Anda di halaman 1dari 348

ANALISA HARGA SATUAN PEKERJAAN

KABUPATEN TASIKMALAYA
WILAYAH II
TAHUN ANGGARAN 2017

HARGA JML HARGA JML HARGA


KODE JENIS PEKERJAAN KOEFISIEN SATUAN SATUAN UPAH BAHAN
( Rp ) ( Rp ) ( Rp )
a b c d e f=(cxe) g=(cxe)
A PERSIAPAN
A001 1 m1 PEK PENGUKURAN
Tukang Batu Terampil 0.0100 HOK 80,000.00 800.00
Pekerja Terampil 0.0200 HOK 72,500.00 1,450.00
Peralatan 0.5000 lot 2,250.00 1,125.00
Total Upah dan bahan ( f & g ) 3,375.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A002 1 m1 PEKERJAAN PASANGAN BOUWPLANK
Kayu 0.0100 m³ 2,367,700.00 23,677.00
Paku 5 - 7 0.0380 kg 13,600.00 516.80
Ongkos Pasang 0.1550 ls 24,193.80 3,750.04
Total Upah dan bahan ( f & g ) 3,750.04 24,193.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A002a 1 m1 PEKERJAAN PENGUKURAN & PEMASANGAN BOUWPLANK
Kayu balok 5/7 0.1200 m3 2,367,700.00 284,124.00
Paku2'-3' 0.0200 kg 19,400.00 388.00
Kayu papan 3/20 0.0070 m3 2,367,700.00 16,573.90
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang Kayu 0.1000 HOK 80,000.00 8,000.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 15,150.00 301,085.90
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A003 1 m2 PEKERJAAN PAPAN NAMA PROYEK
Kayu 0.1300 m³ 4,100,200.00 533,026.00
Paku 5 - 7 0.2500 kg 13,600.00 3,400.00
Cat Minyak 1.0000 ls 55,100.00 55,100.00
Penulisan 0.1250 ls 591,526.00 73,940.75
Ongkos Pasang 0.1250 ls 591,526.00 73,940.75
Total Upah dan bahan ( f & g ) 147,881.50 591,526.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A004 1 m2 PEMBUATAN LOS KERJA
Dolken bambu 1.7000 btg 8,400.00 14,280.00
Kayu 0.2100 m³ 2,367,700.00 497,217.00
Paku 5 - 7 0.3000 kg 13,600.00 4,080.00
Seng gelombang 1.5000 lbr 50,400.00 75,600.00
Seng plat 0.2500 lbr 31,500.00 7,875.00
PC (50 kg) 0.2100 zak 70,000.00 14,700.00
Pasir beton 0.0300 m³ 157,500.00 4,725.00
Koral beton 0.0500 m³ 132,300.00 6,615.00
Pekerja 1.0000 HOK 67,000.00 67,000.00
Tukang Kayu 2.0000 HOK 80,000.00 160,000.00
Kepala Tukang 0.2000 HOK 90,000.00 18,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 249,500.00 625,092.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
a b c d e f=(cxe) g=(cxe)
Dibulatkan
a b c d e f=(cxe) g=(cxe)
A005 1 m2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN
Pekerja 0.1000 HOK 67,000.00 6,700.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 11,200.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A006 1 m3 BONGKARAN BETON BERTULANG
Pekerja 13.3340 HOK 67,000.00 893,378.00
Mandor 0.6660 HOK 90,000.00 59,940.00
Total Upah dan bahan ( f & g ) 953,318.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A007 1 m3 BONGKARAN DINDING TEMBOK BATA MERAH
Pekerja 6.6670 HOK 67,000.00 446,689.00
Mandor 0.3330 HOK 90,000.00 29,970.00
Total Upah dan bahan ( f & g ) 476,659.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A008 1 m2 BONGKARAN PLESTERAN DINDING
Pekerja 0.0500 HOK 67,000.00 3,350.00
Mandor 0.0250 HOK 90,000.00 2,250.00
Total Upah dan bahan ( f & g ) 5,600.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A009 1 m2 BONGKARAN GENTENG
Pekerja 0.4000 HOK 67,000.00 26,800.00
Mandor 0.1000 HOK 90,000.00 9,000.00
Total Upah dan bahan ( f & g ) 35,800.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A010 1 m2 BONGKARAN RANGKA ATAP /RENG+KASO
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.0250 HOK 80,000.00 2,000.00
Kepala tukang kayu 0.0025 HOK 90,000.00 225.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 9,375.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A011 1 m3 BONGKARAN KUDA-KUDA, GORDING /BALOK
Pekerja 4.0000 HOK 67,000.00 268,000.00
Tukang kayu 3.0000 HOK 80,000.00 240,000.00
Mandor 0.2000 HOK 90,000.00 18,000.00
Total Upah dan bahan ( f & g ) 526,000.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A012 1 m2 BONGKARAN PLAFOND
Pekerja 0.1250 HOK 67,000.00 8,375.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 8,825.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
A013 1 m2 STEGER/PERANCAH DARI BAMBU
Bambu 1.2500 btg 8,400.00 10,500.00
Tali ijuk 1.0000 ls 2,500.00 2,500.00
Pekerja 1.0000 HOK 67,000.00 67,000.00
Tukang Kayu 2.0000 HOK 80,000.00 160,000.00
Kepala Tukang 0.2000 HOK 90,000.00 18,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 249,500.00 13,000.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
A014 PEMBUATAN 1 BH KOTAK ADUKAN
Kayu papan kls III 0.0360 m3 2,367,700.00 85,237.20
Paku 0.0800 kg 13,600.00 1,088.00
Tukang Kayu 0.3000 HOK 80,000.00 24,000.00
Kepala Tukang 0.0300 HOK 90,000.00 2,700.00
Total Upah dan bahan ( f & g ) 26,700.00 86,325.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan

B PEKERJAAN TANAH DAN URUGAN


B001 1 m3 GALIAN TANAH BIASA SEDALAM 1 METER
Pekerja 0.7500 HOK 67,000.00 50,250.00
Mandor 0.0250 HOK 90,000.00 2,250.00
Total Upah dan bahan ( f & g ) 52,500.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B002 1 m3 GALIAN TANAH BIASA SEDALAM 2 METER
Pekerja 0.9000 HOK 67,000.00 60,300.00
Mandor 0.0450 HOK 90,000.00 4,050.00
Total Upah dan bahan ( f & g ) 64,350.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B002a 1 m3 GALIAN TANAH BIASA SEDALAM 3 METER
Pekerja 1.0500 HOK 67,000.00 70,350.00
Mandor 0.0670 HOK 90,000.00 6,030.00
Total Upah dan bahan ( f & g ) 76,380.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B003 1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER
Pekerja 0.0500 HOK 67,000.00 3,350.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 3,800.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B004 1 m3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 30 METER
Pekerjan 0.3300 org 67,000.00 22,110.00
Mandor 0.0100 org 90,000.00 900.00
Alat Bantu - lot 23,010.00 0.00
Total Upah dan bahan ( f & g ) 23,010.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B005 1 m3 URUGAN KEMBALI (1/3 X harga galian yg sesuai)
Pekerja 0.5000 HOK 67,000.00 33,500.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 38,000.00 0.00
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
B006 1 m3 PEMADATAN TANAH Per 20 cm
Pekerja 0.5000 HOK 67,000.00 33,500.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 38,000.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B007 1 m3 PEKERJAAN URUGAN PASIR URUG
Pasir Urug 1.2000 m³ 126,000.00 151,200.00
Pekerja 0.3000 org 67,000.00 20,100.00
Mandor 0.0100 org 90,000.00 900.00
Total Upah dan bahan ( f & g ) 900.00 171,300.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B008 1 m3 PEMASANGAN LAPISAN IJUK, tebal 10 cm untuk resapan
Ijuk 6.0000 kg 30,900.00 185,400.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 11,400.00 185,400.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B009 1 m3 URUGAN SIRTU
Sirtu 1.2000 m3 112,300.00 134,760.00
Pekerja 0.2500 HOK 67,000.00 16,750.00
Mandor 0.0250 HOK 90,000.00 2,250.00
Total Upah dan bahan ( f & g ) 19,000.00 134,760.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B010 1 m3 URUGAN TANAH
Tanah Urugan 1.2000 m3 52,600.00 63,120.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Mandor 0.0100 HOK 90,000.00 900.00
Total Upah dan bahan ( f & g ) 21,000.00 63,120.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
B010a 1 m3 URUGAN TANAH
Tanah Urugan 0.0000 m3 52,600.00 0.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Mandor 0.0100 HOK 90,000.00 900.00
Total Upah dan bahan ( f & g ) 21,000.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan

C PEKERJAAN PASANGAN
C001 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps
Batu belah 15/20 cm 1.2000 m3 126,000.00 151,200.00
Semen Portland 267.0000 Kg 1,400.00 373,800.00
Pasir pasang 0.4270 m3 129,100.00 55,125.70
Pekerja 1.5000 HOK 67,000.00 100,500.00
Tukang batu 0.7500 HOK 80,000.00 60,000.00
Kepala tukang 0.0750 HOK 90,000.00 6,750.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total Upah dan bahan ( f & g ) 174,000.00 580,125.70
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
C002 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps
Batu belah 15/20 cm 1.2000 m3 126,000.00 151,200.00
Semen Portland 202.0000 Kg 1,400.00 282,800.00
Pasir pasang 0.4850 m3 129,100.00 62,613.50
Pekerja 1.5000 HOK 67,000.00 100,500.00
Tukang batu 0.7500 HOK 80,000.00 60,000.00
Kepala tukang 0.0750 HOK 90,000.00 6,750.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total Upah dan bahan ( f & g ) 174,000.00 496,613.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C003 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps
Batu belah 15 - 20 cm 1.2000 m3 126,000.00 151,200.00
Semen Portland 163.0000 Kg 1,400.00 228,200.00
Pasir pasang 0.5200 m3 129,100.00 67,132.00
Pekerja 1.5000 HOK 67,000.00 100,500.00
Tukang batu 0.7500 HOK 80,000.00 60,000.00
Kepala tukang 0.0750 HOK 90,000.00 6,750.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total Upah dan bahan ( f & g ) 174,000.00 446,532.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C004 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps
Batu belah 15/20 cm 1.2000 m3 126,000.00 151,200.00
Semen Portland 136.0000 Kg 1,400.00 190,400.00
Pasir pasang 0.5440 m3 129,100.00 70,230.40
Pekerja 1.5000 HOK 67,000.00 100,500.00
Tukang batu 0.7500 HOK 80,000.00 60,000.00
Kepala tukang 0.0750 HOK 90,000.00 6,750.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total Upah dan bahan ( f & g ) 174,000.00 411,830.40
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C005 1 m3 PASANGAN PONDASI BATU KOSONG
Batu Belah 1.2000 m³ 126,000.00 151,200.00
Pasir Urug 0.4320 m³ 126,000.00 54,432.00
Pekerja 0.7800 org 67,000.00 52,260.00
Tk.batu setengah terampil 0.3900 org 72,500.00 28,275.00
Kep.tukang batu 0.0390 org 90,000.00 3,510.00
Mandor 0.0390 org 90,000.00 3,510.00
Total Upah dan bahan ( f & g ) 87,555.00 205,632.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C006 1 m3 PEKERJAAN PONDASI SIKLOP : 60% BETON 1:2:3; 40% BATU KALI
Batu Belah 15 cm/20 cm 0.4800 m³ 126,000.00 60,480.00
Semen 194.0000 kg 1,400.00 271,600.00
Pasir Beton 0.3120 m³ 157,500.00 49,140.00
Koral / Kerikil 0.4680 m³ 132,300.00 61,916.40
Besi Beton 126.0000 kg 10,900.00 1,373,400.00
Kawat Beton 1.8000 kg 21,500.00 38,700.00
Pekerja 3.4000 oh 67,000.00 227,800.00
Tukang Batu 0.8500 oh 80,000.00 68,000.00
Kepala Tukang 0.0850 oh 90,000.00 7,650.00
Mandor 0.1700 oh 90,000.00 15,300.00
Total Upah dan bahan ( f & g ) 318,750.00 1,855,236.40
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
C006a 1 m3 PEKERJAAN BATU BRONJONG
Kawat Bronjong 6.5000 kg 29,400.00 191,100.00
Batu Bronjol 1.2000 m³ 126,000.00 151,200.00
Pekerja 1.5000 oh 67,000.00 100,500.00
Pekerja Terampil 0.2000 oh 72,500.00 14,500.00
Mandor 0.0200 oh 90,000.00 1,800.00
Total Upah dan bahan ( f & g ) 116,800.00 342,300.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C007 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps
Bata merah 70.0000 Bh 700.00 49,000.00
Semen Portland 18.9500 Kg 1,400.00 26,530.00
Pasir pasang 0.0380 m3 129,100.00 4,905.80
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 80,435.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C008 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps
Bata merah 70.0000 Bh 700.00 49,000.00
Semen Portland 14.3700 Kg 1,400.00 20,118.00
Pasir pasang 0.0400 m3 129,100.00 5,164.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 74,282.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C009 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps
Bata merah 70.0000 Bh 700.00 49,000.00
Semen Portland 11.5000 Kg 1,400.00 16,100.00
Pasir pasang 0.0430 m3 129,100.00 5,551.30
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 70,651.30
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C010 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps
Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00 49,000.00
Semen Portland 9.6800 Kg 1,400.00 13,552.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOKK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 68,361.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
C011 1 m2 PASANGAN DINDING HOLLOWBLOCK /BATAKO (HB-20) 1:4
Hollow block (HB-20) 12.5000 Bh 2,200.00 27,500.00
Semen Portland 24.2600 Kg 1,400.00 33,964.00
Pasir pasang 0.7720 m3 129,100.00 99,665.20
Besi beton polos 0.2800 Kg 10,900.00 3,052.00
Pekerja 0.3500 HOK 67,000.00 23,450.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0180 HOK 90,000.00 1,620.00
Total Upah dan bahan ( f & g ) 38,420.00 164,181.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C012 1 m2 PASANGAN DINDING HOLLOWBRICK (HB)/CONBLOCK (CB-20)
Concrete block (CB-20) 12.5000 Bh 3,200.00 40,000.00
Semen Portland 14.0500 Kg 1,400.00 19,670.00
Pasir beton 0.0040 m3 157,500.00 630.00
Pasir pasang 0.0420 m3 129,100.00 5,422.20
Besi beton polos 3.8700 Kg 10,900.00 42,183.00
Paku biasa 2"-5" 0.0060 Kg 13,600.00 81.60
Kayu Albasia 0.0010 m3 2,367,700.00 2,367.70
Kawat beton 0.0300 Kg 21,500.00 645.00
Koral beton 0.0050 m3 132,300.00 661.50
Pekerja 0.3700 HOK 67,000.00 24,790.00
Tukang batu 0.1570 HOK 80,000.00 12,560.00
Tukang besi 0.0070 HOK 80,000.00 560.00
Kepala tukang 0.0164 HOK 90,000.00 1,476.00
Mandor 0.0185 HOK 90,000.00 1,665.00
Total Upah dan bahan ( f & g ) 41,051.00 111,661.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C013 1 m2 PASANGAN DINDING ROSTER /TERAWANG (12X11X24) cm 1:3
Roster /Terawang 30.0000 Bh 8,900.00 267,000.00
Semen Portland 11.0000 Kg 1,400.00 15,400.00
Pasir pasang 0.0350 m3 129,100.00 4,518.50
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 286,918.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C014 1 m2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU
Bilik bambu 1.5000 m2 10,500.00 15,750.00
Kayu 5/7 0.0140 m3 4,100,200.00 57,402.80
Paku 0.0120 Kg 13,600.00 163.20
List kayu 2/4 0.0030 m3 4,400.00 13.20
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0050 HOK 90,000.00 450.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 11,613.20 73,316.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C015 1 m2 PLESTERAN 1 PC : 1 Ps, TEBAL 15 mm
Semen Portland 15.5040 kg 1,400.00 21,705.60
Pasir pasang 0.0160 m3 129,100.00 2,065.60
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
a b c d e f=(cxe) g=(cxe)
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 23,771.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
C016 1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 15 mm
Semen Portland 10.2240 kg 1,400.00 14,313.60
Pasir pasang 0.0200 m3 129,100.00 2,582.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 16,895.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C017 1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 15 mm
Semen Portland 7.7760 kg 1,400.00 10,886.40
Pasir pasang 0.0230 m3 129,100.00 2,969.30
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 13,855.70
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C018 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm
Semen Portland 6.2400 kg 1,400.00 8,736.00
Pasir pasang 0.0240 m3 129,100.00 3,098.40
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 11,834.40
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C019 1 m2 PLESTERAN BETON 1 PC : 2 Ps, TEBAL 15 mm
Semen Portland 10.2240 kg 1,400.00 14,313.60
Pasir pasang 0.0200 m3 129,100.00 2,582.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 16,895.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C020 1 m2 PLESTERAN BETON 1 PC : 3 Ps, TEBAL 15 mm
Semen Portland 7.7760 kg 1,400.00 10,886.40
Pasir pasang 0.0230 m3 129,100.00 2,969.30
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 13,855.70
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C021 1 m1 PLESTERAN SKONING 1 PC : 3 Ps
Semen Portland 0.5000 kg 1,400.00 700.00
Pasir pasang 0.0130 m3 129,100.00 1,678.30
Pekerja 0.0800 HOK 67,000.00 5,360.00
Tukang batu 0.0400 HOK 80,000.00 3,200.00
Kepala tukang 0.0400 HOK 90,000.00 3,600.00
Mandor 0.0040 HOK 90,000.00 360.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 12,520.00 2,378.30
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
C022 1 m2 PLESTERAN CIPRAT 1 PC : 2 Ps
Semen Portland 4.3200 kg 1,400.00 6,048.00
Pasir pasang 0.0060 m3 129,100.00 774.60
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,350.00 6,822.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C022a 1 m2 BERAPEN 1 PC : 5 Ps
Semen Portland 5.1840 kg 1,400.00 7,257.60
Pasir pasang 0.0260 m3 129,100.00 3,356.60
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang batu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0080 HOK 90,000.00 720.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 17,490.00 10,614.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C023 1 m2 PLESTERAN SIAR ADUKAN 1 PC : 2 Ps
Semen Portland 6.3400 kg 1,400.00 8,876.00
Pasir pasang 0.0120 m3 129,100.00 1,549.20
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 10,425.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
C024 1 m2 ACIAN
Semen Portland 3.2500 kg 1,400.00 4,550.00
Pekerja 0.2000 HOK 67,000.00 13,400.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0100 HOK 90,000.00 900.00
Total Upah dan bahan ( f & g ) 23,200.00 4,550.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D PEKERJAAN KAYU
D001 1 m3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II KUAT
Kayu 1.2000 m³ 4,100,200.00 4,920,240.00
Paku 1.2500 kg 13,600.00 17,000.00
Lem Putih (FOX) 1.0000 kg 16,800.00 16,800.00
Pekerja 6.0000 org 67,000.00 402,000.00
Tk. kayu terampil 18.0000 org 80,000.00 1,440,000.00
Kep. tukang kayu 1.8000 org 90,000.00 162,000.00
Mandor 0.3000 org 90,000.00 27,000.00
Total Upah dan bahan ( f & g ) 2,031,000.00 4,954,040.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D002 1 m2 PASANG PINTU PANEL KAYU KLS II KUAT
Kayu, papan 0.0400 m3 4,100,200.00 164,008.00
Lem kayu 0.5000 kg 16,800.00 8,400.00
Pekerja 1.0000 HOK 67,000.00 67,000.00
Tukang kayu 3.0000 HOK 80,000.00 240,000.00
Kepala tukang 0.3000 HOK 90,000.00 27,000.00
a b c d e f=(cxe) g=(cxe)
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 338,500.00 172,408.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
D003 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KLS II KUAT (TANPA KACA)
Kayu, papan 0.0240 m3 4,100,200.00 98,404.80
Lem kayu 0.3000 kg 16,800.00 5,040.00
Pekerja 0.8000 HOK 67,000.00 53,600.00
Tukang kayu 2.4000 HOK 80,000.00 192,000.00
Kepala tukang 0.2400 HOK 90,000.00 21,600.00
Mandor 0.0400 HOK 90,000.00 3,600.00
Total Upah dan bahan ( f & g ) 270,800.00 103,444.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D004 1 m2 JENDELA KACA KAYU KLS II KUAT (TANPA KACA)
Rangka kayu 0.0240 m³ 4,100,200.00 98,404.80
Lem Kayu 0.5000 kg 16,800.00 8,400.00
Pekerja 0.8000 org 67,000.00 53,600.00
Tk. kayu terampil 2.4000 org 80,000.00 192,000.00
Kep. tukang kayu 0.2400 org 90,000.00 21,600.00
Mandor 0.0400 org 90,000.00 3,600.00
Total Upah dan bahan ( f & g ) 270,800.00 106,804.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D005 1 m2 PINTU KACA KAYU KLS II KUAT (TANPA KACA)
Rangka Kayu 0.0240 m³ 4,100,200.00 98,404.80
Lem Kayu 0.5000 kg 16,800.00 8,400.00
List Kayu m1 3,600.00 0.00
Pekerja 0.8000 org 67,000.00 53,600.00
Tk. kayu terampil 2.4000 org 80,000.00 192,000.00
Kep. tukang kayu 0.2400 org 90,000.00 21,600.00
Mandor 0.0400 org 90,000.00 3,600.00
Total Upah dan bahan ( f & g ) 270,800.00 106,804.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D006 1 m2 PASANG JALUSI KUSEN, KAYU KLS II KUAT
Kayu, papan 0.0600 m3 4,100,200.00 246,012.00
Paku Kayu 0.1500 kg 13,600.00 2,040.00
Pekerja 0.6700 HOK 67,000.00 44,890.00
Tukang kayu 2.0000 HOK 80,000.00 160,000.00
Kepala tukang 0.2000 HOK 90,000.00 18,000.00
Mandor 0.3350 HOK 90,000.00 30,150.00
Total Upah dan bahan ( f & g ) 253,040.00 248,052.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D007 1 m2 PASANG PINTU DOUBLE-TEAKWOOD, RANGKA KAYU
Kayu, papan 0.0250 m3 4,100,200.00 102,505.00
Paku biasa 1/2"-1" 0.0300 Kg 19,400.00 582.00
Lem kayu 0.3000 Kg 16,800.00 5,040.00
Teakwood 4'x8'x4 mm 1.0000 Lbr 24,409.72 24,409.72
Pekerja 0.8000 HOK 67,000.00 53,600.00
Tukang kayu 2.4000 HOK 80,000.00 192,000.00
Kepala tukang 0.2400 HOK 90,000.00 21,600.00
Mandor 0.0400 HOK 90,000.00 3,600.00
Total Upah dan bahan ( f & g ) 270,800.00 132,536.72
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
D008 1 m3 KONSTRUKSI KUDA-KUDA
Kayu balok 1.1000 m³ 4,100,200.00 4,510,220.00
Besi Strip tebal 5 mm 15.0000 kg 12,400.00 186,000.00
Paku 8 s.d. 12 cm 5.6000 kg 13,600.00 76,160.00
Pekerja 4.0000 org 67,000.00 268,000.00
Tk. kayu 12.0000 org 80,000.00 960,000.00
Kep. Tukang kayu 1.2000 org 90,000.00 108,000.00
Mandor 0.2000 org 90,000.00 18,000.00
Total Upah dan bahan ( f & g ) 1,354,000.00 4,772,380.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D008a 1 m3 KONSTRUKSI KUDA-KUDA (expose)
Kayu balok 1.2000 m³ 4,100,200.00 4,920,240.00
Besi Strip tebal 5 mm 15.0000 kg 12,400.00 186,000.00
Paku 8 s.d. 12 cm 5.6000 kg 13,600.00 76,160.00
Pekerja 6.7000 org 67,000.00 448,900.00
Tk. kayu 20.1000 org 80,000.00 1,608,000.00
Kep. Tukang kayu 2.0100 org 90,000.00 180,900.00
Mandor 0.3350 org 90,000.00 30,150.00
Total Upah dan bahan ( f & g ) 2,267,950.00 5,182,400.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D008b 1 m3 KONSTRUKSI GORDENG
Kayu balok 1.1000 m³ 4,100,200.00 4,510,220.00
Besi Strip tebal 5 mm 15.0000 kg 12,400.00 186,000.00
Paku 8 s.d. 12 cm 3.0000 kg 13,600.00 40,800.00
Pekerja 6.7000 org 67,000.00 448,900.00
Tk. kayu 20.1000 org 80,000.00 1,608,000.00
Kep. Tukang kayu 2.0100 org 90,000.00 180,900.00
Mandor 0.3350 org 90,000.00 30,150.00
Total Upah dan bahan ( f & g ) 2,267,950.00 4,737,020.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D009 1 m2 PASANG KASO + RENG GENTENG KODOK/PALENTONG KAYU KLS II KUAT
Kayu, balok 0.0140 m3 4,100,200.00 57,402.80
Reng 6.0000 m1 4,000.00 24,000.00
Paku biasa 5-10 cm 0.2500 Kg 13,600.00 3,400.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 16,050.00 84,802.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D010 1 m2 PASANG KASO + RENG GENTENG BETON KAYU KLS II KUAT
Kayu, balok (kaso) 0.0140 m3 4,100,200.00 57,402.80
Reng 6.0000 m1 4,000.00 24,000.00
Paku biasa 5-10cm 0.2500 Kg 13,600.00 3,400.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 16,050.00 84,802.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
D011 1 m2 RANGKA LANGIT-LANGIT ( 0,5X1 ) m, KAYU KLS II KUAT
Kayu, balok 0.0154 m3 4,100,200.00 63,143.08
Paku biasa 7-10 cm 0.2000 Kg 13,600.00 2,720.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.3000 HOK 80,000.00 24,000.00
Kepala tukang 0.0300 HOK 90,000.00 2,700.00
Mandor 0.0750 HOK 90,000.00 6,750.00
Total Upah dan bahan ( f & g ) 43,500.00 65,863.08
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D012 1 m1 LISPLANK KAYU KLS II KUAT
Kayu 0.0110 m³ 4,100,200.00 45,102.20
Paku 0.0500 kg 13,600.00 680.00
Pekerja 0.1000 org 67,000.00 6,700.00
Tk. kayu 0.2000 org 80,000.00 16,000.00
Kep. tukang kayu 0.0200 org 90,000.00 1,800.00
Mandor 0.0050 org 90,000.00 450.00
Total Upah dan bahan ( f & g ) 24,950.00 45,782.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D012a 1 m1 LISPLANK KALSIPLANK
Kalsiplank 1.0500 lbr 14,100.00 14,805.00
Paku 0.0500 kg 13,600.00 680.00
Pekerja 0.1000 org 67,000.00 6,700.00
Tk. kayu 0.2000 org 80,000.00 16,000.00
Kep. tukang kayu 0.0200 org 90,000.00 1,800.00
Mandor 0.0050 org 90,000.00 450.00
Total Upah dan bahan ( f & g ) 24,950.00 15,485.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D013 1 m2 PASANG RANGKA DINDING PEMISAH KAYU KLS II KUAT
Kayu, balok 0.0280 m3 4,100,200.00 114,805.60
Paku biasa 5-10 cm 0.1500 Kg 19,400.00 2,910.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 50,820.00 117,715.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D014 1 m2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KLS II KUAT
Kayu, balok 0.0280 m3 4,100,200.00 114,805.60
Paku biasa 5-10 cm 0.1500 Kg 13,600.00 2,040.00
Lem kayu 0.5600 Kg 16,800.00 9,408.00
Teakwood 120x240x3 mm 0.8600 Lbr 131,700.00 113,262.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 50,820.00 239,515.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
D015 1 m' PASANG TEAKWOOD TEBAL 3 mm, UNTUK DINDING
Teakwood 0.8600 lbr 131,700.00 113,262.00
Paku biasa 1/2"-1" 0.1500 kg 19,400.00 2,910.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.4500 HOK 80,000.00 36,000.00
a b c d e f=(cxe) g=(cxe)
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 50,820.00 116,172.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
D016 1 m' PASANG LIST PLAFOND KAYU PROFIL
Kayu profil 1.0500 m' 4,400.00 4,620.00
Paku biasa 0.0100 kg 19,400.00
Pekerja 0.0500 HOK 67,000.00 3,350.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0030 HOK 90,000.00 270.00
Mandor 0.0010 HOK 90,000.00 90.00
Total Upah dan bahan ( f & g ) 7,710.00 4,620.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E PEKERJAAN BETON
E001 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
Semen portland 218.0000 kg 1,400.00 305,200.00
Pasir beton 0.5200 m3 157,500.00 81,900.00
Koral beton 0.8700 m3 132,300.00 115,101.00
Pekerja 1.6500 HOK 67,000.00 110,550.00
Tukang batu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0800 HOK 90,000.00 7,200.00
Total Upah dan bahan ( f & g ) 140,000.00 502,201.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E002 1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
Semen portland 10.0000 kg 1,400.00 14,000.00
Pasir beton 0.0260 m3 157,500.00 4,095.00
Koral beton 0.0440 m3 132,300.00 5,821.20
Pekerja 1.1500 HOK 67,000.00 77,050.00
Tukang batu 0.0200 HOK 80,000.00 1,600.00
Kepala tukang 0.0020 HOK 90,000.00 180.00
Mandor 0.0060 HOK 90,000.00 540.00
Total Upah dan bahan ( f & g ) 79,370.00 23,916.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E002a 1 m3 MEMBUAT LANTAI KERJA BETON K100
Semen portland 230.0000 kg 1,400.00 322,000.00
Pasir beton 0.6379 m3 157,500.00 100,462.50
Koral beton 0.7607 m3 132,300.00 100,646.00
Pekerja 1.2000 HOK 67,000.00 80,400.00
Tukang batu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0600 HOK 90,000.00 5,400.00
Total Upah dan bahan ( f & g ) 103,600.00 523,108.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E003 1 m3 MEMBUAT BETON 1 PC : 2 Ps : 3 Kr
Semen portland 247.0000 kg 1,400.00 345,800.00
Pasir beton 0.5200 m3 157,500.00 81,900.00
Koral beton 0.7800 m3 132,300.00 103,194.00
Pekerja 1.6500 HOK 67,000.00 110,550.00
Tukang batu 0.2500 HOK 80,000.00 20,000.00
Kepala tukang 0.0250 HOK 90,000.00 2,250.00
Mandor 0.0800 HOK 90,000.00 7,200.00
Total Upah dan bahan ( f & g ) 140,000.00 530,894.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E004 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR
Besi beton ( polos /ulir ) 1.0500 Kg 10,900.00 11,445.00
Kawat beton 0.0150 Kg 21,500.00 322.50
Pekerja 0.0070 HOK 67,000.00 469.00
Tukang besi 0.0070 HOK 80,000.00 560.00
Kepala tukang 0.0007 HOK 90,000.00 63.00
Mandor 0.0004 HOK 90,000.00 36.00
Total Upah dan bahan ( f & g ) utk 100 kg 1,128.00 11,767.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E004a 100 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR
Besi beton ( polos /ulir ) 105.0000 Kg 10,900.00 1,144,500.00
Kawat beton 1.5000 Kg 21,500.00 32,250.00
Pekerja 0.7000 HOK 67,000.00 46,900.00
Tukang besi 0.7000 HOK 80,000.00 56,000.00
Kepala tukang 0.0700 HOK 90,000.00 6,300.00
Mandor 0.0400 HOK 90,000.00 3,600.00
Total Upah dan bahan ( f & g ) 112,800.00 1,176,750.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E004b 1 Kg PEMBESIAN WIREMESH
Wiremesh 1.0200 Kg 56,700.00 57,834.00
Kawat beton 0.0500 Kg 21,500.00 1,075.00
Pekerja 0.0250 HOK 67,000.00 1,675.00
Tukang besi 0.0250 HOK 80,000.00 2,000.00
Kepala tukang 0.0025 HOK 90,000.00 225.00
Mandor 0.0025 HOK 90,000.00 225.00
Total Upah dan bahan ( f & g ) 4,125.00 58,909.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E005 1 m2 PASANG BEKISTING UNTUK PONDASI
Kayu albasia 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.3000 Kg 19,400.00 5,820.00
Minyak bekisting 0.1000 Ltr 14,900.00 1,490.00
Pekerja 0.5200 HOK 67,000.00 34,840.00
Tukang kayu 0.2600 HOK 80,000.00 20,800.00
Kepala tukang 0.0260 HOK 90,000.00 2,340.00
Mandor 0.0260 HOK 90,000.00 2,340.00
Total Upah dan bahan ( f & g ) 60,320.00 102,018.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E006 1 m2 PASANG BEKISTING UNTUK SLOOF
Kayu 0.0450 m3 2,367,700.00 106,546.50
Paku biasa 2'-5" 0.3000 Kg 19,400.00 5,820.00
Minyak bekisting 0.1000 Ltr 14,900.00 1,490.00
Pekerja 0.5200 HOK 67,000.00 34,840.00
Tukang kayu 0.2600 HOK 80,000.00 20,800.00
Kepala tukang 0.0260 HOK 90,000.00 2,340.00
Mandor 0.0260 HOK 90,000.00 2,340.00
Total Upah dan bahan ( f & g ) 60,320.00 113,856.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E007 1 m2 PASANG BEKISTING UNTUK KOLOM (PAPAN)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 19,400.00 7,760.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Papan Albasia 0.0200 m3 2,367,700.00 47,354.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 205,117.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E007a 1 m2 PASANG BEKISTING UNTUK KOLOM (MULTIPLEX)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 13,600.00 5,440.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Multiplex 9 mm 0.3500 lbr 131,700.00 46,095.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 201,538.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E008 1 m2 PASANG BEKISTING UNTUK BALOK (PAPAN)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 19,400.00 7,760.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0180 m3 2,367,700.00 42,618.60
Papan Albasia 0.0200 m3 2,367,700.00 47,354.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 212,220.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E008a 1 m2 PASANG BEKISTING UNTUK BALOK (MULTIPLEX)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 13,600.00 5,440.00
Minyak bekisting 0.2000 Ltr 92,900.00 18,580.00
Balok kayu 0.0180 m3 2,367,700.00 42,618.60
Multiplex 9 mm 0.3500 lbr 131,700.00 46,095.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang kayu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 224,241.60
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E009 1 m2 PASANG BEKISTING UNTUK LANTAI (PAPAN)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 19,400.00 7,760.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Papan Albasia 0.0200 m3 2,367,700.00 47,354.00
Bambu Batang dia 7cm 6.0000 Btg 8,400.00 50,400.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 238,717.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E009a 1 m2 PASANG BEKISTING UNTUK LANTAI (MULTIPLEX)
Kayu 0.0400 m3 2,367,700.00 94,708.00
Paku biasa 2'-5" 0.4000 Kg 13,600.00 5,440.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Multiplex 9 mm 0.3500 lbr 131,700.00 46,095.00
Bambu Batang dia 7cm 6.0000 Btg 8,400.00 50,400.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 235,138.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E010 1 m2 PASANG BEKISTING UNTUK DINDING (PAPAN)
Kayu 0.0300 m3 2,367,700.00 71,031.00
Paku biasa 2'-5" 0.4000 Kg 19,400.00 7,760.00
Minyak bekisting 0.2000 Ltr 14,900.00 2,980.00
Balok kayu 0.0200 m3 2,367,700.00 47,354.00
Papan Albasia 0.0200 m3 2,367,700.00 47,354.00
Bambu Batang dia 7cm 3.0000 Btg 8,400.00 25,200.00
Formtie /spacer /penjaga jarak bekisting 4.0000 Bh 2,700.00 10,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 212,479.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E010a 1 m2 PASANG BEKISTING UNTUK DINDING (MULTIPLEX)
Kayu 0.0300 m3 2,367,700.00 71,031.00
Paku biasa 2'-5" 0.4000 Kg 13,600.00 5,440.00
Minyak bekisting 0.2000 Ltr 123,300.00 24,660.00
Balok kayu 0.0200 m3 2,367,700.00 47,354.00
Multiplex 9 mm 0.3500 lbr 131,700.00 46,095.00
Bambu Batang dia 7cm 3.0000 Btg 8,400.00 25,200.00
Formtie /spacer /penjaga jarak bekisting 4.0000 Bh 2,700.00 10,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 230,580.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E011 1 m2 PASANG BEKISTING UNTUK TANGGA (PAPAN)
Kayu 0.0300 m3 2,367,700.00 71,031.00
Paku biasa 2'-5" 0.4000 Kg 19,400.00 7,760.00
Minyak bekisting 0.1500 Ltr 14,900.00 2,235.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Papan Albasia 0.0200 m3 2,367,700.00 47,354.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 180,695.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E011a 1 m2 PASANG BEKISTING UNTUK TANGGA (MULTIPLEX)
Kayu 0.0300 m3 2,367,700.00 71,031.00
Paku biasa 2'-5" 0.4000 Kg 13,600.00 5,440.00
Minyak bekisting 0.1500 Ltr 14,900.00 2,235.00
Balok kayu 0.0150 m3 2,367,700.00 35,515.50
Multiplex 9 mm 0.3500 lbr 131,700.00 46,095.00
Bambu Batang dia 7cm 2.0000 Btg 8,400.00 16,800.00
Pekerja 0.6600 HOK 67,000.00 44,220.00
Tukang batu 0.3300 HOK 80,000.00 26,400.00
Kepala tukang 0.0330 HOK 90,000.00 2,970.00
Mandor 0.0330 HOK 90,000.00 2,970.00
Total Upah dan bahan ( f & g ) 76,560.00 177,116.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012 1 m3 MEMBUAT BETON DENGAN MUTU K-100
Semen PC (50 kg) 4.9400 zak 70,000.00 345,800.00
Split pecah mesin 2/3 0.7400 m³ 168,000.00 124,320.00
Pasir beton 0.6207 m³ 157,500.00 97,760.25
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 567,880.25
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012a 1 m3 MEMBUAT BETON DENGAN MUTU K-125
Semen PC (50 kg) 5.5200 zak 70,000.00 386,400.00
Split pecah mesin 2/3 0.7496 m³ 168,000.00 125,937.78
Pasir beton 0.5914 m³ 157,500.00 93,150.00
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 605,487.78
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012b 1 m3 MEMBUAT BETON DENGAN MUTU K-150
Semen PC (50 kg) 5.9800 zak 70,000.00 418,600.00
Split pecah mesin 2/3 0.7533 m³ 168,000.00 126,554.40
Pasir beton 0.5707 m³ 157,500.00 89,887.50
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 142,540.00 635,041.90
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E012c 1 m3 MEMBUAT BETON DENGAN MUTU K-175
Semen PC (50 kg) 6.5200 zak 70,000.00 456,400.00
Split pecah mesin 2/3 0.7622 m³ 168,000.00 128,053.33
Pasir beton 0.5429 m³ 157,500.00 85,500.00
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 669,953.33
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012d 1 m3 MEMBUAT BETON DENGAN MUTU K-200
Semen PC (50 kg) 7.0400 zak 70,000.00 492,800.00
Split pecah mesin 2/3 0.7637 m³ 168,000.00 128,302.22
Pasir beton 0.5221 m³ 157,500.00 82,237.50
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 703,339.72
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012e 1 m3 MEMBUAT BETON DENGAN MUTU K-225
Semen PC (50 kg) 7.4200 zak 70,000.00 519,400.00
Split pecah mesin 2/3 0.7756 m³ 168,000.00 130,293.33
Pasir beton 0.4986 m³ 157,500.00 78,525.00
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 728,218.33
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012f 1 m3 MEMBUAT BETON DENGAN MUTU K-250
Semen PC (50 kg) 7.6800 zak 70,000.00 537,600.00
Split pecah mesin 2/3 0.7696 m³ 168,000.00 129,297.78
Pasir beton 0.4943 m³ 157,500.00 77,850.00
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 744,747.78
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E013g 1 m3 MEMBUAT BETON DENGAN MUTU K 275
Semen PC (50 kg) 8.1200 zak 70,000.00 568,400.00
Split pecah mesin 2/3 0.7600 m³ 157,500.00 119,700.00
Pasir beton 0.4886 m³ 132,300.00 64,638.00
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 752,738.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E012h 1 m3 MEMBUAT BETON DENGAN MUTU K-300
Semen PC (50 kg) 8.2600 zak 70,000.00 578,200.00
Split pecah mesin 2/3 0.7563 m³ 157,500.00 119,116.67
Pasir beton 0.4864 m³ 132,300.00 64,354.50
Pekerja 1.6500 org 67,000.00 110,550.00
Tk.batu 0.2750 org 80,000.00 22,000.00
Kepala tk. batu 0.0280 org 90,000.00 2,520.00
Mandor 0.0830 org 90,000.00 7,470.00
Total Upah dan bahan ( f & g ) 142,540.00 761,671.17
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012i 1 m3 MEMBUAT BETON DENGAN MUTU K-325
Semen PC (50 kg) 8.7800 zak 70,000.00 614,600.00
Split pecah mesin 2/3 0.7452 m³ 157,500.00 117,366.67
Pasir beton 0.4786 m³ 132,300.00 63,315.00
Pekerja 2.1000 org 67,000.00 140,700.00
Tk.batu 0.3500 org 80,000.00 28,000.00
Kepala tk. batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0105 org 90,000.00 945.00
Total Upah dan bahan ( f & g ) 172,795.00 795,281.67
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012j 1 m3 MEMBUAT BETON DENGAN MUTU K-350
Semen PC (50 kg) 8.9600 zak 70,000.00 627,200.00
Split pecah mesin 2/3 0.7407 m³ 157,500.00 116,666.67
Pasir beton 0.4764 m³ 132,300.00 63,031.50
Pekerja 2.1000 org 67,000.00 140,700.00
Tk.batu setengah terampil 0.3500 org 80,000.00 28,000.00
Kepala tk. batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0105 org 90,000.00 945.00
Total Upah dan bahan ( f & g ) 172,795.00 806,898.17
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012k 1 m3 MEMBUAT BETON READYMYXED DENGAN MUTU K-225
Pekerja 1.0000 org 67,000.00 67,000.00
Tk.batu 0.2500 org 80,000.00 20,000.00
Kepala tk. batu 0.0250 org 90,000.00 2,250.00
Mandor 0.1000 org 90,000.00 9,000.00
Campurn beton redymixed 1.0200 M3 870,758.33 888,173.50
Pompa dan conveyor beton (sewa/hari) 0.1200 ls 2,500,000.00 300,000.00
Total Upah dan bahan ( f & g ) 398,250.00 888,173.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012l 1 m3 MEMBUAT BETON READYMYXED DENGAN MUTU K-250
Pekerja 1.0000 org 67,000.00 67,000.00
Tk.batu 0.2500 org 80,000.00 20,000.00
Kepala tk. batu 0.0250 org 90,000.00 2,250.00
Mandor 0.1000 org 90,000.00 9,000.00
Campurn beton redymixed 1.0200 M3 887,287.78 905,033.53
Pompa dan conveyor beton (sewa/hari) 0.1200 ls 2,500,000.00 300,000.00
Total Upah dan bahan ( f & g ) 398,250.00 905,033.53
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012m 1 m3 MEMBUAT BETON READYMYXED DENGAN MUTU K-275
Pekerja 1.0000 org 67,000.00 67,000.00
Tk.batu 0.2500 org 80,000.00 20,000.00
Kepala tk. batu 0.0250 org 90,000.00 2,250.00
a b c d e f=(cxe) g=(cxe)
Mandor 0.1000 org 90,000.00 9,000.00
Campurn beton redymixed 1.0200 M3 895,278.00 913,183.56
Pompa dan conveyor beton (sewa/hari) 0.1200 ls 2,500,000.00 300,000.00
Total Upah dan bahan ( f & g ) 398,250.00 913,183.56
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E012n 1 m3 MEMBUAT BETON READYMYXED DENGAN MUTU K-300
Pekerja 1.0000 org 67,000.00 67,000.00
Tk.batu 0.2500 org 80,000.00 20,000.00
Kepala tk. batu 0.0250 org 90,000.00 2,250.00
Mandor 0.1000 org 90,000.00 9,000.00
Campurn beton redymixed 1.0200 M3 904,211.17 922,295.39
Pompa dan conveyor beton (sewa/hari) 0.1200 ls 2,500,000.00 300,000.00
Total Upah dan bahan ( f & g ) 398,250.00 922,295.39
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan

E013 1 m3 MEMBUAT PONDASI BETON BERTULANG ( 150 Kg Besi + Bekisting)


