 0.001
140.10 M2 0.118
989.71 M2 0.483
74.15 M2 0.040
842.78 M1 0.090
1,213.44 M1 1.734
83.10 M2 0.288
91.38 M2 0.220
122.83 M2 0.106
3.44 M2 0.007
5.56 M2 0.027
8.00 Unit 0.023
57.00 Psg 0.017
428.00 Psg 0.090
37.00 Set 0.045
4.00 Set 0.013
3.00 Set 0.005
37.00 set 0.034
4.00 set 0.009
3.00 set 0.003
40.00 Bh 0.018
856.00 Bh 0.177
428.00 Bh 0.135
59.00 Bh 0.108
59.00 Bh 0.033
3.00 Bh 0.003
3.00 Bh 0.002
16.50 M2 0.006
271.32 M2 0.065
112.88 M2 0.027
4,107.14 M2 0.807
103.84 M2 0.018
140.10 M2 0.031
989.71 M2 0.194
74.15 M2 0.015
166.20 M2 0.051
182.75 M2 0.056
29.75 M3 0.133
3,662.80 Kg 0.207
297.51 M2 0.380
1,537.69 Kg 0.161
24,675.54 Kg 2.589
2,050.05 Kg 0.215
13,639.07 Kg 1.431
244.00 Bh 0.047
2,136.00 bh 0.136
1,220.00 bh 0.064
565.27 kg 0.140
1,168.39 Kg 0.123
1,944.70 M2 0.898
1,944.70 M2 0.689
1,944.70 M2 0.660
352.00 M2 0.172
228.80 M1 0.047
228.80 M1 0.283
1,944.70 M2 1.179
168.80 M1 0.078
4.00 Bh 0.002
6.00 Bh 0.003
352.00 M2 0.069
114.40 M2 0.035
16.02 M2 0.005
31.80 M3 0.142
3264.50 Kg 0.184
264.98 M2 0.382
89.25 M2 0.067
85.37 M2 0.099
174.62 M2 0.094
148.84 M1 0.016
522.12 M2 0.124
215.76 M2 0.051
264.98 M2 0.045
143.44 M1 0.182
17.85 M2 0.001
16.90 M1 0.011
55.32 M3 0.019
1.83 M3 0.000
0.89 M3 0.001
0.20 M3 0.000
1.83 M3 0.008
126.91 Kg 0.007
0.89 M3 0.003
3.57 M3 0.015
98.93 Kg 0.006
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.96 M3 0.008
295.78 Kg 0.017
6.52 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
9.47 M3 0.041
591.65 Kg 0.033
63.15 M2 0.082
63.15 M2 0.028
2.68 M3 0.011
98.93 Kg 0.006
17.85 M2 0.026
17.85 M2 0.013
63.15 M2 0.053
98.84 M2 0.022
14.37 M2 0.000
15.28 M1 0.010
43.99 M3 0.015
1.65 M3 0.000
0.71 M3 0.001
0.18 M3 0.000
1.65 M3 0.007
114.30 Kg 0.006
0.71 M3 0.002
2.84 M3 0.012
78.67 Kg 0.004
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.76 M3 0.008
266.38 Kg 0.015
5.87 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
8.33 M3 0.036
519.98 Kg 0.029
55.50 M2 0.072
55.50 M2 0.025
2.13 M3 0.009
78.67 Kg 0.004
14.19 M2 0.020
14.19 M2 0.011
55.50 M2 0.047
83.88 M2 0.019
25.00 m 0.013
28.00 m 0.010
32.00 m 0.012
8.00 m 0.003
78.00 m 0.029
130.00 Bh 0.121
16.00 Bh 0.010
21.00 Bh 0.022
10.00 Bh 0.024
16.00 Bh 0.060
49.00 Bh 0.014
20.00 Bh 0.006
24.00 Bh 0.007
4.00 Bh 0.001
16.00 Bh 0.030
138.00 Bh 0.128
16.00 Bh 0.013
27.00 Bh 0.032
10.00 Bh 0.024
20.00 Bh 0.074
44.00 Bh 0.012
20.00 Bh 0.006
28.00 Bh 0.008
20.00 Bh 0.037
1.00 ls 0.117
1.00 Set 0.239
165.00 m 0.031
8.00 m 0.001
10.00 m 0.002
58.00 m 0.011
100.00 m 0.066
97.00 m 0.027
1.00 Ls 0.016
1.00 Bh 0.002
1.00 Bh 0.002
2.00 Bh 0.001
2.00 Bh 0.004
8.00 Bh 0.015
5.00 Bh 0.009
1.00 Bh 0.008
1.00 Bh 0.005
2.00 set 0.009
49.00 m' 0.009
1.00 Lot 0.015
2.01 M3 0.009
95.26 Kg 0.005
20.13 M2 0.029
903.09 M2 0.570
100.72 M1 0.045
201.50 M1 0.066
305.36 M2 0.067
1500.83 M2 0.327
305.36 M2 0.040
1327.27 M2 0.174
253.09 M2 0.160
291.56 M2 0.064
332.81 M2 0.044
712.50 M2 0.532
93.75 M2 0.070
401.20 M1 0.058
173.56 M2 0.146
726.39 M2 0.354
65.83 M2 0.036
564.58 M1 0.061
574.52 M1 0.821
36.55 M2 0.127
37.43 M2 0.090
51.07 M2 0.044
12.00 M2 0.025
14.72 M2 0.073
68.00 Unit 0.259
20.00 Unit 0.057
24.00 Psg 0.007
172.00 Psg 0.036
24.00 Set 0.029
10.00 Set 0.033
1.00 Set 0.002
21.00 set 0.020
5.00 set 0.011
1.00 set 0.001
2.00 Bh 0.001
344.00 Bh 0.071
172.00 Bh 0.054
33.00 Bh 0.060
39.00 Bh 0.022
1.00 Bh 0.001
1.00 Bh 0.001
13.12 M2 0.005
638.17 M2 0.152
1327.27 M2 0.261
73.15 M2 0.012
173.56 M2 0.039
726.39 M2 0.143
65.83 M2 0.013
73.10 M2 0.022
74.86 M2 0.023
52.13 M3 0.233
10,702.71 Kg 0.605 0.151
451.75 M2 0.578 0.144
22.75 M3 0.102
3,446.46 Kg 0.195 0.049
238.88 M2 0.305 0.076
1.80 M3 0.008
251.35 Kg 0.014
24.00 M2 0.031
0.36 M3 0.002
53.28 Kg 0.003
6.08 M2 0.008
96.75 M3 0.432
9,933.00 Kg 0.561
806.25 M2 1.162
9.36 M3 0.042
3,030.82 Kg 0.171
124.80 M2 0.156
4.52 M3 0.020
1,234.95 Kg 0.070
60.29 M2 0.075
2.01 M3 0.009
95.26 Kg 0.005
20.13 M2 0.029
1,175.18 M2 0.742
97.73 M1 0.043
250.25 M1 0.081
440.18 M2 0.096
1,910.18 M2 0.416
440.18 M2 0.058
1,736.62 M2 0.227
40.16 M2 0.025
170.21 M2 0.037
170.21 M2 0.022
195.03 M2 0.026
717.60 M2 0.536
410.45 M1 0.307
93.75 M2 0.013
173.56 M2 0.146
726.39 M2 0.354
65.83 M2 0.036
574.13 M1 0.062
572.68 M1 0.818
38.20 M2 0.133
39.79 M2 0.096
54.21 M2 0.047
3.51 M2 0.007
3.51 M2 0.017
72.00 Unit 0.274
8.00 Unit 0.023
25.00 Psg 0.008
183.00 Psg 0.039
25.00 Set 0.030
4.00 Set 0.013
1.00 Set 0.002
23.00 set 0.021
2.00 set 0.004
1.00 set 0.001
2.00 Bh 0.001
366.00 Bh 0.076
183.00 Bh 0.058
18.00 Bh 0.033
39.00 Bh 0.022
1.00 Bh 0.001
1.00 Bh 0.001
13.12 M2 0.005
805.42 M2 0.192
1,736.62 M2 0.341
267.75 M2 0.045
216.75 M2 0.048
726.39 M2 0.143
65.83 M2 0.013
76.40 M2 0.023
79.58 M2 0.024
2.19 M3 0.010
395.95 Kg 0.022
21.88 M2 0.028
17.95 M3 0.080
3,469.89 Kg 0.196
188.48 M2 0.241
2.85 M3 0.013
397.73 Kg 0.022
38.00 M2 0.049
22.58 M3 0.101
1,843.35 Kg 0.104
225.81 M2 0.325
957.90 Kg 0.100
12,094.37 Kg 1.269
700.65 Kg 0.073
5,447.62 Kg 0.571
152.00 Bh 0.029
1,584.00 Bh 0.101
760.00 Bh 0.040
275.06 Kg 0.068
934.72 Kg 0.098
1,142.64 M2 0.527
1,142.64 M2 0.405
1,142.64 M2 0.388
192.00 M2 0.094
126.00 M1 0.026
126.00 M1 0.156
1,142.64 M2 0.693
89.00 M1 0.041
2.00 Bh 0.001
4.00 Bh 0.002
192.00 M2 0.038
63.00 M2 0.019
8.82 M2 0.003
13.10 M3 0.058
2501.51 Kg 0.141
131.16 M2 0.630
36.47 M3 0.163
3744.58 Kg 0.212
303.94 M2 0.438
10.56 M3 0.047
1611.68 Kg 0.091
105.80 M2 0.508
52.29 M3 0.233
5368.20 Kg 0.303
435.73 M2 0.628
238.20 M2 0.150
261.76 M1 0.116
476.40 M2 0.104
476.40 M2 0.062
61.99 M2 0.046
100.25 M2 0.116
162.24 M2 0.088
135.88 M1 0.015
476.40 M2 0.114
230.82 M2 0.055
435.73 M2 0.073
130.88 M1 0.166
17.85 M2 0.001
16.90 M1 0.011
55.32 M3 0.019
1.83 M3 0.000
0.89 M3 0.001
0.20 M3 0.000
1.83 M3 0.008
126.91 Kg 0.007
0.89 M3 0.003
3.57 M3 0.016
98.93 Kg 0.006
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.96 M3 0.009
295.78 Kg 0.017
6.52 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
9.47 M3 0.042
591.65 Kg 0.033
63.15 M2 0.082
63.15 M2 0.028
2.68 M3 0.012
98.93 Kg 0.006
17.85 M2 0.026
17.85 M2 0.013
63.15 M2 0.053
98.84 M2 0.022
14.37 M2 0.000
15.28 M1 0.010
43.99 M3 0.015
1.65 M3 0.000
0.71 M3 0.001
0.18 M3 0.000
1.65 M3 0.007
114.30 Kg 0.006
0.71 M3 0.002
2.84 M3 0.013
78.67 Kg 0.004
1.12 M3 0.005
238.92 Kg 0.013
10.23 M2 0.013
1.76 M3 0.008
266.38 Kg 0.015
5.87 M2 0.008
0.26 M3 0.001
33.70 Kg 0.002
1.29 M2 0.002
8.33 M3 0.037
519.98 Kg 0.029
55.50 M2 0.072
55.50 M2 0.025
2.13 M3 0.010
78.67 Kg 0.004
14.19 M2 0.020
14.19 M2 0.011
55.50 M2 0.047
83.88 M2 0.019
20.00 m 0.010
8.00 m 0.003
30.00 m 0.011
86.00 Bh 0.080
16.00 Bh 0.017
9.00 Bh 0.022
13.00 Bh 0.048
46.00 Bh 0.013
10.00 Bh 0.003
15.00 Bh 0.004
13.00 Bh 0.024
85.00 Bh 0.079
9.00 Bh 0.022
14.00 Bh 0.052
27.00 Bh 0.007
9.00 Bh 0.003
16.00 Bh 0.005
14.00 Bh 0.026
2.00 Bh 0.001
2.00 Ttk 0.005
1.00 Lot 0.001
1.00 Lot 0.001
1.00 ls 0.117
1.00 Set 0.239
198.00 m 0.037
10.00 m 0.002
24.00 m 0.004
68.00 m 0.013
100.00 m 0.066
45.00 m 0.013
1.00 Ls 0.016
1.00 Bh 0.002
1.00 Bh 0.002
2.00 Bh 0.001
2.00 Bh 0.004
8.00 Bh 0.015
5.00 Bh 0.009
1.00 Bh 0.008
1.00 Bh 0.005
2.00 set 0.009
49.00 m' 0.009
1.00 Lot 0.015
1.63 M3 0.007
209.25 Kg 0.012
21.79 M2 0.028
3.42 M3 0.015
438.50 Kg 0.025
45.63 M2 0.058
3.42 M3 0.015
210.75 Kg 0.012
34.20 M2 0.049
3.42 M3 0.015
438.50 Kg 0.025
45.63 M2 0.058
7.98 M3 0.034
491.75 Kg 0.028
79.80 M2 0.115
1.13 M3 0.005
145.09 Kg 0.008
15.12 M2 0.019
2.36 M3 0.010
145.28 Kg 0.008
23.58 M2 0.034
1.13 M3 0.005
145.09 Kg 0.008
15.12 M2 0.019
2.36 M3 0.010
145.28 Kg 0.008
23.58 M2 0.034
12.60 M3 0.054
924.00 Kg 0.052
220.00 M2 0.158
14.90 M3 0.064
942.48 Kg 0.053
216.00 M2 0.156
5.75 M3 0.025
732.52 Kg 0.041
57.54 M2 0.083
550.38 M2 0.347
68.25 M2 0.043
100.20 M1 0.033
31.86 M1 0.014
355.26 M2 0.077
745.50 M2 0.162
68.25 M2 0.015
355.26 M2 0.046
745.50 M2 0.098
68.25 M2 0.009
250.80 M2 0.033
115.08 M2 0.015
602.00 M2 0.450
70.92 M2 0.053
164.61 M1 0.024
23.52 M2 0.020
