Soil Testings & Research Administration

sR. BA-0 1 / HW. DM.07-O4t 2021

LAPORAN PENYELIDIKAN TAN AH

Proyek: Jembatan.
Lokasi: (1) Jembatan Tukad Bindu,
{2) Jembatan Tukad Ayung,
(3) Jembatan Tukad Penatih,
Denpasar, Bali.
Relasi : PT. Bnntas Abipraya (Persero).

Surabaya, 23 Juli2021
Testana

ST., MT

Manajer Teknik

Jl. Opak 66, Surabaya. Telp"/ fax. (031) 5678329 (Hunting) E-mail. testanaengineering@gmail.com
TESTANA ENGINEERING.
Soil Testings & Research Administration

DAFTAR ISI
1. PENDAHULUAN .......................................................................................................................................... 1
1.1 Informasi Proyek. .................................................................................................................................. 1
1.2 Maksud dan Tujuan. ............................................................................................................................. 1
1.3 Hasil-hasil Penyelidikan Tanah. ........................................................................................................... 1
2. PENYELIDIKAN TANAH ............................................................................................................................. 1
2.1 Lingkup Pekerjaan. ............................................................................................................................... 1
2.1.1 Penyelidikan Lapangan.............................................................................................................. 2
2.1.1.1 Sondir Mekanis. ............................................................................................................ 3
2.1.1.2 Pemboran Inti (Core Drilling). ....................................................................................... 4
2.1.1.2.1 Uji Penetrasi Standard (SPT). ...................................................................... 5
2.1.1.2.2 Pengambilan Contoh Tanah Tak Terganggu. .............................................. 6
2.1.1.2.3 Level Muka Air Tanah. ................................................................................. 7
2.1.2 Pengujian Laboratorium. ............................................................................................................ 7
2.1.2.1 Berat Isi Tanah. ............................................................................................................ 7
2.1.2.2 Berat Jenis.................................................................................................................... 7
2.1.2.3 Kadar Air....................................................................................................................... 7
2.1.2.4 Batas-batas Konsistensi Atterberg. .............................................................................. 8
2.1.2.5 Analisa Ayakan dan Hidrometer. .................................................................................. 8
2.1.2.6 Kuat Geser Tanah. ....................................................................................................... 9
2.1.2.6.1 Triaxial-UU. .................................................................................................. 9
2.1.2.6.2 Direct Shear Test. ...................................................................................... 10
2.1.2.6.3 Unconfined Compressive Strength Test. .................................................... 10
2.1.2.7 Konsolidasi. ................................................................................................................ 11
2.2 Hasil-hasil Penyelidikan Tanah. ......................................................................................................... 11
2.2.1 Penyelidikan Lapangan............................................................................................................ 11
2.2.1.1 Sondir Mekanis. .......................................................................................................... 11
2.2.1.2 Pemboran dan Uji Penetrasi Standard. ...................................................................... 13
2.2.1.3 Muka Air Tanah. ......................................................................................................... 14
2.2.1.4 Profile Irisan Tanah. ................................................................................................... 14
2.2.2 Pengujian Laboratorium. .......................................................................................................... 18
2.2.2.1 Index Properties. ........................................................................................................ 18
2.2.2.2 Engineering Properties. .............................................................................................. 19
2.2.2.2.1 Kekuatan Tanah. ........................................................................................ 19
2.2.2.2.2 Kompresibilitas Tanah. ............................................................................... 19
2.2.2.2.3 Kekakuan Tanah. ....................................................................................... 20
3. KAJIAN PONDASI TIANG ......................................................................................................................... 22
3.1 Daya Dukung Pondasi Tiang. ............................................................................................................. 22
3.1.1 Metode Analisa. ....................................................................................................................... 22
3.1.1.1 Axial – Tekan. ............................................................................................................. 22
3.1.1.1.1 Perlawanan Ujung (Qp)............................................................................... 23
3.1.1.1.2 Perlawanan Selimut (Qs). ........................................................................... 24
3.1.1.2 Aksial – Tarik. ............................................................................................................. 26
3.1.2 Parameter Analisa. .................................................................................................................. 26
3.1.3 Hasil-hasil Analisa.................................................................................................................... 27
3.2 Pengujian Pondasi Tiang. ................................................................................................................... 27
3.2.1 Daya Dukung Tekan. ............................................................................................................... 28
3.2.2 Keutuhan Pondasi Tiang.......................................................................................................... 28
4. KESIMPULAN DAN SARAN ..................................................................................................................... 29
4.1 Rangkuman Penyelidikan Tanah. ....................................................................................................... 29
4.2 Pilihan Pondasi. .................................................................................................................................. 29
4.3 Saran. ................................................................................................................................................. 30

Jl. Opak 66, Surabaya. Telp./ fax. (031) 5678329 (Hunting) E-mail. testanaengineering@gmail.com
TESTANA ENGINEERING.
Soil Testings & Research Administration

LAMPIRAN

A.1. Location of Testing Points


A.2. Dutch Cone Penetrometer Test
A.3. Boring Log
A.4. Soil Profile
A.5. Summary of Laboratory Test Results
A.6. Grainsize Distribution
A.7. Strength Test
A.8. Consolidation Test
A.9. Isotropic Compression Parameter
A.10. Pile Foundation
A.11. Documentation

Jl. Opak 66, Surabaya. Telp./ fax. (031) 5678329 (Hunting) E-mail. testanaengineering@gmail.com
TESTANA ENGINEERING.
Soil Testings & Research Administration

1. PENDAHULUAN

1.1 Informasi Proyek.

Sesuai dengan penugasan pemberi kerja, telah dilakukan serangkaian penyelidikan tanah pada
proyek dengan informasi dibawah ini.

a. Nama proyek : Jembatan.


b. Lokasi proyek : Jembatan Tukad Bindu, Jembatan Tukad Ayung, Jembatan Tukad Penatih,
Denpasar, Bali.
c. Pemberi kerja : PT. Brantas Abipraya (Persero).
d. Fungsi proyek : Jembatan.

1.2 Maksud dan Tujuan.

Maksud dan tujuan dari penyelidikan tanah ini adalah mengungkapkan kondisi stratifikasi
maupun perlawanan lapisan tanah setempat, untuk mendukung perencanaan substruktur bawah
termasuk fasilitas pendukung lainnya yang berkaitan.

1.3 Hasil-hasil Penyelidikan Tanah.

Kontur lapisan tanah serta memberikan gambaran mengenai karakteristik lapisan tanah pada
lokasi setempat, sehingga diperoleh input karaktetistik kekuatan dan kompresibilitas tanah yang
2
dipergunakan untuk menunjang data desain yang ditujukan kepada pihak yang berkepentingan a.l.
perencana sekaligus kelak pelaksana maupun pemilik lahan dll. nya, agar analisa yang dilakukan dapat
dilakukan maksimal sehingga tidak saja aman, juga efisien serta dimungkinkan pula didalam
pelaksanaannya dengan jasa pelayanan maupun pilihan yang tersedia dipasaran konstruksi setempat
(tujuan ekonomis).

2. PENYELIDIKAN TANAH

2.1 Lingkup Pekerjaan.

Penyelidikan tanah yang dilakukan meliputi penyelidikan dilapangan yang kemudian dilanjutkan
dengan pengujian thd. contoh-contoh tanah dalam kondisi tak terganggu yang dilaksanakan pada
laboratorium.
1
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.1 Penyelidikan Lapangan.

Dalam hal ini tidak diminta untuk dilakukan pengukuran topografi thd. koordinat maupun elevasi
dari lokasi penyelidikan tanah. Koordinat dan elevasi dari titik-titik penyelidikan tanah di sediakan oleh
pemberi kerja, dengan informasi melalui Tabel 2.1 berikut ini.

Tabel 2.1. Koordinat dan elevasi titik penyelidikan tanah.


Easting Northing Elevation
No. Lokasi Keterangan Notasi
(m) (m) (m)
1. Tukad Bindu Benck mark BM-1 305493.471 9044971.625 44.491
BM-2 305540.528 9044966.747 43.985
Sondir S-1 305502.4400 9044970.0750 34.598
S-2 305536.6820 9044952.4780 35.209
Bor dalam DB-1 305496.7208 3044958.8796 No data
DB-2 305529.6554 9044961.0691 No data
DB-3 305541.9892 9044956.5697 No data
2. Tukad Ayung Benck mark BM-1 306216.756 9044938.527 31.765
BM-2 306282.556 9044933.044 31.763
Sondir S-3 306196.6210 9044941.3940 28.415
S-4 306275.8260 9044949.2300 25.730
Bor dalam DB-4 306221.7753 9044937.2792 No data
DB-5 306244.5600 9044931.6570 No data
DB-6 306277.0829 9044942.0360 No data
3. Tukad Penatih Benck mark BM-1 306848.170 9044995.328 37.178
BM-2 306911.816 9044999.415 36.956
Sondir S-5 306849.8430 9044976.0120 37.529
S-6 306903.3030 9044998.4050 28.097
Bor dalam DB-7 306852.6915 9044991.4639 No data
DB-8 306890.5947 9044991.1603 No data
DB-9 306907.8354 9044996.7370 No data

Letak titik-titik penyelidikan tanah kemudian disampaikan lebih lanjut melalui lampiran A.1.
Lingkup pekerjaan penyelidikan tanah dilapangan diringkaskan pada Tabel 2.2 berikut ini.

Tabel 2.2. Penyelidikan lapangan.


Lingkup penyelidikan
No. Keterangan Jumlah titik
tanah
1. Sondir Kapasitas 2.5 ton 6 titik
2. Bor dalam Metode coring. 1@33.5m, 1@40m, 7@ 30m
a. Standard Penetrasi Test (SPT) Interval kedalaman 2.0 m 17+ 20 + 7 x 15
b. Pengambilan UDS Untuk uji laboratorium 2 x 9 tabung
c. Pengamatan muka air tanah Tidak berkala, setelah pemboran usai 9 lubang bor

2
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.1.1 Sondir Mekanis.

Pengujian sondir dilakukan sesuai ASTM D-3441, dimana dalam hal ini pengujian sondir yang
dilaksanakan adalah hingga mencapai kapasitas maksimal alat sondir ringan kapasitas 2.5 ton. Konus
yang digunakan mengadopsi bikonus yang disampaikan oleh Begemann dengan luasan penampang 10
2 2
cm dan luasan selimut 150 cm , diilustrasikan pada Gambar 2.1.

Gambar 2.1. Tipekal konus pada pengujian sondir (ASTM D-3441).

Untuk memasukan konus kedalam tanah setempat, maka digunakan mesin pembeban yang
disertai dengan penekan hidraulik yang dapat dinaikkan ataupun diturunkan. Secara umum rangkaian
alat yang digunakan untuk penetrasi konus disampaikan pada Gambar 2.2.

Gambar 2.2. Rangkaian alat penetrasi konus (SNI 2827:2012).

3
TESTANA ENGINEERING.
Soil Testings & Research Administration

Hasil-hasil pengujian sondir berupa kompilasi data bacaan manometer di lapangan tersaji
dalam bentuk grafik² sondir, yang memperlihatkan pola perlawanan lapisan tanah bawah terhadap
penetrasi bikonus; dinyatakan dengan tahanan ujung (qc), jumlah hambatan pelekat (TCF), gesekan
lokal (fs) dan juga rasio gesekan (FR), kesemuanya vs kedalaman.

2.1.1.2 Pemboran Inti (Core Drilling).

Total sebanyak 9 titik bor dilakukan dengan menggunakan 2 unit mesin bor sistem rotary YBM-
IWA, dilengkapi dengan 2 unit pompa sanchin SC-45, maupun diesel penggerak merk YANMAR-TF-
135H-di. Pengambilan contoh tanah terganggu menggunakan tabung penginti tunggal (Single Tube
Core Barrel, STCB), dengan ujung bor metal tungsten carbide bit berdiameter luar 76 mm. Untuk
menahan kelongsoran dinding lubang bor dipakai pipa pelindung (casing), diameter luar 89 mm.

Gambar 2.3. Ilustrasi pelaksanaan dan peralatan mesin pemboran.

Metode pemboran dilaksanakan dengan sistem coring (core drilling) yang digunakan berbeda
dengan metode pemboran basah (washed boring) terutama untuk contoh tanah yang diperoleh. Hasil
pekerjaan pemboran kemudian disusun di dalam kotak pemboran (core boxes) untuk dilakukan diskripsi
visual lapisan tanah sehingga dapat digambarkan dalam profil lapisan penyusun tanah setempat
4
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.1.2.1 Uji Penetrasi Standard (SPT).

Pada lubang pemboran dilakukan pula uji penetrasi standard (SPT) setiap interval ±2m untuk
2
memperoleh N-Value. Pelaksanaan pengujian dibagi dalam tiga tahap, yaitu berturut setebal 150mm
untuk masing-masing tahap. Tahap pertama dicatat sebagai dudukan, sementara jumlah pukulan untuk
memasukkan tahap ke-2 dan ke-3 dijumlahkan untuk memperoleh nilai pukulan N atau perlawanan SPT
(dinyatakan dalam pukulan/30cm  bpf). Bilamana penetrasi 2x15cm terakhir tidak tercapai, jumlah
pukulan ditulis N=50/x, dimana x merupakan penetrasi. Pada Gambar 2.4 menyajikan ilustrasi prosedur
kerja dari uji penetrasi standard.

Gambar 2.4. Prosedur kerja dari uji penetrasi standard (Mayne et al, 2002).

Tingkat kepadatan/ konsistensi lapisan yang dinyatakan oleh nilai N hasil uji penetrasi standard
(SPT) menggunakan hubungan yang disampaikan oleh Terzaghi and Peck (1948) yang terangkum
pada Tabel 2.3.

Tabel 2.3. Hubungan antara NSPT dengan tingkat kepadatan/ konsistensi tanah.
Tanah berbutir kasar Tanah berbutir halus
No
N-SPT (bpf) Kepadatan (N-SPT) Konsistensi
1. <4 Amat lepas <2 Sangat lunak
2. 4  10 Lepas 24 Lunak
3. 10  30 Agak padat 48 Sedang (medium)
4. 30  50 Padat 8  15 Kaku
5. >50 Amat padat 15  30 Amat kaku
6. - - >30 Keras

5
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.1.2.2 Pengambilan Contoh Tanah Tak Terganggu.

Total sebanyak 18 (delapan belas) pengambilan contoh-contoh tanah tak terganggu (Uds,
undisturbed sampling), Pengambilan contoh tanah-tanah tak terganggu ini dilakukan guna keperluan
pengujian lebih lanjut di laboratorium untuk mengungkapkan index dan engineering properties lapisan
tanah bawah lokasi setempat. Pengambilan contoh tanah tak terganggu diperoleh dengan menekan
tabung dinding tipis ke dalam tanah, mencabut tabung yang telah terisi penuh oleh tanah, dan menutup
kedua ujung tabung untuk menghindari tanah dari gangguan ataupun perubahan kelembaban.

Gambar 2.5. Tabung dinding tipis untuk pengambilan contoh tanah.

Lebih lanjut kedalaman pengambilan contoh tanah tak terganggu (UDS) diringkaskan melalui
Tabel 2.4 dibawah ini.

Tabel 2.4. Kedalaman pengambilan contoh tanah tak terganggu.


Kedalaman Index UU-Triaxial Direct shear UCT Consolidation test
Bor ID 2 2 2
(m) properties test test test 8kg/cm 16kg/cm 32kg/cm
-1- 2.0 - 2.5 x x - - x - -
6.0 - 6.5 x - x - - - -
-2- 6.0 - 6.5 x - x - x - -
12.0 - 12.5 x - x - - - -
-3- 2.0 - 2.5 x - x - - - -
4.0 - 4.5 x - x - - - -
-4- 2.0 - 2.5 x - x - x - -
6.0 - 6.5 x x - - x - -
-5- 12.0 - 12.5 x x - - - - -
18.0 - 18.5 x - x - - - -
-6- 6.0 - 6.5 x x - - x - -
12.0 - 12.5 x - x - - - -
-7- 2.0 - 2.5 x x - - x - -
6.0 - 6.5 x - x - - - -
-8- 6.0 - 6.5 x - - x - - -
12.0 - 12.5 x - x - - - -
-9- 6.0 - 6.5 x x - - x - -
12.0 - 12.5 x x - - x - -
(x) = dilaksanakan, (-) : tidak dilaksanakan.
6
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.1.2.3 Level Muka Air Tanah.

Setelah pemboran berakhir, pada masing-masing titik pemboran dilakukan pengamatan sesaat
(tidak diminta dilakukan secara berkala) untuk menentukan level muka air tanah (jika ada).

2.1.2 Pengujian Laboratorium.

Sementara itu lingkup pengujian laboratorium yang dilakukan thd. contoh tanah tak terganggu
meliputi pengujian-pengujian berikut ini.

a. Indeks properties;
 Berat isi (unit weight), ASTM D-2937,
 Berat jenis (specific gravity), ASTM D-854,
 Kadar air (moisture content), ASTM D-2216,
 Batas-batas Atterberg (plastic limit & liquid limit), ASTM D-4318,
 Analisa ayakan dan hidrometer (grain size distribution & hydrometer), ASTM D-421& D-422,
b. Engineering properties;
 Kuat geser tanah, unconsolidated undrained triaxial test, ASTM D-2850,
direct shear test, ASTM D-3080,
unconfined compressive strength test, ASTM D-2166,
 Konsolidasi (consolidation), ASTM D-2435.
 Potensi pengembangan tanah, ASTM D-4546.

2.1.2.1 Berat Isi Tanah.

Pengukuran dilakukan untuk mendapatkan berat persatuan volume dari contoh tanah. Berat
volume/ berat isi tanah digunakan dalam menghitung tekanan overburden dalam analisa daya dukung
tanah, mengevaluasi kestabilan lereng, dll.

2.1.2.2 Berat Jenis.

Test dilakukan untuk mendapatkan berat jenis contoh tanah. Besaran ini merupakan angka
perbandingan antara berat satuan butir tanah dengan berat satuan air pada 4º C.

2.1.2.3 Kadar Air.

Pengujian ini dilakukan untuk mengungkapkan kelembaban contoh tanah tak terganggu, untuk
mengungkapkan posisi alami tanah sehubungan dengan batas-batas konsistensinya.
7
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.2.4 Batas-batas Konsistensi Atterberg.

Dilakukan untuk menetapkan batas cair dan batas plastis tanah yang dipakai pada banyak
klasifikasi tanah. Dengan menggunakan persamaan sederhana dapat diperoleh nilai indeks kecairan
yang lebih menggambar proporsi keberadaan tanah dalam kondisi mendekati cair ataupun plastis.

Gambar 2.6. Tanah padat, plastis, & cair beserta batasannya.

Plastic Limit :
Batas plastis (PL) adalah nilai kadar air terendah dimana tanah mulai bersifat plastis. Batas
plastis ditentukan dengan cara menggulung tanah diatas kaca menggunakan telapak tangan. Bilamana
tanah mulai mengalami retak setelah mencapai diameter ± 1/8”, maka tanah pada kadar air tersebut
dapat digolongkan sebagai tanah dengan kadar air kondisi batas plastis.

Liquid Limit :
Batas cair (LL) adalah suatu kadar air tertentu dimana perilaku tanah berubah dari plastis
menjadi cair. Pada kondisi ini kuat geser tanah memiliki nilai terendah. Pengujian batas cair dilakukan
menggunakan grooving tool dan alat cassagrande.

Pengujian dilakukan dengan meletakkan dan meratakan sampel tanah pada alat uji
cassagrande. Selanjutnya sampel tanah dipotong menggunakan grooving tool dalam posisi tegak lurus
sehingga didapatkan jalur kosong ditengah. Kemudian alat cassagrande diputar dengan kecepatan 2
putaran/ detik hingga tanah merapat ke tengah. Batas cair merupakan kadar air pada saat jumlah
putaran mencapai 25 putaran.

2.1.2.5 Analisa Ayakan dan Hidrometer.

Pengujian dimaksudkan untuk mengetahui ukuran dan susunan distribusi butiran tanah.
Distribusi partikel tanah dengan ukuran  75 m ditentukan dengan analisa ayakan, sedangkan untuk
partikel-partikel < 75 m dilaksanakan dengan metode hidrometer. Analisa ayakan dilakukan dengan
cara menggetarkan contoh tanah pada 1 set ayakan dimana lubang-lubang ayakan makin kecil secara
2
berurutan. Sedangkan analisa hidrometer mengacu pada prinsip sedimentasi butir tanah dalam air.

8
TESTANA ENGINEERING.
Soil Testings & Research Administration

Tujuan dari pengujian batas-batas konsistensi tanah serta susunan gradasinya adalah dalam
rangka menetapkan klasifikasi tanah. Dengan terungkapnya klasifikasi tanah, dapat diperkirakan sifat-
sifat/ perilaku tanah dalam menerima distribusi pembebanan, serta dapat diperkirakan pula potensi
permasalahan yang mungkin timbul sehubungan dengan karakteristik tanah ybs.

2.1.2.6 Kuat Geser Tanah.

Ragam uji kekuatan tanah dilaboratorium akan dipilih sesuai dengan jenis dan kondisi tanah
ybs, antara lain direct shear dan triaxial-UU. Maksud dari pengujian ini adalah untuk mengetahui
kekuatan geser tanah, yaitu kohesi dan sudut geser. Untuk jenis tanah lempung (kohesif) kekuatan
tanah dalam kondisi undrained lebih ditentukan oleh parameter kohesi (mengabaikan nilai sudut geser
dalam,   0). Sementara itu untuk jenis tanah kepasiran, kekuatan tanah diilustrasikan melalui sudut
gesernya (, º).

Gambar 2.7.Tipekal hasil pengujian kuat geser tanah jenuh dilaboratorium (Chang-Yu Ou, 2006).

2.1.2.6.1 Triaxial-UU.

Pada uji tekan triaksial konvensional, benda uji silinder dibungkus dengan membran karet dan
diletakkan dalam sel triaksial dimana benda uji diberi tekanan fluida. Beban aksial kemudian diberikan
dan ditingkatkan, sampai keruntuhan terjadi. Pada kondisi tersebut, tegangan minor dan pertengahan,
masing-masing 3 dan 2, sama dengan tekanan fluida; tegangan utama (mayor), 1, diberikan oleh
tekanan fluida dan tegangan aksial yang diberikan oleh piston beban. Tegangan deviator (1-3)
merupakan perbedaan antara tegangan utama mayor dan minor. Keruntuhan didefinisikan sebagai
tegangan pada benda uji sama dengan tegangan deviator maksimum yang dicapai.

Selain nilai kohesi dan sudut geser tanah, parameter tanah yang dapat diturunkan grafik kurva
tegangan vs regangan pada hasil uji kuat geser Triaxial UU adalah modulus tanah. Nilai ini ditujukan
untuk mempelajari perilaku tanah dalam kondisi terdrainase maupun tak terdrainase, mengingat
kekakuan tanah tidak sama pada kondisi tsb.
9
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.2.6.2 Direct Shear Test.

Metoda uji geser dengan menempatkan benda uji dalam kotak geser yang tersusun dari 2
bagian (bagian atas dan bawah terpisah) yang diletakkan dalam bak berisi air, dan diberi tegangan
normal untuk konsolidasi. Kemudian digeser lewat bidang horizontal yang dipaksakan sebagai bidang
runtuhnya dengan kecepatan lambat, agar dapat terjadi drainase air (tekanan air pori ekses  nol).
Dengan menggunakan hukum Coulomb, akan diperoleh parameter-parameter kohesi dan sudut geser.

