Anda di halaman 1dari 9

ITEM PEMBAYARAN NO. : 1.

2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA Keterangan
(Rp.) (Rp.)

A. Sewa Tanah M2 15.00 100,000.00 1,500,000.00

B. PERALATAN
Periksa lembar 1.2-2 5,250,000.00

C. MOBILISASI FASILITAS KONTRAKTOR


1 Base Camp M2 5.00 300,000.00 1,500,000.00
2 Kantor M2 5.00 500,000.00 2,500,000.00
3 Barak M2 5.00 200,000.00 1,000,000.00
4 Bengkel M2 5.00 150,000.00
5 Gudang, dan lain-lain M2 100,000.00 -
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM set


1 Ruang Laboratorium (sesuai Gambar) M2

2 Soil & Aggregate Testing Set 1.00 7,500,000.00 7,500,000.00

3 Bituminous Testing

4 Concrete Testing
Slump Cone Test Set - 1,500,000.00 - Beli
Cylinder/Cube Mould for Compressive Strength Test Buah - 1,000,000.00 - Beli
Beam Mould for Flexural Strength (RIGID) Buah - 2,500,000.00 - Beli
Alat Uji Lentur dan Tekan Beton Digital Unit - 6,000,000.00 - Sewa

5 Pendukung (Test Luar) Ls 1.00 5,000,000.00 5,000,000.00

6 Operasional
1 Sewa Mobil Bln

E. MOBILISASI LAINNYA
E.I. Personil Sesuai Struktur Organisasi LS 1 5,000,000.00 5,000,000

E.II. Fasilitas Direksi


1 Transportasi dan Komunikasi Lapangan Ls 1.00 5,000,000.00 5,000,000.00
2 Papan Kegiatan (Tiang Besi Plat Baja Pondasi Beton uk buah 2.00 2,000,000.00 4,000,000.00
3 papan 1,2m xDireksi
Sewa Kantor 0,8m tinggi tiang=1,8m) bln 2.00 2,500,000.00 5,000,000.00
4 Sewa Fasilitas Kantor Direksi Set 1.00 5,000,000.00 5,000,000.00
5 Pelaporan Dokumentasi dan Asbuilt Drawing Set 1.00 5,000,000.00 5,000,000.00
6 Sewa Kendaraan Roda 2(dua) 125 cc Tahun 2019 bln 1,500,000.00 -
7 Sewa Kendaraan Roda 4(empat) 2000 cc Tahun 2019 bln 5,000,000.00 -
8 Dokumentasi dan Video Udara ( Drone ) kali - 1,500,000.00 -

G. DEMOBILISASI LS 1.00 5,250,000.00 5,250,000.00

Total Biaya Mobilisasi 58,500,000.00

Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. : 1.2


Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

DUMP TRUCK 10 TON E09 Unit 1.00 1,000,000.00 1,000,000.00


EXCAVATOR 80-140 HP E10 Unit 1.00 3,500,000.00 3,500,000.00
PEDESTRIAN ROLLER E24 Unit 1.00 500,000.00 500,000.00
JACK HAMMER E26 Unit 1.00 250,000.00 250,000.00
Analisa El - 18
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 0.40
2 Total Masa Pelaksanaan Kegiatan Bulan 2.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 2.00
5 Panjang zona kerja Perkerasan Jalan M 400.00

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu panah berkedip Buah 2.00 125,000.00 250,000.00
2 Rambu suar berkedip portabel M' - 125,000.00 -
3 Rambu tetap informasi pengalihan/pengaturan lalu lintas Buah 2.00 125,000.00 250,000.00
4 Rambu portabel informasi pengalihan/pengaturan lalu lintas Buah 95,000.00 -
5 Rambu penghalang lalu-lintas jenis plastik Buah 75,000.00 -
6 Rambu penghalang lalu-lintas jenis beton Buah - 450,000.00 -
7 Rambu Peringatan Buah 4.00 125,000.00 500,000.00
8 Rambu Petunjuk Buah - 140,000.00 -
9 Pagar jaring pengaman termasuk perlengkapannya M' - 12,000.00 -
10 Marka jalan sementara (jika diperlukan) M2 - 9,000.00 -
11 Peralatan komunikasi dan Lainnya Set 2.00 400,000.00 800,000.00
12 Alat Bantu Ls 1.00 0.00 -