161.20 M2 0.136
30.40 M2 0.035
720.20 M2 0.351
252.24 M1 0.027
116.73 M1 0.167
5.80 M2 0.020
7.12 M2 0.017
6.12 M2 0.005
4.00 Psg 0.001
42.00 Psg 0.009
4.00 Set 0.005
2.00 Set 0.002
4.00 Bh 0.002
84.00 Bh 0.017
42.00 Bh 0.013
4.00 Bh 0.007
4.00 Bh 0.002
355.26 M2 0.085
68.25 M2 0.016
584.30 M2 0.115
218.74 M2 0.049
229.08 M2 0.039
720.20 M2 0.142
11.59 M2 0.004
14.24 M2 0.004
62.22 M2 0.046
40.51 M2 0.010
18.20 M2 0.004
93.05 M2 0.016
6.00 m 0.003
88.00 Bh 0.082
8.00 Bh 0.030
4.00 Bh 0.001
6.00 Bh 0.002
4.00 Bh 0.001
144.00 m 0.027
68.00 m 0.013
16.00 m 0.003
102.00 m 0.028
1.00 Ls 0.016
4.00 Bh 0.010
1.00 Bh 0.001
60.00 m' 0.011
1.00 Lot 0.015
168.00 M2 0.006
52.00 M1 0.033
69.84 M3 0.017
7.68 M3 0.002
4.32 M3 0.003
0.38 M3 0.000
17.29 M3 0.026
49.35 M3 0.147
25.84 M3 0.002
83.05 M3 0.059
8.84 M3 0.007
1.92 M3 0.008
205.70 Kg 0.012
9.60 M2 0.007
2.34 M3 0.010
309.31 Kg 0.017
31.20 M2 0.023
1.68 M3 0.007
181.26 Kg 0.010
22.40 M2 0.017
14.14 M2 0.061
176.70 M2 0.051
5.97 M3 0.026
1,205.05 Kg 0.068
79.56 M2 0.100
3.12 M3 0.013
435.38 Kg 0.025
41.60 M2 0.053
1.98 M3 0.008
186.98 Kg 0.011
33.00 M2 0.042
1.92 M3 0.008
246.45 Kg 0.014
35.20 M2 0.045
1.92 M3 0.008
141.93 Kg 0.008
19.20 M2 0.028
1.56 M3 0.007
200.02 Kg 0.011
28.60 M2 0.037
3.64 M3 0.016
269.07 Kg 0.015
36.40 M2 0.052
0.36 M3 0.002
46.43 Kg 0.003
6.60 M2 0.008
2.20 M3 0.009
271.04 Kg 0.015
22.00 M2 0.032
0.21 M3 0.001
26.93 Kg 0.002
3.85 M2 0.005
0.70 M3 0.003
43.12 Kg 0.002
7.00 M2 0.010
312.41 M2 0.197
7.02 M2 0.004
81.95 M1 0.027
23.86 M1 0.011
624.81 M2 0.136
229.31 M2 0.030
293.70 M2 0.038
156.80 M2 0.021
147.13 M2 0.110
21.27 M2 0.016
8.91 M2 0.008
110.68 M1 0.016
5.78 M2 0.005
216.97 M2 0.117
251.95 M1 0.027
40.48 M1 0.058
24.21 M2 0.084
6.70 M2 0.016
16.00 Psg 0.005
35.00 Psg 0.007
8.83 M2 0.008
10.00 set 0.009
1.00 set 0.001
16.00 set 0.019
1.00 set 0.002
5.00 Bh 0.002
15.00 Bh 0.027
15.00 Bh 0.009
1.00 Bh 0.001
1.00 Bh 0.001
61.82 M2 0.019
70.00 Bh 0.014
35.00 Bh 0.011
229.31 M2 0.055
293.70 M2 0.058
154.42 M2 0.026
29.91 M2 0.007
216.97 M2 0.043
302.50 Kg 0.032
9,650.45 Kg 1.012
435.96 Kg 0.046
1,751.78 Kg 0.184
48.00 Bh 0.009
960.00 Bh 0.061
192.00 Bh 0.010
199.06 Kg 0.049
467.36 Kg 0.049
260.76 M2 0.120
260.76 M2 0.092
260.76 M2 0.089
83.71 M2 0.041
61.10 M1 0.013
61.10 M1 0.038
260.76 M2 0.158
64.31 M1 0.030
2.00 Bh 0.001
4.00 Bh 0.002
6.00 M1 0.003
33.00 Bh 0.031
3.00 Bh 0.007
11.00 Bh 0.003
9.00 Bh 0.003
1.00 Bh 0.000
2.00 Bh 0.001
M3 79.03778
M3 423.3025
kg 34599.28
6.05 Oh
120.90 Oh
P E L A K S A N A A N P E K E R
0.032
0.065
0.059
0.025
0.064
0.033
0.025
0.064
0.033
0.017
0.013
0.053
0.013
0.010
0.042
0.141
0.243
0.263 0.263 0.263
0.193 0.193 0.193
0.036
0.021 0.021 0.021
0.028 0.028 0.028
0.002
0.103 0.103 0.103
0.116 0.116 0.116
0.056
0.047 0.047 0.047
0.057 0.057 0.057
0.008
0.006 0.006 0.006
0.011 0.011 0.011
0.005
0.004 0.004 0.004
0.009 0.009 0.009
0.638
0.414 0.414
0.858 0.858
0.012
0.008 0.008
0.033
0.046
0.205
0.173
0.029
0.102
0.084
0.357 0.357
0.025 0.025
0.048
0.231
0.133
0.207
0.380
0.161
0.863 0.863 0.863
0.072 0.072 0.072
0.477 0.477 0.477
0.047
0.045 0.045 0.045
0.021 0.021 0.021
0.070 0.070
0.041 0.041 0.041
0.449 0.449
0.345 0.345
0.660
0.172
0.047
0.283
0.590 0.590
0.039 0.039
0.002
0.003
0.069
0.035
0.005
0.142
0.184
0.382
0.057
0.034 0.034
0.033 0.033
0.049 0.049
0.094
0.016
0.062 0.062
0.026 0.026
0.045
0.182
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.015
0.006
0.005
0.013
0.013
0.008
0.017
0.008
0.001
0.002
0.002
0.041
0.033
0.082
0.028
0.011
0.006
0.026
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.012
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
0.036
0.029
0.072
0.025
0.009
0.004
0.020
0.011
0.047
0.002
0.019
0.016
0.050
0.051
0.019
0.072
0.037
0.001
0.005
0.117
0.239
0.133
0.024
0.186
0.041
0.015
0.001
0.002
0.011
0.066
0.027
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.032
0.004 0.004
0.003 0.003
0.014 0.014
0.233
0.151 0.151 0.151
0.144 0.144 0.144
0.102
0.049 0.049 0.049
0.076 0.076 0.076
0.008
0.005 0.005 0.005
0.010 0.010 0.010
0.002
0.001 0.001 0.001
0.003 0.003 0.003
0.432
0.187 0.187 0.187
0.387 0.387 0.387
0.042
0.171
0.156
0.020
0.070
0.075
0.004 0.004
0.003 0.003
0.014 0.014
0.247 0.247 0.247
0.043
0.027 0.027 0.027
0.048 0.048
0.139 0.139
0.029
0.025
0.037
0.011
0.010
0.011 0.011
0.014 0.014
0.080
0.098 0.098
0.120 0.120
0.013
0.011 0.011
0.024 0.024
0.101
0.052 0.052
0.163 0.163
0.100
0.423
0.024
0.190
0.029
0.034
0.013
0.068
0.033
0.058
0.141
0.630
0.163
0.212
0.438
0.047
0.091
0.508
0.233
0.152 0.152
0.314 0.314
0.075 0.075
0.116
0.052 0.052
0.031 0.031
0.088
0.015
0.001
0.011
0.019
0.000
0.001
0.000
0.008
0.007
0.003
0.016
0.006
0.005
0.013
0.013
0.009
0.017
0.008
0.001
0.002
0.002
0.042
0.033
0.082
0.028
0.012
0.006
0.026
0.026
0.048
0.026
0.028
0.008
0.024
0.037
0.001
0.005
0.037
0.002
0.004
0.013
0.025
0.007
0.012
0.028
0.015
0.025
0.058
0.015
0.012
0.049
0.015
0.025
0.058
0.034
0.028
0.115
0.005
0.008
0.019
0.010
0.008
0.034
0.005
0.008
0.019
0.010
0.008
0.034
0.054
0.052
0.158
0.064
0.053
0.156
0.025
0.041
0.083
0.116 0.116 0.116
0.043
0.011 0.011 0.011
0.014
0.077
0.081 0.081
0.015
0.023 0.023
0.049 0.049
0.009
0.016 0.016
0.015
0.225
0.053
0.012
0.020
0.068
0.351
0.027
0.146
0.023
0.357
0.061
0.691
0.028
0.022
0.031
0.025
0.470
0.361
0.345
0.088
0.027
0.081
0.617
0.042
0.001
0.002
0.009
0.005
0.091
0.006
0.004
0.008
0.011
0.024
0.037
0.001
0.005
0.027
0.013
0.003
0.028
0.016
0.010
0.001
0.011
0.015
0.006
0.033
0.017
0.002
0.003
0.000
0.026
0.147
0.002
0.059
0.007
0.008
0.012
0.007
0.010
0.017
0.023
0.007
0.010
0.017
0.061
0.051
0.026
0.068
0.100
0.013
0.025
0.053
0.016 0.016
0.506 0.506
0.023 0.023
0.184
0.009
0.031 0.031
0.010
0.025 0.025
0.005
0.009
0.001
0.003
0.080
0.000
0.020
0.122
0.003
5.066 5.132 5.409 5.085 4.903 5.092 5.200 5.530 5.781
20.968 26.100 31.509 36.595 41.497 46.589 51.789 57.318 63.100
E K E R J A A N
0.241 0.241
0.040
0.043 0.043
0.809 0.809
0.280
0.203
0.049 0.049
0.007
0.027
0.023
0.017
0.041 0.041
0.045
0.013
0.005
0.034
0.004
0.003
0.016
0.081 0.081
0.062 0.062
0.104
0.032
0.003
0.002
0.006
0.037
0.049 0.049
0.159 0.159 0.159 0.159
0.018
0.031
0.097 0.097
0.015
0.016 0.016 0.016
0.017 0.017 0.017
0.029
0.018
0.093
0.051
0.041
0.015
0.017
0.008
0.003
0.004
0.357 0.357
0.071
0.025 0.025
0.048
0.020 0.020 0.020
0.231 0.231 0.231
0.012 0.012
0.012 0.012 0.012
0.179 0.179 0.179
0.007 0.007
0.422 0.422
0.012
0.056 0.056
0.001
0.118
0.241 0.241
0.020 0.020
0.045 0.045
0.867 0.867
0.288
0.220
0.106
0.007
0.027
0.023
0.017
0.090
0.045
0.013
0.005
0.034
0.009
0.003
0.018
0.089 0.089
0.068 0.068
0.108
0.033
0.003
0.002
0.006
0.065
0.027
0.807
0.018
0.031
0.194
0.015
0.051
0.056
0.093
0.051
0.041
0.015
0.017
0.004
0.003
0.004
0.064
0.032
0.032
0.032
0.005
0.013
0.010
0.012
0.003
0.029
0.121
0.010
0.022
0.024
0.060
0.014
0.006
0.007
0.001
0.030
0.135
0.010
0.017
0.128
0.013
0.032
0.024
0.074
0.012
0.006
0.008
0.037
0.188
0.050
0.046
0.010
0.021
0.001
0.005
0.001
0.001
0.531
0.005
0.040
0.000
0.009
0.003
0.015
0.023
0.082
0.013
0.043 0.043
0.032
0.015 0.015
0.266 0.266
0.070
0.029 0.029
0.146
0.177 0.177
0.036
0.061
0.821
0.127
0.090
0.044
0.025
0.073
0.259
0.057
0.007
0.018 0.018
0.029
0.033
0.002
0.020
0.011
0.001
0.001
0.036 0.036
0.027 0.027
0.060
0.022
0.001
0.001
0.005
0.152
0.130 0.130
0.012
0.039
0.143
0.013
0.011 0.011
0.011 0.011
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.139
0.029
0.076 0.076 0.076
0.011
0.013 0.013
0.268 0.268
0.153 0.153
0.013
0.146
0.177 0.177
0.036
0.031 0.031
0.818
0.133
0.096
0.047
0.007
0.017
0.274
0.023
0.008
0.039
0.030
0.013
0.002
0.021
0.004
0.001
0.001
0.076
0.058
0.033
0.022
0.001
0.001
0.005
0.192
0.114 0.114 0.114
0.045
0.048
0.071 0.071
0.013
0.012 0.012
0.012 0.012
0.052
0.010
0.023
0.015
0.009
0.003
0.005
0.010
0.423 0.423
0.024 0.024
0.190 0.190
0.034 0.034
0.013 0.013
0.033 0.033
0.264 0.264
0.202 0.202
0.194 0.194
0.094