Kayu 0.2000 m3 2,367,700.00 473,540.00
Paku biasa 2"-5" 1.5000 Kg 19,400.00 29,100.00
Minyak bekisting 0.4000 Ltr 14,900.00 5,960.00
Besi beton polos 157.5000 Kg 10,900.00 1,716,750.00
Kawat beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Pekerja 5.3000 HOK 67,000.00 355,100.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.3000 HOK 80,000.00 104,000.00
Tukang besi 1.0500 HOK 80,000.00 84,000.00
Kepala tukang 0.2620 HOK 90,000.00 23,580.00
Mandor 0.2650 HOK 90,000.00 23,850.00
Total Upah dan bahan ( f & g ) 612,530.00 2,936,338.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E014 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 200 Kg Besi + Bekisting)
Kayu 0.2700 m3 2,367,700.00 639,279.00
Paku biasa 2"-5" 2.0000 Kg 19,400.00 38,800.00
Minyak bekisting 0.6000 Ltr 14,900.00 8,940.00
Besi beton polos 210.0000 Kg 10,900.00 2,289,000.00
Kawat beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Pekerja 5.6500 HOK 67,000.00 378,550.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.5600 HOK 80,000.00 124,800.00
Tukang besi 1.4000 HOK 80,000.00 112,000.00
Kepala tukang 0.3230 HOK 90,000.00 29,070.00
Mandor 0.2830 HOK 90,000.00 25,470.00
Total Upah dan bahan ( f & g ) 691,890.00 3,703,132.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E015 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting Papan )
Kayu 0.4000 m3 2,367,700.00 947,080.00
Paku biasa 2"-5" 4.0000 Kg 19,400.00 77,600.00
Minyak bekisting 2.0000 Ltr 14,900.00 29,800.00
Besi beton polos 315.0000 Kg 10,900.00 3,433,500.00
Kawat beton 4.5000 Kg 21,500.00 96,750.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1500 m3 2,367,700.00 355,155.00
Papan Albasia 0.2000 m3 2,367,700.00 473,540.00
Bambu Batang dia 7cm 20.0000 Btg 8,400.00 168,000.00
Pekerja 7.0500 HOK 67,000.00 472,350.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.6500 HOK 80,000.00 132,000.00
Tukang besi 2.1000 HOK 80,000.00 168,000.00
Kepala tukang 0.4030 HOK 90,000.00 36,270.00
Mandor 0.3530 HOK 90,000.00 31,770.00
Total Upah dan bahan ( f & g ) 862,390.00 6,244,038.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E015a 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting Multiplex )
Kayu 0.4000 m3 2,367,700.00 947,080.00
Paku biasa 2"-5" 4.0000 Kg 13,600.00 54,400.00
Minyak bekisting 2.0000 Ltr 14,900.00 29,800.00
Besi beton polos 315.0000 Kg 10,900.00 3,433,500.00
Kawat beton 4.5000 Kg 21,500.00 96,750.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1500 m3 2,367,700.00 355,155.00
Multiplex 9 mm 3.5000 lbr 131,700.00 460,950.00
Bambu Batang dia 7cm 20.0000 Btg 8,400.00 168,000.00
Pekerja 7.0500 HOK 67,000.00 472,350.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.6500 HOK 80,000.00 132,000.00
Tukang besi 2.1000 HOK 80,000.00 168,000.00
Kepala tukang 0.4030 HOK 90,000.00 36,270.00
Mandor 0.3530 HOK 90,000.00 31,770.00
Total Upah dan bahan ( f & g ) 862,390.00 6,208,248.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E016 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting Papan)
Kayu 0.3200 m3 2,367,700.00 757,664.00
Paku biasa 2"-5" 3.2000 Kg 19,400.00 62,080.00
Minyak bekisting 1.6000 Ltr 14,900.00 23,840.00
Besi beton polos 210.0000 Kg 10,900.00 2,289,000.00
Kawat beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1400 m3 2,367,700.00 331,478.00
Papan Albasia 0.1600 m3 2,367,700.00 378,832.00
Bambu Batang dia 7cm 16.0000 Btg 8,400.00 134,400.00
Pekerja 6.3500 HOK 67,000.00 425,450.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.6500 HOK 80,000.00 132,000.00
Tukang besi 1.4000 HOK 80,000.00 112,000.00
Kepala tukang 0.3330 HOK 90,000.00 29,970.00
Mandor 0.3180 HOK 90,000.00 28,620.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 750,040.00 4,704,407.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E016a 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting Multiplex )
Kayu 0.3200 m3 2,367,700.00 757,664.00
Paku biasa 2"-5" 3.2000 Kg 13,600.00 43,520.00
Minyak bekisting 1.6000 Ltr 14,900.00 23,840.00
Besi beton polos 210.0000 Kg 10,900.00 2,289,000.00
Kawat beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1400 m3 2,367,700.00 331,478.00
Multiplex 9 mm 2.8000 lbr 131,700.00 368,760.00
Bambu Batang dia 7cm 16.0000 Btg 8,400.00 134,400.00
Pekerja 6.3500 HOK 67,000.00 425,450.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.6500 HOK 80,000.00 132,000.00
Tukang besi 1.4000 HOK 80,000.00 112,000.00
Kepala tukang 0.3330 HOK 80,000.00 26,640.00
Mandor 0.3180 HOK 90,000.00 28,620.00
Total Upah dan bahan ( f & g ) 746,710.00 4,675,775.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E017 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 Kg Besi + Bekisting )
Kayu 0.3200 m3 2,367,700.00 757,664.00
Paku biasa 2"-5" 3.2000 Kg 19,400.00 62,080.00
Minyak bekisting 1.6000 Ltr 14,900.00 23,840.00
Besi beton polos 150.0000 Kg 10,900.00 1,635,000.00
Kawat beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 323.0000 Kg 1,400.00 452,200.00
Pasir beton 0.5200 m3 157,500.00 81,900.00
Koral beton 0.7800 m3 132,300.00 103,194.00
Kayu 0.1200 m3 2,367,700.00 284,124.00
Papan Albasia 0.1600 m3 2,367,700.00 378,832.00
Bambu Batang dia 7cm 16.0000 Btg 8,400.00 134,400.00
Pekerja 5.8000 HOK 67,000.00 388,600.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Tukang kayu 2.8000 HOK 80,000.00 224,000.00
Tukang besi 1.0500 HOK 80,000.00 84,000.00
Kepala tukang 0.4200 HOK 90,000.00 37,800.00
Mandor 0.1850 HOK 90,000.00 16,650.00
Total Upah dan bahan ( f & g ) 779,050.00 3,961,609.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E018 1 m3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting Papan)
Kayu 0.2400 m3 2,367,700.00 568,248.00
Paku biasa 2"-5" 3.2000 Kg 19,400.00 62,080.00
Minyak bekisting 1.6000 Ltr 14,900.00 23,840.00
Besi beton polos 157.5000 Kg 10,900.00 1,716,750.00
Kawat beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1600 m3 2,367,700.00 378,832.00
Papan Albasia 0.1600 m3 2,367,700.00 378,832.00
Bambu Batang dia 7cm 24.0000 Btg 8,400.00 201,600.00
Pekerja 5.3000 HOK 67,000.00 355,100.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.3000 HOK 80,000.00 104,000.00
Tukang besi 1.0500 HOK 80,000.00 84,000.00
Kepala tukang 0.2620 HOK 90,000.00 23,580.00
Mandor 0.2650 HOK 90,000.00 23,850.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 612,530.00 4,041,170.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E018a 1 m3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting Multiplex)
Kayu 0.2400 m3 2,367,700.00 568,248.00
Paku biasa 2"-5" 3.2000 Kg 13,600.00 43,520.00
Minyak bekisting 1.6000 Ltr 14,900.00 23,840.00
Besi beton polos 157.5000 Kg 10,900.00 1,716,750.00
Kawat beton 2.2500 Kg 21,500.00 48,375.00
Semen Portland 336.0000 Kg 1,400.00 470,400.00
Pasir beton 0.5400 m3 157,500.00 85,050.00
Koral beton 0.8100 m3 132,300.00 107,163.00
Kayu 0.1600 m3 2,367,700.00 378,832.00
Multiplex 9 mm 2.8000 lbr 131,700.00 368,760.00
Bambu Batang dia 7cm 24.0000 Btg 8,400.00 201,600.00
Pekerja 5.3000 HOK 67,000.00 355,100.00
Tukang batu 0.2750 HOK 80,000.00 22,000.00
Tukang kayu 1.3000 HOK 80,000.00 104,000.00
Tukang besi 1.0500 HOK 80,000.00 84,000.00
Kepala tukang 0.2620 HOK 90,000.00 23,580.00
Mandor 0.2650 HOK 90,000.00 23,850.00
Total Upah dan bahan ( f & g ) 612,530.00 4,012,538.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E019 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg Besi + Bekisting )
Kayu 0.2500 m3 2,367,700.00 591,925.00
Paku biasa 2"-5" 3.0000 Kg 19,400.00 58,200.00
Minyak bekisting 1.2000 Ltr 14,900.00 17,880.00
Besi beton polos 200.0000 Kg 10,900.00 2,180,000.00
Kawat beton 3.0000 Kg 21,500.00 64,500.00
Semen Portland 323.0000 Kg 1,400.00 452,200.00
Pasir beton 0.5200 m3 157,500.00 81,900.00
Koral beton 0.7800 m3 132,300.00 103,194.00
Kayu 0.1050 m3 2,367,700.00 248,608.50
Papan Albasia 0.1600 m3 2,367,700.00 378,832.00
Bambu Batang dia 7cm 16.0000 Btg 8,400.00 134,400.00
Pekerja 5.6000 HOK 67,000.00 375,200.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Tukang kayu 2.3000 HOK 80,000.00 184,000.00
Tukang besi 1.4000 HOK 80,000.00 112,000.00
Kepala tukang 0.4050 HOK 90,000.00 36,450.00
Mandor 0.2020 HOK 90,000.00 18,180.00
Total Upah dan bahan ( f & g ) 753,830.00 4,311,639.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E020 1 m' MEMBUAT KOLOM PRAKTIS BETON BERTULANG ( 11x11 ) cm
Kayu 0.0020 m3 2,367,700.00 4,735.40
Paku biasa 2"-5" 0.0100 Kg 19,400.00 194.00
Besi beton polos 3.0000 Kg 10,900.00 32,700.00
Kawat beton 0.4500 Kg 21,500.00 9,675.00
Semen Portland 4.0000 Kg 1,400.00 5,600.00
Pasir beton 0.0060 m3 157,500.00 945.00
Koral beton 0.0090 m3 132,300.00 1,190.70
Pekerja 0.1800 HOK 67,000.00 12,060.00
Tukang batu 0.0200 HOK 80,000.00 1,600.00
Tukang kayu 0.0200 HOK 80,000.00 1,600.00
Tukang besi 0.0200 HOK 80,000.00 1,600.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0090 HOK 90,000.00 810.00
Total Upah dan bahan ( f & g ) 18,210.00 55,040.10
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E021 1 m' MEMBUAT RING BALOK BETON BERTULANG ( 10x15 ) cm
Kayu 0.0030 m3 2,367,700.00 7,103.10
Paku biasa 2"-5" 0.0200 Kg 19,400.00 388.00
Besi beton polos 3.6000 Kg 10,900.00 39,240.00
Kawat beton 0.0500 Kg 21,500.00 1,075.00
Semen Portland 5.5000 Kg 1,400.00 7,700.00
Pasir beton 0.0090 m3 157,500.00 1,417.50
Koral beton 0.0150 m3 132,300.00 1,984.50
Pekerja 0.2970 HOK 67,000.00 19,899.00
Tukang batu 0.0330 HOK 80,000.00 2,640.00
Tukang kayu 0.0330 HOK 80,000.00 2,640.00
Tukang besi 0.0330 HOK 80,000.00 2,640.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 30,069.00 58,908.10
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F PEKERJAAN ATAP
F001 1 m2 ATAP GENTENG PALENTONG
Genteng 25.0000 bh 2,100.00 52,500.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0075 HOK 90,000.00 675.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 17,445.00 52,500.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F002 1 m2 PASANG ATAP GENTENG KODOK / GLAZZUR
Genteng kodok 25.0000 Bh 3,100.00 77,500.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0080 HOK 90,000.00 720.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 17,490.00 77,500.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F003 1 m2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR
Genteng palentong super 12.0000 Bh 3,100.00 37,200.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0080 HOK 90,000.00 720.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 17,490.00 37,200.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F003a 1 m2 PASANG ATAP GENTENG MORANDO NATURAL
Genteng morando natural 18.0000 Bh 3,100.00 55,800.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 16,110.00 55,800.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F003b 1 m2 PASANG ATAP GENTENG MORANDO GLAZZUR
Genteng morando glazzur 18.0000 Bh 4,200.00 75,600.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
a b c d e f=(cxe) g=(cxe)
Tukang kayu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 16,110.00 75,600.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F004 1 m2 PASANG ATAP GENTENG BETON
Genteng beton 11.0000 bh 10,800.00 118,800.00
Paku biasa 2"-5" 0.0300 Kg 19,400.00 582.00
Pekerja 0.2000 HOK 67,000.00 13,400.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0100 HOK 90,000.00 900.00
Total Upah dan bahan ( f & g ) 23,200.00 119,382.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F005 1 m2 PASANG GENTENG BUBUNG PALENTONG
Genteng bubung palentong 5.0000 Bh 4,900.00 24,500.00
Semen portland 8.0000 Kg 1,400.00 11,200.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 44,780.00 39,831.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F005a 1 m2 PASANG GENTENG BUBUNG MORANDO
Genteng bubung Morando 5.0000 Bh 4,300.00 21,500.00
Semen portland 8.0000 Kg 1,400.00 11,200.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 44,780.00 36,831.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F005b 1 m2 PASANG GENTENG BUBUNG MORANDO GLAZZUR
Genteng bubung Morando Glazzur 5.0000 Bh 6,300.00 31,500.00
Semen portland 8.0000 Kg 1,400.00 11,200.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 44,780.00 46,831.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F006 1 m' PASANG BUBUNG GENTENG KODOK GLAZZUR
Genteng bubung kodok 5.0000 Bh 4,900.00 24,500.00
Semen portland 8.0000 Zak 1,400.00 11,200.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 44,780.00 39,831.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
F007 1 m' PASANG NOK GENTENG BETON
Nok genteng beton 3.5000 bh 11,500.00 40,250.00
Paku biasa 2"-5" 0.0500 Kg 19,400.00 970.00
Semen PC (50 kg) 10.8000 kg 1,400.00 15,120.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Semen warna 1.0000 Kg 15,700.00 15,700.00
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0200 HOK 90,000.00 1,800.00
Total Upah dan bahan ( f & g ) 46,400.00 76,171.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F008 1 m' PASANG BUBUNG GENTENG PALENTONG BESAR
Genteng bubung palentong 4.0000 Bh 4,900.00 19,600.00
Semen portland 8.0000 Kg 1,400.00 11,200.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 44,780.00 34,931.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F009 1 m2 PASANG ROOF LIGHT FIBREGLASS ( 180X90 ) cm
Roof light fibreglass 0.6000 Lbr 158,900.00 95,340.00
Paku biasa 1/2"-1" 0.0500 Kg 19,400.00 970.00
Pekerja 0.1400 HOK 67,000.00 9,380.00
Tukang kayu 0.0670 HOK 80,000.00 5,360.00
Kepala tukang 0.0070 HOK 90,000.00 630.00
Mandor 0.0070 HOK 90,000.00 630.00
Total Upah dan bahan ( f & g ) 16,000.00 96,310.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F010 1 m2 PASANG ATAP ASBES GELOMBANG
Asbes gelombang 0.7500 Lbr 40,400.00 30,300.00
Paku pancing/asbes 60x230 0.1200 Kg 24,100.00 2,892.00
Pekerja 0.1400 HOK 67,000.00 9,380.00
Tukang kayu 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0070 HOK 90,000.00 630.00
Mandor 0.0070 HOK 90,000.00 630.00
Total Upah dan bahan ( f & g ) 16,240.00 33,192.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F011 1 m' PASANG BUBUNG STEL GELOMBANG 0.92 m
Bubung stel gelombang 2.4000 Lbr 31,100.00 74,640.00
Paku skrup 3.5" / paku asbes 6.0000 Bh 1,000.00 6,000.00
Pekerja 0.0840 HOK 67,000.00 5,628.00
Tukang kayu 0.1250 HOK 80,000.00 10,000.00
Kepala tukang 0.0130 HOK 90,000.00 1,170.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 17,158.00 80,640.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
F011a 1 m' PASANG BUBUNG STEL GELOMBANG 1,05 m
Bubung stel gelombang 2.1000 Lbr 31,100.00 65,310.00
Paku skrup 3.5" / paku asbes 6.0000 Bh 1,000.00 6,000.00
Pekerja 0.0840 HOK 67,000.00 5,628.00
Tukang kayu 0.1250 HOK 80,000.00 10,000.00
Kepala tukang 0.0130 HOK 90,000.00 1,170.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 17,158.00 71,310.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F012 1 m2 PASANG ATAP SENG GELOMBANG
Seng gelombang 3"x6" BJLS 28 0.7000 Lbr 50,400.00 35,280.00
Paku biasa 1/2"-1" 0.0200 Kg 19,400.00 388.00
Pekerja 0.1200 HOK 67,000.00 8,040.00
Tukang kayu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0060 HOK 90,000.00 540.00
Total Upah dan bahan ( f & g ) 13,920.00 35,668.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F013 1 m2 PASANG ATAP NOK SENG
Seng plat 3"x6" BJLS 28 0.3000 Lbr 31,500.00 9,450.00
Paku biasa 1/2"-1" 0.0400 Kg 19,400.00 776.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0070 HOK 90,000.00 630.00
Mandor 0.0060 HOK 90,000.00 540.00
Total Upah dan bahan ( f & g ) 16,820.00 10,226.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F014 1 m2 PASANG ATAP ALUMINIUM
Atap alluminium gelombang tebal 0.55 1.0500 m2 44,600.00 46,830.00
Paku hak panjang 15cm 0.0200 Kg 13,600.00 272.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.7500 HOK 80,000.00 60,000.00
Kepala tukang 0.0800 HOK 90,000.00 7,200.00
Mandor 0.0060 HOK 90,000.00 540.00
Total Upah dan bahan ( f & g ) 77,790.00 47,102.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F015 1 m2 PASANG NOK ALLUMINIUM
Nok standar 40 cm18, swg 22 1.2000 m2 44,600.00 53,520.00
Paku hak panjang 15cm 0.0400 Kg 13,600.00 544.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 1.0000 HOK 80,000.00 80,000.00
Kepala tukang 0.1000 HOK 90,000.00 9,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
Total Upah dan bahan ( f & g ) 100,200.00 54,064.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F016 1 m2 PASANG ALLUMINIUM FOIL /SISALATION
Alluminium foil /sisalation 1.0500 m2 15,900.00 16,695.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0050 HOK 90,000.00 450.00
Mandor 0.0080 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 15,220.00 16,695.00
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
F017 1 m2 PASANG ATAP GENTENG METAL
Genteng metal 1.0200 Lbr 79,800.00 81,396.00
Paku biasa 2"-5" 0.2000 Kg 13,600.00 2,720.00
Pekerja 0.2000 HOK 67,000.00 13,400.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0010 HOK 90,000.00 90.00
Total Upah dan bahan ( f & g ) 22,390.00 84,116.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
F018 1 m' PASANG NOK GENTENG METAL
Bubungan metal 1.1000 bh 54,600.00 60,060.00
Paku biasa 1/2"-1" 0.0500 Kg 13,600.00 680.00
Pekerja 0.2500 HOK 67,000.00 16,750.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0130 HOK 90,000.00 1,170.00
Total Upah dan bahan ( f & g ) 31,270.00 60,740.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G PEKERJAAN LANGIT-LANGIT / PLAFOND
G001 1 m2 LANGIT-LANGIT ETERNIT / ASBES (1.00X1.00 ) m, TEBAL 5 mm
Plat asbes 5mm 1.1000 Lbr 9,400.00 10,340.00
Paku 0.0100 Kg 19,400.00 194.00
Pekerja 0.0300 HOK 67,000.00 2,010.00
Tukang kayu 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0070 HOK 90,000.00 630.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 8,600.00 10,534.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G002 1 m2 LANGIT-LANGIT TRIPLEKS (120X240) cm, TEBAL 4 mm
Tripleks 4 mm 0.3750 Lbr 70,300.00 26,362.50
Paku 0.0300 Kg 19,400.00 582.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 16,050.00 26,944.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G003 1 m2 LANGIT-LANGIT ASBES (1.00X1.00) m, RANGKA KAYU GUNUNG KELAS II
Kayu Gunung Kls II, balok 0.0120 m3 4,100,200.00 49,202.40
Paku biasa 0.0600 Kg 13,600.00 816.00
Asbes 1.00x1.00 m 1.1000 Lbr 9,400.00 10,340.00
Pekerja 0.1800 HOK 67,000.00 12,060.00
Tukang kayu 0.3200 HOK 80,000.00 25,600.00
Kepala tukang 0.0320 HOK 90,000.00 2,880.00
Mandor 0.0090 HOK 90,000.00 810.00
Total Upah dan bahan ( f & g ) 41,350.00 60,358.40
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G003a 1 m2 LANGIT-LANGIT GRC (2,40X1.20) m, RANGKA KAYU GUNUNG KELAS II
Kayu Gunung Kls II, balok 0.0120 m3 4,100,200.00 49,202.40
Paku biasa 0.0600 Kg 13,600.00 816.00
GRC 2.44x1.22 m 0.3819 Lbr 68,200.00 26,048.61
Pekerja 0.1800 HOK 67,000.00 12,060.00
a b c d e f=(cxe) g=(cxe)
Tukang kayu 0.3200 HOK 80,000.00 25,600.00
Kepala tukang 0.0320 HOK 90,000.00 2,880.00
Mandor 0.0090 HOK 90,000.00 810.00
Total Upah dan bahan ( f & g ) 41,350.00 76,067.01
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G004 1 m2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm
Gypsum board 120x240x9 mm 0.3640 Lbr 80,800.00 29,411.20
Paku biasa skrup 0.1100 Kg 19,400.00 2,134.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Tukang kayu 0.0500 HOK 80,000.00 4,000.00
Kepala tukang 0.0050 HOK 90,000.00 450.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 11,600.00 31,545.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
G005 1 m2 LANGIT-LANGIT SOFT BOARD
Soft board 4x8x4 mm 0.3500 Lbr 74,200.00 25,970.00
Paku biasa 0.0300 Kg 19,400.00 582.00
Pekerja 0.6000 HOK 67,000.00 40,200.00
Tukang kayu 1.0000 HOK 80,000.00 80,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 121,370.00 26,552.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H PEKERJAAN SANITASI / PIPA
H001 MEMASANG 1 BUAH KLOSET DUDUK /MONOBLOK
Kloset duduk /monoblok (lengkap) 1.0000 Unit 2,122,000.00 2,122,000.00
Perlengkapan ( 6% X Harga closet) 1.0000 ls 127,320.00 127,320.00
Pekerja 3.3000 HOK 67,000.00 221,100.00
Tukang batu 1.1000 HOK 80,000.00 88,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.1600 HOK 90,000.00 14,400.00
Total Upah dan bahan ( f & g ) 324,400.00 2,249,320.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H002 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
Kloset jongkok porselin 1.0000 Bh 290,800.00 290,800.00
Semen Portland 6.0000 Kg 1,400.00 8,400.00
Pasir pasang 0.0100 m3 129,100.00 1,291.00
Pekerja 1.0000 HOK 67,000.00 67,000.00
Tukang batu 1.5000 HOK 80,000.00 120,000.00
Kepala tukang 1.5000 HOK 90,000.00 135,000.00
Mandor 0.1600 HOK 90,000.00 14,400.00
Total Upah dan bahan ( f & g ) 336,400.00 300,491.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H003 MEMASANG 1 BUAH URINOIR
Urinoir 1.0000 Bh 2,182,900.00 2,182,900.00
Perlengkapan (30% x Harga urinoir) 1.0000 ls 654,870.00 654,870.00
Semen Portland 6.0000 Kg 1,400.00 8,400.00
Pasir pasang 0.0100 m3 129,100.00 1,291.00
Pekerja 1.0000 HOK 67,000.00 67,000.00
Tukang batu 1.0000 HOK 80,000.00 80,000.00
Kepala tukang 0.1000 HOK 90,000.00 9,000.00
Mandor 0.0500 HOK 90,000.00 4,500.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 160,500.00 2,847,461.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
H004 MEMASANG 1 BUAH WASTAFEL
Wastafel 1.2000 Bh 800,100.00 960,120.00
Perlengkapan (12% x Harga wastafel) 1.0000 ls 96,012.00 96,012.00
Semen Abu-abu 6.0000 Kg 1,400.00 8,400.00
Pasir pasang 0.0100 m3 129,100.00 1,291.00
Pekerja 1.2000 HOK 67,000.00 80,400.00
Tukang batu 1.4500 HOK 80,000.00 116,000.00
Kepala tukang 0.1500 HOK 90,000.00 13,500.00
Mandor 0.0600 HOK 90,000.00 5,400.00
Total Upah dan bahan ( f & g ) 215,300.00 1,065,823.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H005 MEMASANG 1 BUAH BAK MANDI FIBREGLASS 0,30M3
Bak fibreglass 1.0000 Bh 308,700.00 308,700.00
Perlengkapan (18% x harga bak) 1.0000 ls 37,044.00 37,044.00
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 61,500.00 345,744.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H006 MEMASANG 1 METER PIPA BETON, Ø 15-20 CM
Pipa beton 1.1000 bh 57,700.00 63,470.00
Batu bata (0,0270 m3) 15.6250 bh 700.00 10,937.50
Semen Portland 3.9200 Kg 1,400.00 5,488.00
Pasir Pasang 0.0560 m3 129,100.00 7,229.60
Pasir Urug 0.0240 m3 126,000.00 3,024.00
Pekerja 0.1400 HOK 67,000.00 9,380.00
Tukang batu 0.0700 HOK 80,000.00 5,600.00
Kepala tukang 0.0070 HOK 90,000.00 630.00
Mandor 0.0070 HOK 90,000.00 630.00
Total Upah dan bahan ( f & g ) 16,240.00 90,149.10
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H007 MEMASANG 1 METER PIPA BETON, Ø 30-100 CM
Pipa beton 1.1000 bh 78,700.00 86,570.00
Batu bata (0,0550 m3) 31.8287 bh 700.00 22,280.09
Semen Portland 10.3000 Kg 1,400.00 14,420.00
Pasir Pasang 0.0610 m3 129,100.00 7,875.10
Pasir Urug 0.0690 m3 126,000.00 8,694.00
Pekerja 0.3800 HOK 67,000.00 25,460.00
Tukang batu 0.1900 HOK 80,000.00 15,200.00
Kepala tukang 0.0190 HOK 90,000.00 1,710.00
Mandor 0.0190 HOK 90,000.00 1,710.00
Total Upah dan bahan ( f & g ) 44,080.00 139,839.19
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H008 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30X30) CM TINGGI 35 CM
Batu bata 40.0000 bh 700.00 28,000.00
Semen Portland 44.0000 Kg 1,400.00 61,600.00
Pasir Pasang 0.0700 m3 129,100.00 9,037.00
Batu kerikil 0.0700 m3 132,300.00 9,261.00
Besi beton 1.6000 Kg 10,900.00 17,440.00
Pasir beton 0.0600 m3 157,500.00 9,450.00
Pekerja 2.1600 HOK 67,000.00 144,720.00
Tukang batu 0.7200 HOK 80,000.00 57,600.00
Kepala tukang 0.0720 HOK 90,000.00 6,480.00
a b c d e f=(cxe) g=(cxe)
Mandor 0.0110 HOK 90,000.00 990.00
Total Upah dan bahan ( f & g ) 209,790.00 134,788.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
H009 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45X45) CM TINGGI 50 CM
Batu bata 70.0000 bh 700.00 49,000.00
Semen Portland 77.0000 Kg 1,400.00 107,800.00
Pasir Pasang 0.1300 m3 129,100.00 16,783.00
Batu kerikil 0.0200 m3 132,300.00 2,646.00
Besi beton 2.6000 Kg 10,900.00 28,340.00
Pasir beton 0.0900 m3 157,500.00 14,175.00
Pekerja 3.2000 HOK 67,000.00 214,400.00
Tukang batu 1.1500 HOK 80,000.00 92,000.00
Kepala tukang 0.0110 HOK 90,000.00 990.00
Mandor 0.0160 HOK 90,000.00 1,440.00
Total Upah dan bahan ( f & g ) 308,830.00 218,744.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H010 MEMASANG 1 METER PIPA GALVANIS Ø 1/2"
Pipa galvanis 1.2000 m' 15,483.33 18,580.00
Perlengkapan (35% x harga pipa) 1.0000 ls 5,419.17 5,419.17
Pekerja 0.0540 HOK 67,000.00 3,618.00
Tukang batu 0.0900 HOK 80,000.00 7,200.00
Kepala tukang 0.0090 HOK 90,000.00 810.00
Mandor 0.0270 HOK 90,000.00 2,430.00
Total Upah dan bahan ( f & g ) 14,058.00 23,999.17
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H011 MEMASANG 1 METER PIPA GALVANIS Ø 3/4"
Pipa galvanis 1.2000 m' 20,550.00 24,660.00
Perlengkapan (35% x harga pipa) 1.0000 ls 7,192.50 7,192.50
Pekerja 0.0540 HOK 67,000.00 3,618.00
Tukang batu 0.0900 HOK 80,000.00 7,200.00
Kepala tukang 0.0090 HOK 90,000.00 810.00
Mandor 0.0270 HOK 90,000.00 2,430.00
Total Upah dan bahan ( f & g ) 14,058.00 31,852.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H012 MEMASANG 1 METER PIPA GALVANIS Ø 1"
Pipa galvanis 1.2000 m' 25,366.67 30,440.00
Perlengkapan (35% x harga pipa) 1.0000 ls 8,878.33 8,878.33
Pekerja 0.0540 HOK 67,000.00 3,618.00
Tukang batu 0.0900 HOK 80,000.00 7,200.00
Kepala tukang 0.0090 HOK 90,000.00 810.00
Mandor 0.0270 HOK 90,000.00 2,430.00
Total Upah dan bahan ( f & g ) 14,058.00 39,318.33
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H013 MEMASANG 1 METER PIPA GALVANIS Ø 1 1/2"
Pipa galvanis 1.2000 m' 36,483.33 43,780.00
Perlengkapan (35% x harga pipa) 1.0000 ls 12,769.17 12,769.17
Pekerja 0.1080 HOK 67,000.00 7,236.00
Tukang batu 0.1800 HOK 80,000.00 14,400.00
Kepala tukang 0.0180 HOK 90,000.00 1,620.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 23,706.00 56,549.17
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
H014 MEMASANG 1 METER PIPA GALVANIS Ø 3"
Pipa galvanis 1.2000 m' 0.00 0.00
Perlengkapan (35% x harga pipa) 1.0000 ls 0.00 0.00
Pekerja 0.1350 HOK 67,000.00 9,045.00
Tukang batu 0.2250 HOK 80,000.00 18,000.00
Kepala tukang 0.0230 HOK 90,000.00 2,070.00
Mandor 0.0070 HOK 90,000.00 630.00
Total Upah dan bahan ( f & g ) 29,745.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H015 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1/2"
Pipa PVC 1.2000 m' 4,200.00 5,040.00
Perlengkapan (35% x harga pipa) 1.0000 ls 1,470.00 1,470.00
Pekerja 0.0360 HOK 67,000.00 2,412.00
Tukang batu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 7,932.00 6,510.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H016 MEMASANG 1 METER PIPA PVC TIPE AW Ø 3/4"
Pipa PVC 1.2000 m' 6,550.00 7,860.00
Perlengkapan (35% x harga pipa) 1.0000 ls 2,292.50 2,292.50
Pekerja 0.0360 HOK 67,000.00 2,412.00
Tukang batu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 7,932.00 10,152.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H017 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1"
Pipa PVC 1.2000 m' 8,925.00 10,710.00
Perlengkapan (35% x harga pipa) 1.0000 ls 3,123.75 3,123.75
Pekerja 0.0360 HOK 67,000.00 2,412.00
Tukang batu 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0020 HOK 90,000.00 180.00
Total Upah dan bahan ( f & g ) 7,932.00 13,833.75
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H018 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1 1/2"
Pipa PVC 1.2000 m' 11,150.00 13,380.00
Perlengkapan (35% x harga pipa) 1.0000 ls 3,902.50 3,902.50
Pekerja 0.0540 HOK 67,000.00 3,618.00
Tukang batu 0.0900 HOK 80,000.00 7,200.00
Kepala tukang 0.0090 HOK 90,000.00 810.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 11,898.00 17,282.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H019 MEMASANG 1 METER PIPA PVC TIPE AW Ø 2"
Pipa PVC 1.2000 m' 19,800.00 23,760.00
Perlengkapan (35% x harga pipa) 1.0000 ls 6,930.00 6,930.00
Pekerja 0.0540 HOK 67,000.00 3,618.00
Tukang batu 0.0900 HOK 80,000.00 7,200.00
Kepala tukang 0.0090 HOK 90,000.00 810.00
Mandor 0.0030 HOK 90,000.00 270.00
a b c d e f=(cxe) g=(cxe)
Total Upah dan bahan ( f & g ) 11,898.00 30,690.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
H020 MEMASANG 1 METER PIPA PVC TIPE AW Ø 2 1/2"
Pipa PVC 1.2000 m' 23,625.00 28,350.00
Perlengkapan (35% x harga pipa) 1.0000 ls 8,268.75 8,268.75
Pekerja 0.0810 HOK 67,000.00 5,427.00
Tukang batu 0.1350 HOK 80,000.00 10,800.00
Kepala tukang 0.0135 HOK 90,000.00 1,215.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 17,802.00 36,618.75
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H021 MEMASANG 1 METER PIPA PVC TIPE AW Ø 3"
Pipa PVC 1.2000 m' 33,075.00 39,690.00
Perlengkapan (35% x harga pipa) 1.0000 ls 11,576.25 11,576.25
Pekerja 0.0810 HOK 67,000.00 5,427.00
Tukang batu 0.1350 HOK 80,000.00 10,800.00
Kepala tukang 0.0135 HOK 90,000.00 1,215.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 17,802.00 51,266.25
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H022 MEMASANG 1 METER PIPA PVC TIPE AW Ø 4"
Pipa PVC 1.2000 m' 45,600.00 54,720.00
Perlengkapan (35% x harga pipa) 1.0000 ls 15,960.00 15,960.00
Pekerja 0.0810 HOK 67,000.00 5,427.00
Tukang batu 0.1350 HOK 80,000.00 10,800.00
Kepala tukang 0.0135 HOK 90,000.00 1,215.00
Mandor 0.0040 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 17,802.00 70,680.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H023 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS-STEEL
Bak cuci stainless steel 1.0000 Bh 217,300.00 217,300.00
Water drain + asesoriess 1.0000 Set 21,730.00 21,730.00
Pekerja 0.0300 HOK 67,000.00 2,010.00
Tukang batu 0.3000 HOK 80,000.00 24,000.00
Kepala tukang 0.0300 HOK 90,000.00 2,700.00
Mandor 0.0015 HOK 90,000.00 135.00
Total Upah dan bahan ( f & g ) 28,845.00 239,030.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H024 MEMASANG 1 BUAH KRAN Ø 1/2" ATAU Ø 3/4"
Kran air 1.0000 Bh 78,700.00 78,700.00
Seal tape 0.0250 Set 4,200.00 105.00
Pekerja 0.0100 HOK 67,000.00 670.00
Tukang batu 0.4000 HOK 80,000.00 32,000.00
Kepala tukang 0.0400 HOK 90,000.00 3,600.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 36,720.00 78,805.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H025 MEMASANG 1 BUAH FLOOR DRAIN
Floor drain 1.0000 Bh 29,900.00 29,900.00
Pekerja 0.0100 HOK 67,000.00 670.00
Tukang batu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 10,020.00 29,900.00
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
H026 1 M' SALURAN GRAFEL BETON 1/2 Ø 20 cm + PASANGAN
Galian Tanah 0.1500 m3 52,500.00 7,875.00
Grafel beton Ø 20 cm 1.0000 Bh 36,700.00 36,700.00
Pasangan bata + Plesteran 1 : 3 1.0000 m 10,100.13 10,100.13
Upah kerja 0.3500 Ls 54,675.13 19,136.30
Total Upah dan bahan ( f & g ) 19,136.30 54,675.13
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H027 1 M' SALURAN GRAFEL BETON 1/2 Ø 30 cm + PASANGAN
Galian Tanah 0.2000 m3 52,500.00 10,500.00
Grafel beton Ø 30 cm 1.0000 Bh 52,500.00 52,500.00
Pasangan bata + Plesteran 1 : 3 1.0000 m 10,100.13 10,100.13
Upah kerja 0.3500 Ls 73,100.13 25,585.05
Total Upah dan bahan ( f & g ) 25,585.05 73,100.13
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H028 1 UNIT SEPTICTANK 2.5 x 1.5 X 2 m (TYPE BESAR) + REMBESAN
Galian Tanah 7.5000 m3 52,500.00 393,750.00
Pasir urug 0.3570 m3 126,000.00 44,982.00
Lantai kerja 1 : 3 : 5 3.7500 m2 103,286.20 387,323.25
Pasangan bata + Plesteran 1 : 3 25.0000 m2 162,481.40 4,062,035.00
Plat beton penutup + balok 0.5000 m3 870,758.33 435,379.17
Pipa PVC 4" AW + sambungan 9.0000 m' 5,375.00 48,375.00
Pipa GIF 1 1/2" 2.0000 m' 36,483.33 72,966.67
Galian tanah untuk rembesan 5.6250 m3 52,500.00 295,312.50
Pasangan ijuk 9.0000 kg 196,800.00 1,771,200.00
Urugan kerikil 3.5 cm 1.7500 m3 132,300.00 231,525.00
Pipa PVC 4" AW berlobang 6.0000 m' 5,375.00 32,250.00
Urugan kembali perataan tanah 1.8750 m3 38,000.00 71,250.00
Tambahan upah kerja 0.0850 Ls 7,846,348.58 666,939.63
Total Upah dan bahan ( f & g ) 666,939.63 7,846,348.58
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
H029 1 UNIT SEPTICTANK 1.5 x 1.0 X 1.5 m (TYPE KECIL) + REMBESAN
Galian Tanah 2.2500 m3 52,500.00 118,125.00
Pasir urug 0.1071 m3 126,000.00 13,494.60
Lantai kerja 1 : 3 : 5 1.1250 m3 103,286.20 116,196.98
Pasangan bata + Plesteran 1 : 3 7.5000 m2 162,481.40 1,218,610.50
Plat beton penutup + balok 0.1500 m3 870,758.33 130,613.75
Pipa PVC 4" AW + sambungan 9.0000 m' 45,600.00 410,400.00
Pipa GIF 1 1/2" 0.6000 m' 36,483.33 21,890.00
Galian tanah untuk rembesan 1.6875 m3 52,500.00 88,593.75
Pasangan ijuk 2.7000 kg 196,800.00 531,360.00
Urugan kerikil 3.5 cm 0.5250 m3 132,300.00 69,457.50
Pipa PVC 4" AW berlobang 9.0000 m' 45,600.00 410,400.00
Urugan kembali perataan tanah 0.5625 m3 38,000.00 21,375.00
Tambahan upah kerja 0.0850 Ls 3,150,517.08 267,793.95
Total Upah dan bahan ( f & g ) 267,793.95 3,150,517.08
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
I PEKERJAAN BAJA / BESI
I001 1 Kg PASANG BESI PROFIL
Besi profil WF 1.1500 Kg 11,400.00 13,110.00
Pekerja 0.0600 HOK 67,000.00 4,020.00
Tukang besi 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 9,630.00 13,110.00
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
I002 1 m2 PASANG ALUMUNIUM PINTU
Pintu Allumunium 1.0000 m2 44,600.00 44,600.00
Pekerja 1.0500 HOK 67,000.00 70,350.00
Tukang besi konstruksi 1.0500 HOK 80,000.00 84,000.00
Kepala tukang 0.1050 HOK 90,000.00 9,450.00
Mandor 0.0052 HOK 90,000.00 468.00
Total Upah dan bahan ( f & g ) 164,268.00 44,600.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
I003 1 m2 PASANG TERALI BESI
Besi strip 2x3 6.1770 kg 12,400.00 76,594.80
Pekerja 1.2000 HOK 67,000.00 80,400.00
Tukang las 1.2000 HOK 80,000.00 96,000.00
Kepala tukang 0.0120 HOK 90,000.00 1,080.00
Mandor 0.0006 HOK 90,000.00 54.00
Total Upah dan bahan ( f & g ) 177,534.00 76,594.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
I004 1 m' PASANG TALANG DATAR, SENG BJLS 28
Seng plat 3' x 6' BJLS 28 1.0500 m1 31,500.00 33,075.00
Paku biasa 1/2" - 1" 0.0100 Kg 19,400.00 194.00
Besi strip 0.5000 kg 12,400.00 6,200.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Tukang kayu 0.3000 HOK 80,000.00 24,000.00
Kepala tukang 0.0300 HOK 90,000.00 2,700.00
Mandor 0.00800 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 37,470.00 39,469.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
I005 1 m' PASANG TALANG MIRING, SENG BJLS 28
Seng plat 3' x 6' BJLS 28 1.0500 Lbr 31,500.00 33,075.00
Paku biasa 1/2" - 1" 0.0150 Kg 19,400.00 291.00
Kayu 0.0190 m3 4,100,200.00 77,903.80
Pekerja 0.2000 HOK 67,000.00 13,400.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.00100 HOK 90,000.00 90.00
Total Upah dan bahan ( f & g ) 31,290.00 111,269.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J PEKERJAAN ALAT PENGGANTUNG
J001 1 BUAH PASANG KUNCI TANAM ANTIK
Kunci tanam antik 1.0000 bh 0.00 0.00
Pekerja 0.0600 HOK 67,000.00 4,020.00
Tukang kayu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 57,690.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J002 1 BUAH PASANG KUNCI TANAM BIASA
Kunci tanam biasa 1.0000 bh 181,600.00 181,600.00
Pekerja 0.0100 HOK 67,000.00 670.00
Tukang kayu 0.5000 HOK 80,000.00 40,000.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0050 HOK 90,000.00 450.00
Total Upah dan bahan ( f & g ) 45,620.00 181,600.00
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
J003 1 BUAH PASANG KUNCI TANAM KAMAR MANDI
Kunci tanam kamar mandi 1.0000 bh 66,600.00 66,600.00
Pekerja 0.0050 HOK 67,000.00 335.00
Tukang kayu 0.5000 HOK 80,000.00 40,000.00
Kepala tukang 0.0500 HOK 90,000.00 4,500.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 45,105.00 66,600.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J004 1 BUAH PASANG ENGSEL PINTU
Engsel pintu 1.0000 bh 42,000.00 42,000.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00080 HOK 90,000.00 72.00
Total Upah dan bahan ( f & g ) 14,427.00 42,000.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J005 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
Engsel jendela 1.0000 bh 42,500.00 42,500.00
Pekerja 0.0100 HOK 67,000.00 670.00
Tukang kayu 0.1000 HOK 80,000.00 8,000.00
Kepala tukang 0.0100 HOK 90,000.00 900.00
Mandor 0.0005 HOK 90,000.00 45.00
Total Upah dan bahan ( f & g ) 9,615.00 42,500.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J006 1 BUAH PASANG HAK ANGIN GESER
Kait angin 1.0000 bh 42,000.00 42,000.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00075 HOK 90,000.00 67.50
Total Upah dan bahan ( f & g ) 14,422.50 42,000.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J007 1 BUAH PASANG KAIT ANGIN
Kait angin 1.0000 bh 29,900.00 29,900.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00800 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 15,075.00 29,900.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J008 1 BUAH PASANG KUNCI SELOT
Kunci selot 1.0000 bh 30,400.00 30,400.00
Pekerja 0.0200 HOK 67,000.00 1,340.00
Tukang kayu 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0010 HOK 90,000.00 90.00
Total Upah dan bahan ( f & g ) 19,230.00 30,400.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
J009 1 BUAH PASANG REL PINTU DORONG
Rel pintu dorong 1.0000 bh 122,500.00 122,500.00
Pekerja 0.0600 HOK 67,000.00 4,020.00
Tukang kayu 0.6000 HOK 80,000.00 48,000.00
Kepala tukang 0.0600 HOK 90,000.00 5,400.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 57,690.00 122,500.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J010 1 m2 PASANG KACA TEBAL 3 mm
Kaca 1.1000 M2 78,700.00 86,570.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00080 HOK 90,000.00 72.00
Total Upah dan bahan ( f & g ) 14,427.00 86,570.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J011 1 m2 PASANG KACA TEBAL 5 mm
Kaca 1.1000 bh 99,700.00 109,670.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00080 HOK 90,000.00 72.00
Total Upah dan bahan ( f & g ) 14,427.00 109,670.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J011a 1 m2 PASANG KACA TEBAL 8 mm
Kaca 1.1000 bh 136,500.00 150,150.00
Pekerja 0.0170 HOK 67,000.00 1,139.00
Tukang kayu 0.1700 HOK 80,000.00 13,600.00
Kepala tukang 0.0170 HOK 90,000.00 1,530.00
Mandor 0.00090 HOK 90,000.00 81.00
Total Upah dan bahan ( f & g ) 16,350.00 150,150.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J012 1 m2 PASANG KACA WIREGLASS TEBAL 5 mm
Kaca wireglass 1.1000 bh 0.00 0.00
Pekerja 0.0150 HOK 67,000.00 1,005.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00800 HOK 90,000.00 720.00
Total Upah dan bahan ( f & g ) 15,075.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
J013 1 m2 PASANG KACA PATRI TEBAL 5 mm
Kaca patri 1.1000 bh 0.00 0.00
Pekerja 0.0750 HOK 67,000.00 5,025.00
Tukang kayu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.00400 HOK 90,000.00 360.00
Total Upah dan bahan ( f & g ) 18,735.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
K PEKERJAAN LANTAI
K001 1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20X20 cm
Ubin abu-abu 20x20 cm 26.5000 bh 0.00 0.00
Semen Portland 10.4000 Kg 1,400.00 14,560.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Pekerja 0.2700 HOK 67,000.00 18,090.00
Tukang batu 0.1350 HOK 80,000.00 10,800.00
Kepala tukang 0.0140 HOK 90,000.00 1,260.00
Mandor 0.0140 HOK 90,000.00 1,260.00
Total Upah dan bahan ( f & g ) 31,410.00 20,369.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K002 1 m2 PASANG LANTAI KERAMIK 10X20 cm
Keramik 10/20 KW 1 DN Putih Polos 53.0000 bh 1,600.00 84,800.00
P.C (50 kg) 8.1900 kg 1,400.00 11,466.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 2.7500 kg 15,700.00 43,175.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 145,250.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K003 1 m2 PASANG LANTAI KERAMIK 15X15 cm
Ubin keramik15x15 cm 1.0100 m2 61,400.00 62,014.00
Semen Portland 8.1900 Kg 1,400.00 11,466.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Semen warna 2.7500 Kg 15,700.00 43,175.00
Pekerja 0.7000 HOK 67,000.00 46,900.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0350 HOK 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 122,464.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K004 1 m2 PASANG LANTAI KERAMIK 20X20 cm
Ubin keramik 20x20 cm 26.5000 bh 2,520.00 66,780.00
Semen Portland 10.4000 Kg 1,400.00 14,560.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Semen warna 1.6200 Kg 15,700.00 25,434.00
Pekerja 0.7000 HOK 67,000.00 46,900.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0350 HOK 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 112,583.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K005 1 m2 PASANG LANTAI KERAMIK 30X30 cm putih (polos)
Keramik KW 1 DN putih polos 11.8700 bh 4,481.82 53,199.18
P.C (50 kg) 10.0000 kg 1,400.00 14,000.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.5000 kg 15,700.00 23,550.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 96,558.68
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
K006 1 m2 PASANG LANTAI KERAMIK 30X30 cm warna
Keramik KW 1 DN bercorak berwarna 11.8700 m² 5,245.45 62,263.55
P.C (50 kg) 14.1500 kg 1,400.00 19,810.00
Pasir pasang 0.0390 m³ 129,100.00 5,034.90
Semen warna 2.0000 kg 15,700.00 31,400.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 118,508.45
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K007 1 m2 PASANG LANTAI KERAMIK 10X20 cm, WARNA ( Anti Selip )
Ubin keramik artistik 10x20 cm, anti selip 53.0000 bh 1,800.00 95,400.00
Semen Portland 8.1900 Kg 1,400.00 11,466.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Semen warna 2.7500 Kg 15,700.00 43,175.00
Pekerja 0.7000 HOK 67,000.00 46,900.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0350 HOK 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 155,850.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K008 1 m2 PASANG LANTAI KERAMIK 20X20 cm, WARNA (Anti Selip)
Ubin keramik 20x20 cm 1.0100 m2 57,700.00 58,277.00
Semen Portland 10.4000 Kg 1,400.00 14,560.00
Pasir pasang 0.0450 m3 129,100.00 5,809.50
Semen warna 1.6200 Kg 15,700.00 25,434.00
Pekerja 0.7000 HOK 72,500.00 50,750.00
Tukang batu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0350 HOK 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 85,050.00 104,080.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K009 1 m2 PASANG LANTAI KERAMIK 30X30 cm
Keramik KW 1 DN bercorak 1.0100 m² 49,300.00 49,793.00
P.C (50 kg) 10.0000 kg 1,400.00 14,000.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.5000 kg 15,700.00 23,550.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 93,152.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K009a 1 m2 PASANG LANTAI KERAMIK 40X40 cm
Keramik KW 1 40 x 40 1.0100 m² 55,600.00 56,156.00
P.C (50 kg) 10.0000 kg 1,400.00 14,000.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.5000 kg 15,700.00 23,550.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 99,515.50
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
K009b 1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 40X40 cm
Keramik KW 1 DN bercorak 6.6300 bh 52,500.00 348,075.00
P.C (50 kg) 9.8000 kg 1,400.00 13,720.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.3000 kg 15,700.00 20,410.00
Pekerja 0.2500 org 67,000.00 16,750.00
Tk. batu trampil 0.1250 org 80,000.00 10,000.00
Kep. Tukang batu 0.0130 org 90,000.00 1,170.00
Mandor 0.0130 org 90,000.00 1,170.00
Total Upah dan bahan ( f & g ) 29,090.00 388,014.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K009c 1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 60X60 cm
Keramik KW 1 DN bercorak 3.1000 bh 0.00
P.C (50 kg) 9.6000 kg 1,400.00 13,440.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.5000 kg 15,700.00 23,550.00
Pekerja 0.2400 org 67,000.00 16,080.00
Tk. batu trampil 0.1200 org 80,000.00 9,600.00
Kep. Tukang batu 0.0120 org 90,000.00 1,080.00
Mandor 0.0120 org 90,000.00 1,080.00
Total Upah dan bahan ( f & g ) 27,840.00 42,799.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K010 1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SELIP
Keramik KW 1 DN bercorak anti slip 1.0100 m² 57,700.00 58,277.00
P.C (50 kg) 10.0000 kg 1,400.00 14,000.00
Pasir pasang 0.0450 m³ 129,100.00 5,809.50
Semen warna 1.5000 kg 15,700.00 23,550.00
Pekerja 0.7000 org 67,000.00 46,900.00
Tk. batu trampil 0.3500 org 80,000.00 28,000.00
Kep. Tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 101,636.50
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K011 1 m2 PASANG DINDING KERAMIK 10X20 cm
Keramik KW 1 DN putih 53.0000 bh 1,600.00 84,800.00
P.C (50 kg) 9.3000 kg 1,400.00 13,020.00
Pasir pasang 0.0180 m³ 129,100.00 2,323.80
Semen warna 2.7500 kg 15,700.00 43,175.00
Pekerja 0.9000 org 67,000.00 60,300.00
Tk. batu trampil 0.4500 org 80,000.00 36,000.00
Kep. Tukang batu 0.0450 org 90,000.00 4,050.00
Mandor 0.0450 org 90,000.00 4,050.00
Total Upah dan bahan ( f & g ) 104,400.00 143,318.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K012 1 m2 PASANG DINDING KERAMIK 15X15 cm
Keramik 15x15 cm 1.0000 m2 61,400.00 61,400.00
Semen Abu-abu 9.3000 Kg 1,400.00 13,020.00
Pasir pasang 0.0180 m3 129,100.00 2,323.80
Semen warna 1.5000 Kg 15,700.00 23,550.00
Pekerja 0.6000 HOK 67,000.00 40,200.00
Tukang batu 0.0450 HOK 80,000.00 3,600.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0300 HOK 90,000.00 2,700.00
Total Upah dan bahan ( f & g ) 50,550.00 100,293.80
a b c d e f=(cxe) g=(cxe)
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
K013 1 m2 PASANG DINDING KERAMIK 20X20 cm
Keramik 20x20 cm 26.0000 bh 2,520.00 65,520.00
Semen Abu-abu 9.3000 Kg 1,400.00 13,020.00
Pasir pasang 0.0180 m3 129,100.00 2,323.80
Semen warna 1.9400 Kg 15,700.00 30,458.00
Pekerja 0.9000 HOK 67,000.00 60,300.00
Tukang batu 0.4500 HOK 80,000.00 36,000.00
Kepala tukang 0.0450 HOK 90,000.00 4,050.00
Mandor 0.0450 HOK 90,000.00 4,050.00
Total Upah dan bahan ( f & g ) 104,400.00 111,321.80
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K014 1 m2 PASANG DINDING BATU TEMPEL HITAM
Batu Tempel 1.1000 m2 145,900.00 160,490.00
P C (50 kg) 11.7500 kg 1,400.00 16,450.00
Pasir Pasang 0.0350 m³ 129,100.00 4,518.50
Pekerja 0.7000 org 72,500.00 50,750.00
Tk.batu 0.3500 org 80,000.00 28,000.00
Kep.tukang batu 0.0350 org 90,000.00 3,150.00
Mandor 0.0350 org 90,000.00 3,150.00

