Anda di halaman 1dari 34
orice oF Satanic ce nm Se DIVBIgNAL ECECTRICAL ENGIN: aT ‘DRM OF HCE PREMISES patesrny OF RANA DO BATT, RATLAM 457001 ‘TRACTION DISTRIBUTION PHONE bo, 07412236305, RATLAM PAX No 07412236305, BLITRDIST Date: 01.12.2019 “The Principal Chet Bleetreal Engineer .& Electrical Inspector to Government Western Raila “Churehgate-400020 Sub. + E1G application for guar enerpsation of 132227KV traction sub-sation at Desa at Km 39/38 on 25KV single phase AC in Ujsin-Dewas-Indoresetion of Ratan division Ref: Dy.CEEICIRTM’s leer no, ELICIRTM/2018/08T dh. 30.11.19 With reference © above, EIG application for regular enerisation of 152/27KV taetion sub-station at Dewas at Km 39/38 on 25KV single phase AC in Ujjin-Dewas-Inore section of Ratlam division has been submited by Dy.CEE/CIRTM vide leer under refererce. The application ‘ha been scrutinized and it was found thatthe wor hasbeen completed inal spect except some defects and deficiencies, which has been enclosed ere with he 1G aplication In view of above, EIG-& PCEBAVR is Kindly requested to accord sanction for regular cnergisation of 132227KV traction sub-station at Dewas at Km 39138 on 25KV single phase AC in Lijnin-Dewas-Indore section of Ratlam division in is capacity as Electrical lspecor to Govt. of ind cs As above Sey cesta iv, Electrical Engineer (TRD) Ratian Division, WR DEFECT AND DEFICIENCY LIST SEN. DefeaDeiceney ‘PDC ty Construction organisation *BCategory defect T,_ [SCADA system ie yet tobe provided at TSS. nel 9 “Category defect ‘Voltage indication of HV side Ts ye to be connected 1 “ a ae oF biel with contol pane xe SADEETRDIRTM, by. CEEICRTM orice oF _ DIVISION} ELECTRICAL ENGINEER GOVERNMENT OF INDIA. ‘DRM OFFICE PREMISES MINISTRY OF RAILWAY DO BATT, RATLAM 457001 “TRACTION DISTRIBUTION PHONE No. 07412236305, RATLAM, FAX NoO7412-236305, ELITRDIIST Date: 1.122019 “The Principal Chief Eleetrieal Engineer {& Flectrcal Inspector to Government, Westera Railway, Churehgate-400020 Sub: Approval for relay setting of 13227KY tration substation at Dewas at Kan 39738 on 25K ‘ingle phase AC in Ujjin-Dewas Indore setion of Ratlam division, Ref. : Dy.CEEICIRTM’s letter no, ELICIRTM/2018/08/T a, 30.11.19. With reference to above, E1G application for regular energization of 132/27KV waetion sabsttion at Dewas at Km 39238 on 25KY singe phase AC in Ujain-Devas-Indore section of Ratlam division has been submited by Dy:CEE/CIRTM vide leer under reference with which ray etng calelation Fr tansformer protestin, feeder protection and captor bank has been In view of above elay eting caleulation of DWXITSS is hereby forvarded for your Kind perusal and approval please Encl: Asabove Sr. Div, Eletieal Engineer (TID) Ratlam Division, WR, Relay setting Por Transformer Protection AT DWX-TSS 410 pata Assumptions fr calculations meta vis, Tranter Capcity mw oMA 7 Tansee mpeance mee 1 eltage on Primary side at NO Load vw 2 & Vtage on ecndary side at HO Lond wow 5 {putin caren on Secondary side kee mut 5 pu od cure on Primary sie de i ae ae rau ee vn 408381 1 rin HY Side cri 4005 80 | Grrato Lv Side Gimysa808 200 2 irra se fave 7508110 250 5 