Anda di halaman 1dari 4

RENCANA ANGGARAN BIAYA

REHABILITASI TOTAL GEDUNG PUSKESMAS


APBD TAHUN ANGGARAN 2021
DINAS KESEHATAN KABUPATEN KARAWANG
PEKERJAAN
PEMBANGUNAN PUSKESMAS TELUKJAMBE
KABUPATEN KARAWANG

NO SAT. VOL. SATUAN JUMLAH


NAMA PEKERJAAN
Rp. Rp.
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN 104.032.317,00


1 Pekerjaan Bowplank Ml 153,00 53.128,00 8.128.584,00
2 Air kerja Bulan 6,00 1.500.000,00 9.000.000,00
3 Listrik kerja Bulan 6,00 1.500.000,00 9.000.000,00
4 Pembersihan dan Perataan Lahan M2 2.131,87 20.900,00 44.556.083,00
5 Pagar Pengaman Proyek M3 1,00 6.250,00 6.250,00
6 Direksi Keet M3 1,00 3.500.000,00 3.500.000,00
7 Kesehatan dan keselamatan kerja (K3) LS 1,00 29.841.400,00 29.841.400,00
JUMLAH I 104.032.317,00
II PEKERJAAN PENGURUGAN DAN PENGGALIAN TANAH 41.903.338,40
1 Galian Tanah untuk Pondasi Poer Plat M3 68,51 63.910,00 4.378.474,10
2 Galian Tanah untuk Pondasi Batu Kali M3 579,26 59.950,00 34.726.637,00
3 Galian Tanah untuk Septiktank M3 4,33 63.910,00 276.730,30
4 Galian Tanah untuk Saluran Air Bekas 3 M3 27,41 59.950,00 1.643.229,50
5 Galian Tanah untuk Saluran Air Kotor 4 M3 13,67 59.950,00 819.516,50
6 Galian Tanah untuk Bak Kontrol M3 0,98 59.950,00 58.751,00

JUMLAH II 41.903.338,40
III PEKERJAAN STRUKTUR 1.279.083.539,88
1 Pekerjaan Pondasi Poer Plat ( 150 Kg Besi + Bekisting ) Mutu Beton K-225 M3 5,40 1.793.632,00 9.685.612,80
2 Pekerjaan Pemasangan Pondasi Batu Belah, campuran 1 PC 3 PP M3 395,05 638.581,00 252.271.424,05
3 Pekerjaan Pemasangan Pondasi Batu Belah Pagar Keliling, campuran 1 PC 3 PP M3 117,13 638.581,00 74.796.992,53
4 Pekerjaan Sloof Beton Bertulang 35X65 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 (TB1) M3 1,72 3.108.130,00 5.345.983,60
5 Pekerjaan Sloof Beton Bertulang 20X40 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 (TB2) M3 21,12 3.108.130,00 65.643.705,60
6 Pekerjaan Sloof Beton Bertulang 15X25 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 (TB3) M3 14,20 3.108.130,00 44.135.446,00
7 Pekerjaan Kolom Beton Bertulang 45x45 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( K1 ) M3 6,05 2.781.615,00 16.828.770,75
8 Pekerjaan Kolom Beton Bertulang 30x30 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( K2 ) M3 1,62 2.781.615,00 4.506.216,30
9 Pekerjaan Kolom Beton Bertulang 20x20 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( K3 ) M3 30,60 2.781.615,00 85.117.419,00
10 Pekerjaan Kolom Praktis Beton Bertulang 15 x 15 M3 13,76 2.781.615,00 38.275.022,40
11 Pekerjaan Kolom Praktis Beton Bertulang 15 x 15 M3 14,85 2.781.615,00 41.306.982,75
12 Pekerjaan Balok Lintel Beton Bertulang 11 x 11 M3 2,60 3.014.846,00 7.838.599,60
13 Pekerjaan Balok Beton Bertulang 35X65 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( B1 ) M3 1,68 3.014.846,00 5.064.941,28
14 Pekerjaan Balok Beton Bertulang 20X40 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( B2 ) M3 21,59 3.014.846,00 65.090.525,14
15 Pekerjaan Balok Beton Bertulang 15X30 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( B3 ) M3 17,67 3.014.846,00 53.272.328,82
