RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PENGAWASAN TEKNIS PEMELIHARAAN RUTIN JALAN KABUPATEN / PAKET 14

LOKASI : PAKET 9 PAKET 10 PAKET 11


1. Durian gantang Hulu - Bangkal 1. Barabai - Matang Birik 1. Hantakan - Murung B
2. Pengambau Dalam - Pengambau Hulu 2. Pelajau Hilir - Pandawan 2. Kali Baru - Layuh
3. Paku - Belanti 3. Mandingin - Banua jingah

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB #REF! #REF!
2. Quality / Quantity Engineer - X 3.00 = - OB
3. Inspector 3.00 X 3.00 = 9.00 OB #REF! #REF!

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB #REF! #REF!
#REF!

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN #REF! #REF!

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 3.00 X 3.00 = 9.00 BLN #REF! #REF!
2. Sewa Kamera Digital 3.00 X 3.00 = 9.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN #REF! #REF!
4. Alat tulis / Photo Copy 1.00 LS 1,500,000.00 1,500,000.00

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 3.00 X 3.00 = 9.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 3.00 X 3.00 = 9.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI OE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PENGAWASAN TEKNIS PEMELIHARAAN RUTIN JALAN KABUPATEN / PAKET 14

LOKASI : PAKET 9 PAKET 10 PAKET 11


1. Durian gantang Hulu - Bangkal 1. Barabai - Matang Birik 1. Hantakan - Murung B
2. Pengambau Dalam - Pengambau Hulu 2. Pelajau Hilir - Pandawan 2. Kali Baru - Layuh
3. Paku - Belanti 3. Mandingin - Banua jingah

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. #REF!

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : LIMA PULUH EMPAT JUTA LIMA RATUS EMPAT PULUH RIBU RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RENCANA ANGGARAN BIAYA EE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PENGAWASAN TEKNIS PEMELIHARAAN RUTIN JALAN KABUPATEN / PAKET 14

LOKASI : PAKET 9 PAKET 10 PAKET 11


1. Durian gantang Hulu - Bangkal 1. Barabai - Matang Birik 1. Hantakan - Murung B
2. Pengambau Dalam - Pengambau Hulu 2. Pelajau Hilir - Pandawan 2. Kali Baru - Layuh
3. Paku - Belanti 3. Mandingin - Banua jingah

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB #REF! #REF!
2. Quality / Quantity Engineer X 3.00 = - OB
3. Inspector 3.00 X 3.00 = 9.00 OB #REF! #REF!

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB #REF! #REF!
#REF!

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN #REF! #REF!

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 3.00 X 3.00 = 9.00 BLN #REF! #REF!
2. Sewa Kamera Digital 3.00 X 3.00 = 9.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN #REF! #REF!
4. Alat tulis / Photo Copy 1.00 LS 1,450,000.00 1,450,000.00

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 3.00 X 3.00 = 9.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 3.00 X 3.00 = 9.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN 375,000.00 1,125,000.00

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI EE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PENGAWASAN TEKNIS PEMELIHARAAN RUTIN JALAN KABUPATEN / PAKET 14

LOKASI : PAKET 9 PAKET 10 PAKET 11


1. Durian gantang Hulu - Bangkal 1. Barabai - Matang Birik 1. Hantakan - Murung B
2. Pengambau Dalam - Pengambau Hulu 2. Pelajau Hilir - Pandawan 2. Kali Baru - Layuh
3. Paku - Belanti 3. Mandingin - Banua jingah

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. #REF!

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : LIMA PULUH EMPAT JUTA EMPAT RATUS SEPULUH RIBU RUPIAH

Barabai, Mei 2008


Kabid Bina Marga
Pejabat Pembuat Komitmen

AHMAD ZAID, ST
NIP. 540 013 094
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN KONSTRUKSI GIRDER BAJA


PAKET 10

LOKASI : JEMBATAN HALIAU (KEC. BATU BENAWA)

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 4.50 = 4.50 OB 3,250,000.00 14,625,000.00
2. Quality / Quantity Engineer 1.00 X 4.50 = 4.50 OB 1,650,000.00 7,425,000.00
3. Inspector 1.00 X 4.50 = 4.50 OB 1,650,000.00 7,425,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 4.50 = 4.50 OB 1,040,000.00 4,680,000.00
34,155,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 4.50 = 4.50 BLN #REF! #REF!

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 1.00 X 4.50 = 4.50 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 4.50 = 9.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 4.50 = 4.50 BLN 300,000.00 1,350,000.00
4. Alat tulis / Photo Copy 1.00 LS #REF! #REF!

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 4.50 = 9.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 4.50 = 4.50 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 4.50 = 9.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 4.50 = 4.50 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 4.50 = 13.50 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN KONSTRUKSI GIRDER BAJA


PAKET 10

LOKASI : JEMBATAN HALIAU (KEC. BATU BENAWA)

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 34,155,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : ENAM PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RENCANA ANGGARAN BIAYA EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN KONSTRUKSI GIRDER BAJA


PAKET 10

LOKASI : JEMBATAN HALIAU (KEC. BATU BENAWA)

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 4.50 = 4.50 OB 3,250,000.00 14,625,000.00
2. Quality / Quantity Engineer 1.00 X 4.50 = 4.50 OB 1,650,000.00 7,425,000.00
3. Inspector 1.00 X 4.50 = 4.50 OB 1,650,000.00 7,425,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 4.50 = 4.50 OB 1,040,000.00 4,680,000.00
34,155,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 4.50 = 4.50 BLN 400,000.00 1,800,000.00

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 1.00 X 4.50 = 4.50 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 4.50 = 9.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 4.50 = 4.50 BLN 300,000.00 1,350,000.00
4. Alat tulis / Photo Copy 1.00 LS 750,000.00 750,000.00

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 4.50 = 9.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 4.50 = 4.50 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 4.50 = 9.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 4.50 = 4.50 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 4.50 = 13.50 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN KONSTRUKSI GIRDER BAJA


PAKET 10

LOKASI : JEMBATAN HALIAU (KEC. BATU BENAWA)

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 34,155,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : LIMA PULUH SEMBILAN JUTA TUJUH RATUS TIGA PULUH RIBU RUPIAH

Barabai, Mei 2008


Kabid Bina Marga
Pejabat Pembuat Komitmen

AHMAD ZAID, ST
NIP. 540 013 094
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN BOX CULVERT


PAKET 11

LOKASI : PAKET 2 PAKET 3 PAKET 11


1. Jembatan Birayang - Cukan Lipai 1 1. Jembatan Birayang - Cukan Lipai 2 1. Jembatan Birayang - Cukan Lipai 3

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB 3,250,000.00 9,750,000.00
2. Quality / Quantity Engineer - X 3.00 = - OB
3. Inspector / Quality / Quantity Engineer 2.00 X 3.00 = 6.00 OB 1,650,000.00 9,900,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB 1,040,000.00 3,120,000.00
22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN #REF! #REF!

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 3.00 = 6.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN 300,000.00 900,000.00
4. Alat tulis / Photo Copy 1.00 LS #REF! #REF!