busting ct Rao HY Side fae 0120 5 busting cr Rao LY Side fave ous eto + “ch opersasine eed {he open tine nee 10 a SS Fi Restrcted EF setting TBE ting shouldbe TOO of rated current = tbysee x fom e704 Newent Sutabie Suing 0.5A.Thus 1E>_% “raa7a a | {DMT srung| 180% of Rated oa vrs amps 2000 Je Curent of ansfrmer at CT secondary ide= myer ratio Amps 06667 Sating ine * 12293 138 EF Fine apie Setting HST is “Franamision Line Impedance = vw ivy Pout er ne Ohm 0471 oop Impedance =2x7r ‘ase Ohm 02942 Transformer tmpedance Genyt00y x Vn Vor Tx MYA) ‘ax Ohm 3.1298 Sar Surse impedance Ae seen fom 25K Dus zavte Zs Ohm 3.424 Fault Current an The 25 KY sid for 25KV Bus to Earth Fut tte Feeding Post = ‘te 1000/25 try Amps 78855 Fut eurtent elected to secondary sie of Amps 26.285, Traltevel Requrea TMS setting = Ss sx 002-1 0396 wus 0.0596 0.00 by vw 23 Over Load setting [The relay setting is divided in to 2 main groupe I" 3 sage Overload seting OUI, O12, land O13 and 2° IDM fauk setting. Following table shows the current and time setting fr each stage, The 10% grading in current setingand one min. grading in time setting stage [Current Setting [Operating fou Na0% of Full Load [ua0 Sec fox N05 of Full toed [500 See fors 70% of Pull Load [240 See hw 180% of Pull Load [TS Setting 231 The Rated current of wanslormeratCTLV aideTe LV Amp. 1111-1 Stage 1 Overload setting (120% of Rated loud) = OL. Amps 1383.3 ‘The Current of transformer at CT secondary sde> ILVSEC Amps 44848 ouiycT Ratio Setting nme % 98.989 59 252 Stage I time siting (24 ml ee 340 [aaa asi irs | side OL2/CT Ratio 1852 Setting in % 109.7104 | Zid Stage 2 Gime setting [10-min) see 0 357 aim | ‘The Current of wansformer at CT secondary side+ oLsyer Ratio 62963 Setting in * 125.93, 126 ZAG Slage 3 time setting (@ mi] se 20} (aa Fost over Toad Setting BAT The current im Amps = Rated current Tore Amps TUT Curent of transformer at CT secondary side~ TLV post) CTRL Amps 3.7037 Setting im se z4074 [Za2 Time setting of Fost ever load ee] TAT Reset Time setting of Post overload le 3 hows To__ TW Sie Protection Ti Restricted EF sett REF ecting shouldbe 103% of rated Current» IivseC = 10% aera Nearest Suitable Setting is 0.5A. Thus 1E> oor 1b 32 IDM Over eurrent , REF and Over Load setting 321 IBMT Over Current relay HV side DMT setting (190% of Rated load) "21H 1P> saa CCuffent of transformer at CT secondary de> IP [Cre Amps 5.977 Setting in % 107.95. 108 Cy 35 We A | Jian Protean | orton ie Impeance = ww Tow) Pmt! ay ohm 0x81 taop taped» 22 ie ohm O29e2 ‘arse impedance = (ancaye cea ohm 3.058 Sous apes fre Won 257 HE ovat Zs Ohm a4 eure on The 25K sie or 2547 Bos flirt athe Peedig ot = ‘a soto 724 Irie Amps 70885 ete aa cuent on 13087 ite + tier tramps 16229 Trenance slement ha 6 beset 128 ies etnies ie nia5/cT Amps 23202 ety sing in 00% 5 Ame) wr Ganon caer Rey Setting : sos) | TSF Fe Map Seng HB) Tut cure e LY boes Ved 23 ew pps 758 Fa en aey ade Grimey IW pe 18129 raul curren eeed sonar se of CF amps 20.162 to seve operating ine of msc 8 Tears ated Me ete TE fanpoor ones aus on] | (at — over tan og ea at a i aie aT ie oT TREO Type aOR | fase