REKAPITULASI MUTUAL CHECK AWAL (MC - 01)

KONTRAKTOR PELAKSAN : PT. TAKABEYA PERKASA GROUP


NAMA PAKET : PEMBANGUNAN JEMBATAN LOSKALA LHOKSEUMAWE
NOMOR KONTRAK : 11-KONT/BM/DAK-LSM/VIII
TANGGAL KONTRAK : 25 AGUSTUS 2016
NILAI KONTRAK : Rp 7,961,600,000
KONSULTANT PENGAWAS : CV. GELORA PRIMA CONSULTANT
SUMBER DANA : APBK KOTA LHOKSEUMAWE
TAHUN ANGGARAN : 2016
LOKASI : LHOKSEUMAWE

MATA JUMLAH HARGA


PEMBA URAIAN
KONTRAK AWAL ADD-1 CCO-02
YARAN
1 2 3 4 5

1 DIVISI 1. UMUM 382,625,000.00 285,275,000.00 270,775,000.00

2 DIVISI 3. PEKERJAAN TANAH 561,184,281.16 622,097,832.05 736,834,727.25

3 DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN

4 DIVISI 5. PERKERASAN BERBUTIR

5 DIVISI 6. PERKERASAN ASPAL

6 DIVISI 7. STRUKTUR 7,017,797,603.98 7,054,233,888.15 6,953,998,534.73

A JUMLAH HARGA PEKERJAAN 7,961,606,885.14 7,961,606,720.20 7,961,608,261.97


B DIBULATKAN 7,961,600,000.00 7,961,600,000.00 7,961,600,000.00
C TERBILANG : TUJUH MILYAR SEMBILAN RATUS ENAM PULUH SATU JUTA ENAM RATUS RIBU RUPIAH

Diperiksa Oleh, Dibuat Oleh,


Konsultant Pengawas Kontraktor Pelaksana
CV. GELORA PRIMA CONSULTANT PT. TAKABEYA PERKASA GROUP

EKA SAFITRI, ST MUKHLIS, A.Md


Direktris Direktur Utama

Mengetahui/Menyetujui,

Pejabat Pembuat Komitmen Pejabat Pelaksan Teknis Lapangan


Dinas Pekerjaan Umum Kota Lhokseumawe Dinas Pekerjaan Umum Kota Lhokseumawe

SAID BACHTIAR, ST, MT MULKAN, ST


Nip. 19780622 200604 1 012 Nip. 19780815 201003 1 001
MUTUAL CHECK AWAL (MC - 01)

KONTRAKTOR PELAKSAN : PT. TAKABEYA PERKASA GROUP


NAMA PAKET : PEMBANGUNAN JEMBATAN LOSKALA LHOKSEUMAWE
NOMOR KONTRAK : 11-KONT/BM/DAK-LSM/VIII
TANGGAL KONTRAK : 25 AGUSTUS 2016
NILAI KONTRAK : Rp 7,961,600,000
KONSULTANT PENGAWAS : CV. GELORA PRIMA CONSULTANT
SUMBER DANA : APBK KOTA LHOKSEUMAWE
TAHUN ANGGARAN : 2016
LOKASI : LHOKSEUMAWE

MATA KONTRAK AWAL ADD-1 PEKERJAAN TAMBAH PEKERJAAN KURANG CCO - 02


PEMBA URAIAN SAT HARGA SATUAN VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT
YARAN (Rp) (Rp) (%) (Rp) (%) (Rp) (%) (Rp) (%) (Rp) (%)
1 2 3 4 5 6 7 14 15 16 8 9 10 11 12 13 14 15 16

DIVISI 1. UMUM
1.2 Mobilisasi Ls 203,775,000.00 1.00 203,775,000.00 2.56 1.00 203,775,000.00 2.56 1.00 203,775,000.00 2.56
1.8. (1) Jembatan Sementara Ls 97,350,000.00 1.00 97,350,000.00 1.22 - - - - -
1.18. (2) Relokasi Utilitas dan Pelayanan PDAM yang Ada Ls 14,500,000.00 1.00 14,500,000.00 0.18 1.00 14,500,000.00 0.18 1.00 14,500,000.00 0.18 - - -
1.18. (3) Relokasi Utilitas dan Pelayanan PLN yang Ada Ls 3,000,000.00 3.00 9,000,000.00 0.11 3.00 9,000,000.00 0.11 3.00 9,000,000.00 0.11
1.20. (1) Pengeboran dalam air, termasuk SPT dan Laporan Titik 58,000,000.00 1.00 58,000,000.00 0.73 1.00 58,000,000.00 0.73 1.00 58,000,000.00 0.73
TOTAL DIVISI 1. UMUM 382,625,000.00 4.81 285,275,000.00 3.58 - - 14,500,000.00 0.18 270,775,000.00 3.40