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN BOX CULVERT


PAKET 11

LOKASI : PAKET 2 PAKET 3 PAKET 11


1. Jembatan Birayang - Cukan Lipai 1 1. Jembatan Birayang - Cukan Lipai 2 1. Jembatan Birayang - Cukan Lipai 3

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : EMPAT PULUH JUTA SEMBILAN RATUS DUA PULUH RIBU RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RENCANA ANGGARAN BIAYA EE
PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN BOX CULVERT


PAKET 11

LOKASI : PAKET 2 PAKET 3 PAKET 11


1. Jembatan Birayang - Cukan Lipai 1 1. Jembatan Birayang - Cukan Lipai 2 1. Jembatan Birayang - Cukan Lipai 3

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB 3,250,000.00 9,750,000.00
2. Quality / Quantity Engineer - X 3.00 = - OB
3. Inspector / Quality / Quantity Engineer 2.00 X 3.00 = 6.00 OB 1,650,000.00 9,900,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB 1,040,000.00 3,120,000.00
22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN 400,000.00 1,200,000.00

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 3.00 = 6.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN 300,000.00 900,000.00
4. Alat tulis / Photo Copy 1.00 LS 750,000.00 750,000.00

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN BOX CULVERT


PAKET 11

LOKASI : PAKET 2 PAKET 3 PAKET 11


1. Jembatan Birayang - Cukan Lipai 1 1. Jembatan Birayang - Cukan Lipai 2 1. Jembatan Birayang - Cukan Lipai 3

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : EMPAT PULUH JUTA TUJUH RATUS TIGA PULUH RIBU RUPIAH

Barabai, Mei 2008


Kabid Bina Marga
Pejabat Pembuat Komitmen

AHMAD ZAID, ST
NIP. 540 013 094
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN GANTUNG


PAKET 12

LOKASI : PAKET 5 PAKET 6 PAKET 7


1. Jembatan Desa Haliau 1. Jembatan Desa Pajukungan 1. Jembatan Desa Kiyu

PAKET 8
1. Jembatan Desa Keramat

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB 3,250,000.00 9,750,000.00
2. Quality / Quantity Engineer - X 3.00 = - OB
3. Inspector / Quality / Quantity Engineer 2.00 X 3.00 = 6.00 OB 1,650,000.00 9,900,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB 1,040,000.00 3,120,000.00
22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN #REF! #REF!

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 3.00 = 6.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN 300,000.00 900,000.00
4. Alat tulis / Photo Copy 1.00 LS #REF! #REF!

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN GANTUNG


PAKET 12

LOKASI : PAKET 5 PAKET 6 PAKET 7


1. Jembatan Desa Haliau 1. Jembatan Desa Pajukungan 1. Jembatan Desa Kiyu

PAKET 8
1. Jembatan Desa Keramat

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : EMPAT PULUH JUTA SEMBILAN RATUS DUA PULUH RIBU RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RENCANA ANGGARAN BIAYA EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN GANTUNG


PAKET 12

LOKASI : PAKET 5 PAKET 6 PAKET 7


1. Jembatan Desa Haliau 1. Jembatan Desa Pajukungan 1. Jembatan Desa Kiyu

PAKET 8
1. Jembatan Desa Keramat

HARGA SATUAN
NO. URAIAN VOLUME JUMLAH
(Rp.)
1 2 3 4 5

I. BIAYA LANGSUNG PERSONIL

A. Tenaga Ahli
1. Site Engineer 1.00 X 3.00 = 3.00 OB 3,250,000.00 9,750,000.00
2. Quality / Quantity Engineer - X 3.00 = - OB
3. Inspector / Quality / Quantity Engineer 2.00 X 3.00 = 6.00 OB 1,650,000.00 9,900,000.00

B. Tenaga Pendukung
1. Staf Administrasi/operator komputer 1.00 X 3.00 = 3.00 OB 1,040,000.00 3,120,000.00
22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor 1.00 X 3.00 = 3.00 BLN 425,000.00 1,275,000.00

B. Biaya Operasional Kantor


1. Sewa Komputer dan Printer 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kamera Digital 2.00 X 3.00 = 6.00 BLN #REF! #REF!
3. Biaya Komunikasi 1.00 X 3.00 = 3.00 BLN 300,000.00 900,000.00
4. Alat tulis / Photo Copy 1.00 LS 725,000.00 725,000.00

C. Biaya Transportasi
1. Sewa Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
2. Sewa Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!
3. Bahan Bakar Kendaraan Roda 2 2.00 X 3.00 = 6.00 BLN #REF! #REF!
4. Bahan Bakar Kendaraan Roda 4 1.00 X 3.00 = 3.00 BLN #REF! #REF!

D. Pelaporan
- Laporan Pendahuluan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Bulanan 3.00 X 3.00 = 9.00 BUKU #REF! #REF!
- Laporan Triwulan 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
- Laporan Akhir 3.00 X 1.00 = 3.00 BUKU #REF! #REF!
#REF!
REKAPITULASI EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN GANTUNG


PAKET 12

LOKASI : PAKET 5 PAKET 6 PAKET 7


1. Jembatan Desa Haliau 1. Jembatan Desa Pajukungan 1. Jembatan Desa Kiyu

PAKET 8
1. Jembatan Desa Keramat

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 22,770,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : EMPAT PULUH JUTA TUJUH RATUS SEMBILAN PULUH RIBU RUPIAH

Barabai, Mei 2008


Kabid Bina Marga
Pejabat Pembuat Komitmen

AHMAD ZAID, ST
NIP. 540 013 094
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN GANTUNG


PAKET 1

LOKASI : 1. DESA HALIAU 6. DESA BHAKTI (JEMBATAN 5)


2. DESA PAJUKUNGAN 7. DESA AWANG
3. DESA KIYU 8. DESA SETIAP
4. DESA KERAMAT (PANTAI BATUNG) 9. DESA BAWAN
5. DESA BHAKTI (JEMBATAN 2) 10. DESA DATAR BATUNG

LAMANYA
PENGALAMAN HARGA SATUAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 2.00 Bln = 2.00 OB 4,000,000.00 8,000,000.00
2. Civil Engineer 3 1.00 Org X 2.00 Bln = 2.00 OB 1,800,000.00 3,600,000.00
3. Estimator 3 1.00 Org X 2.00 Bln = 2.00 OB 1,800,000.00 3,600,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 2.00 Bln = 6.00 OB 1,650,000.00 9,900,000.00
2. Draftman 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,650,000.00 3,300,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,200,000.00 2,400,000.00
30,800,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 2.00 Bln = 2.00 Bln 500,000.00 1,000,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 2.00 Bln = 4.00 Bln #REF! #REF!
2. Alat tulis 1.00 Paket X 2.00 Bln = 2.00 Bln 50,000.00 100,000.00
3. Photo Copy 1.00 Ls 110,000.00 110,000.00
4. Biaya Komunikasi 1.00 Ls X 2.00 Bln = 2.00 Bln 300,000.00 600,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 2.00 Unit X 2.00 Bln = 4.00 Bln 350,000.00 1,400,000.00
2. Bahan bakar Kendaraan R 2 2.00 Unit X 2.00 Bln = 4.00 Bln 200,000.00 800,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 2.00 Bln = 2.00 Bln 75,000.00 150,000.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 150,000.00 3,000,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari #REF! #REF!

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 50,000.00 150,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
#REF!
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN GANTUNG


PAKET 1

LOKASI : 1. DESA HALIAU 6. DESA BHAKTI (JEMBATAN 5)


2. DESA PAJUKUNGAN 7. DESA AWANG
3. DESA KIYU 8. DESA SETIAP
4. DESA KERAMAT (PANTAI BATUNG) 9. DESA BAWAN
5. DESA BHAKTI (JEMBATAN 2) 10. DESA DATAR BATUNG

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 30,800,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JALAN


KAB. HST TA. 2008
PEKERJAAN : PERENCANAAN PEMBANGUNAN/PENINGKATAN JALAN (25 Ruas)
PAKET 1

LOKASI : 1. 6. 11. 16. 21.


2. 7. 12. 17. 22.
3. 8. 13. 18. 23.
4. 9. 14. 19. 24.
5. 10. 15. 20. 25.