Sovertoad| Weareat | ww | banca re ED isn Tove —faarassoos 9.6 {sa one pae rPre [238 lar each stage Jens OL and 2° IDM fault seting, Following table shows the current and time setting Gaded ToT main groups 13 stage Over load seting OL1, O12, wu [Garent [Operating Time four 30% of Full 1900 See on 50% of Fll_{720 See fous. 180% of Fuit_|£00 See Dwr 190% of Full FIM Seng should Load le such that i will 4 eve maxieaur | is mgtime of | rn ER =A SET The Rared curvent of wancTormer at CT primary {Sue is = Transformer Rating (Tx) / Viv lye Amps 229.27 we a) ‘Stage 1 Overload setting (30% of Rated load) ~ isin OL1 Amps 29845 Carrent of transformer at CT secondary side= ou CTRWY Amps 3.003% Setting in % 7386474 SAE Stage 1 time setting (1S mio) Tse 300, TAI Giage 2 Overload sting 19% of Rated Toad) = LS XIKV o12 3091 (Current of transformer at CT secondary si 012 / CTR Amps 42614 Setting ia % 65997 85 [332 age ome setting (72 aa 7 See 70 [343 Biage F Overond eeiting (180% of Rated Wo = ey 013 Amps 409.09 Current of transformer at CT secondary sie= OL3 CTRHY Amps 51136 Setting in % % 102.27 102 THE Stage 5 time setting (8 in 73 See 300. 35 Post over fond Setting S51 The current in Amps ~ 10% of Rated 750 Ccurrent of transformer at CT secondary sie~ TAV post) CTRAW Amps 3.125 Setting in % e625 68 TEE Time setting of Port over lsd secmmnnEnea79) SEI Reset Time setting of Post over Toad fe 9 hows] bin 180 a Dilferential Protection Relay = A23R [ut fad Cureton 132K Side Jno [rons [a7 [Guren on HV Busing CT Seconda amps [109984 Sis Gument mast be normalized to 5A using ICT Thos HM |r rato fox HV side [ za Fal Toad cursent on 25KV wide Tx [are | a [Guanton Lv Busting GT Seconda Tarps [3510s Frnt carrent most be normalized t9 SA using 17, [AGM frnus ICr ratio for LV side za [Eoweat tap -15% (Voknge on ISK Side ~ 112.2 KW an22| [Hvatiowest ap lamps | 207 3a) Relay side coven alts TAP Hap [ams | 5.5235} [Spill ver Curent on this TAPE Wap 5 Isp —_Jamps | 0.0251 [Percentage erential Curent» sp XTOO/aprBY 16.2162 Frvaton te relay CT eros, he diforenial current tne creases by aac of 1.25. 25 X oil xo inias wears 20% en Summary of Settings “Fransformers Protection i laze (UM), [Restricted BF sting IE) [isting (200% oT Rae a TP) [rime Mulipir Setting (TMS) 206. inst. Over currect(P>>) laveASS} fot Enable I [Stage 1 Overload setting (120% of Raied toad] (LIT [Stage 1 me setting (6 min) 1) Ae fol 2 Enable I [Stage 2 Overioad Seng [150% of Raed aa (OTA) stage 2 ne stig (9m (2) foL-3 Enabie |toge 3 Owed stig (1 of Red oad) (OLS) [stage 3 mest mn) (7) Post verloagee tng Fim or Pos ones lslelele| [ele Reset Tine for Fost aver fad “OW FORT [iar ae [sFDaay— YES [ire cee Ve 20 ART, ‘Resid EF sting 05) ie IDM seting (200% of Rated load) 1°) ios | “Tame Muli Setting (P-TMS) om Inst Over evrret (>>), 305, OL 1 Enable TES ‘Stage 1 Overload setting (130% of Rated loa) (OL!) 7%, Stage Ite eating ( min (19) 300_| see O12 Enable 78S. Stage 2 Overload setting [150% of Rate lod (0L2) 35m, Stage 2 ie esting (2 i) (72) 720_| ae OL 3 Enable YES ‘Stage 3 Orerioe setting (280% uf Rate a (019) toa Stage 3tme setting (1 min} 3) 300 [see Post