May 2011
Contents
Page
Investment Highlights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Recommendation Changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Summary of Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Global Economic Outlook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Commodity Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Stock Valuation and Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Company Reviews:
Adamus Resources Limited ..................................................... 12 MacArthur Coal Limited .........................................................56
African Iron Limited ................................................................ 14 Mantra Resources Limited ......................................................58
Alacer Gold Corporation ......................................................... 16 Meridian Minerals Limited .....................................................60
Ampella Mining Limited ......................................................... 18 Minara Resources Limited...................................................... 62
Aquila Resources Limited .......................................................20 Mincor Resources NL ............................................................. 64
Atlas Iron Limited ................................................................... 22 Mirabela Nickel Limited ......................................................... 66
Bandanna Energy Limited ...................................................... 24 Mount Gibson Iron Limited ................................................... 68
Brockman Resources Limited ................................................ 26 New Hope Corporation Limited ........................................... 70
Cape Lambert Resources Limited ......................................... 28 Noble Mineral Resources Limited ......................................... 72
Cerro Resources NL ............................................................... 30 Northern Star Resources Limited ...........................................74
Chalice Gold Mines Limited....................................................32 Olympus Pacific Minerals Inc ..................................................76
Coalspur Mines Limited ......................................................... 34 Orocobre Limited ....................................................................78
Cockatoo Coal Limited .......................................................... 36 OZ Minerals Limited .............................................................. 80
Dragon Mining Limited ...........................................................38 Paladin Energy Limited........................................................... 82
Equinox Minerals Limited ......................................................40 Panoramic Resources Limited ................................................ 84
Extract Resources Limited ..................................................... 42 Regis Resources Limited ........................................................ 86
Fortescue Metals Group Limited ...........................................44 South American Ferro Metals Limited ...................................88
Gindalbie Metals Limited ....................................................... 46 St Barbara Limited ..................................................................90
Gloucester Coal Limited ........................................................ 48 Tanami Gold NL ..................................................................... 92
Grange Resources Limited ..................................................... 50 Troy Resources NL.................................................................. 94
Independence Group NL ........................................................52 Western Areas NL .................................................................. 96
Lynas Corporation Limited .................................................... 54
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 1
Investment Highlights
Since our last resources book in December 2010 there have been GOLD
a number of global events (weather, natural disasters and political)
that have helped shape the resources landscape. The gold price continues to benefit from global sovereign debt
pressures and inflation concerns. We remain positive on the future
prospects for the gold price. Issues in Europe and Japan are also
Weather and Natural Disasters
likely to place pressures on the Euro and Yen. We continue to have
In Australia, there have been severe weather conditions (QLD Floods, a preference for offshore operations given the continued strength
Cyclone Yasi, Floods in Pilbara and Kimberley) that have negatively of the AUD leading to deteriorating margins. Buy TRY, TAM and
affected production for a range of commodities (coal, uranium, iron ADU.
ore, gold and nickel). In Japan, we saw the third largest earthquake
on record and subsequent tsunami which triggered the Fukushima
nuclear disaster. Japan is Australia’s second largest trading partner
IRON ORE
and is a large consumer of Australia’s commodities. We believe iron ore stocks have run hard with valuations looking
stretched unless we factor in higher prices beyond 2015/16 when
Geopolitical Tensions expanded production comes online. This said FMG has unparalleled
growth available to it and we continue to see upside in this stock.
Northern African and the Middle East geopolitical tensions have Buy FMG, AGO.
increased significantly with events in Egypt, Sudan, Syria, Libya,
Ivory Coast and Burkina Faso. Namibia is looking to introduce
legislation to nationalise new mining and exploration permits by BASE METALS
the end of 2011 (uranium, copper, gold, zinc and coal). Over the
The outlook for base metals is mixed. We prefer copper in this
past 6 months the market has applied a large discount to resource
space given that the Chinese do not control the supply side.
companies operating in these areas/regions, whereas previously
However, there are only a limited number of domestic investment
the market applied premiums.
opportunities in copper. Based on our analysis we believe the
following stocks represent value in the copper space: AOH and
Appreciation of the AUD YTC.
Domestically, the most significant event for resources companies We are neutral on nickel despite it being a good performer over
has been the continued appreciation of the AUD/USD. Since the last 6 months. Our preference here is MBN given its offshore
December the currency has appreciated by ~12%; this compares project, large growth profile and long mine life. MRE continues to
to 16% in the preceding six months. This has resulted in eroding have some attraction but prefer investors switch into MBN with the
margins and commodity prices mixed. This has also been coupled high AUD impacting. PAN remains a HOLD and MCR a SELL.
with domestic inflationary pressures from wage increases and
labour supply constraints. This has had a negative impact on the
value of Australian producers. URANIUM
STOCK PICKING - look for companies with production growth The events of 11 March in Japan have significantly affected the
and management to deliver. outlook for uranium. On average, equities have decreased by
25-30% since the events of Fukushima. We believe Fukushima
The net effect of the above events has been a contraction in NAV, concerns will continue to linger over the uranium market. Therefore
additionally there has been an evaporation of market premiums we have a HOLD on PDN and a SELL on BMN. We have upgraded
attributed to some resources stocks. Therefore we believe the EXT to a BUY as we believe they own a tier 1 asset and a recent
market is ripe for “stockpickers”. In our view investors should decline in price means the stock is more attractive. We have a
accumulate selected resource companies with the following SPEC BUY on SHE based on potential to develop its project in South
attributes: Korea. Our Top pick from our last book MRU is under takeover from
1. offshore projects with limited exposure to currency ARMZ with the deal expected to close in June.
2. significant organic growth profiles
3. significant long life projects COAL
4. significant margins
Coking coal is set to remain in tight supply particularly as a result
Our preferred picks for our resources book are listed in the table of the floods in QLD. China is turning from being self sufficient
below: AQA, COK, FMG, MBN, ORE, TAM. to being an importer. Main beneficiaries include MCC, AQA, and
COK.
Aquila Resources Ltd AQA $10.79 Mirabela Nickel Ltd MBN $3.38
Fortescue Metals Group Ltd FMG $7.59 Tanami Gold NL TAM $1.81
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
2 Patersons Resources Review - May 2011
Recommendation Changes
CHANGES TO RECOMMENDATIONS SINCE DECEMBER 2010 RESOURCES REVIEW
Stock Change New Old Reason
AGO ▲ BUY New Coverage Emerging Iron Ore producer. Producing at the rate of 6Mtpa aiming to double production by 2012.
AKI ▲ BUY New Coverage Targeting 5Mtpa of DSO Iron from mid-2013 from its Mayoko Iron Ore project, Republic of Congo.
AQA ▲ BUY HOLD Purest valuation leverage plays to coking coal and iron ore with a stable of potentially long life assets.
AQG ▲ BUY New Coverage Merger of AVO and Anatolia. Trading in line with price target.
BRM ▲ BUY New Coverage Targeting first production from its Marillana project from 2014 at the rate of 17Mtpa of fines production.
CFE ▲ BUY New Coverage Asset incubation in Africa. Strategy is to aqcuire and invest in undervalued and distressed assets and add value.
CHN ▼ SPEC BUY BUY Negative investor sentiment towards risk in North Africa. Agreement with ENAMCO yet to be finalised.
CJO ▲ BUY New Coverage Silver leverage moving to production in end 2012.
EXT - BUY BUY We placed EXT as HOLD following Site Visit in Feb. Returns to BUY Tier 1 Asset 5th largest uranium resource in world.
MCR ▼ SELL HOLD Production, cost and staffing issues. Higher grade material towards end of year but question mark on production.
MGX ▲ BUY SELL Board issues resolved. Moving to bring on its third production centre at Extension Hill. Strong cash generation.
MII ▲ SPEC BUY New Coverage HOA to sell Lennard Shelf and buy Russian gold project.
MRU ▼ SELL BUY Top pick in Dec 2010 book. Under ARMZ Takeover expected to be completed in June.
NST ▲ BUY New Coverage Targeting production of 70kozpa from their recently acquired Paulson’s Gold Mine.
Two operating gold mines in Vietnam, a development asset in Malaysia and a significant exploration project in the
OYM ▲ BUY New Coverage
Philippines.
RRL ▲ BUY HOLD New team. Low cost producer at Moolart Well (100kozpa) and new Garden Well project (1.2Moz resource) in Laverton.
SBM ▲ BUY HOLD Moving into a high grade (8g/t) part of Marvel Loch postive for production and costs.
SFZ ▲ BUY New Coverage Junior iron ore producer, ramping up production at Ponte Verde itabirite project in southern Brazil. 6Mtpa from 2013.
TAM ▲ BUY New Coverage Growth Story: Targeting >150,000ozpa from its Central Tanami Project in NT starting in mid-2012.
TRY ▲ BUY New Coverage Argentinean silver and gold producer. Performance to turnaround in the coming year.
AOH ▲ SPEC BUY New Coverage Production of 8ktpa Cu from Outokumpu, Finland is expected to begin in early 2012. Roseby production from 2014.
AUC ▲ SPEC BUY New Coverage Potential to have the largest new Australian discovery since Tropicana at its Katanning Project 320km from Perth.
Guyana: 11,000km2 prospective for gold and uranium. West Omai most advanced project we expect 600koz resource by
AZH ▲ SPEC BUY New Coverage
August.
BRW ▲ NR New Coverage Focused on Two Projects 1) The Leinster Nickel Project; Drilling Continuing 2) Cloncurry Copper Project (2H/CY11 Drilling).
BSR ▲ NR New Coverage Multi-Million Ounce Gold Potential in Senegal, West Africa. 240koz Au (2.3g/t) at its 70%-owned Makabingui project.
CKA ▲ NR New Coverage Actively defining metallurical coal resouce in Kalimantan, Indonesia with an aim to bring into production by 2013.
DTM ▲ NR New Coverage Victorian focussed precious and base metals explorer; Focused on the Unicorn Mo-Cu-Ag Discovery. Drilling in May.
GUF ▲ NR New Coverage Production of +2Mtpa ROM from Mongolian mine and definition of Queensland coking and thermal coal resources this year.
MTE ▲ SPEC BUY New Coverage Growing thermal coal resource in the Surat Basin.
NCR ▲ NR New Coverage Building asset base in the established Hunter Coalfield region with the recent acquisition.
NYO ▲ SPEC BUY New Coverage Gold developer focused in Ethiopia. Developing the 1.2Moz Tulu Kapi project. Excellent exploration upside.
SHD ▲ NR New Coverage Roper River region in the Northern Territory; Resource of 106.6Mt at 47% Fe expected to expand.
SHE ▲ SPEC BUY New Coverage Own the 60mlb Daejon project in South Korea. Vanadium credit key to bring costs down to below $25/lb.
Progressing from an exploration company to a producer of Australian coking and thermal coal in the Bowen and Surat
SMR ▲ NR New Coverage
basins.
UNX ▲ NR New Coverage Focused on the Mkuju Uranium Project in Tanzania. Next to MRU. Drilling underway.
WDR ▲ SPEC BUY New Coverage Own the Rope Bar project in NT with DSO production in mid-2013; Resoruce 312Mt at 40%.
Focussed on two gold and base metals projects near the town of Cobar in NSW: 1) Hera (500koz Au) and 2) Nymagee
YTC ▲ SPEC BUY New Coverage
Copper JV.
ZYL ▲ SPEC BUY New Coverage Developing Anthracite in South Africa, open cut, close to rail and port.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 3
Summary of Recommendations
Top Picks Code Share Price Analysts View
Long life coking coal development assets are under valued by the
Aquila Resources Ltd AQA $8.15
market, with asset sales pending to close the gap.
* Disclosure: Patersons Securities Limited may have received fees for corporate transactions undertaken with these companies. Please refer to
individual research notes for full disclosures.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
4 Patersons Resources Review - May 2011
220%
200%
180%
160%
140%
120%
100%
80%
05/09
06/09
07/09
08/09
09/09
10/09
11/09
12/09
01/10
02/10
03/10
04/10
05/10
06/10
07/10
08/10
09/10
10/10
11/10
12/10
01/11
02/11
03/11
04/11
05/11
All Ordinaries ASX300 Resources LME Index Spot Gold (US$/oz) AUDUSD
NAV VS TP
Our top picks are those companies that are trading at a discount to our price target, have near term catalysts and are weighted against
risk for reward. The ‘cheapest’ companies under coverage for instance are not necessarily our top picks.
40%
20%
0%
Discount / Premium
-20%
-40%
-60%
-80%
-100%
AKI
OYM
TAM
SFZ
CHN
SRQ
DRA
CJO
NST
MBN
ORE
COK
CFE
BRM
ADU
SBM
AMX
LYC
MGX
AQA
TRY
BND
MII
PDN
RRL
AGO
MCC
FMG
AQG
WSA
CPL
EXT
MRE
GBG
OZL
RIV
NHC
EQN
GCL
MRU
NMG
PAN
GRR
IGO
MCR
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 5
2. MRU is under takeover by ARMZ and has increased by 3%. However, ARMZ lowered its initial bid by 12.5% due Fukushima so investors
had the opportunity to sell at higher prices.
3. COK was down by 3.9% due to significant flooding in QLD. This is a temporary setback with COK remaining one of our top picks.
The average price movement of our BUY rated stocks was 8.3% outperforming the ASX300 Resources Index, LME Index and ASX S&P 300.
Our HOLD rated stocks decreased on average by 7.5%, with our SELL rated stocks down 15%.
SRQ/SRL – BUY
NMG – BUY
BND – BUY
LYC – BUY
EQN – BUY
MBN – BUY
AVO/AQG – BUY
RRL – HOLD
RIV – BUY
WSA – HOLD
MGX – SELL
MRE – BUY
MRU – BUY
S&P300 (2.5%)
FMG – HOLD
NHC – HOLD
CPL – BUY
MCC – BUY
COK – BUY
PAN – HOLD
GCL – HOLD
OZL – HOLD
NEC – BUY
AVG. MOVEMENT
IGO – BUY
BUY 8.3%
GRR – BUY HOLD -7.5%
AQA – HOLD SELL -15.0%
ADU – BUY
ORE – HOLD
EXT – BUY
GBG – HOLD
SBM – HOLD
DRA – BUY
PDN – HOLD
AMX – BUY
MCR – HOLD
BMN – SELL
CHN – BUY
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
6 Patersons Resources Review - May 2011
2
the industrial metals market. Copper prices had moved higher
0
on supply disruptions, but concerns over global growth, greater
-2
use of scrap copper, and rising stock levels have taken the upside
-4 pressure off prices. Chinese imports of refined copper concentrates
-6 fell 31% year-on-year in the first quarter of 2011, while scrap
2000Q1
2000Q3
2001Q1
2001Q3
2002Q1
2002Q3
2003Q1
2003Q3
2004Q1
2004Q3
2005Q1
2005Q3
2006Q1
2006Q3
2007Q1
2007Q3
2008Q1
2008Q3
2009Q1
2009Q3
2010Q1
2010Q3
2011Q1
2011Q3
2012Q1
2012Q3
imports lifted.
World Advanced economies Emerging economies US housing construction numbers remain very weak at
Source: IMF approximately 500 000 units per year, construction failing to
bounce in a “V” profile, unlike every other downturn since the
The post-GFC commodity boom continues to be driven by high 1950s. The US S&P/Case-Shiller Index of property values in 20
emerging country demand, particularly related to China, production cities fell 3.3% from February 2010, the biggest year-over-year
and supply delays, investment demand focused on instruments decline since November 2009. Meaning the sector is close to a
such as commodity Exchange Traded Funds (ETF), and investment double dip in prices, this not supporting a rapid recovery in housing
hedging activity on currency, debt and inflation risks. construction numbers.
Fines
Iron Ore
Tin
Aluminium
Gold
A$/US$
Nickel
Copper
Lead
Zinc
the market sending the dollar lower, other countries have similar
debt concerns. Given the current FOMC view on interest rates the
outlook for the US dollar is likely to be reasonably weak, although
Source: Patersons
a patchy performance in some parts of the Australian economy
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 7
and the close linkage to commodity prices may see the local The balance between supply/demand in the metals complex
currency decline from current levels. The strong performance of remains slightly in favour of the demand side, assisted by a slow
the Australian dollar has taken some of the edge off commodity supply recovery, buoyant growth in the emerging markets and
returns for Australian producers. the flow on effects from government stimulatory expenditure.
However, in the short term we see continued weakness on EU
Deficit pressures in the US, EU and Japan are expected to overhang
debt concerns, reduction in stimulatory expenditure effects, and
the metals market for many years. With countries running high
Japanese demand declines. This is expected to see stocks build
deficits, fiscal expenditure is likely to decline taking some support
before the market becomes better supported later in 2011 as
out of the metals market. At the same time there is a general
Japanese demand returns. This assumes macro influences do not
trend for central banks to lift interest rates to tackle rising inflation
overrun the market.
pressures. The effect on prices of interest rate increases by central
banks will be highly dependent on how aggressive central banks We continue to believe the US dollar will not permanently weaken,
are in terms of monetary policy. On balance however, give high given considerable challenges remain for the Japanese, EU and
developed country debt levels, there could be a tendency for UK economies. We do continue to see a positive outlook for the
central banks to run monetary policy a little behind inflationary defensive metals such as gold, give the structural imbalances
forces, holding inflation slightly high. This would be commodity remaining in the global economy and the risks associated with
price supportive. managing these challenges, including ongoing inflation pressures.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
8 Patersons Resources Review - May 2011
Commodity Overview
GOLD Australian gold producers - mine life vs production rate
We have also examined Australian gold producers and compared
Relative performance of equities and spot prices Enterprise Value to current production rate and implied mine
Since our last resources review in December 2010, we have life. The strong correlation of 0.77 between EV and production
upgraded our long term gold price from US$800/oz to US$1,000/ rate indicates the market assigns higher value to gold producers
oz in line with our positive outlook for defensive metals. The gold with higher production rates. We highlight SBM, TAM and TRY.
price has performed strongly up 25% from 12 months ago, while Figure 6: Implied mine life vs production rate for Australian small
our Gold Producers Index is up 6% (Figure 3). More recently small gold producers
gold producers have significantly underperformed the gold price.
35
Figure 3: Patersons small gold producers index and spot gold price RRL
30 ALD
150%
r = 0.68
25
15
SBM
120% AQG
TRY SLR
10 SAR RSG
110% NGF
DRA
NGX
5 NST
100% UML
OYM FML
80%
Bubble size indicates EV ($m). Source: Bloomberg, Company Reports
05/10
06/10
07/10
08/10
09/10
10/10
11/10
12/10
01/11
02/11
03/11
04/11
05/11
Source: Bloomberg
COPPER
Gold resource size and enterprise value Relative performance of equities and spot prices
EV is strongly positively related to the total Au resource size for gold
Since our last resources review we have upgraded our long term
producers (Figure 4), but this relationship is weaker for the gold
copper price from US$2/lb to US$2.50/lb in line with consensus.
explorers (Figure 5). The average EV/oz Au resource is A$178/oz.
The copper price has performed strongly and is up 25% from 12
Although not shown here, the average EV/oz Au reserve is A$375/
months ago, while our Copper Developers Index is up 17% over
oz.
the same period. Copper prices have mostly outperformed our
Figure 4: Average Au resource grade vs resource size for Australian Developers Index over the period.
small gold producers
Figure 7: Patersons copper developers index and copper price
6
NST NGX 150%
DRA SBM
r = 0.93
5 140%
SLR
130%
4
120%
Au Grade g/t
TAM
3 AQG
110%
TRY
RSG
FML 100%
2 SAR NGF
RRL ALD 90%
KCN
OYM
1 80% Patersons Copper Developers Index
Copper Price (spot)
70%
0
0.0 2.0 4.0 6.0 8.0 10.0
60%
05/10
06/10
07/10
08/10
09/10
10/10
11/10
12/10
01/11
02/11
03/11
04/11
05/11
5
total Cu resource size as well as average grade. The average
EV/t Cu Resource is A$525/t for producers and $152/t for non-
4
producers.
Au Grade g/t
NYO
3 LGM
IGR
GRY CQT
AZM RMS SBL CRE
2
AUC PXG ADU
NAV NMG
ATV AMX
1
ALK
CJO
ABU
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Resource size (Au Moz)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 9
AOH
towards 2015 will force industry consolidation among the smaller
1
PNX
HGO HAV
RXM
PNA producers and efforts to differentiate ore to meet steel makers
0
- 1 2 3 4 5 6 7
specific requirements, given smelters will be adjusting production
Cu Eq. Resource (mt) technologies to account for anticipated generally declining ore
Bubble size indicates EV. Source: Bloomberg, Company Reports
quality. The spot market is expected to grow in dominance as a
pricing mechanism with financial institutions offering more products
as the market moves towards greater pricing volatility.
NICKEL Figure 11: Expanding iron ore projects: CAPEX v OPEX and relative
size of the project
Relative performance of equities and spot prices
100
Since our last resources review, we have upgraded our long 90
term average nickel price from US$7/lb to US$8/lb in line with CXM
80
consensus. The nickel price is up 10% from 12 months ago, while WPG
price from June 2010 to February 2011, but have more recently 60 RIO
OPEX A$/t
30
145%
20
r = 0.81 AQA JV
Patersons Nickel Index LML
135% 10
Nickel Price (spot)
0
125% 0 50 100 150 200 250
CAPEX A$/t production
115%
Source: Bloomberg, Company Reports
105%
95% COAL
85% In Figure 12 the performance of the Patersons All Coal index is
compared to spot thermal coal prices as reported by McCloskey.
75%
As expected, the correlation is quite strong at 0.86 but the
05/10
06/10
07/10
08/10
09/10
10/10
11/10
12/10
01/11
02/11
03/11
04/11
05/11
4 MCR
110%
Grade (% Ni)
100%
3
WSA
PAN 90%
2
06/10
07/10
08/10
09/10
10/10
11/10
12/10
01/11
02/11
03/11
04/11
05/11
MBN
GME
1 IGO
FXR
SEG MLM
Source: Bloomberg
0
- 0.5 1.0 1.5 2.0 2.5 3.0
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
10 Patersons Resources Review - May 2011
In the chart below (Figure 13), we compare the market values Figure 14: Patersons uranium index vs spot uranium price
for different coal companies with their resource base. Generally, 180
producers and those with metallurgical coals are to the right and 170
PSL Uranium Index r = 0.86
the scale. The market has raised considerably the value it is 160
willing to attribute to in-situ coal resource over the past 2 years 150
110
8.00
3.4%
7.00 100
07/10
08/10
08/10
08/10
09/10
09/10
10/10
10/10
11/10
11/10
12/10
12/10
01/11
01/11
02/11
02/11
03/11
03/11
03/11
04/11
04/11
05/11
6.00
4.00
We have upgraded our long term uranium price to $70/lb consistent
3.00 with our long term adjustment to the exchange rate. Our current
2.00
spot price deck is: 2011 US$50/lb; 2012 US$60/lb and 2013 and
LT US$70/lb.
1.00
CWK
MTE
CCC
RES
SRK
REY
GLL
NEC
KRL
CPL
COK
BND
AAL
RIV
CEY
CCD
ZYL
HUN
EOC
CNA
NHC
GNM
CZA
FLX
MCC
AZT
AQA
PRC
WHC
GCL
AJM
BTU
EER
SMR
NCR
URANIUM 1000
EME
Uranium equities dropped 29% following the events at Fukushima 800
BLR
reactors the majority of which are ageing and generate about 14%
MTN
EXT
600
Grade (ppm)
of the world’s electricity. We believe the disaster will impact on the TOE EMA
BKY
MRU
nations (China, Russia, India, South Korea) are unlikely to change CUY
PNN
EVE
DYL
BMN
ACB
with 61 reactors currently under construction. Therefore longer
200 MHC FSY.TSX
MEY AEE
UNX
term the outlook for uranium is positive. We expect spot prices will
trade in the US$50-60/lb range in the short to medium term. 0
0 50 100 150 200 250 300 350 400 450
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 11
Recommendation
Stock is undervalued on all investment criteria, and likely to appreciate by more than 10% in the
BUY
next twelve months.
HOLD Sound investment fundamentals but needs a catalyst in the next twelve months.
SELL Stock is overvalued and likely to underperform by at least 10% in the next twelve months.
Stock may not be of investment grade due to low market capitalisation, high levels of debt or
SPECULATIVE BUY
significant risks in the business model, but appears attractively priced.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
12 Patersons Resources Review - May 2011
OUR VIEW
ADU is successfully making the transition from gold explorer to gold producer following the completion of the Nzema plant
commissioning and recording its maiden gold pour. We anticipate ADU’s share of gold production of circa 30koz for H2
FY2011 increasing to 96koz for FY2012. We see ADU’s continued growth coming from the ongoing near mine and regional
exploration which continues to yield positive results. Ongoing drilling along the Salman trend is proving up further resources,
as are the nearby prospects at Akropon, Avribo and Aliva. Additionally, the scoping study for the Sulphide project has
commenced to evaluate the possible scenarios to mine and process the deeper refractory ore of the Salman trend. Further
growth opportunities lay in Liberia where ADU was recently granted mineral reconnaissance licences covering 3,107km2.
With ~A$20m in the bank and near term positive cashflow from production ADU is well situated to fund ongoing exploration
to increase its 2.1Moz resource. A resource update for the Nzema gold project is due in mid CY2011. We retain our BUY
rating with a price target $1.01/sh.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 13
Cost Summary
Exploration Cash Costs (US$/oz) na 767 676 593
33% Total Costs (US$/oz) na 1019 930 839
Salman Price Received (US$/oz) na 1,276 1,271 1,293
61%
Profit & Loss (A$m) 2010A 2011F 2012F 2013F
Disclosure: Patersons acted as joint lead manager to a placement of 29m ADU shares at $0.55/sh which raised $15.95m in September
2010. The transaction was completed in conjunction with a 1:15 rights issue at the same price to raise a total of $31.3m. Patersons
received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
14 Patersons Resources Review - May 2011
OUR VIEW
AKI’s principal asset is the 80% owned (remainder owned by government) Mayoko Iron Ore Project located in the Republic
of Congo, West Africa. The Mayoko Project is located 2kms from an underutilised heavy haulage railway terminating at
the deep water port of Pointe-Noire. Proximity to infrastructure offers the opportunity for near term project development.