Gambar 2.8. Contoh peralatan uji geser langsung (SNI-2813-2008)

2.1.2.6.3 Unconfined Compressive Strength Test.

Hasil dari pemberian tegangan dengan unconfined compressive strength berupa nilai kuat
tekan (qu), yang merupakan rasio antara beban puncak dengan luas penampang. Nilai kohesi dapat
diambil sebesar 50% dari nilai kuat tekan. Selama dalam proses uji berlangsung, tidak diberikan
tegangan keliling (samping) pada contoh benda uji. Bidang keruntuhan pada benda uji yang mengalami
proses kehancuran akan memiliki bidang kelongsoran yang terletak disepanjang retakan-retakannya.
Tipekal proses pengujian dilaboratorium disajikan pada Gambar 2.9 dibawah ini.

Gambar 2.9. Tipekal uji kuat tekan batuan.

10
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.1.2.7 Konsolidasi.

Uji dimaksudkan untuk mengetahui perilaku pemampatan tanah akibat pembebanan, dan waktu
yang dibutuhkan untuk pemampatan tsb.. Pengujian ini dilakukan dengan alat konsolidometer yang
dilengkapi dengan dial pencatat penurunan, pencatat waktu serta pembebanan. Proses pembebanan
saat pengujian konsolidasi akan disesuaikan dengan kedalaman pengambilan contoh tanah yang akan
diuji, mengingat semakin dalam maka tegangan overburden juga semakin meningkat, sehingga
diharapkan proses plotting grafik konsolidasi dapat menghasilkan data yang cukup representative.

Pada umumnya hasil dari pengujian konsolidasi digrafikkan dalam skala logaritma untuk
mendapatkan indeks kompresi (Cc) dan indeks pengembangan (Cs). Namun apabila hasil pengujian
laboratroium tsb. digrafik dalam skala logratima alami (ln), maka pada grafik konsolidasi akan diperoleh
kemiringan indeks kompresi termodifikasi yang dinotasikan sebagai lambda () dan indeks muai
termodifikasi yang dinotasikan sebagai kappa (), dengan idealisasi berikut ini.

Gambar 2.10. Idealisasi untuk uji kompresi isotropis pada lempung (Atkinson et al, 1982).

2.2 Hasil-hasil Penyelidikan Tanah.

2.2.1 Penyelidikan Lapangan.

2.2.1.1 Sondir Mekanis.

Hasil pengujian sondir mekanis diberikan selengkapnya pada lampiran A.2, dimana distribusi
2
perlawanan ujung konus sondir (qc, kg/cm ) dan rasio gesekan (FR, %) thd. kedalaman (m) beserta
sistem klasifikasi tanah yang telah disampaikan oleh Schmertmann (1978) disajikan melalui Gambar
2.11 berikut ini.
11
TESTANA ENGINEERING.
Soil Testings & Research Administration

qc (kg/cm2) FR (%)

0 50 100 150 200 250 0 2 4 6 8 10


0 0
S-1
S-2
S-3
1 1
S-4
S-5
S-6
2 2

Kedalaman (m)
3 3

4 4

5 5

6 6

Gambar 2.11. Klasifikasi tanah usulan Schmertmann (1978), profil tahanan ujung dan rasio
gesekan thd. kedalaman (m).

2
Berdasarkan hubungan antara tahanan ujung konus (qc, kg/cm ) dan rasio gesekan (FR, %)
kondisi lapisan tanah didominasi oleh lanau dan pasir. Untuk jenis tanah lanau diperkirakan memiliki
perlawanan tanah mulai dari lunak hingga teguh, sementara untuk jenis tanah pasir diperkirakan meiliki
perlawanan tanah mulai dari renggang s/d amat padat.

Secara keseluruhan pengujian sondir terhenti pada saat kapasitas alat tekan tercapai (2.5
tonf) ditandai oleh bacaan manometer tahanan konus sondir (q c) dapat mencapai  200 kg/cm . Pada
2

table dibawah ini menyajikan kedalaman akhir maupun tahanan konus sondir dari pengujian sondir
yang telah dilaksanakan.

Tabel 2.5. Ringkasan hasil pengujian sondir mekanis.


Kedalaman akhir Tahanan konus sondir
Lokasi penyelidikan tanah Titik sondir 2
(m) (kg/cm )
Jembatan Tukad Bindu S-1 3.60 250
S-2 6.40 250
Jembatan Tukad Ayung S-3 3.20 250
S-4 3.60 250
Jembatan Tukad Penatih S-5 4.20 250
S-6 3.40 250

12
TESTANA ENGINEERING.
Soil Testings & Research Administration

Untuk mengungkapkan kondisi maupun perlawanan lapisan tanah yang terdapat dibawah
kedalaman akhir pengujian sondir mekanis dilakukan penyelidikan tanah melalui pemboran.

2.2.1.2 Pemboran dan Uji Penetrasi Standard.

Kecuali titik bor no. 4 dan 5, pelaksanaan pemboran di lakukan hingga mencapi kedalaman 30
m. Sementara untuk titiik bor 4, pelaksanaan pemboran dilakukan hingga kedalaman 33.5 m, dan untuk
titik pemboran 5 dilakukan hingga mencapai kedalaman 40 m. Hasil-hasil penyelidikan tanah melalui
pemboran (rotary core drilling) yang disertai dengan uji penetrasi standard (SPT) disampaikan
selengkapnya pada lampiran A.3.

Tabel 2.6. Hasil-hasil pemboran dalam dan SPT.


Titik Kedalaman N-SPT
Stratifikasi tanah Konsistensi/ kepadatan
bor (m) (bpf)
-1- 0.0 – 1.0 Asphalt, basecoarse, limestone, subgrade - -
1.0 – 3.5 Lanau berpasir, sedikit kerikil 7  14 Renggang s/d agak padat
3.5 – 30.0 Pasir, sedikit berlanau dan kerkikil 18  >50 Sedang s/d amat padat
-2- 0.0 – 3.0 Lanau berlempung <1 Amat lunak
3.0 – 4.0 Pasir berlanau 14 Agak padat
4.0 – 8.0 Lanau berpasir 33  47 Padat
8.0 – 12.5 Pasir, sedikit berlanau, dan kerikil <1  28 Amat renggang s/d sedang
12.5 – 30.0 Lanau berlempung dan berpasir 38  >50 Padat s/d amat padat
-3- 0.0 – 1.0 Asphalt, basecoarse, limestone, subgrade - -
1.0 – 10.0 Pasir, sedikit berlanau dan kerkikil 3  23 Renggang s/d agak padat
10.0 – 11.0 Lanau berlempung 1 Amat renggang
11.0 – 12.0 Pasir, sedikit berlanau dan kerkikil 8 Renggang
12.0 – 14.5 Lanau berlempung 5 Sedang
14.5 – 22.5 Pasir, sedikit berlanau dan kerkikil 18  >50 Sedang s/d amat padat
22.5 – 30.0 Lanau berlempung, mengeras 12  >50 Teguh s/d keras
-4- 0.0 – 1.0 Asphalt dan limestone - -
1.0 – 9.0 Lanau berlempung dan berpasir 4  39 Amat renggang s/d keras
9.0 – 11.5 Pasir dan kerikil, sedikit berlanau 13  >50 Sedang s/d amat padat
11.5 – 27.0 Lanau berlempung, mengeras >50 keras
27.0 – 33.5 Pasir, sedikit berlanau dan kerikil 22  >50 Sedang s/d amat keras
-5- 0.0 – 3.0 Lanau berlempung 7 Sedang
3.0 – 30.0 Pasir, sedikit berlanau dan kerikil 47  >50 Padat s/d amat padat
-6- 0.0 – 1.2 Pelat beton dan limestone 22 Agak padat
1.2 – 11.0 Lanau berpasir dan berlempung 36 Amat renggang s/d renggang
11.0 – 30.0 Pasir, sedikit berlanau dan kerikil >50 Amat padat
-7- 0.0 – 1.0 Pelat beton dan limestone - -
1.0 – 4.5 Lanau berpasir dan berlempung 57 renggang

13
TESTANA ENGINEERING.
Soil Testings & Research Administration

-7- 4.5 – 8.0 Pasir, sedikit berlanau dan kerikil 12  30 Agak padat
8.0 – 13.0 Lanau berlempung dan berpasir 9  14 Teguh
13.0 – 30.0 Pasir, sedikit berpasir dan kerikil 49  >50 Padat s/d amat padat
-8- 0.0 – 2.5 Lanau berlempung dan berpasir 12 Teguh
2.5 – 8.0 Pasir, sedikit berlanau dan kerikil 45  >50 Padat s/d amat padat
8.0 – 11.5 Lanau berlempung dan berpasir >50 Keras
11.5 – 30.0 Pasir, sedikit berpasir dan kerikil 16  >50 Sedang s/d amat padat
-9- 0.0 – 1.0 Asphalt, pelat beton, limestone - -
1.0 – 13.0 Lanau berlempung dan berpasir 3 s/d 13 Lunak s/d teguh
13.0 – 30.0 Pasir, sedikit berpasir dan kerikil >50 Amat padat

2.2.1.3 Muka Air Tanah.

Berdasarkan SNI 8460-2017, Persyaratan Perancangan Geoteknik, dimana persyaratan muka


air tanah dalam tahap perencanaan dapat menggunakan ketentuan-ketentuan sbb. :

 Apabila lokasi setempat sering mengalami kebanjiran s/d permukaan tanah setempat, maka muka
air tanah desain harus diambil rata dengan permukaan tanah setempat. Sebaliknya jika lokasi tidak
pernah mengalami kebanjiran, maka harus ditentukan muka air tanah tertinggi dengan melakukan
pengamatan muka air tanah selama periode tertentu.
 Bilamana masa konstruksi jatuh pada musim yang sama dengan masa penyelidikan tanah, maka
muka air tanah tertinggi yang diukur pada masa penyelidikan tanah dapat dianggap dipakai
sebagai muka air tanah desain.
 Bila penyelidikan tanah dilaksanakan pada musim yang berbeda dengan masa konstruksi, maka
muka air tanah hasil dari pengamatan tertinggi harus ditambah dengan perkiraan penambahan
tinggi muka air berdasarkan data sumur-sumur sekitar. Sekalipun lokasi proyek kadang kala
mengalami kebanjiran, muka air tanah desain tidak diambil rata dengan permukaan jalan,
mengingat diperlukan rentang waktu tersendiri untuk menjadikan air permukaan menjadi air tanah,
kecuali banjir berlangsung dengan rentang waktu yang panjang (lama).

Hasil pengamatan pada lubang pemboran mendeteksi muka air tanah pada kedalaman antara
4 hingga 9.0 m dari permukaan tanah eksisting. Hasil pengamatan sesaat setelah pemboran usai yang
dilakukan disampaikan melalui lampiran boring log.

2.2.1.4 Profile Irisan Tanah.

Untuk mempermudah mempelajari kondisi lapisan tanah bawah setempat, disajikan profil tanah
yang didasarkan pada penyelidikan tanah lapangan, diberikan melalui Gambar 2.12 s/d Gambar 2.14
dan juga terlampir melalui lampiran A.4.
14
TESTANA ENGINEERING.
Soil Testings & Research Administration

Gambar 2.12. Profil Irisan tanah untuk lokasi rencana jembatan Tukad Bindu.
15
TESTANA ENGINEERING.
Soil Testings & Research Administration

Gambar 2.13. Profil Irisan tanah untuk lokasi rencana jembatan Tukad Ayung.
16
TESTANA ENGINEERING.
Soil Testings & Research Administration

Gambar 2.14. Profil Irisan tanah untuk lokasi rencana jembatan Tukad Penatih.
17
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.2.2 Pengujian Laboratorium.

Untuk mengungkapkan karakteristik fisis maupun mekanis tanah dasar, dilakukan pengujian
laboratorium terhadap contoh tanah tak terganggu (undisturbed samples). Ringkasan hasil pengujian
laboratorium disampaikan pada lampiran A.5.

2.2.2.1 Index Properties.

Untuk jenis tanah berbutir halus, 3 (tiga) nilai kadar air tanah (kadar air alami, batas plastis dan
batas cair) dapat memberikan gambaran mengenai perilaku tanah yang diuji. Secara umum, pengujian
index properties meliputi pengujian berat isi, berat jenis, kadar air termasuk penetapan batas-batas
Atterberg yang ditampilkan pada lampiran A.3.

Sementara hasil analisa ayakan dan hydrometer yang lebih ditujukan untuk mengklasifikasikan
tanah berdasarkan ukuran butirannya, antara tanah berbutir kasar dan tanah berbutir halus (lolos
saringan no. 200) diberikan pada lampiran A.6. Parameter fisis lapisan tanah yang diperoleh dari
pengujian dilaboratorium disampaikan lebih lanjut pada Tabel 2.7 berikut ini.

Tabel 2.7. Sifat-sifat fisis tanah.


Depth Jenis Tanah t LL wn PL SR
Bor ID Gs e0 LI
(m) (USCS) (t/m³) (%) (%) (%) (%)
-1- 2.0 - 2.5 Lanau (ML) 1.73 2.59 1.01 46 34 29 0.29 88
6.0 - 6.5 Pasir (SM) 1.82 2.60 0.83 30 28 24 0.67 88
-2- 6.0 - 6.5 Lanau (ML) 1.90 2.68 0.81 34 28 25 0.33 93
12.0 - 12.5 Pasir (SM) 1.68 2.70 1.27 49 41 34 0.47 87
-3- 2.0 - 2.5 Pasir (SW-SM) 1.75 2.64 1.01 - 33 - - 87
4.0 - 4.5 Pasir (SM) 1.70 2.65 1.15 42 38 27 0.73 87
-4- 2.0 - 2.5 Lanau (ML) 1.75 2.57 0.94 40 32 28 0.33 88
6.0 - 6.5 Lanau (ML) 1.66 2.60 1.19 44 40 28 0.75 87
-5- 12.0 - 12.5 Pasir (SM) 1.99 2.70 0.66 23 22 17 0.83 91
18.0 - 18.5 Pasir (SP-SM) 2.00 2.67 0.62 - 21 - - 91
-6- 6.0 - 6.5 Lanau (ML) 1.69 2.62 1.14 41 38 27 0.79 87
12.0 - 12.5 Pasir (SM) 1.98 2.68 0.65 26 22 20 0.33 91
-7- 2.0 - 2.5 Lanau (ML) 1.70 2.58 1.06 42 36 30 0.50 87
6.0 - 6.5 Pasir (SP-SM) 1.93 2.72 0.78 - 26 - - 91
-8- 6.0 - 6.5 SP-SM 2.20 2.82 0.49 - 16 - - 93
12.0 - 12.5 Pasir (SM) 2.00 2.62 0.57 23 20 18 0.40 92
-9- 6.0 - 6.5 Lanau (ML) 1.63 2.59 1.26 45 42 31 0.79 87
12.0 - 12.5 Lanau (ML) 1.79 2.55 0.85 36 30 27 0.33 90

18
TESTANA ENGINEERING.
Soil Testings & Research Administration

2.2.2.2 Engineering Properties.

Meliputi hasil pengujian kekuatan tanah dalam kondisi tak teralir serta kompresibilitas tanah
2
yang diwakili oleh uji konsolidasi 1 dimensi dengan pembebanan maximum 8 kg/cm .

2.2.2.2.1 Kekuatan Tanah.

Untuk jenis tanah bebutir kasar, dilakukan pengujian direct shear, sementara untuk jenis tanah
berbutir halus seperti lempung/ lanau dilakukan melalui uji triaxial-UU, dengan hasil akhir untuk kedua
jenis uji tersebut adalah kohesi (c) dan sudut geser dalam (ϕ). Hasil-hasil pengujian kuat geser tanah
dalam kondisi tak teralir diberikan selengkapnya pada lampiran A.7.

2.2.2.2.2 Kompresibilitas Tanah.

Berdasarkan pengujian konsolidasi diperoleh koefisien kemampatan tanah (indeks kompresi,


cc) yang menggambarkan sifat tanah thd. kemampuan berubah volume pada saat menerima tegangan
tambahan. Koefisien ini pada umumnya digunakan untuk memperkirakan penurunan konsolidasi. Hasil
lainnya yang diperoleh dari pengujian ini adalah indeks pengembangan (c s) yang juga digunakan untuk
memperkirakan penurunan konsolidasi terutama jika kondisi tanah telah terkonsolidasi berlebih (OC).

Tabel 2.8. Parameter kekuatan dan kompresibilitas Tanah.


Depth Jenis Tanah c  Pc
Bor ID 2 Cc Cs 2 OCR  
(m) (USCS) (kg/cm )  (kg/cm )
-1- 2.0 - 2.5 Lanau (ML) 0.50 18 0.26 0.01 2.40 6.94 0.094 0.005
6.0 - 6.5 Pasir (SM) 0.10 35 - - - - - -
-2- 6.0 - 6.5 Lanau (ML) 0.20 40 0.27 0.02 2.40 2.55 0.097 0.008
12.0 - 12.5 Pasir (SM) 0.18 28 - - - - - -
-3- 2.0 - 2.5 Pasir (SW-SM) 0.15 29 - - - - - -
4.0 - 4.5 Pasir (SM) 0.18 26 - - - - - -
-4- 2.0 - 2.5 Lanau (ML) 0.13 30 0.25 0.03 1.70 4.86 0.061 0.005
6.0 - 6.5 Lanau (ML) 0.30 8 0.25 0.03 1.70 1.68 0.104 0.013
-5- 12.0 - 12.5 Pasir (SM) 0.17 46 - - - - - -
18.0 - 18.5 Pasir (SP-SM) 0.12 47 - - - - - -
-6- 6.0 - 6.5 Lanau (ML) 0.40 7 0.18 0.01 1.40 1.38 0.065 0.005
12.0 - 12.5 Pasir (SM) 0.10 46 - - - - - -
-7- 2.0 - 2.5 Lanau (ML) 0.35 20 0.19 0.01 1.90 5.59 0.068 0.005
6.0 - 6.5 Pasir (SP-SM) 0.13 37 - - - - - -
-8- 6.0 - 6.5 SP-SM 3.39 - - - - - - -
12.0 - 12.5 Pasir (SM) 0.16 45 - - - - - -
-9- 6.0 - 6.5 Lanau (ML) 0.25 9 0.23 0.01 1.05 1.07 0.068 0.006
12.0 - 12.5 Lanau (ML) 0.75 9 0.13 0.01 2.00 1.14 0.070 0.005

19
TESTANA ENGINEERING.
Soil Testings & Research Administration

Selanjutnya, riwayat tegangan yang pernah terjadi pada suatu lapisan tanah biasa ditunjukkan
dalam besaran OCR. OCR merupakan perbandingan antara tekanan prakonsolidasi (Pc) terhadap
tekanan vertikal efektif (P0’). Tekanan prakonsolidasi tanah adalah tekanan vertikal efektif terbesar yang
pernah dialami oleh tanah. Dengan mengetahui nilai OCR, maka dapat menempatkan tanah dalam
kelompok over consolidated (OC, OCR >1), normally consolidated (NC, OCR = 1) ataupun kelompok
under consolidated (UC, OCR < 1). Hasil-hasil pengujian konsolidasi diberikan selengkapnya pada
lampiran A.8.

2.2.2.2.3 Kekakuan Tanah.

Untuk jenis tanah dengan permeabilitas rendah, mungkin tidak ada konsolidasi yang berarti
selama tahap pembangunan dan pembebanan pondasi, dengan demikian pembebanan adalah tak
terdrainase sehingga perlu digunakan pendekatan nilai modulus. Selanjutnya, parameter tanah yang
dapat diturunkan grafik kurva tegangan vs regangan pada hasil pengujian kuat geser unconsolidated
undrained triaxial test (UU-TX) adalah nilai modulus. Modulus dapat diartikan sebagai perbandingan
antara tegangan () dan regangan () yang dapat dituliskan dalam bentuk persamaan berikut ini.

Δσ
E
Δε

Modulus secant diperoleh dari hasil perbandingan antara 50% tegangan puncak thd. 50%
regangannya dan besarnya modulus ditentukan saat tekanan overburden (p0’)/ saat tekanan 1.0bar
(100kPa), di ilustrasikan pada Gambar 2.15.

Gambar 2.15. Pemodelan modulus secant pada grafik tegangan – regangan.

Seperti yang disampaikan sebelumnya, dimana berdasarkan kurva konsolidasi dapat diperoleh
nilai indeks pengembangan (Cs) dan indeks kompresi (Cc), sehingga persamaan untuk memperoleh
hubungan modulus unloading-reloading (Eur) dengan modulus pembebanan (Eu) dapat dinyatakan
dalam bentuk persamaan berikut ini.

20
TESTANA ENGINEERING.
Soil Testings & Research Administration

Cs E
 u
Cc Eur

Modulus lainnya yang diperoleh dari pengujian konsolidasi adalah modulus oedometer (Eoed)
yang diperoleh dari hasil pengujian konsolidasi 1 dimensi. Modulus oedometer dapat diturunkan dengan
pendekatan sederhana berikut ini.

Δe 1
mv  dan Eoed 
ΔP (1  e0 ) mv

Dimana P merupakan selisih antara tekanan (P2 dan P1), sementara e juga selisih antara
angka pori pertama (e1) dan kedua (e2) atau dapat di ilustrasikan pada Gambar 2.16.

Gambar 2.16. Tipekal kurva hasil dari uji konsolidasi.

Interpretasi kuat geser dan kompresibilitas tanah berupa modulus tanah (Eu, E50 dan Eoed) saat
tekanan overburden diringaskan melalui Tabel 2.9 dibawah ini.

Tabel 2.9. Parameter kekakuan tanah.


Depth Jenis Tanah P0’ Eu E50 Eoed
Bor ID 2 2 2 2
(m) (USCS) (kg/cm ) (kg/cm ) (kg/cm ) (kg/cm )
-1- 2.0 - 2.5 Lanau (ML) 0.35 120 60 45
6.0 - 6.5 Pasir (SM) 1.07 - - -
-2- 6.0 - 6.5 Lanau (ML) 0.94 - - 55
12.0 - 12.5 Pasir (SM) 1.35 - - -
-3- 2.0 - 2.5 Pasir (SW-SM) 0.35 - - -
4.0 - 4.5 Pasir (SM) 0.69 - - -
-4- 2.0 - 2.5 Lanau (ML) 0.35 - - 110
6.0 - 6.5 Lanau (ML) 1.01 100 40 65
-5- 12.0 - 12.5 Pasir (SM) 1.59 - - -
18.0 - 18.5 Pasir (SP-SM) 2.19 - - -

21
TESTANA ENGINEERING.
Soil Testings & Research Administration

-6- 6.0 - 6.5 Lanau (ML) 1.01 85 40 100


12.0 - 12.5 Pasir (SM) 1.90 - - -
-7- 2.0 - 2.5 Lanau (ML) 0.34 80 30 80
6.0 - 6.5 Pasir (SP-SM) 1.11 - - -
-8- 6.0 - 6.5 SP-SM 1.12 210 240 -
12.0 - 12.5 Pasir (SM) 1.72 - - -
-9- 6.0 - 6.5 Lanau (ML) 0.98 55 25 45
12.0 - 12.5 Lanau (ML) 1.75 300 180 100

3. KAJIAN PONDASI TIANG

Mempertimbangkan kondisi perlawanan lapisan yang ada, yang di interpretasikan melalui hasil
bacaan perlawanan konus sondir dan nilai N-SPT, dimana kondisi lapisan tanah lokasi penyelidikan
tanah lebih didominasi oleh pasir dengan tingkat kepadatan cukup tinggi dekat dengan permukaan
tanah eksisting, maka dilakukan kajian pondasi tiang bor sebagai bagian dari elemen struktur bawah
(pondasi) dari konstruksi yang direncanakan.

