Anda di halaman 1dari 22

COMPANY

PROFILE

Pt. berkat mulia wiratama


Medan – Pekanbaru – JAKARTA
www.ptbmw.biz

1
introduction
 PT. BERKAT MULIA WIRATAMA is a Indonesian based
company incorporated in year 2006. It is today palm oil mill
engineering Contractor Company specializing in boiler,
steam turbine, sterilizer, and all mechanical and electrical
works. We install new unit, repair and servicing all equipment
in palm oil mill, our founder had been in palm oil mill industry
since 1985.
 Our concepts are ENVIRONMENT FRIENDLY, we had
completed composting project from Empty Fruit Bunch and
Effluent for PT. PERKEBUNAN V Pekan Baru. And specialized
in ENERGY STATION with Boiler Control System for SCADA
Automation, efficient use of steam with VERTICAL
STERLIZER.
 We have good supported by a team comprising of seasoned
engineering professionals with a combined experience
involving in the project & design in South East Asia Region.
 We have demonstrated our understanding of the demands of
the engineering business. Our track record has proven our
ability for engineering excellence, completion on time, strict
cost control and good project management.
 We bring real solutions to real problems for your business
and engineering success. Tomorrow, you can count on us to
still be working with you.

2
Company particular
 Company Name : PT. BERKAT MULIA WIRATAMA
 Business Reg. :
SIUP No. : 0060/02.13/PM/I/2010
TDP No. : 02.12.51.10027
SIUJK No. : 1.127985.1275.2.02125 / M
SITU : 503/0424/BI/WAS/I/2010
 Date of Incorporation : 09 August 2006
 Registered Office : 126, Jalan Timor Baru I Medan 20231
 Board of director : A. SUMARDI (SU WEN YING)
 Business occupation : 1. Marketing / Operation Director
2. Project Director
 Business Address : 5-A, Jalan Laboratorium III Medan 20111
 Business Phone : 061 – 77589588, 77871388
 Facsimile No : 061-4579943
 E-mail Address : ptbmw1@gmail.com,
ptbmwmdn@yahoo.com
 Bankers

3
Company Chart

4
Authorized dealer for BOILER

 SALES, INSTALL new unit, foundation civil works and


commissioning,
 MAINTEANCE & REPAIR for other brands :
TAKUMA, VICKERS HOISKINS, BOILERMECH,
BABCOCK, FRASER, etc with guarantee original parts
and technician supervise from abroad graduate. Local
technician with INPKK/ Departemen Tenaga Kerja’s
certificate
 We also create control system for boiler such as :
automatic water level, automatic rotary feeder, auto
combustion, pressure transmitter, steam flow differential,
drum level, steam temperature, modulating FD damper,
feed water modulating control valve, and SCADA
monitoring system.

5
Authorized dealer for
steam turbine

 We are servicing various type of Turbines,


repairs and overhaul : NADROWSKI,
TURBODYNE, SHINKO, ELLIOT, and
COPPUS.

 We have joint operation with In-House


and Site Balancing Workshop.

 We are represent of HANG ZHOU (Made


in China) Turbine for palm oil mill
industry

6
Palm oil mill supply & install

Masterlinks

7
Vertical Sterilizer ®

 Vertical sterilizer Patent No. PI 20062472 is a new cutting-edge milling


technology developed by our principle and manufactured in
INDONESIA to fulfill the need of the palm oil industry to stay
competitive by maximizing palm products extraction at a reduced cost
and at the same time meet the requirements of HACCP, GMP and
specific Principals and Criteria of RSPO.
 Vertical Sterilization System completely does away with the marshalling
yard for rail tracks, sterilizer cages, tippers, capstans, bollards, overhead
lifting cranes and much other associated equipments. Fresh fruit
bunches (FFB) are now delivered directly from the reception ramp by a
conveyor system to the sterilizers. The conveyor system has a special
contraption added to separate sand and other foreign particles from the
FFB. Due to the new system's simplicity and the integration of
automation system, this process is now virtually a one-man operation.
As a basic concept of COMPACT DESIGN OF POM.

8
palm oil mill waste
management

Composting
system with
EFB mixed
POME to
become organic
fertilizer
produced
outdoor areal
(Open
Composting).

