PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
REKAPITULASI TOTAL
LUAS SUB JUMLAH HARGA PER M2
NO. URAIAN PEKERJAAN
(M2) Rp. (Rp)
1 INFORMATION AND TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI) 4.531 - -
3 UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU) 4.085 - -
JUMLAH 10.696 - -
PEMBULATAN - -
TERBILANG : ….............................
Hormat kami
Nama Perusahaan
Nama Pimpinan
Jabatan
Rekap BOQ CWR-02 AKSI UNRI (Revisi ke-4) REKAP BOQ CWR-02/HAL.1 DARI 4
BILL OF QUANTITY
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER
(GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN -
II PENERAPAN SMKK DAN ENVIRONMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK -
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS -
III PEKERJAAN STRUKTUR
III.1 PEKERJAAN PONDASI -
III.2 PEKERJAAN STRUKTUR -
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN LANTAI -
IV.2 PEKERJAAN DINDING -
IV.3 PEKERJAAN PLAFOND -
IV.4 PEKERJAAN ATAP -
IV.5 PEKERJAAN UTILITAS -
IV.6 PEKERJAAN FINISHING -
V PEKERJAAN MEP -
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang : …....................
Hormat kami
Nama Perusahaan
Nama Pimpinan
Jabatan
Rekap BOQ CWR-02 AKSI UNRI (Revisi ke-4) 1.BOQ ITC /HAL.2 DARI 4
BILL OF QUANTITY
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
REKAPITULASI
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN -
II PENERAPAN SMKK DAN ENVIRONMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK -
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS -
III PEKERJAAN STRUKTUR
III.1 PEKERJAAN PONDASI -
III.2 PEKERJAAN STRUKTUR -
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN LANTAI -
IV.2 PEKERJAAN DINDING -
IV.3 PEKERJAAN PLAFOND -
IV.4 PEKERJAAN ATAP -
IV.5 PEKERJAAN UTILITAS -
IV.6 PEKERJAAN FINISHING -
V PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING (MEP)
V.1 PEKERJAAN MEP -
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang : …........................
Hormat kami
Nama Perusahaan
Nama Pimpinan
Jabatan
Rekap BOQ CWR-02 AKSI UNRI (Revisi ke-4) 2.BOQ UML/HAL.3 DARI 4
BILL OF QUANTITY
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
REKAPITULASI
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN -
II PENERAPAN SMKK DAN ENVIRONMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK -
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS -
III.A GEDUNG A
PEKERJAAN STRUKTUR
III.A.1 PEKERJAAN PONDASI -
III.A.2 PEKERJAAN STRUKTUR -
PEKERJAAN ARSITEKTUR
III.A.3 PEKERJAAN LANTAI -
III.A.4 PEKERJAAN DINDING -
III.A.5 PEKERJAAN PLAFOND -
III.A.6 PEKERJAAN ATAP -
III.A.7 PEKERJAAN UTILITAS -
III.A.8 PEKERJAAN FINISHING -
III.B GEDUNG B
PEKERJAAN STRUKTUR
III.B.1 PEKERJAAN PONDASI -
III.B.2 PEKERJAAN STRUKTUR -
PEKERJAAN ARSITEKTUR
III.B.3 PEKERJAAN LANTAI -
III.B.4 PEKERJAAN DINDING -
III.B.5 PEKERJAAN PLAFOND -
III.B.6 PEKERJAAN ATAP -
III.B.7 PEKERJAAN UTILITAS -
III.B.8 PEKERJAAN FINISHING -
III.C GEDUNG C
PEKERJAAN STRUKTUR
III.C.1 PEKERJAAN PONDASI -
III.C.2 PEKERJAAN STRUKTUR -
PEKERJAAN ARSITEKTUR
III.C.3 PEKERJAAN LANTAI -
III.C.4 PEKERJAAN DINDING -
III.C.5 PEKERJAAN PLAFOND -
III.C.6 PEKERJAAN ATAP -
III.C.7 PEKERJAAN UTILITAS -
III.C.8 PEKERJAAN FINISHING -
IV PEKERJAAN MEP (GEDUNG A, GEDUNG B, GEDUNG C) -
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang : ….................
Hormat kami
Nama Perusahaan
Nama Pimpinan
Jabatan
Rekap BOQ CWR-02 AKSI UNRI (Revisi ke-4) 3. BOQ UTC/HAL.4 DARI 4
BILL OF QUANTITY
1. INFORMATION TECHNOLOGY CENTER
(GEDUNG TEKNOLOGI INFORMASI DAN
KOMUNIKASI)
BILL OF QUANTITY
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER
(GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN -
II PENERAPAN SMKK DAN ENVIROMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK -
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS -
III PEKERJAAN STRUKTUR
III.1 PEKERJAAN PONDASI -
III.2 PEKERJAAN STRUKTUR -
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN LANTAI -
IV.2 PEKERJAAN DINDING -
IV.3 PEKERJAAN PLAFOND -
IV.4 PEKERJAAN ATAP -
IV.5 PEKERJAAN UTILITAS -
IV.6 PEKERJAAN FINISHING -
V PEKERJAAN MEP -
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang : …..............................
