Tower 32M - Utkl PDF
Tower 32M - Utkl PDF
ONGKOS
ANGKUT HARGA
HARGA
BAHAN JASA BAHAN PROYEK
BAHAN
NO JENIS UPAH DAN BAHAN BANGUNAN SATUAN HARGA (Rp) KE 10%
PROYEK
(HBP} KETERANGAN
LOKASI/O (Rp) PEMBULATAN
(HBP) (Rp)
A (Rp}
(Rp)
1 2 3 4 6 8 9 10 11
1 UPAH 10
1.1 Pekerja Hari 85,000 85,000 85,000
1.2 Tukang Hari 125,000 125,000 125,000
1.2.1. Tukang batu/tembok Hari 125,000 125,000 125,000
1.2.2. Tukang Kayu Hari 125,000 125,000 125,000
1.2.3 Tukang Besi Hari 125,000 125,000 125,000
1.2.4 Tukang cat/Politur Hari 125,000 125,000 125,000
1.2.5 Tukang Pipa/Operator Pompa Hari 125,000 125,000 125,000
1.2.6 Tukang Penganyam Bronjong Hari 125,000 125,000 125,000
1.2.7 Tukang Tebas Hari 125,000 125,000 125,000
1.2.7 Tukang Las Hari 125,000 125,000 125,000
1.3 Kepala Tukang Hari 150,000 150,000 150,000
1.4 Mandor Lapangan Hari 150,000 150,000 150,000
1.5 Operator Hari 150,000 150,000 150,000
1.6 Pembantu Operator Hari 125,000 125,000 125,000
1.7 Mekanik Hari 150,000 150,000 150,000
2 BAHAN LOKAL
2.1 Batu Pondasi
Batu kali utuh m3 200,000 58,578 258,578 258,600
Batu kali belah m3 200,000 58,578 258,578 258,600
Batu Gunung m3 200,000 58,578 258,578 258,600 Harga tersebut
merupakan harga
2.2 Batu Split m3 quary dan belum
termasuk :
Batu Split ukuran 5-7 cm m3 220,000 58,578 278,578 278,600
Batu Split ukuran 3-4 cm m3 242,000 58,578 300,578 300,600
Batu Split ukuran 2-3 cm m3 266,000 58,578 324,578 324,600 - PPN 10 %
2.3 Bataco 0.12 x 0.15 x 0.25 cm Bh 2,500 174 2,674 2,700 - Jasa 10 %
2.4 Bata Merah Bh 2,000 174 2,174 2,200
- Ongkos Angkut
2.5 Pasir Pasang m3 200,000 58,578 304,719 304,700
2.6 Pasir Beton 2,600 m3 200,000 159,422 359,422 359,400 -Logam
Pajak Mineral Bahan
dan Batuan
2.7 Tanah urpil m3 100,000 43,748 143,748 143,700
2.8 Tanah Timbun m3 80,000 43,748 123,748 123,700
2.9 Tanah Timbun/Material Pilihan m3 100,000 43,748 143,748 143,700
2.10 Tanah Liat m3 60,000 43,748 103,748 103,700
2.11 Kerikil m3 242,000 58,578 300,578 300,600
2.12 Ijuk Lembar 8,000 87 8,087 8,100
2.13 Bambu Betong Batang 100,000 8,676 108,676 108,700
2.14 Bambu Pering Batang 75,000 8,676 83,676 83,700
2.15 Bambu Aur Batang 22,000 8,676 30,676 30,700
2.16 Gedek ( 2 x 3 m) Lembar 88,000 868 88,868 88,900
- Besi Beton polos d=6 mm 0.221832 btg 35000.000.00 868 35,868 35,900 13486.181.74
- Besi Beton polos d=8 mm 0.394368 btg 55000.000.00 868 55,868 55,900 11812.148.38
- Besi Beton polos d=10 mm 0.6162 btg 80000.000.00 868 80,868 80,900 10940.711.89
- Besi Beton polos d=12 mm 0.887328 btg 110000.000.00 868 110,868 110,900 10415.164.03
- Besi Beton polos d=16 mm 1.577472 btg 225000.000.00 868 225,868 225,900 11933.650.80
- Besi Beton ulir d=13 mm p 1.041378 btg 140000.000.00 868 140,868 140,900 11275.124.56