16 Pekerjaan Balok Beton Bertulang 15X30+ekstra ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 ( B4 ) M3 13,79 3.014.846,00 41.574.726,34
17 Pekerjaan Ring Balok Beton Bertulang 15x30 ( 200 Kg Besi + Bekisting ) Mutu Beton K-225 (RB1) M3 20,12 3.014.846,00 60.658.701,52
18 Pekerjaan Plat Lantai 1 Beton Bertulang ( 110 Kg Besi + Bekisting ) Mutu Beton K-225 M3 55,83 3.727.324,00 208.096.498,92
19 PekerjaanTalang Beton Lantai 1 Beton Bertulang ( 110 Kg Besi + Bekisting ) Mutu Beton K-225 M3 30,96 3.727.324,00 115.397.951,04
20 Pekerjaan Talang Beton Bertulang Lantai 2 ( 110 Kg Besi + Bekisting ) Mutu Beton K-225 M3 13,69 3.727.324,00 51.027.065,56
21 Pekerjaan Kanopi Beton Bertulang ( 110 Kg Besi + Bekisting ) Mutu Beton K-225 M3 5,00 3.727.324,00 18.636.620,00
22 Pekerjaan Tangga Beton Bertulang ( 110 Kg Besi + Bekisting ) Mutu Beton K-225 M3 2,60 3.689.207,00 9.591.938,20
23 Pekerjaan meja beton dapur, Lab, Gudang Obat dan Spoel hook tebal 10 cm M3 1,32 3.727.324,00 4.920.067,68
JUMLAH III 1.279.083.539,88
IV PEKERJAAN DINDING BATA 840.312.330,12
1 Pekerjaan Pasangan Bata Merah (semen merk tiga roda) M2 2.866,32 89.649,00 256.962.721,68
2 Pekerjaan Plesteran (semen merk tiga roda) M2 5.395,59 67.616,00 364.828.213,44
3 Pekerjaan Acian (semen merk tiga roda) M2 5.395,59 40.500,00 218.521.395,00
JUMLAH IV 840.312.330,12
V PEKERJAAN KUSEN, PINTU JENDELA, DAN AKSESORIS 390.060.057,36
1 PJ1 ( 1 unit ) -
Kusen Alumunium Alexindo 3 White M1 23,00 82.842,00 1.905.366,00
Pintu Kaca Frame Alumunium White M2 4,43 672.359,00 2.978.550,37
Kaca Polos 5 mm merek Mulia M2 8,70 111.181,00 967.274,70
Engsel Psg 3,00 63.509,00 190.527,00
Silinder Kunci set 1,00 171.109,00 171.109,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 2,00 178.365,00 356.730,00
Selot Tanam 8 & 12 set 1,00 151.562,00 151.562,00
2 PJ2 ( 2 unit )
Kusen Alumunium Alexindo 3 White M1 46,60 82.842,00 3.860.437,20
Pintu Kaca Frame Alumunium White M2 8,86 672.359,00 5.957.100,74
Kaca Polos 5 mm merek Mulia M2 17,82 111.181,00 1.981.245,42
Engsel Psg 6,00 63.509,00 381.054,00
Silinder Kunci set 2,00 171.109,00 342.218,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 4,00 178.365,00 713.460,00
Selot tanam 8 & 12 set 2,00 151.562,00 303.124,00
3 PJ3 (2 unit)
Kusen Alumunium Alexindo 3 White M1 28,04 82.842,00 2.322.889,68
Pintu Kaca Frame Alumunium White M2 4,53 672.359,00 3.045.786,27
Kaca Polos 5 mm merek Mulia M2 6,10 111.181,00 678.204,10
Jendela Casement Unit 2,00 850.000,00 1.700.000,00
Silinder Kunci set 2,00 171.109,00 342.218,00
Engsel Psg 6,00 63.509,00 381.054,00
Handle Pintu Psg 4,00 178.365,00 713.460,00
Selot tanam 8 & 12 set 2,00 151.562,00 303.124,00
4 PJ4 (1 unit)
Kusen Alumunium Alexindo 3 White M1 26,82 82.842,00 2.221.822,44
Pintu Kaca Frame Alumunium White M2 2,26 672.359,00 1.519.531,34
Kaca Polos 5 mm merek Mulia M2 8,87 111.181,00 986.175,47
Silinder Kunci set 1,00 171.109,00 171.109,00
Engsel Psg 3,00 63.509,00 190.527,00
Handle Pintu Psg 2,00 178.365,00 356.730,00
Selot tanam 8 & 12 set 1,00 151.562,00 151.562,00
NO SAT. VOL. SATUAN JUMLAH
NAMA PEKERJAAN
Rp. Rp.