Preliminary studies on the rail network indicate haulage capacity of 10Mtpa can be achieved without any significant capex
requirements. AKI is aiming to develop a 5Mtpa direct shipping iron ore operation by mid-2013 leveraging off the projects
proximity to existing rail and port infrastructure. The March Q marked the beginning of a 30,000m resource drilling program
designed to increase the oxidised DSO hematite resource and delineate a maiden resource estimate for the underlying
enriched BIF. The 2010 drilling program confirmed two of the mineralised horizons within the Mayoko Project require
beneficiation and AKI is undertaking extensive metallurgical testing to determine the most effective means of upgrading
the resource to a saleable product. With near term production prospects and low capex requirements we rate the stock
as a BUY - price target $0.99.
has lower capital intensity than peer iron ore developers. Our 0.20
estimates suggest AKI can bring the project into production 9000
for ~US$250m. With AKI targeting 5Mtpa (US$50/t of annual
capacity) in the near term, excess rail capacity may spread 0.10
capital intensity through developmental synergies with other 4500
iron players looking to utilise spare rail capacity.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 15
80
(kt)
Name Position
Ian Burston Non-Executive Chairman Balance Sheet (A$m) 2011F 2012F 2013F 2014F
Joe Ariti Non-Executive Director
Anthony Sage Non-Executive Director Cash/Bullion 42.1 146.9 79.0 118.3
Total Assets 197.3 439.1 446.1 446.1
Substantial Shareholders Shares (m) (%) Total Debt 0.0 120.0 120.0 40.0
Cape Lambert 120.0 25.0 Total Liabilities 92.5 212.5 212.5 212.5
JP Morgan 45.0 9.4 Shareholders Funds 104.8 226.7 233.6 233.6
Deutsche Bank AG 26.2 5.5
Ratios
Net Debt/Equity (%) na (11.9) 17.5 (33.5)
Interest Cover (x) na (1.5) 4.8 48.9
Return on Equity (%) na na 3.0 46.4
Disclosure: Patersons acted as joint lead manager for the re-listing of AKI a spin-out from CFE. In addition, Patersons acted as joint
lead manager to AKI’s recent $96m equity raising at $0.30/sh. It received fees for these services.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
16 Patersons Resources Review - May 2011
Aiming to double gold sales by 2015 Analyst: Alex Passmore, Gary Watson
OUR VIEW
The much anticipated merger between Avoca Resources (AVO) and TSX listed Anatolia Minerals (ANO) to create Alacer
Gold (AQG) was completed on 18 February 2011 with overwhelming shareholder support. AQG has emerged as a leading
intermediate gold producer with a diversified asset portfolio in Australia and Turkey. Large, long mine life operations with
strong inherent value enhance the company’s growth prospects, with AQG forecasting production ramp up to 600koz Au
by CY2013 then 800koz Au by CY2015. With the company looking to increase its inventory base in line with production
depletion, the March Q saw drilling deliver an overall reserve increase from 3.5Moz to 5.7Moz Au and a resource position
of 13Moz Au. April 1 2011 marked the beginning of commercial production from the Çöpler operation in Turkey with AQG
targeting 135koz Au in 2011 at cash operating costs of US$460/oz. Long term viability of the Çöpler operation is underpinned
by the development of its sulphide project which is currently in the detailed feasibility phase. Overall we see AQG trading
at fair value and view it a robust mid-tier gold producer. BUY, Price target $10.57.
test work, with ongoing drilling likely to give rise to further 8.00 1.2
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 17
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
18 Patersons Resources Review - May 2011
Burkino Faso unrest impacts market sentiment Analyst: Alex Passmore, Byron Benvie
OUR VIEW
AMX’s share price has retraced by 35% since mid-April as news of political unrest in Burkina Faso has severely dented
investor sentiment. While developments in the political situation should be closely monitored, AMX’s flagship Batie West
project is 455km away from the Ouagadougou and remains largely unaffected and accordingly the company has continued
to progress project development. AMX recently announced a 2.2Moz (1.6g/t Au) resource at for Konkera and is now working
towards a PFS by Q3 2011. Current estimates have gold production commencing late in 2013. Exploration momentum also
continues with an aggressive drilling programme likely to extend the Konkera mineralisation down to 400m depth during
2011 additionally the programme could add circa 300koz by July 2011. The market has had overly high expectations of the
resource announcements from AMX and this has seen some recent selling in the stock, but we see them delivering on the
expected ounces over time. We continue to rate AMX a BUY with a price target of $3.17/sh (1.25x NAV) and see project
growth as driving the fortunes of the company in 2011. Operating in West Africa undoubtedly presents a risk although
projects the size of Batie West are hard to find in stable jurisdictions.
4,000
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 19
Hedging koz 1-Year3-years % Reserve Production Summary 2010A 2011F 2012F 2013F
Cost Summary
Cash Costs (A$/oz) na na na 554
Batie West
Total Costs (A$/oz) na na na 647
Expl (BW regional,
75% Mabera, Doubema)
20% Profit & Loss (A$m) 2010A 2011F 2012F 2013F
Disclosure: Patersons acted as lead manager to the Australian component of the placement of 21.5m AMX shares at A$1.95/
sh to raise A$41.925m in September 2010. Patersons received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
20 Patersons Resources Review - May 2011
OUR VIEW
AQA’s share price has declined by circa 15% to $8.15/sh since December 2010 as severe weather impacted production at
Isaac Plains, and as investor appetite was damaged firstly by natural disasters in Japan and more recently by the strength
in the Australian dollar (AUD). The company is one of the purest valuation leverage plays to coking coal and iron ore with a
stable of potentially long life assets. We believe AQA’s deep development pipeline will be funded by a serious of divestments
including the Avontuur Manganese Project in South Africa and the Washpool Coking Coal Project in the Bowen Basin,
Australia. The Company is still locked in dispute with JV partner Vale over the port and rail plans for the Eagle Downs coal
project and is also in disagreement over the valuation and sale of AQA’s share (24.5%) of the Belvedere project to Vale
is in arbitration. With a bullish outlook for coking coal, and a series of development announcements due over the coming
2Q’s we are upgrading our recommendation on AQA to BUY with a valuation of $10.79/sh (26% trading disc).
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 21
Isaac Plains (50% AQA, 50% Vale) 379.1 1.01 US$/A$ 0.89 0.99 1.05 1.00
Eagle Downs (50% AQA, 50% Vale) 500.9 1.34 Hard Coking Coal 151 249 303 211
Washpool Hard Coking Coal 366.1 0.98 Semi-soft Coking Coal 111 183 228 153
Talwood Coking Coal 321.7 0.86 PCI 111 195 232 157
Belvedere (24.5% AQA, 75.5% Vale) 400.0 1.07 Export Thermal Coal 77 106 123 98
West Pilbara Iron (API: AQA 50%, AMCI 50%) 687.0 1.84 Domestic Thermal Coal 45 46 48 49
Hardy Iron Ore Project 312.0 0.83 Hamersley Lump 140 225 225 227
Thabazimbi Iron Ore Project 208.7 0.56 Hamersley Fines 119 187 187 187
Avontuur Manganese Project 500.0 1.34 *All comm prices in US$/t
Exploration & Other Projects 110.0 0.29
Equity Investments 29.3 0.08 Production Summary 2010A 2011F 2012F 2013F
Corporate (40.1) (0.11)
Unpaid Capital 29.3 0.08 Attributable Saleable Coal Production
Forwards 0.0 0.00
Cash 233.3 0.62 Isaac Plains (kt) 1239 1021 1463 1463
Debt (0.0) (0.00) Cash costs (US$/t) 83.76 105.71 85.43 78.14
NPV 4037.3 10.79 Price Received (US$/t) 97.55 162.38 190.29 133.19
Price Target 4037.3 10.79
Eagle Downs (kt) 0 0 0 160
Valuation Summary of Assets Cash costs (US$/t) 0.00 0.00 0.00 99.04
Price Received (US$/t) 135.65 219.13 265.87 184.69
Isaac Plains (50% AQA, 50% Vale)
Washpool (kt) 0 0 0 648
Cash costs (US$/t) 0.00 0.00 0.00 119.54
Eagle Downs (50% AQA, 50% Vale)
Washpool Hard Coking Coal
Talwood Coking Coal Price Received (US$/t) 0.00 0.00 0.00 200.57
Belvedere (24.5% AQA, 75.5% Vale)
West Pilbara Iron (API: AQA 50%, AMCI 50%) West Pilbara Iron (kt) 0 0 0 500
Hardy Iron Ore Project Cash costs (US$/t) 0.00 0.00 0.00 31.54
Thabazimbi Iron Ore Project Price Received (US$/t)
Avontuur Manganese Project
2011F
2012F
2013F
2014F
2015F
2016F
2017F
2018F
2019F
2020F
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
22 Patersons Resources Review - May 2011
OUR VIEW
Operational efficiencies in the March Q saw FOB cash operating costs down on last Q, falling within the company’s long
term target band of A$40-43/t. With increasing efficiency AGO is on target to export a record 1.5Mt this Q. A strong cash
position of A$293m at the end of the March Q was supported by increases in quarterly benchmark prices and a number of
favourably priced spot cargos. An agreement with Global Advanced Metals will allow capacity from the Wodgina operation to
be ramped up to 7Mtpa in the near term and bring overall capacity to 9Mtpa when combined with the Pardoo operation. The
Turner River Hub is in Definitive Feasibility Study phase with results expected at the end of FY2011, we see development
of this strategically positioned hub as a key catalyst for AGO meeting its longer term export targets. With the acquisition of
Giralia now complete, AGO’s resource base of Direct Shipping Ore (DSO) has been increased allowing it to exploit synergies
with existing infrastructure and port entitlements. AGO remains the lowest capex cost producer of iron ore in the Pilbara
and we rate the stock as BUY with a price target of $4.36/sh.
•
Share Price (A$)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 23
Sensitivities to Iron Ore Price -10% 0% +10% Group Sales (kt) 1,259 4,984 10,524 13,018
8,000 60
Normalised NPAT (28.6) 138.6 315.1 379.8
4,000 30
Cash Flow (A$m) 2010A 2011F 2012F 2013F
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
24 Patersons Resources Review - May 2011
OUR VIEW
There has been a steady amount of news flow over the last couple of months including the South Galilee Coal Project (SGCP)
pre-feasibility study, the completed Strategic Review Process and nonbinding indicative bids on any or all of Bandanna’s assets.
The SGCP pre-feasibility study highlighted that how the mine is bigger than we initially expected and it could support an average
production rate of 15Mtpa of raw coal. We believe the SGCP would have attracted some attention from potential suitors as there
have been a number of recent transactions in the Galilee Basin. Adding to the attractiveness is the fact that BND has 4Mtpa
WICET stage 1 allocation and is participating in further expansion. We value BND’s 50% of the SGCP at $645m, or $1.09/t for
in situ resources, which is marginally lower than our estimate of the recent and upcoming transactions in the Galilee of about
$1.50/t. We value the other assets, with 800Mt JORC, at over $400m implying that anyone looking at the SGCP may just look at
the company as a whole with a market cap of only $860m. It is an interesting time for BND and it remains attractive at current
price levels. We retain our BUY recommendation with a price target of $2.50/sh.
is estimated to be ramped up in three stages starting EBITDA ($m) (3.8) (5.3) (7.3) (7.2)
at 5Mtpa in Q2 2015, 10Mtpa by Q1 2017 & 15Mtpa EV/EBITDA (x) (200.5) (159.9) (119.0) (144.0)
by Q1 2019. This is higher than our initial estimates of Capex ($m) 3.7 15.8 5.3 150.5
Free Cashflow (6.8) (36.2) (19.1) (167.8)
10Mtpa and we have increased our production and capital
FCFPS (cents) (1.8) (8.3) (4.4) (38.4)
expenditure assumptions. PFCF (x) (115.2) (25.2) (47.9) (5.4)
• At the end of the process BND will know the fair market
Share Price (A$)
2.00
value for some or all of their assets and no matter the
Volume '000
2400
outcome the company is in a strong cash position, with
$63m in the bank to progress their current portfolio of 1.50
assets. We believe that the larger than expected South
Galilee project and with a 4Mtpa WICET stage 1 allocation 1600
would have attracted considerable attention. Our value of 1.00
the larger project is not materially different from previous
assumptions as higher coal prices have been offset by the 0.50
800
higher capex and higher Australian Dollar.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 25
60.00
Exploration Exp. 0.0 0.0 0.0 0.0
(kt)
6,000
50.00 Corporate/Admin 10.1 10.3 10.5 10.8
4,000 EBITDA (7.3) (7.2) 41.1 82.0
40.00
Depn & Amort 0.2 0.2 16.5 34.6
2,000 30.00 EBIT (7.5) (7.4) 24.6 47.5
Interest 0.4 3.9 17.3 23.6
0 20.00 Operating Profit (7.9) (11.3) 7.3 23.9
2012F
2013F
2014F
2015F
2016F
2017F
2018F
2019F
2020F
2021F
Resources 100% Basis (Mt) Normalised NPAT (7.9) (11.3) 5.1 16.7
Mine Meas+Ind. Inf. Total Cash Flow (A$m) 2012F 2013F 2014F 2015F
Dingo West
Resources 0.0 91.0 91 Adjusted Net Profit (7.9) (11.3) 7.3 16.9
Reserves - Prov - Prob - Total 0.0 0.0 0 + Interest/Tax/Expl Exp 0.4 3.9 17.3 30.5
Arcturus 102.6 103.7 206 - Interest/Tax/Expl Inc 6.4 10.1 23.6 37.0
+ Depn/Amort 0.2 0.2 16.5 34.6
Springsure Creek 72.2 252.0 324 +/- Other (Associates) 0.0 0.0 0.0 0.0
South Galilee 372.9 806.1 1179 Operating Cashflow (13.7) (17.3) 17.4 45.1
Arcadia 0.0 273.0 273 - Capex (+asset sales) 5.3 150.5 108.3 110.5
- Working Capital Increase 0.0 0.0 0.0 0.0
Total Resources 2074 Free Cashflow (19.1) (167.8) (90.9) (65.4)
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Directors + Equity raised 10.0 0.0 0.0 0.0
+ Debt drawdown (repaid) 15.0 163.1 108.3 98.3
Name Position Net Change in Cash 5.9 (4.7) 17.4 32.9
Jeremy Barlow Chairman Cash at End Period 69.4 64.7 82.1 114.9
Ray Shaw Managing Director Net Cash/(Debt) 44.4 (123.4) (214.3) (279.7)
David Graham Director
Robert Johansen Director
Balance Sheet (A$m) 2012F 2013F 2014F 2015F
Park Soon Il Director
Cash 69.4 64.7 82.1 114.9
Significant Shareholders Shares (m) % Total Assets 132.5 284.2 468.4 657.3
DJ Mining 87.8 20.6 Total Debt 25.0 188.1 296.4 394.6
Resolve Geo 87.8 20.6 Total Liabilities 27.8 190.8 367.7 539.7
Samtam 37.5 8.8 Shareholders Funds 104.7 93.4 100.7 117.6
Norman Zillman 29.0 6.8
Bruce Wood 36.5 8.6 Ratios
J Barlow Consultants 19.6 4.6 Net Debt/Equity (%) na 132.1 212.8 237.8
Matthew Consulting 19.5 4.6 Interest Cover (x) na na 1.4 2.0
Locmaria 19.8 4.6 Return on Equity (%) na na 7.2 14.4
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
26 Patersons Resources Review - May 2011
OUR VIEW
After viewing the Marillana deposit as a stranded asset there is now light at the end of the tunnel with negotiations for an
infrastructure deal with FMG progressing well. While FMG will likely strike a deal to blend Marillana’s higher grade, lower
phosphorous product with its Nyidinghu ore, the real prize will be access to BRM’s 18.5Mtpa port allocation at Port Hedland.
BRM’s share price fortunes however have been dictated by an unsolicited scrip-based take over offer Wah Nam International
Holdings (WNI) which has recently gone unconditional. WNI has 43% of BRM, the offer closes on 16 May (unless extended)
and we believe the new major shareholder could prove a major distraction to BRM’s development plans. A key risk for our
investment thesis on BRM. Our valuation for BRM is based on an NPV for the Marillana project which incorporates 40Mtpa of
beneficiable ore mined for 17Mtpa of product. We have used the DFS upper estimate for capital cost of A$1.9bn. Our estimates
assumed this is funded via a $2.18bn capital raise on a 60/40 debt to equity basis in the coming 12 months (dilution of NPV
for equity raise at an assumed $4.00/sh). We maintain our BUY recommendation with a price target of $6.31/sh. BRM remains
cheap on valuation although WNI actions present a risk to a mid 2013 start up for the project.
raising. 12 Months
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 27
15.0
20.00 Normalised NPAT (30.4) (61.9) (101.6) (107.8)
10.0
10.00
5.0
Cash Flow (A$m) 2011F 2012F 2013F 2014F
0.0 0.00
2013F 2014F 2015F 2016F 2017F 2018F 2019F 2020F Adjusted Net Profit (30.4) (61.9) (101.6) (107.8)
+ Interest/Tax/Expl Exp 21.5 78.5 138.6 139.0
Production (mt) Cash Costs (A$/t)
- Interest/Tax/Expl Inc 23.2 78.5 138.6 139.0
+ Depn/Amort 0.0 0.0 0.0 2.1
Reserves & Resources +/- Other 0.0 0.0 0.0 0.0
Operating Cashflow (32.0) (61.9) (101.6) (105.8)
Reserves Iron Ore Mt % Fe% Al+Si % LOI - Capex (+asset sales) 0.2 256.7 626.8 1120.1
Marillana 1,001 42.40 - Working Capital Increase (4.6) 0.0 0.0 0.0
CID 49 55.50 9.00 9.70 Free Cashflow (27.6) (318.6) (728.4)(1225.9)
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Resources Iron Ore Mt % Fe% Al+Si % LOI + Equity raised 103.6 880.0 0.0 0.0
Marillana (DSO) 102 55.60 9.00 9.70 + Debt drawdown (repaid) 0.2 1300.1 0.0 0.0
Marillana (Beneficiation) 1,528 42.60 34.29 3.53 Net Change in Cash 75.9 1861.5 (728.4)(1225.9)
Total 1,629.9 62.15 9.00 3.50 Cash at End Period 159.7 2021.2 1292.8 67.0
Net Cash/(LT Debt) 159.5 720.9 (7.4) (1233.3)
Directors
Balance Sheet (A$m) 2011F 2012F 2013F 2014F
Name Position
Barry Cusack Chairman Cash 159.7 2021.2 1292.8 67.0
Ross Norgard Deputy Chairman Total Assets 163.1 2281.3 2179.7 2071.9
Wayne Richards Managing Director Total Debt 4.2 1304.3 1304.3 1304.3
Colin Paterson Executive Director Total Liabilities 8.2 1308.3 1308.3 1308.3
Ross Ashton Non-Executive Director Shareholders Funds 154.9 973.0 871.4 763.6
David Nixon Non-Executive Director
Ratios
Substantial Shareholders Shares (m) % Net Debt/Equity (%) na na 0.9 161.5
Wah Nam 61.9 42.8 Interest Cover (x) nm (0.0) 0.1 0.1
Ross Norgard 13.5 9.3 Return on Equity (%) na na na na
Total 52.1
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
28 Patersons Resources Review - May 2011
OUR VIEW
CFE’s strategy is to acquire and invest in undervalued and distressed mineral assets and companies and to add value to
those assets through a practical approach to management, exploration and evaluation to enable the assets to be monetised
at a multiple. As assets are monetised, CFE intends to follow a policy of distributing surplus cash to shareholders. Patersons’
sum of parts valuation estimate for CFE is $1.05/sh or $609m. However as with the majority of listed investment companies
(LICs) a trading discount for liquidity is expected. We have set our price target at 75% of our NAV in anticipation of this
discount. Large valuations in the group’s projects are for the Marampa Iron Project (unlisted $350m), the Sappes Gold
Project (unlisted $50m), Pinnacle Group Assets (unlisted $45.3m) and CFE’s residual stake in AKI (listed $42m). The coming
2 Qs should see the monetising of several of CFE’s assets with the expected sale of Leichardt Copper Project, Sappes Gold
Project and a listing (on AIM) of the Marampa Iron Ore project. These assets are well advanced, offer potential buyers
production opportunities accordingly we believe the sale process should progress to CFE’s timeline. CFE is trading well
below its some of the parts valuation and these sales are likely to close the discount. BUY PT $0.77/sh.
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 29
Marampa Iron Ore Project 350 0.60 A$:US$ 0.89 0.99 1.05 1.00
Listed Investments 56 0.10 Fe Lump (US$t) 140 225 225 227
Unlisted Investments 128 0.22 Fe Fines(US$t) 119 187 187 187
Exploration 0 0.00
Corporate (15) (0.03)
Unpaid Capital 4 0.01 Production Summary 2010A 2011F 2012F 2013F
Cash 73 0.13
Debt 0 0.00 Marampa Iron Ore Project
Total @ 8% Discount Rate 595.3 1.03 Iron Ore Production 0.0 0.0 0.0 210.0
Price Target (0.75x NAV) 446.5 0.77
Cash Costs (A$/t FOB) na na na 61.65
Total Costs (A$t) na na na 70.59
Valuation Summary of Operating Assets Realised Price (A$t) na na na 115.79
Listed Investments Profit & Loss (A$m) 2010A 2011F 2012F 2013F
13%
Sales Revenue 0.0 0.0 0.0 24.8
Other Income 171.2 14.4 25.7 8.1
Marampa Iron
Operating Costs 58.2 4.4 0.0 12.9
Ore Project
Exploration Exp. 0.0 0.0 0.0 0.0
64%
Corporate/Admin 34.8 10.2 8.2 8.4
EBITDA 78.1 (0.1) 17.5 11.6
Unlisted Investments Depn & Amort 0.4 36.7 0.0 1.9
23% EBIT 77.7 (36.7) 17.5 9.7
Interest 1.1 0.0 0.0 19.0
Operating Profit 76.6 (36.8) 17.5 (9.3)
Marampa Production Summary Tax expense 0.9 0.0 0.0 0.0
Minorities 3.4 5.9 0.0 0.0
12,000 140.00 Abnormals and FX adjustments 0.0 2.2 0.0 0.0
120.00
NPAT 72.3 (40.5) 17.5 (9.3)
10,000
100.00 Normalised NPAT 72.3 (38.3) 17.5 (9.3)
8,000
80.00
(US$/t)
(kt)
6,000
60.00 Cash Flow (A$m) 2010A 2011F 2012F 2013F
4,000
40.00 Adjusted Net Profit 72.3 (38.3) 17.5 (9.3)
2,000 + Interest/Tax/Expl Exp 2.1 0.0 0.0 19.0
20.00
- Interest/Tax/Expl Inc 14.8 28.2 23.0 42.4
0 0.00 + Depn/Amort 0.4 36.7 0.0 1.9
2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F +/- Other 0.0 0.0 0.0 0.0
Realised Price (US$/lb) Cash Cost (US$/lb) Operating Cashflow 59.9 (29.8) (5.5) (30.8)
Iron Ore Production - Capex (+asset sales) 0.0 0.0 411.1 480.4
- Other investing cashflow 44.3 (40.6) 0.0 0.0
Reserves & Resources - Working Capital Increase (52.3) 8.7 0.0 0.0
Free Cashflow 67.9 2.2 (416.6) (511.2)
Reserves (Mt) Cu (%)Ag (g/t) Cu (kt) - Dividends (ords & pref) 0.0 43.8 0.6 0.6
+ Equity raised 8.7 268.1 0.0 0.0
Iron ore resources (Mt) Fe (%) + Debt drawdown (repaid) (14.9) 305.8 0.0 376.3
Marampa 197.0 28.5 Net Change in Cash 61.7 532.3 (417.2) (135.5)
Cash at End Period 135.7 668.0 250.8 115.4
Gold Resources Mt g/t Au Moz Net Cash/(LT Debt) 135.7 668.0 250.8 (637.2)
Sappes Gold Project 1.8 13.4 0.8
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
30 Patersons Resources Review - May 2011
OUR VIEW
CJO is one of the few companies listed on the ASX with exposure to the increasing silver price. The high margin Cerro
del Gallo gold mine (66% CJO) is expected to be in operation by the end of CY2012. The silver credits at Cerro del Gallo
provide a significant cash cost saving of almost US$200/oz bringing LOM cash cost to circa US$510/oz (using US$1000/oz
Au and US$17.50 Long term prices). Furthermore the solid margins gained at Cerro del Gallo will provide a funding source
for the development of the Namiquipa silver project. Namiquipa is our favoured project and believe the upcoming drilling
results at the historic Princessa and La Venturosa shaft mines will confirm extensions and parallel lodes of high grade
silver. We highly rate the management team and the board, who have accumulated a great deal of experience operating in
Mexico with Bolnisi Gold NL before its merger with Coeur D’Alene Mines in 2007. CJO is aggressively searching for further
precious metal projects in Mexico while it looks to divest its Australian assets. We upgrade CJO to a BUY rating (previously
Speculative BUY) with a price target of $0.47/sh.
has indicated economic viability for the CIL plant, which Reported NPAT ($m) (1.7) (0.9) 39.8 57.9
will operate in conjunction with the heap leach, raising Recurrent NPAT ($m) (1.7) (0.9) 39.8 57.9
throughput to 5.5Mtpa from year 5 of the project. The Recurrent EPS (cents) (0.2) (0.1) 4.9 7.2
addition of the CIL plant will increase the mine life from EPS Growth (%) na na na 45.4
PER (x) (104.9) (225.8) 5.2 3.5
8 years (as a heap leach only operation) to 15 years.
EBITDA ($m) (1.7) (0.9) 44.8 64.3
• Low cash costs bolstered by significant silver
credits. Cash costs implied by the feasibility study shows
EV/EBITDA (x)
Capex ($m)
(93.4) (197.1)
0.0 26.4
3.7
30.4
1.6
0.0
Cerro del Gallo will be producing on the low end of the cost Free Cashflow (4.1) (29.0) 12.8 62.8
curve. Our estimates have the Stage 1 4.5Mtpa heap leach FCFPS (cents) (0.6) (3.6) 1.6 7.8
PFCF (x) (44.4) (7.1) 16.0 3.3
producing at cash costs of US$444/oz (US$635 excl. Ag
credits). We have estimated the cash costs for the Stage DPS (cents) 0.0 0.0 0.0 0.0
2 CIL plant at US$575/oz (US$687/oz excl. Ag credits). Yield (%) 0.0 0.0 0.0 0.0
Franking (%) 100.0 100.0 100.0 100.0
• Reserve announced and in-pit resources increased.
The results of the preliminary assessment of Cerro del
Gallo included a maiden mining reserve of 0.7Moz Au and Company Statistics & Performance
15.3Moz Ag for the heap leach stage of the mine. In-pit
gold resources increased by 12% to 1.66Moz and silver Shares on Issue (m) 718.3 3mth ADT ($m) 0.75
increased 16% to 35.37Moz. Market Cap. ($m) 2.0 Debt ($m) 0.0
52 Week Range $0.62 - $2.44 Cash ($m) 20.9
• One of the few silver plays on the ASX. The silver price
has appreciated significantly in recent months threatening
to break the US$50/oz mark. We reiterate the lack of 3.00 10000
investment avenues for exposure to silver on the ASX.
Through CJO we gain exposure to near term gold-silver
production at Cerro del Gallo, but more importantly we also 2.50
8000
gain leverage through our favoured project in Namiquipa.