LAMANYA HARGA SATUAN


PENGALAMAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)

1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 3.00 Bln = 3.00 OB 4,200,000.00 12,600,000.00
2. Civil Engineer 3 1.00 Org X 3.00 Bln = 3.00 OB 1,950,000.00 5,850,000.00
3. Estimator 3 1.00 Org X 3.00 Bln = 3.00 OB 1,950,000.00 5,850,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 3.00 Bln = 9.00 OB 1,650,000.00 14,850,000.00
2. Draftman 1-4 1.00 Org X 3.00 Bln = 3.00 OB 1,650,000.00 4,950,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 3.00 Bln = 3.00 OB 1,300,000.00 3,900,000.00
48,000,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 3.00 Bln = 3.00 Bln 650,000.00 1,950,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 3.00 Bln = 6.00 Bln 175,000.00 1,050,000.00
2. Alat tulis 1.00 Paket X 3.00 Bln = 3.00 Bln 500,000.00 1,500,000.00
3. Photo Copy 1.00 Ls 650,000.00 650,000.00
4. Biaya Komunikasi 1.00 Ls X 3.00 Bln = 3.00 Bln 800,000.00 2,400,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 65,000.00 3,900,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 65,000.00 3,900,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 3.00 Unit X 3.00 Bln = 9.00 Bln 400,000.00 3,600,000.00
2. Sewa Kendaraan Roda 4 1.00 Unit X 3.00 Bln = 3.00 Bln 1,750,000.00 5,250,000.00
3. Bahan bakar Kendaraan R 2 3.00 Unit X 3.00 Bln = 9.00 Bln 100,000.00 900,000.00
4. Bahan Bakar Kendaraan Roda 4 1.00 Unit X 3.00 Bln = 3.00 Bln 300,000.00 900,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 3.00 Bln = 3.00 Bln 175,000.00 525,000.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 125,000.00 2,500,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari 25,000.00 500,000.00

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 150,000.00 450,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 250,000.00 750,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 125,000.00 375,000.00
31,550,000.00
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JALAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN/PENINGKATAN JALAN (25 Ruas)


PAKET 1

LOKASI : 1. 6. 11. 16. 21.


2. 7. 12. 17. 22.
3. 8. 13. 18. 23.
4. 9. 14. 19. 24.
5. 10. 15. 20. 25.

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 48,000,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. 31,550,000.00

JUMLAH 79,550,000.00
PPN 10% 7,955,000.00
TOTAL 87,505,000.00
DIBULATKAN 87,500,000.00

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN


KAB. HST TA. 2008
PEKERJAAN : PERENCANAAN PEMELIHARAAN RUTIN JALAN KABUPATEN (18 Ruas)
PAKET 2

LOKASI : 1. 6. 11. 16.


2. 7. 12. 17.
3. 8. 13. ER 18.
4. 9. 14.
5. 10. P 15.

LAMANYA HARGA SATUAN


PENGALAMAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 2.00 Bln = 2.00 OB 4,200,000.00 8,400,000.00
2. Civil Engineer 3 1.00 Org X 2.00 Bln = 2.00 OB 1,950,000.00 3,900,000.00
3. Estimator 3 1.00 Org X 2.00 Bln = 2.00 OB 1,950,000.00 3,900,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 2.00 Bln = 6.00 OB 1,650,000.00 9,900,000.00
2. Draftman 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,650,000.00 3,300,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,200,000.00 2,400,000.00
31,800,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 2.00 Bln = 2.00 Bln 500,000.00 1,000,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 2.00 Bln = 4.00 Bln 150,000.00 600,000.00
2. Alat tulis 1.00 Paket X 2.00 Bln = 2.00 Bln 125,000.00 250,000.00
3. Photo Copy 1.00 Ls 745,000.00 745,000.00
4. Biaya Komunikasi 1.00 Ls X 2.00 Bln = 2.00 Bln 300,000.00 600,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 15.00 Hari = 45.00 Hari 50,000.00 2,250,000.00
2. Survey Lapangan 3.00 Org X 15.00 Hari = 45.00 Hari 50,000.00 2,250,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 3.00 Unit X 2.00 Bln = 6.00 Bln 325,000.00 1,950,000.00
2. Sewa Kendaraan Roda 4 1.00 Unit X 2.00 Bln = 2.00 Bln 1,400,000.00 2,800,000.00
3. Bahan bakar Kendaraan R 2 3.00 Unit X 2.00 Bln = 6.00 Bln 100,000.00 600,000.00
4. Bahan Bakar Kendaraan Roda 4 1.00 Unit X 2.00 Bln = 2.00 Bln 300,000.00 600,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 2.00 Bln = 2.00 Bln 175,000.00 350,000.00
3. Sewa Water Pass 1.00 Unit X 15.00 Hari = 15.00 Hari 75,000.00 1,125,000.00
4. Sewa Measuring Tape 1.00 Unit X 15.00 Hari = 15.00 Hari 25,000.00 375,000.00

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 150,000.00 450,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 175,000.00 525,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 125,000.00 375,000.00
17,295,000.00
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PERENCANAAN PEMELIHARAAN RUTIN JALAN KABUPATEN (18 Ruas)


PAKET 2

LOKASI : 1. 6. 11. 16.


2. 7. 12. 17.
3. 8. 13. 18.
4. 9. 14.
5. 10. 15.

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 31,800,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. 17,295,000.00

JUMLAH 49,095,000.00
PPN 10% 4,909,500.00
TOTAL 54,004,500.00
DIBULATKAN 54,000,000.00

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN


KAB. HST TA. 2008
PEKERJAAN : PERENCANAAN PEMELIHARAAN JALAN KABUPATEN (13 Ruas)
PAKET 1

LOKASI : 1. 6. 11.
2. 7. 12.
3. 8. 13.
4. 9.
5. 10.

LAMANYA
PENGALAMAN HARGA SATUAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 1.50 Bln = 1.50 OB 4,200,000.00 6,300,000.00
2. Civil Engineer 3 1.00 Org X 1.50 Bln = 1.50 OB 1,950,000.00 2,925,000.00
3. Estimator 3 1.00 Org X 1.50 Bln = 1.50 OB 1,950,000.00 2,925,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 1.50 Bln = 4.50 OB 1,650,000.00 7,425,000.00
2. Draftman 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,650,000.00 2,475,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,200,000.00 1,800,000.00
23,850,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 1.50 Bln = 1.50 Bln 500,000.00 750,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 1.50 Bln = 3.00 Bln 150,000.00 450,000.00
2. Alat tulis 1.00 Paket X 1.50 Bln = 1.50 Bln 125,000.00 187,500.00
3. Photo Copy 1.00 Ls 700,000.00 700,000.00
4. Biaya Komunikasi 1.00 Ls X 1.50 Bln = 1.50 Bln 300,000.00 450,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 3.00 Unit X 1.50 Bln = 4.50 Bln 325,000.00 1,462,500.00
2. Sewa Kendaraan Roda 4 1.00 Unit X 1.50 Bln = 1.50 Bln 1,400,000.00 2,100,000.00
3. Bahan bakar Kendaraan R 2 3.00 Unit X 1.50 Bln = 4.50 Bln 100,000.00 450,000.00
4. Bahan Bakar Kendaraan Roda 4 1.00 Unit X 1.50 Bln = 1.50 Bln 300,000.00 450,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 1.50 Bln = 1.50 Bln 175,000.00 262,500.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 75,000.00 1,500,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari 25,000.00 500,000.00

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 150,000.00 450,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 175,000.00 525,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 125,000.00 375,000.00
17,062,500.00
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PERENCANAAN PEMELIHARAAN JALAN KABUPATEN (13 Ruas)


PAKET 1

LOKASI : 1. 6. 11.
2. 7. 12.
3. 8. 13.
4. 9.
5. 10.