1 2 3 4 5 6
5 P1 (8 unit)
Kusen Alumunium Alexindo 3 White M1 75,84 82.842,00 6.282.737,28
Pintu Kaca Frame Alumunium White M2 33,85 672.359,00 22.759.352,15
Kaca Polos 5 mm merek Mulia M2 30,03 111.181,00 3.338.765,43
Silinder Kunci set 8,00 171.109,00 1.368.872,00
Engsel Psg 24,00 63.509,00 1.524.216,00
Handle Pintu Psg 16,00 178.365,00 2.853.840,00
Selot tanam 8 & 12 set 8,00 151.562,00 1.212.496,00
6 P2 (35 unit)
Kusen Alumunium Alexindo 3 White M1 275,80 82.842,00 22.847.823,60
Daun Pintu Double Teakwood ( fin. Vernis plitur Impra) M2 79,21 672.359,00 53.257.556,39
Kaca Polos 5 mm merek Mulia m 14,81 111.181,00 1.646.590,61
Silinder Kunci set 35,00 171.109,00 5.988.815,00
Engsel psg 70,00 63.509,00 4.445.630,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 35,00 178.365,00 6.242.775,00
7 P3 (2 unit)
Kusen Alumunium Alexindo 3 White M1 15,76 82.842,00 1.305.589,92
Pintu Kaca Frame Alumunium White M2 4,53 672.359,00 3.045.786,27
Kaca Polos 5 mm merek Mulia m 4,10 111.181,00 455.842,10
Silinder Kunci set 2,00 171.109,00 342.218,00
Engsel psg 4,00 63.509,00 254.036,00
Handle Pintu Psg 4,00 178.365,00 713.460,00
Selot tanam 8 & 12 set 2,00 151.562,00 303.124,00
8 P4 (5 unit)
Kusen Alumunium Alexindo 3 White M1 44,90 82.842,00 3.719.605,80
Pintu Kaca Frame Alumunium White M2 15,01 672.359,00 10.092.108,59
Kaca Polos 5 mm merek Mulia m 11,89 111.181,00 1.321.942,09
Silinder Kunci Set 5,00 171.109,00 855.545,00
Engsel psg 10,00 63.509,00 635.090,00
Handle Pintu Psg 10,00 178.365,00 1.783.650,00
Selot tanam 8 & 12 unit 5,00 151.562,00 757.810,00
9 P5 (9 unit)
Kusen Alumunium Alexindo 3 White M1 69,12 82.842,00 5.726.039,04
Daun Pintu Double Teakwood ( fin. Vernis plitur Impra) M2 18,15 672.359,00 12.203.315,85
Kaca Polos 5 mm merek Mulia m 3,24 111.181,00 360.226,44
Silinder Kunci set 9,00 171.109,00 1.539.981,00
Engsel psg 18,00 63.509,00 1.143.162,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 9,00 178.365,00 1.605.285,00
10 P6 (3 unit)
Kusen Alumunium Alexindo 3 White M1 23,64 82.842,00 1.958.384,88
Pintu Kaca Frame Alumunium White M2 6,79 672.359,00 4.565.317,61
Kaca Polos 5 mm merek Mulia m 5,97 111.181,00 663.750,57
Silinder Kunci set 3,00 171.109,00 513.327,00
Rel dan Box Penutup Dekkson set 3,00 252.362,00 757.086,00
Handle Pintu Tanam Psg 3,00 178.365,00 535.095,00
11 P7 (2 unit)
Kusen Alumunium Alexindo 3 White M1 14,56 82.842,00 1.206.179,52
Daun Pintu Double Teakwood ( fin. Vernis plitur Impra) M2 2,62 747.316,00 1.957.967,92
Kaca Polos 5 mm merek Mulia m 0,57 111.181,00 63.373,17
