Anda di halaman 1dari 1

ESTIMASI BIAYA PEKERJAAN PENGECATAN RUMAH DINAS PEMIMPIN KANTOR CABANG PEMBANTU

CABANG TIMIKA
NO RINCIAN VOLUME SATUAN HARGA JUMLAH
BAHAN

1 BAHAN PENGECATAN RUMAH DINAS


* CAT AURTEX SW 2 PAIL 600,000 1,200,000
* BAK CAT 3 BH 15,000 45,000
* KUAS ROLL 3 BH 90,000 270,000
* KAPI / PISAU DEMPUL 2 BH 20,000 40,000
* KUAS 2 ½ 1 BH 15,000 15,000
* KUAS 2" ARCEL 1 BH 10,000 10,000
* KUAS 2" GRT 1 BH 6,000 6,000
* KUAS TOSITA 1½ 2 BH 6,000 12,000
* KUAS LUKIS 10 1 BH 10,000 10,000
* KUAS LUKIS 5 1 BH 5,000 5,000
* AVIAN 10 KALENG 70,000 700,000
* AVIAN 1 KALENG 70,000 70,000
* AVIAN 1 KALENG 70,000 70,000

TOTAL SEMUA BAHAN 2,453,000

4 PEMASANGAN -
* ONGKOS KERJA 4 ORANG 950,000 3,800,000
JASA -
TOTAL SEBELUM POTONG PAJAK 6,253,000

Anda mungkin juga menyukai