NB : tidak ada PPN
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: I. PEKERJAAN PERSIAPAN
I. PEKERJAAN PERSIAPAN -
1 Pekerjaan pengukuran kembali dan pasang bowplank A.2.2.1.4 186,20 m' - -
2 Pematangan lahan untuk gedung
Galian T.06.b.2 109,82 m3 - -
Timbunan A.2.3.1.9 198,80 m3 - -
Pemadatan tanah T.14.b1a 198,80 m3 - -
Pembersihan dan perataan lahan A.2.2.1.9 760,06 m2 - -
3 Mobilisasi dan demobilisai peralatan
Mobil Crane 25 ton P.MD.1.1 1,00 unit - -
Jack in pile YZY250 T P.MD.1.2 1,00 unit - -
Vibro roller 10 ton P.MD.1.3 1,00 unit - -
Excavator PC 200 P.MD.1.4 1,00 unit - -
Dump truck kap. 8 ton P.MD.1.5 1,00 unit - -
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: II.1 PENERAPAN SMKK
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : CWR-02 PIU AKSI UNIVERSITAS RIAU
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : INFORMATION AND TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
I II III IV V VI = (IV*V)
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
Penyiapan Dokumen CEMP (Contractors
1 Environmental Management Plan) Untuk Ke 3 Gedung
Paket CWR-02
I II III IV V VI = (IV*V)
II.2 Mitigasi Dampak Gangguan Sanitasi Lingkungan
5
akibat Limbah Cair dan Limbah Padat
Menyediakan fasilitas toilet/MCK serta pengolahan air
a limbah domestik yang mencukupi dari aktifitas basecamp Unit 7,00 - -
dan pekerja konstruksi
b Menyediakan Bak/tempat sampah domestik dari pekerja Unit 7,00 - -
Menyediakan kontainer sampah/limbah konstruksi yang
c Unit 1,00 - -
mencukupi
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: III. Pekerjaan Struktur
1 PEKERJAAN TANAH
a Pekerjaan Pembuangan Tanah Galian A.2.3.1.8 697,02 m3 - -
SUB JUMLAH -
2 PEKERJAAN PONDASI TIANG PANCANG
a PC1
Pengadaan Tiang Pancang Mini Pile 30x30 J.4.7.6.10.a 48,00 m - -
Pemancangan F.04.d 48,00 m - -
Penyambungan Tiang Pancang J.5.7.6.16.a 3,00 ttk - -
Pemotongan Tiang Pancang B.29.b 3,00 ttk - -
b PC3
Pengadaan Tiang Pancang Mini Pile 30x30 J.4.7.6.10.a 624,00 m - -
Pemancangan F.04.d 624,00 m - -
Penyambungan tiang pancang J.5.7.6.16.a 39,00 ttk - -
Pemotongan Tiang Pancang B.29.b 39,00 ttk - -
c PC4
Pengadaan Tiang Pancang Mini Pile 30x30 J.4.7.6.10.a 1.664,00 m - -
Pemancangan F.04.d 1.664,00 m - -
Penyambungan tiang pancang J.5.7.6.16.a 104,00 ttk - -
Pemotongan Tiang Pancang B.29.b 104,00 ttk - -
d PC5
Pengadaan Tiang Pancang Mini Pile 30x30 J.4.7.6.10.a 2.000,00 m - -
Pemancangan F.04.d 2.000,00 m - -
Penyambungan tiang pancang J.5.7.6.16.a 125,00 ttk - -
Pemotongan Tiang Pancang B.29.b 125,00 ttk - -
e Test PDA T.PDA.1.1 3,00 ttk - -
f Tes Statik Load T.SL.1.1 1,00 ttk - -
SUB JUMLAH -
3 PEKERJAAN PILE CAP
a PC3
Galian Tanah A.2.3.1.2 22,75 m3 - -
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 2,84 m3 - -
Pasir Urug t=10cm A.2.3.1.11 1,42 m2 - -
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 18,44 m3 - -
Bekisting A.4.1.1.20 62,72 m2 - -
Besi Tulangan A.4.1.1.17 4.809,25 kg - -
b PC4
Galian Tanah A.2.3.1.2 71,60 m3 - -
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 8,42 m3 - -
Pasir Urug t=10cm A.2.3.1.11 4,21 m2 - -
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 58,91 m3 - -
Bekisting A.4.1.1.20 131,04 m2 - -
Besi Tulangan A.4.1.1.17 12.559,47 kg - -
c PC5
Galian Tanah A.2.3.1.2 120,60 m3 - -
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 12,06 m3 - -
Pasir Urug t=10cm A.2.3.1.11 6,03 m2 - -
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 102,43 m3 - -
Bekisting A.4.1.1.20 190,40 m2 - -
Besi Tulangan A.4.1.1.17 16.595,30 kg - -
SUB JUMLAH -
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: IV. Pekerjaan Arsitektur
LANTAI 2
Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 731,27 m2 - -
Pemasangan plesteran 1 Pc : 5 Pp Tebal 15 mm A.4.4.2.5 1.462,54 m2 - -
Pemasangan acian A.4.4.2.27 1.358,30 m2 - -
Pemasangan dinding kaca 8 mm + rangka sesuai gambar A.K.C.0.3 41,55 m2 - -
Kaca sunergy tebal 8 mm rangka mullion 135x40 A.K.C.0.1 38,81 m2 - -
Cubical toilet phenolic board O.JP.1.5 27,59 m2 - -