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 23,850,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. 17,062,500.00

JUMLAH 40,912,500.00
PPN 10% 4,091,250.00
TOTAL 45,003,750.00
DIBULATKAN 45,000,000.00

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN


KAB. HST TA. 2008
PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN KABUPATEN (14 Ruas)
PAKET 3

LOKASI : 1. 6. 11.
2. 7. 12.
3. 8. 13.
4. 9. 14.
5. 10.

LAMANYA
PENGALAMAN HARGA SATUAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 1.50 Bln = 1.50 OB 4,200,000.00 6,300,000.00
2. Civil Engineer 3 1.00 Org X 1.50 Bln = 1.50 OB 1,950,000.00 2,925,000.00
3. Estimator 3 1.00 Org X 1.50 Bln = 1.50 OB 1,950,000.00 2,925,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 1.50 Bln = 4.50 OB 1,650,000.00 7,425,000.00
2. Draftman 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,650,000.00 2,475,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,200,000.00 1,800,000.00
23,850,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 1.50 Bln = 1.50 Bln 500,000.00 750,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 1.50 Bln = 3.00 Bln 150,000.00 450,000.00
2. Alat tulis 1.00 Paket X 1.50 Bln = 1.50 Bln 125,000.00 187,500.00
3. Photo Copy 1.00 Ls 700,000.00 700,000.00
4. Biaya Komunikasi 1.00 Ls X 1.50 Bln = 1.50 Bln 300,000.00 450,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 3.00 Unit X 1.50 Bln = 4.50 Bln 325,000.00 1,462,500.00
2. Sewa Kendaraan Roda 4 1.00 Unit X 1.50 Bln = 1.50 Bln 1,400,000.00 2,100,000.00
3. Bahan bakar Kendaraan R 2 3.00 Unit X 1.50 Bln = 4.50 Bln 100,000.00 450,000.00
4. Bahan Bakar Kendaraan Roda 4 1.00 Unit X 1.50 Bln = 1.50 Bln 300,000.00 450,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 1.50 Bln = 1.50 Bln 175,000.00 262,500.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 75,000.00 1,500,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari 25,000.00 500,000.00

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 75,000.00 225,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 150,000.00 450,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 175,000.00 525,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 125,000.00 375,000.00
17,062,500.00
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN REHABILITASI/PEMELIHARAAN JALAN

PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN KABUPATEN (14 Ruas)


PAKET 3

LOKASI : 1. 6. 11.
2. 7. 12.
3. 8. 13.
4. 9. 14.
5. 10.

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 23,850,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. 17,062,500.00

JUMLAH 40,912,500.00
PPN 10% 4,091,250.00
TOTAL 45,003,750.00
DIBULATKAN 45,000,000.00

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RINCIAN ANGGARAN BIAYA HARGA PERKIRAAN SENDIRI (HPS) OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN


KAB. HST TA. 2008
PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN BOX CULVERT (8 Buah)
PAKET 2

LOKASI : KABUPATEN HULU SUNGAI TENGAH

LAMANYA
PENGALAMAN HARGA SATUAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 1.50 Bln = 1.50 OB 4,000,000.00 6,000,000.00
2. Civil Engineer 3 1.00 Org X 1.50 Bln = 1.50 OB 1,800,000.00 2,700,000.00
3. Estimator 3 1.00 Org X 1.50 Bln = 1.50 OB 1,800,000.00 2,700,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 1.50 Bln = 4.50 OB 1,650,000.00 7,425,000.00
2. Draftman 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,650,000.00 2,475,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 1.50 Bln = 1.50 OB 1,000,000.00 1,500,000.00
22,800,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 1.50 Bln = 1.50 Bln 500,000.00 750,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 1.50 Bln = 3.00 Bln 150,000.00 450,000.00
2. Alat tulis 1.00 Paket X 1.50 Bln = 1.50 Bln 50,000.00 75,000.00
3. Photo Copy 1.00 Ls 180,000.00 180,000.00
4. Biaya Komunikasi 1.00 Ls X 1.50 Bln = 1.50 Bln 300,000.00 450,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 2.00 Unit X 1.50 Bln = 3.00 Bln 350,000.00 1,050,000.00
2. Bahan bakar Kendaraan R 2 2.00 Unit X 1.50 Bln = 3.00 Bln 200,000.00 600,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 1.50 Bln = 1.50 Bln 75,000.00 112,500.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 150,000.00 3,000,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari 15,000.00 300,000.00

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 50,000.00 150,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
- Laporan Akhir -
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
13,567,500.00
REKAPITULASI OE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN BOX CULVERT (8 Buah)


PAKET 2

LOKASI : KABUPATEN HULU SUNGAI TENGAH

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 22,800,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. 13,567,500.00

JUMLAH 36,367,500.00
PPN 10% 3,636,750.00
TOTAL 40,004,250.00
DIBULATKAN 40,000,000.00

TERBILANG : LIMA PULUH JUTA RUPIAH

Barabai, Mei 2008


Ditetapkan dan Disyahkan Oleh : Di Susun Oleh :
Pejabat Pembuat Komitmen Panitia Pengadaan Barang / Jasa

AHMAD ZAID, ST H. AKHMAD YANI


NIP. 540 013 094 Ketua
RENCANA ANGGARAN BIAYA EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN GANTUNG


PAKET 1

LOKASI : 1. DESA HALIAU 6. DESA BHAKTI (JEMBATAN 5)


2. DESA PAJUKUNGAN 7. DESA AWANG
3. DESA KIYU 8. DESA SETIAP
4. DESA KERAMAT (PANTAI BATUNG) 9. DESA BAWAN
5. DESA BHAKTI (JEMBATAN 2) 10. DESA DATAR BATUNG

LAMANYA
PENGALAMAN HARGA SATUAN
NO. URAIAN KEAHLIAN VOLUME JUMLAH
(Thn)
(Rp.)
1 2 3 4 5 6

I. BIAYA LANGSUNG PERSONIL

A. Profesional Staf
1. Team Leader 5 1.00 Org X 2.00 Bln = 2.00 OB 3,800,000.00 7,600,000.00
2. Civil Engineer 3 1.00 Org X 2.00 Bln = 2.00 OB 1,800,000.00 3,600,000.00
3. Estimator 3 1.00 Org X 2.00 Bln = 2.00 OB 1,800,000.00 3,600,000.00

B. Supporting Staf
1. Surveyor 1-4 3.00 Org X 2.00 Bln = 6.00 OB 1,650,000.00 9,900,000.00
2. Draftman 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,650,000.00 3,300,000.00
3. Operator komputer / Staf Administrasi 1-4 1.00 Org X 2.00 Bln = 2.00 OB 1,200,000.00 2,400,000.00
30,400,000.00

II. BIAYA LANGSUNG NON PERSONIL

A. Sewa Kantor
1. Sewa Kantor 1.00 Unit X 2.00 Bln = 2.00 Bln 500,000.00 1,000,000.00

B. Peralatan Kantor
1. Sewa Komputer dan Printer 2.00 Unit X 2.00 Bln = 4.00 Bln #REF! #REF!
2. Alat tulis 1.00 Paket X 2.00 Bln = 2.00 Bln 50,000.00 100,000.00
3. Photo Copy 1.00 Ls 110,000.00 110,000.00
4. Biaya Komunikasi 1.00 Ls X 2.00 Bln = 2.00 Bln 300,000.00 600,000.00

C. Survey Lapangan dan Pengukuran


1. Survey Pendahuluan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00
2. Survey Lapangan 3.00 Org X 20.00 Hari = 60.00 Hari 50,000.00 3,000,000.00

D. Sewa Kendaraan
1. Sewa Kendaraan Roda Dua 2.00 Unit X 2.00 Bln = 4.00 Bln 350,000.00 1,400,000.00
2. Bahan bakar Kendaraan R 2 2.00 Unit X 2.00 Bln = 4.00 Bln 200,000.00 800,000.00

E. Sewa Alat
1. Sewa Kamera 1.00 Unit X 2.00 Bln = 2.00 Bln 75,000.00 150,000.00
3. Sewa Water Pass 1.00 Unit X 20.00 Hari = 20.00 Hari 150,000.00 3,000,000.00
4. Sewa Measuring Tape 1.00 Unit X 20.00 Hari = 20.00 Hari #REF! #REF!