Silinder Kunci set 2,00 171.109,00 342.218,00
Engsel psg 4,00 63.509,00 254.036,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 2,00 178.365,00 356.730,00
12 P8 (1 unit)
Kusen Alumunium Alexindo 3 White M1 5,12 82.842,00 424.151,04
Daun Pintu Double Teakwood ( fin. Vernis plitur Impra) M2 1,73 747.316,00 1.292.856,68
Silinder Kunci set 1,00 171.109,00 171.109,00
Engsel Psg 2,00 63.509,00 127.018,00
Handle Pintu termasuk Rumah Kunci merek Solid Psg 1,00 178.365,00 178.365,00
13 J1 (1 unit)
Kusen Alumunium Alexindo 3 White M1 29,14 82.842,00 2.414.015,88
Jendela Casement Unit 2,00 850.000,00 1.700.000,00
Kaca Polos 5 mm merek Mulia M2 7,12 111.181,00 791.608,72
14 J2 (6 unit)
Kusen Alumunium Alexindo 3 White M1 122,28 82.842,00 10.129.919,76
Jendela Casement Unit 12,00 850.000,00 10.200.000,00
Kaca Polos 5 mm merek Mulia M2 23,42 111.181,00 2.603.859,02
15 J3 (12 unit)
Kusen Alumunium Alexindo 3 White M1 134,64 82.842,00 11.153.846,88
Jendela Casement Unit 24,00 850.000,00 20.400.000,00
Kaca Polos 5 mm merek Mulia M2 8,83 111.181,00 981.728,23
16 J4 (3 unit)
Kusen Alumunium Alexindo 3 White M1 21,12 82.842,00 1.749.623,04
Kaca Polos 5 mm merek Mulia M2 3,64 111.181,00 404.698,84
17 J5 ( 4 unit )
Kusen Alumunium Alexindo 3 White M1 43,44 82.842,00 3.598.656,48
Kaca Polos 5 mm merek Mulia M2 13,57 111.181,00 1.508.726,17
18 J6 ( 4 unit )
Kusen Alumunium Alexindo 3 White M1 117,76 82.842,00 9.755.473,92
Jendela Casement Unit 8,00 850.000,00 6.800.000,00
Kaca Polos 5 mm merek Mulia M2 30,03 111.181,00 3.338.765,43
19 J7 ( 13 unit )
Kusen Alumunium Alexindo 3 White M1 264,94 82.842,00 21.948.159,48
Jendela Casement Unit 26,00 850.000,00 22.100.000,00
Kaca Polos 5 mm merek Mulia M2 50,75 111.181,00 5.642.435,75
20 J8 ( 2 unit )
Kusen Alumunium Alexindo 3 White M1 56,48 82.842,00 4.678.916,16
Kaca Polos 5 mm merek Mulia M2 45,57 111.181,00 5.066.518,17
21 BV1 ( 2 unit )
Kusen Alumunium Alexindo 3 White M1 22,36 82.842,00 1.852.347,12
Kaca Polos 5 mm merek Mulia M2 3,31 111.181,00 368.009,11
22 BV2 ( 2 unit )
Kusen Alumunium Alexindo 3 White M1 11,68 82.842,00 967.594,56
Kaca Polos 5 mm merek Mulia M2 1,66 111.181,00 184.560,46
23 BV3 ( 5 unit )
Kusen Alumunium Alexindo 3 White M1 47,00 82.842,00 3.893.574,00
Kaca Polos 5 mm merek Mulia M2 6,90 111.181,00 767.148,90
24 BV4 ( 11 unit )
Kusen Alumunium Alexindo 3 White M1 25,08 82.842,00 2.077.677,36
Kaca Polos 5 mm merek Mulia M2 3,04 111.181,00 337.990,24
NO SAT. VOL. SATUAN JUMLAH
NAMA PEKERJAAN
Rp. Rp.