LANTAI 3
Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 740,69 m2 - -
Pemasangan plesteran 1 Pc : 5 Pp Tebal 15 mm A.4.4.2.5 1.481,38 m2 - -
Pemasangan acian A.4.4.2.27 1.357,20 m2 - -
Pemasangan dinding kaca 8 mm + rangka sesuai gambar A.K.C.0.3 41,55 m2 - -
Kaca sunergy tebal 8 mm rangka mullion 135x40 A.K.C.0.1 94,16 m2 - -
Cubical toilet phenolic board O.JP.1.5 27,59 m2 - -
LANTAI 4
Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 656,10 m2 - -
Pemasangan plesteran 1 Pc : 5 Pp Tebal 15 mm A.4.4.2.5 1.312,21 m2 - -
Pemasangan acian A.4.4.2.27 1.207,97 m2 - -
Pemasangan dinding kaca 8 mm + rangka sesuai gambar A.K.C.0.3 9,86 m2 - -
Cubical toilet phenolic board O.JP.1.5 27,59 m2 - -
Kaca sunergy tebal 8 mm rangka mullion 135x40 A.K.C.0.2 124,52 m2 - -
DINDING DECORATIF WALL
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 1.667,15 m2 - -
Pemasangan plesteran 1 Pc : 5 Pp Tebal 15 mm A.4.4.2.5 1.942,82 m2 - -
Pemasangan skimcoat motif garis A.4.4.2.27a 1.942,82 m2 - -
LANTAI 2
Pintu kaca double type D-01 P.P.F.1.4 1,00 bh - -
Pintu uPVC double type D-03 P.P.U.1.5 3,00 bh - -
Pintu uPVC type D-04 P.P.U.1.6 12,00 bh - -
Pintu geser uPVC type D-05 P.P.U.1.10 1,00 bh - -
Pintu uPVC type D-06 P.P.U.1.7 4,00 bh - -
Pintu besi double type D-08 A.4.2.1.4 4,83 m2 - -
Kusen pintu besi type D-08 A.4.2.1.4a 6,70 m' - -
Pintu shaft type D-10 P.P.B.1 9,00 bh - -
LANTAI 3
Pintu uPVC type D-04 P.P.U.1.6 18,00 bh - -
Pintu geser uPVC type D-05 P.P.U.1.10 1,00 bh - -
Pintu uPVC type D-06 P.P.U.1.7 5,00 bh - -
Pintu shaft type D-10 P.P.B.1 9,00 bh - -
LANTAI 4
Pintu kaca type D-02 P.P.F.1.1 1,00 bh - -
Pintu uPVC type D-04 P.P.U.1.6 1,00 bh - -
Pintu geser uPVC type D-05 P.P.U.1.10 1,00 bh - -
Pintu uPVC type D-06 P.P.U.1.7 5,00 bh - -
Pintu besi double type D-07 A.4.2.1.4 13,80 m2 - -
Pintu besi double type D-08 A.4.2.1.4 4,83 m2 - -
Pintu besi type D-09 A.4.2.1.4 11,50 m2 - -
Kusen pintu besi type D-07 A.4.2.1.4a 19,80 m' - -
Kusen pintu besi type D-08 A.4.2.1.4a 6,70 m' - -
Kusen pintu besi type D-09 A.4.2.1.4a 28,00 m' - -
Pintu shaft type D-10 P.P.B.1 9,00 bh - -
LANTAI 2
Pekerjaan pemasangan toilet duduk A.5.1.1.1 3,00 bh - -
Pekerjaan pemasangan jet washer A.5.1.1.14a 3,00 bh - -
Pekerjaan pemasangan paper hoder A.5.1.1.14b 3,00 bh - -
Pekerjaan pemasangan floor drain A.5.1.1.5.a 3,00 bh - -
Pekerjaan pemasangan urinoir A.5.1.1.4 2,00 bh - -
Pekerjaan pemasangan partisi urinoir A.5.1.1.3a 3,00 bh - -
Pekerjaan pemasangan washtafel A.5.1.1.5 3,00 bh - -
Pekerjaan pemasangan shower A.5.1.1.14c 2,00 bh - -
Pekerjaan pemasangan grab bar A.5.1.1.3b 1,00 bh - -
Pekerjaan pemasangan hand rail A.5.1.1.3b 1,00 bh - -
LANTAI 3
Pekerjaan pemasangan toilet duduk A.5.1.1.1 4,00 bh - -
Pekerjaan pemasangan jet washer A.5.1.1.14a 4,00 bh - -
Pekerjaan pemasangan paper hoder A.5.1.1.14b 4,00 bh - -
Pekerjaan pemasangan floor drain A.5.1.1.5.a 4,00 bh - -
Pekerjaan pemasangan urinoir A.5.1.1.4 2,00 bh - -
Pekerjaan pemasangan partisi urinoir A.5.1.1.3a 3,00 bh - -
Pekerjaan pemasangan washtafel A.5.1.1.5 3,00 bh - -
Pekerjaan pemasangan shower A.5.1.1.14c 2,00 bh - -
Pekerjaan pemasangan grab bar A.5.1.1.3b 1,00 bh - -
Pekerjaan pemasangan hand rail A.5.1.1.3b 1,00 bh - -
LANTAI 4
Pekerjaan pemasangan toilet duduk A.5.1.1.1 3,00 bh - -
Pekerjaan pemasangan jet washer merk Toto type TX403B A.5.1.1.14a 3,00 bh - -
Pekerjaan pemasangan paper hoder A.5.1.1.14b 3,00 bh - -
Pekerjaan pemasangan floor drain A.5.1.1.5.a 3,00 bh - -
Pekerjaan pemasangan urinoir A.5.1.1.4 2,00 bh - -
Pekerjaan pemasangan partisi urinoir A.5.1.1.3a 3,00 bh - -
Pekerjaan pemasangan washtafel A.5.1.1.5 3,00 bh - -
Pekerjaan pemasangan shower A.5.1.1.14c 2,00 bh - -
Pekerjaan pemasangan grab bar A.5.1.1.3b 1,00 bh - -
Pekerjaan pemasangan hand rail A.5.1.1.3b 1,00 bh - -
2 PEKERJAAN DRAINASE AREA BANGUNAN
Pekerjaan galian A.2.3.1.2 76,05 m3 - -
Pekerjaan pemasangan pasir urug A.2.3.1.11 5,85 m3 - -
Pekerjaan pemasangan u-ditch ukuran 600x600 + cover U.D.1.1 169,40 m' - -