ovr caren eng pa, “ane erPot ovo 70 see Reset Time for Post over lod. 120 [ens einen i eT | T [cow For nae [Bau Re 3000, {abet | mae fies erek Yes [fre Ce Te Yes 30 a [Pek up Sting as, [Bins eeting 2% instantaneous Seng [i000 [2nd Bis {200 | fic racror av) B68 fet Factor HL) 270) [courroer — [ees jpaaa Rte 57600" ri OWE |averraaay— oem [EVCT Pay Ral % Relay setting for Feeder Protection Calculations for DWX- TSS , {Assumptions for aeons Conaering iw nt ae 1 Translrmee Capacity fe eae 20 1 Transtar impedance mk ee {Voltage on Primary Sie no load voltage vn ‘2 1 Matege on Senda Side no lod vtape Meow 200 {Pullen caren on Secondary Side ge tits 1 Mansormer impedance ™ “ee ven TeMVA fomn 3120000 + Pr Reto pm aroate 20 crate cr *si0 Ey 1 Cambined Transducer Data = (CTR/PTR) w ry Line Cnarateristes Dats Singin pence tho TRC te bmn 04s + RCA Line Ane moje 707 8 Operating ine ate NR Operating ane uO J no Lo vane ww Vom 000 (peso Dec «Par HM neon 5) pee oa ee er Le erie r hanoeT oe Onee 2 (Oeee | ea lke tins [= [ssa cE See an ar a lee aseia- oom zr fees | ts a le oom [ie coco 810 one & S00 Orne. As ze OSD gues XB Iernrsone 2 sen 1.28 nes, (donee oe wy oe inn Caran =MUA B/N SMARTS) fe ar Isat ety OCR Sting be st 50 t fsa impedance Secondary Sie a waz ripen am 3 to Net SS Por 2 [oie | 3 —| 01 ral mpedane a Secondary Se meas | 0 Ss EB 7 eee ee ieee E —— (Eo meneremen epee [routine mpesance 2 [ome | ar sais | a7 animes eet ee eee [Brornoommeccecaonemonewm feet ee oe uy wt summary of “ype: AZ forward Rexstance RF 7 fra Bockwand Resse RO ams Farmard Reactnce RF ert foe [eckwardReactance XE 708s rn ee RCA 7 fn Oseting Corea + fara Ba 5s spec 2 nf pc ipedance 7 wa 30 fe [ra "le Ping Nx A 150" nie [ocr scion fock om focns ata fee vaoe — J Yong jee arg Lage FTF sing aa 3 = 3st ec Tine 30 foe (Senet Sena [cour rore war Baa sTe00 Pay Tene Fete ves [er bear 195 reac = es ppc Fe es bm Ra a ier 7 Pan 2120 & FDR amiss (Gene Satina Jone ' Jcou rorr R232 Jaa Rate 7600 res ce ves [pci Tes ves [Fe Sins 7 eS eae eat om [sesaro us mead (Be Sapevision RoR eley Hemant Vaage | Tine (See) | [De Ungar Vonage Arm 100 a [bc Under Votoge Te a2 as | [OC Over vata Alarm a0 0 [RC Unger Voge 1s Fa [aC Over Voge 280, ea we wh relay setting DWX-TSS CAPACITOR BANK 10 Data Avsumptions for calculations ‘Considering following data: nts, 4 Shunt eapacitr bank ating at KVAF Kn 600 4 Shunt eapactor bank rating wv rn 1 Rated nominal no tad voltae v soo SCT Ratio 2 + Frratio aman 250 + Rated Secondary FT 110 4 aut Level ra 49886 + crate cm ‘008 40 4 Source trancton tranafeetr Impedance ean TSS ans ‘Constants aoe p00 [20 BRV Shunt Capacitor bank relay setting 21 TDN Over current relay Calculate Capacitive reactance at rated voltaze ={KV"KV]*1000/KVAr oe oe Caleulate Elective reactance of complete capacitor nal fe reactor unit = Xe-(0.13°290.91) cle a ead Calculate KVAr eapacity of bank at 25kv KVAr 29603621 -[. Capacitor bank eurrent in amps: leap amp 1353448 Current setting of IDNT relay in amp| cos (Yeap't) cap amp *” Setting im 9% 68.194 ie 65% TMS Setting Fault current amp 642.987 Plug setting multiplier 4.99194 ‘To achive operating time 