KEMAJUAN KEMAJUAN
BOBOT TERHADAP
JUMLAH HARGA PEKERJAAN TERHADAP
NO URAIAN PEKERJAAN SELURUH
(Rp.) TERHADAP SETIAP SELURUH
PEKERJAAN (%)
BAGIAN/JENIS PEKERJAAN (%)
PEKERJAAN (%)
I Pekerjaan Persiapan
1 Direksi keet, Gudang dan Barak kerja 7,887,667.73 0.940674430410262 100 0.940674430410262
2 Bongkar lapak/kios eksisting 3,621,600.00 0.431907965022459 100 0.431907965022459
3 Pengukuran dan pemasangan bouwplank 11,161,570.44 1.33111640578618 100 1.33111640578618
4 listrik kerja 1,500,000.00 0.178888322159733 100 0.178888322159733
5 Administrasi, dokumentasi, shop drawing & asbuilt drawing 1,500,000.00 0.178888322159733 100 0.178888322159733
C. Elektrikal
1 Pasang kabel NYM 3x2,5 sqmm 2,162,000.00 0.257837701672895 40 0.103135080669158
2 Pasang kabel NYA 2,5 sqmm 272,160.00 0.032457497172662 40 0.0129829988690648
3 Pasang armatur komplit lampu TL 18W 2,400,000.00 0.286221315455573 - -
4 Pasang saklar tunggal 520,000.00 0.0620146183487074 - -
5 Pasang stop kontak 546,000.00 0.0651153492661428 - -
C. Elektrikal
1 Pasang kabel NYM 3x2,5 sqmm 644,000.00 0.0768027196472454 40 0.0307210878588981
2 Pasang kabel NYA 2,5 sqmm 34,020.00 0.00405718714658275 40 0.0016228748586331
3 Pasang armatur komplit lampu TL 18W 480,000.00 0.0572442630911146 - -
4 Pasang saklar tunggal 130,000.00 0.0155036545871769 - -
D. Septic Tank
1 Galian tanah 553,918.50 0.066059700718824 100 0.066059700718824
2 Urugan pasir dipadatkan 71,769.78 0.00855918368398211 100 0.00855918368398211
3 Lantai kerja beton mutu beton f'c 9.8 MPa (K-125) 363,994.37 0.0434095613211856 100 0.0434095613211856
4 Dinding pasangan batu 1/2 bata camp. 1 : 4 1,837,625.77 0.219153194359931 100 0.219153194359931
5 Plesteran pasangan bata camp. 1 : 4 tebal 15 mm 1,091,279.03 0.130144716504238 100 0.130144716504238
6 Plat beton bertulang 3,279,112.13 0.391063245334654 100 0.391063245334654
7 Pipa PVC dia. 4" 358,937.67 0.0428065055364736 100 0.0428065055364736
Kemajuan Pekerjaan telah mencapai prestasi sebesar : 41,126 % (Empat puluh satu koma satu dua enam persen)
Demikian Laporan Kemajuan Pekerjaan ini diperbuat dengan sebenarnya untuk dapat dipergunakan seperlunya.