Pekerjaan pemasangan bak kontrol ukuran 800x800 BK.1.1.8 32,00 bh - -
Pemasangan handrail wood 4/6, paint finish natural color & balustrade
RL.1.1.1 57,95 m' - -
Ø 1.5 inch, spray paint finish + balustrade Ø 8 mm, stainless steel
TANGGA 2
Pemasangan Homogenous Tile 800x800 termasuk stepnossing A.4.4.3.13.b 78,89 m2 - -
Pemasangan handrail wood 4/6, paint finish natural color & balustrade
RL.1.1.1 57,95 m' - -
Ø 1.5 inch, spray paint finish + balustrade Ø 8 mm, stainless steel
2 RAMP
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 136,90 m2 - -
Pekerjaan beton f'c 25 MPa B.13.a.3 1,12 m3 - -
Pekerjaan pembesian A.4.1.1.17 111,69 kg - -
Pemasangan Homogenous Tile 600x600 rustic A.4.4.3.13.d 9,31 m2 - -
Pemasangan handrail wood 4/6, paint finish natural color & balustrade
RL.1.1.1 58,03 m' - -
Ø 1.5 inch, spray paint finish + balustrade Ø 8 mm, stainless steel
7 PEKERJAAN PENGECATAN
LANTAI 1
Pekerjaan cat interior A.4.7.1.10a 602,06 m2 - -
Pekerjaan cat eksterior weathershield A.4.7.1.10b 401,37 m2 - -
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 104,24 m2 - -
LANTAI 2
Pekerjaan cat interior A.4.7.1.10a 814,98 m2 - -
Pekerjaan cat eksterior weathershield A.4.7.1.10b 543,32 m2 - -
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 104,24 m2 - -
LANTAI 3
Pekerjaan cat interior A.4.7.1.10a 814,32 m2 - -
Pekerjaan cat eksterior weathershield A.4.7.1.10b 542,88 m2 - -
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 124,18 m2 - -
LANTAI 4
Pekerjaan cat interior A.4.7.1.10a 724,78 m2 - -
Pekerjaan cat eksterior weathershield A.4.7.1.10b 483,19 m2 - -
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 104,24 m2 - -
9 PEKERJAAN SIGNAGE
Signage huruf stainless steel finishing hairline rangka hollow tulisan
P.HS.1.1 1.125,00 cm - -
"INFORMATION TECHNOLOGY CENTER + LOGO"
Signage huruf stainless steel finishing hairline rangka hollow tulisan
P.HS.1.1 1.375,00 cm - -
"INFORMATION TECHNOLOGY CENTER + LOGO"
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN
KOMUNIKASI)
: V. Pekerjaan MEP
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: V.1. Pekerjaan MEP Plumbing
b. Filter
Pengadaan dan pemasangan filter, lengkap terpasang dengan
alat bantu dan, accessoris, material bantu sesuai gambar dan
spesifikasi teknis
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Gate Valve Ø 80 2,00 bh - -
- Gate Valve Ø 65 3,00 bh - -
- Gate Valve Ø 50 10,00 bh - -
- Strainer Ø 50 4,00 bh - -
- Flexible Joint Ø 50 8,00 bh - -
- Check Valve Ø 50 4,00 bh - -
- Foot Valve Ø 50 2,00 bh - -
- Floating Valve Ø 65 2,00 bh - -
- Floating Valve Ø 50 2,00 bh - -
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Gate Valve Ø 65 8,00 bh - -
- Gate Valve Ø 25 2,00 bh - -
- Strainer Ø 65 4,00 bh - -
- Flexible Joint Ø 65 8,00 bh - -
- Check Valve Ø 65 4,00 bh - -
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Gate Valve Ø 32 2,00 bh - -
- Gate Valve Ø 20 1,00 bh - -
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Gate Valve Ø 32 2,00 bh - -
- Gate Valve Ø 20 1,00 bh - -
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- FD Ø 50 6,00 bh - -
- FCO Ø 100 2,00 bh - -
- FCO Ø 65 2,00 bh - -
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap terpasang
dengan alat bantu dan accessories yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- RD Ø 100 12,00 bh - -
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: V.2. Pekerjaan MEP Pemadam Kebakaran
2.2 Lt. 1
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan IHB, BCV, Gate Valve, Head Sprinkler, Fire
Extinguisher, lengkap terpasang dengan alat bantu dan aksesoris yang
diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
2.3 Lt. 2
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran, bahan pipa black
steel SCH 40, SNI 0039.87, lengkap terpasang dengan alat bantu dan aksesoris
yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan IHB, BCV, Gate Valve, Head Sprinkler, Fire
Extinguisher, lengkap terpasang dengan alat bantu dan aksesoris yang
diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