- Besi Beton ulir d=14 mm p 1.207752 btg - 868 868 900 62.098.84
- Besi Beton ulir d=16 mm p 1.577472 btg 215000.000.00 868 215,868 215,900 11405.379.41
- Besi Beton ulir d=19 mm p 2.224482 btg 325000.000.00 868 325,868 325,900 12208.834.84
- Besi Beton ulir d=25 mm p 3.85125 btg 550000.000.00 868 550,868 550,900 11920.372.17
- Besi Beton ulir d=32 mm p 6.309888 btg - 868 868 900 11.886.11
3.6 Seng gelombang (0,02 x 90 x 180) cm Lembar 52000.000.00 174 52,174 52,200
3.7 Seng gelombang (0,03 x 90 x 180) cm Lembar 86000.000.00 174 86,174 86,200
3.8 Paku 4,820 4,820 4,800
- Paku Kayu 2"-15" kg 25000.000.00 17 25,017 25,000
- Paku Beton kg 20000.000.00 17 20,017 20,000
- Paku Seng kg 45000.000.00 17 45,017 45,000
- Paku tripleks kg 30000.000.00 17 30,017 30,000
- Baut Struktur Ulir bh 250.000.00 17 267 300
- Baut Sekrup bh 700.000.00 17 717 700
- paku Rivet kg 50000.000.00 17 50,017 50,000
Baut Angkur Bolt Ø 19 mm pjg. 50 cm Bh 78210.000.00 17 78,227 78,210
Baut + Mur Ø 19 mm Bh 8800.000.00 17 8,817 8,800
Baut + Mur Ø 16 mm Bh 5500.000.00 17 5,517 5,500
Baut + Mur Gording Ø 12 mm Bh 2475.000.00 17 2,492 2,475
Mur Ø 10 mm Bh 1365.100.00 17 1,382 1,365
Jarum Keras Ø 19 mm Bh 105000.000.00 17 105,017 105,000
3.9 Semen
- Semen tonasa sak 53000.000.00 868 53,868 53,900 1,300
7 Pipa
7.1 PIPA GIP DAN ACCESSORIES 434 434 400
7.1.1 pipa GIP dia.4' Medium A Batang 1,392,500 434 1,392,934 1,392,900 232,150
7.1.2 pipa GIP dia.3' Medium A Batang 1,109,500 434 1,109,934 1,109,900 184,983
7.1.3 pipa GIP dia.2' Medium A Batang 832,000 868 832,868 832,900 138,817
7.1.4 pipa GIP dia.1 1/2' Medium A Batang 500,000 868 500,868 500,900 83,483
7.1.5 pipa GIP dia.1' Medium A Batang 330,000 868 330,868 330,900 55,150
7.1.6 pipa GIP dia.3/4' Medium A Batang 260,000 868 260,868 260,900 43,483
7.1.7 Pipa GIP dia. 1/2' Medium A Batang 286,500 868 287,368 287,400 47,900
7.1.8 Pipa GIP dia. 1/2' Medium B Batang 95,000 868 95,868 95,900 15,983
ACCESSORIES 868 868 900
7.1.9 Boog GIP dia 4' Buah 403,500 868 404,368 404,400 -
7.1.10 Boog GIP dia 3' Buah 196,000 868 196,868 196,900
7.1.11 Boog GIP dia 2' Buah 68,000 868 68,868 68,900
7.1.12 Boog GIP dia 1 1/2 Buah 46,000 868 46,868 46,900
7.1.13 Boog GIP dia 1' Buah 22,400 868 23,268 23,300
7.1.14 Boog GIP dia 3/4' Buah 15,650 868 16,518 16,500
7.1.15 Boog GIP dia 1/2' Buah 13,000 868 13,868 13,900
7.1.16 Teea GIP 1/2 x 1/2 Buah 8,000 868 8,868 8,900
7.1.17 Teea GIP 3/4 x 3/4 Buah 10,500 868 11,368 11,400
7.1.18 Tee GIP dia. 1x 1 1/2' Buah 35,000 868 35,868 35,900
7.1.19 Tea GIP dia. 1 1/2x3/4' Buah 35,000 868 35,868 35,900
7.1.20 Teea GIP dia. 2 x 3/4 Buah 48,500 868 49,368 49,400
7.1.21 Teea GIP dia 3 x 1 1/2 Buah 143,000 868 143,868 143,900