Share Price (A$)
2.00
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 31
Cerro del Gallo 230.2 0.29 A$:US$ 0.99 1.05 1.00 0.96
Exploration (includes Namiquipa) 30.0 0.04 Gold (US$/oz) 1445 1494 1525 1575
Unpaid capital 44.8 0.06 Silver (US$/lb) 37.08 42.60 42.45 42.30
Corporate (10.2) (0.01) Gold (A$/oz) 1458 1420 1525 1641
Forwards 0.0 0.00
Cash 20.9 0.03 Target Price Sensitivity -10% 0% +10% % Chg
Debt 0.0 0.00
NPV (@ 8% discount rate) 315.7 0.39 FX (A$:US$) 0.47 0.47 0.47 1
Price Target (1.2x NPV) 0.47 Gold Price 0.38 0.47 0.56 20
Silver Price 0.45 0.47 0.49 4
NPV Sensitivity Operating costs 0.51 0.47 0.43 (8)
NPV (nom) @ 5% disc. 0.47 Production Summary 2011F 2012F 2013F 2014F
NPV (nom) @ 0% disc. 0.67
Production (koz)
Hedging koz 1-Year 3-years % Reserve Cerro del Gallo 0 0 33 44
Total 0 0 33 44
Committed Production 0 0 0 0
Cost Summary
Valuation Summary of Operating Assets Cash Costs (A$/oz) na na 129 148
Total Costs (A$/oz) na na 280 300
50 300
Adjusted Net Profit (1.7) (0.9) 39.8 57.9
+ Interest/Tax/Expl Exp 0.5 0.3 0.4 0.5
25 200 - Interest/Tax/Expl Inc 2.8 2.0 2.1 2.1
+ Depn/Amort 0.0 0.0 5.0 6.4
+/- Other 0.0 0.0 0.0 0.0
0 100
2013F 2014F 2015F 2016F 2017F 2018F 2019F Operating Cashflow (4.1) (2.6) 43.1 62.7
- Capex (+asset sales) 0.0 26.4 30.4 0.0
Total Cash Costs (A$/oz) - Working Capital Increase 0.0 0.0 0.0 0.0
Free Cashflow (4.1) (29.0) 12.8 62.7
Reserves & Resources - Dividends (ords & pref) 0.0 0.0 0.0 0.0
+ Equity raised 20.5 35.0 0.0 0.0
Reserves Mt Au g/t Ag g/t Au koz Au koz (eq) + Debt drawdown (repaid) 0.0 0.0 0.0 0.0
Cerro del Gallo 32.2 0.7 14.8 712 1,087 Net Change in Cash 15.9 6.0 12.8 62.7
Total 32.2 0.7 14.8 712 1,087 Cash at End Period 20.2 26.1 38.9 101.6
Net Cash/(LT Debt) 20.2 26.1 38.9 101.6
Resources Mt Au g/t Ag g/t Au koz Au koz (eq)
Cerro del Gallo 77.2 0.7 14.2 1,663 2,528 Balance Sheet (A$m) 2011F 2012F 2013F 2014F
Total 77.2 0.7 14.2 1,663 2,528
Cash/Bullion 20.2 26.1 38.9 101.6
Total Assets 62.8 96.9 136.7 194.6
Directors Total Debt 0.0 0.0 0.0 0.0
Total Liabilities 8.1 8.1 8.1 8.1
Name Position Shareholders Funds 54.7 88.8 128.7 186.6
Norm Seckold Non-Executive Chairman
James Crombie Executive Vice-Chairman Ratios
Anthony McDonald Managing Director Net Debt/Equity (%) na na na na
Craig J McPherson CFO and Alt. Director Interest Cover (x) na na na na
Richard Keevers Non-Executive Director Return on Equity (%) na na 31.0 31.0
Robert Bell Non-Executive Director
John Cook Non-Executive Director
Nick Tintor Non-Executive Director
Disclosure: Patersons acted as a lead manager to the placement of 89.3m CJO shares at $0.20/sh to raise A$17.9m in February
2011. It received fees for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
32 Patersons Resources Review - May 2011
Site Visit Confirms Our Positive View on Zara Analyst: Simon Tonkin
OUR VIEW
We recently visited CHN’s Zara Gold Project in Eritrea and we came away impressed with the near-mine and regional upside
potential which could ultimately expand the scope of the project. The site is located 160km northwest from Asmara (the
capital of Eritrea) amongst mountainous terrain. The next key event for CHN is an agreement with ENAMCO which will
outline the terms for its participation in the Zara Gold project. This agreement will pave the way for a mine development
licence and move the project towards production. Meanwhile, CHN has commenced an aggressive exploration campaign
whereby it is targeting several IP targets over the Konate-Koka corridor. Further success here could add mine life to the
already robust Koka project. In addition, drilling is expected to commence on the Mogoraib North Exploration Licence (10km
North of the Bisha mine) in the third Q of this year. Based on Koka’s reserves and grade we believe the stock remains
undervalued trading at $108/oz compared to the peer average of $375/oz. We are placing a SPEC BUY on CHN due to
negative investor sentiment towards risk in Northern Africa and until the agreement with ENAMCO is realised. Our price
target decreases to $0.72/sh based on applying a 0.8x discount to our NAV (from $0.91).
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 33
Koka Gold Project 140.3 0.40 A$:US$ 0.89 0.99 1.05 1.00
Exploration 72.9 0.21 Gold (US$/oz) 1093 1356 1483 1507
Koka Gold 30% Sale to ENAMCO 24.8 0.07 Silver (US$/lb) 17.28 29.77 42.63 42.53
Unpaid Capital 81.4 0.23 Gold (A$/oz) 1222 1368 1409 1507
Corporate (3.1) (0.01)
Forwards 0.0 0.00 Target Price Sensitivity -10% 0% +10% % Chg
Cash (est.) 5.2 0.01
Debt (5.0) (0.01) FX (A$:US$) 0.80 0.72 0.66 (9)
NPV 316.5 0.91 Gold Price 0.65 0.72 0.82 13
(@ 8% discount rate) Gold Grade 0.65 0.72 0.82 13
Price Target (0.8x DCF) 0.72 Operating Costs 0.75 0.72 0.70 (4)
Recovery 0.65 0.72 0.82 13
NPV Sensitivity
Production Summary 2010A 2011F 2012F 2013F
NPV (nom) @ 5% disc. 1.01
NPV (nom) @ 0% disc. 1.54 Production (koz)
Koka Gold Project
Hedging koz % Reserve
Total
Committed Production 0 0
Cost Summary
Valuation Summary of Operating Assets Cash Costs (US$/oz) na na na na
Total Costs (US$/oz) na na na na
Price Received (US$/oz) na na na na
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
34 Patersons Resources Review - May 2011
OUR VIEW
The fundamentals of Coalspur are as robust as ever, 920Mt of Measured and Indicated resources of coal, 3km from a rail line
with spare capacity going to a coal port with spare capacity. Coal production could be up to 8Mtpa of coal comparable to standard
Newcastle coals. Coalspur owns 100% of Vista and the Vista South projects and has yet to dilute its ownership or offtake because
it has been well funded at the equity level. This was reinforced by the successful completion of the first C$44.4m tranche of a
C$55.5m two tranche capital raising. The most recent Quarterly Report contained no reasons to deviate from these assumptions
and with the capital raising the company is in a strong position to complete future milestones such as the Bankable Feasibility
Study on Vista. The study is contracted to be completed by the end of 2011. In the meantime the company has received its
mining permit and process plant approval for sales up to 4.2Mtpa, which is a very significant milestone. Its cash level also puts
the company in a good position to negotiate with potential offtake or JV partners. We have reduced our valuation marginally
to $2.01/sh due to a stronger AUD and the stock has been heavily sold during the last month, oversold in our view. We have
upgraded our recommendation to a BUY with a price target of $2.00/sh.
2.00 6000
Vista may extend over a 16km strike length and interpretation of
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 35
70.00
Depn & Amort 0.0 0.0 0.0 20.0
(kt)
4,000
60.00 EBIT (12.0) (0.0) (0.5) 13.9
3,000
Interest 0.0 0.0 4.1 20.1
50.00
2,000 Operating Profit (12.0) (0.0) (4.6) (6.2)
1,000 40.00 Tax expense 0.0 0.0 0.0 0.0
Abnormals + Minorities 0.0 0.0 0.0 0.0
0 30.00 NPAT (12.0) (0.0) (4.6) (6.2)
2012F
2013F
2014F
2015F
2016F
2017F
2018F
2019F
2020F
2021F
Resources 100% Basis (Mt) (All Thermal) Cash Flow (A$m) 2011F 2012F 2013F 2014F
Mine Meas. Indi. Total Adjusted Net Profit (12.0) (0.0) (4.6) (6.2)
+ Interest/Tax/Expl Exp 10.0 0.0 4.1 20.1
Vista - Interest/Tax/Expl Inc 11.6 8.1 12.4 28.6
Resources - Meas - Indi - Total 588.9 331.6 920.5 + Depn/Amort 0.0 0.0 0.0 20.0
Reserves - Prov - Prob - Total 0.0 0.0 0.0 +/- Other (Associates) 0.0 0.0 0.0 0.0
Operating Cashflow (13.6) (8.1) (12.8) 5.4
Vista South - Capex (+asset sales) 83.9 0.4 182.1 237.6
Resources - Meas - Indi - Total 51.5 41.9 93.4 - Working Capital Increase 1.0 0.0 0.0 0.0
Reserves - Prov - Prob - Total 0.0 0.0 0.0 Free Cashflow (98.5) (8.5) (195.0) (232.2)
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Total Measured & Indicated Resources 1013.9 + Equity raised 141.5 0.0 0.0 0.0
+ Debt drawdown (repaid) 0.0 1.0 197.1 237.6
Directors Net Change in Cash 43.0 (7.5) 2.2 5.4
Cash at End Period 64.2 56.7 58.9 64.3
Name Position Net Cash/(Debt) 64.2 55.7 (139.2) (371.4)
Ian Middlemas Non-Executive Chairman
Eugene Wusaty Managing Director & CEO
Mark Pearce Non-Exec Director & Company Secretary Balance Sheet (A$m) 2011F 2012F 2013F 2014F
Colin Steyn Non-Exec Director
Denis Turcotte Non-Exec Director Cash 64.2 56.7 58.9 64.3
Mark Pearce Non-Exec Director Total Assets 164.7 165.5 357.8 626.9
Total Debt 0.0 1.0 198.1 435.7
Significant Shareholders Shares (m) % Total Liabilities 0.5 1.4 198.3 473.6
Colin Steyn 106.8 20.5 Shareholders Funds 164.1 164.1 159.5 153.3
Gavin Argyle 46.3 8.9
Deans Knight Capital 31.9 6.1 Ratios
Anastosios Arima 19.2 3.7 Net Debt/Equity (%) na na 87.3 242.3
Arredo Pty Ltd 9.3 1.8 Interest Cover (x) na na na 0.7
Ian Middlemas 9.3 1.8 Return on Equity (%) na na na na
Eugene Wusaty 2.6 0.5
Disclosure: Patersons acted as lead manager to the placement that raised $8m at 0.32/sh for Coalspur Mines Limited in
November 2009. It received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
36 Patersons Resources Review - May 2011
OUR VIEW
The widely reported wet season in Queensland has effectively robbed Cockatoo of half a year of sales and imposed a
significant restoration bill. This will mean that it is unlikely Cockatoo will report a profitable financial year for FY11 and the
cash position was looking in a weak position. Despite these short term disruptions Cockatoo remains one of our preferred
mid-cap coal stocks. The management has shown foresight and acted decisively by securing a short term financing package
that will be sufficient to carry the company through these extraordinary circumstances while minimising initial cash outlay
and potential dilution. It looks as though the market has priced the adverse developments but not the full potential and as
such the company continues to look cheap on an EV/t comparison for a producer. It has a very strong production growth
profile over the coming 4 years. The company has been allocated 3Mtpa of WICET stage 1 and it is actively participating
in further expansion of the project. Cockatoo remains on track to be a major producer. Accordingly we are retaining our
BUY recommendation with a price target of $0.75/sh.
was processed and sold from remaining ROM stocks. With Reported NPAT ($m) 3.5 (27.8) 11.0 4.5
the return to full capacity not likely until late in the June Q, Recurrent NPAT ($m) 3.5 (22.9) 11.0 4.5
we expect that full year production will total only 215kt. Recurrent EPS (cents) 0.6 (2.2) 1.1 0.4
EPS Growth (%) na na na (58.7)
• Moving overburden. 409kt of overburden above the waterline,
which is falling as dewatering continues, was able to be removed.
PER (x)
PEG
81.3 (20.8)
na na
43.5
na
105.4
na
Much of this material was utilised in levee bank construction.
Overburden was also removed from the area adjacent to the EBITDA ($m) 4.3 (22.4) 14.2 13.8
north east wall and production of raw coal from this area EV/EBITDA (x) 59.7 (20.9) 33.1 40.0
will begin this quarter. We do not believe that the main pit Capex ($m) 3.2 9.1 2.8 78.4
at Baralaba will be fully restored when there is cheaper coal Free Cashflow (4.0) (36.5) (0.7) (82.5)
accessible to the north but it is cost effective for some areas to FCFPS (cents) (0.6) (3.5) (0.1) (8.0)
be salvaged. PFCF (x) (72.1) (13.1) (662.3) (5.8)
company’s cash position. Part of facility fee will be paid through 4800
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 37
Collingwood/Taroom
Woori (kt) 0 0 0 0
FOB costs (US$/t) 0.00 0.00 60.36 56.16
Woori Project Price Received (US$/t) 0.00 0.00 122.32 97.49
Hume Project
Surat (kt) 0 0 0 0
Other Surat Projects FOB costs (US$/t) 0.0 0.0 0.0 0.0
Price Received (US$/t) 0.0 0.0 0.0 0.0
Coal Production Summary All Mines (kt) 353 177 326 450
12,000 320 FOB costs (US$/t) 128.7 267.4 129.5 97.0
Price Received (US$/t) 152.5 176.7 182.6 130.4
10,000 270
8,000 220 Profit & Loss (A$m) 2010A 2011F 2012F 2013F
(US$/t)
2011F
2012F
2013F
2014F
2015F
2016F
2017F
2018F
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
38 Patersons Resources Review - May 2011
OUR VIEW
Despite DRA’s status as a gold producer, it’s share price has historically lagged its peers due to the lack of reserves at
its Scandinavian gold projects. We see a turning point for DRA, where its focus on near mine and regional exploration
should expand its global resource well above the current 1.1Moz, and grow the reserve base (currently at 3 years) out
beyond 5 years. The most exciting exploration upside exists in Finland at the Kuusamo project with a 383koz resource
and several high grade intersections (including 50.8m @ 75.9g/t) indicating a large upside potential. The Svartliden mine
will simultaneously undergo a cutback and commence development of a decline in Q3 FY2011 to maintain gold production
while transitioning from open pit to underground mining. The Vammala production centre is ramping up with Jokisivu due
to begin full production in Q3 CY2011. We expect DRA to produce 60koz for FY2011 at group cash cost of ~US$850/oz
(includes Svartliden stripping) moving back to ~US$750/oz in FY2012. DRA is currently trading at 3.0x FY2011 EBITDA
and 1.9x FY2012 EBITDA and with $33m in the bank DRA looks cheap. Price target is$2.18/sh. BUY
deposits identified in the Kuusamo project area and has 150 2000
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 39
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
40 Patersons Resources Review - May 2011
OUR VIEW
Barrick Gold Corporation (S&P,TSX: ABX) has trumped Minmetals’ C$6.3bn bid for Equinox (EQN), raising the offer price
to C$7.3bn (C$8.15/sh). The offer is good news for shareholders representing a significant premium to the pre-offer share
price, and ending chances of the expensive Lundin acquisition. We believe the offer values EQN’s assets generously and
shareholders should accept the offer. However, the offer may come as a surprise to shareholders given a 16% interest in EQN
was shopped around by First Quantum in November 2010 at ~$6.00 a share with no takers. This would have represented a
saving of ~C$300m to ABX. Per the terms of the ABX offer the Lundin bid has been dropped. The EQN Board is supportive
of the ABX offer, and has recommended shareholders accept. Whether ABX shareholders will be pleased about the deal
remains to be seen, however the ~14% cooling of ABX’s share price suggests investors are not fully supportive of the move
to diversify to base metals and increase debt. C$8.15/sh represents a 42% premium to the pre-Minmetals share price on
1 April. The deal will provide Barrick with exposure to copper via EQN’s Lumwana copper project. We maintain our SELL
recommendation and do not believe it is likely that a superior offer will emerge.
6.00 40000
first move announcing their intention to make a C$7.00/
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 41
Lumwana Copper Profit & Loss (US$m) 2010A 2011F 2012F 2013F
97%
Lumwana Uranium Sales Revenue 1046.8 1352.5 1802.7 2272.5
3% Other Income (incl.hedging) (34.7) (23.8) 13.3 47.9
Operating Costs 454.4 494.0 526.0 615.9
Exploration Expense 6.0 10.6 12.4 12.6
Corporate/Admin 21.7 36.3 20.7 21.1
Lumwana Copper Production Summary (EQN 100% Share) EBITDA 530.0 787.9 1256.9 1670.8
Depn & Amortisation 75.7 90.6 117.8 165.0
250 5.00 EBIT 454.3 697.3 1139.1 1505.7
Interest Expense 37.6 30.6 21.2 15.9
200 4.00 Abnormals Pre-Tax (10.2) (64.6) 0.0 0.0
Operating Profit 406.5 602.1 1117.9 1489.8
(US$/lb)
0 0.00
Cash Flow (US$m) 2010A 2011F 2012F 2013F
2010A 2011F 2012F 2013F 2014F 2015F
Reported NPAT 269.1 263.1 651.2 930.6
Realised Copper Price (US$/lb) Copper Cash Costs (US$/lb)
+/-Exploration Adjustment (66.0) (0.0) 0.0 0.0
Copper in Concentrate (kt) +/-Interest Adjustment 0.2 0.0 0.0 0.0
Lumwana Reserves & Resources +Depreciation/Amortisation 75.7 90.6 117.8 165.0
+/-Tax Adjustment 101.2 26.0 0.0 0.0
Sulphide Reserves & Resources (Mt) Cu(%) Cu(kt) +/-Other Operating Cash Flows 0.0 0.0 0.0 0.0
Malundwe: Operating Cash Flow 379.8 379.7 769.1 1095.6
Proved Reserve 43 1.09 468 -Capex (Net of Asset Sales) 118.1 291.5 247.8 201.9
Probable Reserve 78 0.79 619 -Other Investing Cash Flows (161.8) 153.1 0.0 0.0
Malundwe Reserves 121 0.90 1086 -Working Capital Increase 33.9 79.1 0.0 0.0
Inferred Resource 4 0.77 32 Free Cash Flow 389.6 (144.0) 521.3 893.7
-Dividends 0.0 0.0 0.0 0.0
Chimiwungo: +New Equity 0.0 0.0 0.0 0.0
Proved Reserve 82 0.70 571 +Debt Drawdown/(Repayment)(179.2) (28.3) (106.8) (31.0)
Probable Reserve 119 0.57 677 Net Change in Cash 210.3 (172.3) 414.5 862.7
Chimiwungo Reserves 200 0.62 1247 Cash at End Period 319.5 147.1 561.6 1424.3
Inferred Resource 413 0.60 2478 Net Cash/(LT Debt) (20.0) (164.0) 357.3 1251.1
Total Reserves 299 0.73 2186
Total Resources 417 0.60 2503 Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Oxide Reserves & Resources (Mt) Cu(%) Cu(kt) Cash/Bullion 319.5 147.1 561.6 1424.3
Proved Reserve 5 0.85 44 Total Assets 3239.0 3402.5 3946.9 4846.5
Probable Reserve 4 0.52 23 Total Debt 339.4 311.1 204.3 173.3
Total Reserves 10 0.70 67 Total Liabilities 1207.5 1104.4 997.5 966.6
Inferred Resource 4 0.42 15 Shareholders Funds 2031.5 2298.1 2949.3 3879.9
Uranium Reserves & Resources (Mt) U3O8(%) U3O8(mlb)
Malundwe: Ratios
Probable Reserve 3 0.12 9 Debt/Equity (%) 16.7 13.5 6.9 4.5
Inferred Resource 1 0.09 2 Interest Cover (x) 1208.4 2276.0 5380.9 9449.7
Chimiwungo: Return on Equity (%) 13.2 11.4 22.1 24.0
Inferred Resource 1 0.07 2
Directors Position
Jabil Sayid (Mt) Cu(%) Cu(kt)
Jabil Sayid Total 38 2.2 837 Peter Tomsett Non-Executive Chairman
Craig Williams Chief Executive Officer
Substantial Shareholders Shares (m) (%) Dave Mosher Non-Executive Director
Brian Penny Non-Executive Director
Dundee Corporation 44.3 5.0 David McAusland Non-Executive Director
Minmetals Resources Limited 37.0 4.2
Jim Pantelidis Non-Executive Director
Concord Capital Ltd 29.6 3.4
ZCCM Investment Holdings Plc 20.1 2.3 Tony Reeves Non-Executive Director
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
42 Patersons Resources Review - May 2011
OUR VIEW
Extract is looking to develop the world class 392mlb Husab uranium project in Namibia. Recent comments by the Namibian
Government regarding nationalisation of mining and exploration tenure have impacted the stock. However, EXT do not expect
to be adversely impacted by the proposed changes and a media release by the Minister of Mines suggests that mining licences
in application will be dealt with under existing procedures on their own merit without prejudice. There could be some impact if
EXT wishes to involve a partner as the mining licence conditions might require the holder to approach the Namibian Government
first in investment opportunities. The Chinese have withdrawn their bid for Kalahari, EXT’s largest shareholder, the original
bid was 290p and the Chinese wished to reduce that bid to 270p following the events at Fukushima. The UK takeover panel
denied the revised bid due to the Chinese not reserving the right to bid lower and lost an appeal. The Chinese will have to
wait three months before they can re-bid. We believe the negative effects of the move to nationalise mining and exploration
tenure and the failed bid from the Chinese presents an opportunity for investors to gain exposure to a tier 1 asset. As such
we believe that the stock will eventually be taken out (most likely following the grant of its mining licence. Key players who
may be interested in EXT are the Chinese, RIO and ARMZ. We are upgrading to Buy our target price is $8.70/sh.
9.00 4000
enhancements. However, we believe that the mining of
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 43
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
44 Patersons Resources Review - May 2011
OUR VIEW
FMG has traded sideways since our last Resources Review in early December 2010 and we are now upgrading our
recommendation with the coming 2 Qs likely to be strong periods. The company reported lower production in the March Q,
due to a record northern wet season. From here the company seasonally does very well (June and Sept Qs) with production
records likely to be broken as the 55Mtpa rate is achieved in the June Q. FMG’s expansion plans to which will see production
of 155Mtpa iron ore by the end of FY14 are progressing with the company’s Solomon and Chichester expansion projects
requiring US$8.4bn in capital likely funded internally. FMG’s capital intensity is US$84/t well below the average for projects
in the Pilbara (US$107/t). The company has more growth options than most in the Pilbara with production likely to rise by
four fold in the coming five years. This will more than offset a softer iron ore price if the anticipated declines occur. With
the AUD reducing margins across the sector and commodity prices softening FMG shows future production growth and has
a track record of delivering expansions. Upgrade to BUY.
Chichester Hub should be running at 55Mtpa during the Reported NPAT (A$m) 642.4 1,033.1 1,817.6 2,123.0
June Q 2011. FMG has outlined a shipping target circa Recurrent NPAT (A$m) 642.4 1,836.3 1,817.6 2,179.5
12Mt for the June Q 2011 (up from 9-10Mtpa). Recurrent EPS (cents) 20.6 58.9 58.3 69.9
EPS Growth (%) 12.6 216.9 5.1 13.9
• Unit costs set to drop with Christmas Creek ramp
up. Unit costs of production for the March Q rose as a
PER (x) 30.4 10.6 10.8 9.0
result of the lower production rates, commissioning of EBITDA (A$m) 1,252.8 2,706.7 3,300.3 3,963.5
EV/EBITDA (x) 16.0 7.4 6.1 5.1
the Christmas Creek processing facility and a ramp up Capex (A$m) 664.4 1,106.8 191.6 3,995.9
in contractor mining. The reported cash cost remained Free Cashflow 621.6 436.4 1,756.7 (1,578.6)
lower than our estimate of US$50/t for the Q but still FCFPS (cents) 19.9 14.0 56.3 (50.6)
had a notable spike from the previous Q of US$38/t to PFCF (x) 31.5 44.8 11.1 (12.4)
US$45/t. We see this increase in costs as a one off event
DPS (cents) 0.0 6.1 5.7 6.0
and expect with the end of the wet season and ramping up
Yield (%) 0.0 1.0 0.9 1.0
of production costs will return to the US$32-37/t range. Franking (%) 100 100 100 100
•
Share Price (A$)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 45
Cloudbreak & C.Creek (net of LN) 13221 4.24 A$:US$ 0.89 0.99 1.05 1.00
Solomon Project 6515 2.09 Iron Ore Fines (US$/t CFR) 83.71 150.50 160.09 125.19
Corporate (241) (0.08) Iron Ore Lump (US$/t CFR) 82.01 141.51 163.10 147.74
Unpaid Capital 45 0.01
Exploration/Resources outside Reserves 2122 0.68 Production Summary 2010A 2011F 2012F 2013F
Cash (est) 2013 0.65
Debt (excl Leucadia note) (3320) (1.07) Chichester Hub
Total @ 10% Discount Rate 20349 6.52 CC & CB - Lumps 0 1100 5500 6000
Price Target (4 x FY14f EBITDA) 7.59 CC & CB - Fines 0 0 0 0
CC & CB - Rocket fines 38418 38045 49500 54000
Chichester Production 38418 39145 55000 60000
Valuation Summary of Operating Assets Chichester Sales 39152 39358 54639 59872
Cost Summary (US$/t)
Exploration/Resources Chichester Unit Cash Costs 33.09 56.81 62.54 59.40
outside Reserves
Cloudbreak &
10%
C.Creek (net of LN) Solomon Hub
60% Solomon Fines Production 0 0 0 10000
Solomon Sales 0 0 0 10000
Cost Summary (US$/t) na na na na
60000
(kt)
80
Net Shipping Costs 612.3 282.7 0.0 0.0
40000 60 Exploration Exp. 0.0 6.0 0.0 0.0
40 Corporate/Admin 24.7 105.6 108.7 110.9
20000 Other expenses 280.0 7.1 0.0 0.0
20
EBITDA 1119.9 2682.8 3473.5 3963.5
0 0 Depn & Amort 153.2 175.1 234.9 300.5
2010A 2011F 2012F 2013F 2014F 2015F 2016F EBIT 966.7 2507.6 3238.6 3663.1
Chichester Production Interest 394.2 395.6 505.7 549.5
Chichester Unit Cash Costs MRRT 0.0 0.0 0.0 56.5
Ave Price Received (FOB, moisture 7%) Operating Profit 572.5 2112.0 2732.9 3113.6
Tax expense (1.8) 292.0 819.9 934.1
Reserves & Resources Minorities 0.0 0.0 0.0 0.0
Sign Items post-tax Gain / (loss) 0.0 77.2 0.0 0.0
Reserves Mt % Fe % Si NPAT 574.3 1101.2 1913.0 2179.5
Christmas Creek and Cloudbreak 1625 58.9 4.16
Normalised NPAT 574.3 1024.0 1913.0 2179.5
Resources Mt % Fe % Si
Cloudbreak/Christmas Creek 2463 58.20 4.46 Cash Flow (US$m) 2010A 2011F 2012F 2013F
Solomon 2860 56.30 7.20
Glacier Valley - Magnetite 1230 33.1029% DTR Adjusted Net Profit 574.3 1024.0 1913.0 2179.5
North star - magnetite 1230 32.0030% DTR + Interest/Tax/Expl Exp 392.4 693.6 1325.6 1540.1
- Interest/Tax/Expl Inc 551.8 878.6 1387.0 1602.7
+ Depn/Amort 153.2 175.1 234.9 300.5
Directors +/- Leucadia Revaluation 280.0 7.1 0.0 0.0
+/- Other 0.0 0.0 0.0 0.0
Name Position Operating Cashflow 848.1 1021.2 2086.6 2417.4
Herb Elliot Chairman - Capex (+asset sales) 594.0 1097.0 201.7 3995.9
Andrew Forrest CEO - Working Capital Increase (301.5) 364.9 0.0 0.0
Russell Scrimshaw Executive Director Free Cashflow 555.6 (440.7) 1884.9 (1578.6)
Geoff Brayshaw Non-Executive Director - Dividends (ords & pref) 0.0 93.4 186.8 186.8
Graeme Rowley Non-Executive Director + Equity raised 2.2 0.0 0.0 0.0
Ian Burston Non-Executive Director + Debt drawdown (repaid) (5.7) 1652.7 0.0 0.0
Ian Cumming Non-Executive Director Net Change in Cash 580.6 1118.6 1698.1 (1765.3)
Ken Ambrecht Non-Executive Director Cash at End Period 1235.5 2354.2 4052.3 2286.9
Li Xiaowei Non-Executive Director Net Cash/(Debt) (2182.6) (2716.6) (1018.5) (2783.9)
Mark Barnaba Non-Executive Director
Owen Hegarty Non-Executive Director Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Ratios
Net Debt/Equity (%) 147.8 109.3 24.2 44.9
Interest Cover (x) 2.5 6.3 6.4 6.7
Return on Equity (%) 38.9 44.3 45.4 35.1
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
46 Patersons Resources Review - May 2011
OUR VIEW
GBG recently reported its maiden hematite shipment under an ore sales agreement with Sinosteel Midwest Corporation
(SMC). Initial mining rates at the Karara Iron Project have ramped up as expected with circa 276Kt of hematite mined and
processed. A review of the Karara Project construction and operating costs is expected to be completed by mid year. GBG is
yet to provide clarity on a course of action to account for the forecast 30% ($250m on PSL calculations) increase in project
capex reported in the March Q but we believe the company may consider debt, forward sales, a rights issue or a combination
of these. It was encouraging to see GBG recently secure funding towards working capital requirements and bank guarantees
to provide security for rail upgrade agreements. Mr Tim Netscher, ex-Newmont has now replaced Garret Dixon as CEO & MD.