2.4 Lt. 3
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan IHB, BCV, Gate Valve, Head Sprinkler, Fire
Extinguisher, lengkap terpasang dengan alat bantu dan aksesoris yang
diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
2.5 Lt. 4
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan IHB, BCV, Gate Valve, Head Sprinkler, Fire
Extinguisher, lengkap terpasang dengan alat bantu dan aksesoris yang
diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: V.3. Pekerjaan MEP VAC
13 Kebisingan -
14 Ruang Yang Dilayani Class/Computer Room/Training
15 Lokasi Lantai - 2
11 Pipa Drain Ø 20
12 Type Unit Ceilling Cassette
13 Kebisingan -
14 Ruang Yang Dilayani Head Of ITC
15 Lokasi Lantai - 3
2.2 Lantai 2
1 Exhaust Fan (EF - 2.1) 1,00 unit - -
1 Kapasitas 450 Cfm
2 ESP 0,35 inch. WG
3 Max. Outlet Velocity 2600 FPM
4 Efisiensi 70%
5 Daya Motor 0,11 KW
6 Daya Listrik 220/1Ø/50 Hz
7 Putaran Max. 2.610 RPM
8 Type Fan Centrifugal
9 Noise 51 dB
10 Fungsi Exhaust
11 Ruangan yang Dilayani Toilet
12 Lokasi Lantai 2
2.3 Lantai 3
2.4 Lantai 4
Exhaust Fan (EF - 4.1) 1,00 unit - -
1 Kapasitas 450 Cfm
2 ESP 0,35 inch. WG
3 Max. Outlet Velocity 2600 FPM
4 Efisiensi 70%
5 Daya Motor 0,11 KW
6 Daya Listrik 220/1Ø/50 Hz
7 Putaran Max. 2.610 RPM
8 Type Fan Centrifugal
9 Noise 51 dB
10 Fungsi Exhaust
11 Ruangan yang Dilayani Toilet
12 Lokasi Lantai 4
2 Ducting PU
-FD 400 x 200 4,00 m - -
-FD 250 x 200 5,00 m - -
-FD 200 x 200 33,00 m - -
-FD 200 x 150 12,00 m - -
-FD 150 x 150 27,00 m - -
c. Pemipaan Refrigerant
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
- Pipa Drain Ø 32 56,00 m - -
- Pipa Drain Ø 25 36,00 m - -
3.2 Lantai 2
a. Ducting
2 Ducting PU
-FD 500 x 200 13,00 m - -
-FD 400 x 200 3,00 m - -
-FD 300 x 200 16,00 m - -
-FD 200 x 200 32,00 m - -
-FD 200 x 150 16,00 m - -
-FD 150 x 150 30,00 m - -
c Pemipaan Refrigerant
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
3.3 Lantai 3
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting Pre
Insulation Aluminium Polyurethane (PU) dan BJLS, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
2 Ducting PU
-FD 500 x 200 4,00 m - -
-FD 450 x 250 1,00 m - -
-FD 400 x 200 3,00 m - -
-FD 350 x 250 2,00 m - -
-FD 350 x 200 19,00 m - -
-FD 300 x 200 4,00 m - -
-FD 250 x 200 4,00 m - -
-FD 200 x 200 22,00 m - -
-FD 200 x 150 16,00 m - -
-FD 150 x 150 33,00 m - -
-FD 150 x 100 67,00 m - -
c Pemipaan Refrigerant
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
3.4 Lantai 4
a. Ducting
2 Ducting PU
-FD 450 x 200 2,00 m - -
-FD 400 x 200 6,00 m - -
-FD 350 x 200 7,00 m - -
-FD 300 x 200 14,00 m - -
-FD 250 x 200 7,00 m - -
-FD 200 x 200 10,00 m - -
-FD 150 x 150 20,00 m - -
-FD 150 x 100 5,00 m - -
c Pemipaan Refrigerant
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: V.4. Pekerjaan MEP Elektrikal
C.2 Lantai 2
1 Down Light LED 12 W 26,00 bh - -
2 Down Light LED 12 W c/w Battery 5,00 bh - -
3 Down Light LED 7 W 5,00 bh - -
4 TL LED 1 x 16 W, Tipe Balk 5,00 bh - -
5 TL LED 1 x 16 W, Tipe Balk c/w Battery 1,00 bh - -
6 TL LED 4 x 10 W, Tipe RM M5 97,00 bh - -
7 TL LED 4 x 10 W, Tipe RM M5 c/w Battery 8,00 bh - -
8 Saklar Tunggal 2,00 bh - -
9 Saklar Ganda 2,00 bh - -
10 Saklar Hotel 48,00 bh - -
11 Grid Switch 12 Gang 1,00 bh - -
12 Stop Kontak 1 ø, 16 A, 200 W 10,00 bh - -
13 Stop Kontak 1 ø, 16 A, 1000 W (Hand Dryer) 2,00 bh - -
14 Stop Kontak Lantai Double 1 ø, 16 A, 2 x 200 W 276,00 bh - -
15 Instalasi Penerangan NYM 3 x 2,5 mm² 147,00 ttk - -
16 Instalasi Stop Kontak 1ø,10A NYM 3 x 2,5 mm² 12,00 ttk - -
17 Instalasi Stop Kontak Lantai Doble 1ø,10A
NYM 3 x 2,5 mm² 276,00 ttk - -
C.3 Lantai 3
1 Down Light LED 12 W 43,00 bh - -
2 Down Light LED 12 W c/w Battery 6,00 bh - -
3 Down Light LED 7 W 5,00 bh - -
4 TL LED 1 x 16 W, Tipe Balk 3,00 bh - -
5 TL LED 1 x 16 W, Tipe Balk c/w Battery 1,00 bh - -
6 TL LED 4 x 10 W, Tipe RM M5 45,00 bh - -
7 TL LED 4 x 10 W, Tipe RM M5 c/w Battery 13,00 bh - -
8 Saklar Tunggal 17,00 bh - -
9 Saklar Ganda 17,00 bh - -
10 Saklar Hotel 12,00 bh - -
