TCE has participated in both conventional and non-conventional power generation. Primarily,TCE's roleisthat
of an Architect Engineer for several clients, including SEBs in India.The company has also been associated
with several power projects implemented on EPC basis. In an exclusive interview,sharing hisviewwith
Electrical India, Subrata Deb, states that I believe the electrical engineer continues to be of key importance
in the Power Industry but his role has evolved fromthat of evaluating purelytechnical aspects to encompassing
various inputs in his day-to-day work.

~62 II March 2011 II Electrical India


-
t
~.
J
Interview
Yourvastexperiencehasostensibly 800 Kv DC system in near future. For proven system or new unproven
EI offered you a panoramicview of effective VARcontrol in the grid we system.
the power and energy sector that few have now static VARcompensator & Also we now find the application of
possess.Couldyou tell us of the various Flexible ACtransmission (FACTS). Geographic Information System (GIS)
significantchangesthat the industryhas On the analytical side, improved tools and Global Positioning System (GPS)in
gone through since you began your were rapidly being developed. Greatly power utilities. GIS when integrated
career? improved tools for technical analysis with real time SCADAhelps in efficient

T hank you for inviting me to share my


perspective about the growth and
such as computers began to appear,
first as analog computers and then as
handling of customer inquiries, fault
management, preventive maintenance,
changes in the power sector. digital computers. network optimization, improved
Because of my active association with Due to advent of microprocessor many revenues and energy audit. Mapping
the field of design for thermal power new concepts were being introduced. by using GPS is very fast, precise and
projects for over 4 decades, I had the Computer control has now become cost effective. Data is acquired in digital
privilegeto observe all round changes format and thus, can be transmitted
inGeneration,Transmission,Distribution
and Utilization of electrical power that
the industry has gone through.
The power sector has registered
significant progress since the process
of planned development
economy began in 1950; new and
of the
» The power
sector has
registered
and further, stored and ana lysed using
different software tools.
Of late, serious thought is being given
to the qua lityof power, implementation
of Smart Grid and Decentralized
Distributed Generation (DDG).
It is observed that there is a gradual
largerthermal power plants with lower significant progress shift in control of Electrical Power
cost per kilowatt are being installed. Industry which was previously
Thiscost advantage has been obtained since the process of dominated by engineering profession.
through higher temperatures and planned Now we find other professionals like
pressures for the steam cycle, which Bankers, Lawyersand Environmentalists
lowered the amount of fuel required development of the are taking active part in this Industry.
per kWhr of electrical energy economy began in The policy of liberalization the Gal
generated. Presently, a number of announced in 1991 and consequent
super critical 660 MW units are under
1950; new and amendments in Electricity Act (supply)
construction. India's first 800 MW larger thermal have opened new vistas to involve
Advanced Ultra Super Critical Coal private efforts and investments in
Fired Power Plant will be operational power pia ntswith electricity industry.
by 2017. lower cost per
Theengineers involved in planning the
powersystem saw the great advantage kilowatt are being EI What technologiesdo you think
are of considerableimportancein
of inter connecting utilities to reduce installed the Indianpowerscenario?
capital investments and fuel costs. ndian power sector is caught
Regional and inter-regional ihter I between the pressure of adding new
connections were established (1960- generation capacities to match the
State Grid, 1970- Regional Grid, 2000- rapidly growing demand of power
Limited Inter-Regional Capacity). Also state-of-art in control by the use of and environmental challenges arising
during late 1970s first 400 kV line was microprocessor with facilities like from large scale power generation.
commissioned. Between 1980-1990's on-line diagnostics and artificial Recognizing that coal may continue to
first 500 kV HVDC line and between intelligence which helps better dominate the sector profile, India is
1990s-2000 first 765 EHV line was operation and on-line testing. This committed to Clean coal technologies
commissioned. ensures reliability of protection system. by utilizing Coal beneficiation,
It is estimated that by 2030, the With the fast evolving electronics Integrated gasification combined
electricityconsumption in India will be technology, it has become extremely cycle technology, Coal bed methane
almost double.To transmit bulk power difficult to supply latest systems with (CBM),Underground coal gasification
through inter- regional grid we may proven record of satisfactory operation (UCG) and also use of Super
haveto implement 1200 KvUHVAC&:t for even 3 years. We can either have old critical technology.