7.1.22 Teea Gip dia 4 x 2" Buah 272,000 868 272,868 272,900
7.1.23 Socket GIP dia 4" Buah 112,000 868 112,868 112,900
7.1.24 Socket GIP dia 3" Buah 73,000 868 73,868 73,900
7.1.25 Soket Gip dia 2" Buah 65,000 868 65,868 65,900
7.1.26 Soket Gip dia 1 1/2 " 2 1/2 Buah 32,000 868 32,868 32,900
7.1.27 Soket GIP dia 1" Buah 11,000 868 11,868 11,900
7.1.28 Soket GIP dia 1/2" Buah 8,000 868 8,868 8,900
7.1.29 Soket GIP dia 3/4" Buah 7,500 868 8,368 8,400
7.1.30 Reducer sock GIP dia 1/2 x 3/4" Buah 10,000 868 10,868 10,900
7.1.31 Reducer sock GIP dia 3/4 x 1 " Buah 12,500 868 13,368 13,400
7.1.32 Reducer sock GIP dia 1 x 1 1/2" Buah 19,500 868 20,368 20,400
7.1.33 Reducer sock GIP dia 1 x 2 " Buah 28,000 868 28,868 28,900
7.1.34 Reducer sock GIP dia 2 x 3" Buah 71,000 868 71,868 71,900
7.1.35 Reducer sock GIP dia 3 x 4" Buah 134,000 868 134,868 134,900
7.1.36 Reducer sock GIP dia 3 x 1/2" Buah 95,000 868 95,868 95,900
7.1.37 Reducer sock GIP dia 3 x 1" Buah 95,000 868 95,868 95,900
7.1.38 Reducer sock GIP dia 3 x 3/4" Buah 95,000 868 95,868 95,900
7.1.39 Reducer Tee GIP 1/2 x 3/4" Buah 14,000 868 14,868 14,900
7.1.40 Reducer Tee GIP 3/4 x 1/2" Buah 19,000 868 19,868 19,900
7.1.41 Reducer Tee GIP 1 1/2 x 1" Buah 43,500 868 44,368 44,400
7.1.42 Reducer Tee GIP 2 x 1 1/2 Buah 56,000 868 56,868 56,900
7.1.43 Reducer Tee GIP dia 3 x 2" Buah 170,000 868 170,868 170,900
7.1.44 Reducer Tee GIP dia 4 x 3" Buah 330,000 868 330,868 330,900
7.1.45 Reducer Tee GIP dia 3 x 1 1/2" Buah 168,000 868 168,868 168,900
7.1.46 Reducer Tee GIP dia 4 x 2" Buah 330,000 868 330,868 330,900
7.1.47 Reducer Tee GIP dia 4 x 1 1/2" Buah 321,000 868 321,868 321,900
7.1.48 Reducer Tee GIP dia 3 x 1" Buah 162,000 868 162,868 162,900
7.1.49 Reducer Tee GIP dia 3 x 3/4" Buah 155,000 868 155,868 155,900
7.1.50 Reducer Tee GIP dia 3 x 1/2" Buah 153,000 868 153,868 153,900
7.1.51 Reducer Tee GIP dia 4 x 1" Buah 325,000 868 325,868 325,900
7.1.52 Nipple GIP dia 3" Buah 67,000 868 67,868 67,900
7.1.53 Nipple GIP dia 2" Buah 65,000 868 65,868 65,900
7.1.54 Nipple GIP dia 1 1/2" Buah 35,000 868 35,868 35,900
7.1.55 Nipple GIP dia 1" Buah 25,000 868 25,868 25,900
7.1.56 Nipple GIP dia 3/4" Buah 12,000 868 12,868 12,900
7.1.57 Nipple GIP dia 1/2" Buah 6,000 868 6,868 6,900
7.1.58 Dopp GIP dia 4" Buah 149,000 868 149,868 149,900
7.1.59 Dopp GIP dia 3" Buah 84,000 868 84,868 84,900
7.1.60 Doop GIP dia 2" Buah 30,000 868 30,868 30,900
7.1.61 Doop GIP dia 1 1/2 2 1/2" Buah 22,000 868 22,868 22,900
7.1.62 Doop GIP dia 1" Buah 19,000 868 19,868 19,900
7.1.63 Doop GIP dia 3/4" Buah 7,000 868 7,868 7,900
7.1.64 Doop GIP dia 1/2" Buah 6,500 868 7,368 7,400
7.1.65 Elbow GIP 2 1/2" Buah 47,000 868 47,868 47,900