11 Grid Switch 12 Gang 1,00 bh - -
12 Stop Kontak 1 ø, 16 A, 200 W 42,00 bh - -
13 Stop Kontak 1 ø, 16 A, 1000 W (Hand Dryer) 2,00 bh - -
14 Stop Kontak Ganda 1 ø, 16 A, 2 x 200 W 49,00 bh - -
15 Stop Kontak Lantai Double 1 ø, 16 A, 2 x 200 W 42,00 bh - -
16 Stop Kontak Lantai 1 ø, 16 A, 200 W 4,00 bh - -
17 Instalasi Penerangan NYM 3 x 2,5 mm² 116,00 ttk - -
18 Instalasi Stop Kontak 1ø,10A NYM 3 x 2,5 mm² 44,00 ttk - -
19 Instalasi Stop Kontak Lantai 1ø,10ANYM 3 x 2,5 mm² 4,00 ttk - -
20 Instalasi Stop Kontak Lantai Doble 1ø,10A
NYM 3 x 2,5 mm² 42,00 ttk - -
21 Instalasi Stop Kontak Ganda 1ø,10ANYM 3 x 2,5 mm² 49,00 ttk - -
C.4 Lantai 4
1 Down Light LED 12 W 26,00 bh - -
2 Down Light LED 12 W c/w Battery 5,00 bh - -
3 Down Light LED 7 W 5,00 bh - -
4 TL LED 1 x 16 W, Tipe Balk 3,00 bh - -
5 TL LED 1 x 16 W, Tipe Balk c/w Battery 1,00 bh - -
6 TL LED 4 x 10 W, Tipe RM M5 97,00 bh - -
7 TL LED 4 x 10 W, Tipe RM M5 c/w Battery 8,00 bh - -
8 Saklar Tunggal 5,00 bh - -
9 Saklar Ganda 10,00 bh - -
10 Grid Switch 12 Gang 1,00 bh - -
11 Stop Kontak 1 ø, 16 A, 200 W 14,00 bh - -
C.6 P-OL.ITC
1 Lampu Taman LED 10,5 W, Tipe Bollar 34,00 bh - -
2 Instalasi Lampu Taman NYFGbY 5 x 4 mm² 34,00 ttk - -
Kabel Tray
1 Kabel Tray 600 x 100 mm2 65,00 mtr - -
2 Kabel Tray 500 x 100 mm2 82,00 mtr - -
3 Kabel Tray 400 x 100 mm2 209,00 mtr - -
4 Kabel Tray 300 x 100 mm2 91,00 mtr - -
I Pekerjaan Lift
1 Peralatan Utama
Pengadaan & pemasangan peralatan Utama Lift, lengkap terpasang
dengan alat bantu & accessories yang diperlukan sesuai dengan
gambar perencanaan dan spesifikasi teknis,
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 1. INFORMATION TECHNOLOGY CENTER (GEDUNG TEKNOLOGI INFORMASI DAN KOMUNIKASI)
: V.5. Pekerjaan MEP Fire Alarm
-
V.5 PEKERJAAN FIRE ALARM
5.1 Peralatan Utama Sistem Fire Alarm (Sistem Semi Addressable)
a. 'Master Control Panel Fire Alarm (MCP-FA) Addressable 1 Loop, 1,00 set - -
- Battery Back-up Stand-by 24 Jam
- Rectifier
- Surge Arrester
- Master Intercom
- Power Supply
b. PC Control Monitoring Fire Alarm 1,00 set - -
- Prosesor: Intel Xeon W-2123
- 8GB DDR4
- 1TB HDD
- DVD±RW
- Grafik: GFX NVIDIA Quadro P600 2GB
- Monitor 21.5"
- Bluetooth
- OS Windows 10 Proffesional 64 bit
c. Software Fire Alarm System 1,00 lic - -
d. Alarm printer dan Interfacing 1,00 unit - -
e. Annunciator w/ back box 1,00 unit - -
f. Test Box (Terminal Bar) - untuk sistem Elektronik 1,00 unit - -
g. MDF-FA 30" (500 x 400 x 250) 1,00 unit - -
- Isolator Module (fault module) (2x)
h. Panel Listrik (P-ELC) 1,00 set - -
i. Panel Manual START/STOP PAF 1,00 set - -
j. UPS 20 kVA, 3 Phasa, Backup 15 menit 1,00 set - -
1 LANTAI 1
a. Smoke Detector (Photo Electric) 28,00 bh - -
b. Rate Of Rise Temperature Heat Detector 20,00 bh - -
c. Fixed Temperature Heat Detector 1,00 bh - -
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh - -
e. Horn Strobe 2,00 bh - -
f. Junction Box Fire Alarm c/w Module 1,00 set - -
- Conventional Zone Module (3x)
- Mini Module (4x)
- Relay Module (2x)
2 LANTAI 2
a. Smoke Detector (Photo Electric) 47,00 bh - -
b. Fixed Temperature Heat Detector 1,00 bh - -
c. Remote LED Lamp 16,00 bh - -
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh - -
e. Horn Strobe 2,00 bh - -
f. Junction Box Fire Alarm c/w Module 1,00 set - -
- Conventional Zone Module (3x)
- Mini Module (4x)
1. BoQ-ITC UNRI2 - V. MEP ELC 56 of 64
SATU HARGA NON- JUMLAH HARGA
No. URAIAN PEKERJAAN VOLUME
AN STANDAR Rp.
3 LANTAI 3
a. Smoke Detector (Photo Electric) 38,00 bh - -
b. Fixed Temperature Heat Detector 1,00 bh - -
c. Remote LED Lamp 17,00 bh - -
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh - -
e. Horn Strobe 2,00 bh - -
f. Junction Box Fire Alarm c/w Module 1,00 set - -
- Conventional Zone Module (3x)
- Mini Module (4x)
4 LANTAI 4
a. Smoke Detector (Photo Electric) 23,00 bh - -
b. Fixed Temperature Heat Detector 2,00 bh - -
c. Manual Alarm Push Button c/w Intercom Jack 2,00 bh - -
d. Horn Strobe 2,00 bh - -
e. Junction Box Fire Alarm c/w Module 1,00 set - -