Dengan data-data perlawanan tanah yang diungkapkan oleh hasil-hasil penyelidikan tanah
tersebut, penggunaan pondasi tiang pracetak kurang disarankan. Kedalaman tiang yang mampu
dicapai diperkirakan cukup dangkal, sehingga kapasitas dukung yang dihasilkannya cukup terbatas.
Dengan kapasitas dukung yang dihasilkan cukup terbatas, diperlukan jumlah maupun konfigurasi yang
cukup rapat untuk mengejar kebutuhan pembebanan upper structure.

3.1 Daya Dukung Pondasi Tiang.

Untuk perencanaan kapasitas dukung pondasi tiang, kriteria stabilitas yang digunakan dalam
analisa mengacu pada konsep faktor keamanan (SF), sebesar 2.5 hingga 3.0 akibat beban aksial.
Dalam hal ini penurunan pondasi tiang belum ditinjau.

3.1.1 Metode Analisa.

3.1.1.1 Axial – Tekan.

Kapasitas dukung pondasi tiang dianalisa dengan menggunakan rumus umum yang diperoleh
dari penjumlahan tahanan ujung (Qp) dan tahanan selimut (Qs) tiang, dengan formulanya disajikan
berikut ini :

Qu = Q p + Q s
22
TESTANA ENGINEERING.
Soil Testings & Research Administration

dimana :
Qu = kapasitas dukung ultimit tiang,
Qp = kapasitas dukung ultimit ujung tiang,
Qs = kapasitas dukung ultimit selimut tiang.

3.1.1.1.1 Perlawanan Ujung (Qp).

Metode untuk memprediksi besarnya kapasitas dukung ujung pondasi tiang bor dilakukan
dengan menggunakan metode Reese & Wright (1977), dimana kapasitas dukung ultimit pada ujung
(Qp) tiang bor merupakan fungsi dari daya ultimite pada ujung per satuan luas (qp) dan luas penampang
(Ap), dinyatakan dalam bentuk persamaan dibawah ini.

Qp = q p . A p
dimana :
Qp = Kapasitas dukung ultimit ujung tiang,
2
qp = Kapasitas dukung ultimit pada ujung per satuan luas (ton/m ),
2
Ap = Luas penampang tiang bor (m ).

Pada tanah kohesif besarnya tahanan ujung per satuan luas, q p, dapat diambil sebesar 9 kali
kuat geser tanah dalam kondisi undrained yang pada umumnya diperoleh dari pengujian tanah di
laboratorium. Sedangkan untuk jenis tanah nonkohesif, Reese & Wright (1977) mengusulkan korelasi
empiris yang disajikan pada Gambar 3.1.

Gambar 3.1. Tahanan ujung ultimit pada tanah non kohesif (Reese & Wright, 1977).

23
TESTANA ENGINEERING.
Soil Testings & Research Administration

Berdasarkan chart tsb., nilai tahanan ujung persatuan luas (qp) yang diusulkan oleh Reese &
Wright, memiliki trend pola perlawanan yang meningkat seiring dengan peningkatan nilai N-SPT (bpf),
semakin besar nilai N-SPT maka tahanan ujung persatuan luas juga akan membesar. Untuk nilai N-
SPT  60bpf, maka tahanan ujung persatuan luas (qp, kg/cm ) bernilai 2/3 dari nilai N-SPT (bpf).
2

Namun pada nilai N-SPT  60 bpf, maka nilai tahanan ujung persatuan luas tsb. dibatasi hanya sebesar
2
40kg/cm .

3.1.1.1.2 Perlawanan Selimut (Qs).

Perhitungan kapasitas dukung selimut (Qs) tiang bor merupakan fungsi dari panjang tiang,
keliling penampang tiang dan gesekan selimut tiang persatuan luas, dinyatakan berikut ini.

i
Qs = 
n 1
fi . li . p

dimana:
fi = Gesekan selimut tiang per satuan luas (ton/m²),
li = Panjang tiang (m),
p = Keliling penampang tiang (m).

Gesekan selimut tiang per satuan luas (f s) dipengaruhi oleh jenis tanah dan parameter kuat
geser tanah. Untuk tanah kohesif dapat menggunakan formula sbb. :

fs =  . cu
dimana :
fs = Gesekan selimut tiang (ton/m²),
 = Faktor adhesi,
2
cu = Kuat geser tanah tak terdrainase (ton/m ).

Untuk mendapatkan faktor adhesi (), Reese mengusulkan untuk menggunakan nilai sebesar
0.55 yang didasarkan pada hasil penelitiannya atau dapat pula menggunakan grafik hubungan antara
faktor adhesi () vs kuat geser tanah tak terdrainase yang diusulkan oleh Stas and Kulhawy (1984),
disajikan pada Gambar 3.2. Grafik Stas and Kulhawy tsb., cukup berhimpit dengan grafik factor adhesi
yang diusulkan oleh Tomlinson (1957) yang diperoleh dari pengamatan pada pondasi tiang pracetak,
dengan persamaannya dapat ditulis berikut :

 = 0.21+0.26 (pa / su)  1

24
TESTANA ENGINEERING.
Soil Testings & Research Administration

Gambar 3.2. Faktor adhesi vs kuat geser tanah tak terdrainase (Stas and Kulhawy, 1984).

Berikutnya, kuat geser tanah selain dapat diperoleh dari hasil pengujian tanah laboratorium,
Pendekatan lain yang dapat diambil adalah dengan korelasi empiris yang pernah disampaikan oleh
Terzaghi and Peck (1967) & Sowers (1979) ataupun korelasi/ pendekatan lokal yang ada, seperti
yang diperlihatkan lebih lanjut pada Gambar 3.3.

Gambar 3.3. Korelasi kuat geser tanah dan NSPT (Terzaghi and Peck,1967 & Sowers, 1979).

Kemiringan garis yang disampaikan oleh Terzaghi and Peck yang tersaji melalui Gambar 3.3
2
tsb, tanpa memperhatikan jenis tanahnya, nilai kuat geser tanah (cu, kN/m ) hanya diambil sebesar
6.67 (20/3) N-SPT (bpf). Irsyam et al (2007) melakukan studi kelayakan pondasi tiang pada pier-
tengah jembatan Suramadu (Surabaya  Madura), dimana lempung keras namun menyerpih (clay-
shale) apabila kontak dengan atmosfer hanya mengambil korelasi sebesar 5  6x N-SPT saja.

25
TESTANA ENGINEERING.
Soil Testings & Research Administration

Untuk tanah non-kohesif, nilai gesekan selimut tiang (fs) dapat diperoleh dari korelasi langsung
dengan NSPT (bpf) yang dipublikasikan oleh Wright (1977) pada Gambar 3.4 dibawah ini.

Gambar 3.4. Tahanan ultimit selimut vs NSPT (Wright, 1977).

Berdasarkan Gambar 3.4, kemiringan garis yang diusulkan oleh Wright (1977) masih berada
dibatas bawah dari data-data yang terkumpul.

3.1.1.2 Aksial – Tarik.

Rahardjo, P.P. (1992) berpendapat pada nilai gesekan ultimate pada kondisi tarik lebih
rendah d/p. nilai gesekan ultimate dalam kondisi tekan, berkisar antara 40  70%. Dengan keterangan
tsb. maka kapasitas dukung tarik pondasi tiang dapat dinyatakan dalam persamaan berikut ini.

Qultimate-tension = 0.7 * Qs + Wp
dimana :
Qult = Kapasitas dukung ultimit untuk kondisi tarik (ton),
Qs = Kapasitas dukung ultimit selimut tiang (ton),
Wp = berat tiang sendiri (ton).

3.1.2 Parameter Analisa.

Perkiraan perlawanan ujung dan selimut pondasi tiang bor menggunakan nilai N-SPT hasil
pengujian penetrasi standard (SPT). Untuk jenis tanah berpasir, tahanan ujung dan selimut pondasi
tiang menggunakan korelasi empiris seperti yang disampaikan oleh Reese and Wright (1978).
26
TESTANA ENGINEERING.
Soil Testings & Research Administration

Sementara untuk tanah kohesif, dilakukan korelasi empiris untuk mendapatkan nilai kuat geser tanah,
2
dimana dalam hal ini nilai kuat geser tanah untuk lempung kondisi undrained (c u, kN/m ) diambil hanya
sebesar  5.0 N-SPT (bpf). Penggunaan nilai diluar batas diatas yang telah disampaikan diatas,
sebaiknya dilengkapi dengan pembuktian dapat berupa instrumentasi pada tiang.

3.1.3 Hasil-hasil Analisa.

2 2
Distribusi gesekan selimut tiang (f s, kg/cm ) dan perlawanan ujung pondasi tiang (qp, kg/cm )
disusun pada lampiran A.10 dan diringkaskan untuk beberapa kedalaman pada Tabel 3.1 sbb. :

Tabel 3.1. Daya dukung pondasi tiang bor.


Lokasi Bor Diameter Kedalaman Qujung Qselimut Q Ijin (ton/ tiang)
Jembatan ID (cm) (m) (ton) (ton) Tarik Tekan
Tukad Bindu -1- 60 26.0 94.29 491.97 115 228
80 26.0 167.64 655.96 153 318
-2- 60 15.0 63.62 202.70 47 102
80 15.0 113.10 270.27 63 146
-3- 60 27.0 63.62 313.28 73 147
80 27.0 113.10 417.71 97 205
Tukad Ayung -4- 60 18.0 63.62 287.61 67 136
80 18.0 113.10 383.48 89 191
-5- 60 15.0 94.29 367.70 86 179
80 15.0 167.64 490.26 114 252
-6- 60 18.0 94.29 262.76 61 137
80 18.0 167.64 350.35 82 196
Tukad Penatih -7- 60 20.0 94.29 300.97 70 152
80 20.0 167.64 401.29 94 216
-8- 60 8.0 82.79 169.15 39 95
80 8.0 147.18 225.53 53 139
-9- 60 20.0 94.29 264.01 62 137
80 20.0 167.64 352.02 82 197

Catatan : Kedalaman tiang usulan yang tersaji mulai dari permukaan tanah eksisting, pada saat
penyelidikan tanah berlangsung dan panjang tiang serta kapasitas dukungnya perlu dikoreksi bila
terdapat perubahan level permukaan tanah, misalnya oleh pekerjaan penggalian/ penimbunan.

3.2 Pengujian Pondasi Tiang.

Sebagai pemeriksaan terhadap mutu dan kualitas pekerjaan pondasi tiang agar memenuhi
kriteria dalam perencanaan, serta terutama untuk mengusahakan efisiensi dan terjaminnya keamanan
konstruksi, maka pada pelaksanaan pondasi tiang perlu dilakukan program pengendalian kualitas thd.
kapasitas dukung. Untuk memverifikasi besarnya kapasitas dukung tiang yang telah tertanam,
27
TESTANA ENGINEERING.
Soil Testings & Research Administration

disarankan untuk melakukan static loading test (SLT) ataupun dynamic loading test (DLT). Tabel 3.2
dibawah ini menyajikan rekomendasi jumlah tiang yang perlu diuji baik dengan SLT dan ataupun DLT.

Tabel 3.2. Rekomendasi jumlah tiang yang perlu diuji.


Jenis Pengujian Jenis Tiang Rekomendasi Jumlah Tiang
Static loading test Tiang pancang 1% x jumlah tiang
Tiang tekan dan tiang bor 1.33% x jumlah tiang
Dynamic loading test Semua jenis tiang 10% x jumlah tiang

3.2.1 Daya Dukung Tekan.

Prinsip pengujian dynamic loading atau yang lebih umum disebut pengujian PDA adalah
dengan memukul kepala pondasi tiang dengan hammer untuk menghasilkan rambatan gelombang di
sepanjang tiang. Pengujian ini membutuhkan gaya tumbuk yang cukup besar guna memobilisasi
penurunan yang diperlukan tiang agar kapasitas dukung selimut dan ujung tiang bekerja dengan
optimal. Interpretasi hasil pengujian dilakukan dengan mengeliminasi komponen dinamis sehingga
dihasilkan daya dukung statis tiang. Hal tersebut dapat diwujudkan menggunakan metode signal
matching dengan bantuan program CAPWAP. Output utama yasng dihasilkan dari program CAPWAP
ini adalah hasil dari signal matching, grafik force vs velocity, kurva load vs settlement, dan kurva load
transfer disepanjang kedalaman tiang terpasang, seperti terlihat pada Gambar 3.5.

Gambar 3.5. Output analisa CAPWAP.

3.2.2 Keutuhan Pondasi Tiang.

PIT adalah suatu metoda yang cepat, efisien, dan terpercaya untuk memeriksa keutuhan
pondasi tiang terpasang di bawah sensor. Hampir sama dengan DLT, prinsip kerja PIT juga
28
TESTANA ENGINEERING.
Soil Testings & Research Administration

memanfaatkan rambatan gelombang tiang akibat pukulan di kepala tiang. Salah satu tujuan utama
dilaksanakannya PIT adalah untuk mengetahui integritas/ keutuhan tiang.

Tidak seperti PDA yang menggunakan hammer untuk mendapatkan gaya tumbuk yang besar,
PIT hanya menggunakan instrumented hammer yang tidak mampu memobilisasi penurunan tiang guna
mendapatkan kapasitas dukung tiang, oleh karena itu PIT disebut juga dengan low strain dynamic test.

4. KESIMPULAN DAN SARAN

4.1 Rangkuman Penyelidikan Tanah.

Melalui serangkaian penyelidikan tanah yang telah dilakukan, stratifikasi maupun perlawanan
lapisan tanah untuk lokasi 3 lokasi proyek rencana pembangunan Jembatan Tukad Bindu, Jembatan
Tukad Ayung dan Jembatan Tukad Penatih dapat disampaikan berikut ini.

Tabel 4.1. Perlawanan dan stratifikasi tanah.


Lapisan
Jenis lapisan tanah Konsistensi/ kepadatan tanah
ID
1 Lapisan tanah permukaan (asphalt, urugan limestone) Agak padat
2 Lanau berlempung dan berpasir, coklat keabu-abuan s/d coklat Lunak hingga kaku
3 Pasir, sedikit berlanau, mengandung kerikil, abu-abu s/d coklat Renggang s/d amat padat
4 Lanau berlempung dan berpasir, mengeras, coklat Kaku s/d keras

Pengamatan sesaat setelah pemboran berakhir mendeteksi keberadaan muka air tanah pada
kedalaman antara ± 4.0 hingga 9.0 m, tak menutup kemungkinan masih bercampur dengan sisa bilas
air pemboran. Bila diperlukan informasi lebih lanjut, dapat mengikuti petunjuk SNI 8460-2017 yakni
dengan melakukan pengamatan muka air tanah dengan rentang waktu tertentu secara periodik. Untuk
mempermudah mempelajari kondisi lapisan tanah bawah setempat, disajikan profil tanah berdasarkan
pada penyelidikan tanah lapangan, disajikan pada lampiran A.4.

Untuk mengungkapkan karakteristik fisis tanah maupun mekanis tanah, dilakukan pengujian
laboratorium terhadap contoh tanah tak terganggu, dengan hasilnya diringkaskan pada lampiran A.5.

4.2 Pilihan Pondasi.

Mempertimbangkan kondisi perlawanan lapisan yang ada, dimana kondisi lapisan tanah lokasi
penyelidikan tanah lebih didominasi oleh pasir dengan tingkat kepadatan cukup tinggi dekat dengan

29
TESTANA ENGINEERING.
Soil Testings & Research Administration

permukaan tanah eksisting, maka dilakukan kajian pondasi tiang bor sebagai bagian dari elemen
struktur bawah (pondasi) dari konstruksi yang direncanakan.

Dengan data-data perlawanan tanah yang diungkapkan oleh hasil-hasil penyelidikan tanah
tersebut, penggunaan pondasi tiang pracetak kurang disarankan. Kedalaman tiang pracetak yang
mampu dicapai diperkirakan cukup dangkal, sehingga daya dukung yang dihasilkannya cukup terbatas.
Dengan kapasitas dukung yang dihasilkan cukup terbatas, diperlukan jumlah maupun konfigurasi yang
cukup rapat untuk mengejar kebutuhan pembebanan upper structure.

Kajian kapasitas dukung tekan tiang tiang bor menggunakan metode Reese and Wright (1977)
dibeberapa kedalaman ditabulasikan melalui Tabel 3.1, dengan distribusi gesekan selimut tiang (f s,
2 2
kg/cm ) dan perlawanan ujung pondasi tiang (qp, kg/cm ) diberikan selengkapnya dalam lampiran A.10.

4.3 Saran.

 Berdasarkan penyelidikan tanah, lapisan tanah dekat permukaan tersusun oleh jenis tanah pasir
kelanauan ataupun lanau berlempung dan berpasir dengan perlawanan yang tinggi, hendaknya
didalam pelaksanaan pekerjaan pondasi tiang bor dilakukan oleh jasa pemboran yang handal,
terpercaya dan memiliki peralatan yang memadai, hal ini bertujuan agar dapat menembus sesuai
dengan kedalaman rencana. Penggunaan pondasi tiang bor dengan sistem washed boring untuk
mencapai kedalaman rencana sepertinya akan mengalami kendala dalam pelaksanaan.
 Proses penuangan beton terutama untuk pondasi tiang bor sebaiknya menggunakan pipa tremmie
dan dilakukan segera mungkin, mengingat lubang bor yang dibiarkan terbuka dalam jangka waktu
lama dan menerima pembasahan/ infiltrasi air secara significant (misalnya pelaksanaan pemboran
menggunakan metode washed boring) dapat mengakibatkan turunnya kapasitas dukung tiang,
terutama pada selimut tiang bor (penurunan kapasitas yang terjadi pada selimut tiang bor dapat
mencapai 50% dari kapasitas dukung selimut semula).
 Untuk mengungkapkan keutuhan pondasi tiang terbenam dapat dilakukan dengan pile integrity test
(ASTM D-5882), sedangkan untuk kapasitas dukung pondasi tiang dapat dilakukan dengan uji
pembebanan dinamis (ASTM D-4945), oleh penguji bersertifkat dan kompeten dibidangnya.

(------ akhir laporan ------)

30
A.1
Location of Testing Points
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SONDIR
BALAI PELAKSANAAN J ALAN NASIONAL JAWA TI MUR -B ALI TUKAD BINDU 1 : 350

40
.00
BM 1

35
.00
X : 305493.471 BM 2
Y : 9044971.625 X : 305540.528

35
.0
0
Z: 44.491 Y : 9044966.747
43.985

JAL
Z:

AN
SE
TA
JAL

PA
AN

K
SE
TA
35
.0
0

PA
K

TU
KA
DB
ANSELMI

35.00

IND

40
U

.0
0

GANG
40.00

A1 TOKO - TOKO

35
.0
0
P1
A2
titik1

SP. COKROAMIN
O TO
SP. TOHPATI
TROTOAR EXIS
TING
35.0
0
JL.

titik2
GE

RUKO - RUKO 40.00


NET

RUKO
RI

TU
KA
D BIN

JAL
DU

AN
JAL

SE
T
AN

AP
PERTOKOAN
40

SE

AK
.00

35.0
TA

0
PRIMALOKA
PA
K
35
.00
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SONDIR
BALAI PELAKSANAAN J ALAN NASIONAL JAWA TI MUR -B ALI TUKAD AYUNG 1 : 350

BM 1
X : 306216.756
Y : 9044938.527
Z : 31.765
PURA BEJI
RATU
DALEM

TU
KA
D
20.0
0
AY
UN A2 A
G JALAN PUR
titik4
25

P1
.0
0

A1
TANAH
20
.00

30.00
titik3

20.00
25.00

SECANT PILE

20
.0
0

25
.00

30
.00
GUDANG

TU
BM 2

KA
X : 306282.556

D
Y : 9044933.044

AY
Z : 31.763

UN

30.0
G
RUKO

0
25.00
20.00
25.00

20.00
30.00
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SONDIR
BALAI PELAKSANAAN J ALAN NASIONAL JAWA TI MUR -B ALI TUKAD PENATIH 1 : 350

25.00
BM 2
LAHAN X : 306911.816
BM 1
X : 306848.170 Y : 9044999.415

H
Z : 36.956

TI
Y : 9044995.328

NA
Z : 37.178

30.00
00

PE
25.

D
KA
TU
A2
SPBE
P1

A1
titik6

SLRN

TOKO
32.354

JECKY
OAMINOTO WARUNG
35.00

titik5
30.00

0
25.0

GARASI
IH

RUMAH
PENAT

TANAH
25.00

35.00
KOSONG

30.00
TUKAD
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SOIL INVESTIGATION
BALAI PELAKSANAAN J ALAN NASIONAL JAWA TI MUR -B ALI TUKAD BINDU 1 : 350

40
.00
BM 1

35
.00
X : 305493.471 BM 2
Y : 9044971.625 X : 305540.528

35
.0
0
Z: 44.491 Y : 9044966.747
43.985

JAL
Z:

AN
SE
TA
JAL

PA
AN

K
SE
TA
35
.0
0

PA
K

TU
KA
DB
ANSELMI

35.00

IND

40
U

.0
0

GANG
40.00

A1 TOKO - TOKO

35
.0
0
P1
A2

SP. COKROAMIN
O TO
TROTOAR EXIS
TITIK SOIL 2 SP. TOHPATI
TITIK SOIL 1
TING

TITIK SOIL 3
35.0
0
JL.
GE

RUKO - RUKO 40.00


NET

RUKO
RI

TU
KA
D BIN

JAL
DU

AN
JAL

SE
T
AN

AP
PERTOKOAN
40

SE

AK
.00

35.0
TA

0
PRIMALOKA
PA
K
35
.00
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SOIL INVESTIGATION
BALAI PELAKSANAAN J ALAN NASIONAL JAWA TI MUR -B ALI TUKAD AYUNG 1 : 350

BM 1
X : 306216.756
Y : 9044938.527
Z : 31.765
PURA BEJI
RATU
DALEM

TU
KA
D
20.0
0
AY
UN A2 A
G JALAN PUR
25

P1
.0
0

A1
TANAH
20
.00

30.00
TITIK SOIL 6

TITIK SOIL 4

20.00
25.00

TITIK SOIL 5 SECANT PILE

20
.0
0

25
.00

30
.00
GUDANG

TU
BM 2

KA
X : 306282.556

D
Y : 9044933.044

AY
Z : 31.763

UN

30.0
G
RUKO

0
25.00
20.00
25.00

20.00
30.00
SHOP DRAWING
REPUBLIK INDONESIA SATKER PELAKSANAAN -
TITIK RENCANA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT JALAN NASIONAL WILAYAH III
DIREKTORAT JENDERAL BINA MARGA PROVINSI BALI SOIL INVESTIGATION
BALAI PELAKSANAAN JALAN NASIONAL JAWA TI MUR - BALI TUKAD PENATIH 1 : 350

25.00
BM 2
LAHAN X : 306911.816
BM 1
X : 306848.170 Y : 9044999.415

H
Z : 36.956

TI
Y : 9044995.328

NA
Z : 37.178

30.00
00

PE
25.