Scoping studies commenced during the Q to consider the viability of a ~$500m upgrade to increase production from 10Mtpa
to 16Mtpa. GBG also reported a substantial cash balance of $241m as at 31 March. Pending an announcement of updated
cost estimates and a funding arrangement for Karara, we retain our HOLD rating with a price target of $0.99/sh.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 47
4000 80
NPAT (2.5) (3.7) (20.0) 46.8
3000 60
2000 40 Normalised NPAT (2.5) (4.0) (20.0) 46.8
1000 20
0 0 Cash Flow (A$m) 2010A 2011F 2012F 2013F
2010A 2011F 2012F 2013F 2014F 2015F
Conc Price Received Karara Magnetite Cash Costs Adjusted Net Profit (2.5) (3.7) (20.0) 46.8
Karara Magnetite + Interest/Tax/Expl Exp (0.2) 6.6 45.0 96.7
- Interest/Tax/Expl Inc 8.3 13.5 59.7 111.6
Reserves & Resources + Depn/Amort 0.9 0.5 1.2 11.1
+/- Other 0.0 0.0 0.0 0.0
Karara Magnetite Mt % Fe Operating Cashflow (10.1) (10.0) (33.5) 43.0
Reserves 977 36.5 - Capex (+asset sales) 154.3 432.7 696.4 296.8
Resources 2518 34.1 - Working Capital Increase 31.9 6.4 0.0 0.0
Free Cashflow (196.2) (449.2) (729.8) (253.9)
Mungada Hematite Mt % Fe - Dividends (ords & pref) 0.0 0.0 0.0 0.0
Reserves 10.9 61.7 + Equity raised 289.0 75.3 0.0 0.0
Resources 27.1 61.5 + Debt drawdown (repaid) 0.0 408.7 565.7 131.4
Net Change in Cash 92.8 14.8 (164.2) (122.5)
Cash at End Period 219.9 234.8 70.6 78.8
Directors Net Cash/(LT Debt) 219.9 (188.4) (918.2) (1172.1)
Name Position
George Jones Non-Executive Chairman Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Tim Netscher Managing Director
Michael O’Neil Non-Executive Director Cash/Bullion 219.9 234.8 70.6 78.8
Yu Wanyuan Non-Executive Director Total Assets 517.0 978.5 1551.0 1859.9
Chen Ping Non-Executive Director Total Debt 0.0 423.2 988.8 1250.9
Wang Heng Non-Executive Director Total Liabilities 54.0 443.8 1036.3 1298.4
Shao An Lin Non-Executive Director Shareholders Funds 463.0 534.6 514.7 561.5
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
48 Patersons Resources Review - May 2011
OUR VIEW
Gloucester has maintained a strong sales performance with a significant portion of sales being coking coal (40%). These
sales were maintained by running down stocks as ROM and saleable coal production was sharply lower for the third quarter
of FY11. The main reason cited for the disappointing production numbers was delays in receiving approvals for extension
work at Duralie and Stratford. We expect that subsequently GCL’s coking coal share will increase as it has exercised the
option, purchased from Noble, to increase its share in Middlemount mine to 47.5%. The $400m raised to make the purchase
was seen as a positive as it increased coking coal production and diluted Noble’s shareholding to 65%. GCL is in a trading
halt at the time of writing pending the announcement of “two potential acquisitions and a capital raising involving retail and
institutional investors” which we expect to be related to the purchase of another Noble asset - Donaldson. Without knowing
the particulars, we assume that GLC will raise in the vicinity of $500-600m to buy Donaldson from Noble, which would likely
further dilute Noble by about 20%. This has always been an issue with GCL and it has now come to pass. Accordingly we
maintain our HOLD recommendation with a price target of $9.65/sh until further details are released.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 49
2,500 100.00
EBIT 42.3 90.4 220.7 160.2
2,000 80.00
Interest 0.7 5.8 10.0 10.0
1,500 60.00
Operating Profit 41.5 84.6 210.7 150.2
1,000 40.00 Tax expense 8.8 25.4 63.2 45.1
500 20.00 Abnormals & Minorities 0.0 0.0 0.0 0.0
0 0.00 NPAT 32.7 59.2 147.5 105.2
2010A
2011F
2012F
2013F
2014F
2015F
2016F
2017F
2018F
2019F
2020F
2021F
Resources & Reserves (Mt) (100% Basis) Cash Flow (A$m) 2010A 2011F 2012F 2013F
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
50 Patersons Resources Review - May 2011
OUR VIEW
GRR recently announced the results of a pre-feasibility study into the Southdown magnetite project near Albany, WA which
showed for an annual throughput of 10Mtpa iron ore concentrate the capital cost of development will be A$2,570m. Funding
for this and valuations on this growth project are set to drive the fortunes of GRR in the medium term. On our estimates
the project only shows mundane returns ($300mpa EBITDA on PSL Fe, AUD assumptions) which equates to a return of 12%
on capital invested. Due to lower production in the March Q (plant shutdown) we have adjusted our underlying CY2011
EBIT forecast down by $40m. However this has been offset by an upwards revision of $70m (i.e. net $30m up) following
a one off US$70m provisional pricing gain to be reported in the June HY (PSL EBIT forecast for GRR is $82m). With the
AUD appreciating by 10% to US$1.07 GRR’s margins are significantly impacted which remains a key risk to our investment
thesis. We continue to rate GRR a BUY (PT$0.98/sh) as its comes into its next growth phase, the stock has had the tainted
image of being ‘ex-growth’ which is set to be removed as Southdown progresses.
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 51
Savage River Profit & Loss (A$m) 2010A 2011F 2012F 2013F
Exploration
69% 2% Sales Revenue 311.32 348.03 414.20 492.19
Other Income (SR Stock Movements)(10.4) 0.9 44.2 16.6
Operating Costs 170.4 220.5 225.1 237.9
Exploration Exp. 1.8 1.8 1.9 1.9
Savage River Iron Ore Production Summary Corporate/Admin 7.4 4.0 4.1 4.2
EBITDA 121.4 122.6 227.4 264.9
3000 220
Depn & Amort 37.3 40.0 55.7 60.0
200
EBIT 84.1 82.6 171.7 204.8
2500 180 MRRT 0.0 0.0 4.9 20.0
160 Interest 9.6 3.3 59.4 77.6
2000 140 Operating Profit 74.5 79.3 107.4 107.3
(A$/t)
1500
100 Minorities 0.0 0.0 0.0 0.0
1000 80 Abnormals 48.2 0.0 0.0 0.0
60 NPAT 77.2 55.5 75.2 75.1
500 40
20 Normalised NPAT 79.3 55.5 75.2 75.1
0 0
2010A 2011F 2012F 2013F 2014F 2015F 2016F 2017F
Ave Price Received (FOB) Weighted Ave Cash Costs
Cash Flow (A$m) 2010A 2011F 2012F 2013F
Savage River
Adjusted Net Profit 77.0 55.5 75.2 75.1
Reserves & Resources + Interest/Tax/Expl Exp 56.8 28.9 93.5 111.7
- Interest/Tax/Expl Inc 16.3 29.1 93.7 111.9
Savage River Magnetite Mt % DTR + Depn/Amort 37.3 40.0 55.7 60.0
Reserves 149 49.2 +/- Other 0.0 0.0 0.0 0.0
Resources 316 50.7 Operating Cashflow 154.8 95.3 130.6 134.9
- Capex (+asset sales) 5.7 31.5 299.8 825.0
Southdown Magnetite (100%) Mt % DTR - Working Capital Increase 63.6 (85.0) 0.0 0.0
Reserves 388 35.5 Free Cashflow 85.5 148.8 (169.2) (690.1)
Resources 654 36.5 - Dividends (ords & pref) 0.0 0.0 0.0 0.0
+ Equity raised 0.0 420.0 0.0 0.0
+ Debt drawdown (repaid) (44.9) (12.5) 968.0 (7.0)
Directors Net Change in Cash (4.0) 556.3 798.8 (697.1)
Cash at End Period 91.9 648.2 1447.0 749.9
Name Position Net Cash/(LT Debt) 44.9 613.7 444.5 (245.6)
Xi Zhiqiang Chairman
Neil Chatfield Deputy Chairman
Russell Clark Managing Director Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Hong Lin Zhao Non-Executive Director
Clement Cheung Ko Non-Executive Director Cash/Bullion 91.9 648.2 1447.0 749.9
Mr Peter Stephens Non-Executive Director Total Assets 799.9 1381.7 2466.3 2583.6
John Hoon Non-Executive Director Total Debt 47.0 34.5 1002.5 995.5
Total Liabilities 236.8 343.2 1352.6 1394.8
Substantial Shareholders Shares (m) (%) Shareholders Funds 563.1 1038.6 1113.7 1188.8
Shagang 551.0 47.2
RGL 143.6 12.5 Ratios
Pacific Minerals 161.3 13.8 Net Debt/Equity (%) (8.0) (59.1) (39.9) 20.7
Acorn 50.0 4.3 Interest Cover (x) 8.8 25.2 2.9 2.6
Stemcor 32.0 2.7 Return on Equity (%) 13.7 5.3 6.7 6.3
Disclosure: Patersons acted as underwriter for GRR’s 1:1 non renounceable pro-rata rights issue in August 2009 which raised
$124m. It received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
52 Patersons Resources Review - May 2011
OUR VIEW
Following a strong run from mid-2010 with a buoyant gold price and news of Tropicana development, IGO announced a
$532m deal to takeover JML on a 1:8 scrip basis in early February. This put significant downwards pressure on the stock
as the market held the view it was over paying. The deal has since closed and we see the assets as a good fit for IGO
adding $61mpa NPAT to the group in the coming years (implying 8.7x P/E acquisition multiple). IGO will acquire a highly
prospective pipeline of exploration projects and JML will gain improved access to funding. We also believe the management
teams of the companies are complimentary with IGO historically being exploration focused while JML management have
a strong project development track record. FY12 looks like a strong year for IGO as the impact of the JML acquisition is
seen in the company’s operating profit (on our estimates EPS almost triples). Funding for IGO’s share of Tropicana and
Stockman will be met internally with the company able to maintain a dividend on our forecasts ($560m in operating cash
flow versus $330m in capital expenditure commitments). We rate IGO a BUY with a target price of $8.13/sh.
the market responded poorly to the deal believing IGO paid a EBITDA ($m) 58.2 71.6 163.4 191.5
premium at the implied value of $532m for JML. However we EV/EBITDA (x) 9.7 13.9 6.6 5.6
believe the takeover is a good fit, providing IGO with a pipeline Capex ($m) 31.1 60.8 120.0 111.0
of exploration and development opportunities and affording the Free Cashflow 21.9 (32.8) (8.6) 20.9
ex-JML projects (Stockman capex requirement is estimated at FCFPS (cents) 19.1 (16.3) (4.3) 10.4
$190m) with funding to take them into production. IGO has PFCF (x) 32.5 (38.1) (144.5) 59.8
compulsorily acquired JML as of 12 May 2011.
DPS (cents) 1.0 12.0 9.0 11.0
Yield (%) 0.2 1.9 1.5 1.8
• Valuation updated for the integration. Our updated IGO
valuation includes JML’s Jaguar/Bentley and Stockman projects, Franking (%) 100 100 100 100
and the target price has been adjusted accordingly. Our DCF
valuation is $7.39/sh with a price target of $8.13/sh.
Company Statistics & Performance
• Nickel production marginally lower. The March Q saw
production fall 16% short of forecasts, which was attributed the Shares on issue (m) 201.5 3mth ADT ($m) 5.67
Moran development where airway ventilation works and drilling Market Cap. ($m) 1249.3 Debt est ($m) 0.0
for extensions were completed. Consequently cash costs moved 52 week range $4.01 - $8.13 Cash est ($m) 252.4
higher (actual A$5.52/lb versus forecast A$4.37/lb). Mine life
remains a key area to watch with exploration at Moran North
highlights including an intercept of 5m at 12.2% Ni. 9.00 3000
moving ahead. We are expecting a 33 month build period and 7.00 2000
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 53
10,000 10.00
Profit & Loss (A$m) 2010A 2011F 2012F 2013F
Nickel in conc (t)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
54 Patersons Resources Review - May 2011
OUR VIEW
Lynas is only months away from becoming the first new Rare Earth Oxide (REO) supplier outside China and with prices at
record levels it is an attractive company in this space. The company has received its operating licence for the Mt Weld Rare
Earth Concentration plant and will begin feeding ore into the concentrator in the third week of May. The resulting concentrate
will be shipped to Malaysia in September to produce the finished Rare Earth Oxide product for sale. We expect REO prices that
are made up of the prices of 15 individual elements to eventually decline but the current market fundamentals for the majority
of the 15 elements are very supportive. Our short term price assumptions are $80/kg, half of current spot prices of $163/kg,
and our long term prices are $40/kg, a quarter of current spot prices. The company is fully funded for it to achieve forthcoming
milestones with $220m in cash plus further funds raised through a combination of issuing equity and debt. Our valuation has
risen and we re-iterate our BUY recommendation with a price target of $2.95/sh.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 55
15,000 60.00
Minorities 0.0 0.0 0.0 0.0
(t)
0 0.00
2010A 2011F 2012F 2013F 2014F
Cash Flow (A$m) 2010A 2011F 2012F 2013F
Mt Weld suite of REO (US$/kg) Cash Cost (US$/kg)
Adjusted Net Profit (43.0) (24.8) 257.6 567.9
Total REO Production (t)
+ Interest/Tax/Expl Exp 0.4 0.2 4.5 15.6
- Interest/Tax/Expl Inc 0.7 0.4 4.6 15.6
Reserves & Resources + Depn/Amort 1.2 0.0 5.8 18.3
+/- Other 0.0 (11.0) 0.0 0.0
Reserves MtGrade (%)REO (kt) Operating Cashflow (42.2) (35.9) 263.3 586.1
Mt Weld 2.08 15.5 322 - Capex (+asset sales) 36.0 218.3 152.8 256.2
Resources MtGrade (%)REO (kt) - Working Capital Increase (39.3) 0.0 0.0 0.0
Mt Weld - CLD 9.9 10.7 1,057 Free Cashflow (38.8) (254.3) 110.5 330.0
Mt Weld - Duncan 7.6 4.8 366 - Dividends (ords & pref) 0.0 0.0 0.0 0.0
Kangankunde- Malawi 2.5 4.2 107 + Equity raised 431.5 101.5 0.0 0.0
Crown Tantalum & Niobium Deposit 37.7 1.2 437 + Debt drawdown (repaid) 0.0 0.0 152.8 32.9
Total 57.7 3.4 1,968 Net Change in Cash 388.5 (184.4) 263.3 362.9
Cash at End Period 405.2 220.8 484.1 847.0
Directors Net Cash/(Debt) 405.2 220.8 331.3 661.2
Name Position
Nick Curtis Executive Chairman Balance Sheet (A$m) 2010A 2011F 2012F 2013F
David Davidson Non Executive Director
Jacob Klein Non Executive Director Cash 405.2 220.8 484.1 847.0
Liam Forde Non Executive Director Total Assets 640.7 676.8 1130.6 1830.4
Total Debt 0.0 0.0 152.8 185.8
Substantial Shareholders Shares (m) % Total Liabilities 21.5 20.2 216.5 348.4
Morgan Stanley 172.9 10.2 Shareholders Funds 619.1 656.6 914.2 1482.0
JP Morgan Chase 76.5 4.5
JP Morgan Asset Mgmt 24.0 1.4 Ratios
Carmignac Gestion 22.0 1.3 Net Debt/Equity (%) na na na na
Van Eck Associates 17.6 1.0 Interest Cover (x) na na 58.1 37.6
General Electric 16.9 1.0 Return on Equity (%) na na 28.2 38.3
Nick Curtis 16.0 0.9 Gearing (%) (9.2) (189.5) (50.7) (56.8)
Fidelity International 9.7 0.6
Fidelity Management 9.6 0.6
Capital Research Global 55.0 3.2
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
56 Patersons Resources Review - May 2011
OUR VIEW
All of the large cap coal producers have their blemishes but looking forward MCC looks like the standout in terms of valuation
and relative to its peers. Granted it reported a very poor result for the third quarter of FY11 where ROM coal production fell
45% and sales fell by 56%. These results were to be expected as the company has been under force majeure conditions
since December due to the QLD floods. The force majeure has been lifted and the impacts of the flooding will only linger for
the next few months, including rollover commitments. Then we should see a return to higher production volumes combined
with higher prices. However those prices and returns will be reduced by the strength of the Aussie dollar, which has knocked
80c per share off our previous valuation. The semi-hard coking coal from Middlemount will contribute less to future growth
after GCL increased its holding to 47.5%. However, development of MCC’s large portfolio of exploration and operating assets
will support growth. The share price has reacted positively to the recent profit guidance and increase in coal resources at
West Rolleston and Vermont East/Willunga tenements. We are maintaining our BUY recommendation despite the fact that
our revised Aussie dollar assumptions have taken some of the shine off our price target which is currently $14.15/sh.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 57
Resources 100% Basis (Mt) Adjusted Net Profit 124.7 212.0 448.2 406.0
+ Interest/Tax/Expl Exp 60.0 98.6 202.2 183.1
Meas. Indic. Total - Interest/Tax/Expl Inc 108.6 114.6 218.4 199.6
Coppabella 59.7 121.6 181.3 + Depn/Amort 31.3 24.3 38.3 47.3
Moorvale/Moorvale West 167.0 68.6 235.6 +/- Other (Associates) 70.0 (31.1) 0.0 0.0
Olive Downs 56.4 53.3 109.7 Operating Cashflow 177.3 189.2 470.3 436.8
Monto 22.4 50.0 72.4 - Capex (+asset sales) 130.2 370.9 64.5 55.7
Vermon East/Wilunga 170.0 123.6 293.6 - Working Capital Increase 0.0 0.0 0.0 0.0
Codrilla 42.8 12.7 55.5 Free Cashflow 47.1 (181.7) 405.8 381.1
West Rolleston 47.2 105.9 153.1 - Dividends (ords & pref) 53.4 130.6 126.9 223.5
Middlemount 89.3 31.5 120.8 + Equity raised 62.0 499.5 0.0 0.0
+ Debt drawdown (repaid) 24.5 (10.8) 29.5 (24.3)
Total Resources 1222.0 Net Change in Cash 80.2 176.4 308.4 133.2
Cash at End Period 347.8 524.2 832.6 965.9
Directors Net Cash/(Debt) 248.4 435.6 714.5 872.0
Name Position
Keith De Lacy Non-Executive Chairman Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Roger Marshall Non-Executive Deputy Chairman
Nicole Hollows Managing Director & Chief Executive Officer Cash 348.2 524.2 832.6 965.9
Martin Kriewaldt Non-Executive Director Total Assets 1567.1 1994.8 2621.4 2799.6
Peter Forbes Non-Executive Director Total Debt 99.4 88.6 118.2 93.8
Terry O’Reilly Non-Executive Director Total Liabilities 438.5 259.7 661.7 636.2
Chen Zeng Non-Executive Director Shareholders Funds 1128.6 1735.0 1959.7 2163.4
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
58 Patersons Resources Review - May 2011
Quality Project: Accept ARMZ Offer Analyst: Simon Tonkin, Rhys Bradley
OUR VIEW
MRU is a uranium exploration and development company with a portfolio of assets in Southern Africa. The company’s
key focus is the Mkuju River Project in Tanzania where it discovered multiple thick zones of sandstone hosted uranium
mineralisation at the 101.4mlb Nyota deposit. In December 2010, MRU and ARMZ Uranium Holding Co. (ARMZ) entered
into a Scheme Implementation Agreement (i.e. friendly deal) under which ARMZ will acquire all of the issued share capital
in MRU by way of a Scheme of Arrangement with minimal conditions. Following the events of Fukushima, Japan and the
impact on the uranium market ARMZ revised downward by 12.5% its all-cash consideration to $6.87/sh with a $0.15/sh
special dividend (from $8/sh). This values the Company at approximately A$1.02 billion. The Scheme Booklet has been
dispatched to shareholders and the next key date is 20 May 2011 whereby a Scheme Meeting will be held to vote on the
deal. The proposed implementation date is Thursday 9 June 2011. We believe the deal is attractive for MRU shareholders
considering the current environment for uranium. We have a $6.60/sh target price on MRU based on our revised multiple
from 1.5 to 1.2x NAV. Our recommendation is for MRU shareholders to accept the offer.
6.00 3000
• Plenty of Exploration Upside. MRU has commenced its
near mine exploration drill program with first results in
November. This could ultimately expand the Nyota resource 5.00 2000
by 100mlb.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 59
Unpaid Capital Profit & Loss (US$m) 2011F 2012F 2013F 2014F
26%
Sales Revenue 0.0 0.0 99.2 203.9
Uranium Production Summary Other Income 2.4 6.3 2.6 2.1
Operating Costs 0.8 0.0 51.1 96.8
5.00 30 Exploration Exp. 36.9 27.8 11.7 12.0
Corporate/Admin 4.1 4.1 5.0 5.1
EBITDA (39.4) (25.7) 33.8 92.2
4.00 28
Depn & Amort 0.0 0.0 13.3 26.0
EBIT (39.4) (25.7) 20.6 66.2
3.00 26 Interest 0.0 1.7 3.1 0.7
Operating Profit (39.4) (27.3) 17.5 65.5
2.00 24 Abnormals (pre-tax) 0.0 0.0 0.0 0.0
Tax expense 0.0 0.0 0.0 0.0
1.00 22
Minorities 0.0 0.0 2.0 6.3
NPAT (39.4) (27.3) 15.5 59.2
0.00 20
2012F 2013F 2014F 2015F 2016F 2017F
Cash Flow (US$m) 2011F 2012F 2013F 2014F
Total Production (mlbs) Cash Cost (US$/lb)
Adjusted Net Profit (39.4) (27.3) 15.5 59.2
Reserves & Resources + Interest/Tax/Expl Exp 36.9 29.5 14.8 12.7
- Interest/Tax/Expl Inc 36.9 32.0 19.9 17.8
M & I Resources Mt ppm (mlb) U3O8 (t) + Depn/Amort 0.0 0.0 13.3 26.0
Mkuju River (200ppm cut) 67.7 439 65.5 29,720 +/- Other (0.2) 0.0 0.0 0.0
Operating Cashflow (39.6) (29.8) 23.7 80.1
Total 67.7 439 65.5 29,720 - Capex (+asset sales) 54.6 222.0 25.8 22.3
- Working Capital Increase (12.2) 0.0 0.0 0.0
Inferred Resources Mt ppm (mlb) U3O8 (t) Free Cashflow (82.0) (251.8) (2.1) 57.8
Mkuju River (200ppm cut) 41.2 395 35.9 16,274 - Dividends 0.0 0.0 0.0 0.0
+ Equity Raised 302.7 0.0 0.0 0.0
Total 41.2 395 35.9 16,274 + Debt Drawdown (Repaid) 0.0 91.9 (64.2) (4.2)
Net Change in Cash 205.6 (159.9) (66.3) 53.6
Total 108.9 422 101.4 45,994 Cash at End Period 284.3 124.4 58.1 111.8
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
60 Patersons Resources Review - May 2011
OUR VIEW
MII recently entered into a non-binding Heads of Agreement (HOA) to sell the Lennard Shelf lead-zinc project for $78m
to its major shareholder NWME. Considering ~$27m was spent on acquisition and development of the project, MII will be
realising significant value from the investment. After the transaction MII will hold approximately $68m in cash (after tax)
and is on the hunt for its next project. The non-binding HOA to acquire a 75% stake in Russian gold company Omchak has
been extended to 11 July 2011 while MII does its due diligence. Our view is neutral on the Russian gold project, pending
the outcome of MII’s due diligence and an upcoming $10m drilling programme. While the Russian HOA is non-binding MII
continues to assess other ventures and has indicated a preference for gold and copper projects in or near production. We
see MII as a cash box, however, we do attribute significant upside value to management, who have a proven track record
of locating and developing quality assets. We rate MII as a Speculative BUY with a price target of $0.15/sh.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 61
30.00
(kt)
0.75
20.00 Cash Flow (A$m) 2010A 2011F 2012F 2013F
0.50
Adjusted Net Profit (9.2) (7.6) (3.2) 3.7
10.00
0.25 + Interest/Tax/Expl Exp 5.6 6.1 4.5 8.3
- Interest/Tax/Expl Inc 7.0 7.6 5.1 8.7
0.00 0.00 + Depn/Amort 0.1 0.0 0.0 11.4
2012F 2013F 2014F 2015F 2016F 2017F
+/- Other 0.0 0.0 0.0 0.0
Zn Production (kt) Pb Production (kt)
Zn + Pb cash cost (US$/lb) Zinc Price (US$/lb) Operating Cashflow (10.5) (9.1) (3.8) 14.7
Lead (US$/lb) - Capex (+asset sales) 2.4 17.4 66.5 51.7
- Other investing cashflow (4.8) 0.0 0.0 0.0
Reserves & Resources - Working Capital Increase (2.8) (0.4) 0.0 0.0
Free Cashflow (5.3) (26.0) (70.3) (37.1)
Resources (Mt) (% g/t) (kt,koz) - Dividends (ords & pref) 0.0 0.0 0.0 0.0
Lennard Shelf 17.23 + Equity raised 12.2 113.1 0.0 0.0
Lead 4.0 689 + Debt drawdown (repaid) 0.0 0.0 60.0 (5.0)
Zinc 5.5 948 Net Change in Cash 6.9 87.1 (10.3) (42.1)
Total Zn + Pb 1,637 Cash at End Period 7.4 94.5 84.2 42.1
Net Cash/(LT Debt) 3.5 94.5 24.2 (12.9)
Silver (koz) 10.5 5,817
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
62 Patersons Resources Review - May 2011
OUR VIEW
MRE is set to demonstrate a turn around in earnings despite currency headwinds. The company reported lower than forecast
production results for the March Q 2011 despite this full year production guidance remains between 33-37kt nickel. While
production consistency has been an issue for MRE’s flagship Murrin Murrin Nickel Project following a major shutdown
and maintenance programme we anticipate a significant boost to output (through debottlenecking) and reliability. MRE
achieved ramp-up to full production in January. MRE’s increased production rates will cash in on higher nickel prices which
have risen >20% since June to ~US$11.00/lb. With nickel metal forwards (LME) trading in contango the price appears
likely to be strong throughout 2012. On current metrics MRE looks attractive trading at 3.2x our FY11 and FY12 EBITDA
forecasts. Furthermore, MRE’s strong cash position of ~$200m provides a basis for their intentions to grow organically or
via acquisition. Glencore has maintained its 71% ownership, which we believe will remain static for the medium term. We
retain our BUY recommendation with a price target of $0.93/sh based on an FY11 and FY12 EV/EBITDA multiple of 5.5x.
to normal mine development drilling and is the first near mine 12500
exploration to be undertaken in 10 years.
0.75 10000
• Growth Opportunities are on the radar. MRE is actively
looking to acquire a second mine to leverage off their strong 7500
cash position and technical success in developing High- 0.50
Pressure Acid Leach (HPAL) nickel production with laterite 5000
ores. The Mount Lucky manganese tenements were purchased
from Crescent Gold (CRE:ASX) in August ‘10 signalling the 0.25
2500
company’s intention to acquire assets complimentary to Murrin
Murrin. The addition of the manganese ore improves the nickel
0.00 0
processing of the nickel laterites in the HPAL plant.