0.026
0.156
0.693
0.041
0.001
0.002
0.038
0.019
0.003
0.046
0.116
0.114
0.055
0.073
0.166
0.013
0.053
0.005
0.022
0.000
0.010
0.015
0.000
0.001
0.000
0.007
0.006
0.002
0.013
0.004
0.005
0.013
0.013
0.008
0.015
0.008
0.001
0.002
0.002
-
0.037
0.029
0.072
0.025
-
0.010
0.004
0.020
0.011
0.047
0.002
0.019
0.064
0.032
0.016
0.005
0.010
0.003
0.011
0.080
0.017
0.022
0.048
0.013
0.003
0.004
0.024
0.089
0.017
0.009
0.013
0.079
0.022
0.052
0.007
0.003
0.005
0.026
0.088
0.009
0.015
0.001
0.005
0.001
0.001
0.117
0.239
0.133
0.024
0.186
0.531
0.041
0.005
0.004
0.011
0.008
0.009
0.005
0.000
0.003
0.066
0.013
0.016
0.002
0.002
0.001
0.004
0.015
0.009
0.008
0.005
0.009
0.009
0.015
0.016
0.225
0.012
0.068
0.035
0.167
0.020
0.017
0.005
0.001
0.009
0.005
0.002
0.002
0.017
0.013
0.007
0.002
0.085
0.016
0.057 0.057
0.049
0.039
0.142
0.004
0.004
0.007
0.046
0.010
0.004
0.016
0.032
0.005
0.003
0.082
0.030
0.001
0.002
0.001
0.008
0.011
0.042
0.008
0.014
0.045
0.008
0.008
0.028
0.007
0.011
0.037
0.016
0.015
0.052
0.002
0.003
0.008
0.009
0.015
0.032
0.001
0.002
0.005
0.003
0.002
0.010
0.099 0.099
0.004
0.027
0.011
0.045 0.045 0.045
0.030
0.038
0.021
0.110
0.016
0.008
0.016
0.005
0.117
0.027
0.058
0.084
0.016
0.005
0.007
0.008
0.009
0.001
0.019
0.002
0.002
0.027
0.009
0.001
0.001
0.019
0.014
0.011
0.055
0.058
0.026
0.007
0.043
0.010
0.014
0.002
0.002
0.003
0.004
0.049
0.120
0.092
0.089
0.041
0.013
0.038
0.158
0.030
0.001
0.002
0.032
0.005
0.003
0.031
0.007
0.003
0.003
0.000
0.001
0.034
0.012
0.011
0.008
0.007
0.004
0.008
0.001
0.004
RENCANA :
REALISASI :
0
0
M
A
S
P
E
M
E
L
I
P
E
M
E
L
I
H
A
R
A
A
N
P
E
K
E
R
A
J
K
A
H
A
I
N
R
1
P
8
E
0
L
A
(
K
S
S
A
E
N
R
A
A
A
T
N
U
S
P
E
D
K
E
E
L
R
A
J
P
A
A
A
N
K
E
E
L
R
A
J
P
A
A
A
N
N
P
U
L
U
H
H
A
R
I
K
A
L
E
N
D
E
R
Tabanan, 7 Juni 2016
Kontraktor Pelaksana
PT. TARUMA KARYA UTAMA
XV PEKERJAAN LANDSCAPE
1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 113,742.56
2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350 Rp. 171,433.50
3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225 Rp. 171,433.50
4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350 Rp. 178,573.50
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 Rp. 171,433.50
6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 Rp. 171,433.50
7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 Rp. 178,752.00
8 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 Rp. 159,027.75
9 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 36,285.11
10 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 41,640.11
DAFTAR ANALISA PEKERJAAN
TAHUN 2016
HARGA HARGA
NO URAIAN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 6
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
1.2500 btg Bambu Sedang 7,650.00
2.5000 kg Semen Portland 1,200.00
1.2000 lbr Seng gelombang 3" - 5" 77,095.00
0.0050 m3 Pasir Beton 140,000.00
0.0090 m3 Koral beton 150,000.00
0.0720 m3 Kayu Meranti Usuk 5/7 5,100,000.00
0.0600 kg Paku biasa 2" - 5" 14,025.00
0.4500 kg Meni Besi 22,355.00
0.2000 oh Tukang Kayu 70,000.00
0.4000 oh Pekerja 55,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 524,327.75
Overhead & Profit 5 % 26,216.39
Harga Satuan Pekerjaan 550,544.14
9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 100,000.00
0.3000 oh Pekerja 55,000.00
0.0100 oh Mandor 80,000.00
Total : 137,300.00
Overhead & Profit 5 % 6,865.00
Harga Satuan Pekerjaan 144,165.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III
1.2000 m3 Balok Kayu kruing 5,100,000.00
1.2500 Kg Paku 10 Cm 12,750.00
1.0000 Kg Lem Kayu 15,300.00
6.0000 oh Pekerja 55,000.00
18.0000 oh Tukang Kayu 70,000.00
1.8000 oh Kepala Tukang 75,000.00
0.3000 oh Mandor 80,000.00
Total : 7,900,237.50
Overhead & Profit 5 % 395,011.88
Harga Satuan Pekerjaan 8,295,249.38
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 8,075,000.00
0.0300 Kg Paku 1-2,5 Cm 12,750.00
0.5000 Kg Lem Kayu 15,300.00
1.0000 Lbr Plywood 4 mm 53,762.50
0.7000 oh Pekerja 55,000.00
2.1000 oh Tukang Kayu 70,000.00
0.2100 oh Kepala Tukang 75,000.00
0.0350 oh Mandor 80,000.00
Total : 467,720.00
Overhead & Profit 5 % 23,386.00
Harga Satuan Pekerjaan 491,106.00
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
276.0000 kg Semen Portland 1,200.00
0.5914 m3 Pasir Beton 140,000.00
0.7496 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 649,753.19
Overhead & Profit 5 % 32,487.66
Harga Satuan Pekerjaan 682,240.85
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,200.00
0.5707 m3 Pasir Beton 140,000.00
0.7533 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 675,008.75
Overhead & Profit 5 % 33,750.44
Harga Satuan Pekerjaan 708,759.19
4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,200.00
0.5429 m3 Pasir Beton 140,000.00
0.7622 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 704,842.08
Overhead & Profit 5 % 35,242.10
Harga Satuan Pekerjaan 740,084.19
5 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,200.00
0.4986 m3 Pasir Beton 140,000.00
0.7756 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 754,642.08
Overhead & Profit 5 % 37,732.10
Harga Satuan Pekerjaan 792,374.19
6 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,200.00
0.4943 m3 Pasir Beton 140,000.00
0.7696 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 768,753.19
Overhead & Profit 5 % 38,437.66
Harga Satuan Pekerjaan 807,190.85
7 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,200.00
0.4886 m3 Pasir Beton 140,000.00
0.7600 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 792,908.75
Overhead & Profit 5 % 39,645.44
Harga Satuan Pekerjaan 832,554.19
8 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
413.0000 kg Semen Portland 1,200.00
0.4864 m3 Pasir Beton 140,000.00
0.7563 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
1.6500 oh Pekerja 55,000.00
0.2750 oh Tukang Batu 70,000.00
0.0280 oh Kepala Tukang 75,000.00
0.0830 oh Mandor 80,000.00
Total : 800,453.19
Overhead & Profit 5 % 40,022.66
Harga Satuan Pekerjaan 840,475.85
9 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,200.00
0.4786 m3 Pasir Beton 140,000.00
0.7452 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
2.1000 oh Pekerja 55,000.00
0.3500 oh Tukang Batu 70,000.00
0.0350 oh Kepala Tukang 75,000.00
0.1050 oh Mandor 80,000.00
Total : 861,171.53
Overhead & Profit 5 % 43,058.58
Harga Satuan Pekerjaan 904,230.10
10 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,200.00
0.4764 m3 Pasir Beton 140,000.00
0.7407 m3 Koral Beton 150,000.00
215.0000 lt Air 21.25
2.1000 oh Pekerja 55,000.00
0.3500 oh Tukang Batu 70,000.00
0.0350 oh Kepala Tukang 75,000.00
0.1050 oh Mandor 80,000.00
Total : 871,004.86
Overhead & Profit 5 % 43,550.24
Harga Satuan Pekerjaan 914,555.10
6 1 M2 KAWAT NYAMUK
1.1000 m2 Kawat Nyamuk 18,700.00
11.1100 cm Pengelasan 11,220.00
1.7160 kg Baja Strip (0,2 x 2) cm 12,750.00
0.1000 oh Pekerja 55,000.00
0.1000 oh Tukang Besi 70,000.00
0.0100 oh Kepala Tukang 75,000.00
0.0050 oh Mandor 80,000.00
Total : 180,753.20
Overhead & Profit 5 % 9,037.66
Harga Satuan Pekerjaan 189,790.86
5 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMUR
0.1000 kg Plamur Tembok 24,650.00
0.2400 Kg Cat Tembok setara Vinilex 30,855.00
0.5000 Lbr Amplas 5,000.00
0.0150 Bh Kuas 8,500.00
0.0500 Bh Kapi 6,800.00
0.0800 oh Pekerja 55,000.00
0.0600 oh Tukang cat 70,000.00
0.0060 oh Kepala Tukang 75,000.00
0.0040 oh Mandor 80,000.00
Total : 22,207.70
Overhead & Profit 5 % 1,110.39
Harga Satuan Pekerjaan 23,318.09
12 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API
0.5000 Lbr Amplas 5,000.00
0.0500 Bh Sikat Baja 25,670.00
0.0500 Kg Soda Api 18,700.00
0.3000 oh Pekerja 55,000.00
0.0150 oh Mandor 80,000.00
Total : 22,418.50
Overhead & Profit 5 % 1,120.93
Harga Satuan Pekerjaan 23,539.43
HARGA HARGA
NO URAIAN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 6
1 1 M2 PASANG BESI WIREMESH
1.1000 m1 Wiremesh 35,273.37
0.5000 kg Kawat beton 16,000.00
0.0500 oh Pekerja 55,000.00
