Anda di halaman 1dari 1

BUBUNGAN ELV. +10.

570

2.670
2.670
RING BALK 2 ELV. +7.900

0.400 0.600
PLAFOND ELV. +7.300
DAK BETON ELV. +6.900

KUSEN ELV. +6.000 0.900


4.100
11.270

2.200

MUKA LANTAI 2 ELV. +3.800


0.800

PLAFOND ELV. +3.000


0.800

KUSEN ELV. +2.200


4.500
2.200

MUKA LANTAI 1 ELV. ±0.00


0.700

MUKA TANAH ELV. -0.700

2.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500


4.000 3.000 3.000 4.500
14.500

1 2 3 4 5 6 7 8 9 10

TAMPAK SAMPING KIRI


SKALA 1 : 100

NO CATATAN JUDUL GAMBAR SKALA PROYEK NO PESERTA


1. SEMUA DIMENSI DIGAMBAR DENGAN MENGGUNAKAN
TAMPAK SAMPING KIRI 1 : 100
2.
SATUAN MILIMETER (KECUALI DITENTUKAN LAIN).
SEMUA ELEVASI DIGAMBAR DENGAN MENGGUNAKAN
RUMAH TINGGAL

09
SATUAN METER (KECUALI DITENTUKAN LAIN) LKS AUTOCAD BUILDING
3. SUDUT KEMIRINGAN ATAP 35°. WILAYAH KERJA IV
4. TEBAL DINDING 15CM SUDAH FINISHING.
5. TITIK DUGA ±0.00 DIAMBIL DARI AS JALAN +0.70. TANGGAL KODE GAMBAR NO. LEMBAR JUMLAH LEMBAR PROVINSI JAWA TIMUR
2022
15/02/2022 ARS 06 16

Anda mungkin juga menyukai