ElectricalIndiaII March 2011 II 63


Interv'iew
and thorium in the same volume of
Iii
EI innovationis inthepowerindustry
.
How important do you think
rocks. If 1% of the thermal energy
This means not onlyinstallingenergy
saving equipment but also controlling
today? What according you are the contained within the uppermost 10 these equipment to operate when
I innovativetechnologiesthat could bring
about a paradigm shift in the Indian
powersector?
km of the earth could be tapped, the
amount of heat would be 500 times
that contained in all oil and gas
required. It is this aspect of control
that is critical to achieving maximum
efficiency. A mention here must be
II
II" T he threat posed by future shortage
of fossil and nuclear fission fuels
resources of the world.
Geothermal energy is immune to daily
and seasonal fluctuations and
made of the advent of the conceptof
Green Buildings which is fast gaining
and the reduced availability of hydro ground. Iam happy to informyouthat
electric power sites has focused therefore is a reliable power source the Tata Consulting Engineersofficein
the attention of engineers on with a high plant capacity factor. Jamshedpur whose construction is
..
"unconventional" sources. The present Commercial production of electricity nearing completion has actively
I emphasis is not only on discovering from geothermal resources has been incorporated many practices and
new means of generating power but carried out for more than 50 years in specific methods to reduce its overall
also on improving the efficiency and New Zealand and California. Power energy and water consumption andis
lowering the cost of established production is currently under way in a good example of putting Active
techniques. Australia, China, France, Indonesia, Energy Efficiencyinto practice.
Utilization of coal for power generation Italy, Kenya, Mexico, Romania, Russia, A significant portion of the generated
poses one ofthe biggest environmental Thailand and Turkey. power is lost or goes unaccounted
problems because of the fly ash In India, exploration and study of because of large aggregate technical
emissions to the. atmosphere &fly ash geothermal fields started in 1970. The and commercial (AT&C) losses.Thishas
dumping in the' land. Due to large GSI (Geological Survey of India) has largely been on account of old and
emissions from thermal power plants identified 350 geothermal energy outdated sub-transmission and
"
air pollution has become an locations. It is surprising why India till distribution infrastructure and heavy
international problem. Therefore all date is unable to tap the 10600 MW commercial leakages. AT&Closses
efforts must be applied to search for geothermal energy based power. continue to be very high in many
alternate sources of energy. Financial assistance is needed for the states. Recently GOIhas come outwith
Power from ocean: The ocean thermal development of geothermal energy. restructured APDRP (Accelerated
. energy conversion (OTEC)technology power development and reforms
is based on temperature difference at Could youshedsomelighton the programme) programme with the
surface (at about 290C) and at a depth EI problems that plague the power target to reduce the AT&Clossesto
of 1100 meter (at about 50C) to industry today and how they can be 15% by the end of 11th fiveyearplan.
produce electricity. It has a potential addressed?Whatmeasuresdo youthink On generation side we have to
to generate around 180 GW of power need to be taken by the governmentto implement retrofitting of old &
along the Indian sea cost. mitigatethe powercrisis in India? uneconomical power plants. Someof
The National Institute of Ocean
Technology (NIOT) is implementing
the world's first 1MW floating OTEC
P roblems cannot be categorized as
financial, technical or managerial;
instead they constitute a seamless
the power plants which cannot
generate electricity at economicalcost
due to their less efficient thermal
technology demonstration project 0 web. As such, our perception of the design can be converted into
the Tuticorin coast in Tamilnadu Solar problem has to be accordingly shaped combined cycle power plants. This
thermal energy technology. Major and the measures we decide upon modification can be done by replacing
technology breakthrough in solar have to be holistic in nature. the existing steam generation by Heat
could catalyze the development of Population growth, rapid RecoverySteam Generator(HRSG) &
large solar farms. In July 2009, India industrialization, higher income levels Gas turbine such that existingsteam
unveiled a $ 19 Billion plan to produce & increased usage of electrical cycle can be utilized as bottoming
20 GWof solar power by 2020 appliances due to change in life style cycle to the gas turbine.
Geothermal Power: The outer crust of are the main factors that have Sometimes, it is also possible to use
}he- ei'lrth contains a very large contributed to India's increasing gas turbine exhaust gases as a partial
(e.~~rV()i~
o(energy present as sensible power consumption levels. source of heat energy in already
"neat. This'resource is between one and We need to implement demand side existing coal fired steam generatorby
two orders-of magnitude larger than management to increase energy doing moderate alterations in the
the 'recover~ble energy from uranium savings by Active Energy Efficiency. steam generator.
,
.-
, .
.