12 Months
• Catalysts. 1) Ramp-up to 36ktpa production rate. 2) Delivery
of higher grades via Murrin Murrin East. 3) Exploration results
from Murrin Murrin. 4) Identification of growth opportunities.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 63
30,000 9
Cash Flow (A$m) 2010A 2011F 2012F 2013F
(US$/lb)
(t)
20,000 6
Adjusted Net Profit 59.9 122.1 109.6 81.4
+ Interest/Tax/Expl Exp 27.8 67.6 62.5 50.8
10,000 3 - Interest/Tax/Expl Inc 25.3 72.7 67.7 56.0
+ Depn/Amort 48.3 23.4 24.5 23.0
0 0 +/- Other 1.0 0.0 0.0 0.0
2010A 2011F 2012F 2013F 2014F 2015F
Operating Cashflow 111.6 140.4 128.9 99.1
Contained Nickel (t) Weighted Ave Cash Cost (US$/lb) - Capex (+asset sales) 32.6 21.4 18.7 19.1
Realised Nickel Price (US$/lb)
- Working Capital / Other (18.6) (1.2) 0.0 0.0
Free Cashflow 97.7 120.2 110.2 80.0
Reserves & Resources - Dividends (ords & pref) 111.1 70.2 70.2 70.2
+ Equity raised 0.0 0.0 0.0 0.0
Reserves Mt Ni % Ni kt + Debt drawdown (repaid) (7.6) 0.0 0.0 0.0
Murrin Murrin 144 1.09 1,570 Net Change in Cash (21.0) 50.0 40.0 9.9
Cash at End Period 226.1 276.2 316.2 326.1
Resources Mt Ni % Ni kt Net Cash/(LT Debt) 226.0 276.2 316.2 326.1
Murrin Murrin 342 0.99 3,386
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
64 Patersons Resources Review - May 2011
OUR VIEW
Mincor (MCR) reported a poor March Q from its Kambalda Operations. Total nickel production was 1,978t for the quarter,
34% lower than PSL forecast of 2,983t. Cash costs came in higher at A$8.64/lb (PSL est. A$7/lb). Lower production was a
result of the partial closure of the Otter Juan mine due to a seismic event in March and ongoing performance issues with
Miitel. A combination of factors have hit MCR that have resulted in potential for the stock to move lower, these include: 1)
several seismic events that have impacted production 2) Lack of Staff at Miitel and Mariners which have required MCR to
increase wages by 15% 3) Lower grade material at Mariners prior to higher grade material at end of year. The biggest problem
appears to be attracting talented miners to work at MCR’s mines and it appears that MCR may have lost several key hires,
therefore it could take several quarters to be back to the full staff complement. Based on our analysis and adjustments to
costs and mining profile our price target decreases to $0.89/sh based on a 1.0x NAV. We retain our SELL rating.
the Otter Juan mine was a considerable factor however Reported NPAT ($m) 28.1 (8.7) 16.9 12.5
low equipment availability and under-supply of contract Recurrent NPAT ($m) 27.6 (0.9) 16.9 12.5
personnel continue to severely impact production at the Recurrent EPS (cents) 13.7 (0.5) 8.4 6.2
Miitel mine. MCR recognised the need to address this in EPS Growth (%) 2,171.2 na na (25.7)
PER (x) 8.3 (246.0) 13.6 18.3
December Q stating an expected 15% increase in cash
costs should address the labour shortfall and improve EBITDA ($m) 79.9 30.1 64.3 38.3
productivity. This quarter saw a 20% increase in cash EV/EBITDA (x) 1.3 4.6 1.8 3.0
costs with none of the expected increase in production Capex ($m) 28.0 44.4 21.8 21.5
realised. There is some hope of better production in the Free Cashflow 65.0 (13.6) 33.1 9.6
September and December Qs at Mariners: with potential FCFPS (cents) 32.4 (6.8) 16.5 4.8
PFCF (x) 3.5 (16.9) 6.9 24.0
for the terrace level to start in late June Q and the N10
orebody late CY2011. DPS (cents) 9.0 4.0 6.0 6.0
Yield (%) 7.9 3.5 5.2 5.2
• Seismic Incident at Otter Juan. Due to a seismic event
on 22 March, production from Otter Juan was down 36%
Franking (%) 100.0 100.0 100.0 100.0
activity.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 65
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
66 Patersons Resources Review - May 2011
MBN Preferred Pick in Nickel Space Analyst: Simon Tonkin, Rhys Bradley
OUR VIEW
MBN is our preferred pick in the nickel space due to: 1) its offshore exposure and attractive operating environment where
the Brazilian currency has been weak against the US$ 2) Growth plans to move production >20ktpa Ni and 3) Installation
of a desliming circuit to improve recoveries and efficiency. MBN’s March quarterly production from its Santa Rita Project
in Brazil came in at 2,825t Ni which was 14% lower than our 3,302t estimate. The reason for the lower March Q was the
impact of the SAG motor failures in January 2011. Costs came in at US$6.97/lb (in line with our US$7.06/lb). Recoveries
remained at 55% as we had anticipated and this is expected to improve to 65% once the desliming circuit is installed.
Despite the lower production the focus for MBN is opening up the pit to give greater production flexibility and completion of
the plant expansion and desliming circuit in Q3/CY2011. We have incorporated the new 43-101 technical report production
and cost profile, the revised private offering for $US375m and our higher nickel forecasts. The net impact is an increase
to our target price to $3.38/sh (previously $2.72/sh) retain our Buy rating.
impact from the SAG mill motor failures in January 2011. Reported NPAT ($m) (47.5) 25.8 203.3 205.9
MBN is also very much focused on the open-pit pre-strip Recurrent NPAT ($m) (28.8) 25.8 203.3 205.9
which will open-up the pit and provide significant production Recurrent EPS (cents) (5.8) 5.2 41.0 41.5
flexibility in the later half of 2011. The completion of the pre- EPS Growth (%) na na 689.4 1.2
PER (x) (35.7) 39.8 5.0 5.0
strip program for the whole mine is on track to be completed
by the end of Q2/2011. The new Brazil mining team appears EBITDA ($m) 36.9 104.4 345.5 349.0
to be doing an excellent job with a strip ratio in the March Q EV/EBITDA (x) 32.2 11.4 2.7 2.0
of 8.3:1 and this is expected to drop dramatically. In addition, Capex ($m) 102.2 30.5 16.7 18.4
It was encouraging to see that the recoveries remained Free Cashflow (101.4) (0.3) 240.2 239.4
strong at 55% and indicates the plant, when operating, FCFPS (cents) (20.5) (0.1) 48.4 48.3
PFCF (x) (10.1) nm 4.3 4.3
was efficient. The focus will be on the Q3/2011 when the
desliming circuit is incorporated and expected to increase DPS (cents) 0.0 0.0 0.0 0.0
recoveries towards 65%. Yield (%) 0.0 0.0 0.0 0.0
Franking (%) 100.0 100.0 100.0 100.0
• Expansion to 7.2Mtpa On-Target. MBN’s expansion of
its processing plant is progressing well and is on schedule
to be completed by the 2H/2011. All major components Company Statistics & Performance
have been ordered for the desliming circuit and crusher
upgrade due to be completed in Q3/2011. This is the Shares on issue (m) 491.6 3mth ADT ($m) 3.35
main value driver for MBN and will take production toward Market Cap. ($m) 1017.5 Debt est ($m) 262.5
25ktpa. We would also expect costs to fall significantly as 52 week range $1.58 - $2.46 Cash est ($m) 56.0
MBN’s grade and recoveries improve.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 67
Sensitivity Price Target (A$) +10% 0% -10% Profit & Loss (US$m) 2010A 2011F 2012F 2013F
Nickel Price 4.03 3.38 2.73 Sales Revenue 211.1 337.6 550.4 541.9
A$ : $US 2.83 3.38 3.59 Other Income 1.0 6.9 16.2 28.3
Operating Costs 166.0 228.9 209.8 209.5
Valuation Summary of Operating Assets Exploration Exp. 0.0 1.8 1.9 1.9
Corporate/Admin 9.3 9.3 9.5 9.7
EBITDA 36.9 104.4 345.5 349.0
Depn & Amort 37.2 43.9 57.8 58.2
EBIT (0.3) 60.6 287.7 290.8
Interest 22.1 26.6 33.5 33.5
Santa Rita Exploration Provisions 18.7 0.0 0.0 0.0
91% 9% Operating Profit (41.2) 33.9 254.2 257.3
Tax expense 6.3 8.2 50.8 51.5
Minorities 0.0 0.0 0.0 0.0
NPAT (47.5) 25.8 203.3 205.9
Santa Rita - Reserves Mt Ni % Cu % Ni kt Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Proven & Probable 84.0 0.61 0.14 508
Total 84.0 0.61 0.14 508 Cash 102.1 234.3 474.4 715.8
Total Assets 1120.3 1251.8 1472.2 1677.4
Santa Rita - Resources Mt Ni % Cu % Ni kt Total Debt 262.5 395.0 395.0 395.0
Proven & Probable (Pit) 121.0 0.6 0.16 726 Total Liabilities 501.0 606.8 623.8 623.1
Inferred (Underground) 87.5 0.79 0.23 691 Shareholders Funds 619.3 645.1 848.4 1054.3
Inferred 19.8 0.6 0.16 119
Low Grade Resource 53.0 0.3 0.07 159 Ratios
Total (excl. low grade) 228.3 0.60 0.10 1,536 Net Debt/Equity (%) 25.90 24.92 na na
Interest Cover (x) na 2.3 8.6 8.7
Directors Return on Equity (%) na 4.0 24.0 19.5
Name Position
Craig Burton Non-Executive Chairman Substantial Shareholders Shares (m) %
Ian Purdy CEO & MD
Colin Steyn Non-Executive Director Canadian Control Account 172.5 35.1
Bill Clough Non-Executive Director JP Morgan Nominees Australia Ltd 64.1 13.1
Nick Sheard Non-Executive Director National Nominees Ltd 57.2 11.6
Joe Hamilton Non-Executive Director HSBC Custody Nominees (Australia) Ltd 32.7 6.7
Geoff Handley Non-Executive Director
Ian McCubbing Non-Executive Director
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
68 Patersons Resources Review - May 2011
OUR VIEW
MGX has enjoyed a steady run up in share price during FY2011 on the back of strengthening iron ore prices. However, with
the Chairman’s resignation in November, a surging Australian dollar and a broader cooling of the market we believe full value
in the stock is yet to be realised. Shaky market sentiment was accentuated by extreme rainfall during the March Q which
caused widespread flooding and constricted ore sales by 41% on the previous Q. Despite the lacklustre performance MGX still
maintained a strong cash position of A$388m and fully repaid its $35m debt facility. With Koolan Island making the transition
to owner operator we expect to see cost and productivity advantages realised in the 2H FY2012 and beyond. Development
at Extension Hill remains on schedule with capital works substantially complete and pre-strip mining well underway. MGX is
currently recruiting two new non-executive directors to restore appropriate independence to the board which is a pivotal step
in addressing market concerns over corporate governance. Set to recover from a torrid March Q, we view favourably the cash
position, earnings outlook and realignment of the board. We upgrade our recommendation from SELL to BUY (PT $2.68).
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 69
NPV 2.30 2.68 3.06 Group Sales (kt) 6,487 5,672 7,781 10,100
Koolan Island Profit & Loss (A$m) 2010A 2011F 2012F 2013F
50%
Sales Revenue 532.9 799.3 1,288.0 1,243.2
Other Income 49.1 18.5 30.3 0.0
Tallering Peak
14%
Operating Costs 79.6 125.4 199.8 307.0
Exploration Exp. 0.1 0.0 0.0 0.0
Corporate/Admin 20.7 20.3 20.5 20.9
Iron Ore Production Summary EBITDA 481.6 672.1 1098.1 915.4
Depn & Amort 278.0 201.6 185.3 166.2
12,000 200 EBIT 203.7 470.5 912.7 749.1
Interest 18.2 9.2 0.0 0.0
160 Abnormals 2.9 14.1 0.0 0.0
9,000 Operating Profit 188.3 475.3 912.7 749.1
120 Tax expense 55.9 141.3 273.8 224.7
(A$/t)
6,000
80
NPAT 132.4 334.1 638.9 524.4
0 0
2010A 2011F 2012F 2013F 2014F 2015F Cash Flow (A$m) 2010A 2011F 2012F 2013F
Weighted Ave Cash Costs Ave Price Received (FOB)
Adjusted Net Profit 132.4 334.1 638.9 524.4
Group Sales (kt)
+ Interest/Tax/Expl Exp 74.3 150.5 273.8 224.7
- Interest/Tax/Expl Inc 74.0 171.0 301.2 252.7
Reserves & Resources + Depn/Amort 278.0 201.6 185.3 166.2
- Deferred Waste 134.8 133.3 128.5 71.7
Reserves Mt % Fe% Al+Si % Phos Operating Cashflow 275.8 381.9 668.3 591.0
Tallering Peak 8.39 61.20 8.32 0.03 - Capex (+asset sales) 284.5 160.0 12.3 12.5
Extension Hill 14.80 59.40 7.66 0.06 - Working Capital Increase (155.6) (27.0) 0.0 0.0
Koolan Island 33.30 63.40 8.41 0.01 Free Cashflow 146.9 248.9 656.1 578.5
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Resources Mt % Fe% Al+Si % Phos + Equity raised 18.6 0.0 0.0 0.0
Tallering Peak 11.20 61.10 8.77 0.04 + Debt drawdown (repaid) (40.3) (64.7) 0.0 0.0
Extension Hill 23.10 58.40 9.33 0.06 Net Change in Cash 125.2 184.2 656.1 578.5
Koolan Island 74.30 62.60 9.61 0.01 Cash at End Period 347.4 531.6 1187.6 1766.1
Net Cash/(Debt) 282.7 531.6 1187.6 1766.1
Directors
Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Name Position
Craig Readhead Chairman Cash/Bullion 347.4 531.6 1187.6 1766.1
Luke Tonkin Managing Director Total Assets 1296.0 1438.6 2024.4 2548.8
Ian Macliver Non Executive Director Total Debt 64.7 0.0 0.0 0.0
Alan Jones Non Executive Director Total Liabilities 369.1 177.6 124.5 124.5
Lee Seng Hui Non Executive Director Shareholders Funds 926.9 1261.0 1899.9 2424.3
Robert Wilcocks (Alternate Director)
Alan Rule (Alternate Director) Ratios
Cao Zhong (APAC nom) Non Executive Director Debt/Equity (%) na na na na
Chen Zhouping (Shougang nom) Non Executive Director Interest Cover (x) 11.2 na na na
Return on Equity (%) 14.3 26.5 33.6 21.6
Substantial Shareholders Shares (m) %
APAC Resources Ltd* 279.9 25.9
Shougang Concord* 154.2 14.2
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
70 Patersons Resources Review - May 2011
OUR VIEW
We continue to view NHC as a good low cost operator in the coal sector. It has been able to capitalise on escalating coal prices
while others have not and production has been almost uninterrupted by the rain. Flooding did damage the Acland rail to QBH
export terminal and therefore impacted sales. The line has now been restored although the disruption will have an impact on
profitability in the next reporting period. The break has allowed ROM stocks, which were run down during the last reporting
period, to be rebuilt. The company had a large cash inflow of $460m from the settlement of its 16.7% share of Arrow Energy
and has acquired a majority share of NEC for about $180m. Our valuation has fallen marginally to $4.90/sh as the company’s
asset base is relatively unchanged and higher coal prices have been offset by the appreciating Australian dollar and a higher cost
base for the Acland mine. All told not much has changed during 2011 for NHC, it has a good mining operation in Acland, large
cash reserves but not much on the horizon in the way of catalysts to break the share price out of the trading range it has been
stuck in for almost three quarters. Though we view NHC as one of the best operators in the sector, we think it is fairly valued.
Accordingly we are maintaining our HOLD recommendation with a price target of $4.90/sh.
informed the market in early April that the first train of Acland
coal was delivered to the QBH export terminal on schedule
6.00 1200
and services are now operating at contractual capacity.
800
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 71
70.00
4,000
60.00 Normalised NPAT 171.3 162.2 277.0 277.2
3,000 Normalised NPAT excl Intrst.100.1 100.5 221.5 218.6
50.00
2,000 40.00
1,000 30.00
0 20.00 Cash Flow (A$m) 2010A 2011F 2012F 2013F
2010A 2011F 2012F 2013F 2014F
All Mines (Kt) FOB Costs (US$/t) Price Recieved (US$/t) Adjusted Net Profit 184.0 162.2 277.0 277.2
+ Interest/Tax/Expl Exp 74.2 209.4 118.7 118.8
- Interest/Tax/Expl Inc 74.6 221.4 130.9 131.3
Resources & Reserves (Mt) + Depn/Amort 38.0 31.9 37.5 44.7
+/- Other (Associates) (696.4) 0.0 0.0 0.0
Total Operating Cashflow (474.8) 182.1 302.4 309.4
New Acland - Capex (+asset sales) 83.0 13.0 154.7 2.1
Resources - Meas - Ind - Tot 322.0 546.0 868.0 - Working Capital Increase 0.0 0.0 0.0 0.0
Reserves - Prov -Prob - Tot 221.0 295.0 516.0 Free Cashflow (557.8) 169.1 147.6 307.3
- Dividends (ords & pref) 679.7 357.0 89.7 162.7
New Oakliegh + Equity raised 14.1 5.3 0.0 0.0
Resources 11.5 5.0 16.5 + Debt drawdown (repaid) 0.0 0.0 0.0 0.0
Reserves 0.5 0.0 0.5 Net Change in Cash (1290.1) 160.5 58.0 144.6
Cash at End Period 1417.0 1577.5 1635.5 1780.1
Lenton Net Cash/(Debt) 1417.0 1577.5 1635.5 1780.1
Resources 0.0 37.0 37.0
Reserves 0.0 0.0 0.0
Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Bee Creek
Resources 0.0 9.0 9.0 Cash 1416.5 1577.5 1635.5 1780.1
Total Assets 2652.5 2744.0 2915.5 2998.0
Directors Total Debt 0.0 0.0 0.0 0.0
Total Liabilities 313.0 154.8 187.0 131.0
Name Position Shareholders Funds 2339.5 2589.2 2728.5 2867.0
Rob Millner Chairman
Rob Neale Managing Director Ratios
David Williamson Director Net Debt/Equity (%) na na na na
Peter Robinson Director Interest Cover (x) na na na na
David Fairfull Director Return on Equity (%) 7.9 18.9 10.2 9.7
Bill Grant Director
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
72 Patersons Resources Review - May 2011
OUR VIEW
Noble Resources (NMG) continues to progress plant refurbishment at the Bibiani Gold Mine (Ghana) with commissioning
expected to be completed during Q3 CY2011. Commercial production will follow in December 2011 and will ramp up to
3Mtpa/150kozpa. We believe this timing is optimistic and with risk of delays in the ramp up schedule we are moving to a
neutral view on NMG until confidence in the December target is increased. Recent drilling activity has been focused on the
Bibiani open pit and smaller satellite deposits, which will form the initial mainstay of plant feed, a strategy we are favourable
on with the Bibiani cutback pushed out until drilling of the west wall can confirm ore body morphology and grade. The USD
gold price has given NMG a boost and the company has moved its reporting currency to USD which reduces translation
losses to AUD. With increasing risks to the investment thesis and NMG concurrently having appreciated from $0.25/sh
since August 2010 we are downgrading our rating from Buy to HOLD with a price target of A$0.60/sh.
ramping up to 150kozpa Au during 2012. Expectations Reported NPAT (A$m) (11.5) 23.9 68.9 73.7
were for commencement of commissioning in July, Recurrent NPAT (A$m) (14.3) 23.9 68.9 73.7
and production before December with risks of further Recurrent EPS (cents) (2.7) 4.6 13.2 14.1
pushback. We have assumed a total capital spend of EPS Growth (%) na na 174.2 2.6
PER (x) (22.8) 13.7 4.7 4.4
US$50m for the plant and mine to commissioning and
a subsequent US$25m for Bibiani cutback and mine EBITDA (A$m) (12.1) 37.7 119.3 125.3
expansion in CY2012. EV/EBITDA (x) (29.9) 10.0 3.1 2.8
Capex (A$m) 35.4 30.1 15.0 7.9
• Owner operator strategy will result in higher capex/
lower opex. NMG is has allocated US$25-30m for the
Free Cashflow
FCFPS (cents)
(47.8)
(9.2)
(5.6)
(1.1)
71.0
13.6
83.0
15.9
PFCF (x) (6.8) (58.8) 4.6 3.9
acquisition of 12 trucks and two excavators with delivery
expected between May and October 2011. Significant DPS (cents) 0.0 0.0 0.0 0.0
extension of mining life is required for the benefits of Yield (%) 0.0 0.0 0.0 0.0
this strategy to be realised and we see risks in sufficient Franking (%) 100.0 100.0 100.0 100.0
extension of the current 10 year plan. However this
equipment will be financed by the exercise of NMG’s short
dated options (NMGO which will see the issue of 74m Company Statistics & Performance
shares at 30cps).
Shares on issue (m) 522.2 3mth ADT ($m) 0.88
Market Cap. ($m) 326.4 Debt est ($m) 34.2
• Resource update pending. Announcement of increases
to the Bibiani resource were expected by end March 2011, 52 week range $0.23 - $0.74 Cash est ($m) 22.1
and are yet to be released. An onsite assay laboratory due
on site in 14 weeks time should reduce turnaround to 5
days and speed up the resource estimation process. 1.00 12000
From January 2012 drilling will resume at satellite pits and 8000
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 73
100
800
Adjusted Net Profit (1.8) (16.5) 18.8 51.2
50
600 + Interest/Tax/Expl Exp 1.1 2.8 8.8 28.8
400 - Interest/Tax/Expl Inc 0.7 3.6 9.9 28.8
+ Depn/Amort 0.0 1.5 6.6 16.5
0 200 +/- Other 0.0 0.0 0.0 0.0
2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F 2020F
Operating Cashflow (1.4) (15.8) 24.3 67.7
Total Cash Costs (US$/oz) Price Received (US$/oz) - Capex (+asset sales) 0.0 34.7 31.3 15.0
- Working Capital Increase 1.1 (3.4) 0.0 0.0
Free Cashflow (2.5) (47.0) (7.0) 52.7
Reserves & Resources - Dividends (ords & pref) 0.0 0.0 0.0 0.0
+ Equity raised/Options Exercised 39.1 28.3 22.0 0.0
Reserves Mt Au g/t Au koz + Debt drawdown (repaid) (3.1) 34.2 18.7 (12.5)
Bibiani 8.4 2.2 605 Net Change in Cash 27.1 (16.0) 33.7 40.2
Cash at End Period 30.9 14.9 48.7 88.9
Resources Mt Au g/t Au koz Net Cash/(LT Debt) 30.9 (19.2) (4.3) 48.5
Bibiani 33.0 1.9 1,983
Aheman 0.7 0.7 17 Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Disclosure: Patersons acted as joint lead manager to the company for a $30m share placement in November 2010, and as Lead
Manager/Underwriter in April 2010 for a placement and SPP which raised a total of $40.2m at $0.30/sh. It received a fee for these
services.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
74 Patersons Resources Review - May 2011
OUR VIEW
The acquisition of the Paulsens gold project in mid 2010 has proved to be a big win for NST, managing a payback period of
7 months and now operating unhedged and debt free. A small capital expenditure on the 705 exploration drive has proved
to be a savvy investment too, already providing a resource upgrade and likely to deliver at least another 200koz. Paulsens
is producing at cash costs of circa $510/oz and has been consistently exceeding guidance of 70kozpa due to positive
reconciliation of the ore grade. Management are very shrewd operators and have proven themselves by turning Paulsens,
which was viewed as a marginal asset, into a highly profitable mine. The acquisition of the 961km2 Ashburton tenements
appears to be another good move by NST, picking up a further 668koz resource and exploration targets within trucking
distance of the Paulsens plant. Our estimates see NST trading on very attractive multiples of 2.0x FY2011 EV/EBITDA and
1.7x FY2012 EBITDA. With NST’s prolific cash generation they are well positioned to initiate their growth strategy in the
near term. We rate NST a BUY with a price target of $0.61/sh.
of gold at cash costs of ~A$510/oz. The nuggety nature of Reported NPAT ($m) 21.5 33.1 39.0 45.8
the ore body has resulted in positive reconciliation of the gold Recurrent NPAT ($m) 21.5 33.1 39.0 45.8
content of the ore, earning greater than expected ounces. We Recurrent EPS (cents) 6.1 9.4 11.0 12.9
are conservatively forecasting 70kozpa production at cash EPS Growth (%) 2,447.8 53.8 17.8 17.5
PER (x) 6.1 4.0 3.4 2.9
cost of A$560/oz with a mine life of 4 years, however there
is good probability of NST producing higher than forecast EBITDA ($m) 49.7 59.5 67.9 77.7
ounces and extending the mine life with additional mill feed EV/EBITDA (x) 2.6 2.1 1.9 1.6
from the Ashburton project. Capex ($m) 44.6 8.1 5.4 2.5
Free Cashflow 10.7 37.7 45.9 55.5
FCFPS (cents) 3.0 10.7 13.0 15.7
• Quick payback to remain debt free and unhedged.
NST acquired the Paulsens gold mine in July 2010 for PFCF (x) 12.2 3.5 2.9 2.4
$40m consisting of $23m in cash payments in addition to DPS (cents) 0.0 0.0 0.0 0.0
$17m in royalty payments. NST achieved a payback period Yield (%) 0.0 0.0 0.0 0.0
of only 7 months and is now debt free and unhedged with Franking (%) 100.0 100.0 100.0 100.0
~$10m cash in the bank.
0.45 8
for replacing its environmental bonds at $445k, plus
royalty based payments on the first 250koz produced. 0.40 7
The tenements contain a 668koz resource and multiple
Share Price (A$)
0.35
walk up drill targets all within trucking distance of the 6
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 75
Paulsens Gold Mine 141.5 0.40 A$:US$ 0.89 0.99 1.05 1.00
Exploration 22.3 0.06 Gold (US$/oz) 1093 1356 1483 1507
Unpaid capital 5.1 0.01 Silver (US$/oz) 17.28 29.77 42.63 42.53
Corporate (1.2) (0.00) Gold (A$/oz) 1222 1368 1409 1507
Forwards 0.0 0.00
Cash (est.) 3.8 0.01 Target Price Sensitivity -10% 0% +10% % Chg
Debt (0.0) (0.00)
NPV 171.5 0.49 FX (A$:US$) 0.58 0.58 0.58 0
(@ 8% discount rate) Gold Price 0.58 0.58 0.58 0
Price Target 0.58 Gold Grade 0.58 0.58 0.58 0
Operating Costs 0.58 0.58 0.58 0
Recovery 0.00 0.58 0.00 (100)
NPV Sensitivity
EV:Reserve (A$/oz) 185
NPV (nom) @ 5% disc. 0.52 EV:Resource (A$/oz) 95
NPV (nom) @ 0% disc. 0.59
Production Summary 2010A 2011F 2012F 2013F
Total 7 84 70 70
Cost Summary
Exploration
14%
Cash Costs (A$/oz) 501 560 573
Total Costs (A$/oz) 706 736 749
Paulsens Gold Mine Price Received (A$/oz) 1,289 1,369 1,410 1,508
86%
Profit & Loss (A$m) 2010A 2011F 2012F 2013F
0 200
2011F 2012F 2013F 2014F Cash Flow (A$m) 2010A 2011F 2012F 2013F
Total Cash Costs (A$/oz) Price Received (A$/oz)
Adjusted Net Profit 0.6 21.5 33.1 39.0
Resources + Interest/Tax/Expl Exp 0.7 8.1 14.7 16.7
- Interest/Tax/Expl Inc 1.6 8.1 14.7 16.7
Mt Au g/t Au koz + Depn/Amort 1.2 20.8 12.3 12.3
Paulsens Gold Mine 1,268 5.5 226 +/- Other 0.0 0.0 0.0 0.0
Ashburton Gold Project 7,145 2.9 668 Operating Cashflow 1.0 42.3 45.4 51.2
- Capex (+asset sales) (0.0) 44.6 8.1 5.4
Total 8,413.0 0.8 894 - Working Capital Increase (0.2) (10.3) 0.0 0.0
Free Cashflow 1.2 8.1 37.2 45.9
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Directors + Equity raised 2.5 4.3 0.0 0.0
+ Debt drawdown (repaid) (0.1) 0.0 0.0 0.0
Name Position Net Change in Cash 3.6 12.4 37.2 45.9
Chris Rowe Non-Executive Chairman Cash at End Period 3.8 16.1 53.4 99.2
Bill Beament Managing Director Net Cash/(LT Debt) 3.8 16.1 53.4 99.2
Michael Fotios Non-Executive Director
Peter Farris Non-Executive Director
Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Substantial Shareholders %
Investmet 19.1 Cash/Bullion 3.8 16.1 53.4 99.2
Total Assets 5.8 44.6 77.7 116.7
Total Debt 0.0 0.0 0.0 0.0
Total Liabilities 0.7 13.7 13.7 13.7
Shareholders Funds 5.1 30.9 64.0 103.0
Ratios
Net Debt/Equity (%) na na na na
Interest Cover (x) 419.1 88.9 na na
Return on Equity (%) 12.1 69.6 51.7 37.8
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
76 Patersons Resources Review - May 2011
OUR VIEW
Olympus Pacific Minerals Inc (OYM-A, OYM-T) is a dual listed gold company focussed on south-east Asia with two operating
gold mines in Vietnam, a development asset in Malaysia and a significant exploration project in the Philippines. We recently
visited OYM’s Bong Mieu and Phuoc Son mines in Vietnam and the Bau development asset in Malaysia. While the Vietnamese
gold mines are relatively small (50kozpa) they are high grade (especially Phuoc Son) and as such have relatively low
cash costs (US$640/oz including royalties). OYM is targeting to increase production to at least 100koz in the near term.