- Conventional Zone Module (3x)
- Mini Module (6x)
- Control Module (3x)
- Relay Module (2x)
b. JBFA-1 ke JBFA-2
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m' - -
c. JBFA-2 ke JBFA-3
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m' - -
d. JBFA-3 ke JBFA-4
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m' - -
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m' - -
e. JBFA-4 ke MDF-FA
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 80,00 m' - -
2 LANTAI 2
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 49,00 ttk - -
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 16,00 ttk - -
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk - -
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
3 LANTAI 3
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 39,00 ttk - -
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 17,00 ttk - -
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk - -
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
4 LANTAI 4
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 25,00 ttk - -
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk - -
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
c. Instalasi Horn Strobe -
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk - -
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk - -
e. Instalasi Interlock ke PABX, Lift dan PAF -
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 4,00 ttk - -
a. LANTAI 1
a. Ceiling Speaker 3 Watt 31,00 bh - -
b. Column Speaker 10 Watt 6,00 bh - -
c. Horn Speaker 15 Watt 6,00 bh - -
d. Volume Control 2,00 bh - -
b. LANTAI 2
a. Ceiling Speaker 3 Watt 52,00 bh - -
b. Volume Control 8,00 bh - -
c. LANTAI 3
a. Ceiling Speaker 3 Watt 58,00 bh - -
b. Volume Control 16,00 bh - -
d. LANTAI 4
a. Ceiling Speaker 3 Watt 40,00 bh - -
b. Wall Speaker 6 Watt 2,00 bh - -
c. Volume Control 6,00 bh - -
b. JBSS-2 :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 60,00 m' - -
c. JBSS-3 :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 70,00 m' - -
d. JBSS-4 :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 80,00 m' - -
1 LANTAI 1
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 2,00 ttk - -
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 31,00 ttk - -
- Instalasi Column Speaker 10 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 6,00 ttk - -
- Instalasi Horn Speaker 15 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 6,00 ttk - -
2 LANTAI 2
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 8,00 ttk - -
- Instalasi Ceiling Speaker 3 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 52,00 ttk - -
3 LANTAI 3
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 16,00 ttk - -
- Instalasi Ceiling Speaker 3 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 58,00 ttk - -
- Instalasi Wall Speaker 6 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 1,00 ttk - -
4 LANTAI 4
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 6,00 ttk - -
- Instalasi Ceiling Speaker 3 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 40,00 ttk - -
- Instalasi Wall Speaker 6 Watt -
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 2,00 ttk - -
-
6.5 Testing & Commissioning Sound System 1,00 lot - -
7 PEKERJAAN TELEPHONE
1 LANTAI - 1
a. Outlet Telephone (RJ-45) w/ Faceplate 4,00 bh - -
2 LANTAI - 3
a. Outlet Telephone (RJ-45) w/ Faceplate 17,00 bh - -
3 LANTAI - 4
a. Outlet Telephone (RJ-45) w/ Faceplate 4,00 bh - -
b. Outlet Telephone (RJ-45) w/ Faceplate (Floor Type) 3,00 bh - -
2 LANTAI 3
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 17,00 ttk - -
3 LANTAI 4
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 7,00 ttk - -
8 PEKERJAAN DATA
b RACK SWITCH-2
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 20,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 20,00 m' - -
c. RACK SWITCH-2.A
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 70,00 m' - -
d. RACK SWITCH-2.B
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 70,00 m' - -
