VOLUME SAT. HARGA SATUAN MATERIAL & ALAT UPAH KERJA TOTAL KET.
Pekerjaan (Rp) (Rp)
I CAT DINDING - Aquaproof 7.257.000 3.075.000 10.332.000
1 Cat Dinding Luar (Belakang) 87,00 m² 84.000
Material & Alat 59.000 5.133.000
Upah Kerja 25.000 2.175.000
2 Dinding Luar (Samping) 36,00 m² 84.000
Material & Alat 59.000 2.124.000
Upah Kerja 25.000 900.000