7.2 PIPA HDPE (SDR 17) DAN ACCESORIS 868 868 900
7.2.1 PIPA HDPE 1/2" Meter 6,500 868 7,368 7,400
7.2.2 PIPA HDPE 3/4" Meter 8,500 868 9,368 9,400
7.2.3 PIPA HDPE 1" Meter 14,000 868 14,868 14,900
7.2.4 PIPA HDPE 1 1/2 " Meter 22,000 868 22,868 22,900
7.2.5 PIPA HDPE 2 " Meter 34,000 868 34,868 34,900
7.2.6 PIPA HDPE 3 " Meter 63,000 868 63,868 63,900
7.2.7 PIPA HDPE 4 " Meter 95,000 868 95,868 95,900
7.2.8 PIPA HDPE 6 " Meter 243,000 868 243,868 243,900
ACCESSORIES 868 868 900
7.2.9 SOCKET HDPE 3/4" Buah 23,000 868 23,868 23,900
7.2.10 SOCKET HDPE 1/2" Buah 18,000 868 18,868 18,900
7.2.11 SOCKET HDPE 1" Buah 30,000 868 30,868 30,900
7.2.12 SOCKET HDPE 1 1/2" Buah 118,000 868 118,868 118,900
7.2.13 SOCKET HDPE 2" Buah 192,000 868 192,868 192,900
7.2.14 REDUCER SOCKET HDPE 2" x 1 1/2" Buah 178,000 868 178,868 178,900
7.2.15 REDUCER SOCKET HDPE 1 1/2" x 1" Buah 118,000 868 118,868 118,900
7.2.16 REDUCER SOCKET HDPE 1 1/2" x 3/4" Buah 100,000 868 100,868 100,900
7.2.17 REDUCER SOCKET HDPE 1" x 3/4" Buah 23,000 868 23,868 23,900
7.2.18 REDUCER SOCKET HDPE 3/4" x 1/2" Buah 15,000 868 15,868 15,900
7.2.19 REDUCER TEE HDPE 3/4" x 1/2" Buah 15,000 868 15,868 15,900
7.2.20 REDUCER TEE HDPE 1" x 3/4" Buah 20,000 868 20,868 20,900
7.2.21 REDUCER TEE HDPE 3/4" Buah 25,000 868 25,868 25,900
7.2.22 EMALE ADAPTOR HDPE 1" Buah 15,000 868 15,868 15,900
7.2.23 EMALE ADAPTOR HDPE 3/4" Buah 12,000 868 12,868 12,900
7.2.24 EMALE ADAPTOR HDPE 1/2" Buah 10,000 868 10,868 10,900
7.2.25 FEMALE ADAPTOR HDPE 1 1/2" Buah 85,000 868 85,868 85,900
7.2.26 FEMALE ADAPTOR HDPE 1" Buah 15,000 868 15,868 15,900
7.2.27 FEMALE ADAPTOR HDPE 3/4" Buah 12,000 868 12,868 12,900
7.2.28 FEMALE ADAPTOR HDPE 2" Buah 165,000 868 165,868 165,900
7.2.29 STUB END DAN FLANGE 0 6" Buah 850,000 868 850,868 850,900
7.2.30 STUB END DAN FLANGE 0 4" Buah 500,000 868 500,868 500,900
7.2.31 STUB END DAN FLANGE 0 3" Buah 430,000 868 430,868 430,900
7.2.32 STUB END DAN FLANGE 0 2" Buah 250,000 868 250,868 250,900
7.2.33 CLEAM SADLE 0 6 x 2" Buah 320,000 868 320,868 320,900
7.2.34 CLEAM SADLE 0 6 x 1" Buah 288,000 868 288,868 288,900
7.2.35 CLEAM SADLE 0 4 x 2" Buah 200,000 868 200,868 200,900
7.2.36 CLEAM SADLE 0 4 x 1" Buah 147,000 868 147,868 147,900
7.2.37 CLEAM SADLE 0 3 x 2" Buah 147,000 868 147,868 147,900
7.2.38 CLEAM SADLE 0 3 x 1" Buah 94,800 868 95,668 95,700
7.2.39 CLEAM SADLE 0 2 x 1" Buah 61,000 868 61,868 61,900
7.2.40 CLEAM SADLE 0 1 x 11/2" Buah 30,000 868 30,868 30,900
7.2.41 REDUCING TEE 0 6 X 4" Buah 993,000 868 993,868 993,900
7.2.42 REDUCING TEE 0 6 X 3" Buah 993,000 868 993,868 993,900
7.2.43 REDUCING TEE 0 6 X 2" Buah 1,080,000 868 1,080,868 1,080,900
7.2.44 REDUCING TEE 0 4 X 4" Buah 360,000 868 360,868 360,900