500m for fault after shunt eactor the TMS = 2507/1000 ms * ae 89/199/Teap)"h1 oea739 0.08462 i 0.08 [27 Over voltage relay S — a setting in volt [V 0/¥) v ery Setting in % % no 110% ‘ams setting Phug setting multiplier 110 Form IDMT curve 7 sce at 1.5 times at 1.2 times of setting the operating time is 17sec at TMS 1 To achieve the operatng,time I sec. ‘TMS setting 0.06 by ZB "TRACTION DISTRIBUTION ~ CONSTRUCTION RATLAM ELG APPLICATION FOR COMMISSIONING OF 132/25 kV DWX/TSS SECTION : INDORE- UJJAIN SECTION RATLAM DIVISION (WESTERN RAILWAY) FROM : DY.CEE(CONST) 70; CIVEF ELECTRICAL ENGINEER RATLAM, WESTERN RAILWAY CHURCHGATE, WESTERN RAILWAY. Ofte of the Dy.CEE /Conseton, DRM office, Ratan, No, EUCRTM201808/F Date: /11n019 (Chet Hectic! Engineer & letreal Inspector to Govt of Inia, Churchgate, Mumbai -20 (Pwrough SeDEERTM) ‘Sub: EIG sanetion for regelar commission between Indore- Ujjain on 25 KV A Division of Westera Railway. the work for necessary charging of Dewas Traction sub-taton have teen ‘competed and ready for regular commissioning Necessary documents and crteats are tclosed a mentioned below (1) Please find enclosed herewith the following cette: (A Cerise as er clause 21007 of ACTM Voll Part cor a eo a No, ee [oas garding TSS To.o8 bonding ad ari To. ee ceric for feeder fine 10.12 | Clearance eetiiate for energization of 5KV DWHITSS 10,16 | Clearance eerste TSS rom Contactor = TOT | Clearance eet 19 SCADA fom Conair Ceriese rearing IE Res (Bit st repos Cetus. Seo: Description z | Chest Or [ACT sandal Proforma O3_[ Alloit st repos. (| Compliance of defect & deficiencies SRLDEE/TRD and supervisor lvl is eelse. 05 [ Listofsouce of procurement of mater rom COREIRDSO approved 106_—[ RITES inpestion erties. (7 [Allain for DWXITSS. i (2) Operon manval of equipments, factory tet cuficates & routne inspection cerifcates of equipments ete provided inthe above TSS have already been handed vero SRDEEIRTM, (6) SCADA work i in progress and testing from RCC wll be done before cammissoning (@)_PCEE & EIGAWR is, terefore, requested to kindly accord sanction for repuar ‘ammissioning of 132/25 KY rion Substation at Devas on 25 KV AC in his capacity a5 tial Inspector to Govt of din, DA: As above o on ©. 0. os 0s. 0, 07 ow. CHECK LIST-T0 BE ENCLOSED WITH PTWIE.LG, APPLICATION em PTW ( Not applicable) Whether concept plan is enclosed Whether sectioning diagram isapproved by H.Q. Whether FO fe as RDSO standard, ‘Whether all he items have been procured from DSO /CORE approved sources. FOR EIG SANCTION. \Whetner join checklists complet in al respect and signe by Construetion & Divisional officers Whether defects & deficiencies ae sll essing (isto be enclosed and consircton offices Remarks for compliance ofthe defectsdeficences ‘Whether pre-commissioning tests cared out and ase within the permissible ints. specified in IS/RDSO Specification and same ae enclosed IR Value Centfcates ‘Whether SWR hasbeen corected and supplied fo all Whee sectioning is corece fortes wherever applicable ‘Whether manufacturer’ Test Repons are enclosed anid they are by order asp espeative specications. {All safety cerificaeinpreseribed