Two boreholes are carried out at this bridge location, BH-1 near pier and BH-2 near abutment.Top layers of BH-1
and BH-2 consist of boulder mixed with gravel and pebble in depth of 0.6m and 1.10m respectively followed by
weathered,fine to medium grained
Calculation