Anda di halaman 1dari 2

LIFTING PLAN PENGANGKATAN KATEGORI A

A. JADWAL PERENCANAAN
 Aktifitas Pekerjaan : Memasang / Melepas Cabin base PC2000-8 ________
 Tanggal Pelaksanaan : __________________________________________________
 Waktu : __________________________________________________
 Lokasi : __________________________________________________
 Estimasi Pekerjaan : __________________________________________________

B. DAFTAR PERSONAL YANG TERLIBAT


 Pengawas Area : __________________________________________________
 Pengawas Pekerjaan : __________________________________________________
 Operator Crane : __________________________________________________
 Rigger : __________________________________________________
 Crew lain : __________________________________________________

C. SPESIFIKASI BEBAN YANG AKAN DIANGKAT


 Berat beban : 2.500 Kg____ _____________________________________
 Dimensi : __________________________________________________
 Jenis Material : __________________________________________________
 Sketsa Gambar Beban :

D. PERALATAN YANG DIPERLUKAN


Jenis alat angkat yang diperlukan 1.
2.
3.
SWL / Kapasitas

Perlengkapan alat angkat yang diperlukan

E. SKETSA & GAMBARAN RINGKAS TEKNIS PEKERJAAN


Nama Jabatan Tanda tangan
Dibuat Frm/GL

Disetujui Spv/Supten

Anda mungkin juga menyukai