0.0100 oh Tukang Batu 70,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 51,910.71
Overhead & Profit 5 % 2,595.54
Harga Satuan Pekerjaan 54,506.24
2 1 M2 PASANG DINDING KERAMIK 20 X 25 CM
20.0000 bh Keramik 20 x 25 cm 1,500.00
9.3000 kg Semen Portland 1,200.00
0.0180 m3 Pasir Pasang 135,000.00
1.9400 kg Semen warna/semen grouting 10,000.00
0.9000 oh Pekerja 55,000.00
0.4500 oh Tukang batu 70,000.00
0.0450 oh Kepala Tukang 75,000.00
0.0450 oh Mandor 80,000.00
Total : 150,965.00
Overhead & Profit 5 % 7,548.25
Harga Satuan Pekerjaan 158,513.25
3 1 M2 PASANG RAMP RUBBER FLOOR
1.0500 M2 Ramp Rubber Floor 150,000.00
1.0000 ls Alat Bantu 25,000.00
0.2500 Oh Pekerja 55,000.00
0.1250 Oh Tukang batu 70,000.00
0.0130 Oh Kepala Tukang batu 75,000.00
0.0130 Oh Mandor 80,000.00
Total : 207,015.00
Overhead & Profit 5 % 10,350.75
Harga Satuan Pekerjaan 217,365.75
4 1 M1 PEMASANGAN LIST PLAFOND GYPSUM
1.0500 m1 List gypsum 7cm 8,800.00
1.0000 kg Cornice 3,250.00
0.0150 oh Pekerja 55,000.00
0.0250 oh Tukang Batu 70,000.00
0.0500 oh Kepala Tukang 75,000.00
0.0050 oh Mandor 80,000.00
Total : 19,215.00
Overhead & Profit 5 % 960.75
Harga Satuan Pekerjaan 20,175.75
5 1 M1 PASANGAN KUSEN ALUMINIUM 4''
1.1000 M' Kusen aluminium 4" cokelat 225,000.00
2.0000 Bh Sekrup fixer 350.00
0.0600 Btl Sealant 35,000.00
0.0430 oh Pekerja 55,000.00
0.0430 oh Tukang besi 70,000.00
0.0043 oh Kepala Tukang 75,000.00
0.0021 oh Mandor 80,000.00
Total : 256,165.50
Overhead & Profit 5 % 12,808.28
Harga Satuan Pekerjaan 268,973.78
6 1 M2 PEMASANGAN PINTU DAN JENDELA KACA, KAYU KELAS I
0.0240 m3 Papan Kayu Jati 29,750,000.00
0.3000 Kg Lem Kayu 15,300.00
0.8000 oh Pekerja 55,000.00
2.4000 oh Tukang Kayu 70,000.00
0.2400 oh Kepala Tukang 75,000.00
0.0400 oh Mandor 80,000.00
Total : 951,790.00
Overhead & Profit 5 % 47,589.50
Harga Satuan Pekerjaan 999,379.50
7 1 PS PEMASANGAN HANDEL PINTU BIASA EX. SOLID
1.0000 bh Handel pintu 175,000.00
0.2000 oh Pekerja 55,000.00
0.2000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 216,600.00
Overhead & Profit 5 % 10,830.00
Harga Satuan Pekerjaan 227,430.00
8 1 PS PEMASANGAN HANDEL PINTU KACA EX. SOLID
1.0000 bh Handel pintu 550,000.00
0.2000 oh Pekerja 55,000.00
0.2000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 591,600.00
Overhead & Profit 5 % 29,580.00
Harga Satuan Pekerjaan 621,180.00
9 1 PS PEMASANGAN HANDEL PINTU DORONG EX. SOLID
1.0000 bh Handel pintu 285,000.00
0.2000 oh Pekerja 55,000.00
0.2000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 326,600.00
Overhead & Profit 5 % 16,330.00
Harga Satuan Pekerjaan 342,930.00
10 1 SET PEMASANGAN KUNCI PINTU KACA EX. SOLID
1.0000 bh Kunci pintu 350,000.00
0.2000 oh Pekerja 55,000.00
0.2000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 391,600.00
Overhead & Profit 5 % 19,580.00
Harga Satuan Pekerjaan 411,180.00
11 1 SET PEMASANGAN KUNCI PINTU DORONG EX. SOLID
1.0000 bh Kunci pintu 155,000.00
0.2000 oh Pekerja 55,000.00
0.2000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 196,600.00
Overhead & Profit 5 % 9,830.00
Harga Satuan Pekerjaan 206,430.00
12 1 BH PASANG KUNCI SLOT TANAM EX. SOLID
1.0000 bh Kunci slot tanam 65,000.00
0.0200 oh Pekerja 55,000.00
0.2000 oh Tukang besi 70,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0010 oh Mandor 80,000.00
Total : 81,680.00
Overhead & Profit 5 % 4,084.00
Harga Satuan Pekerjaan 85,764.00
13 1 BH PEMASANGAN GRENDEL EX. SOLID
1.0000 Bh Grendel 40,000.00
0.0200 OH Pekerja 55,000.00
0.2000 OH Tukang Besi 70,000.00
0.0200 OH Kepala Tukang 75,000.00
0.0010 OH Mandor 80,000.00
Total : 56,680.00
Overhead & Profit 5 % 2,834.00
Harga Satuan Pekerjaan 59,514.00
14 1 PS PEMASANGAN DOOR STOPER EX. SOLID
1.0000 Bh Door Stoper 80,000.00
0.1000 OH Pekerja 55,000.00
0.1000 OH Tukang Besi 70,000.00
0.1000 OH Kepala Tukang 75,000.00
0.0200 OH Mandor 80,000.00
Total : 101,600.00
Overhead & Profit 5 % 5,080.00
Harga Satuan Pekerjaan 106,680.00
15 1 PS PEMASANGAN DOOR CLOOSER EX. SOLID
1.0000 Bh Door Clooser 250,000.00
0.2000 OH Pekerja 55,000.00
0.6000 OH Tukang Besi 70,000.00
0.3000 OH Kepala Tukang 75,000.00
0.0200 OH Mandor 80,000.00
Total : 327,100.00
Overhead & Profit 5 % 16,355.00
Harga Satuan Pekerjaan 343,455.00
16 1 UNIT RELL PINTU ATAS EX. SOLID
1.0000 Unit Rel 155,000.00
0.1000 oh Pekerja 55,000.00
0.1000 oh Tukang Besi 70,000.00
0.1000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 176,600.00
Overhead & Profit 5 % 8,830.00
Harga Satuan Pekerjaan 185,430.00
17 1 UNIT RELL PINTU BAWAH EX. SOLID
1.0000 Unit Rel 95,000.00
0.1000 oh Pekerja 55,000.00
0.1000 oh Tukang Besi 70,000.00
0.1000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 116,600.00
Overhead & Profit 5 % 5,830.00
Harga Satuan Pekerjaan 122,430.00
18 1 M2 PEMASANGAN LAPISAN KULIT JERUK
1.1000 m2 Aluminium kulit jeruk 57,500.00
0.0250 oh Pekerja 55,000.00
0.0750 oh Tukang kayu 70,000.00
0.0075 oh Kepala tukang 75,000.00
0.0013 oh Mandor 80,000.00
Total : 70,541.50
Overhead & Profit 5 % 3,527.08
Harga Satuan Pekerjaan 74,068.58
19 1 M2 PENGECATAN DENGAN CAT EKSTERIOR EX. DULUX WEATHERSHIELD
0.1000 kg Plamir 25,000.00
0.1000 kg Cat dasar 35,000.00
0.2600 kg Cat Penutup 2x 77,095.00
0.1000 oh Pekerja 55,000.00
0.1500 oh Tukang Cat 70,000.00
0.0063 oh Kepala Tukang 75,000.00
0.0025 oh Mandor 80,000.00
Total : 42,717.20
Overhead & Profit 5 % 2,135.86
Harga Satuan Pekerjaan 44,853.06
20 1 M2 PENGECATAN DENGAN CAT INTERIOR EX. DULUX
0.1000 kg Plamir 25,000.00
0.1000 kg Cat dasar 35,000.00
0.2600 kg Cat Penutup 2x 48,280.00
0.1000 oh Pekerja 55,000.00
0.1500 oh Tukang Cat 70,000.00
0.0063 oh Kepala Tukang 75,000.00
0.0025 oh Mandor 80,000.00
Total : 35,225.30
Overhead & Profit 5 % 1,761.27
Harga Satuan Pekerjaan 36,986.57
21 1 M2 PENGECATAN DENGAN CAT WATERPROOFING EX. AQUAPROOF
0.1000 kg Plamir 25,000.00
0.2600 kg Cat Penutup 2x 42,500.00
0.1000 oh Pekerja 55,000.00
0.1500 oh Tukang Cat 70,000.00
0.0063 oh Kepala Tukang 75,000.00
0.0025 oh Mandor 80,000.00
Total : 30,222.50
Overhead & Profit 5 % 1,511.13
Harga Satuan Pekerjaan 31,733.63
22 1 M2 WATERPROOFING SEMEN BASE
2.0000 kg Waterproofing Semen Base 12,000.00
0.1000 oh Pekerja 55,000.00
0.1300 oh Tukang Cat 70,000.00
0.0160 oh Kepala Tukang 75,000.00
0.0025 oh Mandor 80,000.00
Total : 40,000.00
Overhead & Profit 5 % 2,000.00
Harga Satuan Pekerjaan 42,000.00
23 1 KG CAT ZINCROMATE
1.0000 kg Cat Zincromate 42,000.00
1.0000 ls Alat dan material bantu 1,000.00
0.0100 oh Pekerja 55,000.00
0.0080 oh Tukang Cat 70,000.00
0.0020 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 44,420.00
Overhead & Profit 5 % 2,221.00
Harga Satuan Pekerjaan 46,641.00
24 1 M2 PEMASANGAN RAILING STAINLESS STEEL
3.6000 m1 Besi hollow 3" 175,000.00
1.0000 ls Bahan las 100,000.00
0.6000 oh Pekerja 55,000.00
0.8000 oh Tukang Besi 70,000.00
0.2000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 835,600.00
Overhead & Profit 5 % 41,780.00
Harga Satuan Pekerjaan 877,380.00
25 1 M1 PEMASANGAN RAILING STAINLESS STEEL PADA TOILET
1.0000 m1 Besi hollow 3" 175,000.00
1.0000 ls Bahan las 35,000.00
0.1000 oh Pekerja 55,000.00
0.1333 oh Tukang Besi 70,000.00
0.0333 oh Kepala Tukang 75,000.00
0.0033 oh Mandor 80,000.00
80000 227,592.50
Overhead & Profit 5 % 11,379.63
Harga Satuan Pekerjaan 238,972.13
26 1 UNIT PEMASANGAN WASHTAFEL EX. TOTO
1.0000 Bh Washtafel 624,750.00
6.0000 kg Semen Portland 1,200.00
0.0100 m3 Pasir Pasang 135,000.00
1.2000 oh Pekerja 55,000.00
1.4500 oh Tukang batu 70,000.00
0.1500 oh Kepala Tukang 75,000.00
0.1000 oh Mandor 80,000.00
Total : 820,050.00
Overhead & Profit 5 % 41,002.50
Harga Satuan Pekerjaan 861,052.50
27 1 UNIT PEMASANGAN FLOOR DRAIN EX. TOTO
1.0000 Unit Floor Drain 250,000.00
0.1000 oh Pekerja 55,000.00
0.2000 oh Tukang Batu 70,000.00
0.1000 oh Kepala Tukang 75,000.00
0.0025 oh Mandor 80,000.00
Total : 277,200.00
Overhead & Profit 5 % 13,860.00
Harga Satuan Pekerjaan 291,060.00
28 1 BH PEMASANGAN JET SHOWER EX. TOTO
1.0000 Bh Jet Shower 260,000.00