F. Pelaporan
- Laporan Pendahuluan 3.00 Ekspl X 1.00 = 3.00 Buku 50,000.00 150,000.00
- Laporan Hasil Survey
a. Data Pengukuran Lapangan 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
b. Photo Visual 3.00 Ekspl X 1.00 = 3.00 Buku 25,000.00 75,000.00
- Laporan Akhir
a. Gambar Rencana 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
b. Estimasi Biaya 3.00 Ekspl 1.00 = 3.00 Buku 50,000.00 150,000.00
#REF!
REKAPITULASI EE

PROGRAM : PEMBANGUNAN JALAN DAN JEMBATAN

KEGIATAN : PERENCANAAN PEMBANGUNAN JEMBATAN

PEKERJAAN : PERENCANAAN PEMBANGUNAN JEMBATAN GANTUNG


PAKET 1

LOKASI : 1. DESA HALIAU 6. DESA BHAKTI (JEMBATAN 5)


2. DESA PAJUKUNGAN 7. DESA AWANG
3. DESA KIYU 8. DESA SETIAP
4. DESA KERAMAT (PANTAI BATUNG) 9. DESA BAWAN
5. DESA BHAKTI (JEMBATAN 2) 10. DESA DATAR BATUNG

NO. URAIAN TOTAL

I. BIAYA LANGSUNG PERSONIL Rp. 30,400,000.00

II. BIAYA LANGSUNG NON PERSONIL Rp. #REF!

JUMLAH #REF!
PPN 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

TERBILANG : EMPAT PULUH SEMBILAN JUTA LIMA RATUS ENAM PULUH RIBU RUPIAH

Barabai, Juli 2008


Kepala Bidang Bina Marga
Pejabat Pembuat Komitmen

AHMAD ZAID, ST
NIP. 540 013 094
USULAN HARGA NON PERSONIL
KEGIATAN : Bidang Cipta Karya dan Tata Ruang
TAHUN : 2014

BIAYA LANGSUNG NON PERSONIL

No Uraian Satuan Volume Bulan


1 2 4 5 6

A BIAYA BAHAN HABIS PAKAI


1 Alat Tulis Kantor ( ATK) dan Komputer Supplies Ls 1.00 1.00

B BIAYA CETAK DAN PENGGANDAAN LAPORAN


1 Laporan Pendahuluan Buku 1.00 1.00
2 Laporan Konsep Akhir Buku 1.00 1.00
3 Laporan Akhir Buku 1.00 1.00
4 Dokumentasi data dan kegiatan (dalam bentuk flashdisk) Buah 1.00 1.00
5 Laporan Bulanan Buku 1.00 1.00

C BIAYA SURVEY SEWA PERALATAN SURVEY


1 Sewa Alat Survey (Teodholite dan waterpass) unit 1.00 1.00

D BIAYA EKSPOSE LAPORAN


1 Ekspose Pendahuluan ls 1.00 1.00
2 Ekspose Akhir ls 1.00 1.00

E BIAYA SEWA PERLENGKAPAN DAN PERALATAN KANTOR

1 Sewa Komputer/PC Unit 1.00 1.00


2 Sewa Printer A4 Unit 1.00 1.00
3 Sewa Printer A3 Unit 1.00 1.00
4 Sewa Kendaraan Roda Empat Unit 1.00 1.00
5 Sewa Kendaraan Roda dua Unit 1.00 1.00
IL

Jumlah
Bulan Harga Satuan (Rp)
(Rp)
6 7 8

400,000.00 400,000.00 2,656,500.00 2,300,000

150,000.00 150,000.00 161,700.00 140,000


200,000.00 200,000.00 207,900.00 180,000
300,000.00 300,000.00 323,400.00 280,000
160,000.00 160,000.00 184,800.00 160,000
100,000.00 100,000.00

1,500,000.00 1,500,000.00

2,500,000.00 2,500,000.00
3,000,000.00 3,000,000.00

750,000.00 750,000.00 1,155,000.00 1,000,000.00


400,000.00 400,000.00 693,000.00 600,000.00
600,000.00 600,000.00 693,000.00 600,000.00
5,000,000.00 5,000,000.00 9,586,500.00 8,300,000.00 1.1550
700,000.00 700,000.00 1,617,000.00 1,400,000.00

#REF!

42,630,000
0
PERINCIAN USULAN BIAYA PERSONIL
KEGIATAN : Bidang Cipta Karya dan Tata Ruang
PEKERJAAN: :
LOKASI: :
TAHUN ANGGARAN : 2014

Uraian Lama Gaji Dasar Beban Biaya Beban Biaya


Kegiatan Sub Jumlah 1
Pengalaman (Rp) Sosial Umum
No Personil/Pend
idikan/Jurusa Keahlian (Rp) (Rp)
(Rp)
n (Thn) (GD) ( 0,3-04) x GD ( 0,5-1,3) x GD
(1) (2) (3) (4) (5) (6) (7)=(4)+(5)+(6)

I TENAGA AHLI
1 Tenaga Ahli S1/S2 SKA 10 4,000,000.00 1,200,000.00 2,000,000.00 7,200,000.00
2 Tenaga Ahli S1/S2 SKA 8 3,000,000.00 900,000.00 1,500,000.00 5,400,000.00
3 Tenaga Ahli S1 SKA 6 2,500,000.00 750,000.00 1,250,000.00 4,500,000.00
4 Tenaga Ahli S1 SKA 5 2,000,000.00 600,000.00 1,000,000.00 3,600,000.00
5 Tenaga Ahli S1 SKA 3 1,750,000.00 525,000.00 875,000.00 3,150,000.00

II TENAGA PENDUKUNG
1 Surveyor ( D3/S1 Teknik ) 3 1,400,000.00 420,000.00 700,000.00 2,520,000.00
2 Chief Inspektor (S1 teknik) 3 1,600,000.00 480,000.00 800,000.00 2,880,000.00
3 Inspektor/pengawas lap. (D3/S1 Tekn 3 1,500,000.00 450,000.00 750,000.00 2,700,000.00
4 Drafter (D3/S1 Teknik) 3 1,500,000.00 450,000.00 750,000.00 2,700,000.00
5 Operator Komputer / Administrator 1 1,000,000.00 300,000.00 500,000.00 1,800,000.00
L

Tunjangan Beban Biaya


Keuntungan
Penugasan Personil / Bulan
(Rp) (Rp) (Rp)
0,1x(GD+BBS+BBU) (0,1-0,3) x GD (2,2-3,1) x GD
(8)=0.1x(7) (9)=0.1x(4) (10)=(7)+(8)+(9)

720,000.00 400,000.00 8,320,000.00


540,000.00 300,000.00 6,240,000.00
450,000.00 250,000.00 5,200,000.00
360,000.00 200,000.00 4,160,000.00
315,000.00 175,000.00 3,640,000.00

252,000.00 140,000.00 2,912,000.00 145,600.00


288,000.00 160,000.00 3,328,000.00
270,000.00 150,000.00 3,120,000.00
270,000.00 150,000.00 3,120,000.00
180,000.00 100,000.00 2,080,000.00
PERKIRAAN RINCIAN BIAYA BEB
PERENCANAAN / PENGAWASAN T
KABUPATEN HULU S
TAHUN ANGGA