D
KA
TU
A2
SPBE
P1

A1

TITIK SOIL 9

TITIK SOIL 7 TITIK SOIL 8

SLRN

TOKO
32.354

JECKY
OAMINOTO WARUNG
35.00

30.00

0
25.0

GARASI
IH

RUMAH
PENAT

TANAH
25.00

35.00
KOSONG

30.00
TUKAD
A.2
Ducth Cone Penetrometer Test
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

4
Depth (m)

10

Maximum depth : 3.60 m Project : Jembatan Sounding No : S-1


Ground Surface Level : N/A m Location : Tukad Bindu, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 12, 2021.
Project : Jembatan Depth : 3.60 m
Location : Tukad Bindu, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-1 Operator : Abd.
Date of test : July 12, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 9 12 0.20 4.0 2.2 15.4
0.6 10 15 0.33 10.7 3.3 15.6
0.8 50 60 0.67 24.0 1.3 15.8
1.0 70 80 0.67 37.3 1.0 16.0
1.2 90 100 0.67 50.7 0.7 16.2
1.4 130 140 0.67 64.0 0.5 16.4
1.6 50 60 0.67 77.3 1.3 16.6
1.8 25 35 0.67 90.7 2.7 16.8
2.0 30 40 0.67 104.0 2.2 17.0
2.2 30 35 0.33 110.7 1.1 17.2
2.4 30 40 0.67 124.0 2.2 17.4
2.6 40 50 0.67 137.3 1.7 17.6
2.8 50 60 0.67 150.7 1.3 17.8
3.0 60 80 1.33 177.3 2.2 18.0
3.2 120 130 0.67 190.7 0.6 18.2
3.4 200 220 1.33 217.3 0.7 18.4
3.6 250 18.6
3.8 18.8
4.0 19.0
4.2 19.2
4.4 19.4
4.6 19.6
4.8 19.8
5.0 20.0
5.2 20.2
5.4 20.4
5.6 20.6
5.8 20.8
6.0 21.0
6.2 21.2
6.4 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

4
Depth (m)

10

Maximum depth : 6.40 m Project : Jembatan Sounding No : S-2


Ground Surface Level : N/A m Location : Tukad Bindu, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 12, 2021.
Project : Jembatan Depth : 6.40 m
Location : Tukad Bindu, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-2 Operator : Abd.
Date of test : July 12, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 10 15 0.33 6.7 3.3 15.4
0.6 10 15 0.33 13.3 3.3 15.6
0.8 9 12 0.20 17.3 2.2 15.8
1.0 9 12 0.20 21.3 2.2 16.0
1.2 10 15 0.33 28.0 3.3 16.2
1.4 10 15 0.33 34.7 3.3 16.4
1.6 40 50 0.67 48.0 1.7 16.6
1.8 40 55 1.00 68.0 2.5 16.8
2.0 75 80 0.33 74.7 0.4 17.0
2.2 90 95 0.33 81.3 0.4 17.2
2.4 90 95 0.33 88.0 0.4 17.4
2.6 100 105 0.33 94.7 0.3 17.6
2.8 95 100 0.33 101.3 0.4 17.8
3.0 90 105 1.00 121.3 1.1 18.0
3.2 90 100 0.67 134.7 0.7 18.2
3.4 40 50 0.67 148.0 1.7 18.4
3.6 18 25 0.47 157.3 2.6 18.6
3.8 17 23 0.40 165.3 2.4 18.8
4.0 17 23 0.40 173.3 2.4 19.0
4.2 15 25 0.67 186.7 4.4 19.2
4.4 130 145 1.00 206.7 0.8 19.4
4.6 100 110 0.67 220.0 0.7 19.6
4.8 60 70 0.67 233.3 1.1 19.8
5.0 60 70 0.67 246.7 1.1 20.0
5.2 65 75 0.67 260.0 1.0 20.2
5.4 160 170 0.67 273.3 0.4 20.4
5.6 180 200 1.33 300.0 0.7 20.6
5.8 100 120 1.33 326.7 1.3 20.8
6.0 100 120 1.33 353.3 1.3 21.0
6.2 150 200 3.33 420.0 2.2 21.2
6.4 250 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

2
Depth (m)

Maximum depth : 3.20 m Project : Jembatan Sounding No : S-3


Ground Surface Level : N/A m Location : Tukad Ayung, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 14, 2021.
Project : Jembatan Depth : 3.20 m
Location : Tukad Ayung, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-3 Operator : Abd.
Date of test : July 14, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 20 25 0.33 6.7 1.7 15.4
0.6 17 22 0.33 13.3 2.0 15.6
0.8 17 22 0.33 20.0 2.0 15.8
1.0 15 20 0.33 26.7 2.2 16.0
1.2 15 20 0.33 33.3 2.2 16.2
1.4 14 20 0.40 41.3 2.9 16.4
1.6 14 19 0.33 48.0 2.4 16.6
1.8 20 27 0.47 57.3 2.3 16.8
2.0 22 28 0.40 65.3 1.8 17.0
2.2 25 33 0.53 76.0 2.1 17.2
2.4 25 35 0.67 89.3 2.7 17.4
2.6 80 100 1.33 116.0 1.7 17.6
2.8 150 165 1.00 136.0 0.7 17.8
3.0 180 200 1.33 162.7 0.7 18.0
3.2 250 18.2
3.4 18.4
3.6 18.6
3.8 18.8
4.0 19.0
4.2 19.2
4.4 19.4
4.6 19.6
4.8 19.8
5.0 20.0
5.2 20.2
5.4 20.4
5.6 20.6
5.8 20.8
6.0 21.0
6.2 21.2
6.4 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

2
Depth (m)

Maximum depth : 3.60 m Project : Jembatan Sounding No : S-4


Ground Surface Level : N/A m Location : Tukad Ayung, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 14, 2021.
Project : Jembatan Depth : 3.60 m
Location : Tukad Ayung, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-4 Operator : Abd.
Date of test : July 14, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 25 30 0.33 6.7 1.3 15.4
0.6 25 30 0.33 13.3 1.3 15.6
0.8 35 40 0.33 20.0 1.0 15.8
1.0 55 60 0.33 26.7 0.6 16.0
1.2 60 70 0.67 40.0 1.1 16.2
1.4 80 90 0.67 53.3 0.8 16.4
1.6 120 130 0.67 66.7 0.6 16.6
1.8 115 125 0.67 80.0 0.6 16.8
2.0 90 100 0.67 93.3 0.7 17.0
2.2 120 130 0.67 106.7 0.6 17.2
2.4 125 135 0.67 120.0 0.5 17.4
2.6 150 155 0.33 126.7 0.2 17.6
2.8 100 110 0.67 140.0 0.7 17.8
3.0 40 50 0.67 153.3 1.7 18.0
3.2 40 50 0.67 166.7 1.7 18.2
3.4 180 200 1.33 193.3 0.7 18.4
3.6 250 18.6
3.8 18.8
4.0 19.0
4.2 19.2
4.4 19.4
4.6 19.6
4.8 19.8
5.0 20.0
5.2 20.2
5.4 20.4
5.6 20.6
5.8 20.8
6.0 21.0
6.2 21.2
6.4 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

2
Depth (m)

Maximum depth : 4.20 m Project : Jembatan Sounding No : S-5


Ground Surface Level : N/A m Location : Tukad Penatih, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 13, 2021.
Project : Jembatan Depth : 4.20 m
Location : Tukad Penatih, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-5 Operator : Abd.
Date of test : July 13, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 0.00 0.0 0.0 15.4
0.6 0.00 0.0 0.0 15.6
0.8 25 30 0.33 6.7 1.3 15.8
1.0 15 20 0.33 13.3 2.2 16.0
1.2 15 20 0.33 20.0 2.2 16.2
1.4 8 10 0.13 22.7 1.7 16.4
1.6 8 10 0.13 25.3 1.7 16.6
1.8 9 14 0.33 32.0 3.7 16.8
2.0 10 15 0.33 38.7 3.3 17.0
2.2 15 20 0.33 45.3 2.2 17.2
2.4 20 26 0.40 53.3 2.0 17.4
2.6 70 80 0.67 66.7 1.0 17.6
2.8 80 90 0.67 80.0 0.8 17.8
3.0 130 140 0.67 93.3 0.5 18.0
3.2 50 55 0.33 100.0 0.7 18.2
3.4 45 50 0.33 106.7 0.7 18.4
3.6 30 32 0.13 109.3 0.4 18.6
3.8 19 30 0.73 124.0 3.9 18.8
4.0 140 150 0.67 137.3 0.5 19.0
4.2 250 19.2
4.4 19.4
4.6 19.6
4.8 19.8
5.0 20.0
5.2 20.2
5.4 20.4
5.6 20.6
5.8 20.8
6.0 21.0
6.2 21.2
6.4 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
TESTANA ENGINEERING.
Soil Testings & Research Administration.

DUTCH CONE PENETROMETER TEST (ASTM D-3441)

Local friction, fs (kg/cm²) Cone resistance, qc (kg/cm²) Friction ratio, FR (%)


Total cummulative friction, TCF = x 10 (kg/cm)
-55 -44 -33 -22 1
-1 0 40 80 120 160 200 10
240 -10 8
-8 6
-6 -4
4 -22 0
0

2
Depth (m)

Maximum depth : 3.40 m Project : Jembatan Sounding No : S-6


Ground Surface Level : N/A m Location : Tukad Penatih, Denpasar CPT Master : Abd.
Ground Water Level : Unrecorded Bali Date of test : July 13, 2021.
Project : Jembatan Depth : 3.40 m
Location : Tukad Penatih, Denpasar Ground Surface Level : N/A
Bali Ground Water Level : Unrecorded
Sounding N : S-6 Operator : Abd.
Date of test : July 13, 2021. Checked by : DM

Depth (m) I II fs JHP FR Depth (m) I II fs JHP FR


0.0 15.0
0.2 15.2
0.4 45 50 0.33 6.7 0.7 15.4
0.6 40 50 0.67 20.0 1.7 15.6
0.8 35 40 0.33 26.7 1.0 15.8
1.0 30 35 0.33 33.3 1.1 16.0
1.2 30 35 0.33 40.0 1.1 16.2
1.4 40 45 0.33 46.7 0.8 16.4
1.6 40 40 0.00 46.7 0.0 16.6
1.8 30 35 0.33 53.3 1.1 16.8
2.0 25 30 0.33 60.0 1.3 17.0
2.2 110 120 0.67 73.3 0.6 17.2
2.4 100 110 0.67 86.7 0.7 17.4
2.6 95 105 0.67 100.0 0.7 17.6
2.8 110 120 0.67 113.3 0.6 17.8
3.0 160 180 1.33 140.0 0.8 18.0
3.2 190 210 1.33 166.7 0.7 18.2
3.4 250 18.4
3.6 18.6
3.8 18.8
4.0 19.0
4.2 19.2
4.4 19.4
4.6 19.6
4.8 19.8
5.0 20.0
5.2 20.2
5.4 20.4
5.6 20.6
5.8 20.8
6.0 21.0
6.2 21.2
6.4 21.4
6.6 21.6
6.8 21.8
7.0 22.0
7.2 22.2
7.4 22.4
7.6 22.6
7.8 22.8
8.0 23.0
8.2 23.2
8.4 23.4
8.6 23.6
8.8 23.8
9.0 24.0
9.2 24.2
9.4 24.4
9.6 24.6
9.8 24.8
10.0 25.0
10.2 25.2
10.4 25.4
10.6 25.6
10.8 25.8
11.0 26.0
11.2 26.2
11.4 26.4
11.6 26.6
11.8 26.8
12.0 27.0
12.2 27.2
12.4 27.4
12.6 27.6
12.8 27.8
13.0 28.0
13.2 28.2
13.4 28.4
13.6 28.6
13.8 28.8
14.0 29.0
14.2 29.2
14.4 29.4
14.6 29.6
14.8 29.8

Note : Man 1 = Bacaan Manometer (1). Man 2 = Bacaan Manometer (2)


fs = local friction (kg/cm2). TCF = Total Cummulative Friction (kg/cm). FR = Friction Ratio (%)
A.3
Boring Log
l|p resrANA ENG,NEER,NG. BORING LOG BOREHOLE #: Titik bor-1
PRoJECT : Jembatan Tukad Bindu DATEOFTESTING : June21 to25,2021 GROUND WATER LEVEL :g.fi,m
LOCATTON : Denpasar, Bali. DEPTH OF BORING : 30.0 m GROUND SURFACE LEVEL : N,A
DEPTH, STANDARD ATTEREERG
STRENGTH TEST
m, SOIL DESCRIPTION PENEIRATION TEST LIMITS v Gs eo Sr
010203040 WPE c tc'
0
,4 Asphah (1o cm) coftinued by
1
, basecoarse, limestone and
L 14

Silt and sand, brown, , inorganic, 0.50 2.59 't.01


,v little of clay, ioose to medium dense
UU 18 1.73 88

fr 7
4

5
,V
6 30
tv QT 0. 10 35 1.82 2.64 0.83 88
Sand, brownish grey, fine to coarse
grained, some gravel, little of silt,
,V medium to very dense 14
8
t,
I ll
50
:V
10 ;.
11
,V
Sand, brown, fine to medium 20
12
grained, little of silt,
:, medium dense
13 tl
,IB
V
14
t.
15
,V 36
16
Sand, brown, fine to medium
17 grained, little of silt, dense
rl to very dense 42
18

19
tD 50
v
20
s

21 .l
,V
22

t) Sand, brown, fine to coarse 50


1L grained, little of silt, medium 25
24
to very dense
I

., 50
27

50
V 21
28
Sand, brown, tine to coarse
grained, little of silt, trace of gravel, :

cemented at some depth, very 50


V dense 13
30
End of Boring

= FairJy Undisturbed SamDles (blm /ft)


SPT = Standard penetratiof, test O =Wn Moislure content, Yo
oto10 % = Trae
o/o:
UU = Triaxial, Unconsolidated undEined a =wp Plastic limit, %
10 to 20 Little = Undisturbed Samples CU = T.iilial. Consolidated undEined Liquid limit, %
o/o
20 to 35 = Some v Bulk density, Um s
o/o
= SPT
35 to 50 = And = Cohesion interept, kg/cm2 UCT= Un@nfined @mpression strength, kg/cm, Gs Specific gravity
a = lnternal friction angle, deg QT = Direct shear, quick test. eo Void ratio
lfr resrANA ENGTNEERTNG' BORING LOG BOREHOLE #: Titik bor-2
PROJECT : Jembatan Tukad Bindu DATEOF IESTING : July gto rl, 2021 GROUND WATER LEVEL :4.00 m
LOCATION : Oenpasar, Bali. DEPTHOFBORING: 3O.Om GROUND SURFACE LEVEL :N/A
DEPTH. STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS "T Gs Sr
0 10 20 30 4o frPE ctc' l 20 40 60 80 100

0
1
+-/
V Silt and clay, brown, inorganic, L
2 little of sand, very soft consistency
45

t
'u Sand and silt, brown, 14
4 medium dense

.fr t2
6
b Silt and sand, brown, little of clay,
34
trace of gravel, cemented at some
2 QT 0.20 40 1.90 2.68 0.81 93
7
depth, dense
flt 47
I

I
;.
Sand, brown, fine to medium
,.V grained, some silt, medium dense 28
10_
't
11
'i Sand, brown, little of silt, trace of
7
45
12 gravel, very loose 49
'lt QT 0.18 28 1.68 1.27 a7
'13 {
.V
'14
13

Silt, brown, some sand, cemented 50


u at some depth, very dense lz
16

17
lil
.V 50
o
18_ t

l9* r
u
20- t
Silt and clay. bro$/n, inorganic,
50
tz
little of sand, cemented at some
21
depth, hard consistency rit
V o
22* I

.V 50
* 1 0
I

t7 Silt and sand, brown, cemented at 38


26_ some depth, dense to very dense i

'r
CU
E .E

29* 50
V 18
30
End ot Boring

= Fairly Undisturbed Samples SPT = Standard penet,ation lest (blows / ft) o Moisture @ntent, o/o
oto10 % = TEce L]U = Tnaxial. Unconsolidated und.ained a Plastic limit, %
10to20%= Little = Undisturbed Samples CU d
= Triaxial. Consolidated undrained Liquid limit, o/o
20 to 35 o/o = Some v Bulk density, Ym 3
= SP"r
35to50%= And : Cohesion interept, kg/cm, UCT= Unconfined compression strength, kg/cm' Gs Specific gravity
I = lntemal friction angle, deg QT = Direct shear. quicl test m Void ratio
Sr
tF t=.rANA ENG'NEER,NG. BORING LOG BOREHOLE #: Titik bor-3
PROJECT : Jembatan Tukad Bindu DATE OF TESTING : June 17 lo 21, 2021 GROUND WATER LEVEL :9,(x, m
LOCATION : Denpasar, Bali. DEPTH OF BORING : 30.0 m GROUND SURFACE LEVEL : t{rA
DEPTH, STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS ^,1 Gs eo Sr
0 10 20 30 40 TYPE c tc' I 20 40 60 80 100

0
//t, Asphalt (t7 cm) continued by
1 basecoarse, Iimestone and
i
23
2 l4
--l ,Z
QT 0.15 29 1.75 2.64 1.01
'l
3

I
,IL - 7
42
--.,]
.,] .t/ QT 0.18 26 1.70 2.65 1.15
5
: ,y Sand, brown, fine to coarse
grained, little of silt, trace of gravel,
3
loose to medium dense
7 :-
'v I
I
j
9

:V Sand and silt, brown, very loose 1


10
( Silt and clay, some sand
11

1V Sand, brown, some gravel, little of I


12 silt loose
'13
*- Silt and clay, brown, inorganic,
-V 5
14 *_ little of sand, medium consistency
x
15
.v 36
16

17
5S
,Z Sand, broownish grey, fine to 14
18 medium grained, little of silt, trace
of gravel, dense to very dense
19
:Z 44
20

21
,1,
Sand, brown, fine to medium 1B
grained, little of silt, medium dense

Silt and clay, brown, inorganic,


cemented at some depth, stiff 12
24_ 4 mnsislencv
J
50
.V
26_ ( I
14

27_ (- Silt and clay, brown, inorganic,


:V cemented at some depth, 50
'13
28_ a l;ttle of sand, hard consistency

29_

30_
9 10
End of Boring

= Faidy Undisturbed Samples SPT = Standard penetration tesl (blows / ft) o = Moisture @ntent, o/o
0to10 % = Tra@ UU = Triaxial, Un@nsolidated undEined a = Plastic limit, o/o
'10 to0/6
20 = Litue = Undisturbed Samples CU = Tridial. Consolidated undmined A = Liquid limit. %
20 to 35 % = Some v = Bulk density. Ym !
= SPT
35 to 50 o/o
= And = Cohesion intercept, kg/m' UCT= Un@nfined compression strength, kg/m'? US = Specific gravity
a = Intemal friction angle. deg QT = Direcl shear, quick test. eo = Void rat'o
ok
a-
lG= TESTANA ENGINEERING. BORING LOG BOREHOLE #: Titik bor-4
PROJECT ; Jembatan Tukad Ayung. DATE OFTESTING : June 20 to 25, ?O?1 GROUND WATER LEVEL : 9.00 m

LOCATTON: Denpasar, Bali, DEPTH OF BORING : 33.5 m GROUND SURFACE LEVEL :N/A
fi. STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS v Gs eo Sr
110203040 TYPE c/c 0/0 0 20 40 60 80 100
0 Asphalt continued by limestone, :s
1 whila
*V I
2
tfi QT 0.'13 30 1.75 2.57 0.94 88
3 a Silt and sand, greyish brown, little
.V of clay, trace of gravel, loose to 11
4 * medium dense
(
5

-Y 4
Silt and sand, brown, little of clay,
6
2 little of gravel, very loose 2.60
UU 0.30 8 1.66 1.19 87
7 I
,T Silt and clay, brown, inorganic, 39
I some sand, cemented at some
depth, hard consistency
I
,IL
19
10
Sand and gravel, brown, trace of
silt, medium to very dense
11
'- '13
12
( I

-1,
14
( I
5
'15

16_.
x Silt and clay, brown, inorganic,
50
13
some sand, cemented at some
{ depth, containing cobble (012 cm)
17
<V in 18.6 cm depth and boulder (O 5A
16 - 30 cm) between 15.1 and 11

_1 16.5 m depth, hard consistency


(
50
-v 11
,(

21
_(
-V 5
22
'r ill
50
24 <-
V
Silt and clay, brown, inorganic,
I
r some sand, cemented at some ill
depth, hard consistency 50
26
& 12
* lii
27 : 50
iV 14

ltl
l1i
',V Sand, brown, fine to medium
30 I
grained, some silt, lii
31
rq
*.1
medium to very dense lll
50,
,V 6
6.
llr
,V 50
14
End of Boring

= Fairly Undisturbed Samples SPT = Standard penet.ation test (blws / ft) o Moisture @ntent, Yo
oto 10 o/o
= Trace UU= Triaxial, Un@nsolidated undrained a Plastic limit, %
10 to 20 7o : Little = Undistlrbed Samples Triaxial. Consolidated undrained A Liquid limit, %
20 to 35 9o : Some Bulk density, Vm r
= SPT
35 to 50 7o = And = Cohesioo interept, kg/m'l UCT = Unconfined @mpression strength, kg/m': Gs Specific gravity
q = lntemal rriction angle, deg QT = Directshear,quicktest. eo Void ratio
lfr rcsrANA ENGTNEERTNG. BORING LOG BOREHOLE #: Titik bor-S
PROJECT : Jembatan Tukad Ayung, DATEOF TESIING I July zto 6, 2021 GROUND WATER LEVEL :4.00 m
LOCATION : Denpasaa, Bali. DEPTHOFBORTNG: 4O.0m GROUND SURFACE LEVEL : N/A
DEPTH, STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS v Gs eo Sr
l 10 20 30 4A TYPE 0 20 40 60 80 100
0
1

l, Silt and clay, brown, inorganic. little


2 of sand, medium consistency

3
50
.V
19
4

i
Sand, grey, fine to medium grained, 50
little of silt, cemented at some 14
6_
depth, very dense
7- :7 50
11
B

50
,V '13
10_
Sand, grey, fine to medium grained,
11 _ some silt, very dense 50
,V 14
12_ 23
7 UU 0.17 46 't.99 2.70 0.66 91
13_ 50
12
14_ ,4

15 .,n lt
50
6
16_

17_ 50
,V Sand, brown, little of silt, trace of
gravel, cemented at some depth, 12
'18
_ very dense
21
't/ QT 0.12 47 2.00 2.67 0.62 91
1S t.q 50
12

21 _ t- 50
V
21

t/
25
24_
l

,17 50
26_
L I
27*
'n
.v- 47
Sand, brownish grey, fine to coarse
28_ grained, little of silt, dense to very
dense
,V 50
25
30_

31 _ t7 5A
12

,V 50
Sand, brown, fine to medium 12
34_ grained, little of silt, cemented at
l
some depth, very dense
50
'V I
36_ Sand, browny, fine to medium
grained, little of silt, very dense
50
.V 13
38_
Sand, grey, fine to medium grained,
39
,/ some silt, cemented at some depth,
very dense
50
i 30
40
End o, Boring
NOTE T = Fairly Undisturbed Samples SPT = Standard penetration test (bloffi / n) Moisture @ntent, olo
0to10 o/o
= Trace Uu = Triaxial, Un@nsolidated undrained a =wp Plastic limit. Yo
10 to 20 o/o
= Liftle Z = Undisturbed Samples CU = Tridial. Consolidated undrained Liquid limit, 7o
20 to 35 9o = Some Vane shear test 'l Bulk density, t/m 3
35 to 50 o/o
= And 4 = Cohesion inter@pt, kg/m' UCT= Unconfined @mpression st.ength, kglc.rf GS Speciflc gravity
a = lntemal friction angle, deg QT = Direct shear, quick test. eo Void ratio
Sr SatuBlion. o/o
a-
l?= :
TESTANA ENGINEERING. BORING LOG
:
BOREHOLE #: Titik bor-6
PROJECT Jembatan Tukad Ayung. DATEOFTESTING June27to30, 2021 GROUNDWATER LEVEL :9,0O m
LOCATIoN i Oenpasar, Bali. DEPTHOFBORING: 30.0m GROUND SURFAGE LEVEL :t{rA
DEPTH, STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS v Gs eo
310203040 ilPE c/c' 0 20 40 60 80 100
0 :50
Concrete slab (1ocm) continued by
1
limestone, white, medium dense
22
2- /