9
Open composting system

10
Indoor composting plant

11
Indoor composting
plant 2 nd technogy

Organic Content 25-40% > 50%


N,P,K,MgO,B… <10% > 18% (Can
Customized)
Storage/Shelf Live 3 – 6 Months > 12 months
Water Retention Good Very Good
Long Effect 3 – 6 Months 6 – 12 Months
Aeration Good Very Good
Nutrition Retention Good Very Good
Application Apply separately Easier Application
Period 2-4 month Within 45 Mins
Weather Depending Yes No
Production Area Big Space Required Saving of space

12
EFB Processing system
(EFB PLANT)

Empty fruit brunch (janjangan


kosong) are waste in palm oil
mill which recently used as raw
material for feed boiler ,
commercial briquette and
organic composting .
Require standard process or
plant for EFB processing system
until dry (48% moisture)
Application equipment :
1. High speed hammer mill
2. Break-Cutter cum Oil
Extractor
3. Single Barrel Fiber Press

13
Palm kernel machine

 Sales new unit


and service for
palm kernel
 Refurbishment
machine for
improve value
of palm kernel
extraction’s
rate.

14
Exhibition and seminars

15
Join with automation’s principal at westin
nusa dua-bali exhibition 7-8 november 2007

16
Exhibition at Wpose
mei 2008 JCC - Jakarta

Opportunity to meet our customers, business associates, government


Officers all around INDONESIA.

17
Our projects / works experince
No Description Location
1 Pekerjaan Pengadaan Spare Part Hoisting Crane PKS Rambutan
Pembangunan Pagar jalan Citra IKD dalam rangka ISPS
2 Code Pelabuhan Belawan
3 Pengadaan Motor Grader merk. Komatsu Type GD 511 A-1 Kebun Madina
4 Pembuatan Water Treatment PKO Tandun
5 Pengadaan Baru 1 unit Wheel Loader PKO Tandun
6 Pengadaan spare part hoisting crane PKS Sosa
7 Pengadaan Tractor Roda Ban (TRB) Merk John Deere Kebun Madina
Typr 5715/4wd
8 Pengadaan dan pemasangan baru jaringan pipa air minum PKS Sosa
9 Perawatan Gudang Persediaan CFS Pelabuhan Belawan Pelabuhan Belawan
Pembangunan pagar jalan ujung baru depan 101-113 dalam
10 rangka Pelabuhan Belawan
penerapan ISPS Code
11 Perbaikan 1(satu) unit hoisting crane no.2 Demag PTPN III
12 Perawatan gudang CFS Pelabuhan Belawan Pelabuhan Belawan
Pekerjaan pembuatan Maritime and port security committee
13 Port di terminal penumpang lt III Pelabuhan Belawan
14 Pekerjaan pengadaan kimia boiler Sachemie PTPN V
15 Pengadaan 1 (Satu) Unit Backhoe Loader Kebun Lubuk Dalam
16 Pengadaan 1 (Satu) Unit Road Greader Kebun Sei Tapung
17 Pekerjaan Pengecatan Gedung Kantor Cabang Pelabuhan Pelabuhan Belawan
18 Pembuatan Areal Pengomposan Luas 8.4 Ha PKS Terantam
19 Pekerjaan Perbaikan/Pengedockan Kapal Pandu AP-016 Pelabuhan Belawan
20 Pengadaan dan pemasangan baru automatisasi 2 (dua) unit di PKS Dolok Ilir
St Ketel Uapdan 1(satu) unit di St pembangkit (BPV)
21 Pemasangan water level control system boiler no.1 PKS Terantam
22 Pekerjaan Pengadaan Marine Radar ARPA Far 2127 Pelabuhan Belawan
23 Pemasangan/Penggantian sistem automatic boiler no.2 PKS Sei Garo
24 Pengadaan & pemasangan baru 1(satu) unit electrical PKS Tandun
driven tube cleaning machine
25 Pemasangan baru 1 unit Mild Steel Vacuum Drier Kapasitas PKS Mayang
10 ton /jam

18
Power plant <10 mw
consultancy & site survey

19
Ready for technical
presentation

 We are ready for


make presentation
of company profile
and product at
your convenient
time and place.
 Our principal
from abroad will
join us for
technical support
presentation at
free of charges.

20
Our motto and thank
you

21
 Copyright 2010 PT BMW. All rights reserved. Selling, re-
distributing or reproducing the information on these pages
without prior permission from PT BMW is strictly prohibited

22

Anda mungkin juga menyukai