0.2000 oh Pekerja 55,000.00
0.4000 oh Tukang batu 70,000.00
0.4000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 330,600.00
Overhead & Profit 5 % 16,530.00
Harga Satuan Pekerjaan 347,130.00
29 1 BH PEMASANGAN TOWEL BAR
1.0000 Bh Towel Bar 650,000.00
0.2000 oh Pekerja 55,000.00
0.4000 oh Tukang batu 70,000.00
0.4000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 720,600.00
Overhead & Profit 5 % 36,030.00
Harga Satuan Pekerjaan 756,630.00
30 1 SET PEMASANGAN BAK ZINK
1.0000 Bh Bak Zink 560,000.00
0.2000 oh Pekerja 55,000.00
0.4000 oh Tukang batu 70,000.00
0.4000 oh Kepala Tukang 75,000.00
0.0200 oh Mandor 80,000.00
Total : 630,600.00
Overhead & Profit 5 % 31,530.00
Harga Satuan Pekerjaan 662,130.00
31 1 BH PEMASANGAN ANGKUR DIAMETER 16
1.0000 bh Angkur diameter 16 32,000.00
1.0000 ls Alat dan material bantu 1,000.00
0.0100 oh Pekerja 55,000.00
0.0080 oh Tukang Kayu 70,000.00
0.0020 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 34,420.00
Overhead & Profit 5 % 1,721.00
Harga Satuan Pekerjaan 36,141.00
32 1 BH PEMASANGAN BAUT DIAMETER 16
1.0000 bh Baut diameter 16 9,000.00
1.0000 ls Alat dan material bantu 1,000.00
0.0100 oh Pekerja 55,000.00
0.0080 oh Tukang Kayu 70,000.00
0.0020 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 11,420.00
Overhead & Profit 5 % 571.00
Harga Satuan Pekerjaan 11,991.00
33 1 BH PEMASANGAN BAUT DIAMETER 12
1.0000 bh Baut diameter 12 7,000.00
1.0000 ls Alat dan material bantu 1,000.00
0.0100 oh Pekerja 55,000.00
0.0080 oh Tukang Kayu 70,000.00
0.0020 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 9,420.00
Overhead & Profit 5 % 471.00
Harga Satuan Pekerjaan 9,891.00
34 1 M2 PEMASANGAN USUK PROFIL UK 75
0.5833 Bh Baja ringan profil uk 90,000.00
1.0000 Ls Sekrup 10,000.00
0.1000 oh Pekerja 55,000.00
0.1000 oh Tukang Kayu 70,000.00
0.0500 oh Kepala Tukang 75,000.00
0.0500 oh Mandor 80,000.00
Total : 82,750.00
Overhead & Profit 5 % 4,137.50
Harga Satuan Pekerjaan 86,887.50
35 1 M2 PEMASANGAN RENG PROFIL UK 30
0.9242 Bh Baja ringan profil uk 36,000.00
1.0000 Ls Sekrup 10,000.00
0.1000 oh Pekerja 55,000.00
0.1000 oh Tukang Kayu 70,000.00
0.0500 oh Kepala Tukang 75,000.00
0.0500 oh Mandor 80,000.00
Total : 63,522.73
Overhead & Profit 5 % 3,176.14
Harga Satuan Pekerjaan 66,698.86
36 1 M2 PEKERJAAN ATAP GENTENG GEMINI EX. GOODYEAR
20.0000 bh Genteng Gemini 4,700.00
0.1500 oh Pekerja 55,000.00
0.0750 oh Tukang Kayu 70,000.00
0.0075 oh Kepala Tukang 75,000.00
0.0080 oh Mandor 80,000.00
Total : 108,702.50
Overhead & Profit 5 % 5,435.13
Harga Satuan Pekerjaan 114,137.63
37 1 M1 PASANG BUBUNGAN GENTENG GEMINI EX. GOODYEAR
3.5000 bh Bubungan Gemini 9,000.00
8.0000 kg Semen Portland 1,200.00
0.0320 m3 Pasir Pasang 135,000.00
0.4000 oh Pekerja 55,000.00
0.2000 oh Tukang Kayu 70,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 83,080.00
Overhead & Profit 5 % 4,154.00
Harga Satuan Pekerjaan 87,234.00
38 1 M1 PEMASANGAN TATAB KAYU KAMPER
0.0037 m3 Papan Kayu Kamper 8,075,000.00
0.0167 ls Paku 13,600.00
0.0333 oh Pekerja 55,000.00
0.0667 oh Tukang kayu 70,000.00
0.0067 oh Kepala Tukang 75,000.00
0.0017 oh Mandor 80,000.00
Total : 36,974.72
Overhead & Profit 5 % 1,848.74
Harga Satuan Pekerjaan 38,823.46
39 1 M' PEMASANGAN LISPTLANK KAYU KAMPER UKURAN (3 X 30) CM
0.0110 m3 Papan Kayu Kamper 8,075,000.00
0.0500 Kg Paku 5 Cm dan 7 Cm 13,600.00
0.1000 oh Pekerja 55,000.00
0.2000 oh Tukang Kayu 70,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0050 oh Mandor 80,000.00
Total : 110,905.00
Overhead & Profit 5 % 5,545.25
Harga Satuan Pekerjaan 116,450.25
40 1 M' PEMASANGAN LISTPLANK KAYU KAMPER UKURAN (2 X 3 X 30) CM
0.0220 m3 Papan Kayu Kamper 8,075,000.00
0.1000 Kg Paku 5 Cm dan 7 Cm 13,600.00
0.2000 oh Pekerja 55,000.00
0.4000 oh Tukang Kayu 70,000.00
0.0400 oh Kepala Tukang 75,000.00
0.0100 oh Mandor 80,000.00
Total : 221,810.00
Overhead & Profit 5 % 11,090.50
Harga Satuan Pekerjaan 232,900.50
41 1 M2 PEMASANGAN LAPISAN ALUMINIUM
0.0167 rol Alluminium foil M2 Double 203,500.00
0.1000 ls Sekrup 10,000.00
1.0000 oh Pekerja 55,000.00
0.0100 oh Tukang Kayu 70,000.00
0.0080 oh Kepala Tukang 75,000.00
0.0020 oh Mandor 80,000.00
Total : 60,851.67
Overhead & Profit 5 % 3,042.58
Harga Satuan Pekerjaan 63,894.25
42 1 M1 PASANG PLIN KERAMIK 10 X 30 CM EX. ASIA TILE
3.3333 bh Keramik 10 x 30 cm 3,181.82
1.1400 kg Semen Portland 1,200.00
0.0030 m3 Pasir Pasang 135,000.00
0.1000 kg Semen warna/semen grouting 10,000.00
0.0900 oh Pekerja 55,000.00
0.0900 oh Tukang batu 70,000.00
0.0090 oh Kepala Tukang 75,000.00
0.0050 oh Mandor 80,000.00
Total : 25,704.06
Overhead & Profit 5 % 1,285.20
Harga Satuan Pekerjaan 26,989.26
43 1 M2 PASANGAN KACA 8 MM
1.1000 M2 Kaca bening 8mm 204,000.00
3.5000 Btl Sealant 35,000.00
0.0800 oh Pekerja 55,000.00
0.0800 oh Tukang besi 70,000.00
0.0650 oh Kepala Tukang 75,000.00
0.0800 oh Mandor 80,000.00
Total : 368,175.00
Overhead & Profit 5 % 18,408.75
Harga Satuan Pekerjaan 386,583.75
44 1 M2 PASANGAN KACA TEMPERED 12 MM
1.1000 M2 Kaca tempered 12 mm 675,000.00
3.5000 Btl Sealant 35,000.00
0.0800 oh Pekerja 55,000.00
0.0800 oh Tukang besi 70,000.00
0.0650 oh Kepala Tukang 75,000.00
0.0800 oh Mandor 80,000.00
Total : 886,275.00
Overhead & Profit 5 % 44,313.75
Harga Satuan Pekerjaan 930,588.75
45 1 UNIT ENGSEL PIVOT
1.0000 ps Engsel Pivot 500,000.00
- oh Pekerja 55,000.00
0.1250 oh Tukang besi 70,000.00
0.0130 oh Kepala Tukang 75,000.00
- oh Mandor 80,000.00
Total : 509,725.00
Overhead & Profit 5 % 25,486.25
Harga Satuan Pekerjaan 535,211.25
46 1 UNIT TRALI BESI JENDELA
14.3900 m Besi strip 35,000.00
1.0000 ls Bahan las 125,000.00
0.3000 oh Pekerja 55,000.00
0.5000 oh Tukang besi 70,000.00
0.0200 oh Kepala Tukang 75,000.00
0.0010 oh Mandor 80,000.00
Total : 681,730.00
Overhead & Profit 5 % 34,086.50
Harga Satuan Pekerjaan 715,816.50
DAFTAR HARGA SATUAN BAHAN
TAHUN 2016
A. Harga Satuan Bahan
1 2 3 4
BATU KALI ###
1 Batu Kali M3 127,000.00
2 Batu karang Bukit m3 150,000.00
3 Batu Belah 15 cm / 20 cm M3 127,000.00
4 Batu Pecah 5/7 cm m3 202,500.00
5 Batu Pecah 3/5 cm M3 127,000.00
6 Batu Pecah 2/3 cm M3 127,000.00
7 Batu Pecah 1 - 2 M3 229,500.00
8 Batu Pecah 0,5 - 1 M3 234,000.00
9 Koral Beton m3 150,000.00
10 Koral Sikat (Lokal) zak 80,750.00
11 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) m2 131,750.00
12 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) m2 170,000.00
13 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) m2 110,500.00
14 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) m2 167,875.00
15 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2 123,250.00
16 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2 161,500.00
17 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) bh 20,400.00
18 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) bh 27,200.00
19 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh 25,500.00
20 Batako Lubang bj 2,300.00
21 Batako Buntu bj 2,800.00
22 Bata Merah Klas I bj 1,800.00
23 Bata Merah Klas II bj 1,500.00
24 Bata Merah Klas III bj 1,000.00
25 Bata Merah Super (Pripian) bj 3,150.00
26 Bata Pres bj 3,150.00
27 Limestone m3 135,000.00
28 Pasir Halus m3 202,500.00
29 Pasir pasang m3 135,000.00
30 Pasir beton m3 140,000.00
31 Pasir urug m3 100,000.00
32 Sirtu m3 101,250.00
33 Split Kasar M3 216,000.00
34 Split Halus M3 225,000.00
35 Tanah urug m3 80,000.00
SEMEN
36 Semen Setara Gresik kg 1,200.00
37 Semen Setara Tiga Roda kg 1,250.00
38 Semen Setara Tonasa kg 1,250.00
39 Semen Setara Bosowa kg 1,240.00
40 Semen Setara Holcim kg 1,240.00
41 Semen warna/semen grouting kg 10,000.00
KAYU
42 Bambu besar Ukuran 4 m btg 8,500.00
43 Bambu sedang Ukuran 4 m btg 7,650.00
44 Bambu kecil Ukuran 4 m btg 6,800.00
45 Gedeg kulit kelas I m2 29,750.00
46 Gedeg kulit kelas II m2 27,625.00
47 Gedeg Biasa m2 21,250.00
48 Kayu bekesting m3 2,571,250.00
49 Kayu bingkirai Balok m3 9,180,000.00
50 Kayu bingkirai papan m3 11,050,000.00