7.2.45 REDUCING TEE 0 4 X 3" Buah 499,000 868 499,868 499,900
7.2.46 REDUCING TEE 0 4 X 2" Buah 475,000 868 475,868 475,900
7.2.47 DOOP HDPE 0 4" Buah 468,000 868 468,868 468,900
7.2.48 DOOP HDPE 0 3" Buah 252,000 868 252,868 252,900
7.2.49 DOOP HDPE 0 2" Buah 122,000 868 122,868 122,900
7.2.50 DOOP HDPE 0 1" Buah 21,500 868 22,368 22,400
7.2.51 TEE PE 0 1/2MM Buah 25,000 868 25,868 25,900
7.2.52 TEE PE 0 1 MM Buah 41,000 868 41,868 41,900
7.2.53 TEE PE 0 3/4 MM Buah 29,000 868 29,868 29,900
7.2.54 MESIN LAS PIPA PE Buah 38,000,000 868 38,000,868 38,000,900
7.2.55 Socket drat luar 1" Buah 3,100 868 3,968 4,000
7.2.56 Elbow/Kniee/Boog 1" Buah 4,300 868 5,168 5,200
7.2.57 Elbow/Knie/Boog 1 1/2" Buah 10,700 868 11,568 11,600
7.2.58 Reduser Tee 2 x 1 1/2" Buah 18,300 868 19,168 19,200
7.2.59 Reduser Tee 1 x 1/2" Buah 6,300 868 7,168 7,200
7.2.60 Doop 1 " Buah 2,300 868 3,168 3,200
7.2.61 Elbow/Knie/Boog 3" Buah 35,900 868 36,768 36,800
7.2.62 Faucet Drat Luar 2" Buah 10,700 868 11,568 11,600
7.2.63 Faucet Drat Dalam 2" Buah 10,600 868 11,468 11,500
7.2.64 Faucet Drat Luar 1 1/2" Buah 7,700 868 8,568 8,600
7.2.65 Faucet Drat Dalam 1 1/2" Buah 8,600 868 9,468 9,500
7.2.66 Red. Soc 4 x 2" Buah 42,900 868 43,768 43,800
7.2.67 Red. Soc. 2 1/2 x 2" Buah 20,200 868 21,068 21,100
7.3 PIPA PVC AW 6 METER DAN ACCESORIS 868 868 900
7.3.1 Pipa PVC dia 6" Maspion AW/S 55 Batang 1,149,200 868 1,150,068 1,150,100 191,683
7.3.2 Pipa PVC dia 4" Maspion AW Batang 550,700 868 551,568 551,600 91,933
7.3.3 Pipa PVC dia 3" Maspion AW Batang 377,300 868 378,168 378,200 63,033
7.3.4 Pipa PVC dia 2" Maspion AW Batang 206,100 868 206,968 207,000 34,500
7.3.5 Pipa PVC dia 1 1/2" Maspion AW Batang 138,200 868 139,068 139,100 23,183
7.3.6 Pipa PVC dia 1" Maspion AW Batang 74,700 868 75,568 75,600 12,600
7.3.7 Pipa PVC dia 3/4 Maspion AW Batang 59,400 868 60,268 60,300 10,050
7.3.8 Pipa PVC dia 1/2 Maspion AW Batang 48,700 868 49,568 49,600 8,267
7.3.9 Pipa PVC Robering 63 (2 ") Batang 192,400 868 193,268 193,300 32,217
7.3.10 Pipa PVC Robering 110 (4 ") Batang 453,300 868 454,168 454,200 75,700
ACCESSORIES 868
7.3.11 Boog PVC dia 6" Elbow 22 Derajat Buah 269,900 868 270,768 270,800
7.3.12 Boog PVC dia 4" Buah 101,400 868 102,268 102,300
7.3.13 Boog PVC dia 3" Buah 54,900 868 55,768 55,800
7.3.14 Boog PVC dia 2" Buah 19,500 868 20,368 20,400
7.3.15 Boog PVC dia 1 1/2" Buah 12,700 868 13,568 13,600
7.3.16 Boog PVC dia 1" Buah 4,600 868 5,468 5,500
7.3.17 Boog PVC dia 3/4" Buah 2,400 868 3,268 3,300
7.3.18 Boog PVC dia 1/2" Buah 2,100 868 2,968 3,000
7.3.19 Tee PVC dia 1/2" Buah 1,400 868 2,268 2,300
7.3.20 Tee PVC dia 3/4 Buah 2,000 868 2,868 2,900
7.3.21 Tee PVC dia 1" Buah 3,000 868 3,868 3,900