1 2 3 4 5 6
JUMLAH V 390.060.057,36
VI PEKERJAAN ATAP 572.625.700,00
1 Pekerjaan rangka atap baja ringan Profil C Ketebalan 1 mm M2 1.000,59 150.000,00 150.088.500,00
2 Pekerjaan pengadaan & pemasangan atap Onduline M2 1.000,59 390.000,00 390.230.100,00
3 Pekerjaan pengadaan dan pemasangan nok Onduline M1 183,13 70.000,00 12.819.100,00
4 Pekerjaan pengadaan dan pasang lisplank, dengan GRC lebar 30 cm, termasuk rangka dudukannya M1 278,40 70.000,00 19.488.000,00
JUMLAH VI 572.625.700,00
VII PEKERJAAN LISTRIK 168.763.870,00
A. LANTAI DASAR
1 Penambahan daya listrik dari 16000 watt ke 32000 watt Unit 1,00 3.155.000,00 3.155.000,00
2 Pasangan Box panel (10 slot) dan MCB merek Schneider Unit 1,00 802.648,00 802.648,00
3 Pemasangan instalasi lampu (kabel merek Eterna) titik 323,00 73.688,00 23.801.224,00
4 Pasangan armatur Downlight merek Mikawa 4 + lampu LED merek Myled 18 watt Bh 42,00 74.635,00 3.134.670,00
5 Pasangan lampu TL Brilux 18 watt + armatur Bh 53,00 76.002,00 4.028.106,00
6 Pasangan lampu Fitting Broco + armatur Bh 23,00 66.287,00 1.524.601,00
7 Pasangan lampu Taman + armatur Bh 5,00 336.600,00 1.683.000,00
8 Pasangan lampu plafond Phillips 33361 + armatur Bh 2,00 155.100,00 310.200,00
9 Pasangan outlet stop kontak + armatur Broco standar Bh 65,00 73.688,00 4.789.720,00
10 Pasangan outlet tv Broco + armatur Bh 2,00 89.952,00 179.904,00
11 Pasangan outlet telepon Broco + armatur Bh 7,00 89.952,00 629.664,00
12 Pasangan outlet saklar dobel merek Broco standar Unit 22,00 71.197,00 1.566.334,00
13 Pasangan outlet saklar tunggal merek Broco standar Unit 40,00 67.787,00 2.711.480,00
14 Pemasangan Stop Kontak AC merk Broco bh 25,00 97.558,00 2.438.950,00
15 Pemasangan AC 1 PK Daikin Unit 24,00 3.206.252,00 76.950.048,00
16 Pemasangan exhaust kamar mandi merek SEKAI 10 unit 12,00 209.302,00 2.511.624,00
B. LANTAI 1
1 Pemasangan instalasi lampu (kabel merek Eterna) titik 120,00 73.688,00 8.842.560,00
2 Pasangan instalasi MCB merek Schneider Unit 1,00 802.648,00 802.648,00
3 Pasangan armatur Downlight merek Mikawa 4 + lampu LED merek Myled 18 watt Bh 10,00 74.635,00 746.350,00
4 Pasangan lampu TL Brilux 18 watt + armatur Bh 25,00 76.002,00 1.900.050,00
5 Pasangan lampu Fitting Broco + armatur Bh 10,00 66.287,00 662.870,00
6 Pasangan outlet stop kontak + armatur Broco standar Bh 34,00 73.688,00 2.505.392,00
7 Pasangan outlet tv Broco + armatur Bh 2,00 89.952,00 179.904,00
8 Pasangan outlet telepon Broco + armatur Bh 4,00 89.952,00 359.808,00
9 Pemasangan Instalasi Penangkal Petir Titik 2,00 1.950.000,00 3.900.000,00
10 Pasangan outlet saklar dobel merek Broco standar Unit 12,00 71.197,00 854.364,00
11 Pasangan outlet saklar tunggal merek Broco standar Unit 5,00 67.787,00 338.935,00
12 Pemasangan Stop Kontak AC merk Broco bh 6,00 97.558,00 585.348,00
13 Pemasangan AC 1 PK Daikin Unit 5,00 3.206.252,00 16.031.260,00
14 Pemasangan exhaust kamar mandi merek SEKAI 10 unit 4,00 209.302,00 837.208,00
