GLASS
7585 Morning Dove
San Angelo, TX 76901
(817) 999-6714
mg734710@westpost.net
OBJECTIVE
To obtain a supervisory position with my 35 plus years of commercial constructio
n experience. Estimating, quality, safety, and timely completion within budgeta
ry guidelines are the guideline for job completion.
SUMMARY OF QUALIFICATIONS
* Hands-on experience in successfully scheduling projects in logical steps and b
udgeting time required to meet deadlines in a timely manner.
Study job specifications to determine appropriate construction methods.
* Experience in planning, organizing, and directing all aspects of various types
of projects, including the construction of structures, facilities, and systems.
* Conferred with sub-contractors, owners, and design professionals regarding any
and all matters including, providing detailed explanations of contract terms, p
revention and resolution of any issues regarding work procedures, complaints, or
construction problems.
* Ability to give full attention to what other people are saying, taking time to
understand the points being made and asking questions as appropriate .
* Review construction progress to determine when something is wrong or likely to
go wrong.
* Applied general rules to specific problems to produce answers that make sense.
* Analyzed information and evaluate results to choose the best solution and solv
e problems.
* Inspected and reviewed projects to monitor compliance with building and safety
codes.
EXPERINCE
Project Manager- Miller Sierra Contractors April 2009 - September
2009
Euless, Texas
SKILLS
* Proficient in Microsoft Office and Project Management
* Proficient in Primavera Expedition and Sure Track Scheduling.
* Experience with various other computer software programs
* Extensively trained in conflict resolution and negotiation techniques
* Use of RS Mean's production standards for man hour productivity and cost estim
ating.
* Use of DBO2 software for documentation and notification to sub contractors for
quality and safety control.
Project List
Wagnor Oil 5th and 6th floors Window replacement Employees were working on ea
ch floor. replacement with employees
Safety was a great concern.
6th Grade Learning Center Waxahachie, TX. 93,000 sq. ft. School 11 month sched
ule
ASU Science Building San Angelo, TX. 30,000 sq. ft. two story 12 Mo
nth schedule with 2nd floor structural Ground up 22,000 sq. ft. Higher
Concrete slab. Education Facility. 2 story structural
ASU Carr Fine Arts San Angelo, TX. 2 story addition and additional 2ns floor to
existing. 12 month schedule
Story over roof area. $4MM.
Baptist Memorial San Angelo, TX. One story remodel &2.5 MM Story over roof are
a.
Johnson Street Church of Christ San A
ngelo, TX. $2.5 MM Gym/office /classroom/kitchen 12 month schedule
Kitchen and Gym
Sam Moon Shopping Center Frisco, TX. 45,000 sq. ft. concrete project Tilt up
concrete panels completed and panels standing in 90 calendar days
Including drilled piers and 123,700