51 Kayu jati Balok Ex Bojonegoro m3 25,500,000.00
52 Kayu jati papan Ex. Bojonegoro m3 29,750,000.00
53 Kayu kamper balok m3 7,225,000.00
54 Kayu kamper usuk/reng m3 6,375,000.00
55 Kayu kamper papan m3 8,075,000.00
56 Kayu kruing balok m3 5,100,000.00
57 Kayu kruing usuk/reng m3 5,100,000.00
58 Kayu kruing papan m3 6,375,000.00
59 Kayu meranti balok m3 5,100,000.00
60 Kayu meranti usuk/reng m3 5,100,000.00
61 Kayu meranti papan m3 5,610,000.00
62 Kayu merbau Balok m3 13,600,000.00
63 Kayu merbau papan m3 14,450,000.00
64 Kayu Profil 4/5 m1 30,600.00
65 List profil 2/4 M1 24,650.00
66 Kayu seseh balok m3 1,650,000.00
67 Kayu seseh dolken D 20 Panjang 3 m Batang 138,805.00
68 Kayu seseh dolken D 10 Panjang 4 m Batang 80,750.00
69 Kayu Usuk Albesia 5/7 Panjang 4 m Batang 42,500.00
70 Lem Aica Aibond kg 340,000.00
71 Lem Kayu ltr 15,300.00
72 Minyak bekisting ltr 31,025.00
FINISHING
118 Amplas lbr 5,000.00
119 Cat besi kg 71,995.00
120 Cat dasar Tembok Setara Emco kg 35,000.00
121 Cat Setara emco Lux Biasa kg 35,000.00
122 Cat Setara emco Lux Warna kg 49,810.00
123 Cat Setara emco Lux Warna Tua kg 56,355.00
124 Cat Galvanis kg 67,830.00
125 Cat Kayu Emco kg 35,700.00
126 Cat Baja Chromate (anti karat) Kg 85,000.00
127 Cat Marka Jalan kg 33,915.00
128 Cat menie besi kg 22,355.00
129 Cat menie Kayu kg 22,185.00
130 Cat tembok Setara Decolith kg 30,855.00
131 Cat tembok Setara Dulux Exterior kg 77,095.00
132 Cat tembok Setara Dulux Interior kg 48,280.00
133 Cat tembok Setara Vinilex kg 30,855.00
134 Dempul / Plamir ltr 25,000.00
135 Dempul / Plamir Altik ltr 35,955.00
136 Dempul Impra Kayu ltr 31,110.00
137 Kuas untuk mengecat bh 8,500.00
138 Lem Fox (Rajawali Kuning) Gln 123,250.00
139 Lem Wall Paper Kg 21,250.00
140 Mild zak 3,995.00
141 Minyak cat ltr 35,955.00
142 Melamine Lack / Imfra ltr 46,325.00
143 Okear / Veap Kg 63,750.00
144 Plamir kayu kg 25,330.00
145 Plamir tembok setara wall Putty kg 24,650.00
146 Politur ultra ltr 58,055.00
147 Politur Jadi ltr 58,650.00
148 vernis ltr 40,970.00
149 Residu / Teer Ltr 21,250.00
150 Roll Buah 25,500.00
151 Sending Seaker ltr 47,175.00
152 Soda Api Kg 18,700.00
153 Thiner A Spesial ltr 34,000.00
154 Thiner B ltr 21,250.00
155 Teack Oil ltr 51,425.00
156 Wall Paper Setara Silk House m2 510,000.00
157 Wood Filler ltr 38,250.00
158 Cat Scotlight Ltr 128,350.00
KACA
159 Bingkai Nako Silver daun 29,750.00
160 Bingkai Nako Coklat daun 25,500.00
161 Glass Block bh 31,450.00
162 Kaca 3 mm bening m2 63,750.00
163 Kaca 5 mm bening m2 110,500.00
164 Kaca 6 mm bening m2 144,500.00
165 Kaca 8 mm bening m2 204,000.00
166 Kaca 10 mm bening m2 263,500.00
167 Kaca 12 mm bening m2 382,500.00
168 Kaca Cermin 3 mm m2 127,500.00
169 Kaca Cermin 5 mm m2 238,000.00
170 Kaca Es/Kapur 3 mm m2 153,000.00
171 Kaca Es/Kapur 5 mm m2 195,500.00
172 Kaca ryben 3 mm m2 76,500.00
173 Kaca ryben 5 mm m2 119,000.00
174 Kaca 8 mm tempored m2 344,250.00
175 Kaca 10 mm tempored m2 434,775.00
176 Kaca 12 mm tempored m2 675,000.00
PIPA
177 Pipa Galvanis 1" M1 45,050.00
178 Pipa Galvanis 1,5 BSA M1 68,000.00
179 Pipa Galvanis 2" M1 95,093.75
180 Pipa Galvanis 3" M1 146,412.50
181 Pipa Setara Maspion AW 1/2 M1 6,120.00
182 Pipa Setara Maspion AW 3/4 M1 7,458.75
183 Pipa Setara Maspion AW 1 M1 9,350.00
184 Pipa Setara Maspion AW 1-1/2 M1 17,276.25
185 Pipa Setara Maspion AW 1-1/4 M1 13,281.25
186 Pipa Setara Maspion AW 2 M1 25,691.25
187 Pipa Setara Maspion AW 2-1/2 M1 32,937.50
188 Pipa Setara Maspion AW 3 M1 47,175.00
189 Pipa Setara Maspion AW 4 M1 68,531.25
190 Pipa Setara Maspion AW 5 M1 108,162.50
191 Pipa Setara Maspion AW 6 M1 142,800.00
192 Pipa Setara Maspion AW 8 M1 222,062.50
193 Pipa Setara Maspion AW 10 M1 315,562.50
194 Pipa Setara Maspion AW 12 M1 450,712.50
195 Pipa Setara Maspion AW 14 M1 634,100.00
196 Pipa Setara Maspion AW 16 M1 792,625.00
197 Pipa Setara Maspion C 3/4 M1 2,975.00
198 Pipa Setara Maspion C 5/8 M1 1,657.50
199 Pipa Setara Maspion C 1 M1 4,887.50
200 Pipa Setara Maspion C 1-1/2 M1 6,481.25
201 Pipa Setara Maspion C 1-1/4 M1 5,418.75
202 Pipa Setara Maspion C 2 M1 10,306.25
203 Pipa Setara Maspion C 2-1/2 M1 13,068.75
204 Pipa Setara Maspion C 3 M1 15,193.75
205 Pipa Setara Maspion C 4 M1 19,443.75
206 Pipa Setara Maspion D 1/2 M1 5,142.50
207 Pipa Setara Maspion D 1-1/2 M1 9,371.25
208 Pipa Setara Maspion D 1-1/4 M1 8,287.50
209 Pipa Setara Maspion D 2 M1 12,325.00
210 Pipa Setara Maspion D 2-1/2 M1 18,168.75
211 Pipa Setara Maspion D 3 M1 26,350.00
212 Pipa Setara Maspion D 4 M1 37,081.25
213 Pipa Setara Maspion D 5 M1 60,562.50
214 Pipa Setara Maspion D 6 M1 73,525.00
215 Pipa Setara Maspion D 8 M1 129,837.50
216 Pipa Setara Maspion D 10 M1 226,737.50
217 Pipa Setara Maspion D 12 M1 308,975.00
218 Pipa Setara Maspion D 14 M1 404,600.00
219 Pipa Setara Maspion D 16 M1 523,600.00
220 Pipa / selang spiral sel kran M1 28,050.00
221 Tiang Khusus 12 M Bh 2,847,075.00
222 Tiang Khusus 6 M Bh 3,927,000.00
223 Tiang Galvanis 4 M Bh 668,525.00
BAHAN LISTRIK
224 Coaxial cable 5C - 75 ohm commscof m1 14,450.00
225 Box Panel (3 mm) (400 x 600) Bh 462,400.00
226 Figting lampu Broco Bh 17,000.00
227 Inbow dos plastik clipsal E 157 P OB bj 9,222.50
228 Instalasi dalam gedung Titik 194,650.00
229 Instansi listrik halaman Titik 256,700.00
230 Kabel NYM 2 x 1.5 mm Suprime NYM m1 8,500.00
231 Kabel NYY 2 x 1.5 mm m1 12,325.00
232 Kabel NYM 2 x 2.5 mm m1 12,750.00
233 Kabel NYY 3 x 1.5 mm m1 15,300.00
234 Kabel NYM 3 x 2.5 mm m1 16,150.00
235 Kabel NYY 3 x 2.5 mm m1 20,400.00
236 Kabel NYM 4 mm m1 21,250.00
237 Kabel NYY 2 x 2,5 mm m1 12,750.00
238 Kabel Twisteed 2 x 16 mm m1 7,947.50
239 Kabel telephone m1 14,152.50
240 Klem clipsal 20 mm bj 8,925.00
241 Lampu Son 150 Watt Setara Philips Set 1,164,500.00
242 Lampu Mercury 125 Watt Setara Philips Set 1,136,450.00
243 Lampu Mercury 250 Watt Setara Philips Set 2,410,600.00
244 Lampu Mercury 400 Watt Setara Philips Set 9,000,650.00
245 Lampu pijar 10 Watt Setara Philips bh 5,525.00
246 Lampu pijar 15 Watt Setara Philips bh 5,950.00
247 Lampu pijar 25 Watt Setara Philips bh 6,205.00
248 Lampu pijar 40 Watt Setara Philips bh 7,055.00
249 Lampu TL 20 Watt Komplit (Ballast Philips) bh 93,500.00
250 Lampu TL 25 Watt Komplit (Ballast Philips) bh 102,000.00
251 Lampu LED (5 Watt) Setara Philips Bh 42,500.00
252 Lampu LED (7 Watt) Setara Philips Bh 63,750.00
253 Lampu LED (10 Setara Philips Bh 86,700.00
254 Lampu LED (13 Watt) Setara Philips Bh 114,750.00
255 Lampu Sorot LED (5 Watt) Setara Philips Bh 161,500.00
256 Lampu Sorot LED (7 Watt) Setara Philips Bh 185,300.00
257 Lampu Sorot LED (10 Watt) Setara Philips Bh 225,250.00
258 Lampu Sorot LED (13 Watt) Setara Philips Bh 280,500.00
259 Lampu Esensial (5 Watt) Setara Philips Bh 23,800.00
260 Lampu Esensial (8 Watt) Setara Philips Bh 27,200.00
261 Lampu Esensial (11 Watt) Setara Philips Bh 31,875.00
262 Lampu Esensial (14 Watt) Setara Philips Bh 32,980.00
263 Lampu Esensial (18 Watt) Setara Philips Bh 35,360.00
264 Magnet Contactor 80 A SN - 50 Bh 991,848.00
265 MCB 3 phase 40 A MG Bh 281,350.00
266 MCB 3 phase 63 A MG Bh 534,650.00
267 Panel MDP Unit 26,881,250.00
268 Panel SDP Unit 11,687,500.00
269 Pipa clipsal 20 mm bt 10,370.00
270 Pipa flexible clipsal 20 mm m1 8,500.00
271 Saklar ganda Setara Broco Bh 23,800.00
272 Saklar tunggal Setara Broco Bh 15,300.00
273 SL 18 Watt Komplit bh 63,112.50
274 Sock clipsal 20 mm bj 2,550.00
275 Steker bh 11,390.00
276 Stop Kontak bh 17,000.00
277 Stop Kontak Khusus (Kedap Air) bh 38,250.00
278 Tee dos clipsal 20 mm bh 5,780.00
279 Time Switch Bh 382,500.00
280 T Foring Bh 35,700.00
MARMER / GRANIT
281 Marmer (30 x 30) m2 238,000.00
282 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 552,500.00
283 Batu Andesit (30 x 30 x 5 cm) m2 297,500.00
284 Roster Keramik (ukuran) bh 35,700.00
GRANIT TILE
285 Setara Essenza 40 x 40 m2 243,525.00
286 Setara Essenza 60 x 60 m2 299,200.00
287 Setara Granito 40 x 40 cm m2 269,025.00