,V 6
4_

.V 5
6_ I Silt and sand, brown, Iittle of clay,
.I trace ofgravel, very loose to loose UU 0.40 7 1.69 2.62 1 .14 87
7 L
V 4
8_ t
rf,
E
10
a
7,
3

11
50
,V Sand, grey, fine to coarse grained, 23
12) little of silt, trace of gravel, very
QT 0.10 46 '1.98 2.68 0.65
,u dense
91
13
--.1 50
.l V 13
te-.1 I

',a-J Sand and silt, brown, cemented at


,V some depth, very dense 8
16
--.1

..
18J
v 11
I

I
1sJ ,V 50
20-.:]
7

21
,V 50
Sand, brown, fine to coarse 10
22) ,. grained, some silt, cemented at
some depth, very dense lii
50
24
:Z 10
i

l
{l
.V 50
11
26

27
.v 50
10
28

29
Sand, brown, fine to medium
grained, little of silt, cemented at !
50
V some depth, very dense
13
30_
End of Boring

= Fairly Undisturbed Samdes SPT. Slandard penetration test (blows / ft) = Moisture @ntent, o/o
oto 10 o/o
= Trace UU = T.iaxial, Unconsolidated undrained a =wp = Plastic limii. o/o
10to20%= Little V = Undisturbed Samples CU = Triaial. Consolidated und€ined = Liquid limit, o/o
l-7 Bulk density, Ym'
20 to 35 Yo = Some
v_t = SPT
Van€ = Vane sheartest ^l =
35to50%= And c = Cohesion inter@pt, kglm, UCT = Un@nfined @mpression strength, kg/w'z = Specificgravity
a = lntemal friction angle, deg QT = Direct shear, quick test. eo = Void ratio
a-
l.G= TESTANA ENGINEERING. BORING LOG BOREHOLE #: Titik bor-7
PRoJECT r Jembatan Tukad Penatih. DATEOFTESTING : June26to30, 2021 GROUND WATER LEVEL :9.ff1m
LOCATION : Denpasar, Ball. DEPTHOFBORING: 3O.Orn GROUND SURFACE LEVEL : N/A
n, STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPNON PENETRATION TEST LIMITS ^/ Gs eo Sr
l 1C 20 30 40 rYPE s/0 0 20 40 60 80 100

0 :50
1
,4 Concrete slab (10 cm) following by
limestone, white
7
2
{ 12
,V UU 0.35 20 1.70 2.58 1.06 a7
I
3
'v Silt and sand, brown, little of day,
trace of gravel, loose 5
4

5
,y 12
6 Sand, grey, fine to coarse grained,
,v some gravel, little of silt, medium QT 0.13 JT 1.93 t_tt 0.78 91
7 dense
30
I a.
"v
9 9t
10
fr
t(-
o

Silt and clay, brown, inorganic,


11 ( little of sand, stiff consistency
.V 14
12 *
l
*
13

,V 29
14

'v 50
25
16

17 Sand, brown, fine to coarse


l7 49
L grained, some gravel, little of silt,
18 dense to very dense
19
n
V
50
12

21
50
V 15
22

50
V 5
24

25
o 50
L Sand, grey, fine to coarse grained, 7
some gravel, little of silt, cemented
at some depth, very dense
27
50
v 5

29
50
,V 13
End of Boring

\OTE: SPT = Standard penetration test (blows / ft) o lvloisture @otent, %


0to10 % = Trae UU = Triaxial. Un@nsolidated undrained a Plastic limit, 7o
10 to 20 % = Litue = Undisturbed Samples CU = Triaxial. Consolidated undBined A Liquid limit, o/o
20 to 35 % = Some SPT Ven€ : Vene shear lest v Bulk density, Vm 3
35 to 50 o/o = And a == Cohesion interept, kg/cm'z UCT= Un@nfined compression stength. kg/ffi' Gs Specific gEvity
{p . lntemal friction angle, deg QT = Direct shear, quick test. eo Void ratio
@ resrANA ENGTNEERTNG' BORING LOG BOREHOLE #: Titik bor{
PROJECT I Jembatan Tukad Penatih. DATEOFTESTING : July6to'll, 2021 GROUND WATER LEVEL :4-0O m
LOCATIOI : Denpasar, Ball. DEPTH OF BORING i 30.0 m GROUND SURFACE LEVEL : N,A
DEPTH, STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS v Gs eo Sr
0 10 20 30 40 TYPE C IC' c 20 40 60 80 100

0
1*
* Silt and clay, brown, inorganic,
"v little of sand, stiff consistency
12
Silt and clay, brown, little of sand,
( aFmFnled ai some rlenth

'.v 45
4
f
5
.: Sand, brownish grey, tine to
.V medium grained, little of silt, 50
cemented at some depth, 20
6 dense to very dense
:ll UCT 3.39 2.20 2.82 0.49 93
7
5S
v 28
a
9
5g
v Silt and clay, brown, inorganic, o
10_ little of sand, cemented at some
depth, hard consistency
11_ I
50
\7
13
,'7
OT 0. 16 45 2.00 2.62 0.57 92
50
.V 7
14_
:,
Sand, brown, fine to @arse
15_
grained, littleof silt, very dense 50
:V
7
16_
.:
17-
50
:V 13
'18
_
Sand, brown, fine to medium
grained, little of silt, cemented at 50
:V some depth, very dense 14
20_

21 _ 50
v
12

Sand and silt, brown, cemented at 50


,Z )n
24_ some depth, very dense

V
10

27_ Sand, brown, some silt,


v medilrm dense 't6
28_
Sand, brown, fine to medium
29* '17 grained, little of silt, cemented at
tv- some depth, very dense
30_ 23
End of Boring

= Fairty Undisturbed Samples SPT = Standard penetration test (blws / tt) o = Wn = Moisture @ntent, o/o

0to10 % = Trace UU = Triaxial, Un@nsolidated undrained a


10 to 20 o/o = Little = Undisturbed Samples CU = Triilial. Consolidated undrained A = Liquid limit. %
20 to 35 % = Some v = Bulk density, Ym I
= SPT
35to50%= And = Cohesion inter@pt, kg/m2 UCT= Un@nfined @mpression strength, kg/crf = Specific gEvity
a = lntemal friclion angle, deg OI = Direct shear, quick test. eo = Void ratio
%
1-

I:G= TESTANA ENGINEERING. BORING LOG BOREHOLE #: Titik bor-9


PRoJECT : Jembatan Tukad Penatih. DATEOFTESING : July.l to4 2021 GROUND WATER LEVEL :9.00
LOCATON : Denpasac Bali. DEPTHOFBORING; 3O.Om GROUND SURFACE LEVEL ; N/A
DEPTH. STANDARD ATTERBERG
STRENGTH TEST
m, SOIL DESCRIPTION PENETRATION TEST LIMITS T Gs eo Sr
010 20 30 40 frPE 3 20 40 60 80 100
0
1 fi Asphalt, limetone following by
concrete slab with 15 cm thickness
2
E 12

It
3
V 7
4

V 4
Silt and clay, brown, Inorganic,
6
little of sand, trace of gravel,
7
,l soft to stiff consistency
UU 0.25 s 1.63 2.59 1.26 87

V 3
x
B
r
I \-
fr J
10 x
11
13
12 Y Silt and clay, brown, inorganic, 3i
some sand, stiff consistency UU 0.75 I 1.79 2.55 0.85 90
'13
^[
.V 1 7
14

15
ll
Sand, greyish brown, line
.u to medium grained, Iittle of silt,
50
16
28
cemented at some depth,
17
very dense tll
.n
14
18
I Sand, brown, fine to medium :

19
t - grained, little of silt, very dense 50
5
20

21
Sand, greyish brown, fine
,t7 to medium grained, little of silt, 50
,V- very dense B

tI 50
24
Sand, greyish brown, fine 7
to medium grained, some silt, I
very dense
,v 50
6
26 *
<t
27
a) 50
IL Silt, brovyn, some sand, cemented 10
28 at some depth, Yery dense
'x
.V 50
L 12
30
End of Boring

NOTE:
= TEe
0 to 10 o/o
I = Faitly Undisturbed Samples SPT = Standard penetration test (blows / ft)
UU = Triaxial, Unconsglidated undrained a =wp = Moisture @ntenl, o/o
= Plastic limit, %
10 to 20 %
= UtUe Z
f,
= Undisturbed Samples CU = Triaxial Consolidated undrained = Liquid limit, %
20to35Yo. Some n = SPT
Van€= Vanesheartest v = Bulk density, f/m I
35 to 50 o/o
= And = Cohesion interept, kg/m'. strength, kg/cm'? GS . Specific gravity
e = lntemai triction angle, deg QT = Direcl eo = Void ratio
Sr %
A.4
Soil Profile
TESTANA ENGINEERING.
Soil Testings & Research Administration

SECTION-1, CROSS SECTIONAL SOIL PROFILE THROUGH DB-1, DB-2 and DB-3
TESTANA ENGINEERING.
Soil Testings & Research Administration

SECTION-2, CROSS SECTIONAL SOIL PROFILE THROUGH DB-4, DB-5 and DB-6
TESTANA ENGINEERING.
Soil Testings & Research Administration

SECTION-3, CROSS SECTIONAL SOIL PROFILE THROUGH DB-7, DB-8 and DB-9
A.5
Summary of Laboratory Test Results
TESTANA ENGINEERING.
Soil Testings & Research Administration.

Summary of Laboratory Test Results

Grainsize Analysis Index Properties Engineering Properties


m G S M&L gt Sr LL Wn PL c f Eu E50 Eoed Pc'
Gs e0 IL C Cs OCR l k

USCS Classification
2 c

Type of Strength Test


% % % t/m3 % % % % kg/cm2 º kg/cm2 kg/cm2 kg/cm kg/cm2
Borehole ID

Soil Type

Over Consolidation
Oedometer Moduli

compression index
Undrained Moduli

Modified swelling
Preconsolidation
Spesific Gravity

Liquidity Index

Swelling Index
Friction Angle
Water Content

Secant Moduli

Compression
Plastic Limit
Liquid Limit

(total stress)

(total stress)
Unit weight
Silt & Clay

Void Ratio

Saturation

Cohesion

Modified
Pressure
Gravel
Depth

Index

index
Ratio
Sand

(Lokasi : Jembatan Tukad Bindu, Denpasar, Bali)


-1- 2.0 - 2.5 Silt and sand, brown 2.03 43.79 54.18 ML 1.73 2.59 1.01 88 46 34 29 0.29 UU 0.50 18 120 60 45 0.26 0.01 2.40 6.94 0.094 0.005
6.0 - 6.5 Sand, brownish grey 2.59 79.54 17.87 SM 1.82 2.60 0.83 88 30 28 24 0.67 QT 0.10 35 - - - - - - - - -
-2- 6.0 - 6.5 Silt and sand, brown 0.11 47.59 52.30 ML 1.90 2.68 0.81 93 34 28 25 0.33 QT 0.20 40 - - 55 0.27 0.02 2.40 2.55 0.097 0.008
12.0 - 12.5 Sand, little silt, brown 12.47 60.25 27.28 SM 1.68 2.70 1.27 87 49 41 34 0.47 QT 0.18 28 - - - - - - - - -
-3- 2.0 - 2.5 Sand, little silt, brown 7.11 82.54 10.35 SW-SM 1.75 2.64 1.01 87 - 33 - - QT 0.15 29 - - - - - - - - -
4.0 - 4.5 Sand, little silt, brown 2.63 70.33 27.04 SM 1.70 2.65 1.15 87 42 38 27 0.73 QT 0.18 26 - - - - - - - - -

(Lokasi : Jembatan Tukad Ayung, Denpasar, Bali)


-4- 2.0 - 2.5 Silt and sand, grey-brown 1.29 49.67 49.04 ML 1.75 2.57 0.94 88 40 32 28 0.33 QT 0.13 30 - - 110 0.25 0.03 1.70 4.86 0.061 0.005
6.0 - 6.5 Silt and sand, brown 14.63 41.76 43.61 ML 1.66 2.60 1.19 87 44 40 28 0.75 UU 0.30 8 100 40 65 0.25 0.03 1.70 1.68 0.104 0.013
-5- 12.0 - 12.5 Sand, little silt, grey 3.01 80.26 16.73 SM 1.99 2.70 0.66 91 23 22 17 0.83 UU 0.17 46 - - - - - - - - -
18.0 - 18.5 Sand, little silt, brown 1.61 90.17 8.22 SP-SM 2.00 2.67 0.62 91 - 21 - - QT 0.12 47 - - - - - - - - -
-6- 6.0 - 6.5 Silt and sand, brown 2.65 50.78 46.57 ML 1.69 2.62 1.14 87 41 38 27 0.79 UU 0.40 7 85 40 100 0.18 0.01 1.40 1.38 0.065 0.005
12.0 - 12.5 Sand, little silt, grey 3.40 82.07 14.53 SM 1.98 2.68 0.65 91 26 22 20 0.33 QT 0.10 46 - - - - - - - - -

(Lokasi : Jembatan Tukad Penatih, Denpasar, Bali)


-7- 2.0 - 2.5 Silt and clay, brown 0.99 39.19 59.82 ML 1.70 2.58 1.06 87 42 36 30 0.50 UU 0.35 20 80 30 80 0.19 0.01 1.90 5.59 0.068 0.005
6.0 - 6.5 Sand, little silt, grey 5.68 82.90 11.42 SP-SM 1.93 2.72 0.78 91 - 26 - - QT 0.13 37 - - - - - - - - -
-8- 6.0 - 6.5 Sand, brownish grey 2.00 91.29 6.71 SP-SM 2.20 2.82 0.49 93 - 16 - - UCT 3.39 - 210 240 - - - - - - -
12.0 - 12.5 Sand, little silt, brown 0.15 81.46 18.39 SM 2.00 2.62 0.57 92 23 20 18 0.40 QT 0.16 45 - - - - - - - - -
-9- 6.0 - 6.5 Silt and clay, brown 0.00 30.08 69.92 ML 1.63 2.59 1.26 87 45 42 31 0.79 UU 0.25 9 55 25 45 0.23 0.01 1.05 1.07 0.068 0.006
12.0 - 12.5 Silt and clay, brown 0.00 17.03 82.97 ML 1.79 2.55 0.85 90 36 30 27 0.33 UU 0.75 9 300 180 100 0.13 0.01 2.00 1.14 0.070 0.005
A.6
Grainsize Distribution
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-1/ 2.0-2.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 53.41 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 51.22 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 46.84 9.200 0.0124 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 42.47 4.950 0.0124 0.028 40
4 4.750 6.08 2.03 2.03 97.97 3 34 34.8 10.5 35 38.09 3.500 0.0124 0.023
20
8 2.360 29.52 9.84 11.87 88.13 4 30 30.8 11.2 31 33.71 2.800 0.0124 0.021
16 1.180 20.55 6.85 18.72 81.28 8 26 26.8 11.9 27 29.33 1.488 0.0124 0.015
0
30 0.600 24.90 8.30 27.02 72.98 16 22 22.8 12.5 23 24.95 0.781 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 18.46 6.15 33.17 66.83 30 18 18.8 13.2 19 20.58 0.440 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 32.90 10.97 44.14 55.86 60 15 15.8 13.7 16 17.29 0.228 0.0124 0.006
200 0.075 5.04 1.68 45.82 54.18 120 13 13.8 14 14 15.10 0.117 0.0124 0.004
Visuil description : Silt and sand (ML), brown, some clay, trace of gravel
TOTAL 137.45 45.82 - - 24 hrs 10 10.8 14.5 11 11.82 0.010 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-1/ 6.0-6.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 47.8 8.3 49 17.39 33.200 0.01256 0.072 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 45.8 8.6 47 16.66 17.200 0.01256 0.052

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 41.8 9.2 43 15.21 9.200 0.01256 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 37.8 9.9 39 13.75 4.950 0.01256 0.028 40
4 4.750 7.76 2.59 2.59 97.41 3 34 33.8 10.5 35 12.30 3.500 0.01256 0.023
8 2.360 49.42 16.47 19.06 80.94 4 30 29.8 11.2 31 10.84 2.800 0.01256 0.021 20
16 1.180 32.67 10.89 29.95 70.05 8 26 25.8 11.9 27 9.39 1.488 0.01256 0.015
0
30 0.600 56.38 18.79 48.74 51.26 16 22 21.8 12.5 23 7.93 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 39.24 13.08 61.82 38.18 30 18 17.8 13.2 19 6.48 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 54.62 18.21 80.03 19.97 60 14 13.8 13.8 15 5.02 0.230 0.01256 0.006
200 0.075 6.30 2.10 82.13 17.87 120 10 9.8 14.5 11 3.57 0.121 0.01256 0.004
Visuil description : Sand (SM), brownish grey, little of silt, trace of gravel
TOTAL 246.39 82.13 - - 24 hrs 8 7.8 14.8 9 2.84 0.010 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-2/ 6.0-6.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 49 48.8 8.1 50 51.55 32.400 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 47 46.8 8.4 48 49.44 16.800 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 43 42.8 9.1 44 45.21 9.100 0.0124 0.037
3/8 9.500 0.00 0.00 0.00 100.00 2 39 38.8 9.7 40 40.99 4.850 0.0124 0.027 40
4 4.750 0.32 0.11 0.11 99.89 3 35 34.8 10.4 36 36.76 3.467 0.0124 0.023
20
8 2.360 9.80 3.27 3.37 96.63 4 31 30.8 11.1 32 32.54 2.775 0.0124 0.021
16 1.180 13.12 4.37 7.75 92.25 8 27 26.8 11.7 28 28.31 1.463 0.0124 0.015
0
30 0.600 23.07 7.69 15.44 84.56 16 23 22.8 12.4 24 24.09 0.775 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 30.68 10.23 25.66 74.34 30 19 18.8 13 20 19.86 0.433 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 57.95 19.32 44.98 55.02 60 15 14.8 13.7 16 15.63 0.228 0.0124 0.006
200 0.075 8.17 2.72 47.70 52.30 120 11 10.8 14.3 12 11.41 0.119 0.0124 0.004
Visuil description : Silt and sand (ML), brown, little of clay, trace of gravel
TOTAL 143.11 47.70 - - 24 hrs 5 4.8 15.3 6 5.07 0.011 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-2/ 12.0-12.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 27.11 33.200 0.01256 0.072 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 26.00 17.200 0.01256 0.052

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 23.77 9.200 0.01256 0.038
3/8 9.500 13.30 4.43 4.43 95.57 2 38 38.8 9.9 39 21.55 4.950 0.01256 0.028 40
4 4.750 24.11 8.04 12.47 87.53 3 34 34.8 10.5 35 19.33 3.500 0.01256 0.023
8 2.360 51.86 17.29 29.76 70.24 4 30 30.8 11.2 31 17.11 2.800 0.01256 0.021 20
16 1.180 35.40 11.80 41.56 58.44 8 26 26.8 11.9 27 14.89 1.488 0.01256 0.015
0
30 0.600 41.13 13.71 55.27 44.73 16 22 22.8 12.5 23 12.67 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 22.56 7.52 62.79 37.21 30 18 18.8 13.2 19 10.44 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 25.34 8.45 71.23 28.77 60 14 14.8 13.8 15 8.22 0.230 0.01256 0.006
200 0.075 4.45 1.48 72.72 27.28 120 10 10.8 14.5 11 6.00 0.121 0.01256 0.004
Visuil description : Sand (SM), brown, little of silt, trace of gravel
TOTAL 218.15 72.72 - - 24 hrs 2 2.8 15.8 3 1.56 0.011 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-3/ 2.0-2.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R) D60 = 1.20
80 D30 = 0.50
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 50 48.8 7.9 51 10.20 31.600 0.0124 0.070 D10 = 0.15

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 48 46.8 8.3 49 9.78 16.600 0.0124 0.051 60 Cu = 8.00
3/4 19.000 0.00 0.00 0.00 100.00 1 44 42.8 8.9 45 8.95 8.900 0.0124 0.037
3/8 9.500 5.00 1.67 1.67 98.33 2 40 38.8 9.6 41 8.11 4.800 0.0124 0.027 40
4 4.750 16.33 5.44 7.11 92.89 3 36 34.8 10.2 -No 37
Test - 7.28 3.400 0.0124 0.023
20
8 2.360 55.42 18.47 25.58 74.42 4 32 30.8 10.9 33 6.44 2.725 0.0124 0.020
16 1.180 40.78 13.59 39.18 60.82 8 28 26.8 11.5 29 5.60 1.438 0.0124 0.015
0
30 0.600 69.64 23.21 62.39 37.61 16 24 22.8 12.2 25 4.77 0.763 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 46.20 15.40 77.79 22.21 30 20 18.8 12.9 21 3.93 0.430 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 32.40 10.80 88.59 11.41 60 18 16.8 13.2 19 3.51 0.220 0.0124 0.006
200 0.075 3.18 1.06 89.65 10.35 120 16 14.8 13.5 17 3.09 0.113 0.0124 0.004
Visuil description : Sand (SW-SM), brown, little of silt, trace of gravel
TOTAL 268.95 89.65 - - 24 hrs 13 11.8 14 14 2.47 0.010 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-3/ 4.0-4.5 m
Location : Tukad Bindu, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 50 48.8 7.9 51 26.87 31.600 0.01256 0.071 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 48 46.8 8.3 49 25.77 16.600 0.01256 0.051

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 44 42.8 8.9 45 23.57 8.900 0.01256 0.037
3/8 9.500 0.00 0.00 0.00 100.00 2 40 38.8 9.6 41 21.36 4.800 0.01256 0.028 40
4 4.750 7.90 2.63 2.63 97.37 3 36 34.8 10.2 37 19.16 3.400 0.01256 0.023
8 2.360 39.37 13.12 15.76 84.24 4 32 30.8 10.9 33 16.96 2.725 0.01256 0.021 20
16 1.180 33.92 11.31 27.06 72.94 8 28 26.8 11.5 29 14.76 1.438 0.01256 0.015
0
30 0.600 56.93 18.98 46.04 53.96 16 24 22.8 12.2 25 12.55 0.763 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 38.90 12.97 59.01 40.99 30 20 18.8 12.9 21 10.35 0.430 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 36.87 12.29 71.30 28.70 60 16 14.8 13.5 17 8.15 0.225 0.01256 0.006
200 0.075 4.98 1.66 72.96 27.04 120 12 10.8 14.2 13 5.95 0.118 0.01256 0.004
Visuil description : Sand (SM), brown, little of silt, trace of gravel
TOTAL 218.87 72.96 - - 24 hrs 7 5.8 15 8 3.19 0.010 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-4/ 2.0-2.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 48.34 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 46.36 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 42.40 9.200 0.0124 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 38.44 4.950 0.0124 0.028 40
4 4.750 3.88 1.29 1.29 98.71 3 34 34.8 10.5 35 34.48 3.500 0.0124 0.023
20
8 2.360 24.32 8.11 9.40 90.60 4 30 30.8 11.2 31 30.51 2.800 0.0124 0.021
16 1.180 17.25 5.75 15.15 84.85 8 26 26.8 11.9 27 26.55 1.488 0.0124 0.015
0
30 0.600 29.58 9.86 25.01 74.99 16 22 22.8 12.5 23 22.59 0.781 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 22.71 7.57 32.58 67.42 30 18 18.8 13.2 19 18.62 0.440 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 45.50 15.17 47.75 52.25 60 14 14.8 13.8 15 14.66 0.230 0.0124 0.006
200 0.075 9.63 3.21 50.96 49.04 120 10 10.8 14.5 11 10.70 0.121 0.0124 0.004
Visuil description : Silt and sand (ML), greyish brown, little of clay, trace of gravel
TOTAL 152.87 50.96 - - 24 hrs 5 5.8 15.3 6 5.75 0.011 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-4/ 6.0-6.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 43.33 33.200 0.01256 0.072 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 47 47.8 8.4 48 42.44 16.800 0.01256 0.051