Total Upah dan bahan ( f & g ) 85,050.00 181,458.50


Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K015 1 m2 PASANG PAVING BLOCK 6 cm, WARNA
Paving Block Warna 6 cm 1.0100 m² 100,800.00 101,808.00
Pasir Beton 0.1000 m³ 157,500.00 15,750.00
Pekerja Setengah Terampil 0.2500 org 70,000.00 17,500.00
Tukang Batu Setengah Terampil 0.5000 org 72,500.00 36,250.00
Kepala Tukang Batu 0.0250 org 90,000.00 2,250.00
Mandor 0.0030 org 90,000.00 270.00
Peralatan 1.0000 ls 11,755.80 11,755.80
Total Upah dan bahan ( f & g ) 68,025.80 117,558.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K016 1 m2 PASANG PAVING BLOCK 6 cm, NATURAL
Paving Block Natural 6 cm 1.0100 m² 85,000.00 85,850.00
Pasir Beton 0.1000 m³ 157,500.00 15,750.00
Pekerja Setengah Terampil 0.2500 org 70,000.00 17,500.00
Tukang Batu Setengah Terampil 0.5000 org 72,500.00 36,250.00
Kepala Tukang Batu 0.0250 org 90,000.00 2,250.00
Mandor 0.0030 org 90,000.00 270.00
Peralatan 1.0000 ls 10,160.00 10,160.00
Total Upah dan bahan ( f & g ) 66,430.00 101,600.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K017 1 m2 PASANG PAVING BLOCK 8 cm, WARNA
Paving Block Warna 8 cm 1.0100 m² 111,300.00 112,413.00
Pasir Beton 0.1000 m³ 157,500.00 15,750.00
Pekerja Setengah Terampil 0.2500 org 70,000.00 17,500.00
Tukang Batu Setengah Terampil 0.5000 org 72,500.00 36,250.00
Kepala Tukang Batu 0.0250 org 90,000.00 2,250.00
Mandor 0.0030 org 90,000.00 270.00
Peralatan 1.0000 ls 12,816.30 12,816.30
Total Upah dan bahan ( f & g ) 69,086.30 128,163.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
K018 1 m2 PASANG PAVING BLOCK 8 cm, NATURAL
Paving Block Natural 8 cm 1.0100 m² 95,500.00 96,455.00
Pasir Beton 0.1000 m³ 157,500.00 15,750.00
Pekerja Setengah Terampil 0.2500 org 70,000.00 17,500.00
Tukang Batu Setengah Terampil 0.5000 org 72,500.00 36,250.00
Kepala Tukang Batu 0.0250 org 90,000.00 2,250.00
Mandor 0.0030 org 90,000.00 270.00
Peralatan 1.0000 ls 11,220.50 11,220.50
Total Upah dan bahan ( f & g ) 67,490.50 112,205.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K019 1 m2 PASANG LANTAI PARQUET JATI
Parquet jati 1.0500 m2 0.00 0.00
Lem vinyil 0.6000 Kg 54,600.00 32,760.00
Pekerja 0.7000 HOK 67,000.00 46,900.00
Tukang kayu 0.3500 HOK 80,000.00 28,000.00
Kepala tukang 0.0350 HOK 90,000.00 3,150.00
Mandor 0.0350 HOK 90,000.00 3,150.00
Total Upah dan bahan ( f & g ) 81,200.00 32,760.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
K020 1 m2 PASANG DINDING BATA KLINKER 5X11X24 cm (bata berongga ekspose)
Bata pelapis klinker 70.0000 bh 4,300.00 301,000.00
Semen Portland 14.0000 Kg 1,400.00 19,600.00
Pasir pasang 0.0320 m3 129,100.00 4,131.20
Pekerja 0.3000 HOK 67,000.00 20,100.00
Tukang batu 0.1500 HOK 80,000.00 12,000.00
Kepala tukang 0.0150 HOK 90,000.00 1,350.00
Mandor 0.0150 HOK 90,000.00 1,350.00
Total Upah dan bahan ( f & g ) 34,800.00 324,731.20
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L PEKERJAAN PENGECATAN
L001 1 m2 PENGIKISAN/PENGEROKAN PERMUKAAN CAT LAMA
Soda api 0.0500 Kg 0.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 10,320.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L002 1 m2 PENCUCIAN BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT
Sabun 0.0500 Kg 0.00
Pekerja 0.1500 HOK 67,000.00 10,050.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 10,320.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L006 1 m2 PENGECATAN BIDANG KAYU LAMA
Plamir 0.1500 Kg 26,200.00 3,930.00
Cat dasar 0.1700 Kg 36,700.00 6,239.00
Cat Penutup 0.1700 Kg 55,100.00 9,367.00
Pekerja 0.0700 HOK 67,000.00 4,690.00
Tukang cat 0.0750 HOK 80,000.00 6,000.00
Kepala tukang 0.0075 HOK 90,000.00 675.00
Mandor 0.0025 HOK 90,000.00 225.00
Total Upah dan bahan ( f & g ) 11,590.00 19,536.00
Keuntungan & overhead ( pr )
a b c d e f=(cxe) g=(cxe)
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
L007 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat meni 0.2000 Kg 31,500.00 6,300.00
Plamir 0.1500 Kg 26,200.00 3,930.00
Cat dasar 0.1700 Kg 36,700.00 6,239.00
Cat Penutup ( 2 kali ) 0.2600 Kg 55,100.00 14,326.00
Kuas 0.0100 bh 10,500.00 105.00
Pengencer 0.0300 ltr 26,200.00 786.00
Ampelas 0.2000 lbr 3,600.00 720.00
Pekerja 0.0700 HOK 67,000.00 4,690.00
Tukang cat 0.0090 HOK 80,000.00 720.00
Kepala tukang 0.0060 HOK 90,000.00 540.00
Mandor 0.0025 HOK 90,000.00 225.00
Total Upah dan bahan ( f & g ) 6,175.00 32,406.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L008 1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR
Politur 0.1500 Ltr 31,500.00 4,725.00
Politur jadi 0.3720 Ltr 43,000.00 15,996.00
Ampelas 2.0000 Lbr 3,600.00 7,200.00
Pekerja 0.0400 HOK 67,000.00 2,680.00
Tukang cat 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0160 HOK 90,000.00 1,440.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 9,190.00 27,921.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L009 1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
Residu atau ter 0.3500 Ltr 10,500.00 3,675.00
Pekerja 0.1000 HOK 67,000.00 6,700.00
Mandor 0.0060 HOK 90,000.00 540.00
Total Upah dan bahan ( f & g ) 7,240.00 3,675.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L010 1 m2 PELABURAN BIDANG KAYU DENGAN VERNIS
Vernis 0.1500 Ltr 39,300.00 5,895.00
Dempul 0.0500 Kg 42,000.00 2,100.00
Ampelas 0.1000 Lbr 3,600.00 360.00
Pekerja 0.1600 HOK 67,000.00 10,720.00
Tukang cat 0.1600 HOK 80,000.00 12,800.00
Kepala tukang 0.0160 HOK 90,000.00 1,440.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 25,230.00 8,355.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L011 1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir 0.1000 Kg 26,200.00 2,620.00
Cat dasar 0.1000 Kg 14,700.00 1,470.00
Cat Penutup ( 2 kali ) 0.2600 Kg 23,600.00 6,136.00
Pekerja 0.0200 HOK 67,000.00 1,340.00
Tukang cat 0.0630 HOK 80,000.00 5,040.00
Kepala tukang 0.0063 HOK 90,000.00 567.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 7,217.00 10,226.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
L012 1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
Cat dasar 0.1200 Kg 14,700.00 1,764.00
Cat Penutup ( 2 kali ) 0.1800 Kg 23,600.00 4,248.00
Pekerja 0.0280 HOK 67,000.00 1,876.00
Tukang cat 0.0420 HOK 80,000.00 3,360.00
Kepala tukang 0.0042 HOK 90,000.00 378.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 5,884.00 6,012.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L013 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
Meni besi 0.1000 Kg 31,500.00 3,150.00
Kuas 0.0100 Bh 10,500.00 105.00
Pekerja 0.0200 HOK 67,000.00 1,340.00
Tukang cat 0.2000 HOK 80,000.00 16,000.00
Kepala tukang 0.0200 HOK 90,000.00 1,800.00
Mandor 0.0025 HOK 90,000.00 225.00
Total Upah dan bahan ( f & g ) 19,365.00 3,255.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L014 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH
Meni besi 0.1000 Kg 31,500.00 3,150.00
Kuas 0.0100 Bh 10,500.00 105.00
Pengencer 0.0100 ltr 26,200.00 262.00
Perancah kayu 0.0020 m3 4,735.40 9.47
Pekerja 0.2500 HOK 67,000.00 16,750.00
Tukang cat 0.2250 HOK 80,000.00 18,000.00
Kepala tukang 0.0225 HOK 90,000.00 2,025.00
Mandor 0.0075 HOK 90,000.00 675.00
Total Upah dan bahan ( f & g ) 37,450.00 3,526.47
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L015 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
Cat 0.3000 Kg 55,600.00 16,680.00
Kuas 0.0100 Bh 10,500.00 105.00
Pengencer 0.0100 ltr 26,200.00 262.00
Pekerja 0.0600 HOK 67,000.00 4,020.00
Tukang cat 0.0600 HOK 80,000.00 4,800.00
Kepala tukang 0.0120 HOK 90,000.00 1,080.00
Mandor 0.0030 HOK 90,000.00 270.00
Total Upah dan bahan ( f & g ) 10,170.00 17,047.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
L016 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SEMPROT (1 lap cat mutakhir, tebal 200 um)
Cat 0.3000 Kg 55,600.00 16,680.00
Pengencer 0.0100 ltr 26,200.00 262.00
Pekerja 0.4000 HOK 67,000.00 26,800.00
Tukang cat 0.7000 HOK 80,000.00 56,000.00
Kepala tukang 0.0700 HOK 90,000.00 6,300.00
Mandor 0.0200 HOK 90,000.00 1,800.00
Total Upah dan bahan ( f & g ) 90,900.00 16,942.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
L017 1 m2 PENGECATAN PLAFOND
Cat 0.2000 Kg 23,600.00 4,720.00
Plamir tembok 0.1600 Kg 26,200.00 4,192.00
Roll cat 0.0100 bh 26,200.00 262.00
Steger werk 1.0000 lot 9,174.00 9,174.00
Amplas 0.5000 lbr 3,600.00 1,800.00
Pekerja 1/2 terampil 0.1040 HOK 70,000.00 7,280.00
Tukang cat 1/2 terampil 0.1820 HOK 72,500.00 13,195.00
Kepala tukang 0.0195 HOK 90,000.00 1,755.00
Mandor 0.0100 HOK 90,000.00 900.00
Total Upah dan bahan ( f & g ) 23,130.00 20,148.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E023 1 M3 KOLOM 30 X 30 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 88.890 kg 12,895.50 1,146,281.00
Bekisting 13.333 m2 281,677.50 3,755,700.00
Total Upah dan bahan ( f & g ) 5,572,875.00 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E024 1 M3 KOLOM 40 X 80 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 38.880 kg 12,895.50 501,377.04
Bekisting 7.500 m2 281,677.50 2,112,581.25
Total Upah dan bahan ( f & g ) 3,284,852.29 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E025 1 M3 KOLOM 15 X 15 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 211.560 kg 12,895.50 2,728,171.98
Bekisting 26.667 m2 281,677.50 7,511,493.89
Total Upah dan bahan ( f & g ) 10,910,559.87 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E025a 1 M3 KOLOM 15 X 20 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 179.744 kg 12,895.50 2,317,888.75
Bekisting 23.333 m2 281,677.50 6,572,475.00
Total Upah dan bahan ( f & g ) 9,561,257.75 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E026 1 M3 KOLOM 15 X 25 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 153.600 kg 12,895.50 1,980,748.80
Bekisting 21.333 m2 281,677.50 6,009,120.00
Total Upah dan bahan ( f & g ) 8,660,762.80 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E027 1 M3 KOLOM 20 X 25 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 119.200 kg 12,895.50 1,537,143.60
Bekisting 18.000 m2 281,677.50 5,070,195.00
Total Upah dan bahan ( f & g ) 7,278,232.60 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E028 1 M3 KOLOM 25 X 25 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 99.630 kg 12,895.50 1,284,778.67
Bekisting 16.000 m2 281,677.50 4,506,840.00
Total Upah dan bahan ( f & g ) 6,462,512.67 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E029 1 M3 BALOK 15 X 20 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 185.417 kg 12,895.50 2,391,044.92
Bekisting 23.333 m2 288,780.60 6,738,117.74
Total Upah dan bahan ( f & g ) 9,800,056.66 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E030 1 M3 BALOK 50 X 65 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 55.313 kg 12,895.50 713,288.79
Bekisting 7.077 m2 288,780.60 2,043,700.31
Total Upah dan bahan ( f & g ) 3,427,883.10 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E031 1 M3 BALOK 40 X 80 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 44.440 kg 12,895.50 573,076.02
Bekisting 6.250 m2 288,780.60 1,804,878.75
Total Upah dan bahan ( f & g ) 3,048,848.77 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E032 1 M3 BALOK 40 X 65 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 51.620 kg 12,895.50 665,665.71
Bekisting 6.538 m2 288,780.60 1,888,047.56
Total Upah dan bahan ( f & g ) 3,224,607.27 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E033 1 M3 BALOK 25 X 30 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 103.110 kg 12,895.50 1,329,655.01
Bekisting 11.333 m2 288,780.60 3,272,750.54
Total Upah dan bahan ( f & g ) 5,273,299.54 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E034 1 M3 PLAT LANTAI T = 12 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 79.333 kg 12,895.50 1,023,038.70
Bekisting 8.333 m2 315,277.50 2,627,207.41
Total Upah dan bahan ( f & g ) 4,321,140.11 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E035 1 M3 PLAT LANTAI T = 10 CM
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 95.200 kg 12,895.50 1,227,651.60
Bekisting 10.000 m2 315,277.50 3,152,775.00
Total Upah dan bahan ( f & g ) 5,051,320.60 0.00
Keuntungan & overhead ( pr )
a b c d e f=(cxe) g=(cxe)
Jumlah Harga ( f + g + pr )
Dibulatkan
a b c d e f=(cxe) g=(cxe)
E036 1 M3 SLOOF 20 X 25
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 119.150 kg 12,895.50 1,536,498.83
Bekisting 9.000 m2 174,176.50 1,567,588.50
Total Upah dan bahan ( f & g ) 3,774,981.33 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E037 1 M3 SLOOF 20 X 30
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 92.670 kg 12,895.50 1,195,025.99
Bekisting 10.000 m2 174,176.50 1,741,765.00
Total Upah dan bahan ( f & g ) 3,607,684.99 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E038 1 M3 SLOOF 15 X 20
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 185.417 kg 12,895.50 2,391,044.92
Bekisting 11.667 m2 174,176.50 2,032,117.23
Total Upah dan bahan ( f & g ) 5,094,056.15 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
E039 1 M3 RINGBALK
Beton 1PC: 2 PS: 3KR 1.000 m3 670,894.00 670,894.00
Besi beton 185.417 kg 12,895.50 2,391,044.92
Bekisting 11.667 m2 174,176.50 2,032,117.23
Total Upah dan bahan ( f & g ) 5,094,056.15 0.00
Keuntungan & overhead ( pr )
Jumlah Harga ( f + g + pr )
Dibulatkan
HARGA SATUAN
PEKERJAAN
( Rp )
h

3,375.00
337.50
3,712.50
3,710.00

27,943.84
2,794.38
30,738.22
30,730.00

316,235.90
31,623.59
347,859.49
347,850.00

739,407.50
73,940.75
813,348.25
813,340.00

874,592.00
87,459.20
962,051.20
h
962,050.00
h

11,200.00
1,120.00
12,320.00
12,320.00

953,318.00
95,331.80
1,048,649.80
1,048,640.00

476,659.00
47,665.90
524,324.90
524,320.00

5,600.00
560.00
6,160.00
6,160.00

35,800.00
3,580.00
39,380.00
39,380.00

9,375.00
937.50
10,312.50
10,310.00

526,000.00
52,600.00
578,600.00
578,600.00

8,825.00
882.50
9,707.50
9,700.00
h

262,500.00
26,250.00
288,750.00
288,750.00

113,025.20
11,302.52
124,327.72
124,320.00

52,500.00
5,250.00
57,750.00
57,750.00

64,350.00
6,435.00
70,785.00
70,780.00

76,380.00
7,638.00
84,018.00
84,010.00

3,800.00
380.00
4,180.00
4,180.00

23,010.00
2,301.00
25,311.00
25,310.00

38,000.00
h
3,800.00
41,800.00
41,800.00
h

38,000.00
3,800.00
41,800.00
41,800.00

172,200.00
17,220.00
189,420.00
189,420.00

196,800.00
19,680.00
216,480.00
216,480.00

153,760.00
15,376.00
169,136.00
169,130.00

84,120.00
8,412.00
92,532.00
92,530.00

21,000.00
2,100.00
23,100.00
23,100.00

754,125.70
75,412.57
829,538.27
829,530.00
h

670,613.50
67,061.35
737,674.85
737,670.00

620,532.00
62,053.20
682,585.20
682,580.00

585,830.40
58,583.04
644,413.44
644,410.00

293,187.00
29,318.70
322,505.70
322,500.00

2,173,986.40
217,398.64
2,391,385.04
2,391,380.00
h

459,100.00
45,910.00
505,010.00
505,010.00

110,785.80
11,078.58
121,864.38
121,860.00

104,632.00
10,463.20
115,095.20
115,090.00

101,001.30
10,100.13
111,101.43
111,100.00

98,711.50
9,871.15
108,582.65
108,580.00
h

202,601.20
20,260.12
222,861.32
222,860.00

152,712.00
15,271.20
167,983.20
167,980.00

317,268.50
31,726.85
348,995.35
348,990.00

84,929.20
8,492.92
93,422.12
93,420.00
h

58,571.20
5,857.12
64,428.32
64,420.00
h

51,695.60
5,169.56
56,865.16
56,860.00

48,655.70
4,865.57
53,521.27
53,520.00

46,634.40
4,663.44
51,297.84
51,290.00

51,695.60
5,169.56
56,865.16
56,860.00

48,655.70
4,865.57
53,521.27
53,520.00
h
14,898.30
1,489.83
16,388.13
16,380.00
h

37,172.60
3,717.26
40,889.86
40,880.00

28,104.20
2,810.42
30,914.62
30,910.00

45,225.20
4,522.52
49,747.72
49,740.00

27,750.00
2,775.00
30,525.00
30,520.00

6,985,040.00
698,504.00
7,683,544.00
7,683,540.00
h

510,908.00
51,090.80
561,998.80
561,990.00
h

374,244.80
37,424.48
411,669.28
411,660.00

377,604.80
37,760.48
415,365.28
415,360.00

377,604.80
37,760.48
415,365.28
415,360.00

501,092.00
50,109.20
551,201.20
551,200.00

403,336.72
40,333.67
443,670.39
443,670.00
h

6,126,380.00
612,638.00
6,739,018.00
6,739,010.00

7,450,350.00
745,035.00
8,195,385.00
8,195,380.00

7,004,970.00
700,497.00
7,705,467.00
7,705,460.00

100,852.80
10,085.28
110,938.08
110,930.00

100,852.80
10,085.28
110,938.08
110,930.00
h

109,363.08
10,936.31
120,299.39
120,290.00

70,732.20
7,073.22
77,805.42
77,800.00

40,435.00
4,043.50
44,478.50
44,470.00

168,535.60
16,853.56
185,389.16
185,380.00

290,335.60
29,033.56
319,369.16
319,360.00
h

166,992.00
16,699.20
183,691.20
183,690.00
h

12,330.00
1,233.00
13,563.00
13,560.00

642,201.00
64,220.10
706,421.10
706,420.00

103,286.20
10,328.62
113,614.82
113,610.00

626,708.50
62,670.85
689,379.35
689,370.00

670,894.00
67,089.40
737,983.40
737,980.00
h

12,895.50
1,289.55
14,185.05
14,180.00

1,289,550.00
128,955.00
1,418,505.00
1,418,500.00

63,034.00
6,303.40
69,337.40
69,330.00

162,338.00
16,233.80
178,571.80
178,570.00

174,176.50
17,417.65
191,594.15
191,590.00
h

281,677.50
28,167.75
309,845.25
309,840.00

278,098.50
27,809.85
305,908.35
305,900.00

288,780.60
28,878.06
317,658.66
317,650.00

300,801.60
30,080.16
330,881.76
330,880.00
h

315,277.50
31,527.75
346,805.25
346,800.00

311,698.50
31,169.85
342,868.35
342,860.00

289,039.00
28,903.90
317,942.90
317,940.00

307,140.00
30,714.00
337,854.00
337,850.00
h

257,255.50
25,725.55
282,981.05
282,980.00

253,676.50
25,367.65
279,044.15
279,040.00

710,420.25
71,042.03
781,462.28
781,460.00

748,027.78
74,802.78
822,830.56
822,830.00
h
777,581.90
77,758.19
855,340.09
855,340.00
h

812,493.33
81,249.33
893,742.67
893,740.00

845,879.72
84,587.97
930,467.69
930,460.00

870,758.33
87,075.83
957,834.17
957,830.00

887,287.78
88,728.78
976,016.56
976,010.00

895,278.00
89,527.80
984,805.80
984,800.00
h

904,211.17
90,421.12
994,632.28
994,630.00

968,076.67
96,807.67
1,064,884.33
1,064,880.00

979,693.17
97,969.32
1,077,662.48
1,077,660.00

1,286,423.50
128,642.35
1,415,065.85
1,415,060.00

1,303,283.53
130,328.35
1,433,611.89
1,433,610.00
h

1,311,433.56
131,143.36
1,442,576.92
1,442,570.00

1,320,545.39
132,054.54
1,452,599.93
1,452,590.00

3,548,868.00
354,886.80
3,903,754.80
3,903,750.00

4,395,022.00
439,502.20
4,834,524.20
4,834,520.00
h

7,106,428.00
710,642.80
7,817,070.80
7,817,070.00

7,070,638.00
707,063.80
7,777,701.80
7,777,700.00
h
5,454,447.00
545,444.70
5,999,891.70
5,999,890.00
h

5,422,485.00
542,248.50
5,964,733.50
5,964,730.00

4,740,659.00
474,065.90
5,214,724.90
5,214,720.00
h
4,653,700.00
465,370.00
5,119,070.00
5,119,070.00
h

4,625,068.00
462,506.80
5,087,574.80
5,087,570.00

5,065,469.50
506,546.95
5,572,016.45
5,572,010.00

73,250.10
7,325.01
80,575.11
80,570.00
h

88,977.10
8,897.71
97,874.81
97,870.00

69,945.00
6,994.50
76,939.50
76,930.00

94,990.00
9,499.00
104,489.00
104,480.00

54,690.00
5,469.00
60,159.00
60,150.00

71,910.00
7,191.00
79,101.00
79,100.00
h

91,710.00
9,171.00
100,881.00
100,880.00

142,582.00
14,258.20
156,840.20
156,840.00

84,611.20
8,461.12
93,072.32
93,070.00

81,611.20
8,161.12
89,772.32
89,770.00

91,611.20
9,161.12
100,772.32
100,770.00
h
84,611.20
8,461.12
93,072.32
93,070.00
h

122,571.20
12,257.12
134,828.32
134,820.00

79,711.20
7,971.12
87,682.32
87,680.00

112,310.00
11,231.00
123,541.00
123,540.00

49,432.00
4,943.20
54,375.20
54,370.00

97,798.00
9,779.80
107,577.80
107,570.00
h

88,468.00
8,846.80
97,314.80
97,310.00

49,588.00
4,958.80
54,546.80
54,540.00

27,046.00
2,704.60
29,750.60
29,750.00

124,892.00
12,489.20
137,381.20
137,380.00

154,264.00
15,426.40
169,690.40
169,690.00

31,915.00
h
3,191.50
35,106.50
35,100.00
h

106,506.00
10,650.60
117,156.60
117,150.00

92,010.00
9,201.00
101,211.00
101,210.00

19,134.00
1,913.40
21,047.40
21,040.00

42,994.50
4,299.45
47,293.95
47,290.00

101,708.40
10,170.84
111,879.24
111,870.00
h

117,417.01
11,741.70
129,158.71
129,150.00

43,145.20
4,314.52
47,459.72
47,450.00

147,922.00
14,792.20
162,714.20
162,710.00

2,573,720.00
257,372.00
2,831,092.00
2,831,090.00

636,891.00
63,689.10
700,580.10
700,580.00
h
3,007,961.00
300,796.10
3,308,757.10
3,308,750.00
h

1,281,123.00
128,112.30
1,409,235.30
1,409,230.00

407,244.00
40,724.40
447,968.40
447,960.00

106,389.10
10,638.91
117,028.01
117,020.00

183,919.19
18,391.92
202,311.11
202,310.00
h

344,578.00
34,457.80
379,035.80
379,030.00
h

527,574.00
52,757.40
580,331.40
580,330.00

38,057.17
3,805.72
41,862.88
41,860.00

45,910.50
4,591.05
50,501.55
50,500.00

53,376.33
5,337.63
58,713.97
58,710.00

80,255.17
8,025.52
88,280.68
88,280.00
h

29,745.00
2,974.50
32,719.50
32,710.00

14,442.00
1,444.20
15,886.20
15,880.00

18,084.50
1,808.45
19,892.95
19,890.00

21,765.75
2,176.58
23,942.33
23,940.00

29,180.50
2,918.05
32,098.55
32,090.00
h
42,588.00
4,258.80
46,846.80
46,840.00
h

54,420.75
5,442.08
59,862.83
59,860.00

69,068.25
6,906.83
75,975.08
75,970.00

88,482.00
8,848.20
97,330.20
97,330.00

267,875.00
26,787.50
294,662.50
294,660.00

115,525.00
11,552.50
127,077.50
127,070.00

39,920.00
h
3,992.00
43,912.00
43,910.00
h

73,811.43
7,381.14
81,192.57
81,190.00

98,685.18
9,868.52
108,553.69
108,550.00

8,513,288.21
851,328.82
9,364,617.03
9,364,610.00

3,418,311.03
341,831.10
3,760,142.13
3,760,140.00

22,740.00
h
2,274.00
25,014.00
25,010.00
h

208,868.00
20,886.80
229,754.80
229,750.00

254,128.80
25,412.88
279,541.68
279,540.00

76,939.00
7,693.90
84,632.90
84,630.00

142,559.80
14,255.98
156,815.78
156,810.00

57,690.00
5,769.00
63,459.00
63,450.00

227,220.00
h
22,722.00
249,942.00
249,940.00
h

111,705.00
11,170.50
122,875.50
122,870.00

56,427.00
5,642.70
62,069.70
62,060.00

52,115.00
5,211.50
57,326.50
57,320.00

56,422.50
5,642.25
62,064.75
62,060.00

44,975.00
4,497.50
49,472.50
49,470.00

49,630.00
4,963.00
54,593.00
54,590.00
h

180,190.00
18,019.00
198,209.00
198,200.00

100,997.00
10,099.70
111,096.70
111,090.00

124,097.00
12,409.70
136,506.70
136,500.00

166,500.00
16,650.00
183,150.00
183,150.00

15,075.00
1,507.50
16,582.50
16,580.00

18,735.00
1,873.50
20,608.50
20,600.00
h

51,779.50
5,177.95
56,957.45
56,950.00

226,450.50
22,645.05
249,095.55
249,090.00

203,664.50
20,366.45
224,030.95
224,030.00

193,783.50
19,378.35
213,161.85
213,160.00

177,758.68
h
17,775.87
195,534.55
195,530.00
h

199,708.45
19,970.84
219,679.29
219,670.00

237,050.50
23,705.05
260,755.55
260,750.00

189,130.50
18,913.05
208,043.55
208,040.00

174,352.50
17,435.25
191,787.75
191,780.00

180,715.50
h
18,071.55
198,787.05
198,780.00
h

417,104.50
41,710.45
458,814.95
458,810.00

70,639.50
7,063.95
77,703.45
77,700.00

182,836.50
18,283.65
201,120.15
201,120.00

247,718.80
24,771.88
272,490.68
272,490.00

150,843.80
h
15,084.38
165,928.18
165,920.00
h

215,721.80
21,572.18
237,293.98
237,290.00

266,508.50
26,650.85
293,159.35
293,150.00

185,583.80
18,558.38
204,142.18
204,140.00

168,030.00
16,803.00
184,833.00
184,830.00

197,249.30
19,724.93
216,974.23
216,970.00
h

179,695.50
17,969.55
197,665.05
197,660.00

113,960.00
11,396.00
125,356.00
125,350.00

359,531.20
35,953.12
395,484.32
395,480.00

10,320.00
1,032.00
11,352.00
11,350.00

10,320.00
1,032.00
11,352.00
11,350.00

31,126.00
3,112.60
h
34,238.60
34,230.00
h

38,581.00
3,858.10
42,439.10
42,430.00

37,111.00
3,711.10
40,822.10
40,820.00

10,915.00
1,091.50
12,006.50
12,000.00

33,585.00
3,358.50
36,943.50
36,940.00

17,443.00
1,744.30
19,187.30
19,180.00
h

11,896.00
1,189.60
13,085.60
13,080.00

22,620.00
2,262.00
24,882.00
24,880.00

40,976.47
4,097.65
45,074.12
45,070.00

27,217.00
2,721.70
29,938.70
29,930.00

107,842.00
10,784.20
118,626.20
118,620.00
h

43,278.00
4,327.80
47,605.80
47,600.00

5,572,875.00
557,287.50
6,130,162.49
6,130,160.00

3,284,852.29
328,485.23
3,613,337.52
3,613,330.00

10,910,559.87
1,091,055.99
12,001,615.86
12,001,610.00

9,561,257.75
956,125.78
10,517,383.53
10,517,380.00

8,660,762.80
866,076.28
9,526,839.08
9,526,830.00

7,278,232.60
727,823.26
8,006,055.86
8,006,050.00
h

6,462,512.67
646,251.27
7,108,763.93
7,108,760.00

9,800,056.66
980,005.67
10,780,062.33
10,780,060.00

3,427,883.10
342,788.31
3,770,671.41
3,770,670.00

3,048,848.77
304,884.88
3,353,733.65
3,353,730.00

3,224,607.27
322,460.73
3,547,068.00
3,547,060.00

5,273,299.54
527,329.95
5,800,629.50
5,800,620.00

4,321,140.11
432,114.01
4,753,254.12
4,753,250.00

5,051,320.60
505,132.06
h
5,556,452.66
5,556,450.00
h

3,774,981.33
377,498.13
4,152,479.46
4,152,470.00

3,607,684.99
360,768.50
3,968,453.48
3,968,450.00

5,094,056.15
509,405.61
5,603,461.76
5,603,460.00

5,094,056.15
509,405.61
5,603,461.76
5,603,460.00
DAFTAR PERHITUNGAN BAHAN DAN UPAH
JENIS PEKERJAAN : TEMBOK PENAHAN TANAH

No Sket Gambar Perhitungan Volume dan

1 TEMBOK PENAHAN TANAH 100 m' (TPT) Pas. Batu Kali 1 PC : 5 Ps

DATA PONDASI 1.1 Pas. Batu (1:5)


PONDASI A B Rata-rata Satuan =((
Panjang 10 10 m +(
Lebar atas 0.25 0.25 0.25 m =(
Lebar bawah 0.50 0.40 0.45 m =(
Tinggi atas 1.5 0.7 1.1 m
Tinggi bawah 0.40 0.20 0.3 m V Pas tot =

Analisa DTRCK Kabupaten Kuningan


1 M3 PASANG PONDASI BATU KAL
URAIAN
PONDASI A BAHAN
Batu belah
0.25 Semen (50kg)
Pasir
Plesteran Ban UPAH
Camp. 1Pc : 5 Ps Pekerja
Tukang
10 10 Mandor

1 M2 PLESTERAN 1 Pc : 5 Ps TEBAL
Suling-suling 1.50
1.2 Plesteran (1:5)
1.90 =(

L Pl tot =
URAIAN
Pasangan Batu 0.40
BAHAN
Camp 1Pc : 5 Ps Semen (50kg)
Pasir
UPAH
Pekerja
0.50 Tukang
Mandor

DETAIL TPT

PONDASI B 0.25 1 M2 ACIAN


=
Plesteran Ban
Camp. 1Pc : 5 Ps L Pl tot =
L Pl tot =
10 10 URAIAN
BAHAN
Suling-suling 0.70 Semen (50kg)
0.90 Pasir
UPAH
Pekerja
Pasangan Batu 0.20
Tukang
Camp 1Pc : 5 Ps
Mandor
10 10

Suling-suling

Pasangan Batu
No Camp 1Pc : 5 Ps Sket Gambar Perhitungan Volume dan

0.40

1 M3 GALIAN TANAH BIASA SEDAL


DETAIL TPT (
V Gal =

UPAH
Pekerja
Mandor
1.90

0.90
REKAPITULASI KEBUTUHAN BAHAN,

BAHAN

A B 1 Batu Belah
100.0 2 Pasir Pasang
3 Semen 50 Kg
4 Bambu

ALAT
1 Ember aduk
0.30
2 Benang
3
4
0.45
UPAH
1 Mandor
2 Tukang / Buruh Terlatih
3 Pekerja / Buruh Tak Terlatih

Pengukuran Tanggal:
Diukur oleh:
BAHAN DAN UPAH
VOLUME KEGIATAN m'

Perhitungan Volume dan Kebutuhan Bahan, Alat dan Upah

as. Batu Kali 1 PC : 5 Ps

1 Pas. Batu (1:5)


0.250 + 0.45 )/ 2.0 x 1.10
0.45 x 0.30 ))x 10.0 m

0.39 + 0.135 ) x 10
0.52 x 10 )

5.20 m3

nalisa DTRCK Kabupaten Kuningan


1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps
KOEF

= 1.1000 x 5.20 = 5.72 m3


136 Kg = 2.7200 x 5.20 = 14.14 sak
= 0.5440 x 5.20 = 2.83 m3

= 1.5000 x 5.20 = 7.80 OH


= 0.660 x 5.20 = 3.43 OH
= 0.075 x 5.20 = 0.39 OH

1 M2 PLESTERAN 1 Pc : 5 Ps TEBAL 15 mm
2 Plesteran (1:5)
0.250 + 0.20 ) x 10.0 = 4.50

4.50 m2 4.50
KOEF

4.32 kg = 0.0864 x 4.50 = 0.39 sak


= 0.0220 x 4.50 = 0.10 m3

= 0.2000 x 4.50 = 0.90 OH


= 0.1650 x 4.50 = 0.74 OH
= 0.0100 x 4.50 = 0.05 OH

0.250 + 0.20 x 10.0 = 4.5


+ x - = -
4.50 m2 4.5
KOEF

4 kg = 0.0800 x 4.50 = 0.36 sak


= 0.0000 x 4.50 = - m3

= 0.1430 x 4.50 = 0.64 OH


= 0.118 x 4.50 = 0.53 OH
= 0.001 x 4.50 = 0.00 OH
Perhitungan Volume dan Kebutuhan Bahan, Alat dan Upah

1 M3 GALIAN TANAH BIASA SEDALAM 1 M


0.30 x 0.45 )x 10.0
1.35 m3

KOEF
= 0.4000 x 1.35 = 0.54 OH
= 0.0400 x 1.35 = 0.05 OH

EKAPITULASI KEBUTUHAN BAHAN, ALAT DAN UPAH

= 5.7 ~ 6 m3

= 2.9 ~ 3 m3
= 14.9 ~ 15 sak
= 10 ~ 10 batang

= 10.0 ~ 10 bh
= 5.0 ~ 5 bh
~ -
~ -

= 0.5 ~ - OH
ukang / Buruh Terlatih = 4.7 ~ 5 OH
ekerja / Buruh Tak Terlatih = 9.9 ~ 10 OH
DAFTAR HARGA UPAH, BAHAN DAN ALAT
PEKERJAAN : Rehab Mushola
DESA : Gunajaya
LOKASI : Kp. Petir 01//007