~~4I1,~~:-"h " <,~ 201111Electrical India


- .,.'
-'"
Interview
EI What are some of the noteworthy
projectsincludingthermal,turbines
and it also results in cutting of trees in
forest area. It will be economical to EI Doyouhaveanyadviceasthatyou
would like to give to electrical
and substationsthat you haveworkedon electrify these villages by setting up of engineersthat havejust startedwiththeir
in the spanof your illustriouscareer? plant near to the village & supply careers?
was involved in the design of several
I thermal power projects in India. Some
power. Such a distributed generation
can be fed by Biomass fuels which
include fuel wood, animal & domestic
T heory is when everybody knows
how it should work, but it doesnot.
projects which I have handled are Practice is when it worksbut nobody
Kolaghat Thermal Power Station (KTPS) wastes & agro wastes. knows how! Engineers have to
- 3 * 210 MW (Phase-1) Under WBSEB; According to the India Vision 2020 effectively combine both theory &
Korba Super Thermal Power Station, published by Planning Commission, practice in their career and alsothey
Madhya Pradesh - 3*210 MW; about 50 million hectares of degraded have to be increasingly concernednot
Ramagundam Super Thermal Power waste land lie outside the demarcated only with the depth of knowledgebut
Station- 3*210 MW; NALCO- Captive forest areas and 34 million hectares of more so with the width of knowledge
Power Plant - 6*120 MW;Chandrapura protected forest areas do not have any so that they become multi-skilled,
TPP (2 * 140MW) DVCand Titagarh TPP forest cover. A large scale fast growing versatile & develop an attitude of
(4 * 60 MW)CESe. tree plantation programme, like continuous learning. They must
I bamboo, casuarinas and eucalyptus consistently strive to be abreast ofthe

EI What trends do you see in the can be undertaken. The product can
PowerIndustrytoday?Howdoyou be utilized as fuel for the biomass
think the r~le of an electrical engineer power plants. Distributed power plants
latest development &innovationgoing
on around the world in their respective
disciplines. They have to developa
has changedsince the inceptionof your ranging in size from 10 to 25 MW can higher level of consciousness aboutthe
career? substantially reduce dependence on importance of time, cost, quality,

D istributed digital control, PLC & imported fuel oils and fast depleting
extensive automation including
SCADAfor the substation are now being
fossil fuel reserves. It is estimated that
40 million hectares of such plantation
productivity, ecology &inculcatethese
values in all walks of life.
During the sojourn of my lifewhenI
applied by the engineers. Also now we can generate 100 GW of power and look over the canvass of mylongcarrier
find information technology initiative provide employment to 30 million I have become staunch believerin
in electricity distribution system. people round the year. integrity, sincerity and enquiringmind
I believe the electrical engineer The energy-efficient LED lights will which I believe are the ingredientsof
continues to be of key importance in definitely playa key role in providing success. In my view this is the era of
the Power Industry but his role has lighting for the people at the base of good communication welcoming
evolved from that of evaluating purely the pyramid, particularly because of everyone's valuable contribution in
technical aspects to encompassing the limitations in power supply from order to bring out the best andfilledup
various inputs in his day-to-day work. non-conventional sources available to from comprehensive views of
I The engineer is now expected to have them. It consumes 50% less power development of industries.
I understanding of environmental than 11 watt compact fluorescent

r I
regulations and laws gov~rning the
same, scope of modern electronics
based control and communication
lamp (CFL)for the same light output.
These LED lightning can also be EI Would you enlightenaboutyour
future plans and projectsin Tata
extensively used for street lightning in Consulting Engineers Limited as a
systems and ability to work in cross metro cities which will save substantial consultantandChiefmentor?
disciplinary teams that includes lawyers, energy & reduce CO2 emissions. like to keep an open mind and
environmentalists, policy makers and Innovative financial schemes need to l welcome team work. Wherepossible,
engineers from other disciplines. be experimented with to fund setting I take a key role in management,
up of Wind farms and Solar PV panels guiding & facilitating people in order

EI What strategiesdo you think must in rural areas. There is some indication
be implemented to address the of such schemes being already thought
to encourage them to do their
duties to their full potential.
problemsin rural powersectorin India? about by different government bodies Ibelieve that this isthe keyofsuccessful
ost of the villages which need to in the form of subsidies. Extensive management that can yieldexcellent
M be electrified are at places far partnership with rural communities in results aspiring people's sense of
away from the grid. It is expensive to this process is a must to increase achievement in the growth of
extend grid supply to these villages their effectiveness. the industry. .

6611 March 2011 IIElectrical India