A. PERENCANAAN

Lamanya
No. Posisi Pengalaman Gaji Dasar Gaji Dasar 2009
Keahlian (Thn)

1 2 3 3

TENAGA AHLI

1. Team Leader 1 s/d 4 1,687,000.00 2,150,000.00


2 Architect Engineer 1 s/d 4 1,550,000.00 1,900,000.00
3 Civil Engineer 1 s/d 4 1,550,000.00 1,900,000.00
4 Estimator 1 s/d 4 1,550,000.00 1,900,000.00
4. Ahli Transportasi 3 0.00 0.00
5. Ahli Lingkungan 3 0.00 0.00
6. Ahli Tanah 3 0.00 0.00
7. Ahli Geodesi 3 0.00 0.00

TENAGA PENDUKUNG

1 Surveyor - 1,350,000.00 1,000,000.00


2 Draftman - 1,350,000.00 1,000,000.00
3 Operator Komp / Adm. - 1,200,000.00 900,000.00

B. PENGAWASAN
Lamanya
No. Posisi Pengalaman Gaji Dasar 2013 Gaji Dasar
Keahlian (Thn)

1 2 3 4 4
GD GD
TENAGA AHLI

1. Site Engineer 1 s/d 4 1,150,000.00 1,980,000.00


2. Quality Control / Quantity Engineer 1 s/d 4 1,050,000.00 840,000.00
3. Chief Inspector 1 s/d 4 1,050,000.00 840,000.00
4. Inspector 1 s/d 4 1,050,000.00 1,700,000.00

TENAGA PENDUKUNG

1. Material Techniciant 1-4 950,000.00 840,000.00


2. Surveyor 1-4 950,000.00 1,000,000.00
3. Staf administrasi/Operator komputer 1-4 950,000.00 480,000.00
4. Driver 1-4 950,000.00 245,000.00

TENAGA AHLI MENURUT HSPK KABUPATEN HST TAHUN 2013

NO POSISI PENDIDIKAN PENGALAMAN 2011


1 AHLI MUDA S1 1 - 4 Th Rp 4,400,000
2 AHLI S1 5 - 8 Th Rp 5,500,000
3 AHLI UTAMA S1 9 - 12 Th Rp 7,500,000
4 AHLI KEPALA S1 13 - 16 Th Rp 9,500,000
5 AHLI KEPALA S1 17 - 20 Th Rp 11,700,000
6 AHLI MUDA S1/S2 1 - 4 Th Rp 5,200,000
7 AHLI S1/S2 5 - 8 Th Rp 6,500,000
8 AHLI UTAMA S1/S2 9 - 12 Th Rp 8,200,000
9 AHLI KEPALA S1/S2 13 - 16 Th Rp 10,400,000
10 AHLI KEPALA S1/S2 17 - 20 Th Rp 14,300,000
BIAYA LANGSUNG PERSONIL TAHUN
BERDASARKAN

KELOMPOK AHLI
KUALIFIKASI

AHLI PRATAMA

AHLI MUDA

AHLI MADYA

AHLI UTAMA

AHLI KEPALA

AHLI PEMBINA KEPALA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

NO
1
2
3
4
5
6
7
8
9
10
RAAN RINCIAN BIAYA BEBAN PERSONIL PER BULAN
CANAAN / PENGAWASAN TEKNIS BIDANG BINA MARGA
KABUPATEN HULU SUNGAI TENGAH
TAHUN ANGGARAN 2009

Beban Biaya
Beban Biaya
Beban Biaya Sosial Sub Jumlah-1 Keuntungan Personil
Umum
perbulan

4 5 6=3+5+5 7 9=6+7+8

506,100.00 843,500.00 3,036,600.00 303,660.00 3,340,260.00


465,000.00 775,000.00 2,790,000.00 279,000.00 3,069,000.00
465,000.00 775,000.00 2,790,000.00 279,000.00 3,069,000.00
465,000.00 775,000.00 2,790,000.00 279,000.00 3,069,000.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

405,000.00 675,000.00 2,430,000.00 243,000.00 2,673,000.00


405,000.00 675,000.00 2,430,000.00 243,000.00 2,673,000.00
360,000.00 600,000.00 2,160,000.00 216,000.00 2,376,000.00
Beban Biaya
Beban Biaya Tunjangan
Beban Biaya Sosial Sub Jumlah-1 Keuntungan Personil
Umum Penugasan
perbulan

5 6 7 8=4+5+6+7 9 10=8+9
(0,3 s/d 0,4)GD (0,5 s/d 1,3)GD (0,1-0,3)GD (0,1 X No. 8) (2,2 s/d 3,1)GD

345,000.00 575,000.00 230,000.00 2,300,000.00 230,000.00 2,530,000.00


315,000.00 525,000.00 210,000.00 2,100,000.00 210,000.00 2,310,000.00
315,000.00 525,000.00 210,000.00 2,100,000.00 210,000.00 2,310,000.00
315,000.00 525,000.00 210,000.00 2,100,000.00 210,000.00 2,310,000.00

285,000.00 475,000.00 190,000.00 1,900,000.00 190,000.00 2,090,000.00


285,000.00 475,000.00 190,000.00 1,900,000.00 190,000.00 2,090,000.00
285,000.00 475,000.00 190,000.00 1,900,000.00 190,000.00 2,090,000.00
285,000.00 475,000.00 190,000.00 1,900,000.00 190,000.00 2,090,000.00

BILLING RATE INKINDO TAHUN 2011 - BIAYA LANGSUNG


PERSONIL TAHUN 20111 UNTUK TENAGA AHLI S1/S2/S3 DENGAN
UNDANGAN INTERNASIONAL (ICB) BERDASARKAN PENGALAMAN
UN 2013 PROFESI YANG SETARA (COMPARABLE EXPERIENCES)

2013 PENGALAMAN S1 S2 S3
Rp 10,430,000 1 ** Rp 19,050,000 Rp 27,000,000
Rp 14,289,100 2 ** Rp 22,650,000 Rp 30,900,000
Rp 18,069,975 3 Rp 18,150,000 Rp 26,250,000 Rp 34,800,000
Rp 21,955,150 4 Rp 21,750,000 Rp 30,000,000 Rp 38,700,000
Rp 25,762,100 5 Rp 25,350,000 Rp 33,450,000 Rp 42,600,000
Rp 15,175,650 6 Rp 29,100,000 Rp 37,200,000 Rp 46,350,000
Rp 19,399,800 7 Rp 32,550,000 Rp 40,800,000 Rp 50,250,000
Rp 23,676,100 8 Rp 36,300,000 Rp 44,550,000 Rp 54,000,000
Rp 27,900,250 9 Rp 39,750,000 Rp 48,000,000 Rp 57,900,000
Rp 32,176,550 10 Rp 43,500,000 Rp 51,750,000 Rp 61,650,000
11 Rp 46,950,000 Rp 55,500,000 Rp 65,550,000
12 Rp 50,700,000 Rp 58,950,000 Rp 69,450,000
13 Rp 54,300,000 Rp 62,700,000 Rp 73,200,000
14 Rp 57,900,000 Rp 66,300,000 Rp 77,100,000
15 Rp 61,500,000 Rp 70,050,000 Rp 80,850,000
16 Rp 65,100,000 Rp 73,500,000 Rp 84,750,000
17 Rp 68,700,000 Rp 77,250,000 Rp 88,500,000
18 Rp 72,300,000 Rp 80,850,000 Rp 92,400,000
19 Rp 75,900,000 Rp 84,450,000 Rp 96,150,000
20 Rp 79,650,000 Rp 88,050,000 Rp 100,050,000
21 Rp 83,250,000 Rp 91,800,000 Rp 103,950,000
22 Rp 86,850,000 Rp 95,400,000 Rp 107,700,000
23 Rp 90,450,000 Rp 99,000,000 Rp 111,750,000
24 Rp 94,200,000 Rp 102,600,000 Rp 115,650,000
25 Rp 97,800,000 Rp 106,350,000 Rp 119,700,000