No. Komponen Satuan Harga Dasar PPN 10%

I. UPAH - - - - -
- 1 Pekerja - HOK 80,000 8,000
- 2 Tukang Batu - HOK 110,000 11,000
- 3 Tukang - HOK 110,000 11,000
- 4 Tukang Kayu - HOK 110,000 11,000
- 5 Kepala Tukang - HOK 110,000 11,000
- 6 Mandor - HOK 110,000 11,000
- - - - - - -
II BAHAN - - - - -
- 1 Abu Batu - M3 350,000 35,000
- 2 Aspal - Kg 1,800,000 180,000
- 3 Atap Baja Ringan + Genteng M - m2 250,000 25,000
- 4 Balok kayu kelas II - m3 1,800,000 180,000
- 5 Bata merah - bh 800 80
- 6 Batu Belah - m3 141,000 14,100
- 7 Benang - bh 5,000 500
- 8 Besi Beton 10mm - btg 70,000 7,000
- 9 Besi Beton 8mm - btg 45,000 4,500
- 10 Bubungan - bh 90,000 9,000
- 11 Cangkul - bh 75,000 7,500
- 12 Cat dasar Tembok - kg 25,000 2,500
- 13 Cat Penutup Tembok - kg 25,000 2,500
- 14 Dolken kayu Ø 8-10/400 cm - btg 15,000 1,500
- 15 Ember - bh 10,000 1,000
- 16 Ember Aduk - bh 10,000 1,000
- 17 Floor drain - bh 15,000 1,500
- 18 Foot Klep - bh 40,000 4,000
- 19 Gergaji Besi + Mata Gergaji - bh 50,000 5,000
- 20 Gerobak Dorong - bh 550,000 55,000
- 21 Glassbox - bh 30,000 3,000
- 22 GRC Board - lbr 55,000 5,500
- 23 Kabel - m 10,000 1,000
- 24 Kaso 5/7 - m3 1,800,000 180,000
- 25 Kawat beton - kg 25,000 2,500
- 26 Kayu Bakar - M3 150,000 15,000
- 27 Kayu balok 5/7 Kelas II - m3 1,800,000 180,000
- 28 Kayu papan 3/20 - m3 1,800,000 180,000
- 29 keramik Dinding - m2 65,000 6,500
- 30 Keramik Lantai - m2 65,000 6,500
- 31 Kerikil - m3 250,000 25,000
- 32 Kloset jongkok teraso - bh - -
- 33 Knee 3" - bh - -
- 34 Knee 3/4" - bh - -
- 35 Knee 4" - bh - -
- 36 Kran air - bh - -
- 37 Lem Pipa - bh - -
- 38 List profil - m1 - -
- 39 Listplank - m1 - -
- 40 Minyak Bekisting - ltr 17,000 1,700
- 41 Mobilisasi & Demobilisasi Mo - ls 300,000 30,000
- 42 Paku 5 - 10 cm - kg 15,000 1,500
- 43 Paku 5 – 10 cm - kg 15,000 1,500
- 44 Paku Biasa 2" - 5" - kg 15,000 1,500
- 45 Paku GRC - kg 15,000 1,500
- 46 Papan 3/20 cm - m3 1,800,000 180,000
- 47 Papan Bekisting - m3 1,500,000 150,000
- 48 Papan kayu 3/20 Kelas III - m3 1,500,000 150,000
- 49 Papan Nama Kegiatan - bh 350,000 35,000
- 50 Pasir Beton - m3 200,000 20,000
- 51 Pasir Pasang - m3 180,000 18,000
- 52 Pasir Urug - m3 140,000 14,000
- 53 Pintu Alumunium - bh 500,000 50,000
- 54 Pipa PVC 3/4" - btg 25,000 2,500
- 55 Pipa PVC 3” - btg 40,000 4,000
- 56 Pipa PVC 4" - btg 50,000 5,000
- 57 Plamir - kg 20,000 2,000
- 58 Plywood 120x240 tbl. 9 mm - lbr 160,000 16,000
- 59 Kusen Pintu + Daun Pintu - unit 1,200,000 120,000
- 60 Radar - bh - -
- 61 Rol Cat + Bak - bh 50,000 5,000
- 62 Rooster - bh 12,000 1,200
- 63 SDD 3/4" - bh 8,000 800
- 64 SDL 1" - bh 8,000 800
- 65 Sealtape - bh 8,000 800
- 66 Semen - zak 60,000 6,000
- 67 Semen Portland 50 KG - zak 60,000 6,000
- 68 Sewa Molen - hr 300,000 30,000
- 69 Split 2/3 - m3 230,000 23,000
- 70 Tee 3/4" - bh - -
- 71 Water Turn 500Ltr - bh 800,000 80,000
- 72 Dinding GRC + Rangka (Terpa - m2 250,000 25,000
III DEKTORA - - - - -
- 73 Papan Proyek - bh 350,000 35,000
- 74 Prasasti - bh 350,000 35,000
- 75 Biaya Pembuatan RAB - Ls 490,000 49,000
- 75 Biaya Pembuatan RAB - Ls 490,000 49,000
- - - - - - -
- - - - - - -
IV ALAT - - - - -
- 1 - - - - -
- 2 - - - - -
- 3 - - - - -
- 4 - - - - -
- 5 - - - - -
- 6 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Daftar - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Daftar Harga Bahan dan Upah diambil dari Hasil Survey
GA UPAH, BAHAN DAN ALAT