fom as per ACTM pe Sr DEE/TRDIRTM, — Rewarks NA NA TSS drawings enclosed Yes Yes NA Na ves Yes Inclusion of action plan and certifeatin for modifi "Feehncal Circular (TRD) No. 127 dated 06102014 for PSL tems ion/atst intraction a8 per aa = x meal Fe aa TRE RIT SSS HAO] Se annee a eae | Fo Sc assimmaen | beemeha ee | ar ane et x arma OV ee ma tetna evs aca a Fe a race tower [7 ar EET el eo | ae a ered call a aaa os aoe F | een pt a | ar ee wee JE wh een onder PROFORMA-10.03 (CERTIFICATE REGARDING DWNT: Regular commisioning of Dewas Traction Substation (TSS) on 25 KV AC. Cried tht all the equipments in the Deas Traction Substation (TSS) at im. 3938 have been exeted as er approved drawing and standard specications and Dare re no infsements the schedule of dimensions except wher. approved of Taiweylcompetet utbority has teen obtained. The TSS have been nspected and {ound to comply with he above regimens aes b. sree pyceeloerm PROFORMA-10.04 (CERTIFICATE REGARDING BONDING & EARTHING Regular commissioning of Devas Traction Substation (TSS) on 25 KV AC. Crt thatthe bonding apd eating of the above TSS have een cai ut spor thelaning code a pr apere ravings. Se DEETRDRTM, pyceeciery PROFORMA-10.10 BNI \TION ON 25 Ky, 25 KV FEEDER LINES. (Wor is under progress) Proforma 10-12 [CLEARANCE CERTIFICATE FOR ENERGIZATION OW 25 KY eas Traction Substation (TSS) Regular commisionng of Dewas Traction Substation (FSS) on 28KV AC. Detailed deserption f Traction Sub sation to be energize 8) Theabove Traction Sib station have ben jointly checked and ted for ‘completeness, conet elecvzal connections inching ese eonnetions lecticl clerances, insulation esisance earthing and bonding and fund tw bein order. Test eps are separately sited. 1) The works hae been complete in accordance with aproved drawings and complies inal espects ith the requirements othe “Manel fae Traction “Maintenance and Operation’, Indian Eletcty Rules and spi insrctons con the subject ©) AllourtafThave been withdrawn and warned that the TSS wil te charged at 25kY AC immediately. Clearance Create othe same effect hve bee ‘obiained fom al he Coneactors working onthe above ston ho work onthe shove TSS willbe ian yp hereater without obtininga pow Weck Hoan official auborzed by SeDEE/TROVRTM, 0) Alloter sft precautions necessary have been tke, ‘The Traction Sub. stn refered to above reno clear and fit forenenztion on 25 kvac. Forwarded t PCEBICCG, wh SeDEETRDRTA by.CoBURTM Proforma 10-16 Dy ceEycrn Deve Si, Su _cleranc catia fr enerlzation of Deas Traction Sub- eis cert that al physical works have been complete en Devas Teton Sub tation icucing feeding pos andi tobe charged with 25 HV ac singla-phase, 50 HE ecttal energy with fle rom 31.2089, station including festng post andthe OHE : weet, To, Dy.CEEICRTM Ratlam, Dear Sir, Subs PROFORMA-10.17 Clearance Cetifiate For The Commissioning OF Remote Control Equipment At Dewas Sub Station OF Ram Division (Work is under progress) vi is Fath, Dw Cetfeate exarding compliance to rtevant Para fH Rules ‘Sub: Energion of DWX TSS on 25 KV AC a regular measures LE.RULES 3 LE, RULES 34 LE. RULES 48 LE: RULES -61 LE RULES 62 (E RULES 67 1B RULES 68 LE RULES SSETRDC2UN Fellowing i is of ahorzed persons: 2 Sr Section Engine RDI Constretion>' iin. St Sexton EnginerFRD PSU Ujain, Accessibility of bare conductors i} Allbare cond.ctrs are inaccessible ii) Provision re avalible which an make the hae comfuctors dea Insulation resistance of equipments have been mere Conestion with cat Fy The ame of every equipment andthe metic prt intended as onder have been ered by too separate and det ‘Sonmections wat ear {iy Enthressance have ben nnered and ae ive the enclosed i) Minimum safety working clearances have bn maintained fo the re comctor ive ps any appa {iy Alle squpmens have been protected ent sv aguine switching over jy Allpom casa cary met parts as sve hoon eHlecvey cated a ing iy Thermal pnt of every waste hs he re by iomocing to the eaig system seated stn iy Equipment earthing done by SOXGaun and 7SXSim MS Mas Sas heen pots by fencing esha 1S in igh 30 (0 event aces he lestrie-soply Hnes a apprise By 30 (oubosaed person Anttinbing devices ave been provide to preven a uruboized Ferner ram ascending any ofthe spots which canbe esi embed tom without the ep of oer, Rene SSE PSILIN seoeeRibars List of TSS equipments installed with manufacturer's name at DVX/TSS (By Ma Ast Bhanu Techn Servet Ll. ie LOA No ELICIRTM201808/T 6.102018.) — _ So Typeof equipment [Agency Mas TDRVLA. Tamco fed. Ll, Hyderabad iV aco na Lid, Hyderabad 2 KV DP feos GISOA) | Tras Elec, Kola ‘ox _[uekver aeo ind-Lid, Hyderabad 12 KVCB oman Greaves Lid Nas Power Transformer Transformer & Recife, Sand i or [srw ‘amco ind, Lid Hyderabad ! tej 2sKVCB Mauavin Swihgen, Salem to pskver eoaaiam ‘Vishal Transformers, Hyder TO] 25 KVSP lolator (3150 A) | Trans Elect, Kolkata (08) = [i125 kW imerupte Tegan Sehgenr, Salem zi [iz [10KVA AT Suprene Switch Gea, Aurangabad 08) ber typet Tames i Ll, Hydevabed fer type tl Tams did, Hyderabad (3) sf 95 KV CT Taco Li, Hyderabad 9) [ie 1s kv oP ester am Elena, Kolkata 2) ~ Fi Tonto & Relay Pak ‘Ai Elestonis Pt Lid, Mii = [ISO V 200 AH Bate ui Bn ‘MS Fats3? nm da: rod—_—| Trans Veal Indust, Bhiwani ih TITW 40 AH Batery danger | Univeral iP Nc aantboien eed nt [Eat Land Sed SS KV Series emetoe To “Shun pair Bank iE SRV NCT GI Vishal Transtar, Fyerbad ‘HORWA Ausuliay Tansfomer [Supreme Snichersr & Tansfomes— iret types of ses Salar Techno Engineering Lt, Hu SPS. ie Tnslors Pos © pean | rsulaors Besa Company, Hopal ACSR Zebra Coatuclor | : HOW LT distibuton board for | East Land Swichgenr Pot Ld, Kot etna, Sanh = 7 Pr id, Rapa [rans Metis, Biv Trane Metal lds, Bhiwa ening Panel rans Met i ‘ALBZ tecniaton ing or | Transision Line Product, Koki AACSR conductor | Fa bul bus bar { Sa In i, Nashik 1 avhing system (Eee) 1 Roval ol Engioering Pt Kalina PER BUANU TECHNICAL Sepik Ha» LIST OF DRAWINGS FOR DWX TSS DRAWING NO, DEWAS/TSS‘AB 1062. is 1 Steve 12 Cable Trench Layout - FP 13 Cable Run Layout F Baffle Wall Deis * Fewlaion Layout -TS! ae Ru Layout = TSS yout TSS DEWASITSS/AB1062-23-001 001 ng you pycee}el AM U, py.ceelel P™ Ze py.ceelelein pyceele lem py-ceelel i py-cer lel er

Anda mungkin juga menyukai