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 4.00 2,500,000.00 10,000,000.00

2 Koordinator / Pengatur OB 2.00 3,500,000.00 7,000,000.00

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS 18,800,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
Analisa El - 119
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.19


JENIS PEKERJAAN : Keselamatan Dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI SE Menteri No. 11 Tahun 2019

1 Pekerjaan Jalan dan Jembatan


Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp

2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pelaksanaan Bulan 2


Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pelaksanaan Bulan 2

3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dalam kontrak Org

B. Keselamatan dan Kesehatan Kerja SE Menteri No. 11 Tahun 2019


1 Penyiapan RKK :
a Pembuatan Dokumen Rencana Keselematan Konstruksi
b Pembuatan Prosedur dan Instruksi Kerja Set 1 1,500,000 1,500,000
c Penyiapan Formulir

2 Sosialisasi dan Promosi Dan Pelatihan:


a Induksi K3 (Safety Induction) Org 0
b Pengarahan K3 (Safety briefing). 0
c Pertemuan keselamatan (Safety Talk /Tool Box Meeting Org
d Pelatihan K3 0
e P3K Org 0
f Bekerja Di Ketinggian Org 0
g Simulasi K3 Org 0
h Spanduk (Banner) Lbr 0
i Poster Lbr 0
j Papan Informasi K3 Buah 0

3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)


Alat Pelindung Kerja (APK)antara lains:
a Jaring pengaman (Safety Net) Sesuai kebutuhan Ls 0
b Tali keselamatan (Life Line) Sesuai kebutuhan Ls 0
c Penahan Jatuh (Safety Deck) Sesuai kebutuhan Ls 0
d Pagar pengaman (Guard Railling) Sesuai kebutuhan Ls 0
e Pembatas Area (Restricted Area) Sesuai kebutuhan Ls 1 5,000,000 5,000,000
Alat Pelindung Diri (APD) terdiri atas:
a Topi pelindung (Safety helmet) Pekerja, Staf, dan Tamu Buah 20 60,000 1,200,000
b Pelindung mata (Goggles, Spectacles) Sesuai Kebutuhan Psg 0
c Tameng muka (Face shield) Sesuai Kebutuhan Buah 0
d Pelindung pernafasan dan mulut (Masker) Sesuai Kebutuhan Box 0
e Sarung tangan (Safety gloves) Sesuai Kebutuhan Psg 20 10,000 200,000
f Sepatu keselamatan (Safety shoes) Pekerja, Staf, dan Tamu Psg 300,000 0
g Penunjang seluruh tubuh (Full bodu harness) Sesuai Kebutuhan Buah 0
h Rompi keselamatan (Safety vest) Sesuai Kebutuhan Buah 20 40,000 800,000
i Celemek (A[ron/coveralls) Sesuai Kebutuhan Buah 0
k Pelindung jatuh (Fall arrester) Sesuai Kebutuhan Buah 0
0
4 Asuransi dan Perizinan
a Asuransi dan Perizinan Ls 0
b Surat izin Laik Operasi Buah 0
c Sertifikat Kompetensi Operator yang diterbitkan oleh Lembaga/Instansi yang 0
Buah
berwenang sesuai dengan ketentuan peraturan perundang-undangan
Sertifikat Kompetensi Operator yang diterbitkan oleh Lembaga/Instansi yang
Buah
berwenang sesuai dengan ketentuan peraturan perundang-undangan
d Surat Pengesahan Organisasi K3 (P2K3), seusai dengan ketentuan peraturan 0
Ls
perundang-undangan
e Perizinan terkait lingkungan kerja

5 Personel K3 Konstruksi Bulan 2


a Ahli K3 Risiko K3 Tinggi OB 0
b Petugas K3 Risiko K3 Sedang/kecil OB 2 9,000,000 18,000,000
c Petugas tanggap darurat OB 0
d Petugas P3K OB 0
e Petugas Paramedis OB 0

6 Fasilitas sarana kesehatan


a Peralatan P3K (Kotak P3K, Obat Luka, Perban, Dll) Ls 1 500,000 500,000
b Ruang P3K (tempat Tidur Pasien, Stetoskop, Timbangan berat badan) Ls
c Peralatan pengasapan (fogging) LS