The Bau project in Malaysia is large with 2.45Moz in resource and a number of large structures which appear attractive
for expanding the resource. The challenge at Bau is the metallurgy; however, we are confident that OYM has the team in
place to overcome this issue. OYM is cheap on a EV/oz basis and therefore has the potential to significantly increase its
gold production through moving the Bau gold project towards production. We retain our Spec Buy rating and price target
moves up to $0.99/sh due to our commodity price increase.
in South East Asia. Production from its Vietnam assets is Reported NPAT (A$m) (1.5) (1.4) 18.7 35.9
expected to reach 150kozpa Au within 4 years. OYM is Recurrent NPAT (A$m) (3.0) (1.4) 18.7 35.9
currently commissioning its new processing plant at its 85% Recurrent EPS (cents) (0.8) (0.4) 5.1 9.8
owned Phuoc Son mine in Vietnam. The new plant will mean EPS Growth (%) na na na 82.9
PER (x) (45.2) (97.1) 7.3 3.8
that ore from Phuoc Son will no longer need to be trucked to
OYM’s second mine at Bong Mieu. Both mines have excellent EBITDA (A$m) 10.5 9.6 39.4 68.4
exploration potential to extend the mine life. EV/EBITDA (x) 15.2 18.7 4.4 2.5
Capex (A$m) 42.2 13.5 4.6 13.4
• 2.45Moz Resource in Malaysia. We visited OYM’s Bau
development Asset in Malaysia. This appears to have
Free Cashflow
FCFPS (cents)
8.2
2.2
6.0
1.6
38.9
10.6
60.2
16.4
some significant exploration upside with a number of large PFCF (x) 16.6 22.7 3.5 2.3
and relatively unexplored structures. The best targets to
DPS (cents) 0.0 0.0 0.0 0.0
significantly expand the resource are in the Taiton, Juala, Yield (%) 0.0 0.0 0.0 0.0
Krian and Bekajang areas. The mineralisation is variably Franking (%) 100.0 100.0 100.0 100.0
refractory (gold locally associated with arsenopyrite) and
some will require a pressure leach or similar solution
to recover the gold. This would result in a higher cost Company Statistics & Performance
operation around US$700/oz, however, we believe it
will be mined as long as gold prices remain buoyant. At Shares on issue (m) 366.3 3mth ADT ($m) 0.05
current gold prices this would provide sufficient margin Market Cap. ($m) 135.5 Debt est ($m) 50.3
to bring the project into production. 52 week range $0.30 - $0.64 Cash est ($m) 35.6
Volume '000
2000
• Strong Mine Building Team. While the track record of the
mine building team was an issue during construction of Bong
0.40
Mieu mine in 2006, our recent visit to Phuoc Son revealed a 1500
quality plant design and construction. The engineering and
metallurgical teams appear to be very strong and we believe 1000
will be a valuable asset in building further mines in Malaysia 0.20
and the Philippines. Despite that commissioning has been
delayed by the heavy rain in Vietnam. 500
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 77
40,000 900
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
600 + Equity raised 15.8 0.0 0.0 0.0
20,000 + Debt drawdown (repaid) 22.2 24.4 (6.2) (1.5)
300 Net Change in Cash (1.6) 2.7 18.9 41.4
Cash at End Period 4.1 6.8 25.8 67.2
0 0 Net Cash/(LT Debt) (18.1) (38.8) (13.7) 29.2
2010A 2011F 2012F 2013F 2014F 2015F
Bong Mieu Realised Gold Price (US$/oz)
Weighted Ave Cash Cost (US$/lb) Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Reserves & Resources Total Attrib. Cash 4.1 6.8 25.8 67.2
Total Assets 123.2 136.7 160.6 212.7
Reserves Kt g/t Au oz Total Debt 22.2 45.7 39.5 38.0
Bong Mieu 251 2.59 20,863 16,691 Total Liabilities 44.9 59.9 64.6 81.5
Phuoc Son 831 6.26 167,249 142,161 Shareholders Funds 78.3 76.8 96.0 131.2
Total 1,082 0.61 188,112 158,852
Ratios
Resources (M&I) Kt g/t Au oz Au oz Net Debt/Equity (%) 23.15 50.54 14.30 na
Bong Mieu 3,222 1.76 182,293 145,835 Interest Cover (x) na 1.0 9.6 18.4
Phuoc Son 621 9.41 187,858 159,679 Return on Equity (%) na na 20.0 26.8
Bau 10,963 1.6 563,950 423,244
Tungsten Credits 96,236 76,989
Total 14,806 2.16 1,030,337 805,747 Directors
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
78 Patersons Resources Review - May 2011
OUR VIEW
Orocobre has hit some political turbulence on a regional level in Argentina however it has achieved a major milestone
with the completion of the Definitive Feasibility Study (DFS) for the Salar de Olaroz lithium project. Salar de Olaroz, in the
northern province of Jujuy is ORE’s flagship project. The completion of the DFS was the trigger to commence a 90 day period
within which Toyota Tsusho has to exercise its option to acquire 25% of the project. Toyota Tsusho has been intimately
involved with the DFS process and it should be comfortable with the estimated value of $275-450m depending on different
levels of discounts rates and gearing. The share price has reacted more to the Provincial Government of Jujuy declaring
lithium a strategic resource and that projects will be assessed by a new Committee. We see this as more a political process
for a domestic audience ahead of the local elections than a serious attempt to block any projects that have been recently
approved by the government. We see the market pricing ORE more as an exploration play rather than a company with an
advanced project, 3 other attractive projects in the pipeline, and a strong strategic partner. Accordingly we maintain our
BUY recommendation with a price target of $3.95/sh.
3.00
• This means that the Salar de Olaroz project will have to
submit to this new process. This does not stop any of the
800
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 79
Salar de Olaroz (100%) 304 2.92 US$/A$ 0.99 1.05 1.00 0.96
South American Salars (85%) 50 0.48 Lithium Carbonate (US$/t) 6,000 6,177 6,301 6,428
Cauchari 20 0.19 Potash (KCl) (US$/t) 700 587 599 611
Exploration 20 0.19 Boric Acid (US$/t) 500 506 516 527
Corporate (26) (0.25) Sodium Sulphate (US$/t) 120 122 124 126
Elementos Holding 6 0.06
Unpaid Capital 2 0.02
Debt 0 0.00 Production Summary 2011F 2012F 2013F 2014F
Cash 38 0.37
NAV (at 10%) 414 3.97 Salar Olaroz (100%)
Price Target 3.95 Lithium Carbonate (t) 2,000 12,500
Potash (KCl) (t)
Price Target Sensitivities -10% 0% +10% Boric Acid (t)
Sodium Sulphate (t)
Lithium Carbonate Price (US$/t) 3.44 3.97 4.51
Potash Price (US$/t) 3.93 3.97 4.02 Cash Costs (US$/t) 1,674 1,700
Exchange Rate (US$/A$) 4.27 3.97 3.73
Valuation Summary of Operating Assets Profit & Loss (A$m) 2011F 2012F 2013F 2014F
15,000 6,000
12,000
5,000 Cash Flow (A$m) 2011F 2012F 2013F 2014F
(US$/t)
4,000
(kt)
Disclosure: Patersons acted as joint lead manager for a share placement that raised A$15m at A$3.21/sh. In conjunction Cormark
Securities Dundee Securities acted as lead Syndicators for C$20m bought deal at C$3.20/sh in February 2011. Patersons acted as
joint lead manager for a share placement that raised A$6.25m at A$1.10/sh in December 2009. It received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
80 Patersons Resources Review - May 2011
OUR VIEW
We see the recent acquisition of Carrapateena as a positive for OZL, with production starting in 2018 and replacing some
of the production gap at a time when Prominent Hill is tailing off. The Prominent Hill underground development is underway
at Ankata, where the expected 1.2Mtpa production is set to ramp up from early 2012. We see a short term increase in
production but longer term however; the concern remains that post 2018 when the Malu pit ends there will be a significant
feed shortfall for the 10Mtpa mill. We see OZL’s success in filling the expected production gap as critical to their growth going
forward and the company is aggressively pursuing reserve expansion through its significant $20m near mine exploration
spending and $50m regional exploration programme. OZL is also looking for another project, either domestic or international,
and is well placed for an acquisition given its strong cash position of A$700m (post the Carrapteena deal). Lower expected
gold grades and a strong Australian dollar has driven OZL’s cash cost from US$0.44/lb in the Dec Q CY2010, to US$0.70/
lb for the remainder of CY2011. We expect the impact of the higher cost will be largely mitigated by the rising Cu and Au
prices. We retain our HOLD recommendation with a price target of $1.49/sh.
•
Volume '000
Class action loss. Despite recent class action suits having 45000
gone against OZL to the tune of $55.1m and the resulting 1.40
negative impact on the company’s net profit for FY2011,
we don’t expect any ongoing negative impacts from the 1.20
company’s decision to settle. Under the class actions OZL 30000
was accused of classifying much of its current liabilities
1.00
as non-current by around $300m and failing to disclose
the full extent of its refinancing obligations. 15000
0.80
• Regional Exploration. With the Government releasing
land from the Woomera exclusion zone near to OZL existing
exploration tenements, it is likely that OZL will pick up 0.60 0
some of these prospective properties. The $50m regional 12 Months
exploration budget may see some exploration success,
however, the Gawler Craton has ~100m thick cover rocks,
significantly increasing the risk of exploration in the area.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 81
Prominent Hill Profit & Loss (A$m) 2010A 2011F 2012F 2013F
70%
Exploration Sales Revenue 1148.9 1141.1 1195.2 1221.0
18% Other Income 36.3 9.1 9.3 61.1
Operating Costs 341.8 385.9 401.8 429.1
Exploration Exp. 31.4 22.9 13.0 13.2
Corporate/Admin 47.0 40.0 40.0 40.0
Equity Investments EBITDA 765.0 701.5 749.6 799.7
6% Depn & Amort 152.6 169.4 168.0 168.0
EBIT 612.4 532.1 581.6 631.7
Prominent Hill Copper Production Summary Interest 37.1 (0.0) (0.0) (0.0)
Operating Profit 575.3 532.1 581.6 631.7
150 5.0 Tax expense 221.3 159.6 174.5 189.5
Minorities 0.0 0.0 0.0 0.0
120 4.0 Abnormals 190.4 0.0 0.0 0.0
NPAT 544.4 372.5 407.1 442.2
90 3.0
(US$/lb)
60 2.0
Cash Flow (A$m) 2010A 2011F 2012F 2013F
30 1.0 Adjusted Net Profit 411.2 364.5 398.4 432.7
+ Interest/Tax/Expl Exp 280.3 182.5 187.5 202.8
0 0.0 - Interest/Tax/Expl Inc 224.5 205.4 200.4 216.0
2010A 2011F 2012F 2013F
+ Depn/Amort 152.6 169.4 168.0 168.0
Copper Cash Cost (US/lb net) Copper (US$/lb)
+/- Other 0.0 0.0 0.0 0.0
Copper (kt)
Operating Cashflow 619.5 511.0 553.4 587.5
- Capex 79.9 381.4 87.6 36.7
Reserves & Resources - Other investing cashflow 114.9 0.0 0.0 0.0
- Working Capital Increase 293.8 0.0 0.0 0.0
Prominent Hill Ore Reserves (Mt) (g/t, %) (kt, Moz) Free Cashflow 131.0 129.5 465.8 550.8
Cu 74.5 1.21 905 - Dividends (ords & pref) 93.6 615.3 194.3 226.7
Au 0.67 1595 + Equity raised/ZFX acquisiton 123.9 0.0 0.0 0.0
Ag 3.08 7375 + Debt drawdown (repaid) (121.0) 0.0 0.0 0.0
Net Change in Cash 40.3 (485.8) 271.5 324.1
Prominent Hill Mineral Resources (Mt)(g/t, %, ppm)(kt, Moz) Cash at End Period 1334.2 848.4 1119.9 1444.1
Copper-Gold Zone Cu 200.3 1.23 2473 Net Cash/(LT Debt) 1334.2 848.4 1119.9 1444.1
Au 200.3 0.50 3.1
Ag 200.3 3.00 19.3 Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Gold only Zone Cu 85.2 0.08 1.5
Au 85.2 1.50 4.1 Cash/Bullion 1334.2 848.4 1119.9 1444.1
Ag 85.2 1.00 2.7 Total Assets 3386.9 3728.9 3944.4 4220.6
Total Debt 0.0 0.0 0.0 0.0
Carrapateena Resource Cu 203.0 1.31 2659 Total Liabilities 95.9 267.7 279.1 284.5
Au 203.0 0.56 3.66 Shareholders Funds 3291.0 3461.2 3665.3 3936.1
Ag 203.0 6.00 39.16
U 203.0 227 46.08 Ratios
Net Debt/Equity (%) na na na na
Directors Interest Cover (x) 16.5 na na na
Return on Equity (%) 12.5 10.5 10.9 11.0
Name Position
Neil Hamilton Non-Executive Chairman Substantial Shareholders
Terry Burgess Managing Director
Micheal Eager Non Executive Director Shares (m) % issued cap
Brian Jamieson Non Executive Director Blackrock Inv Mgmt 336.6 10.8
Dean Pritchard Non Executive Director Bank of America 215.0 6.9
Paul Dowd Non Executive Director Ausbill Dexia 189.5 6.1
Charles Lenegan Non Executive Director M&G 170.0 5.4
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
82 Patersons Resources Review - May 2011
OUR VIEW
Overall, PDN is starting to meet production expectations; however, investors should remain cautious with the implementation
of Langer Heinrich Stage III and Namibian BEE policies being considered. We believe there could be some production
disruption while Stage III is implemented, however, once up and running there are some new components that have the
potential to improve production and lower costs. One of the biggest catalysts for PDN is access to additional water for LH
Stage IV we estimate if PDN had access to water their 1.0x NAV could improve from $3.00 to $3.20. On 15 April, PDN
released its March quarterly activities report; uranium production was 6% lower than our estimates at 1.40mlb (PSL est:
1.48). As a result PDN revised its production guidance down to 6mlb which is at the lower end of last quarter’s 6-6.3mlb
range (PSL est: 5.9mlb). The reason for the lower production was heavy rainfall (10 times the average in March) and a fuel
shortage at Kayelekera. Revenues from sales (1.4mlb sold) was US$92.5m (PSL est: US$81.8m) at an averaged realised
price of US$66.28/lb. We retain our HOLD rating and our price target is $3.52/sh based on a 1.2x NAV.
16000
capital costs to be in the $75-100m range and will require
4.00
additional water. Currently PDN uses 1.5GLpa and in order
to increase production to Stage IV it will require 5-6GLpa.
The water could come from the Areva desalination plant 3.50
8000
or a new plant by Namwater. We estimate that LH Stage
4 could add $0.29/sh to our valuation.
3.00 0
• Catalysts. April-May 2011: LH Stage III Front-End
Commissioning; Late June Q: LH Stage III Back End; Dec
12 Months
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 83
Exchange Rate (US$/A$) 1.06 Reported Cash Costs (US$/lb) 26.06 26.56 26.16 26.68
Total Cash Costs (US$/lb) 33.07 34.94 35.63 36.28
Valuation Summary of Operating Assets Price Received - ($US/lb) 54.20 54.91 62.07 66.29
(US$/lb)
8.0
Adjusted Net Profit (33.9) (16.7) 185.8 222.6
6.0 40 + Interest/Tax/Expl Exp 69.0 36.1 120.2 126.5
4.0 - Interest/Tax/Expl Inc 61.1 46.0 129.3 132.7
2.0
20 + Depn/Amort 15.0 44.9 82.6 82.6
+/- Other 0.0 0.0 0.0 0.0
0.0 0 Operating Cashflow (11.0) 18.3 259.3 298.9
2010A 2011F 2012F 2013F - Capex (+asset sales) 170.4 102.4 35.5 33.2
Total Production (mlbs) Price Received ($US/lb) - Working Capital Increase 27.5 42.4 0.0 0.0
Free Cashflow (208.9) (126.5) 223.8 265.7
Reserves & Resources - Dividends 0.0 0.0 0.0 0.0
- Other 1.8 0.0 0.0 0.0
Measured & Indicated Resources Mt % U3O8 U3O8 (t) + Equity Raised 364.1 1.5 0.0 0.0
Langer Heinrich 124.3 0.05 67,758 + Debt Drawdown (Repaid) 129.2 (25.9) (44.5) (371.8)
Kayelekera 22.2 0.08 17,760 Net Change in Cash 282.6 (150.9) 179.3 (106.1)
Manyingee 7.9 0.10 7,900 Cash at End Period 348.8 197.9 377.2 271.1
Angela & Pamela 11.4 0.11 12,540 Net Cash/(LT Debt) (245.9) (511.1) (287.3) 40.3
Valhalla 34.7 0.08 28,778
Total 200.5 0.053 134,736 Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Inferred Resources Mt % U3O8 U3O8 (t)
Cash 348.8 197.9 377.2 271.1
Langer Heinrich 18.5 0.06 11,100
Total Assets 1957.6 2056.8 2198.1 1673.1
Kayelekera 3.9 0.06 2,153
Total Debt 730.1 844.4 800.0 41.2
Manyingee 4.2 0.07 2,940
Total Liabilities 1001.2 1115.5 1071.1 323.4
Oobagooma 7.1 0.12 8,520
Shareholders Funds 956.4 941.2 1127.1 1349.6
Valhalla 9.1 0.06 5,851
Total 42.8 0.071 30,564
Ratios
Net Debt/Equity (%) 25.7 54.3 25.5 na
Directors
Interest Cover (x) 0.2 1.3 22.3 na
Name Position Return on Equity (%) na na 15.3 15.3
John Borshoff Managing Director/CEO
Rick Crabb Non-Executive Chairman Substantial Shareholders No. Shares %
Sean Llewelyn Non-Executive Director
HSBC Custody Nominees (Aust) Ltd 172.40 24.00
Donald Shumka Non-Executive Director
Ian Noble Non-Executive Director
Top 20 587.24 81.74
Peter Donkin Non-Executive Director
Philip Bailey Non-Executive Director
Gillian Swaby Company Secretary
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
84 Patersons Resources Review - May 2011
OUR VIEW
Overall, we believe PAN is an attractive nickel story with excellent leverage to nickel prices and exploration upside; however
we believe the stock is fairly priced based on current production expectations. PAN’s diversification into gold at the established
Gidgee project (plant infrastructure) will take some time to prove up with the first milestone the delineation of a 500,000oz
gold reserve estimate. In addition, PAN has a number of exploration properties (East Kimberley, Norrland (Sweden), Tushtena
(Alaska) and Drake (Scandinavia)) which could yield significant discoveries however, further exploration work is needed. PAN
also has investments in Ampella (AMX) and Magma Metals (MMW). For the March Q, PAN reported consolidated production of
4,166t Ni (up 3% previous quarter and below our estimate of 4,500t) at cash costs of US$5.95/lb (10% lower than previous
quarter and above our estimate of US$5.30/lb). However, PAN has revised its FY2011 production guidance downward by
5-10% to 17-17.2kt of nickel. PAN’s costs have been gradually rising and we have incorporated these into our financial
model, with the impact on our NAV $0.30 to $1.92/sh (previously $2.36/sh). We retain our HOLD rating.
•
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 85
Nickel Production Summary Profit & Loss (A$m) 2010A 2011F 2012F 2013F
20,000 12.00
Sales Revenue 284.1 282.9 325.9 321.1
10.00 Other Income 4.5 11.2 6.4 9.0
16,000
Operating Costs 139.1 175.4 188.5 195.8
8.00 Exploration Exp. 7.1 8.2 6.9 7.0
12,000
(US$/lb)
8,000
EBITDA 132.0 100.5 126.7 116.9
4.00 Depn & Amort 52.7 44.7 47.3 47.3
4,000
EBIT 79.4 55.9 79.4 69.6
2.00 Impairments/MTM adjustment (0.4) (4.8) 0.0 0.0
0 0.00
Interest 0.8 0.1 0.0 0.0
2010A 2011F 2012F 2013F 2014F 2015F Operating Profit 79.0 60.5 79.4 69.6
Total Nickel Production (t) Cash Cost per lb payable (US$/lb) Tax expense 22.1 19.3 23.8 20.9
Realised Nickel Price (US$/lb) Spot Nickel price (US$/lb) NPAT 56.9 41.2 55.6 48.7
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
86 Patersons Resources Review - May 2011
OUR VIEW
RRL reported 22,005oz of Au production for the March Q 2011, down marginally from 23,851oz in the December Q although
an impressive result given the high rainfall experienced by all operators is the eastern goldfields during the period. The
company’s second major project, Garden Well, will be given the go ahead following completion of the DFS during the June Q
and the recent announcement of their intent to award the mining contract to MACA, who currently provide mining services
at the Moolart Well project. The combination of these two major projects will see production increase significantly over the
next few years, with forecasts to produce >100koz in 2013 as Moolart ramps up and Garden Well comes online. Despite
RRL being a domestic gold producer and hence exposed to the current strong AUD the company has the ability to grow
revenues and earnings via organic growth at a time when many in the sector are struggling to do so. RRL has a proven
ability of delivering on targets, We are upgrading our recommendation to BUY from HOLD with a price target of $3.13/sh
and see confirmation of Garden Well metrics and a successful ramp up in production as key elements to watch.
2.00
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 87
Cost Summary
Cash Costs (A$/oz) 555 566 586 607
Exploration Total Costs (A$/oz) 766 818 839 860
31%
Moolart Well Profit & Loss (A$m) 2011F 2012F 2013F 2014F
67%
Sales Revenue 106.6 149.0 309.9 486.0
Other Income 0.9 2.1 5.3 11.6
Cash Operating Costs 48.5 60.1 112.4 179.5
2% Exploration Exp. 1.9 3.4 4.6 5.8
Corporate/Admin 6.1 7.3 7.4 7.6
EBITDA 50.9 80.2 190.8 304.6
Gold Production Summary Depn & Amort 15.9 26.9 32.2 36.5
EBIT 35.1 53.3 158.6 268.1
350 800 Interest 2.5 5.3 9.9 7.5
Operating Profit 32.5 48.0 148.7 260.6
300 700 Tax expense 0.0 0.0 36.7 78.2
250 FX Adjustment 0.0 0.0 0.0 0.0
600
Abnormals
(A$/oz)
200
(koz)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
88 Patersons Resources Review - May 2011
OUR VIEW
While some of the heat has come out of the market, SFZ’s share price has fallen further in comparison to well below its
listing price of $0.36/sh, primarily due to the lack of news flow from the company. A lacklustre March Quarterly report did
little to shed light on SFZ’s progress or the company’s upcoming catalysts. We anticipate positive news flow to recommence
shortly with the upcoming announcements of sales agreements and the commencement of the Ponte Verde resource drilling
programme during the June Q. The commissioning of the plant at Ponte Verde has been slower than expected with problems
arising from higher than normal phosphorous content in the beneficiated product. The issue appears to have been resolved
with SFZ beginning to stockpile saleable lump and fines products while the sales agreements are under negotiation. Once
Ponte Verde is in full production we expect to see cash margins of ~$35/t, generating free cash of circa US$35m annually.
Currently SFZ is trading at 10.0x FY12 EBITDA and 4.7x FY13 EBITDA (fully diluted). With a 40% discount to our NPV of
$1.03/sh, we rate this company a BUY with a price target of $0.62/sh.
•
Share Price (A$)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 89
Ponte Verde (Stage 1) 220 0.39 A$:US$ 0.89 0.99 1.05 1.00
Ponte Verde (Stage 2) 327 0.58
Exploration 10 0.02 Iron Ore Lump (US$/t) 89.7 143.8 143.8 145.2
Corporate (30) (0.05) Iron Ore Fines (US$/t) 76.4 119.5 119.5 119.5
Unpaid Capital 58 0.10
Cash (est) 8 0.01 Iron Ore Lump (A$/t) 100.4 145.1 136.6 145.2
Debt 0 0.00 Iron Ore Fines (A$/t) 85.5 120.6 113.6 119.5
Total @ 10% Discount Rate 594 1.04
Production (Mt)
Sensitivities -10% 0% +10% Lump Production 0.00 0.07 0.33 0.36
Fines Production 0.00 0.18 0.82 0.91
Iron Ore Price 0.54 0.63 0.72 Total 0.0 0.3 1.1 1.3
2.0 40
Cash Flow (US$m) 2010A 2011F 2012F 2013F
1.0 20
Adjusted Net Profit (1.3) (6.7) 9.7 17.1
0.0 0 + Interest/Tax/Expl Exp 0.0 0.4 2.2 9.1
2011F 2012F 2013F 2014F 2015F 2016F 2017F 2018F 2019F 2020F - Interest/Tax/Expl Inc 0.0 0.6 6.3 13.2
Iron Ore Price Received (US$/t) Cash Costs (US$/t) + Depn/Amort 0.0 0.2 0.6 0.3
Production (mt) +/- Other 0.0 0.0 0.0 0.0
Operating Cashflow (1.3) (6.7) 6.2 13.2
Reserves & Resources - Capex (+asset sales) 0.1 3.8 6.2 42.2
- Working Capital Increase 1.6 0.0 0.0 0.0
Resources Iron Ore Mt % Fe% Al+Si % LOI Free Cashflow (3.0) (10.6) 0.0 (29.0)
Ponte Verde (Non-JORC) 149 39.18 38.06 - Dividends (ords & pref) 0.0 0.0 0.0 0.0
+ Equity raised 1.8 13.9 0.0 57.0
Total 149.1 39.18 38.06 0.00 + Debt drawdown (repaid) 0.0 0.0 0.0 40.0
Net Change in Cash (1.2) 3.3 0.0 68.0
Cash at End Period 1.3 4.6 4.7 72.6
Directors Net Cash/(LT Debt) 1.3 4.6 4.7 32.6
Name Position
Terry Willsteed Chairman Balance Sheet (US$m) 2010A 2011F 2012F 2013F
Phillip Hopkins CEO
Stephen Fabian Non-Executive Director Cash/Bullion 1.3 4.6 4.7 72.6
Philip Re Non-Executive Director Total Assets 3.6 11.1 20.8 134.8
Stephen Turner Non-Executive Director Total Debt 0.1 0.1 0.1 40.1
Paul Lloyd Non-Executive Director Total Liabilities 0.1 0.4 0.4 40.4
Shareholders Funds 3.5 10.6 20.3 94.4
Substantial Shareholders Shares (m) %
Topix Management Ltd 16.2 10.3 Ratios
Grafton Resource Investment 13.3 8.5 Net Debt/Equity (%) na na na na
Massif Limited 11.2 7.1 Interest Cover (x) na (1.7) na 97.0
Return on Equity (%) na na 47.7 18.1
Disclosure: Patersons was lead manager to a placement of 41.7m SFZ shares at $0.36/sh to raise $15m in October 2010. It received
fees for this service. This analyst declares a beneficial interest in SFZ securities.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
90 Patersons Resources Review - May 2011
OUR VIEW
SBM is on the cusp of a record year in terms of production and costs. In FY11 the company has demonstrated production
stability, while in FY12 earnings are set to jump ($64m to $129m NPAT PSL est) as production from the company’s flagship
Leonora Operation move into overdrive with an impressive 6000oz pvm to be extracted at the Gwalia underground. Further
out the company requires bolt-on acquisitions or exploration success with rapid development to produce more than 240kozpa
as Southern Cross Operations (Marvel Loch) are set to close in 2012 with ore reserves fully depleted. SBM’s management
is cognisant of this and has increased its exploration efforts and is actively looking at projects where value can be added.