Harga yang
PPH 2% Dipakai Keterangan

- - -
1,600 89,600 -
2,200 123,200 -
2,200 123,200 -
2,200 123,200 -
2,200 123,200 -
2,200 123,200 -
- - -
- - -
7,000 392,000 -
36,000 2,016,000 -
5,000 280,000 -
36,000 2,016,000 -
16 896 -
2,820 157,920 -
100 5,600 -
1,400 78,400 -
900 50,400 -
1,800 100,800 -
1,500 84,000 -
500 28,000 -
500 28,000 -
300 16,800 -
200 11,200 -
200 11,200 -
300 16,800 -
800 44,800 -
1,000 56,000 -
11,000 616,000 -
600 33,600 -
1,100 61,600 -
200 11,200 -
36,000 2,016,000 -
500 28,000 -
3,000 168,000 -
36,000 2,016,000 -
36,000 2,016,000 -
1,300 72,800 -
1,300 72,800 -
5,000 280,000 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
340 19,040 -
6,000 336,000 -
300 16,800 -
300 16,800 -
300 16,800 -
300 16,800 -
36,000 2,016,000 -
30,000 1,680,000 -
30,000 1,680,000 -
7,000 392,000 -
4,000 224,000 -
3,600 201,600 -
2,800 156,800 -
10,000 560,000 -
500 28,000 -
800 44,800 -
1,000 56,000 -
400 22,400 -
3,200 179,200 -
24,000 1,344,000 -
- - -
1,000 56,000 -
240 13,440 -
160 8,960 -
160 8,960 -
160 8,960 -
1,200 67,200 -
1,200 67,200 -
6,000 336,000 -
4,600 257,600 -
- - -
16,000 896,000 -
5,000 280,000 -
- - -
7,000 392,000 -
7,000 392,000 -
9,800 548,800 -
9,800 548,800 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Hasil Survey
. A.2.2.1.1. P-001 1.000 m2
L.IV.01 0.400 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.020 OH
M.IV.42 1.250 btg
M.IV.33 5.000 Kg
M.IV.28 0.005 m3
M.IV.26 0.009 m3
M.IV.82 0.072 m3
M.IV.155 0.060 Kg
M.IV.556 0.400 Ltr
. A.2.2.1.2 P-002 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.400 OH
L.IV.36 0.020 OH
L.IV.35 0.020 OH
M.IV.42 1.250 btg
M.IV.33 2.500 Kg
M.IV.365 1.200 Lbr
M.IV.28 0.005 m3
M.IV.26 0.009 m3
M.IV.82 0.072 m3
M.IV.155 0.060 Kg
M.IV.390 0.450 Ltr
. A.2.2.1.3. P-003 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.300 OH
L.IV.36 0.020 OH
L.IV.35 0.020 OH
M.IV.42 1.000 btg
M.IV.33 2.000 Kg
M.IV.144 25.000 M’
M.IV.28 0.005 m3
M.IV.26 0.009 m3
M.IV.155 0.060 Kg
. A.2.2.1.4. P-004 1.000 m1
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.82 0.012 m3
M.IV.155 0.020 Kg
M.IV.100 0.007 m3
. A.2.2.1.5. P-005 1.000 m2
L.IV.01 2.000 OH
L.IV.16 2.000 OH
L.IV.07 1.000 OH
L.IV.36 0.300 OH
L.IV.35 0.050 OH
M.IV.42 1.250 btg
M.IV.82 0.180 m3
M.IV.155 0.080 Kg
M.IV.126 1.100 Kg
M.IV.33 35.000 Kg
M.IV.30 0.150 m3
M.IV.28 0.100 m3
M.IV.26 0.150 m3
M.IV.7 30.000 Bh
M.IV.365 0.250 Lbr
M.IV.568 0.200 Bh
M.IV.521 0.080 m2
M.IV.575 0.150 Bh
M.IV.362 0.060 Lbr
. A.2.2.1.6. P-006 1.000 m2
L.IV.01 1.000 OH
L.IV.16 1.500 OH
L.IV.36 0.150 OH
L.IV.35 0.050 OH
M.IV.42 3.000 btg
M.IV.105 0.276 m3
M.IV.155 0.700 Kg
M.IV.365 1.500 Lbr
. A.2.2.1.7. P-007 1.000 m2
L.IV.01 1.000 OH
L.IV.16 2.000 OH
L.IV.36 0.200 OH
L.IV.35 0.050 OH
M.IV.42 1.700 btg
M.IV.105 0.210 m3
M.IV.155 0.300 Kg
M.IV.33 10.500 Kg
M.IV.28 0.030 m3
M.IV.26 0.050 m3
M.IV.365 1.500 Lbr
M.IV.365 0.250 Lbr
. A.2.2.1.8. P-008 1.000 m2
L.IV.01 1.000 OH
L.IV.16 2.000 OH
L.IV.36 0.200 OH
L.IV.35 0.050 OH
M.IV.42 1.250 btg
M.IV.105 0.186 m3
M.IV.155 0.300 Kg
M.IV.33 18.000 Kg
M.IV.28 0.030 m3
M.IV.26 0.050 m3
M.IV.365 1.500 Lbr
M.IV.362 1.350 Lbr
. A.2.2.1.9. P-009 1.000 m2
L.IV.01 0.100 OH
L.IV.35 0.050 OH
. A.2.2.1.10. P-010 1.000 m2
L.IV.01 1.000 OH
L.IV.16 2.000 OH
L.IV.36 0.200 OH
L.IV.35 0.050 OH
M.IV.41 1.250 btg
M.IV.594 0.186 Kg
. A.2.2.1.11. P-011 1.000 m2
L.IV.16 0.300 OH
L.IV.36 0.030 OH
M.IV.103 0.036 m3
M.IV.83 0.021 m3
M.IV.155 0.080 kg
. A.2.2.1.12. P-012 1.000 m2
L.IV.01 1.000 OH
L.IV.35 0.005 OH
M.IV.13 0.150 m3
M.IV.17 0.090 m3
M.IV.30 0.010 m3
. A.2.2.1.13. P-013 1.000 m2
L.IV.01 1.333 OH
L.IV.35 0.666 OH
. A.2.2.1.14. P-014 1.000 m3
L.IV.01 0.667 OH
L.IV.35 0.333 OH
. A.2.2.1.15. P-015 1.000 m2
L.IV.01 0.042 OH
L.IV.08 0.004 OH
L.IV.36 0.002 OH
L.IV.35 0.042 OH
M.IV.146 0.143 Lbr
. A.2.2.1.16. P-016 1.000 m2
L.IV.01 0.375 OH
L.IV.07 0.125 OH
L.IV.36 0.012 OH
L.IV.35 0.019 OH
M.IV.537 0.986 Lbr
M.IV.536 0.525 btg
M.IV.33 45.000 Kg
M.IV.28 0.074 m3
M.IV.26 0.146 m3
. A.2.3.1.1. P-017 1.000 m3
L.IV.01 0.750 OH
L.IV.35 0.025 OH
. A.2.3.1.2. P-018 1.000 m3
L.IV.01 0.900 OH
L.IV.35 0.045 OH
. A.2.3.1.3. P-019 1.000 m3
L.IV.01 1.050 OH
L.IV.35 0.067 OH
. A.2.3.1.4. P-020 1.000 m3
L.IV.01 1.000 OH
L.IV.35 0.032 OH
. A.2.3.1.5. P-021 1.000 m3
L.IV.01 1.500 OH
L.IV.35 0.060 OH
. A.2.3.1.6. P-022 1.000 m3
L.IV.01 1.200 OH
L.IV.35 0.045 OH
. A.2.3.1.7. P-023 1.000 m2
L.IV.01 0.050 OH
L.IV.35 0.005 OH
. A.2.3.1.8. P-024 1.000 m3
L.IV.01 0.330 OH
L.IV.35 0.010 OH
. A.2.3.1.9. P-025 1.000 m3
L.IV.01 0.250 OH
L.IV.35 0.025 OH
. A.2.3.1.10. P-026 1.000 m3
L.IV.01 0.500 OH
L.IV.35 0.050 OH
. A.2.3.1.11. P-027 1.000 m3
L.IV.01 0.300 OH
L.IV.35 0.010 OH
M.IV.32 1.200 M3
. A.2.3.1.12. P-028 1.000 m3
L.IV.01 0.800 OH
L.IV.07 0.400 OH
L.IV.36 0.040 OH
L.IV.35 0.080 OH
M.IV.20 0.135 m3
M.IV.30 0.400 m3
M.IV.38 0.948 m3
. A.2.3.1.13. P-029 1.000 m3
L.IV.01 0.150 OH
L.IV.35 0.015 OH
M.IV.19 6.000 m3
. A.2.3.1.14. P-030 1.000 m3
L.IV.01 0.250 OH
L.IV.35 0.025 OH
M.IV.37 1.200 m3
. A.3.2.1.1. P-031 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 202.000 Kg
M.IV.30 0.485 m3
. A.3.2.1.2. P-032 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 163.000 Kg
M.IV.30 0.520 m3
. A.3.2.1.3. P-033 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 136.000 Kg
M.IV.30 0.544 m3
. A.3.2.1.4. P-034 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 117.000 Kg
M.IV.30 0.561 m3
. A.3.2.1.5. P-035 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 91.000 Kg
M.IV.30 0.584 m3
. A.3.2.1.6. P-036 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.20 0.170 m3
M.IV.33 170.000 Kg
M.IV.30 0.340 m3
. A.3.2.1.7. P-037 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 61.000 Kg
M.IV.20 0.147 m3
M.IV.30 0.492 m3
. A.3.2.1.8. P-038 1.000 m3
L.IV.01 1.500 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.075 OH
M.IV.13 1.200 m3
M.IV.33 41.000 Kg
M.IV.20 0.131 m3
M.IV.30 0.523 m3
. A.3.2.1.9. P-039 1.000 m3
L.IV.01 0.780 OH
L.IV.07 0.390 OH
L.IV.36 0.039 OH
L.IV.35 0.039 OH
M.IV.13 1.200 m3
M.IV.32 0.432 m3
. A.3.2.1.10. P-040 1.000 m3
L.IV.01 3.400 OH
L.IV.07 0.850 OH
L.IV.36 0.085 OH
L.IV.35 0.170 OH
M.IV.13 0.480 m3
M.IV.33 194.000 Kg
M.IV.28 0.312 m3
M.IV.24 0.468 m3
M.IV.130 126.000 Kg
M.IV.141 1.800 Kg
. A.3.2.1.11. P-041 1.000 m3
L.IV.01 2.400 OH
L.IV.07 0.800 OH
L.IV.36 0.080 OH
L.IV.35 0.119 OH
M.IV.13 0.450 m3
M.IV.33 194.000 Kg
M.IV.28 0.312 m3
M.IV.24 0.468 m3
. A.4.1.1.1 P-042 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 247.000 kg
M.IV.29 869.000 kg
M.IV.25 999.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.2 P-043 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 276.000 kg
M.IV.29 828.000 kg
M.IV.25 1,012.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.3 P-044 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 299.000 kg
M.IV.29 799.000 kg
M.IV.25 1,017.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.4 P-045 1.000 m3
L.IV.01 1.200 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.060 OH
M.IV.33 230.000 kg
M.IV.29 893.000 kg
M.IV.25 1,027.000 kg
M.IV.1 200.000 Ltr
. A.4.1.1.5. P-046 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 326.000 kg
M.IV.29 760.000 kg
M.IV.25 1,029.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.6 P-047 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 352.000 kg
M.IV.29 731.000 kg
M.IV.25 1,031.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.7. P-048 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 371.000 kg
M.IV.29 698.000 kg
M.IV.25 1,047.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.8. P-049 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 384.000 kg
M.IV.29 692.000 kg
M.IV.25 1,039.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.9. P-050 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 406.000 kg
M.IV.29 684.000 kg
M.IV.25 1,026.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.10. P-051 1.000 m3
L.IV.01 1.650 OH
L.IV.07 0.275 OH
L.IV.36 0.028 OH
L.IV.35 0.083 OH
M.IV.33 413.000 kg
M.IV.29 681.000 kg
M.IV.25 1,021.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.11. P-052 1.000 m3
L.IV.01 2.100 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.105 OH
M.IV.33 439.000 kg
M.IV.29 670.000 kg
M.IV.25 1,006.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.12. P-053 1.000 m3
L.IV.01 2.100 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.105 OH
M.IV.33 448.000 kg
M.IV.29 667.000 kg
M.IV.25 1,000.000 kg
M.IV.1 215.000 Ltr
. A.4.1.1.12. P-053a 1.000 m3
L.IV.01 2.100 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.105 OH
M.IV.33 448.000 kg
M.IV.29 667.000 kg
M.IV.25 1,000.000 kg
M.IV.547 4.500 Ltr
M.IV.1 215.000 Ltr
. A.4.1.1.13 P-054 1.000 m3
L.IV.01 2.100 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.105 OH
M.IV.33 400.000 kg
M.IV.28 0.480 m3
M.IV.24 0.800 m3
M.IV.593 1.200 kg
. A.4.1.1.14 P-055 1.000 m1
L.IV.01 0.060 OH
L.IV.20 0.030 OH
L.IV.36 0.003 OH
L.IV.35 0.003 OH
M.IV.597 1.050 m
. A.4.1.1.15 P-056 1.000 m1
L.IV.01 0.070 OH
L.IV.20 0.035 OH
L.IV.36 0.004 OH
L.IV.35 0.007 OH
M.IV.598 1.050 m
. A.4.1.1.16 P-057 1.000 m1
L.IV.01 0.080 OH
L.IV.07 0.040 OH
L.IV.36 0.004 OH
L.IV.35 0.004 OH
M.IV.599 1.050 m
. A.4.1.1.17 P-058 1.000 kg
L.IV.01 0.007 OH
L.IV.08 0.007 OH
L.IV.36 0.001 OH
L.IV.35 0.000 OH
M.IV.130 1.050 kg
M.IV.141 0.015 kg
. A.4.1.1.18 P-059 1.000 kg
L.IV.01 0.005 OH
L.IV.08 0.005 OH
L.IV.36 0.001 OH
L.IV.35 0.000 OH
M.IV.130 1.050 kg
M.IV.141 0.010 kg
. A.4.1.1.19 P-060 1.000 kg
L.IV.01 0.003 OH
L.IV.08 0.003 OH
L.IV.36 0.003 OH
L.IV.35 0.000 OH
M.IV.583 1.020 kg
M.IV.141 0.005 kg
. A.4.1.1.20 P-061 1.000 m2
L.IV.01 0.520 OH
L.IV.16 0.260 OH
L.IV.36 0.026 OH
L.IV.35 0.026 OH
M.IV.106 0.040 m3
M.IV.152 0.300 kg
M.IV.552 0.100 Ltr
. A.4.1.1.21 P-062 1.000 m2
L.IV.01 0.520 OH
L.IV.16 0.260 OH
L.IV.36 0.026 OH
L.IV.35 0.026 OH
M.IV.106 0.045 m3
M.IV.152 0.300 kg
M.IV.552 0.100 Ltr
. A.4.1.1.22 P-063 1.000 m2
L.IV.01 0.660 OH
L.IV.16 0.330 OH
L.IV.36 0.033 OH
L.IV.35 0.033 OH
M.IV.106 0.040 m3
M.IV.155 0.400 kg
M.IV.552 0.200 Ltr
M.IV.78 0.015 m3
M.IV.364 0.350 Lbr
M.IV.42 2.000 btg
. A.4.1.1.23 P-064 1.000 m2
L.IV.01 0.660 OH
L.IV.16 0.330 OH
L.IV.36 0.033 OH
L.IV.35 0.033 OH
M.IV.106 0.040 m3
M.IV.155 0.400 kg
M.IV.552 0.200 Ltr
M.IV.78 0.018 m3
M.IV.364 0.350 Lbr
M.IV.42 2.000 btg
. A.4.1.1.24 P-065 1.000 m2
L.IV.01 0.660 OH
L.IV.16 0.330 OH
L.IV.36 0.033 OH
L.IV.35 0.033 OH
M.IV.106 0.040 m3
M.IV.155 0.400 kg
M.IV.552 0.200 Ltr
M.IV.78 0.015 m3
M.IV.364 0.350 Lbr
M.IV.42 6.000 btg
. A.4.1.1.25 P-066 1.000 m2
L.IV.01 0.660 OH
L.IV.16 0.330 OH
L.IV.36 0.033 OH
L.IV.35 0.033 OH
M.IV.106 0.030 m3
M.IV.155 0.400 kg
M.IV.552 0.200 Ltr
M.IV.78 0.020 m3
M.IV.364 0.350 Lbr
M.IV.42 3.000 btg
A.IV.9 4.000 bh
. A.4.1.1.26 P-067 1.000 m2
L.IV.01 0.660 OH
L.IV.16 0.330 OH
L.IV.36 0.033 OH
L.IV.35 0.033 OH
M.IV.106 0.030 m3
M.IV.155 0.400 kg
M.IV.552 0.150 Ltr
M.IV.78 0.015 m3
M.IV.364 0.350 Lbr
M.IV.42 2.000 btg
. A.4.1.1.27 P-068 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.008 OH
M.IV.97 0.026 m3
M.IV.155 0.600 kg
M.IV.42 0.500 btg
. A.4.1.1.28 P-069 1.000 m3
L.IV.01 5.300 OH
L.IV.07 0.275 OH
L.IV.16 1.300 OH
L.IV.08 1.050 OH
L.IV.36 0.262 OH
L.IV.35 0.265 OH
M.IV.106 0.200 m3
M.IV.155 1.500 kg
M.IV.552 0.400 Ltr
M.IV.130 157.500 kg
M.IV.141 2.250 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
. A.4.1.1.29 P-070 1.000 m3
L.IV.01 5.650 OH
L.IV.07 0.275 OH
L.IV.16 1.560 OH
L.IV.08 1.400 OH
L.IV.36 0.323 OH
L.IV.35 0.283 OH
M.IV.106 0.270 m3
M.IV.155 2.000 kg
M.IV.552 0.600 Ltr
M.IV.130 210.000 kg
M.IV.141 3.000 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
. A.4.1.1.30 P-071 1.000 m3
L.IV.01 7.050 OH
L.IV.07 0.275 OH
L.IV.16 1.650 OH
L.IV.08 2.100 OH
L.IV.36 0.403 OH
L.IV.35 0.353 OH
M.IV.106 0.400 m3
M.IV.155 4.000 kg
M.IV.552 2.000 Ltr
M.IV.130 315.000 kg
M.IV.141 4.500 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
M.IV.90 0.150 M3
M.IV.364 3.500 Lbr
M.IV.42 20.000 btg
. A.4.1.1.31 P-072 1.000 m3
L.IV.01 6.350 OH
L.IV.07 0.275 OH
L.IV.16 1.650 OH
L.IV.08 1.400 OH
L.IV.36 0.333 OH
L.IV.35 0.318 OH
M.IV.106 0.320 m3
M.IV.155 3.200 kg
M.IV.552 1.600 Ltr
M.IV.130 210.000 kg
M.IV.141 3.000 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
M.IV.90 0.140 m3
M.IV.364 2.800 Lbr
M.IV.42 16.000 btg
. A.4.1.1.32 P-073 1.000 m3
L.IV.01 5.300 OH
L.IV.07 0.275 OH
L.IV.16 1.300 OH
L.IV.08 1.050 OH
L.IV.36 0.265 OH
L.IV.35 0.265 OH
M.IV.106 0.320 m3
M.IV.155 3.200 kg
M.IV.552 1.600 Ltr
M.IV.130 157.500 kg
M.IV.141 2.250 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
M.IV.90 0.120 m3
M.IV.364 2.800 Lbr
M.IV.42 32.000 btg
. A.4.1.1.33 P-074 1.000 m3
L.IV.01 0.530 OH
L.IV.07 0.275 OH
L.IV.16 1.300 OH
L.IV.08 1.050 OH
L.IV.36 0.262 OH
L.IV.35 0.265 OH
M.IV.106 0.240 m3
M.IV.155 3.200 kg
M.IV.552 1.600 Ltr
M.IV.130 157.500 kg
M.IV.141 2.250 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
M.IV.90 0.160 m3
M.IV.364 2.800 Lbr
M.IV.42 24.000 btg
. A.4.1.1.34 P-075 1.000 m3
L.IV.01 5.650 OH
L.IV.07 0.275 OH
L.IV.16 1.560 OH
L.IV.08 1.400 OH
L.IV.36 0.323 OH
L.IV.35 0.283 OH
M.IV.106 0.250 m3
M.IV.155 3.000 kg
M.IV.552 1.200 Ltr
M.IV.130 210.000 kg
M.IV.141 3.000 kg
M.IV.33 336.000 kg
M.IV.28 0.540 m3
M.IV.24 0.810 m3
M.IV.90 0.105 m3
M.IV.364 2.500 Lbr
M.IV.42 14.000 btg
. A.4.1.1.35 P-076 1.000 m1
L.IV.01 0.180 OH
L.IV.07 0.020 OH
L.IV.16 0.020 OH
L.IV.08 0.020 OH
L.IV.36 0.006 OH
L.IV.35 0.009 OH
M.IV.106 0.002 m3
M.IV.155 0.010 kg
M.IV.552 1.200 Ltr
M.IV.130 3.000 kg
M.IV.141 0.450 kg
M.IV.33 4.000 kg
M.IV.28 0.006 m3
M.IV.24 0.009 m3
. A.4.1.1.36 P-077 1.000 m1
L.IV.01 0.297 OH
L.IV.07 0.033 OH
L.IV.16 0.033 OH
L.IV.08 0.033 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.106 0.003 m3
M.IV.155 0.020 kg
M.IV.552 1.200 Ltr
M.IV.130 3.600 kg
M.IV.141 0.050 kg
M.IV.33 5.500 kg
M.IV.28 0.009 m3
M.IV.24 0.015 m3
. A.4.1.2.1. P-078 1.000 m2
L.IV.01 0.132 OH
L.IV.07 0.022 OH
L.IV.36 0.002 OH
L.IV.35 0.007 OH
M.IV.33 26.080 Kg
M.IV.29 60.800 Kg
M.IV.25 82.320 Kg
M.IV.1 17.200 L
. A.4.1.2.2. P-079 1.000 m2
L.IV.01 0.165 OH
L.IV.07 0.028 OH
L.IV.36 0.003 OH
L.IV.35 0.008 OH
M.IV.33 32.600 Kg
M.IV.29 76.000 Kg
M.IV.25 102.900 Kg
M.IV.1 21.500 L
. A.4.1.2.3. P-080 1.000 m2
L.IV.01 0.198 OH
L.IV.07 0.033 OH
L.IV.36 0.003 OH
L.IV.35 0.010 OH
M.IV.33 32.120 Kg
M.IV.29 91.200 Kg
M.IV.25 123.480 Kg
M.IV.1 25.800 L
. A.4.1.2.4. P-081 1.000 m2
L.IV.01 0.248 OH
L.IV.07 0.041 OH
L.IV.36 0.004 OH
L.IV.35 0.013 OH
M.IV.33 48.900 Kg
M.IV.29 114.000 Kg
M.IV.25 154.350 Kg
M.IV.1 32.250 L
. A.4.1.2.5. P-082 1.000 m2
L.IV.01 0.007 OH
L.IV.07 0.076 OH
L.IV.36 0.008 OH
L.IV.35 0.001 OH
M.IV.587 0.080 m3
M.IV.131 9.394 Kg
M.IV.57 0.005 m3
M.IV.358 0.080 Lbr
M.IV.552 0.200 L
M.IV.128 3.882 Bh
. A.4.1.2.6. P-083 1.000 m2
L.IV.01 0.004 OH
L.IV.07 0.038 OH
L.IV.36 0.004 OH
L.IV.35 0.001 OH
M.IV.57 0.005 m3
M.IV.358 0.043 Lbr
M.IV.552 0.200 L
M.IV.128 0.693 Bh
. A.4.1.2.7. P-084 1.000 m2
L.IV.01 0.004 OH
L.IV.07 0.038 OH
L.IV.36 0.004 OH
L.IV.35 0.001 OH
M.IV.57 0.004 m3
M.IV.358 0.048 Lbr
M.IV.552 0.200 L
M.IV.155 0.046 Kg
M.IV.128 0.693 Bh
. A.4.1.2.8. P-085 1.000 bh
L.IV.01 0.053 OH
L.IV.16 0.018 OH
L.IV.35 0.005 OH
. A.4.1.2.9. P-086 1.000 bh
L.IV.01 0.089 OH
L.IV.16 0.030 OH
L.IV.35 0.005 OH
. A.4.1.2.10. P-087 1.000 bh
L.IV.01 0.071 OH
L.IV.16 0.024 OH
L.IV.35 0.005 OH
. A.4.1.2.11. P-088 1.000 bh
L.IV.01 0.064 OH
L.IV.07 0.244 OH
L.IV.24 0.128 OH
L.IV.36 0.034 OH
L.IV.35 0.073 OH
. A.4.1.2.12. P-089 1.000 bh
L.IV.01 0.069 OH
L.IV.07 0.242 OH
L.IV.24 0.138 OH
L.IV.36 0.037 OH
L.IV.35 0.073 OH
. A.4.1.2.13. P-090 1.000 bh
L.IV.01 0.061 OH
L.IV.07 0.213 OH
L.IV.24 0.122 OH
L.IV.36 0.033 OH
L.IV.35 0.073 OH
. A.4.1.2.14. P-091 1.000 bh
L.IV.39 0.067 OH
L.IV.43 0.067 OH
L.IV.01 0.067 OH
L.IV.07 0.067 OH
L.IV.11 0.134 OH
L.IV.36 0.067 OH
L.IV.35 0.067 OH
M.IV.559 6.676 L
A.IV.24 0.067 unit hari
A.IV.27 1.100 Buah hari
. A.4.1.2.15. P-092 1.000 bh
L.IV.39 0.061 OH
L.IV.43 0.061 OH
L.IV.01 0.061 OH
L.IV.07 0.061 OH
L.IV.11 0.122 OH
L.IV.36 0.061 OH
L.IV.35 0.061 OH
M.IV.559 6.110 L
A.IV.24 0.061 unit hari
A.IV.27 1.100 Buah hari
. A.4.1.2.16. P-093 1.000 bh
L.IV.39 0.083 OH
L.IV.43 0.083 OH
L.IV.01 0.083 OH
L.IV.07 0.083 OH
L.IV.11 0.166 OH
L.IV.36 0.083 OH
L.IV.35 0.083 OH
M.IV.559 8.277 L
A.IV.24 0.083 unit hari
A.IV.27 2.200 Buah hari
. A.4.1.2.17. P-094 1.000 bh
L.IV.01 0.019 OH
L.IV.07 0.038 OH
L.IV.39 0.019 OH
L.IV.43 0.019 OH
M.IV.559 1.897 L
A.IV.24 0.019 UH
. A.4.1.2.18. P-095 1.000 bh
L.IV.01 0.019 OH
L.IV.07 0.038 OH
L.IV.39 0.019 OH
L.IV.43 0.019 OH
M.IV.559 1.897 L
A.IV.24 0.019 UH
. A.4.1.2.19. P-096 1.000 bh
L.IV.01 0.019 OH
L.IV.07 0.038 OH
L.IV.39 0.019 OH
L.IV.43 0.019 OH
M.IV.559 1.897 L
A.IV.24 0.019 UH
. A.4.1.2.20. P-097 1.000 m3
M.IV.34 1,200.000 Kg
M.IV.178 650.000 Kg
M.IV.1 350.000 L
. A.4.1.2.21. P-098 1.000 m3
M.IV.34 1,850.000 Kg
M.IV.1 400.000 L
. A.4.1.2.22. P-099 1.000 titik
L.IV.07 0.367 OH
L.IV.36 0.074 OH
L.IV.35 0.037 OH
. A.4.1.2.23. P-100 1.000 titik
L.IV.01 0.147 OH
L.IV.16 0.147 OH
L.IV.36 0.015 OH
L.IV.35 0.005 OH
M.IV.57 0.012 m3
M.IV.103 0.004 m3
M.IV.155 0.264 Kg
. A.4.1.2.24. P-101 1.000 titik
L.IV.01 0.220 OH
L.IV.16 0.220 OH
L.IV.08 0.220 OH
L.IV.35 0.011 OH
. A.4.2.1.1. P-102 1.000 titik
L.IV.01 0.060 OH
L.IV.18 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.003 OH
M.IV.135 1.150 Kg
. A.4.2.1.2. P-103 1.000 kg
L.IV.01 0.060 OH
L.IV.18 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.003 OH
M.IV.132 1.150 Kg
. A.4.2.1.3. P-104 1.000 kg
L.IV.01 0.001 OH
L.IV.09 0.001 OH
L.IV.36 0.000 OH
L.IV.35 0.000 OH
M.IV.559 0.010 Ltr
M.IV.553 0.001 Ltr
A.IV.22 0.008 Jam
. A.4.2.1.4. P-105 1.000 m2
L.IV.01 1.050 OH
L.IV.17 1.050 OH
L.IV.36 0.105 OH
L.IV.35 0.052 OH
M.IV.137 15.000 Kg
M.IV.134 32.800 Kg
M.IV.148 0.050 Kg
. A.4.2.1.5. P-106 1.000 m1
L.IV.01 0.400 OH
L.IV.09 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.020 OH
M.IV.148 4.000 Kg
M.IV.559 3.000 Ltr
M.IV.553 0.400 Ltr
A.IV.20 1.700 Jam
. A.4.2.1.6. P-107 1.000 m2
L.IV.01 0.650 OH
L.IV.17 0.650 OH
L.IV.36 0.065 OH
L.IV.35 0.032 OH
M.IV.138 4.760 m
M.IV.133 4.522 m
M.IV.588 20.000 cm
. A.4.2.1.7. P-108 1.000 m2
L.IV.01 1.200 OH
L.IV.17 1.200 OH
L.IV.36 0.120 OH
L.IV.35 0.006 OH
M.IV.173 1.000 m2
. A.4.2.1.8. P-109 1.000 m2
L.IV.01 0.440 OH
L.IV.16 0.440 OH
L.IV.36 0.044 OH
L.IV.35 0.022 OH
M.IV.577 1.000 m2
. A.4.2.1.9. P-110 1.000 m2
L.IV.01 0.080 OH
L.IV.08 0.800 OH
L.IV.36 0.080 OH
L.IV.35 0.004 OH
M.IV.181 1.000 m2
. A.4.2.1.10. P-111 1.000 m2
L.IV.01 1.000 OH
L.IV.08 1.000 OH
L.IV.36 0.100 OH
L.IV.35 0.050 OH
M.IV.177 1.000 m2
. A.4.2.1.11. P-112 1.000 m1
L.IV.01 0.043 OH
L.IV.08 0.043 OH
L.IV.36 0.004 OH
L.IV.35 0.002 OH
M.IV.174 1.100 m
M.IV.180 2.000 bh
M.IV.590 0.060 Tube
. A.4.2.1.12. P-113 1.000 m2
L.IV.01 0.085 OH
L.IV.08 0.085 OH
L.IV.36 0.009 OH
L.IV.35 0.004 OH
M.IV.174 4.400 m
M.IV.122 14.600 m
. A.4.2.1.13. P-114 1.000 m2
L.IV.01 0.085 OH
L.IV.08 0.085 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.171 4.400 m
M.IV.526 4.500 m
M.IV.590 0.270 Tube
. A.4.2.1.14. P-115 1.000 m2
L.IV.01 0.350 OH
L.IV.15 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.018 OH
M.IV.596 1.000 m2
. A.4.2.1.15. P-116 1.000 m2
L.IV.01 1.670 OH
L.IV.17 1.670 OH
L.IV.36 0.167 OH
L.IV.35 0.083 OH
M.IV.126 6.177 kg
M.IV.588 27.080 cm
. A.4.2.1.16. P-117 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.149 1.100 m2
M.IV.588 11.110 cm
M.IV.126 1.716 kg
. A.4.2.1.17. P-118 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.001 OH
M.IV.569 1.100 m2
M.IV.162 10.000 bh
M.IV.126 7.000 m
. A.4.2.1.18. P-119 1.000 m1
L.IV.01 0.200 OH
L.IV.06 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.001 OH
M.IV.365 1.050 m
M.IV.155 0.015 kg
M.IV.102 0.019 m3
. A.4.2.1.19 P-120 1.000 m1
L.IV.01 0.150 OH
L.IV.06 0.300 OH
L.IV.36 0.030 OH
L.IV.35 0.008 OH
M.IV.365 1.050 m
M.IV.155 0.010 kg
M.IV.126 0.500 kg
. A.4.2.1.20. P-121 1.000 m2
L.IV.01 0.250 OH
L.IV.08 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.013 OH
M.IV.139 3.500 M1
A.IV.3 1.000 Ls
. A.4.2.1.21. P-122 1.000 m2
L.IV.01 0.350 OH
L.IV.08 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.018 OH
M.IV.139 4.000 M1
A.IV.3 1.000 Ls
. A.4.2.1.22. P-123 1.000 m2
L.IV.01 0.760 OH
L.IV.08 0.760 OH
L.IV.36 0.076 OH
L.IV.35 0.038 OH
M.IV.125 4.050 m1
A.IV.2 0.100 Ls
. A.4.2.1.23. P-124 1.000 m2
L.IV.01 0.734 OH
L.IV.08 0.734 OH
L.IV.36 0.073 OH
L.IV.35 0.037 OH
M.IV.125 4.050 m1
A.IV.2 0.100 Ls
. A.4.2.1.24. P-125 1.000 m2
L.IV.01 0.200 OH
L.IV.08 0.450 OH
L.IV.36 0.010 OH
L.IV.35 0.050 OH
M.IV.125 3.720 M'
M.IV.127 28.000 bh
M.IV.128 2.000 bh
M.IV.124 5.400 M'
M.IV.508 0.124 M'
A.IV.2 0.100 Ls
. A.4.4.1.1. P-126 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 43.500 Kg
M.IV.30 0.080 m3
. A.4.4.1.2. P-127 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 32.950 Kg
M.IV.30 0.091 m3
. A.4.4.1.3. P-128 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 26.550 Kg
M.IV.30 0.093 m3
. A.4.4.1.4. P-129 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 22.200 Kg
M.IV.30 0.102 m3
. A.4.4.1.5. P-130 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 18.500 Kg
M.IV.30 0.122 m3
. A.4.4.1.6 P-131 1.000 m2
L.IV.01 0.600 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.030 OH
M.IV.7 140.000 bh
M.IV.33 10.080 Kg
M.IV.20 0.028 m3
M.IV.30 0.093 m3
. A.4.4.1.7 P-132 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 18.950 Kg
M.IV.30 0.038 m3
. A.4.4.1.8 P-133 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 14.370 Kg
M.IV.30 0.040 m3
. A.4.4.1.9 P-134 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 m3
M.IV.33 11.500 Kg
M.IV.30 0.043 m3
. A.4.4.1.10 P-135 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 9.680 Kg
M.IV.30 0.045 m3
. A.4.4.1.11 P-136 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 8.320 Kg
M.IV.30 0.049 m3
. A.4.4.1.12 P-137 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 6.500 Kg
M.IV.30 0.050 m3
. A.4.4.1.13 P-138 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.33 4.500 Kg
M.IV.20 0.015 m3
M.IV.30 0.050 m3
. A.4.4.1.14 P-139 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.36 0.018 Kg
M.IV.20 0.018 m3
M.IV.30 0.018 m3
. A.4.4.1.15 P-140 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.7 70.000 bh
M.IV.36 0.014 Kg
M.IV.20 0.014 m3
M.IV.30 0.028 m3
. A.4.4.1.16 P-141 1.000 m2
L.IV.01 0.350 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.018 OH
M.IV.534 12.500 bh
M.IV.33 30.320 Kg
M.IV.30 0.728 m3
M.IV.129 0.280 Kg
. A.4.4.1.17 P-142 1.000 m2
L.IV.01 0.350 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.018 OH
M.IV.534 12.500 m3
M.IV.33 24.260 Kg
M.IV.30 0.772 m3
M.IV.129 0.280 Kg
. A.4.4.1.8 P-143 1.000 m2
L.IV.01 0.320 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.016 OH
M.IV.533 12.500 bh
M.IV.33 22.740 Kg
M.IV.30 0.550 m3
M.IV.129 0.280 Kg
. A.4.4.1.19 P-144 1.000 m2
L.IV.01 0.320 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.016 OH
M.IV.533 12.500 m3
M.IV.33 18.200 Kg
M.IV.30 0.582 m3
M.IV.129 0.280 Kg
. A.4.4.1.20 P-145 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.532 12.500 bh
M.IV.33 15.160 Kg
M.IV.30 0.364 m3
M.IV.129 0.280 Kg
. A.4.4.1.21 P-146 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.532 12.500 bh
M.IV.33 12.130 Kg
M.IV.30 0.388 m3
M.IV.129 0.280 Kg
. A.4.4.1.22 P-147 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.9 30.000 bh
M.IV.33 11.000 Kg
M.IV.30 0.035 m3
. A.4.4.1.23 P-148 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.6 30.000 bh
M.IV.33 11.000 Kg
M.IV.30 0.035 m3
. A.4.4.1.24 P-149 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.9 70.000 m3
M.IV.33 14.000 Kg
M.IV.30 0.032 m3
. A.4.4.1.25 P-150 1.000 m2
L.IV.01 0.350 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.003 OH
M.IV.5 0.075 m3
M.IV.27 2.772 Kg
A.IV.5 0.100 Ls
. A.4.4.1.26 P-151 1.000 m2
L.IV.01 0.350 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.003 OH
M.IV.5 0.100 m3
M.IV.27 4.400 Kg
A.IV.10 0.100 Ls
. A.4.4.2.1. P-152 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 15.504 Kg
M.IV.30 0.016 m3
. A.4.4.2.2. P-153 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 10.224 Kg
M.IV.30 0.020 m3
. A.4.4.2.3. P-154 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 7.776 Kg
M.IV.30 0.023 m3
. A.4.4.2.4. P-155 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 6.240 Kg
M.IV.30 0.024 m3
. A.4.4.2.5. P-156 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 5.184 Kg
M.IV.30 0.026 m3
. A.4.4.2.6. P-157 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 4.416 Kg
M.IV.30 0.027 m3
. A.4.4.2.7. P-158 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 3.936 Kg
M.IV.30 0.028 m3
. A.4.4.2.8. P-159 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 3.456 Kg
M.IV.30 0.029 m3
. A.4.4.2.9. P-160 1.000 m2
L.IV.01 0.360 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.018 OH
M.IV.33 5.760 Kg
M.IV.22 0.003 m3
M.IV.30 0.013 m3
. A.4.4.2.10. P-161 1.000 m2
L.IV.01 0.360 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.018 OH
M.IV.33 3.000 Kg
M.IV.22 0.005 m3
M.IV.30 0.020 m3
. A.4.4.2.11. P-162 1.000 m2
L.IV.01 0.360 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.018 OH
M.IV.33 0.009 m3
M.IV.22 0.009 m3
M.IV.30 0.009 m3
. A.4.4.2.12. P-163 1.000 m2
L.IV.01 0.360 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.018 OH
M.IV.33 0.007 m3
M.IV.22 0.007 m3
M.IV.30 0.015 m3
. A.4.4.2.13. P-164 1.000 m2
L.IV.01 0.400 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.022 OH
M.IV.33 13.632 Kg
M.IV.30 0.027 m3
. A.4.4.2.14. P-165 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.013 OH
M.IV.33 10.368 Kg
M.IV.30 0.031 m3
. A.4.4.2.15. P-166 1.000 m2
L.IV.01 0.400 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.022 OH
M.IV.33 8.320 Kg
M.IV.30 0.032 m3
. A.4.4.2.16. P-167 1.000 m2
L.IV.01 0.400 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.022 OH
M.IV.33 6.912 Kg
M.IV.30 0.035 m3
. A.4.4.2.17. P-168 1.000 m2
L.IV.01 0.400 OH
L.IV.07 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.022 OH
M.IV.33 5.888 Kg
M.IV.30 0.036 m3
. A.4.4.2.18. P-169 1.000 m2
L.IV.01 0.440 OH
L.IV.07 0.220 OH
L.IV.36 0.022 OH
L.IV.35 0.022 OH
M.IV.33 0.009 m3
M.IV.22 0.009 m3
M.IV.30 0.018 m3
. A.4.4.2.19. P-170 1.000 m2
L.IV.01 0.150 OH
L.IV.07 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.33 5.184 Kg
M.IV.30 0.026 m3
. A.4.4.2.20. P-171 1.000 m1
L.IV.01 0.080 OH
L.IV.07 0.400 OH
L.IV.36 0.040 OH
L.IV.35 0.004 OH
M.IV.33 0.500 Kg
M.IV.30 0.013 m3
. A.4.4.2.21. P-172 1.000 m2
L.IV.01 0.450 OH
L.IV.07 0.225 OH
L.IV.36 0.023 OH
L.IV.35 0.023 OH
M.IV.33 10.000 Kg
M.IV.14 15.000 Kg
. A.4.4.2.22. P-173 1.000 m2
L.IV.01 0.450 OH
L.IV.07 0.225 OH
L.IV.36 0.023 OH
L.IV.35 0.023 OH
M.IV.33 10.000 Kg
M.IV.18 15.000 Kg
. A.4.4.2.23. P-174 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.015 OH
M.IV.33 4.320 Kg
M.IV.30 0.006 m3
. A.4.4.2.24 P-175 1.000 m2
L.IV.01 0.150 OH
L.IV.07 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.33 3.108 Kg
. A.4.4.2.25. P-176 1.000 m2
L.IV.01 0.070 OH
L.IV.07 0.035 OH
L.IV.36 0.004 OH
L.IV.35 0.004 OH
M.IV.33 1.600 Kg
. A.4.4.2.26. P-177 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 6.340 Kg
M.IV.30 0.012 m3
. A.4.4.2.27. P-178 1.000 m2
L.IV.01 0.200 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.010 OH
M.IV.33 3.250 Kg
. A.4.4.2.28. P-179 1.000 m2
L.IV.01 0.300 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.015 OH
M.IV.33 16.000 Kg
. A.4.4.2.29. P-180 1.000 m2
L.IV.01 0.200 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.010 OH
M.IV.33 3.600 Kg
. A.4.4.3.1. P-181 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.459 6.630 Bh
M.IV.33 9.800 kg
M.IV.30 0.045 M3
. A.4.4.3.2. P-182 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.458 11.870 Bh
M.IV.33 10.000 kg
M.IV.30 0.045 M3
. A.4.4.3.3. P-183 1.000 m2
L.IV.01 0.270 OH
L.IV.07 0.135 OH
L.IV.36 0.014 OH
L.IV.35 0.014 OH
M.IV.457 26.500 Bh
M.IV.33 10.400 kg
M.IV.30 0.045 M3
. A.4.4.3.4. P-184 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.474 6.630 Bh
M.IV.33 9.800 kg
M.IV.36 1.300 Kg
M.IV.30 0.045 M3
. A.4.4.3.5. P-185 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.473 11.870 Bh
M.IV.33 10.000 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.6. P-186 1.000 m2
L.IV.01 0.270 OH
L.IV.07 0.135 OH
L.IV.36 0.014 OH
L.IV.35 0.014 OH
M.IV.472 26.500 Bh
M.IV.33 10.400 kg
M.IV.36 1.620 Kg
M.IV.30 0.045 M3
. A.4.4.3.7. P-187 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.470 6.630 Bh
M.IV.33 9.800 kg
M.IV.36 1.300 Kg
M.IV.30 0.045 M3
. A.4.4.3.8. P-188 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.469 11.870 Bh
M.IV.33 10.000 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.9. P-189 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.454 6.630 Bh
M.IV.33 9.800 kg
M.IV.36 1.300 Kg
M.IV.30 0.045 M3
. A.4.4.3.10. P-190 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.453 11.870 Bh
M.IV.33 10.000 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.11. P-191 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.461 6.630 Bh
M.IV.33 9.800 kg
M.IV.36 1.300 Kg
M.IV.30 0.045 M3
. A.4.4.3.12. P-192 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.462 11.870 Bh
M.IV.33 10.000 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.13. P-193 1.000 m2
L.IV.01 0.240 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.012 OH
M.IV.467 3.100 Bh
M.IV.33 9.600 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.14. P-194 1.000 m2
L.IV.01 0.250 OH
L.IV.07 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.466 6.630 Bh
M.IV.33 9.800 kg
M.IV.36 1.300 Kg
M.IV.30 0.045 M3
. A.4.4.3.15. P-195 1.000 m2
L.IV.01 0.260 OH
L.IV.07 0.130 OH
L.IV.36 0.013 OH
L.IV.35 0.013 OH
M.IV.465 11.870 Bh
M.IV.33 10.000 kg
M.IV.36 1.500 Kg
M.IV.30 0.045 M3
. A.4.4.3.16. P-196 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.429 5.300 Bh
M.IV.33 1.650 kg
M.IV.30 0.004 M3
. A.4.4.3.17. P-197 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.427 3.530 Bh
M.IV.33 1.240 kg
M.IV.30 0.003 M3
. A.4.4.3.18. P-198 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.428 2.650 Bh
M.IV.33 1.240 kg
M.IV.30 0.003 M3
. A.4.4.3.19. P-199 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.441 2.650 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.20. P-200 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.442 3.530 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.21. P-201 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.443 2.650 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.22. P-202 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.439 3.530 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.23. P-203 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.440 2.650 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.24. P-204 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.424 2.650 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.25. P-205 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.423 3.530 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.26. P-206 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.433 2.630 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.27. P-207 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.432 3.530 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.28. P-208 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.437 1.700 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.29. P-209 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.436 2.650 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.30. P-210 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.005 OH
M.IV.435 3.530 Bh
M.IV.33 1.140 kg
M.IV.36 0.100 Kg
M.IV.30 0.003 M3
. A.4.4.3.31. P-211 1.000 m2
L.IV.01 0.360 OH
L.IV.07 0.180 OH
L.IV.36 0.018 OH
L.IV.35 0.018 OH
M.IV.543 0.036 M3
M.IV.36 0.100 Kg
. A.4.4.3.32. P-212 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.404 1.050 m2
M.IV.33 8.190 Kg
M.IV.30 0.045 M3
M.IV.36 2.750 Kg
. A.4.4.3.33. P-213 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.403 106.000 Bh
M.IV.33 8.190 Kg
M.IV.30 0.045 M3
M.IV.36 3.200 Kg
. A.4.4.3.34. P-214 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.411 10.000 Bh
M.IV.33 8.190 Kg
M.IV.30 0.045 M3
M.IV.36 1.620 Kg
. A.4.4.3.35. P-215 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.410 11.870 Bh
M.IV.33 10.000 Kg
M.IV.30 0.045 M3
M.IV.36 1.500 Kg
. A.4.4.3.36. P-216 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.409 26.500 Bh
M.IV.33 10.400 Kg
M.IV.30 0.045 M3
M.IV.36 1.620 Kg
. A.4.4.3.37. P-217 1.000 m2
L.IV.01 1.050 OH
L.IV.07 0.525 OH
L.IV.36 0.053 OH
L.IV.35 0.053 OH
M.IV.455 33.000 Bh
M.IV.33 9.800 Kg
M.IV.30 0.045 M3
M.IV.36 4.370 Kg
. A.4.4.3.38. P-218 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.408 11.870 Bh
M.IV.33 14.150 Kg
M.IV.30 0.039 M3
M.IV.36 2.000 Kg
. A.4.4.3.39. P-219 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.035 OH
L.IV.35 0.005 OH
M.IV.419 5.300 Bh
M.IV.33 1.140 Kg
M.IV.30 0.003 M3
M.IV.36 0.025 Kg
. A.4.4.3.40. P-220 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.035 OH
L.IV.35 0.005 OH
M.IV.418 10.600 Bh
M.IV.33 1.140 Kg
M.IV.30 0.003 M3
M.IV.36 0.050 Kg
. A.4.4.3.41. P-221 1.000 m1
L.IV.01 0.090 OH
L.IV.07 0.090 OH
L.IV.36 0.035 OH
L.IV.35 0.005 OH
M.IV.420 5.300 Bh
M.IV.33 0.570 Kg
M.IV.30 0.002 M3
M.IV.36 0.013 Kg
. A.4.4.3.42. P-222 1.000 m1
L.IV.01 0.750 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.038 OH
M.IV.416 5.300 Bh
M.IV.33 1.140 Kg
M.IV.30 0.003 M3
M.IV.36 0.100 Kg
. A.4.4.3.43. P-223 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.414 1.060 Bh
M.IV.33 8.190 Kg
M.IV.30 0.045 M3
M.IV.36 0.650 Kg
. A.4.4.3.44. P-224 1.000 m2
L.IV.01 0.170 OH
L.IV.16 0.170 OH
L.IV.36 0.017 OH
L.IV.35 0.009 OH
M.IV.352 1.050 m2
M.IV.549 0.350 Kg
. A.4.4.3.45. P-225 1.000 m2
L.IV.01 0.120 OH
L.IV.16 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.370 1.050 m2
M.IV.549 0.350 Kg
. A.4.4.3.46. P-226 1.000 m2
L.IV.01 0.700 OH
L.IV.16 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.356 1.050 m2
M.IV.549 0.600 Kg
. A.4.4.3.47. P-227 1.000 m2
L.IV.01 0.700 OH
L.IV.16 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.357 1.050 m2
M.IV.549 0.600 Kg
. A.4.4.3.48. P-228 1.000 m2
L.IV.01 1.000 OH
L.IV.07 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.050 OH
M.IV.446 86.000 Bh
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 1.500 Kg
. A.4.4.3.49. P-229 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.447 53.000 Bh
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 2.750 Kg
. A.4.4.3.50. P-230 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.448 26.000 Bh
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 1.940 Kg
. A.4.4.3.51. P-231 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.407 1.100 m2
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 2.750 Kg
. A.4.4.3.52. P-232 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.407 1.050 m2
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 2.900 Kg
. A.4.4.3.53. P-233 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.405 1.050 m2
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 2.750 Kg
. A.4.4.3.54. P-234 1.000 m2
L.IV.01 0.900 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.045 OH
M.IV.406 1.100 m2
M.IV.33 9.300 Kg
M.IV.30 0.018 M3
M.IV.36 1.940 Kg
. A.4.4.3.55. P-235 1.000 m2
L.IV.01 1.300 OH
L.IV.07 0.650 OH
L.IV.36 0.065 OH
L.IV.35 0.065 OH
M.IV.414 1.060 Bh
M.IV.33 12.440 Kg
M.IV.33 0.025 M3
M.IV.30 0.650 Kg
M.IV.36 3.030 Bh
. A.4.4.3.56. P-236 1.000 m2
L.IV.01 1.000 OH
L.IV.07 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.050 OH
M.IV.8 63.000 Bh
M.IV.33 12.440 Kg
M.IV.30 0.025 M3
M.IV.36 2.750 Kg
. A.4.4.3.57. P-237 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.16 1.100 Bh
M.IV.33 11.750 Kg
M.IV.30 0.035 M3
. A.4.4.3.58. P-238 1.000 m2
L.IV.01 0.700 OH
L.IV.07 0.350 OH
L.IV.36 0.035 OH
L.IV.35 0.035 OH
M.IV.11 1.100 m2
M.IV.33 11.750 Kg
M.IV.30 0.035 M3
. A.4.4.3.59. P-239 1.000 m2
L.IV.01 0.150 OH
L.IV.07 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.008 OH
M.IV.401 11.870 Bh
M.IV.549 0.350 Kg
. A.4.4.3.60. P-240 1.000 m2
L.IV.01 0.350 OH
L.IV.07 0.175 OH
L.IV.36 0.017 OH
L.IV.35 0.002 OH
M.IV.371 2.200 m
M.IV.550 0.250 Kg
. A.4.4.3.61. P-241 1.000 m2
L.IV.01 0.120 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.579 5.000 Kg
. A.4.4.3.62. P-242 1.000 m1
L.IV.01 0.080 OH
L.IV.07 0.080 OH
L.IV.36 0.008 OH
L.IV.35 0.004 OH
M.IV.444 1.760 Bh
M.IV.549 0.080 Kg
. A.4.4.3.63. P-243 1.000 m1
L.IV.01 0.120 OH
L.IV.07 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.101 0.003 M3
M.IV.162 0.050 Kg
. A.4.4.3.64. P-244 1.000 m2
L.IV.01 0.250 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.003 OH
M.IV.539 1.010 M2
M.IV.28 0.050 M3
A.IV.4 0.100 %
. A.4.4.3.65. P-245 1.000 m2
L.IV.01 0.250 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.003 OH
M.IV.541 1.010 M2
M.IV.28 0.070 M3
A.IV.4 0.100 %
. A.4.4.3.66. P-246 1.000 m2
L.IV.01 0.250 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.003 OH
M.IV.540 1.010 M2
M.IV.28 0.050 M3
A.IV.4 0.100 %
. A.4.4.3.67. P-247 1.000 m2
L.IV.01 0.250 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.003 OH
M.IV.538 1.010 M2
M.IV.28 0.070 M3
A.IV.4 0.100 %
. A.4.4.3.68. P-248 1.000 m2
L.IV.01 0.150 OH
L.IV.08 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.120 0.365 Lbr
M.IV.179 20.000 bh
. A.4.5.1.1. P-249 1.000 m2
L.IV.01 0.030 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.004 OH
M.IV.339 1.100 m2
M.IV.168 0.010 kg
. A.4.5.1.2. P-250 1.000 m2
L.IV.01 0.120 OH
L.IV.16 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.337 12.000 Lbr
M.IV.168 0.050 kg
. A.4.5.1.3. P-251 1.000 m2
L.IV.01 0.120 OH
L.IV.16 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.338 5.800 Lbr
M.IV.168 0.050 kg
. A.4.5.1.4. P-252 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.336 1.500 Lbr
M.IV.168 0.050 kg
. A.4.5.1.5. P-253 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.369 0.375 Lbr
M.IV.168 0.030 kg
. A.4.5.1.6. P-254 1.000 m2
L.IV.01 0.800 OH
L.IV.16 0.800 OH
L.IV.36 0.080 OH
L.IV.35 0.040 OH
M.IV.100 0.015 m3
M.IV.168 0.010 kg
. A.4.5.1.7. P-255 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.005 OH
M.IV.350 0.364 Lbr
M.IV.162 0.110 kg
. A.4.5.1.8. P-256 1.000 m2
L.IV.01 0.500 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.025 OH
M.IV.174 3.600 m
M.IV.143 0.150 kg
M.IV.128 1.050 bh
M.IV.336 1.500 Lbr
. A.4.5.1.9. P-257 1.000 m1
L.IV.01 0.050 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.003 OH
M.IV.44 1.050 m
M.IV.155 0.010 kg
. A.4.5.1.10. P-258 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.075 OH
M.IV.359 1.050 m2
M.IV.179 18.000 bh
. A.4.5.1.10. P-259 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.005 OH
M.IV.354 1.050 M'
M.IV.179 6.000 bh
. A.4.5.2.1. P-260 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.491 25.000 Bh
. A.4.5.2.2. P-261 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.489 25.000 Bh
. A.4.5.2.3. P-262 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.489 12.000 Bh
. A.4.5.2.4. P-263 1.000 m1
L.IV.01 0.400 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.002 OH
M.IV.485 5.000 Bh
M.IV.33 8.000 Kg
M.IV.30 0.032 M3
. A.4.5.2.5. P-264 1.000 m1
L.IV.01 0.400 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.002 OH
M.IV.485 5.000 Bh
M.IV.33 8.000 Kg
M.IV.30 0.032 M3
. A.4.5.2.6. P-265 1.000 m1
L.IV.01 0.400 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.002 OH
M.IV.485 4.000 Bh
M.IV.33 8.000 Kg
M.IV.30 0.032 M3
. A.4.5.2.7. P-266 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.067 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.506 0.600 Lbr
M.IV.155 0.050 Kg
. A.4.5.2.8. P-267 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.342 0.500 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.9. P-268 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.008 OH
M.IV.342 0.600 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.10. P-269 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.600 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.11. P-270 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.750 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.12. P-271 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.350 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.13. P-272 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.420 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.14. P-273 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.440 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.15. P-274 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.510 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.16. P-275 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.800 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.17. P-276 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.370 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.18. P-277 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.380 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.19. P-278 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.460 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.20. P-279 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.490 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.21. P-280 1.000 m2
L.IV.01 0.140 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.342 0.570 Lbr
M.IV.159 0.120 Kg
. A.4.5.2.22. P-281 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.477 2.400 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.23. P-282 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.477 2.100 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.24. P-283 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.477 2.050 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.25. P-284 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.500 1.200 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.26. P-285 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.500 1.200 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.27. P-286 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.500 1.200 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.28. P-287 1.000 m1
L.IV.01 0.100 OH
L.IV.16 0.150 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.500 1.100 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.29. P-288 1.000 m1
L.IV.01 0.084 OH
L.IV.16 0.125 OH
L.IV.36 0.013 OH
L.IV.35 0.004 OH
M.IV.500 1.100 Lbr
M.IV.162 6.000 Bh
. A.4.5.2.30. P-289 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.010 OH
M.IV.482 11.000 Bh
M.IV.155 0.030 Kg
. A.4.5.2.31. P-290 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.300 OH
L.IV.36 0.003 OH
L.IV.35 0.010 OH
M.IV.481 6.900 Bh
M.IV.363 0.350 Lbr
M.IV.155 0.030 Kg
M.IV.360 0.500 Bh
. A.4.5.2.32. P-291 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.001 OH
M.IV.490 1.300 Bh
M.IV.154 0.200 Kg
. A.4.5.2.33. P-292 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.001 OH
M.IV.490 2.000 Bh
M.IV.154 0.200 Kg
. A.4.5.2.34. P-293 1.000 m2
L.IV.01 0.166 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.008 OH
M.IV.507 30.000 Bh
M.IV.155 0.200 Kg
. A.4.5.2.35. P-294 1.000 m1
L.IV.01 0.400 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.020 OH
M.IV.496 3.500 Bh
M.IV.155 0.050 Kg
M.IV.33 10.800 Kg
M.IV.30 0.032 M3
M.IV.36 1.000 Kg
. A.4.5.2.36. P-295 1.000 m1
L.IV.01 0.125 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.006 OH
M.IV.495 2.000 Bh
M.IV.155 0.050 Kg
M.IV.84 0.004 M3
. A.4.5.2.37. P-296 1.000 m1
L.IV.01 0.250 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.013 OH
M.IV.498 1.100 Bh
M.IV.155 0.050 Kg
. A.4.5.2.38. P-297 1.000 m1
L.IV.01 0.125 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.006 OH
M.IV.365 0.400 Lbr
M.IV.155 0.050 Kg
M.IV.155 0.050 Kg
. A.4.5.2.39. P-298 1.000 m2
L.IV.01 0.120 OH
L.IV.16 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.006 OH
M.IV.365 0.700 Lbr
M.IV.155 0.020 Kg
. A.4.5.2.40. P-299 1.000 m1
L.IV.01 0.150 OH
L.IV.16 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.006 OH
M.IV.365 0.300 Lbr
M.IV.155 0.040 Kg
. A.4.5.2.41. P-300 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.750 OH
L.IV.36 0.080 OH
L.IV.35 0.006 OH
M.IV.123 1.050 Lbr
M.IV.158 0.020 Kg
. A.4.5.2.42. P-301 1.000 m1
L.IV.01 0.100 OH
L.IV.16 1.000 OH
L.IV.36 0.100 OH
L.IV.35 0.050 OH
M.IV.502 1.200 Bh
M.IV.158 0.040 Kg
. A.4.5.2.43. P-302 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.008 OH
M.IV.121 1.050 M2
. A.4.6.1.1. P-303 1.000 m3
L.IV.01 7.000 OH
L.IV.16 21.000 OH
L.IV.36 2.100 OH
L.IV.35 0.350 OH
M.IV.72 1.100 m3
M.IV.155 1.250 Kg
M.IV.549 1.000 Kg
. A.4.6.1.2. P-304 1.000 m3
L.IV.01 6.000 OH
L.IV.16 18.000 OH
L.IV.36 1.800 OH
L.IV.35 0.300 OH
M.IV.72 1.200 m3
M.IV.155 1.250 Kg
M.IV.549 1.000 Kg
. A.4.6.1.3. P-305 1.000 m2
L.IV.01 0.350 OH
L.IV.16 1.050 OH
L.IV.36 0.105 OH
L.IV.35 0.018 OH
M.IV.100 0.040 m3
M.IV.155 0.050 Kg
. A.4.6.1.4. P-306 1.000 m2
L.IV.01 0.350 OH
L.IV.16 1.050 OH
L.IV.36 0.105 OH
L.IV.35 0.018 OH
M.IV.100 0.040 m3
M.IV.155 0.050 Kg
. A.4.6.1.5. P-307 1.000 m2
L.IV.01 1.000 OH
L.IV.16 3.000 OH
L.IV.36 0.300 OH
L.IV.35 0.050 OH
M.IV.100 0.040 m3
M.IV.549 0.500 Kg
. A.4.6.1.6. P-308 1.000 m2
L.IV.01 0.800 OH
L.IV.16 2.400 OH
L.IV.36 0.240 OH
L.IV.35 0.040 OH
M.IV.100 0.024 m3
M.IV.549 0.300 Kg
. A.4.6.1.7. P-309 1.000 m2
L.IV.01 1.000 OH
L.IV.16 3.000 OH
L.IV.36 0.300 OH
L.IV.35 0.050 OH
M.IV.100 0.064 m3
M.IV.549 0.500 Kg
. A.4.6.1.8. P-310 1.000 m2
L.IV.01 0.700 OH
L.IV.16 2.100 OH
L.IV.36 0.210 OH
L.IV.35 0.035 OH
M.IV.100 0.025 m3
M.IV.155 0.030 kg
M.IV.549 0.500 kg
M.IV.362 1.000 Lbr
. A.4.6.1.9. P-311 1.000 m2
L.IV.01 0.800 OH
L.IV.16 2.400 OH
L.IV.36 0.240 OH
L.IV.35 0.040 OH
M.IV.100 0.026 m3
M.IV.155 0.030 kg
M.IV.549 0.500 kg
M.IV.362 1.000 Lbr
. A.4.6.1.10. P-312 1.000 m2
L.IV.01 0.670 OH
L.IV.16 2.000 OH
L.IV.36 0.200 OH
L.IV.35 0.335 OH
M.IV.100 0.060 m3
M.IV.155 0.150 kg
. A.4.6.1.11. P-313 1.000 m2
L.IV.01 0.800 OH
L.IV.16 2.400 OH
L.IV.36 0.240 OH
L.IV.35 0.040 OH
M.IV.100 0.025 m3
M.IV.155 0.030 kg
M.IV.549 0.300 kg
M.IV.367 1.000 Lbr
. A.4.6.1.12. P-314 1.000 m2
L.IV.01 0.850 OH
L.IV.16 2.550 OH
L.IV.36 0.255 OH
L.IV.35 0.043 OH
M.IV.100 0.025 m3
M.IV.155 0.030 kg
M.IV.549 0.800 kg
M.IV.367 1.000 Lbr
M.IV.348 0.500 Lbr
. A.4.6.1.13. P-315 1.000 m3
L.IV.01 4.000 OH
L.IV.16 12.000 OH
L.IV.36 1.200 OH
L.IV.35 0.200 OH
M.IV.72 1.100 m3
M.IV.126 15.000 kg
M.IV.155 5.600 kg
. A.4.6.1.14. P-316 1.000 m3
L.IV.01 6.700 OH
L.IV.16 20.100 OH
L.IV.36 2.010 OH
L.IV.35 0.335 OH
M.IV.72 1.200 m3
M.IV.126 15.000 kg
M.IV.155 5.600 kg
. A.4.6.1.15. P-317 1.000 m3
L.IV.01 6.700 OH
L.IV.16 20.100 OH
L.IV.36 2.010 OH
L.IV.35 0,335 OH
M.IV.72 1.100 m3
M.IV.126 15.000 kg
M.IV.155 3.000 kg
. A.4.6.1.16. P-318 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.82 0.014 m3
M.IV.47 0.036 m3
M.IV.155 0.250 kg
. A.4.6.1.17. P-319 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.82 0.014 m3
M.IV.47 0.057 m3
M.IV.155 0.250 kg
. A.4.6.1.18. P-320 1.000 m2
L.IV.01 0.120 OH
L.IV.16 0.120 OH
L.IV.36 0.012 OH
L.IV.35 0.006 OH
M.IV.82 0.014 m3
M.IV.155 0.057 m3
. A.4.6.1.19. P-321 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.300 OH
L.IV.36 0.030 OH
L.IV.35 0.075 OH
M.IV.82 0.015 m3
M.IV.155 0.200 kg
. A.4.6.1.20. P-322 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.300 OH
L.IV.36 0.030 OH
L.IV.35 0.010 OH
M.IV.82 0.016 m3
M.IV.155 0.250 kg
. A.4.6.1.21. P-323 1.000 m1
L.IV.01 0.100 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.005 OH
M.IV.100 0.011 m3
M.IV.155 0.100 kg
. A.4.6.1.22. P-324 1.000 m1
L.IV.01 0.100 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.005 OH
M.IV.100 0.011 m3
M.IV.155 0.050 kg
. A.4.6.1.23. P-325 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.008 OH
M.IV.72 0.028 m3
M.IV.155 0.150 kg
. A.4.6.1.24. P-326 1.000 m2
L.IV.01 0.150 OH
L.IV.16 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.008 OH
M.IV.81 0.028 m3
M.IV.155 0.150 kg
M.IV.368 0.860 Lbr
M.IV.549 0.560 kg
. A.4.6.1.25. P-327 1.000 m2
L.IV.01 0.200 OH
L.IV.16 0.600 OH
L.IV.36 0.060 OH
L.IV.35 0.010 OH
M.IV.81 0.028 m3
M.IV.155 0.150 kg
M.IV.362 0.860 Lbr
M.IV.549 0.560 kg
. A.4.6.1.26. P-328 1.000 m2
L.IV.01 0.600 OH
L.IV.16 1.800 OH
L.IV.36 0.180 OH
L.IV.35 0.030 OH
M.IV.100 0.007 m3
M.IV.155 0.100 kg
M.IV.162 0.150 kg
. A.4.6.1.27. P-329 1.000 m2
L.IV.01 0.025 OH
L.IV.16 0.075 OH
L.IV.36 0.008 OH
L.IV.35 0.001 OH
M.IV.362 0.400 m3
M.IV.155 0.050 kg
. A.4.6.1.28. P-330 1.000 m2
L.IV.01 0.100 OH
L.IV.16 0.050 OH
L.IV.36 0.005 OH
L.IV.35 0.005 OH
M.IV.347 1.500 m2
M.IV.82 0.014 m3
M.IV.155 0.012 kg
M.IV.43 0.003 m3
. A.4.6.2.1. P-331 1.000 bh
L.IV.01 0.060 OH
L.IV.16 0.600 OH
L.IV.36 0.060 OH
L.IV.35 0.003 OH
M.IV.574 1.000 Bh
. A.4.6.2.2. P-332 1.000 bh
L.IV.01 0.010 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.005 OH
M.IV.575 1.000 Bh
. A.4.6.2.3. P-333 1.000 bh
L.IV.01 0.005 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.003 OH
M.IV.576 1.000 Bh
. A.4.6.2.4. P-334 1.000 bh
L.IV.01 0.005 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.003 OH
M.IV.572 1.000 Bh
. A.4.6.2.5. P-335 1.000 bh
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.001 OH
M.IV.566 1.000 Bh
. A.4.6.2.6. P-336 1.000 bh
L.IV.01 0.010 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.001 OH
M.IV.565 1.000 Bh
. A.4.6.2.7. P-337 1.000 bh
L.IV.01 0.100 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.001 OH
M.IV.563 1.000 Bh
. A.4.6.2.8. P-338 1.000 bh
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.008 OH
M.IV.592 1.000 Bh
. A.4.6.2.9. P-339 1.000 bh
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.008 OH
M.IV.140 1.000 Bh
. A.4.6.2.10. P-340 1.000 bh
L.IV.01 0.050 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.003 OH
M.IV.560 1.000 set
. A.4.6.2.11. P-341 1.000 bh
L.IV.01 0.020 OH
L.IV.16 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.001 OH
M.IV.573 1.000 Bh
. A.4.6.2.12. P-342 1.000 bh
L.IV.01 0.050 OH
L.IV.16 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.003 OH
M.IV.561 1.000 Bh
. A.4.6.2.13. P-343 1.000 bh
L.IV.01 0.010 OH
L.IV.16 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.562 1.000 Bh
. A.4.6.2.14. P-344 1.000 bh
L.IV.01 0.060 OH
L.IV.16 0.600 OH
L.IV.36 0.060 OH
L.IV.35 0.003 OH
M.IV.176 1.000 Set
. A.4.6.2.15. P-345 1.000 bh
L.IV.01 0.025 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.001 OH
M.IV.571 1.000 Set
. A.4.6.2.16. P-346 1.000 m2
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.001 OH
M.IV.522 1.100 m2
M.IV.590 0.050 Kg
. A.4.6.2.17. P-347 1.000 m2
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.001 OH
M.IV.523 1.100 m2
M.IV.590 0.050 Kg
. A.4.6.2.18. P-348 1.000 m2
L.IV.01 0.017 OH
L.IV.16 0.170 OH
L.IV.36 0.017 OH
L.IV.35 0.001 OH
M.IV.524 1.100 m2
M.IV.590 0.070 Kg
. A.4.6.2.19. P-349 1.000 m2
L.IV.01 0.025 OH
L.IV.16 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.001 OH
M.IV.517 1.100 m2
M.IV.590 0.070 Kg
. A.4.6.2.20. P-350 1.000 m2
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.008 OH
M.IV.518 1.100 m2
. A.4.6.2.21. P-351 1.000 m2
L.IV.01 0.017 OH
L.IV.16 0.170 OH
L.IV.36 0.017 OH
L.IV.35 0.009 OH
M.IV.519 1.100 m2
. A.4.6.2.22. P-352 1.000 m2
L.IV.01 0.015 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.008 OH
M.IV.525 1.100 m2
. A.4.6.2.23. P-353 1.000 m2
L.IV.01 0.075 OH
L.IV.16 0.150 OH
L.IV.36 0.015 OH
L.IV.35 0.004 OH
M.IV.520 1.100 m2
M.IV.590 0.050 Kg
. A.4.7.1.1. P-354 1.000 m2
L.IV.01 0.150 OH
L.IV.35 0.003 OH
M.IV.558 0.050 Kg
. A.4.7.1.2. P-355 1.000 m2
L.IV.01 0.150 OH
L.IV.35 0.003 OH
M.IV.557 0.050 Kg
. A.4.7.1.3. P-356 1.000 m2
L.IV.01 0.150 OH
L.IV.35 0.008 OH
M.IV.557 0.050 Kg
. A.4.7.1.4. P-357 1.000 m2
L.IV.01 0.070 OH
L.IV.10 0.009 OH
L.IV.36 0.006 OH
L.IV.35 0.003 OH
M.IV.383 0.200 Kg
M.IV.396 0.150 Kg
M.IV.377 0.170 Kg
M.IV.382 0.260 Kg
M.IV.387 0.010 Bh
M.IV.395 0.030 Kg
M.IV.545 0.200 Lbr
. A.4.7.1.5. P-358 1.000 m2
L.IV.01 0.070 OH
L.IV.10 0.105 OH
L.IV.36 0.004 OH
L.IV.35 0.003 OH
M.IV.383 0.200 Kg
M.IV.396 0.150 Kg
M.IV.377 0.170 Kg
M.IV.382 0.350 Kg
M.IV.387 0.010 Bh
M.IV.395 0.030 Kg
M.IV.545 0.200 Lbr
. A.4.7.1.6. P-359 1.000 m2
L.IV.01 0.040 OH
L.IV.10 0.063 OH
L.IV.36 0.063 OH
L.IV.35 0.003 OH
M.IV.398 0.360 L
. A.4.7.1.7. P-360 1.000 m2
L.IV.01 0.040 OH
L.IV.10 0.060 OH
L.IV.36 0.016 OH
L.IV.35 0.003 OH
M.IV.397 0.150 L
M.IV.397 0.372 L
M.IV.545 2.000 Lbr
. A.4.7.1.8. P-361 1.000 m2
L.IV.01 0.100 OH
L.IV.35 0.006 OH
M.IV.556 0.350 L
. A.4.7.1.9. P-362 1.000 m2
L.IV.01 0.160 OH
L.IV.10 0.160 OH
L.IV.36 0.016 OH
L.IV.35 0.003 OH
M.IV.400 0.150 L
M.IV.385 0.050 Kg
M.IV.545 0.100 Lbr
. A.4.7.1.10. P-363 1.000 m2
L.IV.01 0.020 OH
L.IV.10 0.063 OH
L.IV.36 0.006 OH
L.IV.35 0.003 OH
M.IV.396 0.100 Kg
M.IV.378 0.100 Kg
M.IV.384 0.260 Kg
. A.4.7.1.11. P-364 1.000 m2
L.IV.01 0.028 OH
L.IV.10 0.042 OH
L.IV.36 0.004 OH
L.IV.35 0.003 OH
M.IV.378 0.120 Kg
M.IV.384 0.180 Kg
. A.4.7.1.12. P-365 1.000 m2
L.IV.01 0.028 OH
L.IV.10 0.042 OH
L.IV.36 0.004 OH
L.IV.35 0.003 OH
M.IV.584 0.100 Kg
. A.4.7.1.13. P-366 1.000 m2
L.IV.01 0.150 OH
L.IV.10 0.001 OH
L.IV.36 0.000 OH
L.IV.35 0.003 OH
M.IV.23 0.150 Kg
M.IV.545 0.100 Lbr
M.IV.3 0.250 Ikat
. A.4.7.1.14. P-367 1.000 m2
L.IV.01 0.040 OH
L.IV.10 0.005 OH
L.IV.36 0.001 OH
L.IV.35 0.003 OH
M.IV.23 0.300 Kg
M.IV.545 0.200 Lbr
M.IV.3 0.250 Ikat
. A.4.7.1.15. P-368 1.000 m2
L.IV.01 0.020 OH
L.IV.10 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.003 OH
M.IV.371 1.200 m2
M.IV.549 0.200 Kg
. A.4.7.1.16. P-369 1.000 m2
L.IV.01 0.020 OH
L.IV.10 0.200 OH
L.IV.36 0.020 OH
L.IV.35 0.003 OH
M.IV.393 0.100 Kg
M.IV.387 0.010 Bh
. A.4.7.1.17. P-370 1.000 m2
L.IV.01 0.250 OH
L.IV.10 0.225 OH
L.IV.36 0.023 OH
L.IV.35 0.008 OH
M.IV.393 0.100 Kg
M.IV.395 0.010 L
M.IV.387 0.010 Bh
A.IV.11 0.002 m3
. A.4.7.1.18. P-371 1.000 m2
L.IV.01 0.250 OH
L.IV.10 0.250 OH
L.IV.36 0.025 OH
L.IV.35 0.001 OH
M.IV.391 0.100 Kg
M.IV.392 0.100 Kg
M.IV.374 0.080 Kg
M.IV.387 0.010 Bh
M.IV.395 0.010 L
. A.4.7.1.19. P-372 1.000 m2
L.IV.01 0.060 OH
L.IV.10 0.060 OH
L.IV.36 0.012 OH
L.IV.35 0.003 OH
M.IV.374 0.300 Kg
M.IV.387 0.010 Bh
M.IV.395 0.010 L
. A.4.7.1.20. P-373 1.000 m2
L.IV.01 0.400 OH
L.IV.10 0.800 OH
L.IV.36 0.080 OH
L.IV.35 0.020 OH
M.IV.376 0.110 Kg
M.IV.373 0.170 Kg
M.IV.374 0.080 Kg
M.IV.387 0.010 Bh
M.IV.395 0.010 L
. A.4.7.1.21. P-374 1.000 m2
L.IV.01 0.400 OH
L.IV.10 0.700 OH
L.IV.36 0.070 OH
L.IV.35 0.020 OH
M.IV.374 0.300 Kg
M.IV.395 0.010 L
. A.4.7.1.22. P-375 1.000 m2
L.IV.01 0.040 OH
L.IV.10 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.002 OH
M.IV.377 0.030 Kg
M.IV.395 0.001 L
. A.5.1.1.1. P-376 1.000 bh
L.IV.01 3.300 OH
L.IV.07 1.100 OH
L.IV.36 0.010 OH
L.IV.35 0.160 OH
M.IV.188 1.000 Unit
A.IV.12 0.060 %
. A.5.1.1 2. P-377 1.000 bh
L.IV.01 1.000 OH
L.IV.07 1.500 OH
L.IV.36 0.150 OH
L.IV.35 0.160 OH
M.IV.190 1.000 Unit
M.IV.33 6.000 Kg
M.IV.30 0.010 M3
. A.5.1.1 3. P-378 1.000 bh
L.IV.01 1.000 OH
L.IV.07 1.500 OH
L.IV.36 0.150 OH
L.IV.35 0.050 OH
M.IV.190 1.000 Unit
M.IV.33 6.000 Kg
M.IV.30 0.010 M3
M.IV.7 7.000 Bh
. A.5.1.1 4. P-379 1.000 bh
L.IV.01 1.000 OH
L.IV.07 1.000 OH
L.IV.36 0.100 OH
L.IV.35 0.050 OH
M.IV.197 1.000 Unit
M.IV.33 6.000 Kg
M.IV.30 0.010 M3
A.IV.12 0.300 %
. A.5.1.1 5. P-380 1.000 bh
L.IV.01 1.200 OH
L.IV.07 1.450 OH
L.IV.36 0.150 OH
L.IV.35 0.060 OH
M.IV.198 1.200 Unit
M.IV.33 6.000 Kg
M.IV.30 0.010 M3
A.IV.12 0.120 %
. A.5.1.1 6. P-381 1.000 bh
L.IV.01 0.075 OH
L.IV.07 0.750 OH
L.IV.36 0.075 OH
L.IV.35 0.003 OH
M.IV.185 1.000 Unit
A.IV.12 0.200 %
. A.5.1.1 7. P-382 1.000 bh
L.IV.01 3.000 OH
L.IV.07 4.500 OH
L.IV.36 0.050 OH
L.IV.35 0.900 OH
M.IV.183 1.000 Unit
A.IV.12 0.120 %
. A.5.1.1 8. P-383 1.000 bh
L.IV.01 6.000 OH
L.IV.07 3.000 OH
L.IV.36 0.300 OH
L.IV.35 0.030 OH
M.IV.7 150.000 M3
M.IV.33 120.000 Kg
M.IV.30 0.300 M3
M.IV.446 360.000 bh
M.IV.36 6.000 Kg
. A.5.1.1 9. P-384 1.000 bh
L.IV.01 3.000 OH
L.IV.07 4.500 OH
L.IV.36 0.050 OH
L.IV.35 0.900 OH
M.IV.183 1.000 Unit
A.IV.12 0.120 %
. A.5.1.1 10. P-385 1.000 bh
L.IV.01 0.300 OH
L.IV.07 0.450 OH
L.IV.36 0.045 OH
L.IV.35 0.015 OH
M.IV.183 1.000 Unit
A.IV.12 0.120 %
. A.5.1.1 11. P-386 1.000 bh
L.IV.01 3.500 OH
L.IV.07 4.500 OH
L.IV.36 0.050 OH
L.IV.35 0.018 OH
M.IV.528 0.900 M3
M.IV.130 180.000 Kg
M.IV.46 8.000 M2
M.IV.460 500.000 Bh
A.IV.12 0.100 %
. A.5.1.1 12. P-387 1.000 bh
L.IV.01 0.030 OH
L.IV.07 0.300 OH
L.IV.36 0.030 OH
L.IV.35 0.015 OH
M.IV.182 1.000 Unit
M.IV.199 1.000 Bh
. A.5.1.1 13. P-388 1.000 bh
L.IV.01 0.050 OH
L.IV.07 0.500 OH
L.IV.36 0.050 OH
L.IV.35 0.025 OH
M.IV.182 1.000 Unit
M.IV.199 1.000 Bh
M.IV.33 20.000 Kg
M.IV.30 0.050 M3
. A.5.1.1 14. P-389 1.000 bh
L.IV.01 0.010 OH
L.IV.07 0.100 OH
L.IV.36 0.010 OH
L.IV.35 0.005 OH
M.IV.186 1.000 Unit
. A.5.1.1 15. P-390 1.000 bh
L.IV.01 2.160 OH
L.IV.07 0.720 OH
L.IV.36 0.072 OH
L.IV.35 0.011 OH
M.IV.7 40.000 bh
M.IV.33 44.000 Kg
M.IV.30 0.070 M3
M.IV.28 0.060 M3
M.IV.24 0.070 M3
M.IV.130 1.600 Kg
. A.5.1.1 16. P-391 1.000 bh
L.IV.01 3.200 OH
L.IV.07 1.150 OH
L.IV.36 0.011 OH
L.IV.35 0.016 OH
M.IV.7 70.000 bh
M.IV.33 77.000 Kg
M.IV.30 0.130 M3
M.IV.28 0.090 M3
M.IV.24 0.020 M3
M.IV.130 2.600 Kg
. A.5.1.1 17. P-392 1.000 bh
L.IV.01 3.200 OH
L.IV.07 1.150 OH
L.IV.36 0.011 OH
L.IV.35 0.016 OH
M.IV.7 123.000 bh
M.IV.33 114.000 Kg
M.IV.30 0.184 M3
M.IV.28 0.120 M3
M.IV.24 0.033 M3
M.IV.130 4.850 Kg
. A.5.1.1 18. P-393 1.000 m1
L.IV.01 0.054 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.027 OH
M.IV.209 1.200 M
A.IV.12 0.350 %
. A.5.1.1 19. P-394 1.000 bh
L.IV.01 0.010 OH
L.IV.07 0.400 OH
L.IV.36 0.040 OH
L.IV.35 0.005 OH
M.IV.191 1.000 M
M.IV.591 0.025 bh
. A.5.1.1 20. P-395 1.000 m1
L.IV.01 0.054 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.027 OH
M.IV.210 1.200 M
A.IV.12 0.350 %
. A.5.1.1 21. P-396 1.000 m1
L.IV.01 0.054 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.027 OH
M.IV.211 1.200 M
A.IV.12 0.350 %
. A.5.1.1 22. P-397 1.000 m1
L.IV.01 0.108 OH
L.IV.07 0.180 OH
L.IV.36 0.018 OH
L.IV.35 0.005 OH
M.IV.212 1.200 M
A.IV.12 0.350 %
. A.5.1.1 23. P-398 1.000 m1
L.IV.01 0.135 OH
L.IV.07 0.225 OH
L.IV.36 0.023 OH
L.IV.35 0.007 OH
M.IV.213 1.200 M
A.IV.12 0.350 %
. A.5.1.1 24. P-399 1.000 m1
L.IV.01 0.135 OH
L.IV.07 0.225 OH
L.IV.36 0.023 OH
L.IV.35 0.007 OH
M.IV.214 1.200 M
A.IV.12 0.350 %
. A.5.1.1 25. P-400 1.000 m1
L.IV.01 0.036 OH
L.IV.07 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.002 OH
M.IV.200 1.200 M
A.IV.12 0.350 %
. A.5.1.1 26. P-401 1.000 m1
L.IV.01 0.036 OH
L.IV.07 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.002 OH
M.IV.201 1.200 M
A.IV.12 0.350 %
. A.5.1.1 27. P-402 1.000 m1
L.IV.01 0.036 OH
L.IV.07 0.060 OH
L.IV.36 0.006 OH
L.IV.35 0.002 OH
M.IV.202 1.200 M
A.IV.12 0.350 %
. A.5.1.1 28. P-403 1.000 m1
L.IV.01 0.054 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.003 OH
M.IV.203 1.200 M
A.IV.12 0.350 %
. A.5.1.1 29. P-404 1.000 m1
L.IV.01 0.054 OH
L.IV.07 0.090 OH
L.IV.36 0.009 OH
L.IV.35 0.003 OH
M.IV.204 1.200 M
A.IV.12 0.350 %
. A.5.1.1 30. P-405 1.000 m1
L.IV.01 0.081 OH
L.IV.07 0.135 OH
L.IV.36 0.014 OH
L.IV.35 0.004 OH
M.IV.205 1.200 M
A.IV.12 0.350 %
. A.5.1.1 31. P-406 1.000 m1
L.IV.01 0.081 OH
L.IV.07 0.135 OH
L.IV.36 0.014 OH
L.IV.35 0.004 OH
M.IV.207 1.200 M
A.IV.12 0.350 %
. A.5.1.1 32. P-407 1.000 m1
L.IV.01 0.081 OH
L.IV.07 0.135 OH
L.IV.36 0.014 OH
L.IV.35 0.004 OH
M.IV.208 1.200 M
A.IV.12 0.350 %
. A.5.1.1 33. P-408 1.000 m1
L.IV.01 0.080 OH
L.IV.07 0.040 OH
L.IV.36 0.004 OH
L.IV.35 0.004 OH
M.IV.195 1.600 m
M.IV.33 35.000 Kg
M.IV.30 0.014 M3
M.IV.32 0.014 M3
. A.5.1.1 34. P-409 1.000 m1
L.IV.01 0.060 OH
L.IV.07 0.030 OH
L.IV.36 0.003 OH
L.IV.35 0.003 OH
M.IV.195 1.600 Bh
M.IV.33 0.680 Kg
M.IV.30 0.013 M3
M.IV.32 0.011 M3
. A.5.1.1 35. P-410 1.000 m1
L.IV.01 0.140 OH
L.IV.07 0.070 OH
L.IV.36 0.007 OH
L.IV.35 0.007 OH
M.IV.193 1.100 Bh
M.IV.7 0.027 M3
M.IV.33 3.920 Kg
M.IV.30 0.056 M3
M.IV.32 0.024 M3
. A.5.1.1.36. P-411 1.000 m1
L.IV.01 0.380 OH
L.IV.07 0.190 OH
L.IV.36 0.019 OH
L.IV.35 0.019 OH
M.IV.193 1.100 Bh
M.IV.7 0.550 M3
M.IV.33 10.300 Kg
M.IV.30 0.061 M3
M.IV.32 0.069 M3
. A.8.4.1.1 P-412 1.000 m1
L.IV.01 0.081 OH
L.IV.20 0.041 OH
L.IV.35 0.008 OH
M.IV.292 1.000 m
A.IV.29 0.006 hari
. A.8.4.1.2 P-413 1.000 m1
L.IV.01 0.094 OH
L.IV.20 0.047 OH
L.IV.35 0.009 OH
M.IV.293 1.000 m
A.IV.29 0.008 hari
. A.8.4.1.3 P-414 1.000 m1
L.IV.01 0.105 OH
L.IV.20 0.053 OH
L.IV.35 0.011 OH
M.IV.294 1.000 m
A.IV.29 0.010 hari
. A.8.4.1.4 P-415 1.000 m1
L.IV.01 0.118 OH
L.IV.20 0.059 OH
L.IV.35 0.012 OH
M.IV.295 1.000 m
A.IV.29 0.012 hari
. A.8.4.1.5 P-416 1.000 m1
L.IV.01 0.189 OH
L.IV.20 0.095 OH
L.IV.35 0.019 OH
M.IV.296 1.000 m
A.IV.29 0.024 hari
. A.8.4.1.6 P-417 1.000 m1
L.IV.01 0.256 OH
L.IV.20 0.128 OH
L.IV.35 0.026 OH
M.IV.297 1.000 m
A.IV.29 0.034 hari
. A.8.4.1.7 P-418 1.000 m1
L.IV.01 0.294 OH
L.IV.20 0.147 OH
L.IV.35 0.029 OH
M.IV.298 1.000 m
A.IV.29 0.040 hari
. A.8.4.1.8 P-419 1.000 m1
L.IV.01 0.544 OH
L.IV.20 0.272 OH
L.IV.35 0.054 OH
M.IV.299 1.000 m
A.IV.29 0.080 hari
. A.8.4.1.9 P-420 1.000 m1
L.IV.01 0.669 OH
L.IV.20 0.335 OH
L.IV.35 0.067 OH
M.IV.300 1.000 m
A.IV.29 0.100 hari
. A.8.4.1.10 P-421 1.000 m1
L.IV.01 0.809 OH
L.IV.20 0.405 OH
L.IV.35 0.081 OH
M.IV.301 1.000 m
A.IV.29 0.122 hari
. A.8.4.1.11 P-422 1.000 m1
L.IV.01 0.957 OH
L.IV.20 0.479 OH
L.IV.35 0.096 OH
M.IV.302 1.000 m
A.IV.29 0.145 hari
. A.8.4.1.12 P-423 1.000 m1
L.IV.01 1.618 OH
L.IV.20 0.809 OH
L.IV.35 0.162 OH
M.IV.303 1.000 m
A.IV.29 0.250 hari
. A.8.4.1.13 P-424 1.000 m1
L.IV.01 1.691 OH
L.IV.20 0.846 OH
L.IV.35 0.169 OH
M.IV.304 1.000 m
A.IV.29 0.262 hari
. A.8.4.1.14 P-425 1.000 m1
L.IV.01 1.895 OH
L.IV.20 0.948 OH
L.IV.35 0.190 OH
M.IV.305 1.000 m
A.IV.29 0.294 hari
. A.8.4.1.15 P-426 1.000 m1
L.IV.01 2.099 OH
L.IV.20 1.050 OH
L.IV.35 0.210 OH
M.IV.306 1.000 m
A.IV.29 0.327 hari
. A.8.4.1.16 P-427 1.000 m1
L.IV.01 2.303 OH
L.IV.20 1.152 OH
L.IV.35 0.230 OH
M.IV.307 1.000 m
A.IV.29 0.359 hari
. A.8.4.1.17 P-428 1.000 m1
L.IV.01 0.035 OH
L.IV.20 0.017 OH
L.IV.35 0.003 OH
M.IV.262 1.000 m
A.IV.29 0.019 hari
. A.8.4.1.18 P-429 1.000 m1
L.IV.01 0.040 OH
L.IV.20 0.020 OH
L.IV.35 0.004 OH
M.IV.263 1.000 m
A.IV.29 0.019 hari
. A.8.4.1.19 P-430 1.000 m1
L.IV.01 0.045 OH
L.IV.20 0.023 OH
L.IV.35 0.005 OH
M.IV.264 1.000 m
A.IV.29 0.019 hari
. A.8.4.1.20 P-431 1.000 m1
L.IV.01 0.062 OH
L.IV.20 0.031 OH
L.IV.35 0.006 OH
M.IV.265 1.000 m
A.IV.29 0.019 hari
. A.8.4.1.21 P-432 1.000 m1
L.IV.01 0.102 OH
L.IV.20 0.051 OH
L.IV.35 0.010 OH
M.IV.266 1.000 m
A.IV.29 0.019 hari
. A.8.4.1.22 P-433 1.000 m1
L.IV.01 0.133 OH
L.IV.20 0.067 OH
L.IV.35 0.013 OH
M.IV.267 1.000 m
A.IV.29 0.042 hari
. A.8.4.1.23 P-434 1.000 m1
L.IV.01 0.170 OH
L.IV.20 0.085 OH
L.IV.35 0.017 OH
M.IV.268 1.000 m
A.IV.29 0.065 hari
. A.8.4.1.24 P-435 1.000 m1
L.IV.01 0.290 OH
L.IV.20 0.145 OH
L.IV.35 0.029 OH
M.IV.269 1.000 m
A.IV.29 0.152 hari
. A.8.4.1.25 P-436 1.000 m1
L.IV.01 0.359 OH
L.IV.20 0.180 OH
L.IV.35 0.036 OH
M.IV.270 1.000 m
A.IV.29 0.200 hari
. A.8.4.1.26 P-437 1.000 m1
L.IV.01 0.433 OH
L.IV.20 0.216 OH
L.IV.35 0.043 OH
M.IV.271 1.000 m
A.IV.29 0.251 hari
. A.8.4.1.27 P-438 1.000 m1
L.IV.01 0.512 OH
L.IV.20 0.256 OH
L.IV.35 0.051 OH
M.IV.271 1.000 m
A.IV.29 0.307 hari
. A.8.4.1.28 P-439 1.000 m1
L.IV.01 0.893 OH
L.IV.20 0.446 OH
L.IV.35 0.089 OH
M.IV.273 1.000 m
A.IV.29 0.573 hari
. A.8.4.1.29 P-440 1.000 m1
L.IV.01 1.353 OH
L.IV.20 0.677 OH
L.IV.35 0.135 OH
M.IV.274 1.000 m
A.IV.29 0.883 hari
. A.8.4.1.30 P-441 1.000 m1
L.IV.01 1.659 OH
L.IV.20 0.830 OH
L.IV.35 0.166 OH
M.IV.276 1.000 m
A.IV.29 1.093 hari
. A.8.4.1.31 P-442 1.000 m1
L.IV.01 1.818 OH
L.IV.20 0.909 OH
L.IV.35 0.182 OH
M.IV.278 1.000 m
A.IV.29 1.205 hari
. A.8.4.1.32 P-443 1.000 m1
L.IV.01 2.370 OH
L.IV.20 1.185 OH
L.IV.35 0.237 OH
M.IV.279 1.000 m
A.IV.29 1.584 hari
. A.8.4.1.33 P-444 1.000 m1
L.IV.01 0.345 OH
L.IV.20 0.172 OH
L.IV.35 0.034 OH
M.IV.246 1.000 m
A.IV.29 0.038 hari
. A.8.4.1.34 P-445 1.000 m1
L.IV.01 0.400 OH
L.IV.20 0.200 OH
L.IV.35 0.040 OH
M.IV.247 1.000 m
A.IV.29 0.038 hari
. A.8.4.1.35 P-446 1.000 m1
L.IV.01 0.448 OH
L.IV.20 0.224 OH
L.IV.35 0.045 OH
M.IV.248 1.000 m
A.IV.29 0.038 hari
. A.8.4.1.36 P-447 1.000 m1
L.IV.01 0.506 OH
L.IV.20 0.253 OH
L.IV.35 0.051 OH
M.IV.249 1.000 m
A.IV.29 0.042 hari
. A.8.4.1.37 P-448 1.000 m1
L.IV.01 0.796 OH
L.IV.20 0.398 OH
L.IV.35 0.080 OH
M.IV.250 1.000 m
A.IV.29 0.042 hari
. A.8.4.1.38 P-449 1.000 m1
L.IV.01 0.949 OH
L.IV.20 0.475 OH
L.IV.35 0.095 OH
M.IV.251 1.000 m
A.IV.29 0.042 hari
. A.8.4.1.39 P-450 1.000 m1
L.IV.01 0.958 OH
L.IV.20 0.479 OH
L.IV.35 0.096 OH
M.IV.252 1.000 m
A.IV.29 0.042 hari
. A.8.4.1.40 P-451 1.000 m1
L.IV.01 1.212 OH
L.IV.20 0.606 OH
L.IV.35 0.121 OH
M.IV.253 1.000 m
A.IV.29 0.058 hari
. A.8.4.1.41 P-452 1.000 m1
L.IV.01 1.353 OH
L.IV.20 0.676 OH
L.IV.35 0.135 OH
M.IV.254 1.000 m
A.IV.29 0.058 hari
. A.8.4.1.42 P-453 1.000 m1
L.IV.01 1.469 OH
L.IV.20 0.735 OH
L.IV.35 0.147 OH
M.IV.255 1.000 m
A.IV.29 0.077 hari
. A.8.4.1.43 P-454 1.000 m1
L.IV.01 1.327 OH
L.IV.20 0.664 OH
L.IV.35 0.133 OH
M.IV.256 1.000 m
A.IV.29 0.077 hari
. A.8.4.1.44 P-455 1.000 m1
L.IV.01 2.327 OH
L.IV.20 1.163 OH
L.IV.35 0.233 OH
M.IV.257 1.000 m
A.IV.29 0.086 hari
. A.8.4.1.45 P-456 1.000 m1
L.IV.01 2.623 OH
L.IV.20 1.312 OH
L.IV.35 0.262 OH
M.IV.258 1.000 m
A.IV.29 0.086 hari
. A.8.4.1.46 P-457 1.000 m1
L.IV.01 2.911 OH
L.IV.20 1.456 OH
L.IV.35 0.291 OH
M.IV.259 1.000 m
A.IV.29 0.086 hari
. A.8.4.1.47 P-458 1.000 m1
L.IV.01 3.200 OH
L.IV.20 1.600 OH
L.IV.35 0.320 OH
M.IV.260 1.000 m
A.IV.29 0.086 hari
. A.8.4.1.48 P-459 1.000 m1
L.IV.01 0.349 OH
L.IV.20 1.744 OH
L.IV.35 0.349 OH
M.IV.261 1.000 m
A.IV.29 0.086 hari
. A.8.4.1.49 P-460 1.000 m1
L.IV.01 0.489 OH
L.IV.20 0.098 OH
L.IV.35 0.049 OH
M.IV.231 1.000 m
A.IV.29 0.380 hari
. A.8.4.1.50 P-461 1.000 m1
L.IV.01 0.547 OH
L.IV.20 0.109 OH
L.IV.35 0.055 OH
M.IV.232 1.000 m
A.IV.29 0.380 hari
. A.8.4.1.51 P-462 1.000 m1
L.IV.01 0.613 OH
L.IV.20 0.123 OH
L.IV.35 0.061 OH
M.IV.233 1.000 m
A.IV.29 0.380 hari
. A.8.4.1.52 P-463 1.000 m1
L.IV.01 0.855 OH
L.IV.20 0.171 OH
L.IV.35 0.085 OH
M.IV.234 1.000 M
A.IV.29 0.380 hari
. A.8.4.1.53 P-464 1.000 m1
L.IV.01 0.951 OH
L.IV.20 0.190 OH
L.IV.35 0.095 OH
M.IV.235 1.000 M
A.IV.29 0.050 hari
. A.8.4.1.54 P-465 1.000 m1
L.IV.01 0.973 OH
L.IV.20 0.195 OH
L.IV.35 0.097 OH
M.IV.236 1.000 m
A.IV.29 0.071 hari
. A.8.4.1.55 P-466 1.000 m1
L.IV.01 1.545 OH
L.IV.20 0.309 OH
L.IV.37 0.093 OH
L.IV.35 0.154 OH
M.IV.237 1.000 m
A.IV.25 0.023 hari
A.IV.29 0.031 hari
. A.8.4.1.56 P-467 1.000 m1
L.IV.01 1.813 OH
L.IV.20 0.363 OH
L.IV.37 0.143 OH
L.IV.35 0.181 OH
M.IV.238 1.000 m
A.IV.25 0.029 hari
A.IV.29 0.039 hari
. A.8.4.1.57 P-468 1.000 m1
L.IV.01 2.047 OH
L.IV.20 0.409 OH
L.IV.37 0.193 OH
L.IV.35 0.205 OH
M.IV.239 1.000 m
A.IV.25 0.034 hari
A.IV.29 0.045 hari
. A.8.4.1.58 P-469 1.000 m1
L.IV.01 2.011 OH
L.IV.20 0.402 OH
L.IV.37 0.293 OH
L.IV.35 0.201 OH
M.IV.240 1.000 m
A.IV.25 0.058 hari
A.IV.29 0.077 hari
. A.8.4.1.59 P-470 1.000 m1
L.IV.01 3.859 OH
L.IV.20 0.772 OH
L.IV.37 0.493 OH
L.IV.35 0.386 OH
M.IV.241 1.000 m
A.IV.25 0.084 hari
A.IV.29 0.225 hari
. A.8.4.1.60 P-471 1.000 m1
L.IV.01 4.995 OH
L.IV.20 0.999 OH
L.IV.37 0.593 OH
L.IV.35 0.499 OH
M.IV.242 1.000 m
A.IV.25 0.093 hari
A.IV.29 0.248 hari
. A.8.4.1.61 P-472 1.000 m1
L.IV.01 5.931 OH
L.IV.20 1.186 OH
L.IV.37 0.793 OH
L.IV.35 0.693 OH
M.IV.243 1.000 m
A.IV.25 0.112 hari
A.IV.29 0.298 hari
. A.8.4.1.62 P-473 1.000 m1
L.IV.01 6.949 OH
L.IV.20 1.390 OH
L.IV.37 0.793 OH
L.IV.35 0.695 OH
M.IV.244 1.000 m
A.IV.25 0.152 hari
A.IV.29 0.304 hari
. A.8.4.1.63 P-474 1.000 m1
L.IV.01 8.056 OH
L.IV.20 1.611 OH
L.IV.37 0.893 OH
L.IV.35 0.806 OH
M.IV.245 1.000 m
A.IV.25 0.180 hari
A.IV.29 0.360 hari
. A.8.4.1.64 P-475 1.000 m1
L.IV.01 0.499 OH
L.IV.20 0.100 OH
L.IV.35 0.050 OH
M.IV.215 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.65 P-476 1.000 m1
L.IV.01 0.579 OH
L.IV.20 0.116 OH
L.IV.35 0.058 OH
M.IV.216 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.66 P-477 1.000 m1
L.IV.01 0.648 OH
L.IV.20 0.130 OH
L.IV.35 0.065 OH
M.IV.217 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.67 P-478 1.000 m1
L.IV.01 0.708 OH
L.IV.20 0.142 OH
L.IV.35 0.071 OH
M.IV.218 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.68 P-479 1.000 m1
L.IV.01 1.113 OH
L.IV.20 0.223 OH
L.IV.35 0.111 OH
M.IV.219 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.69 P-480 1.000 m1
L.IV.01 1.325 OH
L.IV.20 0.265 OH
L.IV.35 0.133 OH
M.IV.220 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.70 P-481 1.000 m1
L.IV.01 1.415 OH
L.IV.20 0.283 OH
L.IV.35 0.141 OH
M.IV.221 1.000 m
A.IV.29 0.004 hari
. A.8.4.1.71 P-482 1.000 m1
L.IV.01 2.366 OH
L.IV.20 0.473 OH
L.IV.35 0.237 OH
M.IV.222 1.000 m
A.IV.25 0.027 hari
A.IV.29 0.039 hari
. A.8.4.1.72 P-483 1.000 m1
L.IV.01 2.231 OH
L.IV.20 0.446 OH
L.IV.35 0.223 OH
M.IV.223 1.000 m
A.IV.25 0.026 hari
A.IV.29 0.037 hari
. A.8.4.1.73 P-484 1.000 m1
L.IV.01 2.432 OH
L.IV.20 0.486 OH
L.IV.35 0.243 OH
M.IV.224 1.000 m
A.IV.25 0.029 hari
A.IV.29 0.045 hari
. A.8.4.1.74 P-485 1.000 m1
L.IV.01 2.208 OH
L.IV.20 0.442 OH
L.IV.35 0.221 OH
M.IV.225 1.000 m
A.IV.25 0.027 hari
A.IV.29 0.039 hari
. A.8.4.1.75 P-486 1.000 m1
L.IV.01 3.897 OH
L.IV.20 0.779 OH
L.IV.35 0.390 OH
M.IV.226 1.000 m
A.IV.25 0.046 hari
A.IV.29 0.098 hari
. A.8.4.1.76 P-487 1.000 m1
L.IV.01 4.403 OH
L.IV.20 0.081 OH
L.IV.35 0.440 OH
M.IV.227 1.000 m
A.IV.25 0.052 hari
A.IV.29 0.115 hari
. A.8.4.1.77 P-488 1.000 m1
L.IV.01 4.895 OH
L.IV.20 0.979 OH
L.IV.35 0.489 OH
M.IV.228 1.000 m
A.IV.25 0.058 hari
A.IV.29 0.133 hari
. A.8.4.1.78 P-489 1.000 m1
L.IV.01 5.387 OH
L.IV.20 1.077 OH
L.IV.35 0.539 OH
M.IV.229 1.000 m
A.IV.25 0.064 hari
A.IV.29 0.150 hari
. A.8.4.1.79 P-490 1.000 m1
L.IV.01 5.897 OH
L.IV.20 1.176 OH
L.IV.35 0.588 OH
M.IV.230 1.000 m
A.IV.25 0.070 hari
A.IV.29 0.167 hari
. A.8.4.2.1 P-491 1.000 m1
L.IV.01 0.005 OH
L.IV.20 0.002 OH
L.IV.35 0.001 OH
M.IV.292 1.000 bh
A.IV.6 0.003 hari
. A.8.4.2.2 P-492 1.000 m1
L.IV.01 0.014 OH
L.IV.20 0.007 OH
L.IV.35 0.001 OH
M.IV.293 1.000 bh
A.IV.6 0.003 hari
. A.8.4.2.3 P-493 1.000 bh
L.IV.01 0.022 OH
L.IV.20 0.011 OH
L.IV.35 0.002 OH
M.IV.294 1.000 bh
A.IV.6 0.003 hari
. A.8.4.2.4 P-494 1.000 bh
L.IV.01 0.031 OH
L.IV.20 0.015 OH
L.IV.35 0.003 OH
M.IV.295 1.000 bh
A.IV.6 0.003 hari
. A.8.4.2.5 P-495 1.000 bh
L.IV.01 0.081 OH
L.IV.20 0.040 OH
L.IV.35 0.008 OH
M.IV.296 1.000 bh
A.IV.6 0.017 hari
. A.8.4.2.6 P-496 1.000 bh
L.IV.01 0.128 OH
L.IV.20 0.064 OH
L.IV.35 0.013 OH
M.IV.297 1.000 bh
A.IV.6 0.030 hari
. A.8.4.2.7 P-497 1.000 bh
L.IV.01 0.155 OH
L.IV.20 0.077 OH
L.IV.35 0.015 OH
M.IV.298 1.000 bh
A.IV.6 0.037 hari
. A.8.4.2.8 P-498 1.000 bh
L.IV.01 0.331 OH
L.IV.20 0.166 OH
L.IV.35 0.033 OH
M.IV.299 1.000 bh
A.IV.6 0.086 hari
. A.8.4.2.9 P-499 1.000 bh
L.IV.01 0.420 OH
L.IV.20 0.210 OH
L.IV.35 0.042 OH
M.IV.300 1.000 bh
A.IV.7 0.054 hari
. A.8.4.2.10 P-500 1.000 bh
L.IV.01 0.518 OH