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 45 45.8 8.8 46 40.67 8.800 0.01256 0.037
3/8 9.500 18.16 6.05 6.05 93.95 2 43 43.8 9.1 44 38.89 4.550 0.01256 0.027 40
4 4.750 25.72 8.57 14.63 85.37 3 41 41.8 9.4 42 37.12 3.133 0.01256 0.022
8 2.360 60.57 20.19 34.82 65.18 4 39 39.8 9.7 40 35.34 2.425 0.01256 0.020 20
16 1.180 25.97 8.66 43.47 56.53 8 37 37.8 10.1 38 33.57 1.263 0.01256 0.014
0
30 0.600 15.58 5.19 48.67 51.33 16 35 35.8 10.4 36 31.79 0.650 0.01256 0.010 0.001 0.01 0.1 1 10 100
40 0.425 8.00 2.67 51.33 48.67 30 33 33.8 10.7 34 30.01 0.357 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 11.46 3.82 55.15 44.85 60 31 31.8 11.1 32 28.24 0.185 0.01256 0.005
200 0.075 3.70 1.23 56.39 43.61 120 29 29.8 11.4 30 26.46 0.095 0.01256 0.004
Visuil description : Silt and sand (ML), brown, little of clay, little of gravel
TOTAL 169.16 56.39 - - 24 hrs 23 23.8 12.4 24 21.13 0.009 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-5/ 12.0-12.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 47.8 8.3 49 16.15 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 45.8 8.6 47 15.48 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 41.8 9.2 43 14.13 9.200 0.0124 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 37.8 9.9 39 12.77 4.950 0.0124 0.028 40
4 4.750 9.04 3.01 3.01 96.99 3 34 33.8 10.5 35 11.42 3.500 0.0124 0.023
20
8 2.360 60.22 20.07 23.09 76.91 4 30 29.8 11.2 31 10.07 2.800 0.0124 0.021
16 1.180 38.58 12.86 35.95 64.05 8 26 25.8 11.9 27 8.72 1.488 0.0124 0.015
0
30 0.600 54.63 18.21 54.16 45.84 16 22 21.8 12.5 23 7.37 0.781 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 34.60 11.53 65.69 34.31 30 18 17.8 13.2 19 6.02 0.440 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 45.02 15.01 80.70 19.30 60 14 13.8 13.8 15 4.66 0.230 0.0124 0.006
200 0.075 7.72 2.57 83.27 16.73 120 11 10.8 14.3 12 3.65 0.119 0.0124 0.004
Visuil description : Sand (SM), grey, little of silt, trace of gravel
TOTAL 249.81 83.27 - - 24 hrs 9 8.8 14.7 10 2.97 0.010 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-5/ 18.0-18.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
D60 = 1.80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 8.17 33.200 0.01256 0.072 80
D30 = 0.60
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 7.84 17.200 0.01256 0.052 D10 = 0.18

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 7.17 9.200 0.01256 0.038 Cu = 10.0
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 6.50 4.950 0.01256 0.028 40 Cs = 1.11
4 4.750 4.82 1.61 1.61 98.39 3 34 34.8 10.5 35 5.83 3.500 0.01256 0.023
8 2.360 85.05 28.35 29.96 70.04 4 30 30.8 11.2
-No
31
Test - 5.16 2.800 0.01256 0.021 20
16 1.180 60.95 20.32 50.27 49.73 8 26 26.8 11.9 27 4.49 1.488 0.01256 0.015
0
30 0.600 66.64 22.21 72.49 27.51 16 22 22.8 12.5 23 3.82 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 34.38 11.46 83.95 16.05 30 18 18.8 13.2 19 3.15 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 19.96 6.65 90.60 9.40 60 14 14.8 13.8 15 2.48 0.230 0.01256 0.006
200 0.075 3.53 1.18 91.78 8.22 120 10 10.8 14.5 11 1.81 0.121 0.01256 0.004
Visuil description : Sand (SW-SM), brown, little of silt, trace of gravel
TOTAL 275.33 91.78 - - 24 hrs 8 8.8 14.8 9 1.47 0.010 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-6/ 6.0-6.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 45.91 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 44.03 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 40.26 9.200 0.0124 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 36.50 4.950 0.0124 0.028 40
4 4.750 7.94 2.65 2.65 97.35 3 34 34.8 10.5 35 32.74 3.500 0.0124 0.023
20
8 2.360 27.02 9.01 11.65 88.35 4 30 30.8 11.2 31 28.97 2.800 0.0124 0.021
16 1.180 20.80 6.93 18.59 81.41 8 26 26.8 11.9 27 25.21 1.488 0.0124 0.015
0
30 0.600 32.84 10.95 29.53 70.47 16 22 22.8 12.5 23 21.45 0.781 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 23.26 7.75 37.29 62.71 30 18 18.8 13.2 19 17.69 0.440 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 42.60 14.20 51.49 48.51 60 14 14.8 13.8 15 13.92 0.230 0.0124 0.006
200 0.075 5.83 1.94 53.43 46.57 120 10 10.8 14.5 11 10.16 0.121 0.0124 0.004
Visuil description : Silt and sand (ML), some clay, trace of gravel
TOTAL 160.29 53.43 - - 24 hrs 5 5.8 15.3 6 5.46 0.011 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-6/ 12.0-12.5 m
Location : Tukad Ayung, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 44 44.8 8.9 45 13.25 35.600 0.01256 0.075 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 42 42.8 9.2 43 12.66 18.400 0.01256 0.054

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 38 38.8 9.9 39 11.48 9.900 0.01256 0.040
3/8 9.500 0.00 0.00 0.00 100.00 2 34 34.8 10.5 35 10.29 5.250 0.01256 0.029 40
4 4.750 10.21 3.40 3.40 96.60 3 30 30.8 11.2 31 9.11 3.733 0.01256 0.024
8 2.360 95.12 31.71 35.11 64.89 4 26 26.8 11.9 27 7.93 2.975 0.01256 0.022 20
16 1.180 45.65 15.22 50.33 49.67 8 22 22.8 12.5 23 6.74 1.563 0.01256 0.016
0
30 0.600 51.78 17.26 67.59 32.41 16 18 18.8 13.2 19 5.56 0.825 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 29.30 9.77 77.35 22.65 30 14 14.8 13.8 15 4.38 0.460 0.01256 0.009
GRAIN DIAMETER (mm)
100 0.150 20.16 6.72 84.07 15.93 60 10 10.8 14.5 11 3.19 0.242 0.01256 0.006
200 0.075 4.20 1.40 85.47 14.53 120 8 8.8 14.8 9 2.60 0.123 0.01256 0.004
Visuil description : Sand (SM), brown, little of silt, trace of gravel
TOTAL 256.42 85.47 - - 24 hrs 8 8.8 14.8 9 2.60 0.010 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-7/ 2.0-2.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 58.96 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 56.55 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 51.72 9.200 0.0124 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 46.88 4.950 0.0124 0.028 40
4 4.750 2.98 0.99 0.99 99.01 3 34 34.8 10.5 35 42.05 3.500 0.0124 0.023
20
8 2.360 17.30 5.77 6.76 93.24 4 30 30.8 11.2 31 37.22 2.800 0.0124 0.021
16 1.180 15.52 5.17 11.93 88.07 8 26 26.8 11.9 27 32.38 1.488 0.0124 0.015
0
30 0.600 22.54 7.51 19.45 80.55 16 22 22.8 12.5 23 27.55 0.781 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 16.32 5.44 24.89 75.11 30 18 18.8 13.2 19 22.72 0.440 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 39.74 13.25 38.13 61.87 60 14 14.8 13.8 15 17.88 0.230 0.0124 0.006
200 0.075 6.15 2.05 40.18 59.82 120 12 12.8 14.2 13 15.47 0.118 0.0124 0.004
Visuil description : Silt and sand (ML), brown, little of clay, trace of gravel
TOTAL 120.55 40.18 - - 24 hrs 6 6.8 15.2 7 8.22 0.011 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : DTitik bor-7/ 6.0-6.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
D60 = 1.50
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 47.8 8.3 49 11.12 33.200 0.01256 0.072 80 D30 = 0.60
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 45.8 8.6 47 10.65 17.200 0.01256 0.052 D10 = 0.04

% FINER
60 Cu = 37.5
3/4 19.000 0.00 0.00 0.00 100.00 1 42 41.8 9.2 43 9.72 9.200 0.01256 0.038
3/8 9.500 3.20 1.07 1.07 98.93 2 38 37.8 9.9 39 8.79 4.950 0.01256 0.028
Cs = 6.00
40
4 4.750 13.83 4.61 5.68 94.32 3 34 33.8 10.5 35 7.86 3.500 0.01256 0.023
8 2.360 64.07 21.36 27.03 72.97 4 30 29.8 11.2
-No
31
Test - 6.93 2.800 0.01256 0.021 20
16 1.180 49.32 16.44 43.47 56.53 8 26 25.8 11.9 27 6.00 1.488 0.01256 0.015
0
30 0.600 70.72 23.57 67.05 32.95 16 22 21.8 12.5 23 5.07 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 36.90 12.30 79.35 20.65 30 18 17.8 13.2 19 4.14 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 24.64 8.21 87.56 12.44 60 14 13.8 13.8 15 3.21 0.230 0.01256 0.006
200 0.075 3.05 1.02 88.58 11.42 120 10 9.8 14.5 11 2.28 0.121 0.01256 0.004
Visuil description : Sand (SP-SM), brown, little of silt, trace of gravel
TOTAL 265.73 88.58 - - 24 hrs 8 7.8 14.8 9 1.81 0.010 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-8/ 6.0-6.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R) D60 = 1.40
80 D30 = 0.65
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 45 45.8 8.8 46 6.21 35.200 0.0124 0.074 D10 = 0.30

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 43 43.8 9.1 44 5.94 18.200 0.0124 0.053 60 Cu = 4.67
3/4 19.000 0.00 0.00 0.00 100.00 1 39 39.8 9.7 40 5.40 9.700 0.0124 0.039
3/8 9.500 1.54 0.51 0.51 99.49 2 35 35.8 10.4 36 4.85 5.200 0.0124 0.028 40
4 4.750 4.46 1.49 2.00 98.00 3 31 31.8 11.1 32 4.31 3.700 0.0124 0.024
8 2.360 55.53 18.51 20.51 79.49 4 27 27.8 11.7
-No Test - 3.77
28 2.925 0.0124 0.021
20
16 1.180 69.02 23.01 43.52 56.48 8 23 23.8 12.4 24 3.23 1.550 0.0124 0.015
0
30 0.600 84.65 28.22 71.73 28.27 16 19 19.8 13 20 2.69 0.813 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 46.73 15.58 87.31 12.69 30 15 15.8 13.7 16 2.14 0.457 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 16.67 5.56 92.87 7.13 60 11 11.8 14.3 12 1.60 0.238 0.0124 0.006
200 0.075 1.26 0.42 93.29 6.71 120 9 9.8 14.7 10 1.33 0.123 0.0124 0.004
Visuil description : Sand (SP-SM), brownish grey, little of silt, trace of gravel.
TOTAL 279.86 93.29 - - 24 hrs 6 6.8 15.2 7 0.92 0.011 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-8/ 12.0-12.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 18.27 33.200 0.01256 0.072 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 17.52 17.200 0.01256 0.052

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 16.03 9.200 0.01256 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 14.53 4.950 0.01256 0.028 40
4 4.750 0.46 0.15 0.15 99.85 3 34 34.8 10.5 35 13.03 3.500 0.01256 0.023
8 2.360 45.84 15.28 15.43 84.57 4 30 30.8 11.2 31 11.53 2.800 0.01256 0.021 20
16 1.180 51.72 17.24 32.67 67.33 8 26 26.8 11.9 27 10.03 1.488 0.01256 0.015
0
30 0.600 56.80 18.93 51.61 48.39 16 22 22.8 12.5 23 8.54 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 39.41 13.14 64.74 35.26 30 18 18.8 13.2 19 7.04 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 43.78 14.59 79.34 20.66 60 14 14.8 13.8 15 5.54 0.230 0.01256 0.006
200 0.075 6.82 2.27 81.61 18.39 120 10 10.8 14.5 11 4.04 0.121 0.01256 0.004
Visuil description : Sand (SM), brown, little of silt, trace of gravel
TOTAL 244.83 81.61 - - 24 hrs 6 6.8 15.2 7 2.55 0.011 0.01256 0.001
TESTANA ENGINEERING
Soil Testings & Research Administration.

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-9/ 6.0-6.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
80
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 68.92 33.200 0.0124 0.071

% FINER
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 66.10 17.200 0.0124 0.051 60
3/4 19.000 0.00 0.00 0.00 100.00 1 43 43.8 9.1 44 61.86 9.100 0.0124 0.037
3/8 9.500 0.00 0.00 0.00 100.00 2 40 40.8 9.6 41 57.62 4.800 0.0124 0.027 40
4 4.750 0.00 0.00 0.00 100.00 3 37 37.8 10.1 38 53.39 3.367 0.0124 0.023
20
8 2.360 5.78 1.93 1.93 98.07 4 34 34.8 10.5 35 49.15 2.625 0.0124 0.020
16 1.180 7.50 2.50 4.43 95.57 8 31 31.8 11.1 32 44.91 1.388 0.0124 0.015
0
30 0.600 15.50 5.17 9.59 90.41 16 28 28.8 11.5 29 40.67 0.719 0.0124 0.011
0.001 0.01 0.1 1 10 100
40 0.425 15.38 5.13 14.72 85.28 30 25 25.8 12 26 36.44 0.400 0.0124 0.008
GRAIN DIAMETER (mm)
100 0.150 39.52 13.17 27.89 72.11 60 22 22.8 12.5 23 32.20 0.208 0.0124 0.006
200 0.075 6.57 2.19 30.08 69.92 120 19 19.8 13 20 27.96 0.108 0.0124 0.004
Visuil description : Silt and clay (ML), greyish brown, some sand.
TOTAL 90.25 30.08 - - 24 hrs 11 11.8 14.3 12 16.67 0.010 0.0124 0.001

GRAIN SIZE DISTRIBUTION


Project : Jembatan. Boring/depth : Titik bor-9/ 12.0-12.5 m
Location : Tukad Penatih, Denpasar, Bali Date : Juli 2021
Sieve Analysis Hydrometer
Sieve opening mean % Cumulative % Time Actual Hyd. Corr. Hyd. Effective Hyd. Corr. % finer L/t K D, mm CLAY SILT SAND GRAVEL
fine medium to coarse
No (mm) weight retained % retained finer (min) reading reading depth only for 100
(Ra) (Rc) L (cm) meniscus (R)
1.5" 38.100 0.00 0.00 0.00 100.00 0.25 48 48.8 8.3 49 82.44 33.200 0.01256 0.072 80
1.0" 25.400 0.00 0.00 0.00 100.00 0.5 46 46.8 8.6 47 79.06 17.200 0.01256 0.052

% FINER
60
3/4 19.000 0.00 0.00 0.00 100.00 1 42 42.8 9.2 43 72.30 9.200 0.01256 0.038
3/8 9.500 0.00 0.00 0.00 100.00 2 38 38.8 9.9 39 65.54 4.950 0.01256 0.028 40
4 4.750 0.00 0.00 0.00 100.00 3 34 34.8 10.5 35 58.79 3.500 0.01256 0.023
8 2.360 0.52 0.17 0.17 99.83 4 30 30.8 11.2 31 52.03 2.800 0.01256 0.021 20
16 1.180 2.10 0.70 0.87 99.13 8 26 26.8 11.9 27 45.27 1.488 0.01256 0.015
0
30 0.600 6.64 2.21 3.09 96.91 16 22 22.8 12.5 23 38.52 0.781 0.01256 0.011 0.001 0.01 0.1 1 10 100
40 0.425 8.10 2.70 5.79 94.21 30 18 18.8 13.2 19 31.76 0.440 0.01256 0.008
GRAIN DIAMETER (mm)
100 0.150 29.18 9.73 15.51 84.49 60 14 14.8 13.8 15 25.00 0.230 0.01256 0.006
200 0.075 4.55 1.52 17.03 82.97 120 11 11.8 14.3 12 19.93 0.119 0.01256 0.004
Visuil description : Silt and clay (ML), brown, little of sand
TOTAL 51.09 17.03 - - 24 hrs 6 6.8 15.2 7 11.49 0.011 0.01256 0.001
A.7
Strength test
A.8
Consolidation Test
TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Bindu, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-1 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.59 Ws,solid weigth (gr) = 50.43
diameter, cm = 5.05 eo = 1.01 2Ho,solid height (cm) = 0.97
A area, cm2 = 20.03

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 1.950 0.978 1.006


0.009 240.00 3.34E-03
0.25 0.991 1.941 0.968 0.996
0.008 240.00 3.31E-03
0.50 0.983 1.933 0.961 0.989
0.010 375.00 2.10E-03
1.00 0.973 1.923 0.951 0.978
0.018 240.00 3.24E-03
2.00 0.956 1.906 0.933 0.960
0.039 375.00 2.01E-03
4.00 0.917 1.867 0.895 0.921
0.088 375.00 1.88E-03
8.00 0.829 1.779 0.807 0.830
-0.003
4.00 0.832 1.782 0.810 0.833
-0.003
2.00 0.835 1.785 0.813 0.836
-0.004
1.00 0.839 1.789 0.816 0.840
-0.004
0.50 0.843 1.793 0.821 0.845
-0.004
0.25 0.847 1.797 0.825 0.849

Before After
Liquid Limit (%) 46 Sample height (cm) 1.95 1.80
Plasticity Index (%) 17 Water content (%) 34.0 32.8
Specific Gravity 2.59 Dry unit weight (gr/cm3) 1.29 1.40
Preconsolidation pressure (kg/cm2) 2.40 Void ratio 1.01 0.85
Effective overburden pressure (kg/cm2) 0.35 Saturation 88 100
Po' Pc
1.1 4

1 eo

0.9 Cc = 0.26 3

0.8
Cv. 10-3 (cm2/sec)

Cs = 0.01
VOID RATIO

0.7 2

0.6

0.5 1

0.42 eo
0.4

0.3 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Bindu, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-2 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.68 Ws,solid weigth (gr) = 57.98
diameter, cm = 5.05 eo = 0.81 2Ho,solid height (cm) = 1.08
A area, cm2 = 20.03

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 1.950 0.870 0.805


0.011 240.00 3.34E-03
0.25 0.990 1.940 0.859 0.796
0.008 240.00 3.31E-03
0.50 0.982 1.932 0.852 0.789
0.019 240.00 3.26E-03
1.00 0.963 1.913 0.833 0.771
0.028 375.00 2.04E-03
2.00 0.935 1.885 0.805 0.745
0.051 375.00 1.95E-03
4.00 0.884 1.834 0.754 0.698
0.094 375.00 1.81E-03
8.00 0.790 1.740 0.660 0.611
-0.005
4.00 0.795 1.745 0.665 0.616
-0.005
2.00 0.800 1.750 0.670 0.620
-0.007
1.00 0.807 1.757 0.677 0.627
-0.006
0.50 0.813 1.763 0.683 0.632
-0.009
0.25 0.822 1.772 0.692 0.641

Before After
Liquid Limit (%) 34 Sample height (cm) 1.95 1.77
Plasticity Index (%) 9 Water content (%) 28.0 23.9
Specific Gravity 2.68 Dry unit weight (gr/cm3) 1.48 1.63
Preconsolidation pressure (kg/cm2) 2.40 Void ratio 0.81 0.64
Effective overburden pressure (kg/cm2) 0.94 Saturation 93 100
Po' Pc
0.9 4

0.8 eo

0.7 Cc = 0.27
Cv. 10-3 (cm2/sec)
VOID RATIO

0.6 2
Cs = 0.02

0.5

0.4

0.42 eo
0.3 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-4 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.57 Ws,solid weigth (gr) = 57.22
diameter, cm = 5.14 eo = 0.94 2Ho,solid height (cm) = 1.07
A area, cm2 = 20.75

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 2.080 1.007 0.939


0.005 183.75 4.98E-03
0.25 0.995 2.075 1.002 0.934
0.005 240.00 3.79E-03
0.50 0.990 2.070 0.997 0.929
0.010 240.00 3.77E-03
1.00 0.980 2.060 0.987 0.920
0.024 453.75 1.96E-03
2.00 0.956 2.036 0.963 0.898
0.038 375.00 2.30E-03
4.00 0.919 1.999 0.926 0.863
0.053 540.00 1.53E-03
8.00 0.866 1.946 0.873 0.814
-0.004
4.00 0.870 1.950 0.877 0.817
-0.004
2.00 0.874 1.954 0.881 0.821
-0.004
1.00 0.878 1.958 0.885 0.825
-0.003
0.50 0.882 1.962 0.889 0.828
-0.003
0.25 0.884 1.964 0.891 0.830

Before After
Liquid Limit (%) 40 Sample height (cm) 2.08 1.96
Plasticity Index (%) 12 Water content (%) 32.0 32.3
Specific Gravity 2.57 Dry unit weight (gr/cm3) 1.33 1.40
Preconsolidation pressure (kg/cm2) 2.10 Void ratio 0.94 0.83
Effective overburden pressure (kg/cm2) 0.35 Saturation 88 100
Po' Pc
1 6

eo
0.9
5

Cc = 0.17
0.8

4
Cv. 10-3 (cm2/sec)

0.7 Cs = 0.01
VOID RATIO

0.6

0.5

1
0.4 0.42 eo

0.3 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-4 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.6 Ws,solid weigth (gr) = 51.18
diameter, cm = 5.14 eo = 1.19 2Ho,solid height (cm) = 0.95
A area, cm2 = 20.75

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 2.080 1.131 1.193


0.013 240.00 3.80E-03
0.25 0.988 2.068 1.119 1.180
0.007 240.00 3.76E-03
0.50 0.981 2.061 1.112 1.173
0.016 375.00 2.38E-03
1.00 0.965 2.045 1.096 1.156
0.037 375.00 2.32E-03
2.00 0.929 2.009 1.060 1.117
0.054 540.00 1.54E-03
4.00 0.875 1.955 1.006 1.061
0.083 540.00 1.44E-03
8.00 0.792 1.872 0.923 0.973
-0.007
4.00 0.800 1.880 0.931 0.981
-0.011
2.00 0.810 1.890 0.941 0.992
-0.013
1.00 0.823 1.903 0.954 1.006
-0.005
0.50 0.828 1.908 0.959 1.011
-0.003
0.25 0.831 1.911 0.962 1.015

Before After
Liquid Limit (%) 44 Sample height (cm) 2.08 1.91
Plasticity Index (%) 16 Water content (%) 40.0 39.0
Specific Gravity 2.60 Dry unit weight (gr/cm3) 1.19 1.29
Preconsolidation pressure (kg/cm2) 1.70 Void ratio 1.19 1.01
Effective overburden pressure (kg/cm2) 1.01 Saturation 87 100
Po' Pc
1.3 5

1.2
eo
4
1.1
Cc = 0.25
1
Cv. 10-3 (cm2/sec)