7.3.22 Tee PVC dia 1 1/2" Buah 9,000 868 9,868 9,900
7.3.23 Tee PVC dia 2" Buah 11,200 868 12,068 12,100
7.3.24 Tee PVC dia 3" Buah 29,500 868 30,368 30,400
7.3.25 Reducer Tee PVC dia. 1/2 x 3/4" Buah 3,600 868 4,468 4,500
7.3.26 Reducer Tee PVC dia. 1 1/2 x 3/4" Buah 11,600 868 12,468 12,500
7.3.27 Reducer Tee PVC dia. 1 x 1/2" Buah 15,900 868 16,768 16,800
7.3.28 Reducer Tee PVC dia. 1 x 2" Buah 13,500 868 14,368 14,400
7.3.29 Reducer Tee PVC dia. 1 1/2 x 2" Buah 19,600 868 20,468 20,500
7.3.30 Reducer Tee PVC dia. 3 x 2" Buah 38,100 868 38,968 39,000
7.3.31 Reducer Tee PVC dia. 3 x 4" Buah 137,800 868 138,668 138,700
7.3.32 Reducer Tee PVC dia. 6 x 4" Buah 301,400 868 302,268 302,300
7.3.33 Reducer Tee PVC dia. 3 x 1 1/2" Buah 55,300 868 56,168 56,200
7.3.34 Reducer Tee PVC dia. 3 x 1" Buah 52,200 868 53,068 53,100
7.3.35 Reducer Tee PVC dia. 4 x 2" Buah 129,100 868 129,968 130,000
7.3.36 Reducer Tee PVC dia. 4 x 1 1/2" Buah 125,400 868 126,268 126,300
7.3.37 Reducer Tee PVC dia. 2 x 1/2" Buah 13,300 868 14,168 14,200
7.3.38 Reducer Tee PVC dia. 2 x 3/4" Buah 13,500 868 14,368 14,400
7.3.39 Stop Kran CL dia 4" Buah 953,800 868 954,668 954,700
7.3.40 Stop Kran CL dia 3" Buah 800,000 868 800,868 800,900
7.3.41 Stop Kran CL dia 2" Buah 523,000 868 523,868 523,900
7.3.42 Stop Kran CL dia 1 1/2" Buah 504,600 868 505,468 505,500
7.3.43 Stop Kran Kitzs dia 1" Buah 159,900 868 160,768 160,800
7.3.44 Stop Kran Kitzs dia 3/4" Buah 123,000 868 123,868 123,900
7.3.45 Stop Kran Kitzs dia 1/2" Buah 104,500 868 105,368 105,400
7.3.46 Valve Sock PVC dia. 3" Buah 12,800 868 13,668 13,700
7.3.47 Valve Sock PVC dai. 1 1/2" Buah 3,200 868 4,068 4,100
7.3.48 Valve Sock PVC dia. 1/2" Buah 1,800 868 2,668 2,700
7.3.49 Faucet Sock PVC dia 3" Buah 12,400 868 13,268 13,300
7.3.50 Faucet Sock PVC dia 2" Buah 5,800 868 6,668 6,700
7.3.51 Faucet Sock PVC dia 1 1/2" Buah 3,300 868 4,168 4,200
7.3.52 Faucet Sock PVC dia 1" Buah 1,800 868 2,668 2,700
7.3.53 Faucet Sock PVC dia 3/4" Buah 1,100 868 1,968 2,000
7.3.54 Faucet Sock PVC dia 1/2" Buah 1,800 868 2,668 2,700
7.3.55 Clem Sadle dia. 2 x 1/2" Buah 36,400 868 37,268 37,300
7.3.56 Clem saddle dia. 3 x 1/2" Buah 58,700 868 59,568 59,600
7.3.57 Clem Sadle dia 4 x 1/2" Buah 65,600 868 66,468 66,500
7.3.58 Clem Saddle dia. 2 x 3/4" Buah 36,400 868 37,268 37,300
7.3.59 Clem saddle dia. 3 x 3/4" Buah 58,700 868 59,568 59,600
7.3.60 Clem Saddle dia. 2 x 1" Buah 36,400 868 37,268 37,300
7.3.61 Clem Saddle dia. 3 x 1" Buah 58,700 868 59,568 59,600
7.3.62 Clem saddle dia. 4 x 1" Buah 65,600 868 66,468 66,500
7.3.63 Gibolt joint dia 1/2" Buah 36,800 868 37,668 37,700
7.3.64 Gibolt joint dia 1" Buah 49,200 868 50,068 50,100
7.3.65 Gibolt joint dia 2" Buah 79,900 868 80,768 80,800