L.IV.20 0.259 OH
L.IV.35 0.052 OH
M.IV.301 1.000 bh
A.IV.7 0.069 hari
. A.8.4.2.11 P-501 1.000 bh
L.IV.01 0.623 OH
L.IV.20 0.311 OH
L.IV.35 0.062 OH
M.IV.302 1.000 bh
A.IV.7 0.086 hari
. A.8.4.2.12 P-502 1.000 bh
L.IV.01 1.089 OH
L.IV.20 0.545 OH
L.IV.35 0.109 OH
M.IV.303 1.000 bh
A.IV.7 0.160 hari
. A.8.4.2.13 P-503 1.000 bh
L.IV.01 1.141 OH
L.IV.20 0.571 OH
L.IV.35 0.114 OH
M.IV.304 1.000 bh
A.IV.7 0.168 hari
. A.8.4.2.14 P-504 1.000 bh
L.IV.01 1.285 OH
L.IV.20 0.643 OH
L.IV.35 0.129 OH
M.IV.305 1.000 bh
A.IV.7 0.191 hari
. A.8.4.2.15 P-505 1.000 bh
L.IV.01 1.429 OH
L.IV.20 0.715 OH
L.IV.35 0.143 OH
M.IV.306 1.000 bh
A.IV.7 0.213 hari
. A.8.4.2.16 P-506 1.000 bh
L.IV.01 1.573 OH
L.IV.20 0.787 OH
L.IV.35 0.157 OH
M.IV.307 1.000 bh
A.IV.7 0.236 hari
. A.8.4.2.17 P-507 1.000 bh
L.IV.01 0.002 OH
L.IV.20 0.001 OH
L.IV.35 0.000 OH
L.IV.38 0.034 OH
M.IV.262 1.000 bh
A.IV.7 0.004 hari
. A.8.4.2.18 P-508 1.000 bh
L.IV.01 0.006 OH
L.IV.20 0.003 OH
L.IV.35 0.001 OH
L.IV.38 0.071 OH
M.IV.263 1.000 bh
A.IV.7 0.005 hari
. A.8.4.2.19 P-509 1.000 bh
L.IV.01 0.009 OH
L.IV.20 0.005 OH
L.IV.35 0.001 OH
L.IV.38 0.096 OH
M.IV.264 1.000 bh
A.IV.7 0.006 hari
. A.8.4.2.20 P-510 1.000 bh
L.IV.01 0.016 OH
L.IV.20 0.008 OH
L.IV.35 0.002 OH
L.IV.38 0.121 OH
M.IV.265 1.000 bh
A.IV.7 0.009 hari
. A.8.4.2.21 P-511 1.000 bh
L.IV.01 0.044 OH
L.IV.20 0.022 OH
L.IV.35 0.004 OH
L.IV.38 0.171 OH
M.IV.266 1.000 bh
A.IV.7 0.017 hari
. A.8.4.2.22 P-512 1.000 bh
L.IV.01 0.067 OH
L.IV.20 0.033 OH
L.IV.35 0.007 OH
L.IV.38 0.221 OH
M.IV.267 1.000 bh
A.IV.7 0.023 hari
. A.8.4.2.23 P-513 1.000 bh
L.IV.01 0.090 OH
L.IV.20 0.045 OH
L.IV.35 0.009 OH
L.IV.38 0.271 OH
M.IV.268 1.000 bh
A.IV.7 0.030 hari
. A.8.4.2.24 P-514 1.000 bh
L.IV.01 0.177 OH
L.IV.20 0.088 OH
L.IV.35 0.018 OH
L.IV.38 0.371 OH
M.IV.269 1.000 bh
A.IV.7 0.055 hari
. A.8.4.2.25 P-515 1.000 bh
L.IV.01 0.225 OH
L.IV.20 0.113 OH
L.IV.35 0.023 OH
L.IV.38 0.421 OH
M.IV.270 1.000 bh
A.IV.7 0.070 hari
. A.8.4.2.26 P-516 1.000 bh
L.IV.01 0.277 OH
L.IV.20 0.139 OH
L.IV.35 0.028 OH
L.IV.38 0.471 OH
M.IV.271 1.000 bh
A.IV.7 0.085 hari
. A.8.4.2.27 P-517 1.000 bh
L.IV.01 0.333 OH
L.IV.20 0.167 OH
L.IV.35 0.033 OH
L.IV.38 0.571 OH
M.IV.272 1.000 bh
A.IV.7 0.101 hari
. A.8.4.2.28 P-518 1.000 bh
L.IV.01 0.601 OH
L.IV.20 0.301 OH
L.IV.35 0.060 OH
L.IV.38 0.771 OH
M.IV.273 1.000 bh
A.IV.7 0.179 hari
. A.8.4.2.29 P-519 1.000 bh
L.IV.01 0.913 OH
L.IV.20 0.456 OH
L.IV.35 0.091 OH
L.IV.38 0.871 OH
M.IV.274 1.000 bh
A.IV.7 0.270 hari
. A.8.4.2.30 P-520 1.000 bh
L.IV.01 1.125 OH
L.IV.20 0.562 OH
L.IV.35 0.112 OH
L.IV.38 0.971 OH
M.IV.275 1.000 bh
A.IV.7 0.332 hari
. A.8.4.2.31 P-521 1.000 bh
L.IV.01 1.238 OH
L.IV.20 0.619 OH
L.IV.35 0.124 OH
L.IV.38 1.071 OH
M.IV.277 1.000 bh
A.IV.7 0.365 hari
. A.8.4.2.32 P-522 1.000 bh
L.IV.01 1.619 OH
L.IV.20 0.809 OH
L.IV.35 0.162 OH
L.IV.38 1.171 OH
M.IV.279 1.000 bh
A.IV.7 0.477 hari
. A.8.4.2.33 P-523 1.000 bh
L.IV.01 0.019 OH
L.IV.20 0.010 OH
L.IV.35 0.002 OH
M.IV.246 1.000 bh
A.IV.7 0.017 hari
. A.8.4.2.34 P-524 1.000 bh
L.IV.01 0.058 OH
L.IV.20 0.029 OH
L.IV.35 0.006 OH
M.IV.247 1.000 bh
A.IV.7 0.017 hari
. A.8.4.2.35 P-525 1.000 bh
L.IV.01 0.092 OH
L.IV.20 0.046 OH
L.IV.35 0.009 OH
M.IV.248 1.000 bh
A.IV.7 0.034 hari
. A.8.4.2.36 P-526 1.000 bh
L.IV.01 0.131 OH
L.IV.20 0.066 OH
L.IV.35 0.013 OH
M.IV.249 1.000 bh
A.IV.7 0.034 hari
. A.8.4.2.37 P-527 1.000 bh
L.IV.01 0.340 OH
L.IV.20 0.170 OH
L.IV.35 0.034 OH
M.IV.250 1.000 bh
A.IV.7 0.051 hari
. A.8.4.2.38 P-528 1.000 bh
L.IV.01 0.475 OH
L.IV.20 0.237 OH
L.IV.35 0.047 OH
M.IV.251 1.000 bh
A.IV.7 0.051 hari
. A.8.4.2.39 P-529 1.000 bh
L.IV.01 0.504 OH
L.IV.20 0.252 OH
L.IV.35 0.050 OH
M.IV.252 1.000 bh
A.IV.7 0.051 hari
. A.8.4.2.40 P-530 1.000 bh
L.IV.01 0.738 OH
L.IV.20 0.369 OH
L.IV.35 0.074 OH
M.IV.253 1.000 bh
A.IV.7 0.068 hari
. A.8.4.2.41 P-531 1.000 bh
L.IV.01 0.848 OH
L.IV.20 0.424 OH
L.IV.35 0.085 OH
M.IV.254 1.000 bh
A.IV.7 0.068 hari
. A.8.4.2.42 P-532 1.000 bh
L.IV.01 0.941 OH
L.IV.20 0.471 OH
L.IV.35 0.094 OH
M.IV.255 1.000 bh
A.IV.7 0.068 hari
. A.8.4.2.43 P-533 1.000 bh
L.IV.01 0.864 OH
L.IV.20 0.432 OH
L.IV.35 0.086 OH
M.IV.256 1.000 bh
A.IV.7 0.085 hari
. A.8.4.2.44 P-534 1.000 bh
L.IV.01 1.567 OH
L.IV.20 0.783 OH
L.IV.35 0.157 OH
M.IV.257 1.000 bh
A.IV.7 0.085 hari
. A.8.4.2.45 P-535 1.000 bh
L.IV.01 1.770 OH
L.IV.20 0.885 OH
L.IV.35 0.177 OH
M.IV.258 1.000 bh
A.IV.7 0.085 hari
. A.8.4.2.46 P-536 1.000 bh
L.IV.01 1.974 OH
L.IV.20 0.987 OH
L.IV.35 0.197 OH
M.IV.259 1.000 bh
A.IV.7 0.102 hari
. A.8.4.2.47 P-537 1.000 bh
L.IV.01 2.178 OH
L.IV.20 1.089 OH
L.IV.35 0.218 OH
M.IV.260 1.000 bh
A.IV.7 0.102 hari
. A.8.4.2.48 P-538 1.000 bh
L.IV.01 2.382 OH
L.IV.20 1.191 OH
L.IV.35 0.238 OH
M.IV.261 1.000 bh
A.IV.7 0.102 hari
. A.8.4.2.49 P-539 1.000 bh
L.IV.01 0.071 OH
L.IV.20 0.014 OH
L.IV.35 0.007 OH
M.IV.231 1.000 bh
A.IV.29 0.003 hari
. A.8.4.2.50 P-540 1.000 bh
L.IV.01 0.112 OH
L.IV.20 0.022 OH
L.IV.35 0.011 OH
M.IV.232 1.000 bh
A.IV.29 0.010 hari
. A.8.4.2.51 P-541 1.000 bh
L.IV.01 0.159 OH
L.IV.20 0.032 OH
L.IV.35 0.016 OH
M.IV.233 1.000 bh
A.IV.29 0.018 hari
. A.8.4.2.52 P-542 1.000 bh
L.IV.01 0.366 OH
L.IV.20 0.073 OH
L.IV.35 0.037 OH
M.IV.234 1.000 bh
A.IV.29 0.054 hari
. A.8.4.2.53 P-543 1.000 bh
L.IV.01 0.476 OH
L.IV.20 0.095 OH
L.IV.35 0.048 OH
M.IV.235 1.000 bh
A.IV.29 0.073 hari
. A.8.4.2.54 P-544 1.000 bh
L.IV.01 0.512 OH
L.IV.20 0.102 OH
L.IV.35 0.051 OH
M.IV.236 1.000 bh
A.IV.29 0.079 hari
. A.8.4.2.55 P-545 1.000 bh
L.IV.01 0.941 OH
L.IV.20 0.188 OH
L.IV.35 0.094 OH
M.IV.237 1.000 bh
A.IV.7 0.158 hari
. A.8.4.2.56 P-546 1.000 bh
L.IV.01 1.137 OH
L.IV.20 0.227 OH
L.IV.35 0.114 OH
M.IV.238 1.000 bh
A.IV.7 0.176 hari
. A.8.4.2.57 P-547 1.000 bh
L.IV.01 1.312 OH
L.IV.20 0.262 OH
L.IV.35 0.131 OH
M.IV.239 1.000 bh
A.IV.7 0.192 hari
. A.8.4.2.58 P-548 1.000 bh
L.IV.01 1.309 OH
L.IV.20 0.262 OH
L.IV.35 0.131 OH
M.IV.240 1.000 bh
A.IV.7 0.192 hari
. A.8.4.2.59 P-549 1.000 bh
L.IV.01 2.598 OH
L.IV.20 0.520 OH
L.IV.35 0.260 OH
M.IV.241 1.000 bh
A.IV.7 0.310 hari
. A.8.4.2.60 P-550 1.000 bh
L.IV.01 3.370 OH
L.IV.20 0.674 OH
L.IV.35 0.337 OH
M.IV.242 1.000 bh
A.IV.7 0.381 hari
. A.8.4.2.61 P-551 1.000 bh
L.IV.01 4.021 OH
L.IV.20 0.804 OH
L.IV.35 0.402 OH
M.IV.243 1.000 bh
A.IV.7 0.441 hari
. A.8.4.2.62 P-552 1.000 bh
L.IV.01 4.731 OH
L.IV.20 0.946 OH
L.IV.35 0.473 OH
M.IV.244 1.000 bh
A.IV.7 0.506 hari
. A.8.4.2.63 P-553 1.000 bh
L.IV.01 5.502 OH
L.IV.20 1.100 OH
L.IV.35 0.550 OH
M.IV.245 1.000 bh
A.IV.7 0.576 hari
. A.8.4.2.64 P-554 1.000 bh
L.IV.01 0.028 OH
L.IV.20 0.006 OH
L.IV.35 0.003 OH
M.IV.215 1.000 bh
A.IV.7 0.037 hari
. A.8.4.2.65 P-555 1.000 bh
L.IV.01 0.085 OH
L.IV.20 0.017 OH
L.IV.35 0.008 OH
M.IV.216 1.000 bh
A.IV.7 0.040 hari
. A.8.4.2.66 P-556 1.000 bh
L.IV.01 0.133 OH
L.IV.20 0.027 OH
L.IV.35 0.013 OH
M.IV.217 1.000 bh
A.IV.7 0.042 hari
. A.8.4.2.67 P-557 1.000 bh
L.IV.01 0.184 OH
L.IV.20 0.037 OH
L.IV.35 0.018 OH
M.IV.218 1.000 bh
A.IV.7 0.045 hari
. A.8.4.2.68 P-558 1.000 bh
L.IV.01 0.476 OH
L.IV.20 0.095 OH
L.IV.35 0.048 OH
M.IV.219 1.000 bh
A.IV.7 0.060 hari
. A.8.4.2.69 P-559 1.000 bh
L.IV.01 0.663 OH
L.IV.20 0.133 OH
L.IV.35 0.066 OH
M.IV.220 1.000 bh
A.IV.7 0.068 hari
. A.8.4.2.70 P-560 1.000 bh
L.IV.01 0.745 OH
L.IV.20 0.149 OH
L.IV.35 0.074 OH
M.IV.221 1.000 bh
A.IV.7 0.072 hari
. A.8.4.2.71 P-561 1.000 bh
L.IV.01 1.440 OH
L.IV.20 0.288 OH
L.IV.35 0.144 OH
M.IV.222 1.000 bh
A.IV.7 0.105 hari
. A.8.4.2.72 P-562 1.000 bh
L.IV.01 1.399 OH
L.IV.20 0.280 OH
L.IV.35 0.140 OH
M.IV.223 1.000 bh
A.IV.7 0.107 hari
. A.8.4.2.73 P-563 1.000 bh
L.IV.01 1.558 OH
L.IV.20 0.312 OH
L.IV.35 0.156 OH
M.IV.224 1.000 bh
A.IV.7 0.107 hari
. A.8.4.2.74 P-564 1.000 bh
L.IV.01 1.437 OH
L.IV.20 0.287 OH
L.IV.35 0.144 OH
M.IV.225 1.000 bh
A.IV.7 0.113 hari
. A.8.4.2.75 P-565 1.000 bh
L.IV.01 2.624 OH
L.IV.20 0.525 OH
L.IV.35 0.262 OH
M.IV.226 1.000 bh
A.IV.7 0.166 hari
. A.8.4.2.76 P-566 1.000 bh
L.IV.01 2.971 OH
L.IV.20 0.594 OH
L.IV.35 0.297 OH
M.IV.227 1.000 bh
A.IV.7 0.183 hari
. A.8.4.2.77 P-567 1.000 bh
L.IV.01 3.319 OH
L.IV.20 0.664 OH
L.IV.35 0.332 OH
M.IV.228 1.000 bh
A.IV.7 0.201 hari
. A.8.4.2.78 P-568 1.000 bh
L.IV.01 3.667 OH
L.IV.20 0.733 OH
L.IV.35 0.367 OH
M.IV.229 1.000 bh
A.IV.7 0.218 hari
. A.8.4.2.79 P-569 1.000 bh
L.IV.01 4.015 OH
L.IV.20 0.803 OH
L.IV.35 0.402 OH
M.IV.229 1.000 bh
A.IV.7 0.236 hari
. A.8.4.3.1 P-570 1.000 bh
L.IV.01 1.429 OH
L.IV.20 0.715 OH
L.IV.35 0.143 OH
M.IV.322 1.000 bh
A.IV.29 0.100 hari
. A.8.4.3.2 P-571 1.000 bh
L.IV.01 1.714 OH
L.IV.20 0.857 OH
L.IV.35 0.171 OH
M.IV.323 1.000 bh
A.IV.29 0.300 hari
. A.8.4.3.3 P-572 1.000 bh
L.IV.01 1.714 OH
L.IV.20 0.857 OH
L.IV.35 0.171 OH
M.IV.324 1.000 bh
A.IV.29 0.400 hari
. A.8.4.3.4 P-573 1.000 bh
L.IV.01 2.000 OH
L.IV.20 1.000 OH
L.IV.35 0.200 OH
M.IV.325 1.000 bh
A.IV.29 0.500 hari
. A.8.4.3.5 P-574 1.000 bh
L.IV.01 3.429 OH
L.IV.20 1.715 OH
L.IV.35 0.343 OH
M.IV.326 1.000 bh
A.IV.29 1.000 hari
. A.8.4.3.6 P-575 1.000 bh
L.IV.01 3.429 OH
L.IV.20 1.715 OH
L.IV.35 0.343 OH
M.IV.327 1.000 bh
A.IV.29 1.000 hari
. A.8.4.3.7 P-576 1.000 bh
L.IV.01 4.000 OH
L.IV.20 2.000 OH
L.IV.35 0.400 OH
M.IV.328 1.000 bh
A.IV.29 1.000 hari
. A.8.4.3.8 P-577 1.000 bh
L.IV.01 1.421 OH
L.IV.20 0.711 OH
L.IV.35 0.142 OH
M.IV.329 1.000 bh
A.IV.29 0.600 hari
A.IV.8 0.300 hari
. A.8.4.3.9 P-578 1.000 bh
L.IV.01 1.429 OH
L.IV.20 0.715 OH
L.IV.35 0.143 OH
M.IV.330 1.000 bh
A.IV.29 0.500 hari
A.IV.8 0.500 hari
. A.8.4.3.10 P-579 1.000 bh
L.IV.01 1.786 OH
L.IV.20 0.893 OH
L.IV.35 0.179 OH
M.IV.331 1.000 bh
A.IV.29 0.500 hari
A.IV.8 0.500 hari
. A.8.4.3.11 P-580 1.000 bh
L.IV.01 1.714 OH
L.IV.20 0.857 OH
L.IV.35 0.171 OH
M.IV.332 1.000 bh
A.IV.29 0.750 hari
A.IV.8 0.750 hari
. A.8.4.3.12 P-581 1.000 bh
L.IV.01 2.571 OH
L.IV.20 1.286 OH
L.IV.35 0.257 OH
M.IV.333 1.000 bh
A.IV.29 1.000 hari
A.IV.8 1.000 hari
. A.8.4.3.13 P-582 1.000 bh
L.IV.01 3.000 OH
L.IV.20 1.500 OH
L.IV.35 0.300 OH
M.IV.334 1.000 bh
A.IV.29 1.000 hari
A.IV.8 1.000 hari
. A.8.4.3.14 P-583 1.000 bh
L.IV.01 3.000 OH
L.IV.20 1.500 OH
L.IV.35 0.300 OH
M.IV.335 1.000 bh
A.IV.29 1.000 hari
A.IV.8 1.000 hari
. A.8.4.3.15 P-584 1.000 bh
L.IV.01 0.106 OH
L.IV.20 0.053 OH
L.IV.35 0.011 OH
M.IV.308 1.000 bh
A.IV.29 0.028 hari
. A.8.4.3.16 P-585 1.000 bh
L.IV.01 0.216 OH
L.IV.20 0.108 OH
L.IV.35 0.022 OH
M.IV.309 1.000 bh
A.IV.29 0.029 hari
. A.8.4.3.17 P-586 1.000 bh
L.IV.01 0.326 OH
L.IV.20 0.163 OH
L.IV.35 0.033 OH
M.IV.310 1.000 bh
A.IV.29 0.039 hari
. A.8.4.3.18 P-587 1.000 bh
L.IV.01 0.436 OH
L.IV.20 0.218 OH
L.IV.35 0.044 OH
M.IV.311 1.000 bh
A.IV.29 0.500 hari
. A.8.4.3.19 P-588 1.000 bh
L.IV.01 0.656 OH
L.IV.20 0.328 OH
L.IV.35 0.066 OH
M.IV.312 1.000 bh
A.IV.29 0.500 hari
. A.8.4.3.20 P-589 1.000 bh
L.IV.01 0.766 OH
L.IV.20 0.383 OH
L.IV.35 0.077 OH
M.IV.313 1.000 bh
A.IV.29 0.500 hari
. A.8.4.3.21 P-590 1.000 bh
L.IV.01 0.876 OH
L.IV.20 0.438 OH
L.IV.35 0.088 OH
M.IV.314 1.000 bh
A.IV.29 0.600 hari
. A.8.4.3.22 P-591 1.000 bh
L.IV.01 1.096 OH
L.IV.20 0.548 OH
L.IV.35 0.110 OH
M.IV.315 1.000 bh
A.IV.29 0.193 hari
A.IV.8 0.096 hari
. A.8.4.3.23 P-592 1.000 bh
L.IV.01 1.316 OH
L.IV.20 0.658 OH
L.IV.35 0.132 OH
M.IV.316 1.000 bh
A.IV.29 0.225 hari
A.IV.8 0.113 hari
. A.8.4.3.24 P-593 1.000 bh
L.IV.01 1.536 OH
L.IV.20 0.768 OH
L.IV.35 0.154 OH
M.IV.317 1.000 bh
A.IV.29 0.257 hari
A.IV.8 0.129 hari
. A.8.4.3.25 P-594 1.000 bh
L.IV.01 1.756 OH
L.IV.20 0.878 OH
L.IV.35 0.176 OH
M.IV.318 1.000 bh
A.IV.29 0.321 hari
A.IV.8 0.161 hari
. A.8.4.3.26 P-595 1.000 bh
L.IV.01 1.976 OH
L.IV.20 0.988 OH
L.IV.35 0.198 OH
M.IV.319 1.000 bh
A.IV.29 0.366 hari
A.IV.8 0.183 hari
. A.8.4.3.27 P-596 1.000 bh
L.IV.01 2.196 OH
L.IV.20 1.098 OH
L.IV.35 0.220 OH
M.IV.320 1.000 bh
A.IV.29 0.386 hari
A.IV.8 0.193 hari
. A.8.4.3.28 P-597 1.000 bh
L.IV.01 2.416 OH
L.IV.20 1.208 OH
L.IV.35 0.242 OH
M.IV.321 1.000 bh
A.IV.29 0.450 hari
A.IV.8 0.225 hari
. A.8.4.4.1 P-598 1.000 bh
L.IV.01 1.466 OH
L.IV.20 0.733 OH
L.IV.35 0.147 OH
M.IV.280 1.000 bh
A.IV.7 0.606 hari
A.IV.26 0.075 hari
A.IV.28 0.968 hari
A.IV.29 0.865 hari
. A.8.4.4.2 P-599 1.000 bh
L.IV.01 1.646 OH
L.IV.20 0.823 OH
L.IV.35 0.165 OH
M.IV.281 1.000 bh
A.IV.7 0.650 hari
A.IV.26 0.159 hari
A.IV.28 1.078 hari
A.IV.29 0.911 hari
. A.8.4.4.3 P-600 1.000 bh
L.IV.01 2.096 OH
L.IV.20 1.048 OH
L.IV.35 0.210 OH
M.IV.282 1.000 bh
A.IV.7 0.760 hari
A.IV.26 0.369 hari
A.IV.28 1.353 hari
A.IV.29 1.026 hari
. A.8.4.4.4 P-601 1.000 bh
L.IV.01 2.546 OH
L.IV.20 1.273 OH
L.IV.35 0.255 OH
M.IV.283 1.000 bh
A.IV.7 0.870 hari
A.IV.26 0.579 hari
A.IV.28 1.628 hari
A.IV.29 1.141 hari
. A.8.4.4.5 P-602 1.000 bh
L.IV.01 2.996 OH
L.IV.20 1.498 OH
L.IV.35 0.300 OH
M.IV.284 1.000 bh
A.IV.7 0.980 hari
A.IV.26 0.789 hari
A.IV.28 1.903 hari
A.IV.29 1.256 hari
. A.8.4.4.6 P-603 1.000 bh
L.IV.01 3.446 OH
L.IV.20 1.723 OH
L.IV.35 0.345 OH
M.IV.285 1.000 bh
A.IV.7 1.090 hari
A.IV.26 0.999 hari
A.IV.28 2.178 hari
A.IV.29 1.371 hari
. A.8.4.4.7 P-604 1.000 bh
L.IV.01 4.346 OH
L.IV.20 2.173 OH
L.IV.35 0.435 OH
M.IV.286 1.000 bh
A.IV.7 1.310 hari
A.IV.26 1.419 hari
A.IV.28 2.728 hari
A.IV.29 1.601 hari
. A.8.4.4.8 P-605 1.000 bh
L.IV.01 4.796 OH
L.IV.20 2.398 OH
L.IV.35 0.480 OH
M.IV.287 1.000 bh
A.IV.7 1.420 hari
A.IV.26 1.629 hari
A.IV.28 3.003 hari
A.IV.29 1.716 hari
. A.8.4.4.9 P-606 1.000 bh
L.IV.01 5.246 OH
L.IV.20 2.623 OH
L.IV.35 0.525 OH
M.IV.288 1.000 bh
A.IV.7 1.530 hari
A.IV.26 1.839 hari
A.IV.28 3.278 hari
A.IV.29 1.831 hari
. A.8.4.4.10 P-607 1.000 bh
L.IV.01 6.146 OH
L.IV.20 3.073 OH
L.IV.35 0.615 OH
M.IV.289 1.000 bh
A.IV.7 1.750 hari
A.IV.26 2.259 hari
A.IV.28 3.828 hari
A.IV.29 2.061 hari
. A.8.4.4.11 P-608 1.000 bh
L.IV.01 7.046 OH
L.IV.20 3.523 OH
L.IV.35 0.705 OH
M.IV.290 1.000 bh
A.IV.7 1.970 hari
A.IV.26 2.679 hari
A.IV.28 4.378 hari
A.IV.29 2.291 hari
. A.8.4.4.12 P-609 1.000 bh
L.IV.01 7.946 OH
L.IV.20 3.973 OH
L.IV.35 0.795 OH
M.IV.291 1.000 bh
A.IV.7 2.190 hari
A.IV.26 3.099 hari
A.IV.28 4.928 hari
A.IV.29 2.521 hari
. A.8.4.5.1 P-610 1.000 bh
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.002 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.2 P-611 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.004 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.3 P-612 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.008 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.4 P-613 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.018 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.5 P-614 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.031 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.6 P-615 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.049 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.7 P-616 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.071 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.8 P-617 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.126 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.9 P-618 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.158 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.5.10 P-619 1.000 m1
L.IV.01 0.008 OH
L.IV.35 0.001 OH
M.IV.2 0.283 m3
M.IV.546 0.060 Ltr
M.IV.554 0.002 Ltr
. A.8.4.6.1 P-620 1.000 titik
L.IV.01 0.150 OH
L.IV.07 0.150 OH
L.IV.36 0.030 OH
L.IV.35 0.030 OH
M.IV.516 0.283 btg
M.IV.510 24.000 m
M.IV.515 3.000 bh
M.IV.192 4.000 bh
M.IV.512 3.000 bh
M.IV.511 24.000 bh
M.IV.513 1.000 bh
M.IV.514 1.000 bh
M.IV.509 1.000 bh
. A.8.4.6.2 P-621 1.000 titik
L.IV.01 0.150 OH
L.IV.07 0.150 OH
L.IV.36 0.030 OH
L.IV.35 0.030 OH
M.IV.510 11.000 M'
M.IV.194 11.000 M'
M.IV.196 1.000 bh
M.IV.515 2.000 bh
M.IV.187 3.000 bh
M.IV.180 6.000 bh
M.IV.512 2.000 bh
M.IV.591 0.250 bh
(K3) Pembuatan pagar sementara dari kayu tinggi 2 meter
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Semen
Pasir beton
Koral beton
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Residu
(K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Semen
Seng Gelombang 3" x 6" BJLS 28
Pasir beton
Koral beton
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Meni besi
Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Semen
Kawat duri
Pasir beton
Koral beton
Paku Biasa 2" - 5"
Pengukuran dan pemasangan Bouwplank
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Kayu papan 3/20
(K3) Pembuatan kantor sementara lantai plesteran
Pekerja
Tukang Kayu
Tukang batu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Baja strip (0,2 x 2) cm
Semen
Pasir pasang
Pasir beton
Koral beton
Bata merah
Seng Gelombang 3" x 6" BJLS 28
Jendela naco
Kaca polos
Kunci tanam biasa
Plywood 120x240 tbl. 4 mm
(K3) Pembuatan rumah jaga (konstruksi kayu )
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Papan kayu 3/20 Kelas II
Paku Biasa 2" - 5"
Seng Gelombang 3" x 6" BJLS 28
(K3) Pembuatan gudang semen dan
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Papan kayu 3/20 Kelas II
Paku Biasa 2" - 5"
Semen
Pasir beton
Koral beton
Seng Gelombang 3" x 6" BJLS 28
Seng Gelombang 3" x 6" BJLS 28
(K3) Pembuatan bedeng pekerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken kayu Ø 8-10/400 cm
Papan kayu 3/20 Kelas II
Paku Biasa 2" - 5"
Semen
Pasir beton
Koral beton
Seng Gelombang 3" x 6" BJLS 28
Plywood 120x240 tbl. 4 mm
(K3) Pembersihan lapangan dan perataan
Pekerja
Mandor
(K3) Pembuatan steger/perancah dari bambu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bambu Ø 6 - 8 / 600 cm
Tali ijuk
Pembuatan kotak adukan ukuran 40cm x50cm x25cm
Tukang Kayu
Kepala Tukang
Kayu papan kelas III
Kayu balok 5/7 kelas III
Paku Biasa 2" - 5"
Pembuatan jalan sementara
Pekerja
Mandor
Batu belah
Batu pecah 2/3
Pasir pasang
Pembongkaran beton bertulang
Pekerja
Mandor
Pembongkaran dinding tembok bata
Pekerja
Mandor
Pemasangan pagar kawat jaring galvanis panjang 240 cm
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kawat jaring
Pemasangan panel beton pracetak 5x50x240 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Panel Beton Pracetak
Kolom beton pracetak
Semen
Pasir beton
Koral beton
Penggalian tanah biasa sedalam 1 m
Pekerja
Mandor
Penggalian tanah biasa sedalam 2 m
Pekerja
Mandor
Menggali tanah biasa sedalam 3 m
Pekerja
Mandor
Menggali tanah keras sedalam 1 m
Pekerja
Mandor
Menggali tanah cadas sedalam 1 m
Pekerja
Mandor
Menggali tanah lumpur sedalam 1 m
Pekerja
Mandor
Pengerjaan stripping tanah tebing setinggi 1 meter
Pekerja
Mandor
(K3) Pembuangan tanah sejauh 30 meter
Pekerja
Mandor
Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M
Pekerja
Mandor
(K3) Pemadatan tanah tanah ( per 20 cm)
Pekerja
Mandor
Pengurugan dengan pasir urug
Pekerja
Mandor
Pasir urug
Pemasangan lapisan pudel campuran 1KP:3PP:7TL
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kapur
Pasir Pasang
Tanah Liat
Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan
Pekerja
Mandor
Ijuk
Pengurugan sirtu padat
Pekerja
Mandor
Sirtu
Pemasangan pondasi batu belah campuran 1SP : 3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1SP : 4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1SP : 5PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1SP : 6PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1SP : 8PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Kapur
Semen
Pasir Pasang
Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Kapur
Pasir Pasang
Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Kapur
Pasir Pasang
Pemasangan batu kosong (anstamping)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Pasir urug
(K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Beton
Kerikil
Besi beton
Kawat beton
Pemasangan pondasi sumuran, diameter 100 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Batu belah
Semen
Pasir Beton
Kerikil
Membuat beton mutu f’c = 7,4 MPa (K 100)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’= 9,8 MPa (K 125)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’= 12,2 MPa (K 150)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Membuat beton mutu f’c = 31,2 MPa (K 350), campuran bahan kimia
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Bahan Kimia
Air
Membuat beton kedap air dengan strorox - 100
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Beton
Kerikil
Strorox - 100
Pemasangan PVC Waterstop lebar 150 mm
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
Waterstop lebar 150 mm
Pemasangan PVC Waterstop lebar 200 mm
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
Waterstop lebar 200 mm
Membuat PVC Waterstop lebar 230 mm - 320 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos atau besi ulir
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Besi beton
Kawat beton
Pemasangan kabel presstressed polos/strands
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Besi beton
Kawat beton
Pemasangan jaring kawat baja (wiremesh)
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Jaring kawat baja dilas
Kawat beton
(K3) Pemasangan bekisting untuk pondasi
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku 5 - 10 cm
Minyak bekisting
(K3) Pemasangan bekisting untuk sloof
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku 5 - 10 cm
Minyak bekisting
(K3) Pemasangan bekisting untuk kolom
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Balok kayu kelas II
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
(K3) Pemasangan bekisting untuk balok
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Balok kayu kelas II
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
(K3) Pemasangan bekisting untuk lantai
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Balok kayu kelas II
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
(K3) Pemasangan bekisting untuk dinding
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Balok kayu kelas II
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Penjaga jarak bekisting / spacer
(K3) Pemasangan bekisting untuk tangga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Balok kayu kelas II
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Pemasangan jembatan untuk pengecoran beton
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kayu kelas III (papan)
Paku Biasa 2" - 5"
Dolken kayu Ø 8-10/400 cm
Membuat pondasi beton bertulang (150 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Membuat sloof beton bertulang (200 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Membuat kolom beton bertulang (300 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Kayu kelas II balok
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Membuat balok beton bertulang (200 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Kayu kelas II balok
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Membuat kolom beton bertulang (150 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Kayu kelas II balok
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Membuat dinding beton bertulang (150 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Kayu kelas II balok
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Membuat dinding beton bertulang (200 kg besi + bekisting)
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Kayu kelas II balok
Plywood 120x240 tbl. 9 mm
Dolken kayu Ø 8-10/400 cm
Membuat kolom praktis beton bertulang (11 x 11) cm
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
Membuat ring balok beton bertulang (10 x 15) cm
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Papan kayu 3/20 Kelas III
Paku Biasa 2" - 5"
Minyak bekisting
Besi beton
Kawat beton
Semen
Pasir Beton
Kerikil
(K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Pekerja
Tukang batu
Kepala tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
(K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Pekerja
Tukang batu
Kepala tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
(K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Pekerja
Tukang batu
Kepala tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
(K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
Pekerja
Tukang batu
Kepala tukang
Mandor
Semen
Pasir Beton (kg)
Kerikil (kg)
Air
Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai)
Pekerja
Tukang batu
Kepala tukang
Mandor
Lantai kerja tebal 10cm
Besi hollow 50.50.3
Kaso 5/7 Kelas II
Phel film 12mm
Minyak bekisting
Baut Ramset / Dina Bolt
Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai)
Pekerja
Tukang batu
Kepala tukang
Mandor
Kaso 5/7 Kelas II
Phel film 12mm
Minyak bekisting
Baut Ramset / Dina Bolt
Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai)
Pekerja
Tukang batu
Kepala tukang
Mandor
Kaso 5/7 Kelas II
Phel film 12mm
Minyak bekisting
Paku Biasa 2" - 5"
Baut Ramset / Dina Bolt
Pemasangan dan membuka bekisting komponen plat beton pracetak
Pekerja
Tukang kayu
Mandor
Pemasangan dan membuka bekisting komponen balok beton pracetak
Pekerja
Tukang kayu
Mandor
Pemasangan dan membuka bekisting komponen Kolom beton pracetak
Pekerja
Tukang kayu
Mandor
Penuangan/menebar beton untuk komponen plat pracetak
Pekerja
Tukang batu
Tukang vibrator
Kepala Tukang
Mandor
Penuangan/menebar beton untuk komponen balok pracetak
Pekerja
Tukang batu
Tukang vibrator
Kepala Tukang
Mandor
Penuangan/menebar beton untuk komponen kolom pracetak
Pekerja
Tukang batu
Tukang vibrator
Kepala Tukang
Mandor
Ereksi komponen untuk pelat pracetak
Operator crane
Pembantu operator crane
Pekerja
Tukang batu
Tukang ereksi
Kepala tukang
Mandor
Solar
Sewa crane
Sewa pipe support
Ereksi komponen untuk balok pracetak
Operator crane
Pembantu operator crane
Pekerja
Tukang batu
Tukang ereksi
Kepala tukang
Mandor
Solar
Sewa crane
Sewa pipe support
Ereksi komponen untuk Kolom pracetak
Operator crane
Pembantu operator crane
Pekerja
Tukang batu
Tukang ereksi
Kepala tukang
Mandor
Solar
Sewa crane
Sewa pipe support
Melangsir komponen plat pracetak ( ± 20 m)
Pekerja
Tukang batu
Operator crane
Pembantu operator crane
Solar
Sewa crane
Melangsir komponen balok pracetak ( ± 20 m)
Pekerja
Tukang batu
Operator crane
Pembantu operator crane
Solar
Sewa crane
Melangsir komponen kolom pracetak ( ± 20 m)
Pekerja
Tukang batu
Operator crane
Pembantu operator crane
Solar
Sewa crane
Grouting campuran
Semen grout
Screening
Air
Grouting tidak campuran
Semen grout
Air
Upah melakukan grouting pada join pracetak
Tukang batu
Kepala tukang
Mandor
Pemasangan Bekisting join pracetak
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaso 5/7 Kelas II
Kayu papan kelas III
Paku Biasa 2" - 5"
Upah Join dengan Sling
Pekerja
Tukang kayu
Tukang besi
Mandor
Pemasangan besi profil
Pekerja
Tukang Las Konstruksi
Kepala tukang
Mandor
Besi Profil
Pemasangan rangka kuda-kuda baja IWF
Pekerja
Tukang Las Konstruksi
Kepala tukang
Mandor
Besi IWF
Pengerjaan pekerjaan perakitan
Pekerja
Tukang Besi Konstruksi
Kepala tukang
Mandor
Solar
Minyak pelumas
Sewa alat Perakitan Baja IWF
Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Pekerja
Tukang Las
Kepala tukang
Mandor
Besi siku L 30.30.3
Besi plat baja
Kawat las listrik
Pengerjaan pengelasan dengan las listrik
Pekerja
Tukang Besi Konstruksi
Kepala tukang
Mandor
Kawat las listrik
Solar
Minyak pelumas
Sewa alat las
Pembuatan rangka jendela besi scuare tube (25 x 5) cm
Pekerja
Tukang Las
Kepala tukang
Mandor
Besi square tube
Besi lis kaca (1 x 1) cm
Pengelasan
Pemasangan pintu rolling door besi
Pekerja
Tukang Las
Kepala tukang
Mandor
Pintu gulung besi
Pemasangan pintu lipat (folding door) plastik/PVC
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pintu lipat
Pemasangan sunscreen alluminium
Pekerja
Tukang Besi
Kepala tukang
Mandor
Sunscreen alumunium
Pemasangan rolling door alluminium
Pekerja
Tukang Besi
Kepala tukang
Mandor
Rolling door alluminium
Pemasangan kusen pintu alluminium
Pekerja
Tukang Besi
Kepala tukang
Mandor
Profil Alluminium "T"
Sekrup fixer
Sealant
Pemasangan pintu alluminium strip lebar 8 cm
Pekerja
Tukang Besi
Kepala tukang
Mandor
Profil Alluminium "T"
Aluminium strip
Pemasangan pintu kaca rangka alluminium
Pekerja
Tukang Besi
Kepala tukang
Mandor
Pintu alluminium
Profil kaca
Sealant
Pemasangan venetions blinds dan Vertical blinds
Pekerja
Tukang Interior
Kepala tukang
Mandor
Venetions blinds dan vertical blinds (tirai)
Pemasangan terali besi strip (2 x 3) mm
Pekerja
Tukang Las
Kepala tukang
Mandor
Baja strip (0,2 x 2) cm
Pengelasan
Pemasangan kawat nyamuk
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Kawat nyamuk
Pengelasan
Baja strip (0,2 x 2) cm
Pemasangan jendela nako & tralis
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Jendela nako (rangka + kaca 5 mm)
Paku sekrup
Baja strip (0,2 x 2) cm
Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm
Pekerja
Tukang Atap
Kepala tukang
Mandor
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 2" - 5"
Kayu Papan kelas II
Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Pekerja
Tukang Atap
Kepala tukang
Mandor
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 2" - 5"
Baja strip (0,2 x 2) cm
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Hollow 4/4
Assesoris (perkuatan, las dll)
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Hollow 4/4
Assesoris (perkuatan, las dll)
(K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Baja Ringan-C Truss
Alat Rangka Atap Baja Canai Dingin
(K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Baja Ringan-C Truss
Alat Rangka Atap Baja Canai Dingin
Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Baja Ringan-C Truss
Baut (Srew driver)
Baut Ramset / Dina Bolt
Baja Ringan- Reng Truss
Talang / Jurai Canai Dingin
Alat Rangka Atap Baja Canai Dingin
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Kapur
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Pasir Pasang
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen
Kapur
Pasir Pasang
Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen Warna
Kapur
Pasir Pasang
Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata merah
Semen Warna
Kapur
Pasir Pasang
Pemasangan dinding conblock HB20 campuran 1SP : 3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 20
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding conblock HB20 campuran 1SP:4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 20
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding conblock HB15 campuran 1SP :3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 15
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding conblock HB15 campuran 1SP :4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 15
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding conblock HB10 campuran 1SP :3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 10
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding conblock HB10 campuran 1SP :4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Hollow Block 10
Semen
Pasir Pasang
Besi angkur Ø=8 mm
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata rooster
Semen
Pasir Pasang
Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata berongga
Semen
Pasir Pasang
Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata rooster
Semen
Pasir Pasang
Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata ringan tebal 7,5 cm
Mortar siap pakai
Bahan Pasang Dinding Bata Ringan
Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bata ringan tebal 7,5 cm
Mortar siap pakai
Peralatan Pasang Dinding Bata Ringan
Pemasangan plesteran 1SP : 1PP tebal 15 mm.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 2PP tebal 15 mm.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 3PP tebal 15mm.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 4PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 5PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 6PP tebal 15 mm.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 7PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 8PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Kapur Pasang
Pasir Pasang
Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Kapur Pasang
Pasir Pasang
Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Kapur Pasang
Pasir Pasang
Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Kapur Pasang
Pasir Pasang
Pemasangan plesteran 1SP : 1PP tebal 20 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 3PP tebal 20 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 4PP tebal 20 mm.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 5PP tebal 20 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SP : 6PP tebal 20 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Kapur Pasang
Pasir Pasang
Pemasangan berapen 1SP : 5PP tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan plesteran granit 1SP : 2 granit tebal 1cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Batu granit
Pemasangan plesteran traso 1SP : 2 traso tebal 1cm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Batu teraso
Pemasangan plesteran ciprat 1SP : 2PP
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan finishing siar pasangan bata merah
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pemasangan Finishing siar pasangan conblock ekspose
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pasir Pasang
Pemasangan acian.
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pemasangan plesteran dengan mortar siap pakai (MSP)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pemasangan Acian dengan mortar siap pakai (MSP)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen
Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin PC abu-abu ukuran 40cm x40cm
Semen
Pasir Pasang
Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin PC abu-abu ukuran 30cm x30 cm
Semen
Pasir Pasang
Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin PC abu-abu ukuran 20cm x20 cm
Semen
Pasir Pasang
Pemasangan lantai ubin warna ukuran 40cm x40 cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin warna ukuran 40cm x40 cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin warna ukuran 30cm x30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin warna ukuran 30cm x30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin warna ukuran 20cm x20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin warna ukuran 20cm x20cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teraso ukuran 40cm x40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teraso ukuran 40cm x40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teraso ukuran 30cm x30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teraso ukuran 30cm x30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin granit ukuran 40cm x40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin granit ukuran 40cm x40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin granit ukuran 30cm x30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin granit ukuran 30cm x30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teralux marmer ukuran 40cm x40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teralux ukuran 30cm x30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teralux ukuran 30cm x30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teralux marmer ukuran 60cm x60cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teralux marmer ukuran 40cm x40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
ubin teralux marmer ukuran 30cm x30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin Pc abu-abu ukuran 15cm x 20cm
Semen
Pasir Pasang
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin Pc abu-abu ukuran 10cm x 30cm
Semen
Pasir Pasang
Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin Pc abu-abu ukuran 10cm x 40cm
Semen
Pasir pasang
Pemasangan plint ubin warna ukuran 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin warna ukuran 10cm x 20cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin warna ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin warna ukuran 10cm x 30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin warna ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin warna ukuran 10cm x 40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teraso ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teraso ukuran 10cm x 30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teraso ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teraso ukuran 10cm x 40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin granit ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin granit ukuran 10cm x 40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin granit ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin granit ukuran 10cm x 30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teralux kerang ukuran 10cm x 40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teralux kerang ukuran 10cm x 30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
plint ubin teralux marmer ukuran 10cm x 60cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teralux marmer ukuran 10cm x 40cm
Semen
Semen Warna
Pasir Pasang
Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint ubin teralux marmer ukuran 10cm x 30cm
Semen
Semen Warna
Pasir Pasang
Pemasangan lantai teraso cor di tempat, tebal 3cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Teraso cor di tempat, tebal 3cm
Semen warna
Pemasangan lantai keramik artistik 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik artistik 10cm x 20cm
Semen
Pasir pasang
Semen warna
Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik artistik 10cm x 10cm atau 5cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai keramik ukuran 33cm x 33cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik ukuran 33cm x 33cm
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai keramik ukuran 30cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik ukuran 30cm x 30cm
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai keramik ukuran 20cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Keramik ukuran 20cm x 20cm
Semen
Pasir Pasang
Semen Warna
keramik ukuran 10cm x 33cm untuk variasi/border
Pekerja
Tukang Batu
Kepala tukang
Mandor
Ubin keramik
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai keramik mozaik ukuran 30cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Keramik mozaik ukuran 30cm x 30cm
Semen
Pasir Pasang
Semen Warna
Pemasangan plint keramik ukuran 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint keramik ukuran 10cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan plint keramik ukuran 10cm x 10cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint keramik ukuran 10cm x 10cm
Semen
Pasir Pasang
Semen Warna
Pemasangan plint keramik ukuran 5cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint keramik ukuran 5cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan plint internal cove artistik 5cm x 5cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Plint internal cove artistik 5cm x 5cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai marmer ukuran 100cm x 100cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
marmer ukuran 100cm x 100cm
Semen
Pasir Pasang
Semen Warna
Pemasangan lantai karpet
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Karpet
Lem kayu
Pemasangan underlayer (pelapis bawah karpet)
Pekerja
Tukang Kayu
Kepala tukang
Mandor
underlayer (pelapis bawah karpet)
Lem kayu
Pemasangan lantai parquet kayu
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Parquet kayu
Lem kayu
Pemasangan lantai kayu gymfloor
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Parquet kayu gymfloor
Lem kayu
Pemasangan dinding porslen 11cm x 11cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Porselen (11 x 11) cm
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding porslen 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Porselen Dinding 10x20
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding porslen 20cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Porselen Dinding 20x20
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding keramik artistik 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Keramik Dinding artistik
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding keramik artistik 5cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Keramik Dinding artistik
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding keramik 10cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik Dinding 10cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding keramik 20cm x 20cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
keramik Dinding 20cm x 20cm
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding marmer 100cm x 100cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
marmer ukuran 100cm x 100cm
Semen
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding bata pelapis 3cm x 7cm x 24cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Bata pelapis Dinding 3cm x 7cm x 24cm
Semen
Pasir Pasang
Semen Warna
Pemasangan dinding batu paras
Pekerja
Tukang Batu
Kepala tukang
Mandor
Batu paras Dinding
Semen
Pasir Pasang
Pemasangan dinding batu tempel hitam
Pekerja
Tukang Batu
Kepala tukang
Mandor
Batu alam / tempel
Semen
Pasir Pasang
Pemasangan lantai vynil ukuran 30cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Vinyl
Lem kayu
Pemasangan wallpaper lebar 50 cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Wallpaper
Lem Putih
Pemasangan floor harderner
Pekerja
Tukang Batu
Kepala tukang
Mandor
Floor hardener
Pemasangan plint vynil 15cm x 30cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
plint vynil 15cm x 30cm
Lem kayu
Pemasangan plint kayu tebal 2 cm lebar 10 cm
Pekerja
Tukang Batu
Kepala tukang
Mandor
Kayu Papan kelas I
Paku sekrup
Pemasangan paving block natural tebal 6 cm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Paving block 6 cm
Pasir beton
Bahan Kerja Paving Blok
Pemasangan paving block natural tebal 8 cm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Paving block 8 cm natural
Pasir beton
Bahan Kerja Paving Blok
Pemasangan paving block berwarna tebal 6 cm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Paving block 6cm berwarna
Pasir beton
Bahan Kerja Paving Blok
Pemasangan paving block berwarna tebal 8 cm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Paving block 8 cm berwarna
Pasir beton
Bahan Kerja Paving Blok
Pemasangan Aluminium Composite Panel
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Aluminium Composite Panel
Screw
Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Asbes semen
Paku tripleks
Pemasangan langit-langit akustik ukuran (30 x 30) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Akustik ukuran 30 x 30 cm
Paku tripleks
Pemasangan langit-langit akustik ukuran (30 x 60) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Akustik ukuran 30 x 60 cm
Paku tripleks
Pemasangan langit-langit akustik ukuran (60 x 120) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Akustik Uk. 60 cm x 120 cm
Paku tripleks
Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
Pekerja
Tukang kayu
Kepala tukang
Mandor
Tripleks
Paku tripleks
Pemasangan langit-langit lambrisering kayu, tebal 9 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku tripleks
Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Gypsum board 9 mm
Paku sekrup
Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Pekerja
Tukang kayu
Kepala tukang
Mandor
Profil Alluminium "T"
Kawat dia 4 mm
Baut Ramset / Dina Bolt
Akustik Uk. 60 cm x 120 cm
Pemasangan list langit-langit kayu profil
Pekerja
Tukang Kayu
Kepala tukang
Mandor
List kayu profil
Paku Biasa 2" - 5"
Pemasangan Plafond PVC
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Plafond PVC
Screw
Pemasangan List Plafond PVC
Pekerja
Tukang Kayu
Kepala tukang
Mandor
List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic)
Screw
Pemasangan atap genteng palentong kecil
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng palentong
Pemasangan atap genteng kodok glazuur
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng kodok
Pemasangan atap genteng palentong besar/super
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng kodok
Pemasangan bubung genteng palentong
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng bubung
Semen
Pasir Pasang
Pemasangan bubung genteng kodok glazuur
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng bubung
Semen
Pasir Pasang
Pemasangan bubung genteng palentong besar
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng bubung
Semen
Pasir Pasang
Pemasangan roof light fibreglass 90x180
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Rooflight 90x180
Paku Biasa 2" - 5"
Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Asbes gelombang 92x250
Paku Pancing 60 x 230
Pemasangan bubung stel gelombang 0,92m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Bubung stel gel.
Paku sekrup
Pemasangan bubung stel gelombang 1,05m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Bubung stel gel.
Paku sekrup
Pemasangan bubung stel gelombang 1,08m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Bubung stel gel.
Paku sekrup
Pemasangan Nok paten 0,92m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok Paten
Paku sekrup
Pemasangan Nok paten 1,05m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok Paten
Paku sekrup
Pemasangan Nok paten 1,08m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok Paten
Paku sekrup
Pemasangan nok stel rata 0,92m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok Paten
Paku sekrup
Pemasangan nok stel rata 1,05m
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok Paten
Paku sekrup
Pemasangan genteng beton
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng beton
Paku Biasa 2" - 5"
Pemasangan genteng aspal
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng aspal
Plywood 120x240 tbl. 6 mm
Paku Biasa 2" - 5"
Plastic aerator
Pemasangan genteng metal ukuran 80 x 100 atap pelana
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng metal
Paku Biasa ½" - 1"
Pemasangan genteng metal ukuran 80 x 100 atap Jurai
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Genteng metal
Paku Biasa ½" - 1"
Pemasangan atap sirap kayu
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Sirap kayu
Paku Biasa 2" - 5"
Pemasangan nok genteng beton
Pekerja
Tukang Kayu
Kepala tukang
Mandor
nok genteng beton
Paku Biasa 2" - 5"
Semen
Pasir Pasang
Semen warna
Pemasangan Nok genteng aspal
Pekerja
Tukang Kayu
Kepala tukang
Mandor
nok genteng aspal
Paku Biasa 2" - 5"
Kayu balok borneo
Pemasangan nok genteng metal
Pekerja
Tukang Kayu
Kepala tukang
Mandor
nok genteng metal
Paku Biasa 2" - 5"
Pemasangan Nok sirap
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 2" - 5"
Paku Biasa 2" - 5"
Pemasangan atap seng gelombang
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 2" - 5"
Pemasangan nok atap seng
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 2" - 5"
Pemasangan atap alumunium
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Alumunium gel tbl 0,55
Paku Hak Panjang 15cm
Pemasangan Nok alumunium
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Nok standar 40x18
Paku Hak Panjang 15cm
Pemasangan alumunium foil/sisalation
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Aluminium foil
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Paku Biasa 2" - 5"
Lem kayu
Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Paku Biasa 2" - 5"
Lem kayu
Pembuatan dan pemasangan pintu klamp standar, kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Lem kayu
Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Lem kayu
Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Lem kayu
Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Lem kayu
Plywood 120x240 tbl. 4 mm
Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Lem kayu
Plywood 120x240 tbl. 4 mm
Pemasangan jalusi kusen, kayu kelas I atau II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Pemasangan teakwood rangkap, rangka expose kayu kelas I
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Lem kayu
Teakwood 4 mm 90 x 220 cm
Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Lem kayu
Teakwood 4 mm 90 x 220 cm
Formika
Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Baja strip (0,2 x 2) cm
Paku Biasa 2" - 5"
Pemasangan konstruksi kuda-kuda expose, kayu kelas I
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Baja strip (0,2 x 2) cm
Paku Biasa 2" - 5"
Pemasangan konstruksi gordeng, kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Baja strip (0,2 x 2) cm
Paku Biasa 2" - 5"
Pemasangan rangka atap genteng keramik, kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu balok 5/7 Kelas II
Reng 2 x 3 cm Kayu Kelas II
Paku Biasa 2" - 5"
Pemasangan rangka atap genteng beton, kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu balok 5/7 Kelas II
Reng 2 x 3 cm Kayu Kelas II
Paku Biasa 2" - 5"
Pemasangan rangka atap sirap, kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu 8/15 Kelas I
Paku Biasa 2" - 5"
Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu, 6 x 12
Paku Biasa 2" - 5"
Teakwood 4 mm, 120 x 240
Lem kayu
Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
Balok kayu, 6 x 12
Paku Biasa 2" - 5"
Plywood 120x240 tbl. 4 mm
Lem kayu
Pemasangan dinding lambrisering dari Kayu Papan kelas I
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kayu Papan 3/20
Paku Biasa 2" - 5"
Paku sekrup
Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Plywood 120x240 tbl. 4 mm
Paku Biasa 2" - 5"
Pemasangan dinding bilik, rangka kayu kelas III atau IV
Pekerja
Tukang kayu
Kepala tukang
Mandor
Bilik bambu
Kayu balok 5/7 Kelas II
Paku Biasa 2" - 5"
List kayu 2/4
Pemasangan kunci tanam antik
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci tanam antik
Pemasangan kunci tanam biasa
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci tanam biasa
Pemasangan kunci kamar mandi
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci tanam KM
Pemasangan kunci silinder
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci silinder
Pemasangan engsel pintu
Pekerja
Tukang kayu
Kepala tukang
Mandor
Engsel pintu
Pemasangan engsel jendela kupu-kupu
Pekerja
Tukang kayu
Kepala tukang
Mandor
Engsel kupu-kupu
Pemasangan engsel angin
Pekerja
Tukang kayu
Kepala tukang
Mandor
Engsel angin
Pemasangan spring knip
Pekerja
Tukang kayu
Kepala tukang
Mandor
Spring knip
Pemasangan kait angin
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kait angin
Pemasangan door closer
Pekerja
Tukang kayu
Kepala tukang
Mandor
Door closer
Pemasangan kunci slot
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci slot
Pemasangan Door holder
Pekerja
Tukang kayu
Kepala tukang
Mandor
Door holder
Pemasangan door stop
Pekerja
Tukang kayu
Kepala tukang
Mandor
Door stop
Pemasangan Rrel pintu sorong
Pekerja
Tukang kayu
Kepala tukang
Mandor
Rel pintu dorong
Pemasangan kunci lemari
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kunci lemari
Pemasangan kaca tebal 3 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca tebal 3mm
SEalant
Pemasangan kaca tebal 5 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca tebal 5 mm
SEalant
Pemasangan kaca tebal 8 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca tebal 8 mm
SEalant
Pemasangan kaca buram tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca buram 12 mm
SEalant
Pemasangan kaca cermin tebal 5 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca cermin 5 mm
Pemasangan kaca cermin tebal 8 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca cermin 8 mm
Pemasangan kaca wireglassed tebal 5 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca wire glass
Pemasangan kaca patri tebal 5 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Kaca patri 5mm
Sealant
Pengikisan/pengerokan permukaan cat lama
Pekerja
Mandor
Soda api
Pencucian bidang permukaan tembok yang pernah dicat
Pekerja
Mandor
Sabun
Pengerokan karat pada permukaan baja cara manual
Pekerja
Mandor
Sabun
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat meni
Plamir
Cat dasar Kayu
Cat kayu
Kuas
Pengencer
Amplas
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat meni
Plamir
Cat dasar Kayu
Cat kayu
Kuas
Pengencer
Amplas
Pelaburan bidang kayu dengan teak oil
Pekerja
Tukang cat
Kepala tukang
Mandor
Teak oil
Pelaburan bidang kayu dengan politur
Pekerja
Tukang cat
Kepala tukang
Mandor
Politur
Politur
Amplas
Pelaburan bidang kayu dengan cat residu dan ter
Pekerja
Mandor
Residu
Pelaburan bidang kayu dengan vernis
Pekerja
Tukang cat
Kepala tukang
Mandor
Vernis
Dempul
Amplas
Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja
Tukang cat
Kepala tukang
Mandor
Plamir
Cat dasar Tembok
Cat Penutup Tembok
Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat dasar Tembok
Cat Penutup Tembok
Pelaburan tembok dengan kalkarium
Pekerja
Tukang cat
Kepala tukang
Mandor
Kalkarium
Pelaburan tembok dengan kapur sirih
Pekerja
Tukang cat
Kepala tukang
Mandor
Kapur sirih
Amplas
Alang-alang
Pelaburan tembok lama dengan kapur sirih (pemeliharaan)
Pekerja
Tukang cat
Kepala tukang
Mandor
Kapur sirih
Amplas
Alang-alang
Pemasangan wallpaper
Pekerja
Tukang cat
Kepala tukang
Mandor
Wallpaper
Lem kayu
Pengecatan permukaan baja dengan menie besi
Pekerja
Tukang cat
Kepala tukang
Mandor
Menie besi
Kuas
Pengecatan permukaan baja dengan menie besi dengan perancah
Pekerja
Tukang cat
Kepala tukang
Mandor
Menie besi
Pengencer
Kuas
Perancah kayu
Pengecatan permukaan baja galvanis secara manual 4 lapis
Pekerja
Tukang cat
Kepala tukang
Mandor
Menie A
Menie B
Cat Besi
Kuas
Pengencer
Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat Besi
Kuas
Pengencer
Pengecatan permukaan baja galvanis secara manual sistem 3 lapis
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat dasar Besi
Cat antara
Cat Besi
Kuas
Pengencer
Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat Besi
Pengencer
Plituran dengan plitur melamic
Pekerja
Tukang cat
Kepala tukang
Mandor
Cat Dasar Kayu
Pengencer
(K3) Pemasangan closet duduk/moblock
Pekerja
Tukang batu
Kepala tukang
Mandor
Kloset duduk / monoblock
Perlengkapan
Pemasangan closet jongkok porslen
Pekerja
Tukang batu
Kepala tukang
Mandor
Kloset jongkok teraso
Semen
Pasir pasang
Pemasangan closet jongkok teraso
Pekerja
Tukang batu
Kepala tukang
Mandor
Kloset jongkok teraso
Semen
Pasir pasang
Bata merah
(K3) Pemasangan uriir
Pekerja
Tukang batu
Kepala tukang
Mandor
Urinoir
Semen
Pasir pasang
Perlengkapan
(K3) Pemasangan wastafel
Pekerja
Tukang batu
Kepala tukang
Mandor
Wastafel
Semen
Pasir pasang
Perlengkapan
(K3) Pemasangan bathcuip porselen
Pekerja
Tukang batu
Kepala tukang
Mandor
Bathcuip
Perlengkapan
(K3) Pemasangan bak fibreglass vol 1 m3
Pekerja
Tukang batu
Kepala tukang
Mandor
Bak fiberglass
Perlengkapan
(K3) Pemasangan bak mandi batu bata vol 0,30 m3
Pekerja
Tukang batu
Kepala tukang
Mandor
Bata merah
Semen
Pasir pasang
Porselen (11 x 11) cm
Semen warna
Pemasangan bak mandi teraso vol 0,30 m3
Pekerja
Tukang batu
Kepala tukang
Mandor
Bak fiberglass
Perlengkapan
Pemasangan bak air fibreglass vol 1 m3
Pekerja
Tukang batu
Kepala tukang
Mandor
Bak fiberglass
Perlengkapan
Pemasangan bak beton volume 1 m3
Pekerja
Tukang batu
Kepala tukang
Mandor
Beton 1:2:3
Besi beton
Kayu cetakan
Ubin porselen
Perlengkapan
Pemasangan bak cuci piring stainlessteel
Pekerja
Tukang batu
Kepala tukang
Mandor
Bak cuci piring
Waterdrain
Pemasangan bak cuci piring teraso
Pekerja
Tukang batu
Kepala tukang
Mandor
Bak cuci piring
Waterdrain
Semen
Pasir pasang
Pemasangan floor drain
Pekerja
Tukang batu
Kepala tukang
Mandor
Floor drain
Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Bata merah
Semen
Pasir pasang
Pasir beton
Kerikil
Besi beton
Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Bata merah
Semen
Pasir pasang
Pasir beton
Kerikil
Besi beton
Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Bata merah
Semen
Pasir pasang
Pasir beton
Kerikil
Besi beton
Pemasangan pipa galvanis diameter ½”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis ½”
Perlengkapan
Pemasangan kran diameter ½” atau 3/4”
Pekerja
Tukang batu
Kepala tukang
Mandor
Kran air
Sealtape
Pemasangan pipa galvanis diameter 3/4”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis 3/4”
Perlengkapan
Pemasangan pipa galvanis diameter 1”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis 1”
Perlengkapan
Pemasangan pipa galvanis diameter 1 ½”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis 11/2”
Perlengkapan
Pemasangan pipa galvanis diameter 3”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis 3”
Perlengkapan
Pemasangan pipa galvanis diameter 4”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa galvanis 4”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 1/2”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 1/2"
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 3/4”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 3/4"
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 1”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 1”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 11/2”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 11/2”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 2”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 2”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 21/2”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 21/2”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 3”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 3”
Perlengkapan
Pemasangan pipa PVC tipe AW diameter 4”
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa PVC 4"
Perlengkapan
Pemasangan pipa air limbah jenis pipa tanah
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa tanah
Semen
Pasir pasang
Pasir urug
Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa tanah
Semen
Pasir pasang
Pasir urug
Pemasangan pipa beton diameter 15 - 20 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa Beton
Bata merah
Semen
Pasir pasang
Pasir urug
Pemasangan pipa beton diameter 30 - 100 cm
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa Beton
Bata merah
Semen
Pasir pasang
Pasir urug
(K3) Pemasangan pipa PVC Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 63 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 90 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 90 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 110 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 110 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasngan pipa PVC Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 400 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 450 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 600 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 800 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 900 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1000 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa PVC Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 63 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 125 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 400 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 450 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 800 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 900 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 1000 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 1100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa HDPE Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa HDPE Ø 1200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 63 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 125 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 400 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 450 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 600 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 800 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 900 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1000 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa GIP Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 125 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 400 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 400 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 450 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 450 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 500 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 500 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø 600 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 600 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø800 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 800 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø900 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 900 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø1000 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 1000 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø1100 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 1100 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa DCI Ø1200 mm
Pekerja
Tukang pipa
Operator alat berat
Mandor
Pipa DCI Ø 1200 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 63 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 125 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 400 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 450 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 500 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 600 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 800 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 900 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1000 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1100 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan pipa baja Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1200 mm
Sewa excavator type 225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa PVC Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 63 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 90 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 90 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 110 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 110 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 150 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 200 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 250 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 300 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 400 mm
Bahan potong pipa T1/manual (gergaji) /saw
(K3) Pemotongan pipa PVC Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 900 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1000 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa PVC Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa PVC Ø 1200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 63 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 63 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 100 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 125 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 125 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 150 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 150 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 200 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipaHDPE Ø 250 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 250 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 300 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 300 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 400 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 400 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 450 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 500 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 600 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 800 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 900 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 900 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 1000
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 1100
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa HDPE Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Operator Alat Pipa
Pipa HDPE Ø 1200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 63 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 125 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 150 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 250 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 300 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 400 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 900 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1000 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa GIP Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa GIP Ø 1200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 100 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 125 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemotongan pipa DCI Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 400 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 900 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 1000 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 1100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa DCI Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa DCI Ø 1200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 63 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 63 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 125 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 125 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 150 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 200 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 250 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 300 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 400 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 900 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 900 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1000 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemotongan pipa baja Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Pipa Baja Ø 1100 mm
Bahan potong pipa T2/mekanik / cilinder
(K3) Pemasangan Valve Ø 150 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 200 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 250 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 300 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 400 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 400 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 450 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 450 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 500 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Valve Ø 600 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 600 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 700 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 700 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 800 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 800 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 900 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 900 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 1000 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 1100 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Valve Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Valve Ø 1200 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 150 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 150 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 200 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 200 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan 1 buah Tee Ø 250 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 250 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 300 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 300 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 400 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 400 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 450 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 450 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 500 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 500 mm
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pemasangan Tee Ø 600 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 600 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 700 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 700 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 800 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 800 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 900 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 900 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 1000 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 1000 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 1100 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 1100 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Pemasangan Tee Ø 1200 mm
Pekerja
Tukang pipa
Mandor
Tee Ø 1200 mm
Sewa Tripot/Tackel & handle crane 2 T
Mobile crane =< 3 ton
(K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 80 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 100 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 150 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 200 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 250 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 300 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 400 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 450 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 500 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 600 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 700 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm
Pekerja
Tukang pipa
Mandor
Pipa Ø 800 mm
Bahan potong pipa T2/mekanik / cilinder
Sewa Genset 1500 watt
Sewa Pompa Submersible 3m3/h
Sewa Tripot/Tackel & handle crane 2 T
(K3) Pengetesan pipa Ø 50 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 75 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 100 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 150 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan 1 m pipa Ø 200 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 250 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan 1 m pipa Ø 300 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 400 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan 1 m pipa Ø 500 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pengetesan pipa Ø 600 mm
Pekerja
Mandor
Air test (air bersih)
Bahan Bakar
Oli
(K3) Pemasangan titik lampu
Pekerja
Tukang batu
Kepala tukang
Mandor
Pipa listrik 5/8”
Kabel NYM 3x2,5 mm2
Tee Doos
L.Bow
Las Dop
Klem Pipa Listrik
Mongkok (Listrik)
Saklar (standar)
Fitting Lampu
Memasang Instalasi Penerangan
Pekerja
Tukang batu
Kepala tukang
Mandor
Kabel NYM 3x2,5 mm2
Pipa Conduit
Socket Pipa
Tee Doos
Klem Pipa
Sekrup fixer
Las Dop
Sealtape
LAMPIRAN PERHITUNGAN VOLUME PEKERJAAN
A002/T100.80/I-2021
ANALISA HARGA SATUAN
RAB :
A. PEKERJAAN PENDAHULUAN