3
Cs = 0.03
VOID RATIO

0.9

0.8
2

0.7

0.6
1

0.5 0.42 eo

0.4 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-6 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.62 Ws,solid weigth (gr) = 52.86
diameter, cm = 5.14 eo = 1.14 2Ho,solid height (cm) = 0.97
A area, cm2 = 20.75

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 2.080 1.108 1.139


0.017 183.75 4.95E-03
0.25 0.983 2.063 1.091 1.122
0.005 183.75 4.90E-03
0.50 0.978 2.058 1.086 1.117
0.009 240.00 3.72E-03
1.00 0.969 2.049 1.077 1.108
0.021 303.75 2.90E-03
2.00 0.948 2.028 1.056 1.086
0.039 303.75 2.82E-03
4.00 0.910 1.990 1.017 1.046
0.050 375.00 2.18E-03
8.00 0.860 1.940 0.968 0.995
-0.005
4.00 0.865 1.945 0.973 1.001
-0.003
2.00 0.868 1.948 0.976 1.004
-0.003
1.00 0.871 1.951 0.979 1.007
-0.003
0.50 0.874 1.954 0.982 1.010
-0.003
0.25 0.878 1.958 0.985 1.013

Before After
Liquid Limit (%) 41 Sample height (cm) 2.08 1.96
Plasticity Index (%) 14 Water content (%) 38.0 38.7
Specific Gravity 2.62 Dry unit weight (gr/cm3) 1.22 1.30
Preconsolidation pressure (kg/cm2) 1.40 Void ratio 1.14 1.01
Effective overburden pressure (kg/cm2) 1.01 Saturation 87 100
Po' Pc
1.2 6

eo

5
Cc = 0.18
1

4
Cv. 10-3 (cm2/sec)

Cs = 0.01
VOID RATIO

0.8 3

0.6

0.42 eo

0.4 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-7 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.58 Ws,solid weigth (gr) = 53.95
diameter, cm = 5.14 eo = 1.06 2Ho,solid height (cm) = 1.01
A area, cm2 = 20.75

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 2.080 1.072 1.064


0.010 240.00 3.80E-03
0.25 0.990 2.070 1.062 1.054
0.005 375.00 2.42E-03
0.50 0.985 2.065 1.057 1.049
0.015 375.00 2.39E-03
1.00 0.970 2.050 1.042 1.034
0.025 375.00 2.35E-03
2.00 0.945 2.025 1.017 1.009
0.038 453.75 1.88E-03
4.00 0.907 1.987 0.979 0.972
0.057 540.00 1.51E-03
8.00 0.850 1.930 0.922 0.915
-0.004
4.00 0.854 1.934 0.926 0.919
-0.003
2.00 0.857 1.937 0.929 0.922
-0.003
1.00 0.860 1.940 0.932 0.925
-0.004
0.50 0.864 1.944 0.936 0.929
-0.004
0.25 0.868 1.948 0.940 0.933

Before After
Liquid Limit (%) 42 Sample height (cm) 2.08 1.95
Plasticity Index (%) 12 Water content (%) 36.0 36.1
Specific Gravity 2.58 Dry unit weight (gr/cm3) 1.25 1.34
Preconsolidation pressure (kg/cm2) 1.90 Void ratio 1.06 0.93
Effective overburden pressure (kg/cm2) 0.34 Saturation 87 100
Po' Pc
1.1 4

eo

Cc = 0.19 3
0.9
Cv. 10-3 (cm2/sec)

0.8 Cs = 0.01
VOID RATIO

0.7

0.6
1

0.5

0.42 eo
0.4 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-9 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.59 Ws,solid weigth (gr) = 44.83
diameter, cm = 5.05 eo = 1.26 2Ho,solid height (cm) = 0.86
A area, cm2 = 20.03

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 1.950 1.086 1.256


0.020 305.10 2.62E-03
0.25 0.981 1.931 1.066 1.234
0.009 375.00 2.10E-03
0.50 0.972 1.922 1.058 1.224
0.024 375.00 2.06E-03
1.00 0.949 1.899 1.034 1.197
0.039 375.00 2.00E-03
2.00 0.910 1.860 0.996 1.152
0.061 540.00 1.31E-03
4.00 0.850 1.800 0.935 1.082
0.070 540.00 1.22E-03
8.00 0.780 1.730 0.866 1.002
-0.005
4.00 0.785 1.735 0.871 1.008
-0.005
2.00 0.790 1.740 0.876 1.013
-0.003
1.00 0.793 1.743 0.879 1.017
-0.002
0.50 0.796 1.746 0.881 1.020
-0.003
0.25 0.799 1.749 0.884 1.023

Before After
Liquid Limit (%) 45 Sample height (cm) 1.95 1.75
Plasticity Index (%) 14 Water content (%) 42.0 39.5
Specific Gravity 2.59 Dry unit weight (gr/cm3) 1.15 1.28
Preconsolidation pressure (kg/cm2) 1.05 Void ratio 1.26 1.02
Effective overburden pressure (kg/cm2) 0.98 Saturation 87 100
Po' Pc
1.3 3

eo
1.2

1.1 Cc = 0.23

1 2
Cv. 10-3 (cm2/sec)

Cs = 0.01
VOID RATIO

0.9

0.8

0.7 1

0.6

0.42 eo
0.5

0.4 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

CONSOLIDATION TEST

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-9 Tested by : BR
Depth : 12.0 - 12.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.55 Ws,solid weigth (gr) = 53.78
diameter, cm = 5.05 eo = 0.85 2Ho,solid height (cm) = 1.05
A area, cm2 = 20.03

Applied Final Dial Height Void 2H-2Ho Fitting time (sec) CV, Coef of consolidation
pressure dial change 2H (cm) height e = ----------
P (kg/cm2) reading 2H-2Ho 2Ho t90 0.848H2/t90

0.00 1.000 1.950 0.897 0.852


0.008 240.00 3.34E-03
0.25 0.992 1.942 0.889 0.844
0.005 240.00 3.32E-03
0.50 0.987 1.937 0.884 0.839
0.012 375.00 2.11E-03
1.00 0.975 1.925 0.872 0.828
0.019 453.75 1.71E-03
2.00 0.957 1.907 0.854 0.811
0.047 540.00 1.39E-03
4.00 0.910 1.860 0.807 0.766
0.055 540.00 1.32E-03
8.00 0.855 1.805 0.752 0.714
-0.005
4.00 0.860 1.810 0.757 0.719
-0.005
2.00 0.865 1.815 0.762 0.724
-0.003
1.00 0.868 1.818 0.765 0.727
-0.003
0.50 0.871 1.821 0.768 0.729
-0.004
0.25 0.875 1.825 0.772 0.733

Before After
Liquid Limit (%) 36 Sample height (cm) 1.95 1.83
Plasticity Index (%) 9 Water content (%) 30.0 28.8
Specific Gravity 2.55 Dry unit weight (gr/cm3) 1.38 1.47
Preconsolidation pressure (kg/cm2) 2.00 Void ratio 0.85 0.73
Effective overburden pressure (kg/cm2) 1.75 Saturation 90 100
Po' Pc
1 4

0.9

eo
3
0.8
Cv. 10-3 (cm2/sec)

0.7 Cc = 0.13
VOID RATIO

0.6 Cs = 0.01

0.5
1

0.4

0.42 eo

0.3 0
0.01 0.1 1 10 100 1000 0.1 1 10

AXIAL PRESSURE (kg/cm2) AXIAL PRESSURE (kg/cm2)


A.9
Isotropic Compression Parameter
TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Bindu, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-1 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.59 Ws,solid weight (gr) = 50.43
diameter, cm = 5.05 eo = 1.01 2Ho,solid height (cm) = 0.97
2
A area, cm = 20.03 Effective overburden pressure (kg/cm ²) = 0.35

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 1.950 0.978 1.006


0.009 0.010 0.005 6.51E-08 51.32
0.25 0.991 1.941 0.968 0.996 2.813 1.996
0.008 0.008 0.004 5.12E-08 64.68
0.50 0.983 1.933 0.961 0.989 3.507 1.989
0.010 0.010 0.005 2.17E-08 96.65
1.00 0.973 1.923 0.951 0.978 4.200 1.978
0.018 0.018 0.009 2.95E-08 109.89
2.00 0.956 1.906 0.933 0.960 4.893 1.960
0.039 0.040 0.020 2.03E-08 98.99
4.00 0.917 1.867 0.895 0.921 5.586 1.921
0.088 0.091 0.047 2.21E-08 84.86
8.00 0.829 1.779 0.807 0.830 6.279 1.830
-0.003
4.00 0.832 1.782 0.810 0.833 5.586 1.833
-0.003
2.00 0.835 1.785 0.813 0.836 4.893 1.836
-0.004
1.00 0.839 1.789 0.816 0.840 4.200 1.840
-0.004
0.50 0.843 1.793 0.821 0.845 3.507 1.845
-0.004
0.25 0.847 1.797 0.825 0.849 2.813 1.849

0 2.20

20 2.10 λ = 0.094
Oedometer mod., Eoed (kg/cm2)

Spesific volume, v (-)

40 2.00

60 1.90

80 1.80 κ = 0.005

100 1.70

120 1.60
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Bindu, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-2 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.68 Ws,solid weight (gr) = 57.98
diameter, cm = 5.05 eo = 0.81 2Ho,solid height (cm) = 1.08
2
A area, cm = 20.03 Effective overburden pressure (kg/cm ²) = 0.94

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 1.950 0.870 0.805


0.011 0.010 0.005 7.20E-08 46.43
0.25 0.990 1.940 0.859 0.796 2.813 1.796
0.008 0.007 0.004 5.12E-08 64.65
0.50 0.982 1.932 0.852 0.789 3.507 1.789
0.019 0.018 0.010 6.42E-08 50.84
1.00 0.963 1.913 0.833 0.771 4.200 1.771
0.028 0.026 0.015 2.98E-08 68.32
2.00 0.935 1.885 0.805 0.745 4.893 1.745
0.051 0.047 0.027 2.64E-08 73.92
4.00 0.884 1.834 0.754 0.698 5.586 1.698
0.094 0.087 0.051 2.31E-08 78.04
8.00 0.790 1.740 0.660 0.611 6.279 1.611
-0.005
4.00 0.795 1.745 0.665 0.616 5.586 1.616
-0.005
2.00 0.800 1.750 0.670 0.620 4.893 1.620
-0.007
1.00 0.807 1.757 0.677 0.627 4.200 1.627
-0.006
0.50 0.813 1.763 0.683 0.632 3.507 1.632
-0.009
0.25 0.822 1.772 0.692 0.641 2.813 1.641

0 1.90

20 1.80 λ = 0.097
Oedometer mod., Eoed (kg/cm2)

Spesific volume, v (-)

40 1.70

60 1.60

κ = 0.008

80 1.50

100 1.40
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-4 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.57 Ws,solid weight (gr) = 57.22
diameter, cm = 5.14 eo = 0.94 2Ho,solid height (cm) = 1.07
2
A area, cm = 20.75 Effective overburden pressure (kg/cm ²) = 0.35

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 2.080 1.007 0.939


0.005 0.005 0.002 4.79E-08 104.00
0.25 0.995 2.075 1.002 0.934 2.813 1.934
0.005 0.005 0.002 3.66E-08 103.75
0.50 0.990 2.070 0.997 0.929 3.507 1.929
0.010 0.009 0.005 3.64E-08 103.50
1.00 0.980 2.060 0.987 0.920 4.200 1.920
0.024 0.022 0.012 2.28E-08 85.83
2.00 0.956 2.036 0.963 0.898 4.893 1.898
0.038 0.035 0.018 2.12E-08 108.59
4.00 0.919 1.999 0.926 0.863 5.586 1.863
0.053 0.049 0.026 1.00E-08 152.27
8.00 0.866 1.946 0.873 0.814 6.279 1.814
-0.004
4.00 0.870 1.950 0.877 0.817 5.586 1.817
-0.004
2.00 0.874 1.954 0.881 0.821 4.893 1.821
-0.004
1.00 0.878 1.958 0.885 0.825 4.200 1.825
-0.003
0.50 0.882 1.962 0.889 0.828 3.507 1.828
-0.003
0.25 0.884 1.964 0.891 0.830 2.813 1.830

0 2.10

40 2.00 λ = 0.061
Oedometer mod., Eoed (kg/cm2)

Spesific volume, v (-)

80 1.90

120 1.80
κ = 0.005

160 1.70
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-4 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.60 Ws,solid weight (gr) = 51.18
diameter, cm = 5.14 eo = 1.19 2Ho,solid height (cm) = 0.95
2
A area, cm = 20.75 Effective overburden pressure (kg/cm ²) = 1.01

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 2.080 1.131 1.193


0.013 0.013 0.006 9.13E-08 41.60
0.25 0.988 2.068 1.119 1.180 2.813 2.180
0.007 0.007 0.003 4.73E-08 79.52
0.50 0.981 2.061 1.112 1.173 3.507 2.173
0.016 0.017 0.008 3.70E-08 64.41
1.00 0.965 2.045 1.096 1.156 4.200 2.156
0.037 0.038 0.018 4.14E-08 56.03
2.00 0.929 2.009 1.060 1.117 4.893 2.117
0.054 0.056 0.027 2.05E-08 75.08
4.00 0.875 1.955 1.006 1.061 5.586 2.061
0.083 0.087 0.042 1.53E-08 94.22
8.00 0.792 1.872 0.923 0.973 6.279 1.973
-0.007
4.00 0.800 1.880 0.931 0.981 5.586 1.981
-0.011
2.00 0.810 1.890 0.941 0.992 4.893 1.992
-0.013
1.00 0.823 1.903 0.954 1.006 4.200 2.006
-0.005
0.50 0.828 1.908 0.959 1.011 3.507 2.011
-0.003
0.25 0.831 1.911 0.962 1.015 2.813 2.015

0 2.40

2.30
20
Oedometer mod., Eoed (kg/cm2)

λ = 0.104
Spesific volume, v (-)

2.20

40

2.10

60

2.00

κ = 0.013
80
1.90

100 1.80
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Ayung, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-6 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.62 Ws,solid weight (gr) = 52.86
diameter, cm = 5.14 eo = 1.14 2Ho,solid height (cm) = 0.97
2
A area, cm = 20.75 Effective overburden pressure (kg/cm ²) = 1.01

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 2.080 1.108 1.139


0.017 0.017 0.008 1.62E-07 30.59
0.25 0.983 2.063 1.091 1.122 2.813 2.122
0.005 0.005 0.002 4.75E-08 103.15
0.50 0.978 2.058 1.086 1.117 3.507 2.117
0.009 0.009 0.004 3.26E-08 114.33
1.00 0.969 2.049 1.077 1.108 4.200 2.108
0.021 0.022 0.010 2.97E-08 97.57
2.00 0.948 2.028 1.056 1.086 4.893 2.086
0.039 0.040 0.019 2.67E-08 105.35
4.00 0.910 1.990 1.017 1.046 5.586 2.046
0.050 0.051 0.025 1.36E-08 160.77
8.00 0.860 1.940 0.968 0.995 6.279 1.995
-0.005
4.00 0.865 1.945 0.973 1.001 5.586 2.001
-0.003
2.00 0.868 1.948 0.976 1.004 4.893 2.004
-0.003
1.00 0.871 1.951 0.979 1.007 4.200 2.007
-0.003
0.50 0.874 1.954 0.982 1.010 3.507 2.010
-0.003
0.25 0.878 1.958 0.985 1.013 2.813 2.013

0 2.20

40 2.15
Oedometer mod., Eoed (kg/cm2)

λ = 0.065
Spesific volume, v (-)

80 2.10

120 2.05

160 2.00

κ = 0.005

200 1.95
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-7 Tested by : BR
Depth : 2.0 - 2.5 m Checked by : DM

Aparatus
ring height , cm = 2.08 Gs = 2.58 Ws,solid weight (gr) = 53.95
diameter, cm = 5.14 eo = 1.06 2Ho,solid height (cm) = 1.01
2
A area, cm = 20.75 Effective overburden pressure (kg/cm ²) = 0.34

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 2.080 1.072 1.064


0.010 0.010 0.005 7.31E-08 52.00
0.25 0.990 2.070 1.062 1.054 2.813 2.054
0.005 0.005 0.003 2.57E-08 94.09
0.50 0.985 2.065 1.057 1.049 3.507 2.049
0.015 0.014 0.007 3.36E-08 71.19
1.00 0.970 2.050 1.042 1.034 4.200 2.034
0.025 0.025 0.012 2.86E-08 82.00
2.00 0.945 2.025 1.017 1.009 4.893 2.009
0.038 0.038 0.019 1.76E-08 106.58
4.00 0.907 1.987 0.979 0.972 5.586 1.972
0.057 0.057 0.029 1.08E-08 139.44
8.00 0.850 1.930 0.922 0.915 6.279 1.915
-0.004
4.00 0.854 1.934 0.926 0.919 5.586 1.919
-0.003
2.00 0.857 1.937 0.929 0.922 4.893 1.922
-0.003
1.00 0.860 1.940 0.932 0.925 4.200 1.925
-0.004
0.50 0.864 1.944 0.936 0.929 3.507 1.929
-0.004
0.25 0.868 1.948 0.940 0.933 2.813 1.933

0 2.10

30 2.05
Oedometer mod., Eoed (kg/cm2)

λ = 0.068
Spesific volume, v (-)

60 2.00

90 1.95

120 1.90 κ = 0.005

150 1.85
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-9 Tested by : BR
Depth : 6.0 - 6.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.59 Ws,solid weight (gr) = 44.83
diameter, cm = 5.05 eo = 1.26 2Ho,solid height (cm) = 0.86
2
A area, cm = 20.03 Effective overburden pressure (kg/cm ²) = 0.98

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 1.950 1.086 1.256


0.020 0.023 0.010 1.05E-07 25.00
0.25 0.981 1.931 1.066 1.234 2.813 2.234
0.009 0.010 0.004 3.69E-08 56.78
0.50 0.972 1.922 1.058 1.224 3.507 2.224
0.024 0.027 0.012 5.04E-08 40.89
1.00 0.949 1.899 1.034 1.197 4.200 2.197
0.039 0.045 0.020 4.05E-08 49.31
2.00 0.910 1.860 0.996 1.152 4.893 2.152
0.061 0.070 0.033 2.14E-08 61.49
4.00 0.850 1.800 0.935 1.082 5.586 2.082
0.070 0.080 0.039 1.18E-08 103.57
8.00 0.780 1.730 0.866 1.002 6.279 2.002
-0.005
4.00 0.785 1.735 0.871 1.008 5.586 2.008
-0.005
2.00 0.790 1.740 0.876 1.013 4.893 2.013
-0.003
1.00 0.793 1.743 0.879 1.017 4.200 2.017
-0.002
0.50 0.796 1.746 0.881 1.020 3.507 2.020
-0.003
0.25 0.799 1.749 0.884 1.023 2.813 2.023

0 2.25

20 2.20
Oedometer mod., Eoed (kg/cm2)

λ = 0.068
Spesific volume, v (-)

40 2.15

60 2.10

80 2.05

100 2.00
κ = 0.006

120 1.95
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


TESTANA ENGINEERING
Soil Testings & Research Administration.

ISOTROPIC COMPRESSION PARAMETER

Project : Jembatan. Test No :-


Location : Tukad Penatih, Denpasar, Bali, Date : Juli 2021
Boring No : Titik bor-9 Tested by : BR
Depth : 12.0 - 12.5 m Checked by : DM

Aparatus
ring height , cm = 1.95 Gs = 2.55 Ws,solid weight (gr) = 53.78
diameter, cm = 5.05 eo = 0.85 2Ho,solid height (cm) = 1.05
2
A area, cm = 20.03 Effective overburden pressure (kg/cm ²) = 1.75

Applied Final Dial Height Void 2H-2Ho ∆h


pressure dial change 2H (cm) height e = ---------- ∆e ∆ε = ………… K (cm/s) Eoed (kg/cm²) ln P (kN/m2) ν (-)
2 reading 2H-2Ho 2Ho
P (kg/cm ) h

0.00 1.000 1.950 0.897 0.852


0.008 0.008 0.004 5.83E-08 57.35
0.25 0.992 1.942 0.889 0.844 2.813 1.844
0.005 0.005 0.003 3.42E-08 97.07
0.50 0.987 1.937 0.884 0.839 3.507 1.839
0.012 0.011 0.006 2.50E-08 84.20
1.00 0.975 1.925 0.872 0.828 4.200 1.828
0.019 0.018 0.010 1.65E-08 104.05
2.00 0.957 1.907 0.854 0.811 4.893 1.811
0.047 0.044 0.024 1.70E-08 82.00
4.00 0.910 1.860 0.807 0.766 5.586 1.766
0.055 0.052 0.030 9.75E-09 135.27
8.00 0.855 1.805 0.752 0.714 6.279 1.714
-0.005
4.00 0.860 1.810 0.757 0.719 5.586 1.719
-0.005
2.00 0.865 1.815 0.762 0.724 4.893 1.724
-0.003
1.00 0.868 1.818 0.765 0.727 4.200 1.727
-0.003
0.50 0.871 1.821 0.768 0.729 3.507 1.729
-0.004
0.25 0.875 1.825 0.772 0.733 2.813 1.733

0 1.90

40 1.85 λ = 0.070
Oedometer mod., Eoed (kg/cm2)

Spesific volume, v (-)

80 1.80

120 1.75

κ = 0.005

160 1.70
0 1 2 3 4 5 6 7 8 0 1 2 3 4 5 6 7 8

Axial pressure, P (kg/cm2) Axial pressure, ln P (kN/m2)


A.10
Deep Foundation
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Bindu, Denpasar, Bali.

TITIK BOR-1 (Jembatan Tukad Bindu) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 27 Sand 256.8 5.1 72.6 39.0 111.6 9.10 39.80
7.25 50 Sand 333.5 11.5 94.3 82.3 176.6 19.21 64.37
9.25 50 Sand 233.5 15.0 66.0 138.7 204.7 32.37 77.49
11.25 20 Sand 126.7 10.5 35.8 178.1 213.9 41.56 83.19
13.25 18 Sand 180.1 5.7 50.9 199.4 250.3 46.53 96.73
15.25 36 Sand 260.1 8.1 73.6 229.8 303.3 53.61 116.42
17.25 42 Sand 306.8 11.7 86.8 273.7 360.4 63.86 138.39
19.25 50 Sand 263.5 13.8 74.5 325.5 400.0 75.95 155.03
21.25 29 Sand 263.5 11.8 74.5 370.0 444.5 86.33 172.83
23.25 50 Sand 333.5 11.8 94.3 414.5 508.8 96.71 197.22
25.25 50 Sand 333.5 15.0 94.3 470.8 565.1 109.86 219.77
27.25 50 Sand 333.5 15.0 94.3 527.2 621.5 123.01 242.31
29.25 50 Sand 333.5 15.0 94.3 583.6 677.9 136.16 264.86

TITIK BOR-1 (Jembatan Tukad Bindu) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 27 Sand 256.8 5.1 129.1 52.0 181.1 12.13 63.82
7.25 50 Sand 333.5 11.5 167.6 109.8 277.4 25.62 99.80
9.25 50 Sand 233.5 15.0 117.3 184.9 302.3 43.15 113.09
11.25 20 Sand 126.7 10.5 63.7 237.5 301.2 55.41 116.22
13.25 18 Sand 180.1 5.7 90.5 265.9 356.4 62.04 136.52
15.25 36 Sand 260.1 8.1 130.8 306.3 437.1 71.48 166.12
17.25 42 Sand 306.8 11.7 154.2 364.9 519.1 85.14 197.37
19.25 50 Sand 263.5 13.8 132.4 434.0 566.4 101.27 217.75
21.25 29 Sand 263.5 11.8 132.4 493.3 625.8 115.11 241.47
23.25 50 Sand 333.5 11.8 167.6 552.6 720.3 128.95 276.93
25.25 50 Sand 333.5 15.0 167.6 627.8 795.4 146.48 306.99
27.25 50 Sand 333.5 15.0 167.6 702.9 870.6 164.02 337.05
29.25 50 Sand 333.5 15.0 167.6 778.1 945.7 181.55 367.11
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Bindu, Denpasar, Bali.

