Has the Plan (or Plans) been reviewed this school year? Yes No N/A
10-08-08 5-27-2010
(second date)
Location:
Status of the Asbestos repair and maintenance Work Order System: N/A
Established,
Pending
Comments:
Has the Plan been reviewed this school year? Yes No N/A
How often are meetings held? Concurrently with the Building and Grounds
Committee.
Who is the Contact Person for OSHA 300? Sr. Kathy Kuchar, OSB
Is the OSHA 300A Log completed for the previous calendar year? No
The location/s of the posted log: Main office and School Kitchen
Is information on injuries recorded on the Log within five (5) working days? Yes
No N/A
Safety Committee – Meeting Schedule
List job categories that may be at risk to exposure: All-staff are considered at
risk of coming in contact bodily fluids.
Have the employees identified as first aid responders been given at a minimum
Red Cross First Aid Training? Yes No N/A
Note: Those that wished , went for a refresher course at Northwest Medical
Center, fall, 2006.
Note: Training was completed in10 October 2010 conducted by Lee Carlson
Checklist of E/OHS Activities for Confined Space Entry
Has the Plan been reviewed this school year? Yes No N/A
Are information maps posted to indicate travel routes in the event of fire,
tornado shelter locations, and procedures during lockdown? Yes No
Does this school coordinate drills with local government authorities to assure
sheltering in school, evacuating to their homes or use of congregate care
centers? Yes No N/A
Has this school completed the Fire Marshall required Fire Safety and Emergency
Evacuation Plan? Yes No N/A
Sr. Kathy reviews and updates the plan annually. The Plan is included in the
staff handout provided at the beginning of the year.
Fire drills and lockdowns are recorded in the Activities manual. They have
been completed for 2010-2011 school year.
Checklist of E/OHS Activities for Employee Right-to-Know/Hazard
Communication
Has the chemical inventory been completed for the following functional areas?
Are MSDS available and located with the chemical inventory? Yes No
Does this school use contracted services for the Management Assistant
Program? Yes No N/A
Is the Fire Marshal approved Emergency Evacuation Plan in place for each
district building? Yes No
Note: There is no fire suppression system in the fume hoods located in the
basement kitchen. No grease laden foods are cooked in that area. The building
does not have a sprinkler system.
Facilities Safety Review
Dark Room X
Wood Shop X
Metal Shop X
Halls, Gym, etc. 5-25-2011 See Facility Safety Report and photos
Graphic Arts X
Transportation X
Chemistry/Life X
Science
Checklist of E/OHS Activities for First Aid/CPR
The local provider determined travel time was estimated to be within the 4-8
minute limit. Therefore Dakota Clinic/Hospitals, ALTRU will be the
designated emergency response provider.
The local provider determined travel time was estimated to be in excess of the
4-8 minute limit. Therefore N/A will be the
designated emergency response person located within the district.
Have the program and goals been approved by the School Board for the current
school year? Yes No
Were occupied areas of the district evaluated using the EPA’s Tools For Schools
check list or equivalent?
• Teachers check list? An information fact sheet was provided all –staff.
# of forms distributed # of Forms returned:
Training conducted
(date)
Has the District determined the mechanical ventilation rate of each occupied
space? Yes No.
Has the annual monitoring been conducted to determine location and degree of
infestation? Yes No
Is a map of all potable water taps available for review? Yes No N/A
Has the Plan been reviewed this school year? Yes No N/A
Have affected personnel been trained as to methods and technique of use? Yes
No N/A
Has the annual audit of energy control procedures been completed? Yes No
Is the Machine Guarding Plan for each affected work area in place? Yes No
Has the alternative MDE “best practices” criteria used to safeguard equipment?
Yes No
Surfacing:
There are no pinch, crush, and shearing points or exposed moving parts
Security of Hardware:
Drainage:
The entire play area has satisfactory drainage, especially in heavy use
areas such as under swings and at slide exits
Leaded Paint:
Note: the playground was checked on 5-14-08 and found to meet standards of
this program.
The playground has a very thin layer of pea rock in some locations. I
recommend that retaining barriers be provided and additional rock be added.
LC 5-27-2010
The playground was reviewed on this date and found to be in good condition.
Lee Carlson 5/25/2011
Checklist of E/OHS Activities for Personal Protective Equipment
Has the Plan been reviewed this school year? Yes No N/A