288 Setara Nero Granito 30 x 60 cm m2 236,300.00
289 Setara Nero Granito 40 x 40 cm m2 269,025.00
290 Setara Nero Granito 60 x 60 cm m2 267,325.00
291 Setara Ex Cina 60 x 60 cm m2 212,500.00
292 Setara Ex Cina 80 x 80 cm m2 238,000.00
KERAMIK
293 Keramik Setara Asia Tile 20 x 20 kelas I warna muda m2 30,000.00
294 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 30,000.00
295 Keramik Setara Asia Tile 20 x 25 kelas I m2 30,000.00
296 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 35,000.00
297 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 30,000.00
298 Keramik Setara Asia Tile 40 x 40 kelas I m2 59,500.00
299 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 127,500.00
300 Keramik Setara ARWANA ( warna putih) 40 X 40 M2 45,900.00
301 Keramik Setara ARWANA ( warna tua) M2 48,875.00
293 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm m2 47,175.00
294 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 46,155.00
295 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 53,210.00
296 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 68,425.00
297 Keramik Setara KIA 20/20 cm warna muda m2 54,400.00
298 Keramik Setara KIA 30/30 cm warna muda m2 56,100.00
299 Keramik Setara KIA 20/20 cm warna tua m2 59,925.00
300 Keramik Setara KIA 30/30 cm warna tua m2 59,925.00
301 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 39,950.00
302 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 37,825.00
303 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 36,635.00
304 Keramik Setara Mulia 30 x 30 Warna Marbel m2 42,925.00
305 Keramik Setara Mulia 30 x 30 Warna Impresso m2 44,115.00
306 Keramik Setara Mulia 40 x 40 cm kelas I m2 53,975.00
307 Keramik Setara ROMAN 20/20 cm m2 79,475.00
308 Keramik Setara ROMAN 30/30 cm m2 110,500.00
309 Tegel Bata 20 x 20 Pc m2 66,725.00
310 Tegel B/TB 20 x 20 Kuning m2 66,725.00
311 Tegel 20 x 20 TB Merah m2 66,725.00
312 Tegel 30 x 30 TB PC m2 66,725.00
313 Tegel 30 x 30 TB PC Kuning m2 66,725.00
314 Tegel 30 x 30 Warna Merah m2 66,725.00
315 Tegel PC Abu - Abu 20/20 cm m2 66,725.00
316 Tegel PC Warna 20/20 cm m2 66,725.00
317 Tegel PC Warna 30/30 cm m2 66,725.00
ATAP
318 Alang-alang panjang 2,4 meter lbr 12,750.00
319 Alluminium foil M2 Double Roll 189,550.00
320 Akustik 60 cm x 120 cm lembar 42,075.00
321 Asbes Bubungan lbr 17,000.00
322 Asbes Gelombang 1,80 m x 0,80 m lbr 29,750.00
323 Asbes Gelombang 1,80 m x 1,05 m lbr 32,300.00
324 Asbes Gelombang 2,10 m x 1,05 m lbr 34,850.00
325 Asbes Gelombang 2,4 m x 1,05 m lbr 41,650.00
326 Asbes Rata 2 m x 1 m x 4 mm lbr 46,750.00
327 Bentala tanah liat Ex Pejaten bh 72,250.00
328 Bentala Besar polos Lubang 25 cm bj 63,750.00
329 Bentala Besar Warna Lubang 25 cm bj 85,000.00
330 Bentala Besar polos Lubang 90 cm bj 110,500.00
331 Bentala Besar Warna Lubang 90 cm bj 127,500.00
332 Bubungan Besar bj 13,600.00
333 Bubungan Kecil bj 10,200.00
334 Bubungan Bambe Kecil bj 14,875.00
335 Bubungan Bulat Karang Pilang bj 14,875.00
336 Bubungan Bulat Jati Wangi bj 13,175.00
337 Bubungan Bulat Ngalayur isi 3,5/m bj 7,650.00
338 Bubungan Besar Good Year bj 13,600.00
339 Bubungan Beton Cisangkan bj 16,575.00
340 Bubungan Karang Pilang isi 3,5/m bj 9,000.00
341 Bubungan Pletong Jatiwangi bj 12,750.00
342 Bubungan SL Utama Bj 12,750.00
343 Bubungan SL Ngalayur bj 7,225.00
344 Bubungan Segi Tiga Karang Pilang bj 14,875.00
345 Bubungan Utama isi 3,5/m bj 12,750.00
346 Genteng Bambe bj 4,165.00
347 Genteng Bambe Karang Pilang bj 4,165.00
348 Genteng Bambe Kecil bj 3,995.00
349 Genteng Beton Cisangkan bj 10,625.00
350 Genteng Gemini bj 4,700.00
351 Genteng Good Year Bj 4,250.00
352 Genteng Kanmuri (glazur) isi 14/m2 bj 8,925.00
353 Genteng Kodok Lokal bj 2,890.00
354 Genteng Kodok Kamulan bj 2,975.00
355 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj 4,250.00
356 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj 3,995.00
357 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj 4,250.00
358 Genteng Kodok Soka bj 1,870.00
359 Genteng Lestari bj 2,380.00
360 Genteng Metal 80 x 77,6 (Polos) lembar 31,365.00
361 Genteng Metal 80 x 77,6 (Pasir) lembar 50,490.00
362 Genteng Morando Abadi isi 18/m2 bj 7,140.00
363 Genteng Morando Jatiwangi isi 18/m2 bj 3,825.00
364 Genteng Morando Ngalayur isi 20/m2 bj 3,145.00
365 Genteng Morando Metal bj 49,300.00
366 Genteng Pejaten Mini bj 2,380.00
367 Genteng Plentong bj 1,700.00
368 Genteng plentong dicat bj 1,870.00
369 Genteng Plentong Mantili bj 1,700.00
370 Genteng Pres Besar bj 1,530.00
371 Genteng Pres Besar Cat bj 1,615.00
372 Genteng Pres Mini bj 1,360.00
373 Genteng Pres Mini Cat bj 1,530.00
374 Genteng Besar polos Lubang 35 cm bj 1,530.00
375 Genteng Besar Warna Lubang 35 cm bj 1,615.00
376 Fiberglas (1.80 x 0.80) M2 lbr 1,360.00
377 Ijuk kg 1,530.00
378 Ikut Celedu Besar Polos bh 68,000.00
379 Ikut Celedu Besar Warna bh 76,500.00
380 Ikut Celedu Kecil Polos bh 51,000.00
381 Ikut Celedu Kecil Warna bh 68,000.00
382 Kawat las Kg 62,050.00
383 Kawat Diameter 4 mm Kg 68,000.00
384 Murda tanah liat Ex Pejaten bh 93,500.00
385 Murda Kecil Polos Lubang 25 cm bh 68,000.00
386 Murda Kecil Warna Lubang 25 cm bh 80,750.00
387 Profil Aluminium "T" m3 169,575.00
388 Seng BJLS 0,18 gelombang lbr 77,095.00
389 Seng BJLS 0,22 gelombang lbr 82,280.00
390 Seng BJLS 0,30 gelombang lbr 92,565.00
391 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr 72,250.00
392 Seng Plat Lebar 0,90 M lbr 41,140.00
393 Seng Plat 3" x 6" BJLS 28 lbr 51,425.00
394 Seng Plat Aluminium lbr 41,140.00
395 Sirap Lbr 3,825.00
396 Subeng Besar Polos lbr 7,140.00
397 Subeng Besar Warna lbr 4,165.00
398 Subeng Kecil Polos lbr 5,100.00
399 Subeng Kecil Warna bh 3,230.00
400 Tali Ijuk kg 4,165.00
401 Tali pengikat alang-alang ikat 15,300.00
SANITAIR
402 Bak mandi fibre glass 70x70x66 cm bh 236,555.00
403 Bak mandi keramik 50x50 bh 144,500.00
404 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 263,500.00
405 Floor drain plastik Setara Alianco bh 21,250.00
406 Floor drain stainless Setara Wasser bh 38,250.00
407 Kloset duduk INA Komplit bh 1,275,000.00
408 Kloset duduk Amerika Standar Winplus bh 1,105,000.00
409 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 1,402,500.00
410 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 4,403,850.00
411 Kloset duduk " TOTO Type AVANTE CW 823 J bh 6,535,650.00
412 Kloset duduk " TOTO Type CW 660J bh 570,350.00
413 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,487,500.00
414 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 2,000,900.00
415 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 626,450.00
416 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 2,618,000.00
417 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 2,907,850.00
418 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 3,020,050.00
419 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 362,525.00
420 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 190,825.00
421 Kloset porselin jongkok TOTO (standar) bh 289,000.00
422 Kloset porselin jongkok Ina (standar) bh 135,575.00
423 Kran biasa Setara Onda bh 42,500.00
424 Kran SunEi PI/3 JHR bh 207,995.00
425 Kran TOTO T 205 LCSC bh 187,425.00
426 Kran TOTO T 205 MC bh 255,000.00
427 Kran TOTO T 23 B13 bh 209,950.00
428 Kran TOTO T 23 B13V7NB bh 216,750.00
429 Kran TOTO T 26 - 13 bh 283,900.00
430 Kran TOTO TX 109 LH bh 599,250.00
431 Penyekat Urinoir " TOTO " Type A 100 " bh 1,054,000.00
432 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 355,300.00
433 Soap holder " TOTO " Type S 6 N " bh 93,500.00
434 Seal tape bh 2,337.50
435 Urinoir " TOTO U 57 M bh 2,221,560.00
436 Urinoir " TOTO U 57 M BODI bh 1,093,100.00
437 Wastagel KIA Standard bh 157,250.00
438 Wastagel KIA Warna bh 199,750.00
439 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 964,750.00
440 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 624,750.00
PAKU
463 Paku 10 cm kg 12,750.00
464 Paku Beton Kg 25,500.00