SUNG PERSONIL TAHUN 2011 UNTUK TENAGA AHLI BERPENDIDIKAN S1/S2/S3 DENGAN UNDANGAN NASIONAL (NCB)
BERDASARKAN PENGALAMAN PROFESI YANG SETARA (COMPARABLE EXPERIENCES)

RUPIAH PER RUPIAH PER


KELOMPOK AHLI TAHUN TAHUN TAHUN
BULAN BULAN
PENGALAMAN PENGALAMAN PENGALAMAN
GOLONGAN S1 S2
I-A 1 **
I-B 2 **
I-C 3 Rp 13,350,000
I-D 4 Rp 14,850,000
II - A 5 Rp 16,350,000 1 Rp17,100,000
II - B 6 Rp 17,850,000 2 Rp18,900,000
II - C 7 Rp 19,350,000 3 Rp20,850,000
II - D 8 Rp 20,850,000 4 Rp22,650,000
III - A 9 Rp 22,350,000 5 Rp24,450,000 1
III - B 10 Rp 23,850,000 6 Rp26,250,000 2
III - C 11 Rp 25,350,000 7 Rp28,050,000 3
III - D 12 Rp 26,850,000 8 Rp29,850,000 4
IV - A 13 Rp 28,350,000 9 Rp31,800,000 5
IV - B 14 Rp 29,850,000 10 Rp33,600,000 6
IV - C 15 Rp 31,350,000 11 Rp35,400,000 7
IV - D 16 Rp 32,850,000 12 Rp37,200,000 8
V-A 17 Rp 34,350,000 13 Rp39,000,000 9
V-B 18 Rp 35,850,000 14 Rp40,950,000 10
V-C 19 Rp 37,350,000 15 Rp42,750,000 11
V-D 20 Rp 38,850,000 16 Rp44,550,000 12
VI - A 21 Rp 40,350,000 17 Rp46,350,000 13
VI - B 22 Rp 41,850,000 18 Rp48,150,000 14
VI - C 23 Rp 43,350,000 19 Rp49,950,000 15
VI - D 24 Rp 44,850,000 20 Rp51,900,000 16
VI - E 25 Rp 46,350,000 21 Rp53,700,000 17

PERSONIL PENDIDIKAN DAN PENGALAMAN RUPIAH PER BULAN


D3/S0 (5-10 TAHUN)
CAD/CAM OPERATOR S1 (0-3 TAHUN) 7,200,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
SOFTWARE
PROGRAMMER/IMPLEMENTER
S1 (0-3 TAHUN) 8,700,000
SOFTWARE
PROGRAMMER/IMPLEMENTER 8,700,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
HARDWARE TECHNICIAN S1 (0-3 TAHUN) 7,200,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
FACILITATOR S1 (0-3 TAHUN) 7,200,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
SENIOR ASSISTANT
PROFESSIONAL STAFF
S1 (0-3 TAHUN) 9,500,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
ASSISTANT PROFESSIONAL
STAFF
S1 (0-3 TAHUN) 9,000,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
SPECIAL
TECHNICIAN/INSPECTOR
S1 (0-3 TAHUN) 8,700,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
TECHNICIAN S1 (0-3 TAHUN) 7,200,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
INSPECTOR S1 (0-3 TAHUN) 7,200,000
S2 (0-1 TAHUN)
D3/S0 (>3 TAHUN)
SURVEYOR S1 (0-3 TAHUN) 6,700,000
S2 (0-1 TAHUN)

SBOH SURVEYOR Rp 313,225 PER HARI

TENAGA PENDUKUNG
PERSONIL RUPIAH PERBULAN KALSEL
OFFICE MANAGER Rp 7,600,000 Rp 7,106,000 0.935
SITE OFFICE MANAGER/ADMINI Rp 6,900,000 Rp 6,451,500 0.935
BILINGUAL SECRETARY Rp 7,500,000 Rp 7,012,500 0.935
SECRETARY Rp 4,650,000 Rp 4,347,750 0.935
COMPUTER OPERATOR/TYPIST Rp 4,100,000 Rp 3,833,500 0.935
DRAFTER (MANUAL) Rp 3,450,000 Rp 3,225,750 0.935
MESSENGER Rp 2,400,000 Rp 2,244,000 0.935
OFFICE BOY Rp 1,750,000 Rp 1,636,250 0.935
DRIVER Rp 2,600,000 Rp 2,431,000 0.935
OFFICE GUARD/SECURITY Rp 2,150,000 Rp 2,010,250 0.935
Pembulatan
Ket
( Rp. )

10

3,340,000.00 3,341,250
3,069,000.00
3,069,000.00
3,069,000.00
0.00
0.00
0.00
0.00

UPAH HARIAN

2,673,000.00 133,650
2,673,000.00
2,376,000.00
Pembulatan
Ket
( Rp. )

11 12

2,530,000.00 3,341,250.00
2,310,000.00
2,310,000.00
2,310,000.00

2,090,000.00
2,090,000.00
2,090,000.00
2,090,000.00

PERMEN KEU RI
Personil Isteri
15,840,000 1,320,000

PEGAWAI TIDAK TETAP


PEGAWAI TETAP
PEGAWAI TIDAK TETAP
PEGAWAI TETAP
PEGAWAI TIDAK TETAP
PEGAWAI TETAP

PERMEN KEU RI 162/PMK.0


Personil Isteri
24,300,000 2,025,000

PEGAWAI TIDAK TETAP


PEGAWAI TETAP
PEGAWAI TIDAK TETAP
PEGAWAI TETAP
PEGAWAI TIDAK TETAP
PEGAWAI TETAP

ANGAN NASIONAL (NCB)


ES)

RUPIAH PER INDEKS KALSEL


BULAN
S3 0.935 S1
0.935 #VALUE!
0.935 #VALUE!
0.935 Rp12,482,250
0.935 Rp13,884,750
0.935 Rp15,287,250
0.935 Rp16,689,750
0.935 Rp18,092,250
0.935 Rp19,494,750
Rp26,550,000 0.935 Rp20,897,250
Rp 2,850,000 0.935 Rp22,299,750
Rp30,600,000 0.935 Rp23,702,250
Rp32,550,000 0.935 Rp25,104,750
Rp34,500,000 0.935 Rp26,507,250
Rp36,450,000 0.935 Rp27,909,750
Rp38,550,000 0.935 Rp29,312,250
Rp40,500,000 0.935 Rp30,714,750
Rp42,450,000 0.935 Rp32,117,250
Rp44,400,000 0.935 Rp33,519,750
Rp46,500,000 0.935 Rp34,922,250
Rp48,450,000 0.935 Rp36,324,750
Rp50,400,000 0.935 Rp37,727,250
Rp52,350,000 0.935 Rp39,129,750
Rp54,450,000 0.935 Rp40,532,250
Rp56,400,000 0.935 Rp41,934,750
Rp58,350,000 0.935 Rp43,337,250