7 Rambu-rambu terdiri atas: Ada di 1.8 (Manajemen Keselamatan Lalu Lintas)

8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi


a Ahli Keselamatan terkait Jembatan OJ
b Ahli Keselamatan terkait Jalan OJ

9 Protokol Kesehatan Covid - 19


a Sosialisasi Dari instansi Kesehatan skitar Ls 1 1,800,000 1,800,000
b Pemeriksaan Rapid Test Bh 20 99,000 1,980,000
c pemeriksaan Swab Test Bh 10 275,000 2,750,000
d Penangan kondisi Darurat Ke RS Ls 1 2,500,000 2,500,000
f APD Bh 5 350,000 1,750,000

9 Lain-lain terkait pengendalian risiko K3


a Alat pemadam api ringan (APAR) Buah 0
b Bendera K3 Buah 4 50,000 200,000
c Lampu darurat (Emergency lamp) Buah 1 200,000 200,000
d Pembuatan Kartu Identitas Pekerja (KIP) Lb 0
e Program inspeksi Ls 0
f Pelaporan dan penyelidikan insiden Ls 0
g Titik Kumpul (assembly Poin) Ls 0
h Ambulance atau Mobil untuk angkutan ke RS Bulan 0

E TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 38,380,000.00

Catatan : 1. Perkiraan Kuantitas harus disesuaikan dengan kebutuhan di lapangan


2. Harga perlu disesuaikan dengan harga terbaru, termasuk biaya personil
3. Yang dimaksud dengan konsultansi dengan Ahli terkait keselamatan konstruksi termasuk pakar dan praktisi
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Dinas : Dinas Pekerjaan Umum dan Penataan Ruang
PPK : -
No. Paket Kontrak : -
Nama Paket : Pemeliharaan Berkala Drainase Jalan
Nama Ruas Jalan :
Prop / Kab / Kodya : 0

No. Divisi Uraian Jumlah Harga


Pekerjaan (Rupiah)

1 Umum 11,905,517
2 Drainase 409,883,955
3 Pekerjaan Tanah Dan Geosintetik -
4 Pelebaran Preventif -
5 Pekerasan Berbutir Dan Perkerasan Beton Semen 3,090,360
6 Perkerasan Aspal 4,147,790
7 Struktur -
8 Rehabilitasi Jembatan -
9 Pekerjaan Harian Dan Pekerjaan Lain-Lain -
10 Pekerjaan Pemeliharaan Kinerja -

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 429,027,622
(B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A) 47,193,038
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 476,220,660
(D) DIBULATKAN 476,220,000

Tangerang, February 2021

Di Tetapkan Oleh : Di Buat Oleh : Tim Perencana


PPK
…............
NIP. …...........

…............
….......................... NIP. …...........
Nip. …...............

…............
NIP. …...........
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2018
Dinas : Dinas Pekerjaan Umum dan Penataan Ruang
PPK : -
No. Paket Kontrak : -
Nama Paket : Pemeliharaan Berkala Drainase Jalan
Nama Ruas Jalan : -
Prop / Kab / Kodya : -

No. Mata Perkiraan Harga Satuan Jumlah Harga


Pembayaran Uraian Satuan Kuantitas (Rupiah) (Rupiah)

a b c d e f =d x e

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 5,400,000.00 5,400,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 2,500,000.00 2,500,000.00
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 4,005,516.50 4,005,516.50
-

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 11,905,516.50

-
DIVISI 2. DRAINASE -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 115.80 40,300.00 4,666,740.00
2.2.(1) Pasangan Batu dengan Mortar M3 4.30 1,011,100.00 4,350,515.12
2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1 13.00 3,860,900.00 50,191,700.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 4,612,900.00 -
2.3.(27) Saluran berbentuk U Tipe DS 3a 80/100 (dengan tutup) M1 130.00 2,697,500.00 350,675,000.00
Manhole Buah 3,220,000.00 -
Beton Fc' 15 Dudukan Manhole m3 1,593,000.00 -
Baja Tulangan Sirip BjTP 280 Kg 16,600.00 -
Pipa PVC M1 92,500.00 -
- - - -