P panjang, m1 5.00 L lebar, m1 2.50 Luas Lahan,m2 12.50


Bowplank,m1 17.00
Gudang Bahan,m2 0.00
s1 Luas Gudang,m2 0.00 n1 Jumlah Gudang Bahan,unit 0.00 Jumlah Gudang Bahan,unit 0.00
s2 Luas Direksi Ket,m2 0.00 n2 Jumlah Direksi Keet,unit 0.00 Jumlah Direksi Keet,unit 0.00

B. PEKERJAANPONDASI
B1. Pondasi Setempat (Foot Plate)
Dimensi Utama
a1 Lebar 1 Kolom, m1 0.25 h2 Tinggi tapak,m1 0.30 Pekerjaan Galian,m3 0.00
a2 Lebar 2 Kolom, m1 0.25 h4 Tinggi urugan pasir,m1 0.05 Urugan Pasir,m3 0.00
b1 Lebar 1 Tapak , m1 0.80 N Jumlah Tapak 0 Pembesian,kg 0.00
b2 Lebar 1 Tapak , m1 0.80 Bekisting,m2 0.00
h1 Tinggi Kaki Kolom, m1 1.00 Cor Beton,m3 0.00

Pembesian Kaki Kolom


d1 Ø besi utama, mm 10.00 n1 Jumlah besi utama,bh 4.00 sisa galian,m3 0.00
d2 Ø besi support, mm 10.00 n2 Jumlah besi support,bh 4.00 Besi Beton 10mm -
d3 Ø besi ring, mm 8.00 r1 jarak ring, m1 0.20 Besi Beton 10mm -
Kb Ø kawat beton, mm 0.80 x panjang kawat ikat, m1 0.35 Besi Beton 8mm -