465 Paku kalsiboard kg 30,600.00
466 Paku List Kg 13,600.00
467 Paku Pancing 60 x 230 Kg 12,750.00
468 Paku reng kg 14,025.00
469 Paku seng kg 20,400.00
470 Sekrup Kalisiboard buah 170.00
`
PAVING
471 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2 60,775.00
472 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2 96,900.00
473 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2 60,775.00
474 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2 96,900.00
475 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2 70,125.00
476 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2 105,400.00
477 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2 70,125.00
478 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2 105,825.00
479 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2 70,125.00
480 Paving 10 x 20 cm tebal 8 cm K225 (Warna)) m2 105,825.00
481 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2 70,125.00
482 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2 106,080.00
483 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2 76,925.00
484 Paving 10 x 20 cm tebal 8 cm K350 (Warna)) m2 113,475.00
485 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2 77,095.00
486 Paving 20 x 20 cm tebal 8 cm K350 (Warna)) m2 113,050.00
487 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2 90,950.00
488 Paving 20 x 20 cm tebal 8 cm K400 (Warna)) m2 120,700.00
489 Paving Tiga Berlian tebal 6 cm K225 (Polos) m2 58,310.00
490 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2 94,350.00
491 Kanstein Segi Lima P40 Buah 22,525.00
492 Kanstein Segi Lima P50 Buah 27,625.00
493 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 60,605.00
PLAFOND
494 Acustik 30/30 lbr 65,450.00
495 Celling teak (0,62 x 2,40) m2 lbr 81,600.00
496 Eternit lbr 14,025.00
497 Plywood 4 mm Setara Meranti lbr 53,762.50
498 Plywood 5 mm lbr 94,350.00
499 Plywood 9 mm Setara Meranti lbr 114,750.00
500 Plywood aluminium lbr 91,800.00
501 Gypsum Board (120x240x9) lbr 61,200.00
502 Kalsiboard (4,5 x 1220 x 2420) mm lbr 87,380.00
503 Hard board MDF lbr 109,650.00
504 Multiplek 6 mm lbr 57,800.00
505 Multiplek 9 mm lbr 89,250.00
506 Rangka Aluminium m1 14,960.00
507 Rangka Metal Furing (2 x 4 cm) panjang 4 m Batang 17,000.00
508 Rangka Metal Furing (4 x 4 cm) panjang 4 m Batang 21,250.00
509 Teak wood (1,20x2,40x 0,4) lbr 65,450.00
510 Teak wood (0,90x2,00 x 0,4) lbr 56,100.00
BUIS BETON
511 Buis beton Diameter 25 x 75 bh 43,775.00
512 Buis beton Diameter 30 x 75 bh 56,100.00
513 Buis beton Diameter 50 x 75 bh 76,500.00
TALANG
514 Talang Karet L = 0.50 m' 76,500.00
515 Talang Karet L = 0.90 m' 97,750.00
516 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m' 55,250.00
517 Pipa Talang PVC Setara Maspion 6" Kotak m' 72,250.00
LAIN-LAIN
518 Air Bersih Ltr 21.25
519 Bak Cuci Aluminium Bh 174,250.00
520 Cangkul Bh 56,100.00
521 Cangkul Gigi Bh 123,250.00
522 Ember Bh 20,400.00
523 Gerinding bh 391,000.00
524 Helm Proyek Bh 62,050.00
525 Hammer 3 kg Bh 71,825.00
526 Instalasi Tata Suara Titik 308,550.00
527 Kapi Bh 6,800.00
528 Keni 2" Bh 12,325.00
529 Keranjang Sampah Bh 30,600.00
530 Linggis bh 61,200.00
531 Masker Bh 40,800.00
532 Ompreng Besar (bak Adonan) Bh 374,850.00
533 Panyong Bh 68,000.00
534 Pengelasan cm 11,220.00
535 Sabit Bh 51,000.00
536 Sapu lidi Ikat 5,100.00
537 Sepatu Karet Bh 102,850.00
538 Sikat baja Bh 25,670.00
539 Skop Bh 46,325.00
540 Water mur Bh 2,040.00
541 Pipa Tremi dan Casing pelindung Ls 93,500.00
542 Pelumas (olie) Ltr 30,600.00
543 Solar Ltr 6,375.00
HARGA
NO NAMA BARANG SATUAN
(Rp.)
1 2 3 4
Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
Lantai 1 KELAS
Lebar Tinggi Total Panjang Panjang Lebar
Kode Jumlah
Total Total Lubang Kusen Balok Kusen Total Kusen Kusen
P1 17.00 1.49 2.56 64.76 25.30 130.83 0.04
P2 6.00 0.88 2.56 13.52 5.28 41.28 0.04
P3 3.00 0.82 2.10 5.17 2.46 15.06 0.04
P4 2.00 2.35 2.20 10.34 4.70 21.52 0.04
P5 10.00 0.88 2.11 18.57 8.80 38.70 0.04
P6 1.00 0.85 1.30 1.11 0.85 4.30 0.04
Lantai 2 KELAS
Lebar Tinggi Total Panjang Panjang Lebar
Kode Jumlah
Total Total Lubang Kusen Balok Kusen Total Kusen Kusen
P1 19.00 1.49 2.56 72.38 28.27 146.22 0.04
P2 4.00 0.88 2.56 9.01 3.52 27.52 0.04
P3 3.00 0.82 2.10 5.17 2.46 15.06 0.04
P4 2.00 2.35 2.20 10.34 4.70 21.52 0.04
P5 10.00 0.88 2.11 18.57 8.80 38.70 0.04
P6 1.00 0.85 1.30 1.11 0.85 4.30 0.04
Tinggi Total Luas Luas Total Luas Luas Total Luas Engsel
Kusen Permukaan Kusen Pintu Pintu Jendela Jendela Pivot
0.10 42.70 2.90 55.06 0.34 6.46
0.10 8.04 1.65 6.60 0.20 0.82
0.10 4.40 1.50 4.50 0.00 0.00
0.10 6.28 0.00 0.00 0.00 0.00 4.00
0.10 11.30 1.65 16.50 0.00 0.00
0.10 1.26 0.44 0.44 0.00 0.00
Lantai 2 Asrama
Lebar Tinggi Total Panjang Panjang
Kode Jumlah
Total Total Lubang Kusen Balok Kusen Total Kusen
P1 12.00 0.88 2.56 27.03 10.56 82.56
P2 1.00 1.48 2.56 3.79 1.48 8.58
P3 1.00 0.82 2.10 1.72 0.82 5.02
P4 2.00 2.35 2.20 10.34 4.70 21.52
P5 8.00 0.88 2.11 14.85 7.04 30.96
P6 0.00 3.00 2.37 0.00 0.00 0.00
P7 1.00 0.85 1.30 1.11 0.85 4.30
Lebar Tinggi Total Luas Luas Total Luas Luas Total Luas
Kusen Kusen Permukaan Kusen Pintu Pintu Jendela Jendela
0.04 0.10 24.11 1.65 19.80 0.20 2.40
0.04 0.10 2.51 2.90 2.90 0.34 0.34
0.04 0.10 1.47 1.50 1.50 0.00
0.04 0.10 6.28 0.00 0.00
0.04 0.10 9.04 1.64 13.12 0.00
0.04 0.10 0.00 0.00 0.00
0.04 0.10 1.26 0.88 0.88 0.00
0.00
0.00
0.00
8.40
0.00
6.32
0.00
0.00
0.00
14.72
Total
0.00
0.00
0.00
3.51
0.00
0.00
0.00
0.00
0.00
3.51
Bangunan Ruang Makan
Lebar Tinggi Total Panjang Panjang
Kode Jumlah
Total Total Lubang Kusen Balok Kusen Total Kusen
P1 2.00 1.49 2.56 7.62 2.98 17.17
BV1 38.00 0.76 0.55 15.88 28.88 99.56
23.50 31.86 116.73
Lebar Tinggi Total Luas Luas Total Luas Luas Total Luas
Kusen Kusen Permukaan Kusen Pintu Pintu Jendela Jendela
0.04 0.10 5.01 2.90 5.80 0.35 0.71
0.04 0.10 29.07 0.00 0.00 0.17 6.41
34.09 5.80 7.12
Engsel Total Engsel Total Engsel Total Kait
Pivot Engsel Pivot Pintu Engsel Pintu Jendela Engsel Jendela Angin
0.00 2.00 4.00 2.00 4.00 4.00
0.00 0.00 1.00 38.00 2.00
0 4 42
Total Total Door Total Door Total
Grendel
Kait angin Grendel Stoper Door Stoper Clooser Door Clooser
8.00 2.00 4.00 2.00 4.00 2.00 4.00
76.00 1.00 38.00 0.00 0.00
84 42 4 4
Kunci Total Kunci Total Kunci Total Kunci
P. Biasa Kunci P. Biasa P. Kaca Kunci P. Kaca P. Dorong Kunci P. Dorong Slot Tanam
1.00 2.00 0.00 0.00 2.00
0.00 0.00 0.00
2 0.00 0.00
Total Handel Total Handel Total Handel Total
Kunci Biasa Handel Biasa P. Kaca Handel P. Kaca P. Dorong Handel P. Dorong
4.00 2.00 4.00 0.00 0.00
0.00 0.00 0.00 0.00
4.00 4.00 0.00 0.00
Rel Total Rel Total Kaca Total Kaca Total Kaca
Atas Rel Atas Bawah Rel Bawah 5mm 8mm 12mm
0.00 0.00 0.21 0.42 0.00
0.00 0.00 0.15 5.70 0.00
0.00 0.00 6.12 0.00
Total
0.00
0.00
0.00
Lebar Tinggi Luas Total Panjang
Kode Jumlah
Total Total 1 Unit Lubang Kusen Balok Kusen
P1 5.00 1.488 2.56 3.81 19.05 7.44
P2 5.00 0.888 2.11 1.87 9.37 4.44
P3 1.00 0.820 2.10 1.72 1.72 0.82
J1 4.00 1.480 1.65 2.44 9.76 5.92
J2 1.00 2.200 1.65 3.63 3.63 2.20
BV1 4.00 0.760 0.55 0.42 1.67 3.04
45.19 23.86
Panjang Luas Total Luas Luas Total Luas Engsel
Total Kusen Daun Pintu Pintu Daun Jendela Jendela Pintu
40.48 2.89 14.43 0.3540 1.77 2.00
29.98 1.66 8.28 1.00
5.84 1.51 1.51 1.00
25.02 0.8218 3.29
7.70 0.9660 0.97
10.48 0.1688 0.68
119.50 24.21 6.70
Total Engsel Total Kait Total Total
Grendel
Engsel Pintu Jendela Engsel Jendela Angin Kait angin Grendel
10.00 2.00 10.00 4.00 20.00 2.00 10.00
5.00
1.00
4.00 16.00 8.00 32.00 4.00 16.00
5.00 5.00 10.00 10.00 5.00 5.00
1.00 4.00 2.00 8.00 1.00 4.00
16 35 70 35
Door Total Door Total Kunci Total Kunci
Stoper Door Stoper Clooser Door Clooser P. Biasa Kunci P. Biasa P. Dorong
2.00 10.00 2.00 10.00 1.00 5.00
1.00 5.00 1.00 5.00 1.00 5.00
1.00
15 15 10
Total Kunci Total Handel Total Handel
Kunci P. Dorong Slot Tanam Kunci Biasa Handel Biasa P. Dorong
1.00 5.00 2.00 10.00
1.00 5.00
1.00 1.00 1.00 1.00