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 409,883,955.12

- - - -
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - -
3.1.(1) Galian Biasa M3 - 40,300.00 -
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter M3 245,600.00 -
3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 347,500.00 -
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 - 148,200.00 -
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 629,100.00 -
3.1.(9) Galian Perkerasan berbutir M3 50,200.00 -
3.1.(10). Galian Perkerasan Beton M3 619,600.00 -
3.2.(2a) Timbunan Pilihan dari sumber galian M3 333,100.00 -
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3 680.13 -
3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M3 680.13 -
- -

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 4. PEKERJAAN PREVENTIF

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

- -
DIVISI 5. PERKERASAN BERBUTIR - -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 2.60 403,200.00 1,048,320.00
5.1.(2) Lapis Pondasi Agregat Kelas B M3 5.20 392,700.00 2,042,040.00
5.1.(3) Lapis Pondasi Agregat Kelas S M3 388,500.00 -
5.3.(1.a) Perkerasan Beton Semen (Fs = 45 Mpa) M3 - 1,646,800.00 -
5.3.(3) Lapis Pondasi bawah Beton Kurus M3 - 1,100,600.00 -
- - - -

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,090,360.00

- - - -
DIVISI 6. PERKERASAN ASPAL - - -
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 20.80 19,500.00 405,600.00
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 18,400.00 -
6.3(5a) Laston Lapis Aus (AC-WC) Ton 2.30 1,622,500.00 3,731,750.00
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1,522,600.00 -
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1,098,300.00 -
6.3.(8) Bahan anti pengelupasan Kg 0.30 34,800.00 10,440.00
- - - -

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 4,147,790.00
- - - -
DIVISI 7. STRUKTUR - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 16,600.00 -
7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 16,500.00 -
- - - -

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

- - - -
DIVISI 8. REHABILITASI JEMBATAN - - -
8.1 (1) Cairan Perekat (Epoksi resin) Kg 457,600.00 -
8.1 (2) Bahan Penutup (Sealant) Kg 299,500.00 -
8.1 (3a) Tabung Penyuntik, penyediaan Buah 132,000.00 -
8.1 (3b) Tabung Penyuntik, penggunan Buah 132,000.00 -
8.2.(1) Penambahan (Patching) M3 30,222,400.00 -
8.4.(4) Perkuatan Struktur dengan bahan FRP Jenis carbon per lapis pada daerah kering M2 2,216,500.00 -
- - - -

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

- - - -
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN - - -
9.2.(1) Marka Jalan Termoplastik M2 270,100.00 -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 234,000.00 -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 335,100.00 -
- - - -

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

- - - -
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 720,600.00 -
-

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
INFORMASI PERHITUNGAN

Dinas : Dinas Pekerjaan Umum dan Penataan Ruang


PPK : -
No. Paket Kontrak : -
Nama Paket : Pemeliharaan Berkala Drainase Jalan
Nama Ruas Jalan :
Prop / Kab / Kodya :

Perkiraan
No. Mata Volume Kadar Perkiraan
Uraian Panjang Lebar Luas (m2) Tebal (m2) Koefisien/BJ Banyak Satuan Kuantitas BOQ
Pembayaran (m3) Aspal (%) Kuantitas
(Pembulatan)