KALSEL

6,732,000
0.935

8,134,500
0.935
8,134,500
0.935

6,732,000
0.935

6,732,000
0.935

8,882,500
0.935

8,415,000
0.935

8,134,500
0.935

6,732,000
0.935

6,732,000
0.935

6,264,500
0.935
PERMEN KEU RI JUMLAH
Anak 1 Anak 2 Anak 3 Sendiri Satu Isteri Satu Anak
1,320,000 1,320,000 1,320,000 15,840,000 17,160,000 18,480,000
PER BULAN Rp. 1,320,000 1,430,000 1,540,000
1, 5 KALI Rp. 1,980,000 2,145,000 2,310,000
3,2 KALI Rp. 4,224,000 4,576,000 4,928,000
10% (1,5 KALI) 198,000 214,500 231,000
10% (3,2 KALI) 422,400 457,600 492,800
TOTAL Rp. (1,5 KALI) 2,178,000 2,359,500 2,541,000
TOTAL Rp. (3,2 KALI) 4,646,400 5,033,600 5,420,800

EN KEU RI 162/PMK.011/2012 JUMLAH


Anak 1 Anak 2 Anak 3 Sendiri Satu Isteri Satu Anak
2,025,000 2,025,000 2,025,000 24,300,000 26,325,000 28,350,000
PER BULAN Rp. 2,025,000 2,193,750 2,362,500
1, 5 KALI Rp. 3,037,500 3,290,625 3,543,750
3,2 KALI Rp. 6,480,000 7,020,000 7,560,000
10% (1,5 KALI) 303,750 329,063 354,375
10% (3,2 KALI) 648,000 702,000 756,000
TOTAL Rp. (1,5 KALI) 3,341,250 3,619,688 3,898,125
TOTAL Rp. (3,2 KALI) 7,128,000 7,722,000 8,316,000
UMLAH
Dua Anak Tiga Anak
19,800,000 21,120,000
1,650,000 1,760,000
2,475,000 2,640,000
5,280,000 5,632,000
247,500 264,000
528,000 563,200
2,722,500 2,904,000
5,808,000 6,195,200

UMLAH
Dua Anak Tiga Anak
30,375,000 32,400,000
2,531,250 2,700,000
3,796,875 4,050,000
8,100,000 8,640,000
379,688 405,000
810,000 864,000
4,176,563 4,455,000
8,910,000 9,504,000
Nama : Taufik Ridhony, ST
Jabatan : Estimator

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,635,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,635,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Taufik Ridhony, ST


Direktur Estimator
Nama : Erwansyah, ST
Jabatan : Estimator

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,635,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,635,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Erwansyah, ST


Direktur Estimator
Nama : Akhmad Royadi
Jabatan : Surveyor

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 1,160,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 1,160,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Akhmad Royadi


Direktur Surveyor
Nama : Rahmatullah
Jabatan : Surveyor

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 1,160,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 1,160,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Rahmatullah


Direktur Surveyor
Nama : Sugianto
Jabatan : Surveyor

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 1,160,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 1,160,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Sugianto


Direktur Surveyor
Nama : Ridha Afghani
Jabatan : Surveyor

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 1,160,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 1,160,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Ridha Afghani


Direktur Surveyor
Nama : Taufiq Hidayat
Jabatan : Draffman

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,115,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,115,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Taufiq Hidayat


Direktur Draffman
Nama : Ahmad Ridho
Jabatan : Draffman

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,115,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,115,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Ahmad Ridho


Direktur Draffman
Nama : Risa Mawarni
Jabatan : Draffman

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,115,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,115,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Risa Mawarni


Direktur Draffman
Nama : Dwi Fadliani
Jabatan : Draffman

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 3,115,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 3,115,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Dwi Fadliani


Direktur Draffman
Nama : Rahmani
Jabatan : Staff Admin

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 2,075,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 2,075,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Rahmani


Direktur Staff Admin
Nama : Mutiara Charisa
Jabatan : Staff Admin

Periode : 28 Oktober s/d 26 November 2015


No. URAIAN JUMLAH
Penerimaan
1. Gaji Pokok Rp 2,075,000.00
2. Tunjangan Jabatan Rp -
3. Lembur Rp -
4. Uang Makan Rp -
5. Transportasi Rp -
6. Pengobatan Rp -
7. Bonus Bulanan Rp -
Potongan
1. Koperasi Rp -
2. Lain-lain Rp -
TOTAL : Rp 2,075,000.00

Banjarmasin, 26 November 2015


Menyetujui : Diterima Oleh :

RIES WISNU W, ST Mutiara Charisa


Direktur Staff Admin
Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 3,700,000.00
Terbilang : Tiga Juta Tujuh Ratus Ribu Rupiah

No. URAIAN

1. Biaya sewa 5 unit komputer selama 1 bulan pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 430,000.00
Terbilang : Empat Ratus Tiga Puluh Ribu Rupiah

No. URAIAN

1. Biaya pembelian 1 paket alat tulis kantor dan komputer supplies selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 520,000.00
Terbilang : Lima Ratus Dua Puluh Ribu Rupiah

No. URAIAN

1. Biaya survey lapangan dan pengukuran selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Akhmad Royadi
Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 520,000.00
Terbilang : Lima Ratus Dua Puluh Ribu Rupiah

No. URAIAN

1. Biaya survey lapangan dan pengukuran selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmatullah

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 520,000.00
Terbilang : Lima Ratus Dua Puluh Ribu Rupiah

No. URAIAN

1. Biaya survey lapangan dan pengukuran selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Sugianto

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 520,000.00
Terbilang : Lima Ratus Dua Puluh Ribu Rupiah

No. URAIAN

1. Biaya survey lapangan dan pengukuran selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Ridha Afghani
Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 690,000.00
Terbilang : Enam Ratus Sembilan Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa kendaraan roda 2 dengan no polisi DA 3674 JC selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

H. Abdul Muthalib

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 690,000.00
Terbilang : Enam Ratus Sembilan Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa kendaraan roda 2 dengan no polisi DA 6385 IG selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Fazryan Noor

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 690,000.00
Terbilang : Enam Ratus Sembilan Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa kendaraan roda 2 dengan no polisi DA 6892 VM selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Hj. Siti Rachmah


Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 690,000.00
Terbilang : Enam Ratus Sembilan Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa kendaraan roda 2 dengan no polisi DA 6332 JT selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

H. Abdul Muthalib

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 690,000.00
Terbilang : Enam Ratus Sembilan Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa kendaraan roda 2 dengan no polisi DA 6988 DM selama 1 bulan pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Syarif Fadilah

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 150,000.00
Terbilang : Seratus Lima Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa 2 unit kamera selama 1 bulan (28 Oktober s/d 26 Nopember 2015) pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Akhmad Royadi
Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 1,360,000.00
Terbilang : Satu juta Tiga Ratus Enam Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa 2 unit water pass selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Akhmad Royadi

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 160,000.00
Terbilang : Seratus Enam Puluh Ribu Rupiah

No. URAIAN

1. Biaya sewa 2 unit measuring tape selama 8 hari pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Akhmad Royadi

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 1,040,000.00
Terbilang : Satu Juta Empat Puluh Ribu Rupiah

No. URAIAN

1. Biaya pembuatan 1 buku laporan hasil survey untuk 8 paket fisik pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani
Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 1,680,000.00
Terbilang : Satu Juta Enam Ratus Delapan Puluh Ribu Rupiah

No. URAIAN

1. Biaya pembuatan 1 buku draft final rencana untuk 8 paket fisik pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 2,480,000.00
Terbilang : Dua Juta Empat Ratus Delapan Puluh Ribu Rupiah

No. URAIAN

1. Biaya pembuatan 1 buku laporan akhir untuk 8 paket fisik pada pekerjaan
Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani

Nomor : -
Kwitansi
Telah terima dari : CV. QUATRO ENGINEERS
Sebesar : Rp 150,000.00
Terbilang : Seratus Lima Puluh Ribu Rupiah

No. URAIAN

1. Biaya softcopy produk 1 flashdisk pada pekerjaan


Perencanaan Pembangunan Pagar Sekolah SD/SMP Tahun 2015 (Wilayah 1)

Barabai, 26 November 2015 Yang Menerima

Rahmani