Pembesian Tapak
d4 Ø besi alas (merah), mm 10.00 r2 jarak antar tulangan,m1 0.15
d5 Ø besi pembentuk (hijau), mm 8.00 x panjang kawat ikat, m1 0.35 Besi Beton 10mm -
d6 Ø besi kait (kuning), mm 10.00 Besi Beton 8mm -
Kb Ø kawat beton, mm 0.80 Besi Beton 10mm -

B1. Pondasi Batu Kali


a lebar atas, m1 0.25 bk tggi batu kosong, m1 0.15 Galian,m3 3.78
b lebar bawah, m1 0.40 p pjg pondasi, m1 14.00 Urugan pasir,m3 0.35
t tinggi pondasi, m1 0.40 Anstamping,m3 1.05
ur urugan pasir, m1 0.05 Pasangan batu,m3 1.82

sisa galian,m3 0.56

B2. Pondasi Rollag


x lebar rollag, m1 0.20 p panjang pondasi, m1 5.20 Galian,m3 0.26
y tinggi rollag, m1 0.50 Urugan pasir,m3 0.05
Pasangan rollag,m3 0.52

sisa galian,m3 0.05

C. PEKERJAAN SLOOF
C1. Sloof Utama
x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 14.00
y tinggi, m1 0.20 K mutu beton, K K-225 Pembesian,kg 77.76
t panjang total , m1 14.00 Bekisting,m2 5.60
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.42
d2 Ø tulang support, mm 10.00 Besi Beton 10mm 4.67
d3 Ø tulang sengkang, mm 8.00 Besi Beton 10mm 2.33
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm 3.50
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 2.00 SL K-225-15x20-4xØ10+2xØ10 ,Ø8-20cm

C2. Sloof Praktis


x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y tinggi, m1 0.20 K mutu beton, K K-225 Pembesian,kg 0.65
t panjang total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 0.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 8.00 Besi Beton 0mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm -

Software RAB Exarch xPro 333/348


n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 SL K-225-15x20-4xØ10+0xØ0 ,Ø8-20cm

D. PEKERJAAN TIMBUNAN DAN PENINGGIAN ELEVASI

a Luasan Timbunan , m2 7.50 Urugan Tanah,m3 1.50


h Tinggi Timbunan, m1 0.20 Pemadatan tanah,m3 0.18
% Factor Buckling, m1 12%

E. PEKERJAAN KOLOM
C1. Kolom Utama Lantai 1
x lebar 1, m1 0.25 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y lebar 2, m1 0.25 K mutu beton, K K-225 Pembesian,kg 0.78
t tinggi/panjang total , m1 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 10.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 8.00 Besi Beton 10mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm -
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 4.00 KO K-225-25x25-4xØ10+4xØ10 ,Ø8-20cm

C2. Kolom Praktis Lantai 1


x lebar 1, m1 0.12 r jarak antar sengkang, m1 0.20 Pembesian, m1 6.00
y lebar 2, m1 0.12 K mutu beton, K K-225 Pembesian,kg 24.13
t tinggi total , m1 6.00 Bekisting,m2 2.88
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.09
d2 Ø tulang support, mm 0.00 Besi Beton 10mm 2.00
d3 Ø tulang sengkang, mm 6.00 Besi Beton 0mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 6mm 0.95
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 KO K-225-12x12-4xØ10+0xØ0 ,Ø6-20cm

C3. Kolom Utama Lantai 2


x lebar 1, m1 0.30 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y lebar 2, m1 0.30 K mutu beton, K K-225 Pembesian,kg 0.87
t tinggi total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 10.00 Besi Beton 12mm -
d3 Ø tulang sengkang, mm 8.00 Besi Beton 10mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm -
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 KO K-225-30x30-6xØ12+2xØ10 ,Ø8-20cm

C4. Kolom Praktis Lantai 2


x lebar 1, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y lebar 2, m1 0.15 K mutu beton, K K-225 Pembesian,kg 0.28
t tinggi total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 0.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 6.00 Besi Beton 0mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 6mm -
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 KO K-225-15x15-4xØ10+0xØ0 ,Ø6-20cm

F. PEKERJAAN BALOK (RING BALOK)


E1.E1. Ring Balok Utama
x lebar, m1 0.12 r jarak antar sengkang, m1 0.15 Pembesian, m1 0.00
y tinggi, m1 0.12 K mutu beton, K K-225 Pembesian,kg 0.56
t panjang total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 10.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 8.00 Besi Beton 10mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm -
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 RB K-225-12x12-4xØ10+0xØ10 ,Ø8-15cm

E2. Ring Balok Praktis


x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y tinggi, m1 0.20 K mutu beton, K K-225 Pembesian,kg 0.31
t panjang total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 0.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 6.00 Besi Beton 0mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 6mm -
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 RB K-225-15x20-4xØ10+0xØ0 ,Ø6-20cm

Software RAB Exarch xPro 334/348


E1.E1. Ring Balok Utama
x lebar, m1 0.25 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y tinggi, m1 0.40 K mutu beton, K K-225 Pembesian,kg 0.91
t panjang total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 10.00 Besi Beton 12mm -
d3 Ø tulang sengkang, mm 8.00 Besi Beton 10mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 8mm -
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 RB K-225-25x40-6xØ12+2xØ10 ,Ø8-20cm

E2. Ring Balok Praktis


x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 0.00
y tinggi, m1 0.20 K mutu beton, K K-225 Pembesian,kg 0.31
t panjang total , m1 0.00 Bekisting,m2 0.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.00
d2 Ø tulang support, mm 0.00 Besi Beton 10mm -
d3 Ø tulang sengkang, mm 6.00 Besi Beton 0mm -
d4 Ø kawat beton, mm 0.80 Besi Beton 6mm -
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 RB K-225-15x20-4xØ10+0xØ0 ,Ø6-20cm

G. PEKERJAAN DAK DAN PELAT BETON


F1. Dak Beton
x Lebar x , m1 0.00 K mutu beton, K K-225 Luasan Pembesian, m2 0.00
y Lebar y , m1 0.00 Pembesian,kg 0.00
t tebal dak , m1 0.13 Bekisting,m2 0.00
D Ø tulangan , mm 10.00 Cor Beton,m3 0.00
k Jarak tulangan, m1 0.15 Besi Beton 10mm -
n Jumlah Layer/Susunan, lapis 2 A' Luas Dak Beton ,m1 0.00

F1. Pelat Beton, Septick Tank


x Lebar x , m1 1.50 Luasan Pembesian, m2 3.00
y Lebar y , m1 2.00 K mutu beton, K K-225 Pembesian,kg 49.54
t tebal dak , m1 0.15 Bekisting,m2 3.00
D Ø tulangan , mm 10.00 Cor Beton,m3 0.45
k Jarak tulangan, m1 0.20 Besi Beton 10mm 2.67
n Jumlah Layer/Susunan, lapis 2 A' Luas Dak Beton ,m1 3.00

H. PEKERJAAN DINDING
E1. Dinding 1
Luasan Area Luar (Exterior)
Tampak Depan Tampak Belakang Pasangan,m2 7.00
F1 (+) Luasan Dinding, m2 1.50 B1 (+) Luasan Dinding, m2 1.50 Trassram,m2 0.70
F2 (-) Luasan Pengurang, m2 0.00 B2 (-) Luasan Pengurang, m2 0.48 Plasteran,m2 14.00
Total A 1.50 Total B 1.02 Acian,m2 14.00
Tampak Kanan Tampak Kiri
R1 (+) Luasan Dinding, m2 2.40 L1 (+) Luasan Dinding, m2 2.40 Septicktank
R2 (-) Luasan Pengurang, m2 0.16 L2 (-) Luasan Pengurang, m2 0.16 Pasangan,m2 10.50
Total A 2.24 Total B 2.24

E1. Dinding 2
Luasan Area Luar (Exterior)
Tampak Depan Tampak Belakang Pasangan,m2 0.00
F1 (+) Luasan Dinding, m2 0.00 B1 (+) Luasan Dinding, m2 0.00 Trassram,m2 0.00
F2 (-) Luasan Pengurang, m2 0.00 B2 (-) Luasan Pengurang, m2 0.00 Plasteran,m2 0.00
Total A 0.00 Total B 0.00 Acian,m2 0.00
Tampak Kanan Tampak Kiri
R1 (+) Luasan Dinding, m2 0.00 L1 (+) Luasan Dinding, m2 0.00
R2 (-) Luasan Pengurang, m2 0.00 L2 (-) Luasan Pengurang, m2 0.00
Total A 0.00 Total B 0.00

I. PEKERJAAN ATAP

P Panjang Bentangan, m1 3.70 L Sudut Atap, derajat 16.6 Pek.Rangka Atap,m2 25.87
L Lebar Bentangan, m1 6.70 Pek. Pelapis Atap,m2 25.87
t Tinggi atap, m1 1.00 Pekerjaan Nok Atap,m1 3.70
ty Model Atap, Type segitiga Pekerjaan Listplank,m1 21.38
Pekerjaan Talang Air,m1 7.40

Software RAB Exarch xPro 335/348


J. PEKERJAAN PINTU DAN JENDELA

p1 Pintu Utama 1 Pintu Utama, unit 1.00


p2 Pintu Kamar 0 Pintu Kamar, unit 0.00
p3 Pintu WC 0 Pintu WC, unit 0.00
j1 Jendela Type 1 0 Jendela Type 1, unit 0.00
j2 Jendela Type 2 0 Jendela Type 2, unit 0.00
bv1 Lubang angin (loster) 6 Lubang Angin, unit 6.00

K. PEKERJAAN MEKANIKAL & PLUMBING


Plumbing
k jumlah kran, titik 0 Instalasi Pipa 3/4-Air Bersih,m1 16.50
d kloset duduk, titik 0 Instalasi Pipa 1/2-Air Bersih,m1 5.00
j kloset jongkok, titik 0 Keran Air,bh 0.00
ws wastafel Cuci, titik 0 Shower Mandi,bh 0.00
sh Shower Mandi, unit 0 Tangki Air,bh 0.00
tk Tangki Air, unit 0 Instalasi Pipa 3"-Air Limbah,m1 16.50
Inst. Pipa 4"-Sanitasi/Kloset,m1 0.00
Wastafel Cuci,bh 0.00
Jumlah Kloset Duduk,bh 0.00
Jumlah Kloset Jongkok,bh 0.00
Jumlah Floor Drain,bh 0.00
Jumlah Septik Tank,Unit 1.00
Jumlah Sumur Resapan,unit 1.00

L. PEKERJAAN ELECTRIKAL

L lebar rumah, m1 2.50 l1 Lampu 5 Watt, bh 0.00 MCB Pengaman, unit 1.00
P panjang rumah , m1 3.00 l2 Lampu 10 Watt, bh 2.00 Grounding, unit 1.00
t jumlah tingkat , tingkat 1 l3 Lampu 20 Watt, bh 0 Kabel Utama (3x2.5 NYM),m1 16.50
z jumlah ruang , ruang 1 Kabel Instalasi (2x2.5 NYM),m1 34.50
nL Jumlah titik lampu , titik 2 Jumlah Fitting Lampu,bh 2.00
nC Jumlah titik colokan , titik 1 Jumlah Saklar ,bh 1.00
Jumlah Receiptackle,bh 1.00
Lampu 5 Watt ,bh 0.00
Lampu 10 Watt ,bh 2.00
Lampu 20 Watt ,bh 0.00

M. PEKERJAAN KERAMIK

T Tebal Cor lantai Kerja, m1 0.05 K mutu beton, K K-225 Vol. Cor lantai kerja,m3 0.50
Luasan Keramik Lantai (m2) Luasan Keramik Dinding (m2) Keramik Lantai Utama,m2 8.50
f1 Keramik Utama,m2 8.50 w1 Keramik Dinding 1,m2 0.00 Keramik lantai Teras,m2 1.50
f2 Keramik WC/Toilet,m2 0.00 w2 Keramik Dinding 2,m2 0.00 Keramik Lantai WC,m2 0.00
f3 Keramik Teras,m2 1.50 w3 Keramik Dinding 3,m2 0.00 Keramik Dinding,m2 0.00
10.00 0.00 Pasangan Plint,m1 0.00
Panjang Pasangan Plint (m1) Panjang pasangan rope tile (m1) Pas. Rope Tile,m1 0.00
p1 Panjang Plint 1 0.00 r1 Panjang Rope Tile 1 0.00
p2 Panjang Plint 2 0.00 r2 Panjang Rope Tile 2 0.00
0.00 0.00

N. PEKERJAAN PLAFON

P Panjang Ruang, m1 3.70 L Lebar Ruang, m1 5.20 Pekerjaan Rangka Plafon 19.24
Pekerjaan Pelapis Plafon 19.24
A Luas Plafon, m2 19.24 Pekerjaan List Plafon 17.80

O. PEKERJAANPENGECATAN DAN LABURAN

Pekerjaan Cat Interior Pekerjaan Cat Exterior Pekerjaan Plamir,m2 7.00


Ct1 Luasan Cat 1 7.00 Ct1 Luasan Cat 1 7.00 Cat Waterprofing,m2 0.00
Ct2 Luasan Cat 2 0.00 Ct2 Luasan Cat 2 0.00 Cat Exterior (Luar),m2 7.00
7.00 7.00 Cat Interior (Dalam),m2 7.00
Pekerjaan Cat Plafon Pekerjaan Cat Waterprofing Pengecatan Plafon,m2 19.24
Ct1 Luasan Cat 1 19.24 Ct1 Luasan Cat 1 Pengecatan Kayu,m2 0.00
Ct2 Luasan Cat 2 Ct2 Luasan Cat 2 Pengecatan Besi,m2 0.00
19.24 0.00
Pekerjaan Cat Kayu Pekerjaan Cat Besi
Ct1 Luasan Cat 1 Ct1 Luasan Cat 1

P. PEKERJAAN TANGGA

Software RAB Exarch xPro 336/348


L Lebar Tangga, m1 0.0 r1 jarak antar tulangan, m1 0.15 Total Pjg besi Ød1,m1 0.00
L1 Horizontal Tangga 1, m1 0.0 r2 jarak antar ring, m1 0.15 Total Pjg besi Ød2,m1 0.66
L2 Horizontal Tangga 2, m1 0.0 Total Pjg besi Ød3,m1 0.00
L3 Lebar Rest/bordess, m1 0.0 R Panjang Rail Tangga, m1 9.00 Total Pjg besi Ød4,m1 0.33
t1 Tinggi Pondasi, m1 0.0 Total Pjg besi Ød5,m1 0.00
t2 Tinggi Tangga 1, m1 0.0 Jumlah kawat beton,kg 0.02
t3 Tinggi Tangga 2, m1 0.0 Hasil Total Besi , kg 0.54
m Tinggi anak tangga, m1 0.2 Panjang Tangga 1,m1 0.0 Total Bekisting,m2 0.00
n Lebar anak tangga, m1 0.3 Panjang Tangga 2,m1 0.0 Cor Beton,m3 0.00
d1 Ø tulang susut/bagi , mm 12.0 Sudut tangga 1,derajat #DIV/0! Plasteran,m2 0.00
d2 Ø tulang utama 1, mm 10.0 Sudut tangga 2, derajat #DIV/0! Keramik,m2 0.00
d3 Ø tulang tumpuan, mm 8.0 Luas Bentang, m2 0.0 Rope Tile,m1 0.00
d4 Ø tulang ring, mm 8.0 Jumlah Anak tangga 1,bh 0.0 Plamir atau Cat,m2 0.00
d5 Ø tulang anak tangga, mm 6.0 Jumlah Anak tangga 2,bh 0.0 Railing Tangga,m1 9.00

Q. PEKERJAAN PAGAR DAN HALAMAN/TAMAN

a Panjang Pagar,m1 0.00 Struktur Balok (Ring Balok) Galian Pondasi,m3 0.00
b Tinggi Pagar, m1 0.00 m Lebar 1 Balok,m1 0.00 Pas. Batu Pondasi,m3 0.00
h Jarak Antar Kolom,m1 0.00 n Lebar 2 Balok ,m1 0.00 Pembesian Sloof, kg #DIV/0!
Bekisting Sloof,m2 0.00
d1 Ø tulang utama , mm 10 Finishing dan lainnya Cor Sloof,m3 0.00
n Jumlah tulang utama, bh 0 ba Pasangan Batu Alam,m2 0.00 Pembesian Kolom, kg #DIV/0!
d2 Ø tulang ring , mm 0 pb Paving Block,m2 0.00 Bekisting Kolom ,m2 #DIV/0!
r jarak antar ring, m1 0.00 po Tanaman Pohon/Bunga,unit 0 Cor Kolom,m3 #DIV/0!
Struktur Pondasi Pembesian Balok, kg #DIV/0!
a Lebar Atas Pondasi,m1 0.00 Result Bekisting Balok ,m2 0.00
b Lebar Bawah Pondasi,m1 0.00 d1 Tulang Utama Sloof,m1 0.0 Cor Balok,m3 0.00
h Tinggi Pondasi,m1 0.00 d2 Tulang Ring Sloof,m1 #DIV/0! Pas. Bata/Batako,m2 #DIV/0!
Struktur Sloof d1 Tulang Utama Kolom,m1 #DIV/0! Plasteran,m2 0.00
c Ukuran lebar sloof, m1 0.00 d2 Tulang Ring Kolom,m1 #DIV/0! Pas. Batu Alam,m2 0.00
d Ukuran tinggi sloof,m1 0.00 d1 Tulang Utama Balok,m1 0.0 Acian,m2 0.00
Struktur Kolom d2 Tulang Ring Balok,m1 #DIV/0! Pengecatan,m2 0.00
e Lebar 1 Kolom,m1 0.00 Paving Block,m2 0.00
f Lebar 2 Kolom,m1 0.00 Pohon/Bunga,unit 0.00

R. PAKET SATUAN PEKERJAAN

ml Meteran Listrik (PLN) ac Air Condironer (AC) Instalasi Listrik PLN, unit 0.00
ma Meteran Air (PDAM) wh Water Heater Instalasi Air PDAM, unit 0.00
po Instalasi Pompa Instalasi Pompa Air, Unit 0.00
ef Exhaust Fan+blower Instalasi Exhaust Fan, unit 0.00
ta Instalasi Anti Petir Instalasi AC, Unit 0.00
Instalasi Water Heater, unit 0.00
Instalasi Anti Petir 0.00

Software RAB Exarch xPro 337/348


RENCANA ANGGARAN BIAYA
Propinsi : Jawa Barat No. RAB : 01
Kabupaten : Tasikmalaya Program : Bankeu Kab. Tasikmalaya 2022
Kecamatan : Manonjaya Jenis Kegiatan : Rehab Mushola
Desa : Gunajaya Ukuran : 5 x 2,5

VOLUME Harga Satuan BIAYA (Rp)


No URAIAN Satuan
Total Swadaya Dana Desa Swadaya Dana Desa Total
(Rp)

A TENAGA KERJA Sub Total-A - 5,656,000 5,656,000


1 Pekerja 37.00 37.00 HOK 89,600.00 - 3,315,200 3,315,200
2 Tukang 19.00 19.00 HOK 123,200.00 - 2,340,800 2,340,800

B BAHAN Sub Total-B - 25,481,120 25,481,120


1 Atap Baja Ringan + Genteng Metal (Terpasang) 26.00 26.00 m2 280,000.00 - 7,280,000 7,280,000
2 Balok kayu kelas II 0.10 0.10 m3 2,016,000.00 - 201,600 201,600
3 Bata merah 1,225.00 1,225.00 bh 896.00 - 1,097,600 1,097,600
4 Batu belah 3.00 3.00 m3 157,920.00 - 473,760 473,760
5 Besi Beton 10mm 12.00 12.00 btg 78,400.00 - 940,800 940,800
6 Besi Beton 8mm 4.00 4.00 btg 50,400.00 - 201,600 201,600
7 Bubungan 4.00 4.00 bh 100,800.00 - 403,200 403,200
8 Cat dasar Tembok 4.00 4.00 kg 28,000.00 - 112,000 112,000
9 Cat Penutup Tembok 10.00 10.00 kg 28,000.00 - 280,000 280,000
10 Dolken kayu Ø 8-10/400 cm 24.00 24.00 btg 16,800.00 - 403,200 403,200
11 Ember 5.00 5.00 bh 11,200.00 - 56,000 56,000
12 Glassbox 8.00 8.00 bh 33,600.00 - 268,800 268,800
13 Kabel 25.00 25.00 m 11,200.00 - 280,000 280,000
14 Kawat beton 2.00 2.00 kg 28,000.00 - 56,000 56,000
15 Kayu balok 5/7 Kelas II 0.20 0.20 m3 2,016,000.00 - 403,200 403,200
16 Kayu papan 3/20 0.10 0.10 m3 2,016,000.00 - 201,600 201,600
17 Keramik Lantai 11.00 11.00 m2 72,800.00 - 800,800 800,800
18 Kusen Pintu + Daun Pintu 1.00 1.00 unit 1,344,000.00 - 1,344,000 1,344,000
19 Kerikil 0.60 0.60 m3 280,000.00 - 168,000 168,000
20 Paku Biasa 2" - 5" 3.00 3.00 kg 16,800.00 - 50,400 50,400
21 Papan kayu 3/20 Kelas III 0.20 0.20 m3 1,680,000.00 - 336,000 336,000
22 Pasir Beton 0.50 0.50 m3 224,000.00 - 112,000 112,000
23 Pasir Pasang 3.00 3.00 m3 201,600.00 - 604,800 604,800
24 Pasir urug 1.00 1.00 m3 156,800.00 - 156,800 156,800
25 Plamir 4.00 4.00 kg 22,400.00 - 89,600 89,600
26 Plywood 120x240 tbl. 9 mm 2.00 2.00 lbr 179,200.00 - 358,400 358,400
27 Rol Cat + Bak 1.00 1.00 bh 56,000.00 - 56,000 56,000
28 Rooster 9.00 9.00 bh 13,440.00 - 120,960 120,960
29 Semen Portland 50 KG 20.00 20.00 zak 67,200.00 - 1,344,000 1,344,000
30 Dinding GRC + Rangka (Terpasang) 26.00 26.00 m2 280,000.00 - 7,280,000 7,280,000

C PERLENGKAPAN & LAIN-LAIN Sub Total-C - 1,332,800 1,332,800

1 Papan Proyek 1.00 1.00 bh 392,000.00 - 392,000 392,000


2 Biaya Pembuatan RAB 1.00 1.00 Ls 548,800.00 - 548,800 548,800
3 Prasasti 1.00 1.00 bh 392,000.00 - 392,000 392,000

TOTAL (A + B + C ) - 32,469,920 32,469,920

JUMLAH TOTAL Dana Desa 32,469,920

Dari Dana Desa 32,469,920

SUMBER DANA Dari Swadaya -

TOTAL 32,469,920

Gunajaya, Februari 2022


Disetujui Oleh : Dibuat Oleh :
Kepala Desa TPK Desa Gunajaya

ELI SURACHMAN, SP …......................


1.00 m1 Pengukuran dan pemasangan Bouwplank 17.00
0.10 OH Pekerja 17.00 1.70
0.10 OH Tukang 17.00 1.70
0.01 OH Kepala Tukang 17.00 0.17
0.01 OH Mandor 17.00 0.09
0.01 m3 Kayu balok 5/7 Kelas II 17.00 0.20
0.02 Kg Paku Biasa 2" - 5" 17.00 0.34
0.01 m3 Kayu papan 3/20 17.00 0.12
1.00 m3 Penggalian tanah biasa sedalam 1 m 3.78 3.78
0.75 OH Pekerja 3.78 2.84
0.03 OH Mandor 3.78 0.09
1.00 m3 Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M 0.95 0.95
0.25 OH Pekerja 0.95 0.24
0.03 OH Mandor 0.95 0.02
1.00 m3 (K3) Pemadatan tanah tanah ( per 20 cm) 0.18 0.18
0.50 OH Pekerja 0.18 0.09
0.05 OH Mandor 0.18 0.01
1.00 m3 Pengurugan dengan pasir urug 0.35 0.35
0.30 OH Pekerja 0.35 0.11
0.01 OH Mandor 0.35 0.00
1.20 M3 Pasir urug 0.35 0.42
1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 1.82 1.82
1.50 OH Pekerja 1.82 2.73
0.75 OH Tukang 1.82 1.37
0.08 OH Kepala Tukang 1.82 0.14
0.08 OH Mandor 1.82 0.14
1.20 m3 Batu belah 1.82 2.18
136.00 Kg Semen Portland 50 KG 1.82 247.52
0.54 m3 Pasir Pasang 1.82 0.99
1.00 m3 Pemasangan batu kosong (anstamping) 1.05 1.05
0.78 OH Pekerja 1.05 0.82
0.39 OH Tukang 1.05 0.41
0.04 OH Kepala Tukang 1.05 0.04
0.04 OH Mandor 1.05 0.04
1.20 m3 Batu belah 1.05 1.26
0.43 m3 Pasir urug 1.05 0.45
1.00 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 0.96 0.96
1.65 OH Pekerja 0.96 1.58
0.28 OH Tukang 0.96 0.26
0.03 OH Kepala Tukang 0.96 0.03
0.08 OH Mandor 0.96 0.08
371.00 kg Semen Portland 50 KG 0.96 354.82
0.50 kg Pasir Beton 0.96 0.48
0.58 kg Kerikil 0.96 0.56
215.00 Ltr Air 0.96 205.63
1.00 kg Pembesian dengan besi polos atau besi ulir 156.10 156.10
0.01 OH Pekerja 156.10 1.09
0.01 OH Tukang 156.10 1.09
0.00 OH Kepala Tukang 156.10 0.11
0.00 OH Mandor 156.10 0.06
1.05 btg Besi Beton 12mm - -
1.05 btg Besi Beton 10mm 11.67 12.25
1.05 btg Besi Beton 8mm 3.50 3.68
1.05 btg Besi Beton 6mm - -
0.02 kg Kawat beton 156.10 2.34
1.00 m2 (K3) Pemasangan bekisting untuk sloof -
0.52 OH Pekerja - -
0.26 OH Tukang - -
0.03 OH Kepala Tukang - -
0.03 OH Mandor - -
0.05 m3 Papan kayu 3/20 Kelas III - -
0.30 kg Paku 5 - 10 cm - -
0.10 Ltr Minyak bekisting - -
1.00 m2 (K3) Pemasangan bekisting untuk kolom 2.88 2.88
0.66 OH Pekerja 2.88 1.90
0.33 OH Tukang 2.88 0.95
0.03 OH Kepala Tukang 2.88 0.10
0.03 OH Mandor 2.88 0.10

analisa 581955019.xlsx
0.04 m3 Papan kayu 3/20 Kelas III 2.88 0.12
0.40 kg Paku Biasa 2" - 5" 2.88 1.15
0.20 Ltr Minyak bekisting 2.88 0.58
0.02 m3 Balok kayu kelas II 2.88 0.04
0.35 Lbr Plywood 120x240 tbl. 9 mm 2.88 1.01
2.00 btg Dolken kayu Ø 8-10/400 cm 2.88 5.76
1.00 m2 (K3) Pemasangan bekisting untuk balok - -
0.66 OH Pekerja - -
0.33 OH Tukang - -
0.03 OH Kepala Tukang - -
0.03 OH Mandor - -
0.04 m3 Papan kayu 3/20 Kelas III - -
0.40 kg Paku Biasa 2" - 5" - -
0.20 Ltr Minyak bekisting - -
0.02 m3 Balok kayu kelas II - -
0.35 Lbr Plywood 120x240 tbl. 9 mm - -
2.00 btg Dolken kayu Ø 8-10/400 cm - -
1.00 m2 (K3) Pemasangan bekisting untuk lantai 3.00 3.00
0.66 OH Pekerja 3.00 1.98
0.33 OH Tukang 3.00 0.99
0.03 OH Kepala Tukang 3.00 0.10
0.03 OH Mandor 3.00 0.10
0.04 m3 Papan kayu 3/20 Kelas III 3.00 0.12
0.40 kg Paku Biasa 2" - 5" 3.00 1.20
0.20 Ltr Minyak bekisting 3.00 0.60
0.02 m3 Balok kayu kelas II 3.00 0.05
0.35 Lbr Plywood 120x240 tbl. 9 mm 3.00 1.05
6.00 btg Dolken kayu Ø 8-10/400 cm 3.00 18.00
1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP 7.00 Dinding
0.30 OH Pekerja 7.00 2.10
0.10 OH Tukang 7.00 0.70
0.01 OH Kepala Tukang 7.00 0.07
0.02 OH Mandor 7.00 0.11
70.00 bh Bata merah 7.00 490.00
9.68 Kg Semen Portland 50 KG 7.00 67.76
0.05 m3 Pasir Pasang 7.00 0.32
1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP 10.50 Septicktank
0.30 OH Pekerja 10.50 3.15
0.10 OH Tukang 10.50 1.05
0.01 OH Kepala Tukang 10.50 0.11
0.02 OH Mandor 10.50 0.16
70.00 bh Bata merah 10.50 735.00
9.68 Kg Semen Portland 50 KG 10.50 101.64
0.05 m3 Pasir Pasang 10.50 0.47
1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 0.24
0.30 OH Pekerja 0.24 0.07
0.10 OH Tukang 0.24 0.02
0.01 OH Kepala Tukang 0.24 0.00
0.02 OH Mandor 0.24 0.00
36.00 bh Rooster 0.24 8.64
11.00 Kg Semen Portland 50 KG 0.24 2.64
0.04 m3 Pasir Pasang 0.24 0.01
1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 20 mm 14.00 14.00
0.40 OH Pekerja 14.00 5.60
0.20 OH Tukang 14.00 2.80
0.02 OH Kepala Tukang 14.00 0.28
0.02 OH Mandor 14.00 0.31
6.91 Kg Semen Portland 50 KG 14.00 96.77
0.04 m3 Pasir Pasang 14.00 0.49
1.00 m2 Pemasangan acian. 14.00 14.00
0.20 OH Pekerja 14.00 2.80
0.10 OH Tukang 14.00 1.40
0.01 OH Kepala Tukang 14.00 0.14
0.01 OH Mandor 14.00 0.14
3.25 Kg Semen Portland 50 KG 14.00 45.50
1.00 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 10.00 10.00
0.70 OH Pekerja 10.00 7.00
0.35 OH Tukang 10.00 3.50

analisa 581955019.xlsx
0.04 OH Kepala tukang 10.00 0.35
0.04 OH Mandor 10.00 0.35
1.10 m2 Keramik Lantai 10.00 11.00
10.40 Kg Semen Portland 50 KG 10.00 104.00
0.05 M3 Pasir Pasang 10.00 0.45
1.62 Kg Semen Portland 50 KG Warna 10.00 16.20
1.00 m2 Pemasangan dinding keramik 20cm x 20cm - -
0.90 OH Pekerja - -
0.45 OH Tukang - -
0.05 OH Kepala tukang - -
0.05 OH Mandor - -
1.10 m2 keramik Dinding - -
9.30 Kg Semen Portland 50 KG - -
0.02 M3 Pasir Pasang - -
1.94 Kg Semen Portland 50 KG Warna - -
1.00 m2 Pemasangan langit-langit GRC Board ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 - -
0.10 OH Pekerja - -
0.10 OH Tukang - -
0.01 OH Kepala tukang - -
0.01 OH Mandor - -
0.38 Lbr GRC Board - -
0.03 kg Paku GRC - -
1.00 m1 Pemasangan list langit-langit kayu profil - -
0.05 OH Pekerja - -
0.05 OH Tukang - -
0.01 OH Kepala tukang - -
0.00 OH Mandor - -
1.05 m List profil - -
0.01 kg Paku Biasa 2" - 5" - -
1.00 m2 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III - -
0.20 OH Pekerja - -
0.30 OH Tukang - -
0.03 OH Kepala tukang - -
0.01 OH Mandor - -
0.02 m3 Kayu balok 5/7 Kelas II - -
0.25 kg Paku Biasa 2" - 5" - -
1.00 m2 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 40.00 40.00
0.02 OH Pekerja 40.00 0.80
0.06 OH Tukang 40.00 2.52
0.01 OH Kepala tukang 40.00 0.25
0.00 OH Mandor 40.00 0.12
0.10 Kg Plamir 40.00 4.00
0.10 Kg Cat dasar Tembok 40.00 4.00
0.26 Kg Cat Penutup Tembok 40.00 10.40
1.000 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi -
0.250 OH Pekerja - -
0.250 OH Tukang Besi - -
0.025 OH Kepala Tukang - -
0.013 OH Mandor - -
3.500 M1 Hollow 4/4 - -
1.000 Ls Assesoris (perkuatan, las dll) - -
1.00 bh Pemasangan closet jongkok porslen -
1.00 OH Pekerja - -
1.50 OH Tukang - -
0.15 OH Kepala tukang - -
0.16 OH Mandor - -
1.00 Unit Kloset jongkok teraso - -
6.00 Kg Semen Portland 50 KG - -
0.01 M3 Pasir pasang - -
1.00 bh Pemasangan floor drain -
0.01 OH Pekerja - -
0.10 OH Tukang - -
0.01 OH Kepala tukang - -
0.01 OH Mandor - -
1.00 Unit Floor drain - -
1.00 bh Pemasangan kran diameter ½” atau 3/4” -
0.01 OH Pekerja - -
0.40 OH Tukang - -

analisa 581955019.xlsx
0.04 OH Kepala tukang - -
0.01 OH Mandor - -
1.00 M Kran air - -
0.50 bh Sealtape - -
1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” - -
0.04 OH Pekerja - -
0.06 OH Tukang - -
0.01 OH Kepala tukang - -
0.00 OH Mandor - -
0.30 btg Pipa PVC 3/4" - -
0.35 % Perlengkapan - -
1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” - -
0.08 OH Pekerja - -
0.14 OH Tukang - -
0.01 OH Kepala tukang - -
0.00 OH Mandor - -
0.30 btg Pipa PVC 3” - -
0.35 % Perlengkapan - -
1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” - -
0.08 OH Pekerja - -
0.14 OH Tukang - -
0.01 OH Kepala tukang - -
0.00 OH Mandor - -
0.30 btg Pipa PVC 4" - -
0.35 % Perlengkapan - -

analisa 581955019.xlsx
Perhitungan Kebutuhan Bahan, Alat dan Upah
Desa : Manonjaya Kegiatan
Kecamatan : Manonjaya Lokasi
Kabupaten : Tasikmalaya Volume

PEK. GALIAN Volume = 2.298 m3


Upah
Pekerja 0.750 2.30 1.72 HOK

PEK. PAS. BATU ( 1:5 ) Volume = 0.500 m3


Bahan
Batu belah 1.200 0.50 0.60 m3
Semen 2.720 0.50 1.36 sak
Pasir pasang 0.544 0.50 0.27 m3
Upah
Pekerja 1.500 0.50 0.75 HOK
Tukang 0.750 0.50 0.38 HOK

PEK. PEMBESIAN Volume =


Besi D 13
Besi D 12 -
Besi D 10 214
Besi D 8 37
Besi D 6 71
Bahan
Besi D 13 0.092 - - btg
Besi D 12 0.092 - - btg
Besi D 10 0.092 213.60 19.58 btg
Besi D 8 0.092 37.40 3.43 btg
Besi D 6 0.092 71.00 6.51 btg
Bendrat 0.015 162.20 1.62 kg
Upah
Pekerja 0.007 162.21 1.14 HOK
Tukang 0.007 162.21 1.14 HOK

PEK. BEKISTING Volume = 15.640 m2


Bahan
Papan Bekisting 0.026 15.64 0.41 m3
Balok kayu 0.015 15.64 0.23 m3
Paku 0.550 15.64 8.60 kg
Upah
Pekerja 0.520 15.64 8.13 HOK
Tukang 0.260 15.64 4.07 HOK

1 m2 PASANG BEKISTING UNTUK LANTAI (MULTIPLEX) Volume = - m2


Kayu Kaso 0.040 - - m3
Paku 0.400 - - Kg
Balok kayu 0.015 - - m3
Multiplex 9 mm (Bekisting D 0.350 - - lbr
Bambu Batang dia 7cm 6.000 - - Btg
Pekerja 0.660 - - HOK
Tukang 0.330 - - HOK
6. PEK. COR BETON ( 1:2:3 ) Volume = 1.687 m3
Bahan
Batu split Batu split 0.760 1.69 1.28 m3
Semen 6.520 1.69 11.00 sak
Pasir cor 0.540 1.69 0.91 m3
Upah
Pekerja 1.650 1.69 2.78 HOK
Tukang 0.250 1.69 0.42 HOK

7. PEK. PAS. BATU BATA 1/2 BATA ( 1:5 ) Volume = 3.000 m2


Bahan
Bata merah 70.000 3.00 210.00 bh
Semen 0.194 3.00 0.58 sak
Pasir pasang 0.045 3.00 0.14 m3

Upah
Pekerja 0.300 3.00 0.90 HOK
Tukang 0.100 3.00 0.30 HOK

8. PEK. PLESTERAN 15mm ( 1:5 ) Volume = 6.000 m2


Bahan
Pasir pasang 0.026 6.00 0.16 m3
Semen 0.104 6.00 0.62 sak
Upah
Pekerja 0.300 6.00 1.80 HOK
Tukang 0.200 6.00 1.20 HOK

9. PEK. ACIAN Volume = 6.000 m2


Bahan
Pasir pasang 0.000 6.00 0.00 m3
Semen 0.065 6.00 0.39 sak
Upah
Pekerja 0.200 6.00 1.20 HOK
Tukang 0.100 6.00 0.60 HOK

17. PEK. RANGKA & PLAFON GRC 120x240, tebal 4 mm Volume = m2


Bahan
GRC 120x240 0.364 - - lbr
Kayu Kaso 0.015 - - m3
Paku 0.310 - - kg
Upah
Pekerja 0.150 - - HOK
Tukang 0.350 - - HOK
20. PEK. KERAMIK LANTAI Volume = 6.000 m2
Bahan
Keramik Anti Slip 1.100 6.00 6.60 m2
Semen 0.228 6.00 1.37 sak
Pasir pasang 0.045 6.00 0.27 m3
Upah
Pekerja 0.250 6.00 1.50 HOK
Tukang 0.125 6.00 0.75 HOK

20. PEK. KERAMIK DINDING Volume = 11.650 m2


Bahan
Keramik Dinding 1.100 11.65 12.82 m2
Semen 0.228 11.65 2.66 sak
Pasir pasang 0.045 11.65 0.52 m3
Upah
Pekerja 0.250 11.65 2.91 HOK
Tukang 0.125 11.65 1.46 HOK

2PEK. CAT TEMBOK Volume = 6.000 m2


Bahan
Plamir 0.100 6.00 0.60 kg
Cat Dasar 0.100 6.00 0.60 kg
Cat Tembok 0.160 6.00 0.96 kg
Upah
Pekerja 0.020 6.00 0.12 HOK
Tukang 0.063 6.00 0.38 HOK
Kecamatan : Manonjaya
PERHITUNGAN VOLUME PEKERJAAN
Desa : Manonjaya
Lokasi :
( Take of Sheet ) Ukuran :
SKETSA PERHITUNGAN VOLUME
01. Pek. Galian Tanah
- Panjang galian untuk pondasi = (Pnj galian pond teras )+ (pj galian pond bangunan) Volume =
Pondasi Pelat = 0.80 x 0.80 x 0.80 x 4.0 = 2.05 m3 2.30 m3
Pondasi Batu = 2.00 x 0.50 x 0.50 0.50 = 0.25 m3
2.30 m3

03. Pas.Pondasi Batu


- Pas.Pondasi Batu Belah Teras =(lebar atas +lebar bawah)/2 x tinggi pondasi x panjang pondasi Volume =
( 0.50 + 0.50 ) x 0.50 x 2.00 = 0.50 m3 0.50 m3
2

04. Pek. Bekisting Volume bekisting =


Sloof 15.64 m2
B - Bekisting Kolom jml : 4.00 bh Tinggi = 3.50 m'
H Volume = lebar kolom x 4 sisi x tinggi kolom x jumlah kolom Vol Bekisting Dak
P 0.20 x 4 x 3.50 x 4.00 = 11.20 m2 m2
- Bekisting Balok 20/35 Panjang = 5.00 m'
Kolom Volume =( lebar balok +( tinggi balok x 2 sisi))x Panjang balok yang sama
B 0.2 = 0.31 x 5.00 x
H 0.2 = 1.55 m2
T 3.5
JML 4

Balok
B 0.15 - Bekisting Dak Beton
H 0.2 Volume =(Lebar Dak x Panjang Dak)
P 5 = 1.70 x 1.70
= 2.89 m2
Panjang = 16.00 m'

- m2
05. Pek. Pembesian Volume Besi
Ø 12 = 0.0 m
Ø6 = 71.0 m
Ø 10 = 213.6 m
Ø8 = 37.4 m

Kolom
B 0.2
H 0.2 - Kolom Utama Tinggi kolom = 4.00 m' , jumlah = 4.00 Bh 12 0.88776 0 kg
T 3.5 Pokok D10mm 10 0.6165 131.6844 kg
JML 4 Volume =Tinggi kolom x jumlah besi x jumlah kolom yg sama 8 0.39456 14.756544 kg
Ø 10 = 4.00 x 6.00 x 4.00 = 96.00 m' 6 0.22194 15.75774 kg
Balok Sengkang Ø 6 mm 162.19868 kg
B 0.15 Volume =Tinggi Kolom/jarak cincin x panjang cincin x Jumlah pondasi yang sama
H 0.2 Ø6 = 4.00 = 20.00 x 0.70 x 4.00 = 56.00 m
P 5 0.20
- Balok panjang = 5.00 m
Pokok D10mm
Volume =Panjang balok x jumlah besi
Ø 10 = 5.00 x 7.00 = 35.00 m'
Sengkang Ø 6 mm
Volume =Panjang balok /jarak cincin x panjang cincin
Ø6 = 5.00 = 25.00 x 0.60 = 15.00 m'
0.20
- Plat Pondasi panjang = 0.80 m lebar = 0.80 m

Volume =Panjang balok x jumlah besi


m'
Tulangan Bawah
Volume =Lebar balok x jumlah besi
Ø 10 = 1.30 x 5.00 x 2.00 x 4 52.00 m'

Kolom
B 0.2
H 0.2
T 3.5
JML 4 - Lantai / Dak panjang = 1.70 m lebar = 1.70 m
Tulangan Atas
Balok Melintang Ø 8 mm
B 0.15 Volume =Panjang balok x jumlah besi
H 0.2 Ø8 = 1.70 x 11.00 = 18.70 m'
P 5 Memanjang Ø 8 mm
Volume =Lebar balok x jumlah besi
Ø8 = 1.70 x 11.00 = 18.70 m'

Tulangan Bawah
Melintang Ø 10mm-150
Volume =Panjang balok x jumlah besi
Pelat Pondasi Ø 10 = 1.70 x 9.00 = 15.30 m'
B 0.8 Memanjang Ø10 mm-200
H 0.8 Volume =Lebar balok x jumlah besi
T 0.25 Ø 10 = 1.70 x 9.00 = 15.30 m'
JML 4

Dak
P 1.7
L 1.7
T 0.12
06. Pek. Beton Cor - Sloof = - x - x - = - m3 Volume :
Site Mix - Kolom 0.20 x 0.20 x 4.00 x 4.00 Bh = 0.64 m3 1.69 m3
- Balok = 0.15 x 0.08 x 5.00 x 1.00 Bh = 0.06 m3

- Pondasi Pelat = 0.80 x 0.80 x 0.25 x 4.00 bh 0.64 m3

- Lantai/Dak = 1.70 x 1.70 x 0.12 0.35 m3


total Volume = 1.69 m3
07. Pas. Batu Bata Vol. Pekj.Pas bt.bata = Asumsi Bata Rusak adalah 50% dari total Volume :
Volume = Panjang pas x tinggi bata
- Luas dinding X = 1.00 x 2.00 = 2.00 m2 3.00 m2
Y = 1.00 x 1.00 = 1.00 m2

Vol pas. batu bata =( 3.00 - ) = 3.00 m2

08. Pek. Plesteran Volume Plesteran = Luasan pas.batu bata x 2 Volume :


= 3.00 x 2.00 = 6.00 m2 6.00 m2

09. Pek. Acian Volume Acian = Luasan pas.batu bata x 2 Volume :


= 3.00 x 2.00 = 6.00 m2 6.00 m2

20. Pas. Keramik Lantai Volume :


KM = 2.00 x 1.00 = 2.00 m2 6.00 m2
T Wudlu = 2.00 x 2.00 = 4.00 m2
Jumlah = 6.00 m2
Dinding Keramik KM = 5.30 x 1.50 = 7.95 m2
T Wudlu = 3.70 x 1.00 = 3.70 m2
Jumlah = 11.65 m2

25. Pek. Cat Dinding Volume pekerjaan = ( L. dinding total - L. Kusen ) x 2 ---> lihat pekj pas bt.bata Volume :
= 6.00 x 1 = 6.00 m2 6.00 m2

Anda mungkin juga menyukai