JUMLAH VII 168.763.870,00
VIII PEKERJAAN PLAFOND 183.607.312,24
1 Pekerjaan rangka plafond hollow galvanis 20/40 dan 40/40 M2 1.563,80 56.746,00 88.739.394,80
2 Pekerjaan gypsum 9 mm eks. Jayaboard M2 1.563,80 42.175,00 65.953.265,00
3 List profil gipsum uk. 10 cm M1 1.609,32 17.967,00 28.914.652,44
JUMLAH VIII 183.607.312,24
IX PEKERJAAN SANITAIR 127.097.952,40
1 Pengadaan dan Pemasangan Pipa Pvc Air Bersih 1 M1 46,08 23.972,00 1.104.629,76
2 Pengadaan dan Pemasangan Pipa Pvc Air Bersih 3/4 M1 161,59 20.923,00 3.380.947,57
3 Pengadaan dan Pemasangan Pipa Pvc Air Bersih supply Fixtures toilet 1/2 M1 121,22 19.145,00 2.320.756,90
4 Pengadaan dan Pemasangan Pipa Pvc Air Bekas/ Drain 3. M1 292,39 75.731,00 22.142.987,09
5 Pengadaan dan Pemasangan pipa Pvc air Kotor ex.Wavin 4 M1 170,48 104.946,00 17.891.194,08
6 Pengadaan dan Pemasangan pipa Pvc air Hujan ex.Wavin 4 M1 203,00 104.946,00 21.304.038,00
7 Pengadaan dan Pemasangan Urinoir lengkap warna standar Merk INA type U114N Bh 6,00 1.610.620,00 9.663.720,00
8 Pengadaan dan Pemasangan Kloset Duduk Merk INA Type C22 Bh 16,00 1.194.710,00 19.115.360,00
9 Pengadaan dan Pemasangan Jet washer merek Jaguchi Bh 16,00 58.900,00 942.400,00
11 Pengadaan dan Pemasangan Kran tembok dia 1/2 ONDA Bh 30,00 111.600,00 3.348.000,00
12 Pengadaan dan Pemasangan Wastafel lengkap Merk INA Bh 25,00 722.094,00 18.052.350,00
13 Pengadaan dan Pemasangan Kran Wastafel lokal ONDA Bh 25,00 111.600,00 2.790.000,00
14 Pengadaan dan Pemasangan Floor drain merek Lokal Bh 23,00 50.648,00 1.164.904,00
15 Pengadaan dan Pemasangan Bak Cuci stainless steel standar lokal Bh 5,00 345.212,00 1.726.060,00
16 Pengadaan dan Pemasangan Kran cuci piring ONDA Bh 5,00 124.461,00 622.305,00
17 Pengadaan dan Pemasangan Roof Drain 4 merek Lokal Bh 29,00 52.700,00 1.528.300,00
JUMLAH IX 127.097.952,40
X PEKERJAAN FINISHING 693.932.068,43
1 Pemasangan Granit Tile Lantai uk. 60x60 Merek roman M2 1.286,47 159.590,00 205.307.747,30
2 Pemasangan Granit Tile Lantai Teras uk. 60x60 roman nonslip M2 14,62 159.590,00 2.333.205,80
3 Pemasangan Plin Lantai Granit Tile uk. 60 x 60 merek roman M1 784,46 59.526,00 46.695.765,96
4 Pemasangan Keramik Lantai Toilet,Janitor,Rendam Cuci bilas dan Tempat Wudhu uk. 20 x 20 roman
M2 69,36 107.677,00 7.468.476,72
Brown
5 Pemasangan Keramik Dinding Toilet uk. 20 x 25 roman tinggi 1,5 m M2 201,83 141.143,00 28.486.891,69
6 Pemasangan Keramik Dinding Janitor uk. 20 x 25 roman tinggi 1,5 m M2 15,75 141.143,00 2.223.002,25
7 Pemasangan Keramik Dinding UGD, Spoel Hook dan Ruang Alat uk. 20 x 25 roman tinggi 1,5 m M2 55,20 141.143,00 7.791.093,60
8 Pemasangan Keramik Dinding R. Bersalin uk. 20 x 25 roman tinggi 1,5 m M2 30,67 141.143,00 4.328.855,81
9 Pemasangan Keramik Dinding R. Pasca Bersalin uk. 20 x 25 roman tinggi 1,5 m M2 34,05 141.143,00 4.805.919,15
10 Pemasangan Keramik Dinding R. Perawatan Pria uk. 20 x 25 roman tinggi 1,5 m M2 45,30 141.143,00 6.393.777,90