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa M³ 56,570.16 110.00 6,222,717.60 0.08 123.75 7,000,557.30 0.09 13.75 777,839.70 0.01 110.00 6,222,717.60 0.08
3.1.(3) Galian Struktur Dengan Kedalaman 0 - 2 meter M³ 41,267.44 344.84 14,230,664.01 0.18 344.84 14,230,664.01 0.18 76.36 3,151,181.72 0.04 421.20 17,381,845.73 0.22
3.1 (4) Galian Struktur Dengan Kedalaman 2 - 4 meter M³ 667,270.62 159.30 106,296,209.77 1.34 159.30 106,296,209.77 1.34 0.34 226,872.01 0.00 159.64 106,523,081.78 1.34
3.1.(5b) Cofferdam, Penyokong, Pengaku dan Pekerjaan yang Berkaitan Ls 71,943,142.00 1.00 71,943,142.00 0.90 1.00 71,943,142.00 0.90 1.00 71,943,142.00 0.90
3.2.(1a) Timbunan Biasa dari sumber galian M³ 112,969.81 2,417.86 273,145,184.81 3.43 2,667.86 301,387,637.31 3.79 1,342.06 151,612,263.21 1.90 4,009.92 452,999,900.52 5.69
3.2 (2a) Timbunan Pilihan dari sumber galian M³ 161,566.66 553.00 89,346,362.98 1.12 750.40 121,239,621.66 1.52 244.33 39,475,582.04 0.50 506.07 81,764,039.63 1.03
TOTAL DIVISI 3. PEKERJAAN TANAH 561,184,281.16 7.05 622,097,832.05 7.81 154,990,316.94 1.95 40,253,421.74 0.51 736,834,727.25 9.25

DIVISI 7. STRUKTUR
7.1 (7) a Beton mutu sedang fc’20 Mpa M3 2,488,509.43 365.13 908,629,448.18 11.41 362.08 901,032,028.89 11.32 34.45 85,734,126.88 1.08 327.63 815,297,902.00 10.24
7.1 (9) Beton Siklop fc’10 Mpa M3 1,248,754.20 87.66 109,465,793.17 1.37 83.90 104,770,477.38 1.32 8.10 10,119,904.04 0.13 75.80 94,650,573.34 1.19
7.1 (10) Beton mutu rendah fc’10 Mpa K-125 M3 1,409,815.57 11.66 16,438,449.55 0.21 11.66 16,438,590.53 0.21 6.33 8,928,362.00 0.11 17.99 25,366,952.53 0.32
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 28,6 meter Buah 260,000,000.00 10.00 2,600,000,000.00 32.66 10.00 2,600,000,000.00 32.66 10.00 2,600,000,000.00 32.66
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 28,6 meter Buah 72,000,000.00 10.00 720,000,000.00 9.04 10.00 720,000,000.00 9.04 10.00 720,000,000.00 9.04
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan Buah 3,750,000.00 32.00 120,000,000.00 1.51 32.00 120,000,000.00 1.51 32.00 120,000,000.00 1.51
setelah pengecoran (post tension)
7.2.(12).a Penyediaan panel full deph slab Buah 1,250,000.00 224.00 280,000,000.00 3.52 224.00 280,000,000.00 3.52 224.00 280,000,000.00 3.52
7.3 (1) Baja Tulangan U24 Polos Kg 20,553.75 2,596.79 53,373,772.46 0.67 3,586.79 73,721,984.96 0.93 6.86 140,998.73 0.00 3,593.65 73,862,983.69 0.93
7.3 (3) Baja Tulangan D32 Ulir Kg 23,112.50 53,143.24 1,228,273,134.50 15.43 54,468.53 1,258,903,922.74 15.81 54,468.53 1,258,903,922.74 15.81
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk (pangkal Bambu M1 30,000.00 330.00 9,900,000.00 0.12 330.00 9,900,000.00 0.12 126.00 3,780,000.00 0.05 204.00 6,120,000.00 0.08
7.6 (12)a Penyediaan Tiang Pancang Beton Pratekan Pracetak M1 1,038,614.32 588.00 610,705,220.16 7.67 588.00 610,705,220.16 7.67 588.00 610,705,220.16 7.67
diameter 450 mm
MUTUAL CHECK AWAL (MC - 01)