Our $2.92/sh valuation for the stock is based on 1x NAV. SBM has retraced to $2.08/sh and represents good comparative
value at these levels particularly with looking toward the impending jump in production and cash flow. While major additions
to project value and SBM’s production profile are difficult to identify (meaning that SBM is not in the ‘strategic’ category)
we believe the market will applaud the upcoming strong FY12 Upgrade to BUY from Hold.
production (in FY12 SBM is set to produce 350ozpa which Reported NPAT ($m) (40.2) 64.5 129.1 89.4
equates to an even cheaper EV of $1,500/oz) while Recurrent NPAT ($m) (40.2) 54.8 129.1 89.4
CAH, at the offer price, is trading on an EV of $2,900/oz Recurrent EPS (cents) (2.2) 7.5 39.5 27.4
normalised annual production (120koz). Hence the deal EPS Growth (%) na na 429.6 (30.7)
PER (x) (91.0) 26.6 5.0 7.2
looks dilutive for SBM shareholders.
EBITDA ($m) 39.0 125.8 276.2 190.1
• Lower forecasting risk with steady recent production
and costs. Mined ore supply at both Marvel Loch and
EV/EBITDA (x)
Capex ($m)
14.4
85.9
4.5
101.1
2.0
32.6
2.9
24.9
Leonora is the constraint on both operations. However Free Cashflow (1.2) (29.6) 242.8 164.4
SBM has maintained gold production in excess of 60kozpa FCFPS (cents) (0.1) (4.0) 74.4 50.4
PFCF (x) (3,074.4) (49.3) 2.7 3.9
(61.5koz for the March Q) for four consecutive Qs. This
indicates the reliability and stability of the operation has DPS (cents) 0.0 0.0 0.0 0.0
improved markedly from its previous history via more Yield (%) 0.0 0.0 0.0 0.0
stable milling operations. Franking (%) 0.0 0.0 0.0 0.0
vertically per annum. The upper areas SBM has been mining
Volume '000
over the past 2 years have been running at 3000oz pvm with 2.00
9000
a lift in grade and a wider ore body dimension the Au ounces
within each vertical metre of depth is set to double which 1.50
will have a marked increase in positive cash flow impact. 6000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 91
180 1000
+ Interest/Tax/Expl Exp 12.5 20.7 62.2 45.3
- Interest/Tax/Expl Inc 12.7 6.8 6.9 7.0
120 + Depn/Amort 71.9 58.5 91.0 61.7
500
60 +/- Other 0.0 0.0 0.0 0.0
Operating Cashflow 31.5 136.9 275.4 189.3
0 0 - Capex (+asset sales) 85.9 101.1 32.6 24.9
2010A 2011F 2012F 2013F 2014F 2015F
- Working Capital Increase (53.2) 46.0 0.0 0.0
Total Production Weighted Ave Gold Cash Cost (A$/oz) - Other Investing (2.7) (2.7) 0.0 0.0
Gold Price Realised (post Hedging, A$/oz) Free Cashflow (1.2) (10.2) 242.8 164.4
- Dividends (ords & pref) 0.0 0.0 0.0 0.0
Reserves & Resources + Equity raised 124.0 0.0 0.0 0.0
+ Debt drawdown (repaid) (75.5) (1.5) 0.0 0.0
Reserves (A$1075/oz to 2010, $850/oz thereafter) Net Change in Cash 50.0 (9.0) 242.8 164.4
Mt Au g/t Au koz Cash at End Period 104.0 95.0 337.9 502.3
Southern Cross 5.5 2.8 500 Net Cash/(Debt) 90.0 82.6 325.4 489.8
Leonora 10.2 7.3 2406
Total 15.69 5.7 2906
Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Resources Mt Au g/t Au koz
Southern Cross 19.9 3.5 2257 Cash/Bullion 102.2 95.0 337.9 502.3
Leonora (Tarmoola = 2.1Moz) 27.7 6.1 5394 Total Assets 479.2 549.6 697.2 824.9
Total 47.6 5.0 7651 Total Debt 13.9 12.5 12.5 12.5
Total Liabilities 129.7 135.6 154.1 192.4
Directors Shareholders Funds 349.5 414.0 543.0 632.4
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
92 Patersons Resources Review - May 2011
OUR VIEW
Tanami Gold NL (TAM:ASX) is an Australian based gold producer and explorer. TAM’s production focus has been on its
Western Tanami Operation located in north-east Western Australia where it expects to produce 40koz Au in FY2011. In mid-
2012, we expect the production focus to shift to TAM’s recently acquired Central Tanami Project, located in the Northern
Territory, which is currently under feasibility study. The Central Tanami Project contains approximately 75% of TAM’s 2Moz
resource and has much larger widths and a larger processing facility which we believe will make a significant contribution
to TAM’s push to increase production to >150,000koz of gold by 2013. In addition, to its production targets one of the
most exciting upside for TAM is targeting deeper Callie style targets which have the potential for higher grades and large
size. TAM has significant exposure to the TAM region through its 25% stake in ABM Resources. The next big catalyst for
TAM is its reserve update expected in May this will be followed by a feasibility for the Central Tanami Project at the end of
CY2011. We are retain our BUY rating and our price target increases to $1.81 due to our higher gold price.
on our sum of the parts valuation. On a P/CF (13)/(14) DPS (cents) 0.0 0.0 0.0 0.0
basis we determine a value between $1.27-$1.70/sh and Yield (%) 0.0 0.0 0.0 0.0
on an EV/oz basis TAM is trading at $116/oz compared Franking (%) 100.0 100.0 100.0 100.0
to the peer average of $178/oz.
1.25 2500
in the gold price has a 17% increase to our 1.0x NAV. TAM’s
Volume '000
Production.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 93
Western Tanami 48 41 75 97
Central Tanami 0 0 7 71
Total TAM Share of Production 43 37 75 158
Western Tanami
33% Cost Summary
Cash Costs (US$/oz) 697 944 829 761
Total Costs (US$/oz) 727 1039 982 909
Gold Production Summary Price Received (US$/oz) 1,197 1,369 1,484 1,508
200 1800
Profit & Loss (A$m) 2010A 2011F 2012F 2013F
1500
150 Sales Revenue 57.1 65.1 106.5 238.7
1200 Other Income 0.3 3.0 2.4 2.4
(US$/oz)
(koz)
Resources M&I Mt Au g/t Au koz (eq) Cash Flow (A$m) 2010A 2011F 2012F 2013F
Coyote (Western Tanami) 551.0 13.5 238
Sandpiper (Western Tanami) 493.0 4.0 64 Adjusted Net Profit 0.4 1.8 23.5 80.6
Kookaburra (Western Tanami) 594.0 2.6 51 + Interest/Tax/Expl Exp 0.0 2.8 16.8 29.2
Stockpiles (Western Tanami) 100.0 2.4 8 - Interest/Tax/Expl Inc 0.0 6.0 16.8 29.2
MLS153 (Central Tanami) 3,258.0 2.0 209 + Depn/Amort 4.2 10.5 8.2 16.5
MLS167 (Central Tanami) 5,324.0 3.2 550 +/- Other 0.0 0.0 0.0 0.0
MLS168 (Central Tanami) 1,168.0 2.0 77 Operating Cashflow 4.6 9.0 31.7 97.2
MLS180 (Central Tanami) 1,417.0 2.9 134 - Capex (+asset sales) 0.0 8.7 73.3 22.1
MLSA172 (Central Tanami) 1,272.0 2.6 106 - Working Capital Increase (0.9) (44.6) 0.0 0.0
Stockpiles (Central Tanami) 1,400.0 0.7 32 Free Cashflow 5.6 45.0 (41.6) 75.1
Total 15,577.0 2.9 1,468 - Dividends (ords & pref) 0.0 0.0 0.0 0.0
+ Equity raised 0.0 0.0 45.0 0.0
Resources Inferred Mt Au g/t Au koz (eq) + Debt drawdown (repaid) 0.0 (39.4) 14.7 0.0
Western Tanami 1,380.0 4.4 194 Net Change in Cash 5.6 1.1 23.1 75.1
Central Tanami 4,319.0 2.7 368 Cash at End Period 6.7 7.9 31.0 106.1
Total 5,699.0 3.1 562 Net Cash/(LT Debt) (48.5) (7.9) 0.5 75.6
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
94 Patersons Resources Review - May 2011
OUR VIEW
Troy Resources (TRY) is an unhedged, low cost gold and silver producer focused on South America. The coming months will
see TRY’s flagship Casposo Project in Argentina ramp up to full production. The operation will produce a total of 320koz Au and
11.6Moz Ag on our base case estimates. While production fluctuates y-on-y it will average 80kozpa Au with significant silver
credits (15-30kozpa Au equivalent). On a by-product basis this results in negative operating costs from FY14 onwards. Casposo
commissioning has been prolonged as seen in the March Q production result, however we highlight the coming June Q as a key
turnaround event. Problems experienced in the tailings filtration system leading to throughput constraints have been resolved.
The next key value driver is an upgrading of Casposo reserves to facilitate a 10-yr life. In addition we continue to watch the
Sandstone Nickel JV with Western Areas ($4m over 4 years for 70%) which has recently shown positive results. TRY also stands
to benefit from recent currency fluctuations with costs incurred in Brazilian Real and Argentina Peso’s. Following a tumultuous
year the Board appears to be operating well. We rate TRY a BUY with a $4.66/sh price target.
34koz, and production for the June Q expected to be DPS (cents) 4.0 8.0 8.0 8.0
>10koz at cash costs YTD of $606/oz. Furthermore, the Yield (%) 1.1 2.2 2.2 2.2
sale of iron ore should deliver an additional $3m in initial Franking (%) 100.0 100.0 100.0 100.0
payment by the end of CY2011, and US$3mpa in royalties.
Exploration is continuing in the area with opportunities at
depth and regionally with geological mapping required to Company Statistics & Performance
better identify drill targets.
Shares on issue (m) 69.8 3mth ADT ($m) 0.74
Market Cap. ($m) 257.0 Debt est ($m) 0.0
• Exploration upside. Further drilling at Julieta, located to
the north east of Casposo, will target deeper vein systems 52 week range $2.40 - $4.10 Cash est ($m) 15.4
down dip aiming to intersect higher grades. At Castano Nuevo
(Argentina) deeper underground drilling is anticipated in the
June Q to identify higher grade deposits. TRY will aim expand 5.00 2400
Casposo’s life out to 10 years with further exploration of the
ore body along strike to the south-east and at depth. 4.50 2000
• WSA Sandstone JV. The Sandstone mill has now been 4.00
Share Price (A$)
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 95
Bought Puts 5.0 A$900/oz Production Summary 2010A 2011F 2012F 2013F
Cost summary
Wtd Ave Cash Costs (US$/oz) 808 481 126 137
Wtd Ave Cash Costs (A$/oz) 904 485 120 137
Wtd Ave Total Costs (A$/oz) 1,117 844 410 470
Gold Production Summary Realised price (A$/oz) 1,215 1,365 1,410 1,508
150 1200
Profit & Loss (A$m) 2010A 2011F 2012F 2013F
125 1000
Sales Revenue 73.3 106.6 233.9 185.1
100 800 Other Income 1.5 0.7 2.6 5.9
Operating Costs 51.2 45.5 66.0 66.5
75 600 Exploration Exp. 7.3 5.7 6.6 6.7
50 400 Corporate/Admin 8.5 9.7 9.2 9.3
EBITDA 7.7 46.3 154.8 108.4
25 200 Depn & Amort 13.3 19.5 37.8 28.9
EBIT (5.5) 26.8 117.0 79.5
0 0
2010A 2011F 2012F 2013F Interest 0.1 2.1 0.6 0.0
Wtd Ave Cash Costs (A$/oz) Wtd Ave Total Costs (A$/oz) Operating Profit (5.6) 24.6 116.4 79.5
Total Production (koz) Tax expense (0.2) 6.7 38.8 26.5
Abnormals 0.0 0.0 0.0 0.0
Reserves & Resources (as at 30 June 2010) Minorities 0.0 0.0 0.0 0.0
NPAT (5.4) 18.0 77.6 53.0
Reserves (Gold/Silver) Mt Au(g/t) Ag(g/t) Au koz
Andorinhas (Brazil) 1.0 7.00 224 Normalised NPAT (3.9) 17.2 81.5 55.7
Casposo (Argentina) 2.0 5.22 171 829
Sandstone (Australia) 0.7 1.70 36 Cash Flow (A$m) 2010A 2011F 2012F 2013F
Total 3.0 5.81 171 1,053
Resources (Gold/Silver) Mt Au(g/t) Ag(g/t) Au koz Adjusted Net Profit (3.7) 16.4 77.6 53.0
Andorinhas (Brazil) 2.3 5.1 369 + Interest/Tax/Expl Exp 7.2 14.2 45.9 33.2
Casposo (Argentina) 2.6 5.22 189 1,139 - Interest/Tax/Expl Inc 7.1 14.2 45.9 33.2
Sandstone (Australia) 15.5 1.49 739 + Depn/Amort 13.3 19.5 37.8 28.9
Total 4.9 5.16 189 1,508 +/- Other 0.0 0.0 0.0 0.0
Operating Cashflow 9.6 36.0 115.4 81.9
Reserve (Iron Ore) Mt Fe% kt - Capex (+asset sales) 43.3 41.5 16.4 18.0
Andorinhas (Brazil) 2.8 64% 1.79 - Working Capital Increase 11.2 (1.5) 0.0 0.0
Total 2.8 1.79 Free Cashflow (44.9) (4.0) 99.3 63.8
Resources (Iron Ore) Mt Fe% kt - Dividends (ords & pref) 4.4 5.2 7.0 7.0
Andorinhas (Brazil) 6.5 51% 3.30 + Equity raised 26.0 0.0 0.0 0.0
Total 6.5 3.30 + Debt drawdown (repaid) 0.0 20.7 (20.7) 0.0
Net Change in Cash (24.2) 14.3 71.6 56.7
Directors Cash at End Period 13.4 27.7 99.3 156.2
Net Cash/(LT Debt) 13.4 7.1 99.3 156.2
Name Position
David Dix Non-Executive Chairman
Paul Benson CEO & MD Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Ken Nilsson Executive Director
Fred Grimwade Non-Executive Director Cash/Bullion 13.4 27.7 99.3 156.2
Robin Parish Non-Executive Director Total Assets 153.7 189.9 239.9 279.8
John Jones Non-Executive Director Total Debt 0.0 20.7 0.0 0.0
Fred Grimwade Non-Executive Director Total Liabilities 28.1 53.5 32.7 26.5
Substantial Shareholders Shares (m) % Shareholders Funds 125.6 136.5 207.1 253.3
Warrigal Pty Ltd 6.0 8.5
John Jones & Ass. 3.5 5.0 Ratios
Robin Parish 3.8 5.4 Net Debt/Equity (%) na na na na
Fidelity 3.5 5.0 Interest Cover (x) na 12.5 212.3 na
Top 20 34.3 Return on Equity (%) na 13.1 37.5 20.9
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
96 Patersons Resources Review - May 2011
OUR VIEW
Since the Cosmic Boy concentrator upgrade at the beginning of FY2011, consistent improvements in production and
recovery rates have been realised, with the March Q no exception. WSA’s improved throughput has the company on track
to produce ~25,000t of nickel in concentrate for FY2011. Record nickel in concentrate sales for the March Q of 6,813t which
coincided with strong average LME nickel prices of US$26,903/t or US12.20/lb (PSL long term est: US$8/lb). Consistently
low production costs, record sales and a 27% improvement in nickel prices have seen the share price run up 67% since
the beginning of FY2011. Cash and nickel sales receivables totalled A$208.8m at the end of the March Q which represents
a net positive movement of 33% from the December Q. WSA continues an aggressive drilling campaign aimed at proving
up resource extensions and extending mine life to both the Flying Fox and Spotted Quoll underground operations. With
strong production performance, open offtake arrangements, and full control of the Forrestania greenstone belt, we believe
WSA should trade on a premium to NAV, accordingly ascribe a 1.4x multiple to derive a price target of $7.42/sh. BUY
2000
extensions to know sulphide mineralisation and aiming to
Volume '000
6.00
extend the mine life beyond ten years.
1500
• New underground development progressing. The
Spotted Quoll underground has made solid progress with 4.00
significant infrastructure already in place. Development 1000
mining began in April 2011 with the contract being awarded
to Barminco. Commencement of underground ore mining will 2.00
target 10,000tpa nickel and should largely coincide with the 500
closure of the Spotted Quoll open pit operation.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 97
15,000 8
Adjusted Net Profit 13.8 131.4 169.8 389.4
10,000 5 + Interest/Tax/Expl Exp 46.3 107.1 115.1 201.2
- Interest/Tax/Expl Inc 50.6 107.1 125.3 211.6
5,000 2
+ Depn/Amort 34.7 73.6 74.4 87.2
0 -1 +/- Other 0.0 0.0 0.0 0.0
2009A 2010F 2011F 2012F Operating Cashflow 44.1 205.0 234.0 466.2
Total Ni in Concentrate (t) Cash Cost (US$/lb) per lb prod. - Capex (+asset sales) 94.9 60.0 108.0 52.5
Realised Price Received (US$/lb) - Working Capital Increase 5.6 4.6 0.0 0.0
Free Cashflow (56.4) 140.4 126.1 413.7
Reserves & Resources - Dividends (ords & pref) 5.4 12.6 12.6 27.0
+ Equity raised 0.0 0.0 0.0 0.0
Reserves kt Ni % Ni kt + Debt drawdown (repaid) 20.6 0.0 0.0 (209.0)
Flying Fox 1,062 5.5 58.7 Net Change in Cash (21.2) 127.8 113.5 177.7
Spotted Quoll 1,980 4.2 82.7 Cash at End Period 70.4 198.2 311.7 489.4
Diggers 2,109 1.5 30.8 Net Cash/(LT Debt) (138.6) (10.8) 102.7 489.4
Total 5,150.7 3.34 172.2
Balance Sheet (A$m) 2010A 2011F 2012F 2013F
Resources kt Ni % Ni kt
Flying Fox 1,891 4.6 86.4 Cash 70.4 198.2 311.7 489.4
Spotted Quoll 1,806 6.0 108.1 Total Assets 384.0 561.9 719.0 949.9
New Morning/Daybreak 2,144 1.4 30.7 Total Debt 209.0 209.0 209.0 0.0
Cosmic Boy 376 2.4 9.0 Total Liabilities 306.5 365.5 365.5 233.9
Diggers South 7,800 1.0 80.3 Shareholders Funds 77.5 196.3 353.6 716.0
Diggers Rocks 2,229 0.9 19.3
Beautiful Sunday 480 1.4 6.7 Ratios
Total 16,726 2.04 340.4 Net Debt/Equity (%) 178.8 5.5 na na
Interest Cover (x) 1.9 6.9 11.0 35.6
Directors Return on Equity (%) 17.8 66.9 48.0 54.4
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
98 Patersons Resources Review - May 2011
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 99
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
100 Patersons Resources Review - May 2011
OUR VIEW
In early 2010, Altona Mining Ltd (AOH) was formed through the merger of Vulcan Resources Limited and Universal Resources
Limited. AOH is a copper explorer and developer with a strategy to build production from its two 100% assets: Outokumpu
in Finland and Roseby in Australia. AOH expects to commence production at Outokumpu from early 2012 at the rate of
8ktpa, with annual production building towards 35ktpa Cu and 15koz Au by 2014 when Roseby is expected to come online.
The Outokumpu Project has low capital costs of A$46m, is fully funded, and has good potential to extend the planned 8
year mine life by inclusion of regional satellite deposits. A DFS update has commenced at the Roseby Project which will
evaluate upgrading the processing capacity from 5Mtpa to 8Mtpa, and ongoing drilling is expected to substantially upgrade
the current 900kt Cu and 250koz Au resource base. We see AOH becoming a mid-tier copper producer over the next 3
years and given the significant discount to its peers (A$50/t vs $150/t), we will continue to monitor its progress toward
achieving its production targets which could see a significant re-rating of the stock. We rate AOH as a Speculative BUY.
8000
it will update this study to include a larger resource size and
Volume '000
0.10
at A$50/t Cu compared to the A$150/t Cu average for Australian 2000
listed copper explorers and developers. Producer’s average over 0.05
$1000/t therefore AOH has significant value upside.
0.00 0
• Catalysts. 1) Early 2012 Outokumpu production 2) Ongoing:
Roseby resource expansion 3) Continued strong copper
12 Months
prices.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 101
Figure 2: Map showing location of the Roseby Project showing regional mineral deposits
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
102 Patersons Resources Review - May 2011
OUR VIEW
Ausgold Limited (“AUC”) has utilised some of the latest advances in exploration technology to target areas in Australia that
are highly prospective for gold and copper ore bodies. The company has pegged 12,500km2 within Australia based on work
by the Centre for Exploration Targeting, an internationally renowned group affiliated with the University of Western Australia
and Curtin University. We recently visited AUC’s flagship Katanning Gold Discovery located 300km southeast of Perth and were
impressed with the potential to establish a new gold province. AUC has 15km of strike on its 80% owned JV ground with gold
mineralisation (resources) and anomalism recorded along the entire length. Thus far at the Jinkas deposit AUC has discovered
continuous mineralisation along 900m of strike. We are awaiting drill results (150 holes) from Dingo which is located 3km south
of Jinkas with drilling underway at Jackson (2km north of Jinkas). This has the potential to prove up 8km of strike. In addition,
AUC has secured a number of other highly prospective projects. We believe there is potential for a multi-million ounce gold
discovery which could be the biggest new discovery since Tropicana. We have a Speculative Buy rating on AUC.
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 103
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
104 Patersons Resources Review - May 2011
OUR VIEW
Azimuth Resources (AZH), formerly Epsilon Energy Limited, is a junior explorer seeking dual listing on the TSX and focussed
on several early and advanced exploration projects in Guyana, South America (see Figure 1). The projects are mainly
prospective for gold but also have potential to host uranium mineralisation, and cover a combined area of 11,330km2. A large
proportion of the licence areas are underlain by geological terrain considered equivalent to that hosting the gold deposits
of West Africa. A recently announced A$1.3m geophysical exploration campaign covering 7,330km2 of this terrain is seen
as a key catalyst for value creation from these properties. AZH’s cornerstone project is West Omai where intensive drilling
is currently underway to define a maiden resource at the Hicks and Smarts Prospects. Our expectation is for a ~600koz
Au combined resource to be defined here by August 2011. This potential resource is the main driver for our preliminary
A$0.41/sh valuation, but we note significant upside potential as further drilling upgrades this resource and mineralised
extensions continue to be identified along strike of the Hicks-Smarts trend. We therefore rate AZH a Speculative BUY.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 105
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
106 Patersons Resources Review - May 2011
OUR VIEW
We continue to believe that Bannerman’s 80% owned Etango project in Namibia is a marginal asset at our long term
uranium price of US$70/lb. In our view, in the post-Fukushima environment BMN will find it more difficult to access funding
to continue development of the project. In the short term BMN will need to extend or refinance its $10m convertible note in
December 2011. Over the longer term, the capital cost of Etango is US$638m before mining fleet (US$64m) which is 9x the
current market capitalisation of BMN. Therefore, BMN will need to secure a deal with a strategic partner who would likely
want control of the project and consequently this would likely be dilutionary for BMN shareholders. While financing is the
largest risk we have identified other risks which include: BEE, access to water and grant of mining licence. The main reason
Etango is less attractive and higher cost than other alaskite-hosted uranium projects already in production/development
is its lower grade which is >30% lower than the operating Rossing mine and 60% lower than EXT. We maintain our SELL
rating and we suspend our target price.
DFS completion.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 107
; Right Place 9
Figure 2: Etango pit outline and targets Figure 3: Etango example cross sections
a 7,488,800 mN
a
a a b 7,488,300 mN b
b b
c c
c 7,488,600 mN c
Infill drill to
Indicated status
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
108 Patersons Resources Review - May 2011
OUR VIEW
Bassari Resources (BSR) is a gold explorer with a strategic tenement position in the well-endowed Birimian gold belt in
eastern Senegal, West Africa. The company’s main focus is development of its 70%-owned Makabingui project. The project
has multi-million ounce potential with a number of prospects to be followed up. The company’s main focus is the Makabingui
project where it has defined a resource of 240,000oz (8% Measured + 65% Indicated + 27% Inferred) at 2.3g/t from three
zones over a strike length of 600m. This is about 20% largest than we had previously anticipated and further drilling will
be needed to improve the confidence in the resource and continue to expand its size. Based on our analysis the company
is trading on an EV/oz resource of $81/oz below the peer average of $178/oz. We note if BSR is able to define 1Moz then
the EV/oz drops to $19.50/oz. Therefore, BSR is a relatively attractive entry point for a gold project with multi-million
ounce potential in West Africa. BSR also has adjacent tenure to the north and south of the Makabingui project where 8
further prospects have been identified.
•
Share Price (A$)
0.20 6000
prospects in their 70% owned northern and southern tenements
mainly from regional drill programs and termite geochemistry. 5000
While the focus is on Makabingui the company will continue to 0.15
progress these targets towards drilling. 4000
central permit. First gold was poured in November 2010 with 2000
the operations main benefits being: training for the Senegalese 0.05
and to establish good governmental relationships. The first gold 1000
shipment was 964oz with 728oz produced in the March Q. 0.00 0
• Strong Financial Position. BSR had $2.03m in cash at the end
of the March Q with $688,000 coming from gold sales from its
12 Months
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 109
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
110 Patersons Resources Review - May 2011
OUR VIEW
BRW is focussed on two premier regions: 1) the Leinster Nickel project in Western Australia where the company has several
high priority nickel sulphide targets along trend from the world class Cosmos and Perseverance nickel deposits. BRW has
completed 8 of 10 holes from its 3,100m drill program at its Miranda and Wildara projects. BRW has reported sulphide bearing
sulphide intersections with assays awaited. BRW is planning a Downhole TEM survey following completion of the drilling to
assist in targeting further mineralisation. 2) Cloncurry Copper Project in Queensland which has a number of copper, silver
and gold targets in close proximity to the Eloise Copper mine. Mill production is expected to recommence in May 2011 at
the Eloise copper mine whereby BRW owns a 30% NPI (adjusted for previous losses) and could supply additional cash flow
to help fund exploration activities in the region. BRW plans to commence drilling of multiple high grade copper targets on
BRW’s 100% owned exploration ground in the June Q 2011. Further discoveries by BRW could supply additional satellite
feed to the Eloise Copper mine. BRW has $4.5m in cash at the end of March 2011.