7.3.66 Gibolt joint dia 3" Buah 116,900 868 117,768 117,800
7.3.67 Gibolt joint dia 4" Buah 135,300 868 136,168 136,200
7.3.68 Gibolt joint dia 6" Buah 246,100 868 246,968 247,000
7.3.69 Reducer Sock PVC Maspion dia. 1 x 1/2" Buah 2,400 868 3,268 3,300
7.3.70 Reducer Sock PVC Maspion dia. 3/4 x 1/2" Buah 2,100 868 2,968 3,000
7.3.71 Reducer Sock PVC Maspion dia. 1 1/2 x 1" Buah 3,700 868 4,568 4,600
7.3.72 Reducer sock PVC Maspion dia. 2 x 1 1/2" Buah 12,200 868 13,068 13,100
7.3.73 Reducer Sock PVC Maspion dia. 3 x 1 1/2" Buah 28,200 868 29,068 29,100
7.3.74 Reducer Sock PVC Maspion dia. 3 x 2" Buah 30,600 868 31,468 31,500
7.3.75 Reducer Sock PVC Maspion dia. 4 x 3" Buah 55,300 868 56,168 56,200
7.3.76 Reducer Sock PVC Maspion dia. 4 x 3" Buah 89,500 868 90,368 90,400
7.3.77 Reducer Sock PVC Maspion dia. 6 x 4 Buah 186,400 868 187,268 187,300
7.3.78 Dop PVC dia. 1/2" Buah 2,100 868 2,968 3,000
7.3.79 Dop PVC dia. 3/4" Buah 2,100 868 2,968 3,000
7.3.80 Dop PVC dia. 1 1/2" Buah 8,200 868 9,068 9,100
7.3.81 Dop PVC dia. 2" Buah 9,100 868 9,968 10,000
7.3.82 Dop PVC dia. 3" Buah 21,500 868 22,368 22,400
7.3.83 Dop PVC dia. 4" Buah 49,200 868 50,068 50,100
7.3.84 Flange PVC 4 " Buah 78,400 868 79,268 79,300
7.3.85 Flange PVC 3 " Buah 55,900 868 56,768 56,800
7.3.86 Flange PVC 2 " Buah 43,600 868 44,468 44,500
7.3.87 Flange PVC 1 1/2 " Buah 47,900 868 48,768 48,800
7.3.88 Packing Karet 3" Buah 12,200 868 13,068 13,100
7.3.89 Packing Karet 2" Buah 9,100 868 9,968 10,000
7.3.90 Packing Karet 1 1/2" Buah 7,300 868 8,168 8,200
868 868 900
7.3.36 Reducer Tee PVC dia. 4 x 1 1/2" Buah 125,400 868 126,268 126,300
7.3.37 Reducer Tee PVC dia. 2 x 1/2" Buah 13,300 868 14,168 14,200
7.3.38 Reducer Tee PVC dia. 2 x 3/4" Buah 13,500 868 14,368 14,400
7.3.39 Stop Kran CL dia 4" Buah 953,800 868 954,668 954,700
7.3.40 Stop Kran CL dia 3" Buah 800,000 868 800,868 800,900
7.3.41 Stop Kran CL dia 2" Buah 523,000 868 523,868 523,900
7.3.42 Stop Kran CL dia 1 1/2" Buah 504,600 868 505,468 505,500
7.3.43 Stop Kran Kitzs dia 1" Buah 159,900 868 160,768 160,800
7.3.44 Stop Kran Kitzs dia 3/4" Buah 123,000 868 123,868 123,900
7.3.45 Stop Kran Kitzs dia 1/2" Buah 104,500 868 105,368 105,400
7.3.46 Valve Sock PVC dia. 3" Buah 12,800 868 13,668 13,700
7.3.47 Valve Sock PVC dai. 1 1/2" Buah 3,200 868 4,068 4,100
7.3.48 Valve Sock PVC dia. 1/2" Buah 1,800 868 2,668 2,700
7.3.49 Faucet Sock PVC dia 3" Buah 12,400 868 13,268 13,300
7.3.50 Faucet Sock PVC dia 2" Buah 5,800 868 6,668 6,700
Harga tersebut belum
7.3.51 Faucet Sock PVC dia 1 1/2" Buah 3,300 868 4,168 4,200 termasuk:
7.3.52 Faucet Sock PVC dia 1" Buah 1,800 868 2,668 2,700
7.3.53 Faucet Sock PVC dia 3/4" Buah 1,100 868 1,968 2,000