KONTRAKTOR PELAKSAN : PT. TAKABEYA PERKASA GROUP


NAMA PAKET : PEMBANGUNAN JEMBATAN LOSKALA LHOKSEUMAWE
NOMOR KONTRAK : 11-KONT/BM/DAK-LSM/VIII
TANGGAL KONTRAK : 25 AGUSTUS 2016
NILAI KONTRAK : Rp 7,961,600,000
KONSULTANT PENGAWAS : CV. GELORA PRIMA CONSULTANT
SUMBER DANA : APBK KOTA LHOKSEUMAWE
TAHUN ANGGARAN : 2016
LOKASI : LHOKSEUMAWE

MATA KONTRAK AWAL ADD-1 PEKERJAAN TAMBAH PEKERJAAN KURANG CCO - 02


PEMBA URAIAN SAT HARGA SATUAN VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT VOL JUMLAH HARGA BOBOT
YARAN (Rp) (Rp) (%) (Rp) (%) (Rp) (%) (Rp) (%) (Rp) (%)
1 2 3 4 5 6 7 14 15 16 8 9 10 11 12 13 14 15 16
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak M1 289,134.74 588.00 170,011,227.12 2.14 588.00 170,011,227.12 2.14 9.00 2,602,212.66 0.03 579.00 167,409,014.46 2.10
diameter 450 mm
7.6.(20) Tambahan Biaya Untuk Nomor Mata Pembayaran 7.6 (13) s/d 7.6 (18) bi M1 6,016.04 588.00 3,537,431.52 0.04 252.00 1,516,042.08 0.02 252.00 1,516,042.08 0.02
Tiang Pancang dikerjakan dalam Air
7.9.(1) Pasangan Batu M3 994,169.40 113.79 113,126,536.03 1.42 113.56 112,897,803.00 1.42 7.11 7,068,470.58 0.09 106.45 105,829,332.42 1.33
7.12.(3) Perletakan Elastomerik Bearing Pad 450mm x 350mm x 50mm Buah 2,120,100.00 20.00 42,402,000.00 0.53 20.00 42,402,000.00 0.53 20.00 42,402,000.00 0.53
7.14.(1) Papan Nama Jembatan Buah 356,500.00 1.00 356,500.00 0.00 1.00 356,500.00 0.00 1.00 356,500.00 0.00
7.15.(1) Pembongkaran Pasangan Batu M3 385,888.10 18.00 6,945,985.80 0.09 18.00 6,945,985.80 0.09 18.00 6,945,985.80 0.09
7.15.(2) Pembongkaran Beton M3 672,314.23 10.00 6,723,142.30 0.08 10.00 6,723,142.30 0.08 10.00 6,723,142.30 0.08
7.15.(6) Pembongkaran Bangunan Gedung (tempat usaha & rumah warga) M2 111,931.02 160.00 17,908,963.20 0.22 160.00 17,908,963.20 0.22 160.00 17,908,963.20 0.22
TOTAL DIVISI 7. STRUKTUR 7,017,797,603.98 88.15 7,054,233,888.15 88.60 9,069,360.73 0.11 109,304,714.16 1.37 6,953,998,534.73 87.34

A JUMLAH HARGA PEKERJAAN 7,961,606,885.14 100.00 7,961,606,720.20 100.00 164,059,677.67 2.06 164,058,135.89 2.06 7,961,608,261.97 100.00
B DIBULATKAN 7,961,600,000.00 7,961,600,000.00 164,050,000.00 164,050,000.00 7,961,600,000.00

Disetujui Oleh, Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksan Teknis Lapangan Konsultant Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Kota Lhokseumawe Dinas Pekerjaan Umum Kota Lhokseumawe CV. GELORA PRIMA CONSULTANT PT. TAKABEYA PERKASA GROUP

SAID BACHTIAR, ST, MT MULKAN, ST EKA SAFITRI, ST MUKHLIS, A.Md


Nip. 19780622 200604 1 012 Nip. 19780815 201003 1 001 Direktris Direktur Utama
MC - 01

KEGIATAN : PEMBANGUNAN JEMBATAN

PEKERJAAN : PEMBANGUNAN JEMBATAN LOSKALA LHOKSEUMAWE

LOKASI : KEC. MUARA SATU KOTA LHOKSEUMAWE

NO / TGL. KONTRAK : 11-KONT/BM/DAK-LSM/VIII, 25 Agustus 2016

SUMBER DANA : APBK

TAHUN ANGGARAN : 2016

KONTRAKTOR PELAKSANA

PT. TAKABEYA PERKASA GROUP