a b c d e f g h i j k l m

DIVISI 1. UMUM
1.2 Mobilisasi 378.00 7.00 1.00 LS 1.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 LS 1.00
-
DIVISI 2. DRAINASE -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 143.00 0.90 128.70 0.90 115.83 1.00 115.83 M3 115.80
2.2.(1) Pasangan Batu dengan Mortar 0.36 - M3 -
2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm 13.00 13.00 M1 13.00
2.3.(25) Saluran berbentuk U Tipe DS 2a (dengan tutup) 130.00 130.00 M1 130.00
-
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -
3.1.(1) Galian Biasa 2.00 - 0.20 - - M3 -
3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter - 0.15 - - M3 -
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 7.00 - 0.30 - - M3 -
3.1.(9) Galian Perkerasan berbutir - 0.16 - - M3 -
3.1.(10). Galian Perkerasan Beton 13.00 1.00 13.00 0.25 3.25 3.25 M3 3.20
3.2.(1a) Timbunan Biasa dari sumber galian - 0.15 - - M3 -
-
DIVISI 4. PEKERJAAN PREVENTIF -
-
DIVISI 5. PERKERASAN BERBUTIR -
5.1.(1) Lapis Pondasi Agregat Kelas A 13.00 2.00 26.00 0.10 2.60 2.60 M3 2.60
5.1.(2) Lapis Pondasi Agregat Kelas B 13.00 2.00 26.00 0.20 5.20 5.20 M3 5.20
5.3.(1.a) Perkerasan Beton Semen (Fs = 45 Mpa) 7 D 7.00 - 0.25 - - M3 -
5.3.(3) Lapis Pondasi bawah Beton Kurus 2.00 - 0.10 - - M3 -
-
DIVISI 6. PERKERASAN ASPAL -
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi 13.00 2.00 26.00 0.80 20.80 Liter 20.80
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 2.00 - 0.35 - Liter -
6.3(5a) Laston Lapis Aus (AC-WC) 13.00 2.00 26.00 0.04 5.50% 2.27 0.30% 2.36 Ton 2.30
6.3(6a) Laston Lapis Antara (AC-BC) 2.00 0.06 6.00% 2.30 0.30% - Ton -
6.3(7a) Laston Lapis Fondasi (AC-Base) 2.00 0.06 2.30 - Ton -
6.3.(8) Bahan anti pengelupasan 13.00 2.00 26.00 0.30% 0.39 Kg 0.30
-
DIVISI 7. STRUKTUR -
7.1 (5a) Beton mutu sedang dengan fc’=30 MPa (K-350) Ready Mix 1.00 - 0.15 - - M3 -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg -
7.3 (2) Baja Tulangan Sirip BjTS 280 - Kg -
7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) - 2.00 - 5.45 - Kg -
-
DIVISI 8. REHABILITASI JEMBATAN -
8.1 (0) Perkuatan Struktur Jembatan dengan FRP M2 -
8.1 (1) Cairan Perekat (Epoksi resin) M2 -
8.1 (2) Bahan Penutup (Sealant) Kg -
8.1 (3a) Tabung Penyuntik, penyediaan Buah -
8.1 (3b) Tabung Penyuntik, penggunan Buah -
8.2.(1) Penambahan (Patching) M3 -
8.2.(2) Bongkaran Selimut Beton M2 -
-
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
9.2.(1) Marka Jalan Termoplastik Solid 13.00 0.12 1.56 0.03 1.00 2.00 3.12 M2 3.10
9.2.(1) Marka Jalan Termoplastik Modul 13.00 0.12 1.56 0.03 0.60 1.00 0.94 M2 0.90
9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier) M1 -
-
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA

PEMBESIAN BAJA TULANGAN POLOS/SIRIP 280

Panjang Lebar Jalan Jumlah Jumlah Berat/M1 Jumlah Segmen Volume Total
NO Uraian Panjang Sisi Kanan (Kg) Sisi Kiri (Kg)
Jalan (Joint) Buah (M1) (Kg) Berat (Kg) (Panjang/5) (Kg)

a Besi Dia.8 c d e=cxd f g=exf h i j k=i+j


A Besi Dia.8
1 Sloof Memanjang 13.00 3.50 4.80 8.00 38.40 0.40 15.36 2.60 39.94 39.94 79.87
2 Ring Sloof Memanjang 13.00 3.50 0.67 32.00 21.44 0.40 8.58 2.60 22.30 22.30 44.60
3 Sloof Cross 13.00 3.50 3.40 8.00 27.20 0.40 10.88 2.60 28.29 28.29 56.58
4 Ring Sloof Cross 13.00 3.50 0.67 34.00 22.78 0.40 9.11 2.60 23.69 23.69 47.38
5 Dudukan Wiremesh 13.00 3.50 0.75 9.00 6.75 0.40 2.70 2.60 7.02 7.02 14.04

B Besi Dia.16
1 Tiebar 13.00 3.50 0.50 12.50 6.25 1.58 9.88 2.60 25.68 25.68

C Besi Dia.32
1 Dowel 13.00 3.50 0.40 8.75 3.50 6.31 22.09 2.60 57.42 57.42 114.84

382.98
PERHITUNGAN LAPANGAN

Ruas Jalan : Surya Kencana SP Setia Budi


Item Pekerjaan : Drainase

JARAK (M') LEBAR LUAS


No. KM. / STA. POSISI KETERANGAN
PROFIL (M1) (M2)
f=
a b c = a2 - a1 d c*((d1+d2)/2 j
)

SEGMEN 1

JUMLAH TOTAL - -