7.3.54 Faucet Sock PVC dia 1/2" Buah 1,800 868 2,668 2,700 - PPN 10 %
7.3.55 Clem Sadle dia. 2 x 1/2" Buah 36,400 868 37,268 37,300 - Jasa 10 %
7.3.56 Clem saddle dia. 3 x 1/2" Buah 58,700 868 59,568 59,600 - Ongkos Angkut
7.3.57 Clem Sadle dia 4 x 1/2" Buah 65,600 868 66,468 66,500
7.3.58 Clem Saddle dia. 2 x 3/4" Buah 36,400 868 37,268 37,300
7.3.59 Clem saddle dia. 3 x 3/4" Buah 58,700 868 59,568 59,600
7.3.60 Clem Saddle dia. 2 x 1" Buah 36,400 868 37,268 37,300
7.3.61 Clem Saddle dia. 3 x 1" Buah 58,700 868 59,568 59,600
7.3.62 Clem saddle dia. 4 x 1" Buah 65,600 868 66,468 66,500
7.3.63 Gibolt joint dia 1/2" Buah 36,800 868 37,668 37,700
7.3.64 Gibolt joint dia 1" Buah 49,200 868 50,068 50,100
7.3.65 Gibolt joint dia 2" Buah 79,900 868 80,768 80,800
7.3.66 Gibolt joint dia 3" Buah 116,900 868 117,768 117,800
7.3.67 Gibolt joint dia 4" Buah 135,300 868 136,168 136,200
7.3.68 Gibolt joint dia 6" Buah 246,100 868 246,968 247,000
7.3.69 Reducer Sock PVC Maspion dia. 1 x 1/2" Buah 2,400 868 3,268 3,300
7.3.70 Reducer Sock PVC Maspion dia. 3/4 x 1/2" Buah 2,100 868 2,968 3,000
7.3.71 Reducer Sock PVC Maspion dia. 1 1/2 x 1" Buah 3,700 868 4,568 4,600
7.3.72 Reducer sock PVC Maspion dia. 2 x 1 1/2" Buah 12,200 868 13,068 13,100
7.3.73 Reducer Sock PVC Maspion dia. 3 x 1 1/2" Buah 28,200 868 29,068 29,100
7.3.74 Reducer Sock PVC Maspion dia. 3 x 2" Buah 30,600 868 31,468 31,500
7.3.75 Reducer Sock PVC Maspion dia. 4 x 3" Buah 55,300 868 56,168 56,200
7.3.76 Reducer Sock PVC Maspion dia. 4 x 3" Buah 89,500 868 90,368 90,400
7.3.77 Reducer Sock PVC Maspion dia. 6 x 4 Buah 186,400 868 187,268 187,300
7.3.78 Dop PVC dia. 1/2" Buah 2,100 868 2,968 3,000
7.3.79 Dop PVC dia. 3/4" Buah 2,100 868 2,968 3,000
7.3.80 Dop PVC dia. 1 1/2" Buah 8,200 868 9,068 9,100
7.3.81 Dop PVC dia. 2" Buah 9,100 868 9,968 10,000
7.3.82 Dop PVC dia. 3" Buah 21,500 868 22,368 22,400
7.3.83 Dop PVC dia. 4" Buah 49,200 868 50,068 50,100
7.3.84 Flange PVC 4 " Buah 78,400 868 79,268 79,300
7.3.85 Flange PVC 3 " Buah 55,900 868 56,768 56,800
7.3.86 Flange PVC 2 " Buah 43,600 868 44,468 44,500
7.3.87 Flange PVC 1 1/2 " Buah 47,900 868 48,768 48,800
7.3.88 Packing Karet 3" Buah 12,200 868 13,068 13,100
7.3.89 Packing Karet 2" Buah 9,100 868 9,968 10,000
7.3.90 Packing Karet 1 1/2" Buah 7,300 868 8,168 8,200
Exhaust Fan setara Celling Plafon Cerobong Sirocco Buah 750,000 868 750,868 750,900
Selang Exhaust Fan 4" dan asesories Unit 280,000 868 280,868 280,900
Kipas Angin Dinding setara KRISBOW 45 cm Unit 1,450,000 868 1,450,868 1,450,900
Kawat Kasa m 10,000 87 10,087 10,100
Bata Ringan m3 900,000 28,918 928,918 928,900 92,890
Mortar Siap Pakai 25 Kg 75,000 174 75,174 75,200 1,504.00