Pendapatan Jasa
85,000,000
1,000,000
15,000,000
1,000,000
2,000,000
19,000,000
66,000,000
Luas 3,5 M X 5,5 M Remark
QTY Satuan Harga Satuan Total Hari Kerja
Spandek 30 5 lembar 70,000 2,100,000 Spandek
Baja Ringan 12 12 Batang 125,000 1,500,000
Ongkos Kerja 3 2 Orang 200,000 1,200,000
Paku dan baut 200,000 200,000
Sewa mobil untuk buang puing-puing 300,000
Total 5,300,000
Remark
2 Hari
1 Lembar 6 Meter Per Meter 70.000