Anda di halaman 1dari 4

.MICHAEL D.

GLASS
7585 Morning Dove
San Angelo, TX 76901
(817) 999-6714
mg734710@westpost.net

OBJECTIVE
To obtain a supervisory position with my 35 plus years of commercial constructio
n experience. Estimating, quality, safety, and timely completion within budgeta
ry guidelines are the guideline for job completion.

SUMMARY OF QUALIFICATIONS
* Hands-on experience in successfully scheduling projects in logical steps and b
udgeting time required to meet deadlines in a timely manner.
Study job specifications to determine appropriate construction methods.
* Experience in planning, organizing, and directing all aspects of various types
of projects, including the construction of structures, facilities, and systems.
* Conferred with sub-contractors, owners, and design professionals regarding any
and all matters including, providing detailed explanations of contract terms, p
revention and resolution of any issues regarding work procedures, complaints, or
construction problems.
* Ability to give full attention to what other people are saying, taking time to
understand the points being made and asking questions as appropriate .
* Review construction progress to determine when something is wrong or likely to
go wrong.
* Applied general rules to specific problems to produce answers that make sense.
* Analyzed information and evaluate results to choose the best solution and solv
e problems.
* Inspected and reviewed projects to monitor compliance with building and safety
codes.

EXPERINCE
Project Manager- Miller Sierra Contractors April 2009 - September
2009
Euless, Texas

* Supervised the overall construction of multiple projects in Longview, Texas.


* Responsible for planning, direction and budget cost for all projects.
* Developed project CPM schedules.
* Quality control and overall safety.
* Conducted all project communications and meetings with Architects and Owners.
* Plan compliance and specification reviews for compliance.
* Change order cost and implementation.
* RFI and RFP implementation.
* Purchasing of materials and delivery dates.
Onsite Project Manager/Superintendent - SEDALCO Construction Services May 200
7 - March 2009
Ft. Worth, Texas
* Responsible for the construction of the $14 MM 6th Grade Learning Center and W
agner Oil Co. renovation.
* Responsible for planning and direction of sub contractor activities concerned
with the construction of structures, facilities and systems.
* Development of the CPM Schedule.
* Supervise the project in logical steps and budget the time required to meet de
adlines.
* Inspect and review projects to monitor compliance with building, city and safe
ty codes.
* Maintain accurate job records and as built drawings to show changes in the fie
ld or by change order.
* Approve sub contractor pay applications.
* Seek sub contractor cost on change orders and for additional work not included
in their contract.
* Review sub contracts for omissions or errors.
* Conduct weekly sub contractor and supplier meetings.
* Communications with Owner, Architect and Sub Contractors.

Contract Project Manager/Superintendent - Patriot Construction


May 2006 - May 2007
Plano, TX
* Supervision of the construction project and sub contractor progress and qualit
y.
* Schedule the project in logical steps and budget the time to meet deadlines.
* Schedule delivery of materials.
* Recommend design changes enhance the appearance of the project.
* Insure that all phases of the project meet city building codes and the require
ments of the franchise chosen during the design of the project.
* Interpret and explain plans and contract terms to sub contractors and clients.
* Written and verbal communication between the City and Construction Team.

Project Superintendent - Templeton Construction June 2003 _ May 2006


San Angelo, TX
* Development of the CPM Schedule.
* Daily inspection of the project for quality, plan compliance and safety.
* Supervision of sub contractors and hourly workers on the project.
* Conduction of all job meetings and responsible for job communications with the
construction team and owner representative.
* Interpret and explain plans and contract terms to sub contractors and clients.
* Review of shop drawings for plan compliance and details.
* Maintain accurate job records and as built drawings.
* Estimate change orders, job costs controls, budget analysis.

SKILLS
* Proficient in Microsoft Office and Project Management
* Proficient in Primavera Expedition and Sure Track Scheduling.
* Experience with various other computer software programs
* Extensively trained in conflict resolution and negotiation techniques
* Use of RS Mean's production standards for man hour productivity and cost estim
ating.
* Use of DBO2 software for documentation and notification to sub contractors for
quality and safety control.

EDUCATION & TRAINING


* Proficient in Microsoft Office and Project Management
* Proficient in Primavera Project Management and Sure Track Scheduling
* Experience with various other computer software programs
* Extensively trained in conflict resolution and negotiation techniques
* Kaplan Financial Texas Property and Casualty Insurance Adjuster license traini
ng.
* Licensed Insurance Adjuster for State of Texas.
* Ed to Go online project management classes.
* AGC Storm Water Inspection Certificate
* AGC Safety Training classes
* US Navy training in electronics and flight communications.
* Kaplan University Project Manager and LEED Certificates completed in 8 months
on line.

References available on request

Project List
Wagnor Oil 5th and 6th floors Window replacement Employees were working on ea
ch floor. replacement with employees
Safety was a great concern.
6th Grade Learning Center Waxahachie, TX. 93,000 sq. ft. School 11 month sched
ule
ASU Science Building San Angelo, TX. 30,000 sq. ft. two story 12 Mo
nth schedule with 2nd floor structural Ground up 22,000 sq. ft. Higher
Concrete slab. Education Facility. 2 story structural
ASU Carr Fine Arts San Angelo, TX. 2 story addition and additional 2ns floor to
existing. 12 month schedule
Story over roof area. $4MM.
Baptist Memorial San Angelo, TX. One story remodel &2.5 MM Story over roof are
a.
Johnson Street Church of Christ San A
ngelo, TX. $2.5 MM Gym/office /classroom/kitchen 12 month schedule
Kitchen and Gym
Sam Moon Shopping Center Frisco, TX. 45,000 sq. ft. concrete project Tilt up
concrete panels completed and panels standing in 90 calendar days
Including drilled piers and 123,700

Anda mungkin juga menyukai