4000
which is contained within BRW’s Eloise Exploration Project
and represents approximately 2% of the project’s total
Share Price (A$)
3500
Volume '000
area. BHPB is testing the Altia deposit which has potential 0.08
to provide additional high grade silver feed to BHPB’s 3000
Cannington mill located 120km away. BHPB is currently 0.06 2500
reviewing the results of its 2010 drilling program at Altia
before determining whether further drilling is warranted. 2000
BRW expects a decision to made by the end of May 2011. 0.04
1500
500
placement to raise $3.8m. This should provide sufficient
funding for the 2011 exploration program. In addition, 0.00 0
BRW divested its East Kimberley tenements to Panoramic
12 Months
Resources Limited for $0.36m.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 111
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
112 Patersons Resources Review - May 2011
OUR VIEW
Cokal Limited has emerged from the restructuring of Altera Resources. The company has exploration permits in the Surat/
Clarence-Moreton and Bowen Basins, a joint venture in Tanzania, and they have recently purchased options to acquire shares
in four exploration projects in Kalimantan, Indonesia. The company is targeting metallurgical coal tenements primarily on the
overseas projects. The focus is on developing the Indonesian assets and bring them into production by 2013. Geologists have
been going over the ground in Kalimantan since the start of the year to map out the drilling program. CKA has secured one
drill rigs and would like to increase that number to 5 or 6 with a target to bring a maiden resource to the market by late Q3
or early Q4 this year. The Tanzanian JV has secured a tenement to explore part of the Karoo basin, which may share many
characteristic with the Riversdale and Moatize deposits in Mozambique. A drill rig has been secured and scouting is due to
begin once the dry season begins. The board and senior management are one of the strongest teams in the industry and
though it is very early days, the combination of assets, management, and coking coal strength is very attractive.
by the end of the year and start scoping studies soon after, on
Share Price (A$)
a timeline to bring the projects into production during 2013. 0.60 2000
Volume '000
0.00 0
put the company into a well financed position, with $20m in the
bank, to actively pursue their high priority exploration targets. 12 Months
These projects are in the very early stages and but the company
has ambitions to start production very quickly in a small scale.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 113
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
114 Patersons Resources Review - May 2011
OUR VIEW
Dart Mining NL (DTM) is a Victorian focussed precious and base metals explorer that has a strategic tenement position. Dart
appears to have discovered a new mineral province within northeast Victoria that has similar rocks (Lachlan fold) to the
large Cadia and Ridgeway copper mines in NSW. At DTM’s flagship property the Unicorn Mo-Cu-Ag project which outcrops
at surface DTM has returned some very encouraging Mo-Cu-Ag drill results. DTM recently appointed Mr Lindsay Ward as
Managing Director he is a qualified geologist with 25 years of industry experience and will drive DTM to fully evaluate the
Unicorn discovery. Drilling is expected to recommence in May to continue to define the extent and grade of the mineralisation
which has a 500m diameter footprint at surface and is a similar size to the giant Climax and Henderson mines in the US. DTM
plans to carry out a series of deep diamond drilled holes 800m in length with the aim to move towards the establishment
of a maiden resource estimate. We would expect a resource estimate to be released by the end of 2011. In addition, DTM
has a number of other Mo and Au porphyry targets within Victoria that have had some encouraging results.
0.14 14000
crude oil and its price is correlated strongly with oil price.
Volume '000
The Moly market is fairly small being 488mlbpa (220,000t) 0.12 12000
in 2010 with 47% of supply by-products from copper mines
and 53% from large primary mines and smaller mines. The 0.10 10000
LME began trading of Moly future in February 2010 with the 0.08 8000
current price US$17.50/lb.
0.06 6000
• Other Projects. DTM have highly prospective tenure with a
number of other projects identified other than Unicorn these 0.04 4000
include: 1) Morgan 2) Mountain View 3) Bunroy and Boebuck.
0.02 2000
• Stronger Financial Position. DTM is in a stronger financial
position after a $2m placement and 1 for 3 rights issue at
0.00 0
6.5cps. For every two shares shareholders received a listed 12 Months
option exercisable at 10cps. DTM has a cash position of
approximately $1.63m at the end of March.
Disclosure: Patersons was lead manager and underwriter for
• Catalysts. 1) May - recommencement of Drilling at Unicorn
2) Further positive drill results from the Unicorn project.
a $2m rights issue and placement at $0.065/sh conducted in
November 2010. Patersons received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 115
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
116 Patersons Resources Review - May 2011
OUR VIEW
Since floating mid last year Guildford has moved quickly to secure multiple targets in major Queensland and Mongolian Coal
Basins which the share price has reflected in a positive manner. This portfolio will allow the company to explore coking coal,
thermal coal and PCI targets. The company is in a very strong financial position with over $40m in the bank and it is utilising
those funds by initiating an intensive drilling program in both Mongolia and Australia. The South Gobi Mongolian project has
now secured the third drill rig and is well down the road to being issued a mining lease for the tenement. The first hole on
this Project has been completed and has intersected approximately 8 metres net of coal contained in three coal seams with
the deepest seam estimated at 87m. If key milestones, are met the project is expected to start production late this year or
in early 2012. Drilling has re-started on the Australian assets after being held up by the extraordinary wet season last year.
The company expects 6 rigs (from the current 3) to define the assets in the Galilee, Maryborough and Bowen Basins. The
main negative, in our view, is the management fee of $2.5mpa for 5 years and the success fee of $20m for each 100Mt of
JORC compliant indicated resource defined on the original Queensland assets up to a maximum of $100m.
the main rail line to Townsville. The company has already 1.00
Volume '000
12000
started negotiations to secure rail and port capacity.
0.80
• And the Others. Kolan in the Maryborough Basin has
re- started to confirm the coking coal target. Drilling the
9000
0.60
Sierra Project in the Bowen Basin will commence once
the EL is granted later this year. 6000
0.40
• Different Management Structure. The company has
a management agreement with Chairman 1, the major 0.20 3000
shareholder and original owner of the assets in the Galilee,
Maryborough and Bowen Basins. Chairman 1 will receive
$2.5mpa for 5 years to manage Guildford and for each 0.00 0
100Mt of JORC compliant indicated resources defined on 12 Months
the original Queensland assets a fee of $20m will be paid
to Chairman 1 up to a maximum of $100m.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 117
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
118 Patersons Resources Review - May 2011
OUR VIEW
MetroCoal is an emerging coal explorer focused on the Surat Basin. It has a number of tenements but its main focus is on the
Columboola, Bundi and Norwood projects around Wandoan and Miles. Current JORC compliant resources total 709Mt (686Mt
Inferred and 23Mt Indicated). Like other projects in the Surat it is dependant on infrastructure development, primarily the
Surat Basin Rail Link and WICET Stage 2, to which is has applied for a 12Mtpa allocation. The company is in a financially strong
position with $14m in the bank on top of the recent sale of 51% of Columboola to Sinocoal for $30m. The JV will develop a 5Mtpa
underground thermal coal mine with initial production most likely in 2016. The company is actively pursuing a partner for the
Bundi project and with a JORC compliant resource already identified management believes it should attract a premium to the
Columboola transaction. Details of any transaction should emerge during the second half this year. Metro has not had the same
run up in value prices seen in other junior coal plays but it has not had experienced the depreciation in value seen recently. The
company has an experienced Board and Management team to move the company forward. Accordingly we retain our Speculative
BUY recommendation with a price target of $0.50/sh.
• The Bundi Project drilling program has just begun and initial
results (first 5 holes of a 70 hole program) indicate the potential
for two working seams. Thicker than anticipated Kogan and Company Statistics & Performance
Macalister Upper Seams were intersected with up to 7m in
thickness.
Shares on Issue (m) 176.7 3mth ADT ($m) 0.23
• MTE is in a strong financial position with $14.2m in the bank as
at the 31 March 2011. The majority of these funds were raised
Market Cap. ($m) 69.8 Debt ($m) 1.0
52 Week Range $0.215 - $0.42 Cash ($m) 4.4
by a successful placement to institutional and sophisticated
investors. MTE entered into a JV agreement with Sinocoal where
Sinocoal acquired a 51% interest in the Columboola Project and 0.45 4000
pre-emptive rights over MTE’s other tenements for an agreed
expenditure commitment of $30m. Sinocoal has waived pre- 0.40 3500
emptive rights over the Bundi Project and MTE has appointed
Caldrex Capital to market a JV proposal. 0.35
3000
Share Price (A$)
• Both the Columboola and Bundi projects are well located to the 0.30
Volume '000
2500
proposed Surat Basin Rail (SBR) link connecting to Gladstone
but as with other explorers in the region they are dependant 0.25
2000
on the successful completion of the rail line. MetroCoal plans to
0.20
seek participation in the SBR project later in 2011 and this will
1500
follow its application for 12Mtpa capacity of the second stage of 0.15
the Wiggins Island Coal Export Terminal development.
1000
0.10
• MTE has an experienced Board and Management team to move
the company from explorer to producer over the next five years. 0.05 500
The team have considerable knowledge and expertise covering
geology, mining, financial management and investment, and 0.00 0
business development. 12 Months
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 119
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
120 Patersons Resources Review - May 2011
OUR VIEW
NuCoal successfully reconstructed and re-listed the company early last year as an emerging coal developer with the acquisition
of the Doyles Creek project in the Lower Hunter Valley. The company has grown its presence in the established Hunter Coalfield
region with the recent acquisition of the Dellworth assets and the expansion of the Doyles Creek resources. The political
environment and the process surrounding the granting of Doyles Creek exploration licence (EL) have been an unwelcome
development to management and shareholders and the share price has been tending downwards since February. The EL issue
is unlikely to disappear immediately as the newly elected NSW government raised the issue while it was in opposition although
an independent probity review did find “the then Minister acted within the powers afforded to him under the legislation.” The
company was given a vote of confidence by the investment community as it successfully completed a $30m capital raising
last quarter. This will allow the company to complete a BFS, upgrade the resources of the Doyles Creek and develop the
Dellworth assets. An extension to the Doyles Creek project is the establishment of a specialised underground coal mining
training facility to help to address the skills shortage currently being experienced in the mining sector.
• The newly elected NSW government proposed a review of Company Statistics & Performance
Exploration Licences (EL) and its Strategic Regional Land
Use Policy has highlighted the Doyle Creek Project. NCR
supports the review and an independent probity review on Shares on Issue (m) 646.9 3mth ADT ($m) 0.63
Market Cap. ($m) 245.8 Debt ($m) 0.6
the granting of this EL was conducted last year which found
52 Week Range $0.2 - $0.62 Cash ($m) 3.9
“the then Minister acted within the powers afforded to him
under the legislation.”
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 121
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
122 Patersons Resources Review - May 2011
OUR VIEW
Nyota Minerals (NYO) is an east African gold company with its main focus on the development of the Tulu Kapi deposit in
Ethiopia which has a JORC compliant inferred resource of 1.2Moz Au at a grade of 1.18g/t Au. NYO recently completed
a positive Preliminary Economic Assessment and is progressing the project to Pre-feasibility Study. The resource has a
significant amount of exploration upside with recent positive drill results from the Northern and South Eastern extensions
and the discovery of a deeper feeder zone late last year. The feeder zone hole returned 15.7m at 37.04g/t Au from 490m
since then a number of other positive intersections have been released. Further work is likely to grow the feeder zone and
a number of trade-off studies will determine if the operation targets the underground or the open-pit or a combination of
the two. In addition, NYO has a significant number of outstanding exploration targets within the greenstone belt in western
Ethiopia derived from soil geochemistry, airborne and ground geophysics, trenching and rock sampling. We recently visited
site and were impressed with the potential for further discoveries in the area which could provide additional feed for a
central processing facility. NYO is well cash up with $32m in the bank. We have a Spec Buy on NYO.
1400
currently has one operating mine Lege Dembi which produces
Volume '000
0.40
approximately 100-120kozpa Au. Given the positive 1200
contribution to the economy, the Ethiopian Government is
keen for Nyota to move to a development scenario. NYO 0.30 1000
has lodged its Mining Licence application with the Ethiopian 800
Government. 0.20
600
• New CEO announced. Recently, NYO has announced that
it has appointed Mr Richard Chase as CEO effective 1 June 400
0.10
2011. He has 19 years experience in the resources sector:
200
8 working for SAMAX Resources (acquired by Ashanti
Goldfields) and the last 8 with Ambrian Capital Plc. 0.00 0
Underway.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 123
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
124 Patersons Resources Review - May 2011
OUR VIEW
SHD’s strategic tenement holding in the highly prospective Roper River region in the Northern Territory is the primary focus of
development for the company. In just 6 months drilling at the 100% owned Roper River Iron Ore Project, SHD has firmed up
a resource of 106.6Mt at 47% Fe. Latest metallurgical test work on the resource has indicated a saleable product of >60% Fe
at robust recovery yield of 56% can be achieved through the introduction of a SLon magnetic separator into the beneficiation
circuit. Initial drill results of the 2011 drilling program continue to confirm extensions of oolitic hematite mineralisation
consistent with the existing resource. Combined exploration targets for the Hodgson Downs, Sherwin Creek & Mount Scott
Deposits stand at 400-500Mt at 40-48% Fe. We believe developing the Gulf of Carpentaria Infrastructure Service under Joint
Venture with Western Desert Resources to provide a cost effective means of export to market is a key aspect of the project.
Scoping studies and environmental work critical to advancing the bulk loading facility are already underway and SHD remains
confident that a multi-user export facility will be ready by mid 2013. With the recent capital raising of $8.5m, SHD is well
funded in the near term and we believe the company offers an attractive entry point into the iron ore market.
0.20
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 125
Figure 1: Location of the Roper River Iron Ore Project, Northern Territory
Figure 3: Proposed trans shipping infrastructure - Maria Island Figure 4: Key targets within the tenement holding
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
126 Patersons Resources Review - May 2011
OUR VIEW
Stanmore Coal (SMR) is a coal company that has been listed for less than two years and in that time is has progressed
from an early stage exploration company to a development company and it remains firmly on track to be a producing
company. Production is expected in 2015 from two projects, the Mackenzie River in the Bowen Basin and the Range in the
Surat Basin. These projects currently have a combined inferred JORC compliant resource of 318Mt of coking and thermal
coal, which further drilling should expand and upgrade. Both projects are dependant on allocation from the WICET Stage
2 port development. Also, the Range is a thermal coal project dependant on the Surat Basin Rail Link to be completed.
Both infrastructure projects are progressing. We view SMR as being well positioned to secure an initial 7Mt allocation at
WICET with prefeasibility studies, ML applications and EIS either underway or due to begin next quarter. The company
is continuing to explore its other tenements and some encouraging results thave surfaced on the Tennyson and Belview
Projects in the Bowen basin. The share price of SMR has been under pressure since mid April but the market can expect
a good flow of information on resource establishment and expansion over the next 6 months.
Volume '000
1.00 5000
• Infrastructure. All the Bowen Basin projects are located in
close proximity to rail lines which access coal terminals at
either Gladstone or Dalrymple Bay. The Range project is well 0.80 4000
located to the proposed Surat Basin Rail link connecting to
Gladstone. Stanmore has applied for an allocation of capacity 0.60 3000
of the Wiggins Island Export Terminal Stage 2.
0.40 2000
• Expansion fully funded. The successful renounceable
rights issue late last year has the company in a strong 0.20 1000
financial position. This allows the company to fund the drilling
programs already outlined and progress the Mackenzie and 0.00 0
Range projects to further milestones. Scoping and pre-
12 Months
feasibility studies on Range are well progressed in conjunction
with statutory approvals such as the ML and EIS, while a
conceptual mining study is underway on Mackenzie.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 127
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
128 Patersons Resources Review - May 2011
OUR VIEW
We recently visited Stonehenge Metals flagship Daejon Uranium Project in South Korea. The project contains an inferred
resource of 65mlb of uranium grading 320ppm U3O8 and has a significant vanadium by-product credit which is the key to
the project. Initial results from a pre-scoping study have indicated cash costs of $24.50/lb uranium (assuming vanadium
by-product credits) and mid-40’s for uranium extraction. Bench scale uranium recoveries are >90%, however, vanadium
recoveries are 50% and this is where SHE is looking to improve through applying more intensive leach conditions such as: 1)
higher temperatures 2) more acid 3) medium pressure leach or 4) Salt roast. SHE is currently cheap on an EV/lb of uranium
basis trading at A$0.50/lb in the ground (excluding by-products) compared to the peer average of A$1.70/lb. Our analysis
suggests that as SHE continues to progress the project the stock could appreciate towards $0.30/sh. Therefore we rate the
stock as a Speculative Buy with the biggest risks i) metallurgy and ii) community relations to allow a smooth permitting
process. SHE had $3.9m at the end of the March Q and should provide sufficient capital for the near term.
0.20
successfully progress the project to a development scenario. 10000
ii) Community Relations: SHE are only in the initial stages 6000
of community consultation with the town of Chubu located 0.10
in the adjacent valley. It will be imperative to foster positive 4000
relations to allow a smooth permitting process.
0.05
2000
• Potential Second Project at Gweson: In April, SHE released
assays results from 8 diamond holes with the best intercept: 0.00 0
8m at 245ppm U3O8 and 3,471ppm V2O5. All intercepts were
12 Months
between 73 and 183m depth. The results at Gwesan are
encouraging and suggest a potential second project other
than SHE’s key Daejon project (located 50km NE).
Disclosure: Patersons was co-manager of a $2.8m placement at
$0.056/sh with an attaching 10c option in June 2010. Patersons
• Catalysts: May - Commence Prefeasibility; May/June
Metallurgical test work on 3x20kg samples. received a fee for this service.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 129
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
130 Patersons Resources Review - May 2011
OUR VIEW
UNX’s main focus is its Mkuju Uranium Project in Southern Tanzania. UNX’s tenure is located adjacent to Mantra Resource’s
(MRU) Mkuju River project (MRP), MRU are currently in the process of being acquired for $1.02b all cash/dividend offer by
Russian-state owned uranium miner ARMZ. UNX stock has come off following the Fukushima disaster in Japan, prior to this
it had performed well due to the ARMZ-MRU takeover and encouraging high grade drill results at its Mkuju Uranium Project.
We believe the Fukushima impact is likely to remain in the short to medium term, however, with further drilling UNX has
a good opportunity to establish a high grade resource at its Likuyu North prospect by the end of 2011. In addition, UNX
has identified through a radiometric survey on its Mkuju Uranium Project extensive uranium anomalies over 64km of strike
within four prospect areas. UNX also holds the Songea Coal project in Southern Tanzania where exploration is continuing
and expects to commence drilling in June 2011. There are two established coalfields adjacent to the Songea Coal project
with resources exceeding 1bt of coal. Finally, UNX is also looking to divest its non-core uranium assets in Australia.
MRU which total 69km of strike. Likuyu North (5km), Likuyu 0.60 3000
Volume '000
covers an area of 3,500km2 where 11 coal fields have been 0.30 1500
identified. It is located in close proximity (50km) to the
Ketewaka (804Mt) and Ngaka (250Mt) coalfields. 0.20 1000
0.00 0
options (would bring in $1.5-5m) and the expected divestiture of
its non-core Australian assets in the June Q which would include 12 Months
the 14mlb Thatcher Soak project in Western Australia.
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 131
$? Production
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
132 Patersons Resources Review - May 2011
OUR VIEW
The unrelenting Northern Territory wet season has seen a slow start to 2011 field program with excessive rainfall hampering
access to WDR’s flagship Roper Bar Project. In light of this WDR has concentrated on critical pre-feasibility studies relating to
the development of the Gulf Infrastructure Service and environmental studies for the proposed mining leases and transport
corridors. WDR’s resource inventory grew to 312Mt at 40% Fe during the March Q on the back of a positive drilling program
which ceased in mid January due the wet season. WDR is set to embark on a well funded aggressive drilling campaign to
increase resource inventories and importantly grow the 14.5Mt of direct shippable ore (DSO) that is currently in resource.
Pivotal to the longer term success of the project is an effective means of concentrating the lower grade hematite into a
saleable product. Initial metallurgical test work has shown Dense Media Separation can upgrade the resource to a saleable
grade ~58% Fe with further enrichment capable through the introduction of magnetic separation. WDR remains well funded
for 2011 and we should see a steady news flow regarding essential infrastructure, resource upgrade and clarity on metallurgy.
Attractive on EV/resource basis with a DSO resource <50kms from the coast. We rate WDR a SPEC BUY.
0.35 3500
benefits. We see WDR’s close proximity to the coast and
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 133
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
134 Patersons Resources Review - May 2011
OUR VIEW
YTC Resources Ltd (YTC) is a gold and base metal exploration and development company focussed on: 1) the Hera Gold Project
and 2) the adjacent Nymagee Copper Joint Venture near the town of Cobar in NSW. YTC acquired these projects from CBH
Resources in September 2009. A DFS study is currently underway focussed on developing an integrated mining and processing
hub to accommodate both of the deposits which are located in close proximity to each other. YTC aims to move to producer
status by 2013. The company is well funded with A$30m in cash on hand to fund its DFS and aggressive exploration programme
at the Nymagee Copper deposit. Recent drilling at the Nymagee Project continues to reveal high grade Cu, as well as Pb-Zn-Ag
mineralisation with a maiden resource expected in August 2011. Based on our estimates we believe that this could approach
150kt Cu and YTC has an existing 560koz Au Eq. resource at Hera. We see a combined value of ~A$137m for these two projects,
which is approximately YTC’s EV. With YTC moving toward achieving producer status and continuing to increase the size of its
resources, their valuation is likely to increase substantially. We therefore rate YTC as a Speculative BUY.
Nymagee deposit has many similarities to Glencore’s CSA mine 0.50 2500
(Figure 2). The Nymagee mineralisation appears narrower than
CSA’s but we estimate that YTC could define 150kt contained 0.40 2000
Cu. On this basis we estimate a value of $47m based on our
average EV/t resource for Cu explorers and developers but 0.30 1500
we note this value could increase by as much as 4x once YTC
achieves producer status. We would value the current 560koz 0.20 1000
Au eq. resource at Hera at A$90m (using our average EV/oz
Au resource for Au explorers and developers). This gives a total 0.10 500
A$137m, which is approximately equal to YTC’s EV.
0.00 0
• Catalysts. 1) Maiden resource at Nymagee and Hera DFS in
August 2011. 2) Production expected by January 2013.
12 Months
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 135
Figure 1: Regional view showing the location of the Nymagee and Hera projects in the Cobar Basin, as well as surrounding deposits
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
136 Patersons Resources Review - May 2011
OUR VIEW
ZYL is one of our preferred coal exploration companies with a majority stake in Kangwane, an opencut anthracite project in
south Africa. A capital raising of $30m associated with the lodging of a re-compliance prospectus will ensure the company
has sufficient funds for its share of the feasibility study, commercial development and mine construction at the Kangwane
Project. The project has a rail siding with a capacity of 1.2Mt while the railway has spare carrying capacity and access to port
facilities. Some of the coal may be consumed locally as a non-binding MOU with a power company has been signed with a
utility company which is planning on building a modular power station near to Kangwane. The board has extensive operational
experience in African mining including coal. They have appointed SRK Consulting to independently manage the BFS and
Olympic Park to undertake the drilling program at the Kangwane Project which commenced in mid February. We expect that
ZYL will be hitting milestones with new resources, the completion of studies, agreements and permits. The company has
been suspended while it re-complies with the ASX rules to change from a tech company to a resources company. It will be
relisted shortly and we maintain our Speculative Buy recommendation with a price target of $0.40/sh.
0.20
Volume '000
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 137
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
138 Patersons Resources Review - May 2011
Notes
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Patersons Resources Review - May 2011 139
Notes
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
140 Patersons Resources Review - May 2011
Notes
All information and advice is confidential and for the private information of the person to whom it is provided and is provided without
any responsibility or liability on any account whatsoever on the part of this firm or any member or employee thereof.
Research
Alex Passmore - Head of Research Phone: (+61 8) 9263 1239 Email: apassmore@psl.com.au
Andrew Quin - Research Strategy Coordinator Phone: (+61 8) 9263 1152 Email: aquin@psl.com.au
Tony Farnham - Economist Phone: (+61 8) 9258 8973 Email: tfarnham@psl.com.au
Industrials
Jonathan Kriska - REIT Analyst Phone: (+61 2) 8238 6245 Email: jkriska@psl.com.au
Russell Wright - Retail Analyst Phone: (+61 2) 8238 6219 Email: rwright@psl.com.au
Quantitative
Mark Barsdell - Quantitative Analyst Phone: (+61 3) 9242 4187 Email: mbarsdell@psl.com.au
Kien Trinh - Quantitative Analyst Phone: (+61 3) 9242 4027 Email: ktrinh@psl.com.au
Institutional Dealing
Phil Schofield Phone: (+61 2) 8238 6223 Email: pschofield@psl.com.au
Michael Brindal Phone: (+61 2) 8238 6274 Email: mbrindal@psl.com.au
Gordon Anderson Phone: (+61 2) 8238 6276 Email: ganderson@psl.com.au
Dan Bahen Phone: (+61 8) 9263 1274 Email: dbahen@psl.com.au
Artie Damaa Phone: (+61 2) 8238 6215 Email: adamaa@psl.com.au
Paul Doherty Phone: (+61 3) 8803 0108 Email: pdoherty@psl.com.au
Trent Foxe Phone: (+61 2) 8238 6265 Email: tfoxe@pls.com.au
Peter Graham Phone: (+61 3) 9242 4129 Email: pgraham@psl.com.au
Chris Kelly Phone: (+61 3) 9242 4078 Email: ckelly@psl.com.au
Jason Lal Phone: (+61 2) 8238 6262 Email: jlal@psl.com.au
Ben McIlvride Phone: (+61 2) 8238 6253 Email: bmcilvride@psl.com.au
Jeremy Nugara Phone: (+61 3) 8803 0166 Email: jnugara@psl.com.au
Trevor Pike Phone: (+61 3) 8803 0110 Email: tpike@psl.com.au
Joe Wang Phone: (+61 8) 9263 1125 Email: jwang@psl.com.au
Rob Willis Phone: (+61 7) 3737 8021 Email: rwillis@psl.com.au
Sandy Wylie Phone: (+61 8) 9263 1232 Email: swylie@psl.com.au
Important Notice: Copyright 2011. The contents contained in this report are owned by Patersons Securities Limited (‘Patersons’) and are protected by the
Copyright Act 1968 and the copyright laws of other countries. The material contained in this report may not be copied, reproduced, republished, posted,
transmitted or distributed in any way without prior written permission from Patersons. Modification of the materials or use of the materials for any other
purpose is a violation of the copyrights and other proprietary rights of Patersons.
Disclaimer: Patersons believes that the information or advice (including any financial product advice) contained in this report has been obtained from
sources that are accurate at the time of issue, but it has not independently checked or verified that information and as such does not warrant its accuracy
or reliability. Except to the extent that liability cannot be excluded, Patersons accepts no liability or responsibility for any direct or indirect loss or damage
caused by any error in or omission from this report. You should make and rely on your own independent inquiries. If not specifically disclosed otherwise,
investors should assume that Patersons is seeking or will seek corporate finance business from the companies disclosed in this report.
Warning: This report is intended to provide general securities advice, and does not purport to make any recommendation that any securities transaction is
appropriate to your particular investment objectives, financial situation or particular needs. Prior to making any investment decision, you should assess, or seek
advice from your adviser, on whether any relevant part of this report is appropriate to your individual financial circumstances and investment objectives.
Disclosure: Patersons, its director and/or employees may earn brokerage, fees, commissions and other benefits as a result of a transaction arising from any
advice mentioned in this report. Patersons as principal, its directors and/or employees and their associates may hold securities in the companies the subject
of this report, as at the date of publication. These interests did not influence Patersons in giving the advice contained in this report. Details of any interests
may be obtained from your adviser. Patersons as principal, its directors and/or employees and their associates may trade in these securities in a manner
which may be contrary to recommendations given by an authorised representative of Patersons to clients. They may sell shares the subject of a general
‘Buy’ recommendation, or buy shares the subject of a general ‘Sell’ recommendation.
Stock recommendations: Investment ratings are a function of Patersons expectation of total return (forecast price appreciation plus dividend yield) within
the next 12 months. The investment ratings are Buy (expected total return of 10% or more), Hold (-10% to +10% total return) and Sell (> 10% negative
total return). In addition we have a Speculative Buy rating covering higher risk stocks that may not be of investment grade due to low market capitalisation,
high debt levels, or significant risks in the business model. Investment ratings are determined at the time of initiation of coverage, or a change in target price.
At other times the expected total return may fall outside of these ranges because of price movements and/or volatility. Such interim deviations from specified
ranges will be permitted but will become subject to review by Research Management. This Document is not to be passed on to any third party without our
prior written consent.
1300 582 256
patersons@psl.com.au
Western Australia
Victoria
Queensland
South Australia
Northern Territory
www.psl.com.au
Participant of ASX Group; Stockbrokers Association of Australia Principal Member; Financial Planning Association Principal Member