TITIK BOR-2 (Jembatan Tukad Bindu) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 33 ML 180.0 6.5 50.9 32.1 83.0 7.49 29.80
7.25 47 ML 168.8 11.0 47.7 73.6 121.3 17.16 45.33
9.25 28 Sand 93.4 11.2 26.4 115.8 142.2 27.02 55.11
11.25 0 Sand 166.8 4.2 47.1 131.4 178.6 30.67 68.29
13.25 50 ML 225.0 6.9 63.6 157.3 221.0 36.71 84.14
15.25 50 ML 225.0 13.8 63.6 209.2 272.8 48.81 104.88
17.25 50 ML 225.0 13.8 63.6 261.0 324.6 60.90 125.61
19.25 50 ML 225.0 13.8 63.6 312.9 376.5 73.00 146.35
21.25 50 ML 225.0 13.8 63.6 364.7 428.3 85.09 167.08
23.25 50 ML 198.0 13.8 56.0 416.5 472.5 97.19 185.27
25.25 38 ML 198.0 12.1 56.0 462.1 518.1 107.83 203.52
27.25 50 ML 225.0 12.1 63.6 507.8 571.4 118.48 224.31
29.25 50 ML 225.0 13.8 63.6 559.6 623.2 130.57 245.04

TITIK BOR-2 (Jembatan Tukad Bindu) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton

5.25 33 ML 180.0 6.5 90.5 42.8 133.3 9.98 47.27


7.25 47 ML 168.8 11.0 84.8 98.1 182.9 22.89 67.51
9.25 28 Sand 93.4 11.2 46.9 154.4 201.3 36.02 77.40
11.25 0 Sand 166.8 4.2 83.8 175.2 259.1 40.89 98.03
13.25 50 ML 225.0 6.9 113.1 209.8 322.9 48.95 121.62
15.25 50 ML 225.0 13.8 113.1 278.9 392.0 65.08 149.26
17.25 50 ML 225.0 13.8 113.1 348.0 461.1 81.21 176.91
19.25 50 ML 225.0 13.8 113.1 417.1 530.2 97.33 204.56
21.25 50 ML 225.0 13.8 113.1 486.3 599.4 113.46 232.20
23.25 50 ML 198.0 13.8 99.5 555.4 654.9 129.59 255.32
25.25 38 ML 198.0 12.1 99.5 616.2 715.7 143.78 279.65
27.25 50 ML 225.0 12.1 113.1 677.0 790.1 157.97 308.50
29.25 50 ML 225.0 13.8 113.1 746.1 859.2 174.10 336.15
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Bindu, Denpasar, Bali.

TITIK BOR-3 (Jembatan Tukad Bindu) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 3 Sand 36.7 1.5 10.4 38.4 48.8 8.96 18.81
7.25 8 Sand 30.0 1.6 8.5 44.4 52.9 10.36 20.59
9.25 1 Sand 30.0 1.3 8.5 49.3 57.8 11.51 22.55
11.25 8 Sand 43.4 1.3 12.3 54.2 66.5 12.65 25.77
13.25 5 ML 92.3 1.8 26.1 61.0 87.0 14.22 33.08
15.25 36 Sand 286.8 6.1 81.1 84.0 165.0 19.59 60.61
17.25 50 Sand 313.5 12.9 88.6 132.4 221.0 30.89 82.50
19.25 44 Sand 206.8 14.1 58.5 185.4 243.8 43.25 93.63
21.25 18 Sand 100.1 9.3 28.3 220.2 248.5 51.39 97.52
23.25 12 ML 139.5 4.1 39.4 235.8 275.2 55.02 107.46
25.25 50 ML 225.0 8.5 63.6 267.9 331.5 62.52 128.37
27.25 50 ML 225.0 13.8 63.6 319.8 383.4 74.61 149.11
29.25 50 ML 225.0 13.8 63.6 371.6 435.2 86.71 169.84

TITIK BOR-3 (Jembatan Tukad Bindu) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 3 Sand 36.7 1.5 18.4 51.2 69.6 11.94 26.62
7.25 8 Sand 30.0 1.6 15.1 59.2 74.3 13.82 28.72
9.25 1 Sand 30.0 1.3 15.1 65.8 80.8 15.34 31.33
11.25 8 Sand 43.4 1.3 21.8 72.3 94.1 16.87 36.18
13.25 5 ML 92.3 1.8 46.4 81.3 127.6 18.96 47.97
15.25 36 Sand 286.8 6.1 144.2 111.9 256.1 26.12 92.83
17.25 50 Sand 313.5 12.9 157.6 176.5 334.1 41.19 123.14
19.25 44 Sand 206.8 14.1 103.9 247.1 351.1 57.67 133.50
21.25 18 Sand 100.1 9.3 50.3 293.6 343.9 68.52 134.22
23.25 12 ML 139.5 4.1 70.1 314.4 384.5 73.36 149.13
25.25 50 ML 225.0 8.5 113.1 357.2 470.3 83.35 180.59
27.25 50 ML 225.0 13.8 113.1 426.3 539.4 99.48 208.24
29.25 50 ML 225.0 13.8 113.1 495.5 608.6 115.61 235.88
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Ayung, Denpasar, Bali.

TITIK BOR-4 (Jembatan Tukad Ayung) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 4 ML 96.8 2.1 27.4 24.0 51.3 5.59 18.71
7.25 39 ML 200.3 5.9 56.6 46.3 102.9 10.79 37.38
9.25 50 Sand 210.1 13.3 59.4 96.4 155.8 22.49 58.36
11.25 13 Sand 210.1 9.4 59.4 131.8 191.2 30.76 72.54
13.25 50 ML 225.0 8.7 63.6 164.5 228.1 38.38 87.00
15.25 50 ML 225.0 13.8 63.6 216.3 280.0 50.48 107.74
17.25 50 ML 225.0 13.8 63.6 268.2 331.8 62.57 128.47
19.25 50 ML 225.0 13.8 63.6 320.0 383.6 74.67 149.21
21.25 50 ML 225.0 13.8 63.6 371.8 435.5 86.76 169.94
23.25 50 ML 225.0 13.8 63.6 423.7 487.3 98.86 190.68
25.25 50 ML 225.0 13.8 63.6 475.5 539.1 110.95 211.41
27.25 50 Sand 240.1 15.0 67.9 531.9 599.8 124.10 235.38
29.25 22 Sand 240.1 10.8 67.9 572.4 640.3 133.56 251.59
31.25 50 Sand 333.5 10.8 94.3 612.9 707.2 143.02 276.60
33.25 50 Sand 333.5 15.0 94.3 669.3 763.6 156.17 299.15

TITIK BOR-4 (Jembatan Tukad Ayung) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 4 ML 96.8 2.1 48.6 32.0 80.6 7.46 29.00
7.25 39 ML 200.3 5.9 100.7 61.7 162.3 14.39 58.23
9.25 50 Sand 210.1 13.3 105.6 128.5 234.1 29.99 86.62
11.25 13 Sand 210.1 9.4 105.6 175.8 281.4 41.02 105.52
13.25 50 ML 225.0 8.7 113.1 219.3 332.4 51.18 125.43
15.25 50 ML 225.0 13.8 113.1 288.4 401.5 67.30 153.08
17.25 50 ML 225.0 13.8 113.1 357.6 470.7 83.43 180.72
19.25 50 ML 225.0 13.8 113.1 426.7 539.8 99.56 208.37
21.25 50 ML 225.0 13.8 113.1 495.8 608.9 115.68 236.02
23.25 50 ML 225.0 13.8 113.1 564.9 678.0 131.81 263.66
25.25 50 ML 225.0 13.8 113.1 634.0 747.1 147.94 291.31
27.25 50 Sand 240.1 15.0 120.7 709.2 829.9 165.47 323.90
29.25 22 Sand 240.1 10.8 120.7 763.2 883.9 178.08 345.51
31.25 50 Sand 333.5 10.8 167.6 817.2 984.9 190.69 382.77
33.25 50 Sand 333.5 15.0 167.6 892.4 1060.0 208.22 412.83
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Ayung, Denpasar, Bali.

TITIK BOR-5 (Jembatan Tukad Ayung) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 50 Sand 333.5 15.0 94.3 92.9 187.2 21.69 68.61
7.25 50 Sand 333.5 15.0 94.3 149.3 243.6 34.84 91.15
9.25 50 Sand 333.5 15.0 94.3 205.7 300.0 47.99 113.70
11.25 50 Sand 333.5 15.0 94.3 262.0 356.3 61.14 136.24
13.25 50 Sand 333.5 15.0 94.3 318.4 412.7 74.29 158.78
15.25 50 Sand 333.5 15.0 94.3 374.7 469.0 87.44 181.33
17.25 50 Sand 333.5 15.0 94.3 431.1 525.4 100.59 203.87
19.25 50 Sand 333.5 15.0 94.3 487.5 581.8 113.74 226.42
21.25 50 Sand 333.5 15.0 94.3 543.8 638.1 126.89 248.96
23.25 50 Sand 333.5 15.0 94.3 600.2 694.5 140.04 271.50
25.25 50 Sand 323.5 15.0 91.5 656.5 748.0 153.19 293.11
27.25 47 Sand 323.5 14.5 91.5 711.2 802.7 165.95 314.97
29.25 50 Sand 333.5 14.5 94.3 765.9 860.2 178.70 337.78
31.25 50 Sand 333.5 15.0 94.3 822.2 916.5 191.85 360.32
33.25 50 Sand 333.5 15.0 94.3 878.6 972.9 205.00 382.87
35.25 50 Sand 333.5 15.0 94.3 934.9 1029.2 218.15 405.41
37.25 50 Sand 333.5 15.0 94.3 991.3 1085.6 231.31 427.96
39.25 50 Sand 333.5 15.0 94.3 1047.7 1142.0 244.46 450.50

TITIK BOR-5 (Jembatan Tukad Ayung) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 50 Sand 333.5 15.0 167.6 123.9 291.6 28.91 105.45
7.25 50 Sand 333.5 15.0 167.6 199.1 366.7 46.45 135.51
9.25 50 Sand 333.5 15.0 167.6 274.2 441.8 63.98 165.56
11.25 50 Sand 333.5 15.0 167.6 349.4 517.0 81.52 195.62
13.25 50 Sand 333.5 15.0 167.6 424.5 592.1 99.05 225.68
15.25 50 Sand 333.5 15.0 167.6 499.7 667.3 116.59 255.74
17.25 50 Sand 333.5 15.0 167.6 574.8 742.4 134.12 285.80
19.25 50 Sand 333.5 15.0 167.6 649.9 817.6 151.65 315.86
21.25 50 Sand 333.5 15.0 167.6 725.1 892.7 169.19 345.92
23.25 50 Sand 333.5 15.0 167.6 800.2 967.9 186.72 375.98
25.25 50 Sand 323.5 15.0 162.6 875.4 1038.0 204.26 404.36
27.25 47 Sand 323.5 14.5 162.6 948.3 1110.9 221.26 433.51
29.25 50 Sand 333.5 14.5 167.6 1021.2 1188.8 238.27 464.34
31.25 50 Sand 333.5 15.0 167.6 1096.3 1263.9 255.80 494.40
33.25 50 Sand 333.5 15.0 167.6 1171.5 1339.1 273.34 524.46
35.25 50 Sand 333.5 15.0 167.6 1246.6 1414.2 290.87 554.52
37.25 50 Sand 333.5 15.0 167.6 1321.7 1489.4 308.41 584.58
39.25 50 Sand 333.5 15.0 167.6 1396.9 1564.5 325.94 614.64
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Ayung, Denpasar, Bali.

TITIK BOR-6 (Jembatan Tukad Ayung) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 5 ML 20.3 1.5 5.7 34.5 40.2 8.04 15.70
7.25 4 ML 15.8 1.2 4.5 39.1 43.6 9.13 17.14
9.25 3 ML 119.3 1.0 33.7 42.8 76.5 9.98 28.35
11.25 50 Sand 333.5 7.9 94.3 72.5 166.8 16.93 60.45
13.25 50 Sand 333.5 15.0 94.3 128.9 223.2 30.08 82.99
15.25 50 Sand 333.5 15.0 94.3 185.3 279.6 43.23 105.54
17.25 50 Sand 333.5 15.0 94.3 241.6 335.9 56.38 128.08
19.25 50 Sand 333.5 15.0 94.3 298.0 392.3 69.53 150.63
21.25 50 Sand 333.5 15.0 94.3 354.3 448.6 82.68 173.17
23.25 50 Sand 333.5 15.0 94.3 410.7 505.0 95.83 195.71
25.25 50 Sand 333.5 15.0 94.3 467.1 561.4 108.98 218.26
27.25 50 Sand 333.5 15.0 94.3 523.4 617.7 122.13 240.80
29.25 50 Sand 333.5 15.0 94.3 579.8 674.1 135.28 263.35

TITIK BOR-6 (Jembatan Tukad Ayung) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton

5.25 5 ML 20.3 1.5 10.2 46.0 56.1 10.72 21.78


7.25 4 ML 15.8 1.2 7.9 52.2 60.1 12.18 23.51
9.25 3 ML 119.3 1.0 59.9 57.0 117.0 13.30 42.79
11.25 50 Sand 333.5 7.9 167.6 96.7 264.4 22.57 94.57
13.25 50 Sand 333.5 15.0 167.6 171.9 339.5 40.10 124.63
15.25 50 Sand 333.5 15.0 167.6 247.0 414.7 57.64 154.69
17.25 50 Sand 333.5 15.0 167.6 322.2 489.8 75.17 184.75
19.25 50 Sand 333.5 15.0 167.6 397.3 565.0 92.71 214.81
21.25 50 Sand 333.5 15.0 167.6 472.5 640.1 110.24 244.86
23.25 50 Sand 333.5 15.0 167.6 547.6 715.2 127.78 274.92
25.25 50 Sand 333.5 15.0 167.6 622.8 790.4 145.31 304.98
27.25 50 Sand 333.5 15.0 167.6 697.9 865.5 162.84 335.04
29.25 50 Sand 333.5 15.0 167.6 773.1 940.7 180.38 365.10
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Penatih, Denpasar, Bali.

TITIK BOR-7 (Jembatan Tukad Penatih) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 12 Sand 140.1 2.5 39.6 20.2 59.8 4.71 21.27
7.25 30 Sand 130.1 6.3 36.8 43.7 80.5 10.21 29.76
9.25 9 ML 51.8 5.4 14.6 64.0 78.6 14.92 30.46
11.25 14 ML 144.0 3.2 40.7 75.9 116.6 17.71 43.92
13.25 50 Sand 333.5 9.6 94.3 111.9 206.2 26.11 76.19
15.25 50 Sand 330.2 15.0 93.4 168.2 261.6 39.26 98.41
17.25 49 Sand 330.2 14.8 93.4 224.0 317.4 52.28 120.73
19.25 50 Sand 333.5 14.8 94.3 279.8 374.1 65.29 143.37
21.25 50 Sand 333.5 15.0 94.3 336.2 430.5 78.45 165.91
23.25 50 Sand 333.5 15.0 94.3 392.6 486.8 91.60 188.45
25.25 50 Sand 333.5 15.0 94.3 448.9 543.2 104.75 211.00
27.25 50 Sand 333.5 15.0 94.3 505.3 599.6 117.90 233.54
29.25 50 Sand 333.5 15.0 94.3 561.6 655.9 131.05 256.09

TITIK BOR-7 (Jembatan Tukad Penatih) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 12 Sand 140.1 2.5 70.4 26.9 97.3 6.28 34.23
7.25 30 Sand 130.1 6.3 65.4 58.3 123.7 13.61 45.12
9.25 9 ML 51.8 5.4 26.0 85.3 111.3 19.90 42.78
11.25 14 ML 144.0 3.2 72.4 101.2 173.6 23.61 64.60
13.25 50 Sand 333.5 9.6 167.6 149.2 316.8 34.81 115.55
15.25 50 Sand 330.2 15.0 166.0 224.3 390.3 52.34 145.05
17.25 49 Sand 330.2 14.8 166.0 298.7 464.7 69.70 174.81
19.25 50 Sand 333.5 14.8 167.6 373.1 540.7 87.06 205.12
21.25 50 Sand 333.5 15.0 167.6 448.3 615.9 104.59 235.18
23.25 50 Sand 333.5 15.0 167.6 523.4 691.0 122.13 265.24
25.25 50 Sand 333.5 15.0 167.6 598.6 766.2 139.66 295.30
27.25 50 Sand 333.5 15.0 167.6 673.7 841.3 157.20 325.36
29.25 50 Sand 333.5 15.0 167.6 748.8 916.5 174.73 355.42
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Penatih, Denpasar, Bali.

TITIK BOR-8 (Jembatan Tukad Penatih) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 50 Sand 333.5 14.2 94.3 93.4 187.6 21.78 68.77
7.25 50 Sand 333.5 15.0 94.3 149.7 244.0 34.93 91.32
9.25 50 ML 225.0 13.8 63.6 201.5 265.2 47.03 101.83
11.25 50 ML 225.0 13.8 63.6 253.4 317.0 59.12 122.56
13.25 50 Sand 333.5 15.0 94.3 309.7 404.0 72.27 155.33
15.25 50 Sand 333.5 15.0 94.3 366.1 460.4 85.42 177.87
17.25 50 Sand 333.5 15.0 94.3 422.5 516.8 98.58 200.42
19.25 50 Sand 333.5 15.0 94.3 478.8 573.1 111.73 222.96
21.25 50 Sand 333.5 15.0 94.3 535.2 629.5 124.88 245.51
23.25 50 Sand 333.5 15.0 94.3 591.5 685.8 138.03 268.05
25.25 50 Sand 220.1 15.0 62.2 647.9 710.1 151.18 279.91
27.25 16 Sand 220.1 9.9 62.2 685.0 747.3 159.84 294.76
29.25 50 Sand 333.5 9.9 94.3 722.2 816.5 168.51 320.30

TITIK BOR-8 (Jembatan Tukad Penatih) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 50 Sand 333.5 14.2 167.6 124.5 292.1 29.04 105.67
7.25 50 Sand 333.5 15.0 167.6 199.6 367.3 46.58 135.73
9.25 50 ML 225.0 13.8 113.1 268.7 381.8 62.70 145.19
11.25 50 ML 225.0 13.8 113.1 337.8 450.9 78.83 172.84
13.25 50 Sand 333.5 15.0 167.6 413.0 580.6 96.37 221.08
15.25 50 Sand 333.5 15.0 167.6 488.1 655.8 113.90 251.13
17.25 50 Sand 333.5 15.0 167.6 563.3 730.9 131.43 281.19
19.25 50 Sand 333.5 15.0 167.6 638.4 806.1 148.97 311.25
21.25 50 Sand 333.5 15.0 167.6 713.6 881.2 166.50 341.31
23.25 50 Sand 333.5 15.0 167.6 788.7 956.4 184.04 371.37
25.25 50 Sand 220.1 15.0 110.6 863.9 974.5 201.57 382.43
27.25 16 Sand 220.1 9.9 110.6 913.4 1024.0 213.12 402.23
29.25 50 Sand 333.5 9.9 167.6 962.9 1130.5 224.68 441.04
TESTANA ENGINEERING.
Soil Testings & Research Administration

BEARING CAPACITY OF DRILLED SHAFT FOUNDATION


Reese & Wright Formula (1978)

Project : Jembatan.
Location : Tukad Penatih, Denpasar, Bali.

TITIK BOR-9 (Jembatan Tukad Penatih) Boredpile dia. 60cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 4 ML 15.8 1.5 4.5 23.3 27.8 5.44 10.81
7.25 3 ML 13.5 1.0 3.8 27.0 30.8 6.29 12.05
9.25 3 ML 36.0 0.8 10.2 30.1 40.2 7.02 15.42
11.25 13 ML 141.8 2.2 40.1 38.4 78.4 8.95 28.70
13.25 50 Sand 333.5 9.4 94.3 73.8 168.1 17.22 60.95
15.25 50 Sand 333.5 15.0 94.3 130.2 224.5 30.37 83.49
17.25 50 Sand 333.5 15.0 94.3 186.5 280.8 43.52 106.04
19.25 50 Sand 333.5 15.0 94.3 242.9 337.2 56.67 128.58
21.25 50 Sand 333.5 15.0 94.3 299.2 393.5 69.82 151.13
23.25 50 Sand 333.5 15.0 94.3 355.6 449.9 82.97 173.67
25.25 50 Sand 333.5 15.0 94.3 412.0 506.3 96.12 196.21
27.25 50 ML 225.0 13.8 63.6 463.8 527.4 108.22 206.72
29.25 50 ML 225.0 13.8 63.6 515.6 579.2 120.31 227.46

TITIK BOR-9 (Jembatan Tukad Penatih) Boredpile dia. 80cm


Pile Length N-SPT Soil qp fs Qp ΣQs Qult SF shaft = 2.5; SF tip = 3
m Bpf Type t/m2 t/m2 ton ton ton Qall-tension, ton Qall-comp., ton
5.25 4 ML 15.8 1.5 7.9 31.1 39.0 7.26 15.08
7.25 3 ML 13.5 1.0 6.8 35.9 42.7 8.39 16.64
9.25 3 ML 36.0 0.8 18.1 40.1 58.2 9.35 22.07
11.25 13 ML 141.8 2.2 71.3 51.1 122.4 11.93 44.21
13.25 50 Sand 333.5 9.4 167.6 98.4 266.0 22.96 95.24
15.25 50 Sand 333.5 15.0 167.6 173.5 341.2 40.49 125.30
17.25 50 Sand 333.5 15.0 167.6 248.7 416.3 58.03 155.35
19.25 50 Sand 333.5 15.0 167.6 323.8 491.5 75.56 185.41
21.25 50 Sand 333.5 15.0 167.6 399.0 566.6 93.10 215.47
23.25 50 Sand 333.5 15.0 167.6 474.1 641.8 110.63 245.53
25.25 50 Sand 333.5 15.0 167.6 549.3 716.9 128.16 275.59
27.25 50 ML 225.0 13.8 113.1 618.4 731.5 144.29 285.06
29.25 50 ML 225.0 13.8 113.1 687.5 800.6 160.42 312.70
A.11
Documentation
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Denpasar, Bali

Tukad Bindu, S-1 S-2, Tukad Bindu

Tukad Ayung, S-3 S-4, Tukad Ayung

Tukad Penatih, S-5 S-6, Tukad Penatih


TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Bindu, Denpasar, Bali

Bor-1@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Bindu, Denpasar, Bali

Bor-2@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Bindu, Denpasar, Bali

Bor-3@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Ayung, Denpasar, Bali

Bor-4@33.50 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Ayung, Denpasar, Bali

Bor-5@40 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Ayung, Denpasar, Bali

Bor-6@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Penatih, Denpasar, Bali

Bor-7@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Penatih, Denpasar, Bali

Bor-8@30 meter
TESTANA ENGINEERING.
Soil Testings & Research Administration

DOCUMENTATION

Penyelidikan Tanah Proyek Pembangunan Jembatan


Tukad Penatih, Denpasar, Bali

Bor-9@30 meter