11 Pemasangan Keramik Dinding R. Perawatan Wanita uk. 20 x 25 roman tinggi 1,5 m M2 45,30 141.143,00 6.393.777,90
12 Pemasangan Keramik Dinding R. Perawatan Anak uk. 20 x 25 roman tinggi 1,5 m M2 28,73 141.143,00 4.055.038,39
13 Pemasangan Keramik Dinding R. Perawatan Infeksius uk. 20 x 25 roman tinggi 1,5 m M2 28,69 141.143,00 4.049.392,67
14 Pemasangan Keramik Dinding Tempat Wudhu uk. 20 x 25 roman tinggi 1,5 m M2 20,64 141.143,00 2.913.191,52
15 Pemasangan Keramik Meja Beton ( Dapur,Spoel Hook,Gudang Obat dan Lab ) 30x30 Mulia Putih M2 12,22 115.260,00 1.408.477,20
16 Pengecatan Dinding Vynilex M2 5.395,59 20.863,00 112.568.194,17
17 Pengecatan Plafond Sanlex m2 1.563,80 23.758,00 37.152.760,40
18 Pemasangan ACP ( beserta rangka )merek Seven m2 257,33 750.000,00 192.997.500,00
19 Pemasangan Batu Alam Andesit 20x40 Kolom Teras M2 29,98 300.000,00 8.994.000,00
20 Pemasangan Huruf Bahan Stainless Tulisan Puskesmas TelukJambe Tinggi 45 cm bh 19,00 315.000,00 5.985.000,00
21 Pemasangan Huruf Bahan Akrilik Tulisan U G D Tinggi 45 cm bh 3,00 450.000,00 1.350.000,00
22 Pemasangan Logo & Huruf Puskesmas ( sign board ) unit 1,00 230.000,00 230.000,00
JUMLAH X 693.932.068,43
NO SAT. VOL. SATUAN JUMLAH
NAMA PEKERJAAN
Rp. Rp.
1 2 3 4 5 6
XI PEKERJAAN BESI 29.063.500,00
1 Pemasangan Handrail untuk Ram dan finishing cat besi Avian M1 10,80 350.000,00 3.780.000,00
2 Pemasangan Handrail untuk Kamar Mandi Difabel dan finishing cat besi ex. Avian M1 4,46 350.000,00 1.561.000,00
3 Pemasangan Railing Tangga dan finishing cat besi Avian M1 12,63 750.000,00 9.472.500,00
4 Pemasangan Kanopi Ambulan Rangka Besi Hollow Penutup Kanopi Solartuff M1 15,00 950.000,00 14.250.000,00
JUMLAH XI 29.063.500,00
XII PEKERJAAN LAIN-LAIN 299.373.583,32
5 Pemasangan Pagar Depan Besi Hollow m2 15,00 1.497.500,00 22.462.500,00
6 Pemasangan dinding Bata Benteng Keliling m2 337,01 89.649,00 30.212.609,49
7 Finishing Plester dinding Benteng Keliling m2 674,02 67.616,00 45.574.536,32
8 Finishing Acian dinding Benteng Keliling m2 674,02 40.500,00 27.297.810,00
9 Pengecatan Benteng Keliling Cat Tembok Vynilex m2 674,02 20.863,00 14.062.079,26
10 Hotmix aspal t = 3 cm beserta pemadatan dan sirtu tebal 10 cm m2 498,09 61.625,00 30.694.796,25
11 Pengeboran Air termasuk Pompa dan Pemasangannya Unit 1,00 17.500.000,00 17.500.000,00
12 Pompa Air Zet pump 500 watt merek Shimizu Unit 2,00 2.500.000,00 5.000.000,00
13 Tangki air fiber 2000 ltr merek Penguin Unit 2,00 4.500.000,00 9.000.000,00
14 Pemasangan Septiktank dan resapannya Unit 1,00 8.300.000,00 8.300.000,00
15 Pembuatan Bak Kontrol 45 x 45 x 50 Unit 4,00 442.313,00 1.769.252,00
16 Pek. Dinding Baground Multy Lapis HPL ruang pendaftaran M2 15,00 500.000,00 7.500.000,00
17 Pemasangan instalasi dan perlengkapan IPAL unit 1,00 80.000.000,00 80.000.000,00
JUMLAH XI 299.373.583,32
JUMLAH I s.d XI` 4.729.855.569,15

Ciamis, 02 Juni 2021


Dibuat Oleh
CV. SANG ANGGANA

TTD

SAEPUL MAULANA
Direktur

Anda mungkin juga menyukai