PEMERINTAH ACEH

DINAS PERUMAHAN RAKYAT DAN


KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax (0651) 41130 Banda Aceh 23239

FINAL PROGRESS REPORT


LAPORAN KEMAJUAN PEKERJAAN TAHAP AKHIR

KEGIATAN
URUSAN PENYELENGGARAAN PSU PERMUKIMAN

PEKERJAAN
LANJUTAN PEMBANGUNAN ASRAMA IKATAN MASYARAKAT KABUPATEN BIREUEN (IMKB)
GAMPONG TIBANG KEC. SYIAH KUALA KOTA BANDA ACEH

NOMOR KONTRAK : 602.1/050/TB-TE.33/PERKIM/APBA/2021


TANGGAL KONTRAK : 18 OKTOBER 2021
NOMOR ADD-1 : 602.1/050.ADD-1/TB-TE.33/PERKIM/APBA/2021
TANGGAL ADD-1 : 18 NOVEMBER 2021
LOKASI : GAMPONG TIBANG KOTA BANDA ACEH
NILAI ADD-1 : 830.000.000,-
NO. DPA SKPA REFOCUSING : DPPA/A2/1.04.1.03.0.00.01.00/001/2021
TANGGAL : 19 JULI 2021
KODE KEGIATAN : 1.04.05.1.01
KODE REKENING : 5.1.02.01.01.0039
SUMBER DANA : APBA
TAHUN ANGGARAN : 2021
MASA PELAKSANAAN : 70 HARI KALENDER
DIMULAI TANGGAL 18 OKTOBER 2021 SAMPAI DENGAN 26 DESEMBER 2021

PELAKSANA :

CV. PRIMAVERA
Jl. Gampong Dayah Teungoh Desa Dayah Teungoh Kec. Pidie Kab. Pidie
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN
KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax (0651) 41130 Banda Aceh 23239

PHOTO DOKUMENTASI

PEKERJAAN
LANJUTAN PEMBANGUNAN ASRAMA IKATAN MASYARAKAT KABUPATEN BIREUEN (IMKB) GAMPONG TIBANG
KEC. SYIAH KUALA KOTA BANDA ACEH

PELAKSANA :

CV. PRIMAVERA
Jl. Gampong Dayah Teungoh Desa Dayah Teungoh Kec. Pidie Kab. Pidie