e. RACK SWITCH-2.C
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
f. RACK SWITCH-2.D
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
g. RACK SWITCH-2.E
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
h. RACK SWITCH-2.F
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
i. RACK SWITCH-2.G
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
j. RACK SWITCH-3
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 50,00 m' - -
k. RACK SWITCH-3.A
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 80,00 m' - -
l. RACK SWITCH-4
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 100,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 100,00 m' - -
- (Kabel FO Single Mode 4 Core dalam PVC Conduit Ø 20 mm) 100,00 m' - -
2 LANTAI 2
- Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 288,00 ttk - -
3 LANTAI 3
- Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 117,00 ttk - -
4 LANTAI 4
- Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 26,00 ttk - -
2 LANTAI - 2
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 300,00 m' - -
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 64,00 bh - -
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 11,00 bh - -
d Cross Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 2,00 bh
e Hanger Tray 30,00 bh - -
f. Junction Box (Floor Duct) include Channel PVC 50,00 bh - -
3 LANTAI - 3
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 150,00 m' - -
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 15,00 bh - -
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 11,00 bh - -
d Cross Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 2,00 bh
e Hanger Tray 15,00 bh - -
f. Junction Box (Floor Duct) include Channel PVC 17,00 bh - -
4 LANTAI - 4
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 100,00 m' - -
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 4,00 bh - -
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh - -
d Hanger Tray 10,00 bh - -
e. Junction Box (Floor Duct) include Channel PVC 3,00 bh - -
Hormat Kami
PT….............................
Nama Pimpinan
Jabatan
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
REKAPITULASI
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN
II PENERAPAN SMKK DAN ENVIRONMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
III PEKERJAAN STRUKTUR
III.1 PEKERJAAN PONDASI
III.2 PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTUR
IV.1 PEKERJAAN LANTAI
IV.2 PEKERJAAN DINDING
IV.3 PEKERJAAN PLAFOND
IV.4 PEKERJAAN ATAP
IV.5 PEKERJAAN UTILITAS
IV.6 PEKERJAAN FINISHING
V PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING (MEP)
V.1 PEKERJAAN MEP
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: I. Pekerjaan Persiapan
JUMLAH
VOLUME HARGA TOTAL HARGA
No. URAIAN PEKERJAAN KODE HARGA
PEKERJAAN SATUAN Rp. Rp.
Rp.
I. PEKERJAAN PERSIAPAN
1 Pekerjaan pengukuran dan pasang bowplank A.2.2.1.4 186,20 m'
2 Pematangan lahan untuk gedung
Timbunan A.2.3.1.9 518,65 m3
Pemadatan tanah T.14.b1a 518,65 m3
Pembersihan dan perataan lahan A.2.2.1.9 1.178,80 m2
3 Mobilisasi dan demobilisai peralatan
Mobil Crane 25 ton P.MD.1.1 1,00 unit
Jack in pile YZY250 T P.MD.1.2 1,00 unit
Vibro roller 10 ton P.MD.1.3 1,00 unit
Excavator PC 200 P.MD.1.4 1,00 unit
Dump truck kap. 8 ton P.MD.1.5 1,00 unit
Hormat Kami
PT. ......
NAMA
JABATAN
HARGA JUMLAH
VOLUME TOTAL HARGA
No. URAIAN PEKERJAAN SATUAN HARGA
PEKERJAAN Rp.
Rp. Rp.
II.1 PENERAPAN SMKK
Estimasi jangka waktu 10,00 bulan Informasi
Jumlah Pekerja 100,00 org Informasi
Pelatihan K3
Bekerja di ketinggian 100,00 org
K3 Peralatan Konstruksi & Penggunaan Bahan Kimia (MSDS) 100,00 org
Analisis keselamatan pekerjaan 100,00 org
Perilaku berbasis keselamatan (Budaya K3) 100,00 org
P3K 7,00 org
Pencegahan Covid-19 7,00 org
Simulasi K3 100,00 org
Simulasi pencegahan Covid-19 100,00 org
Spanduk (Banner) 5,00 lb
Poster 5,00 lb
Papan informasi K3 2,00 bh
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
PAKET PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
I II III IV V VI = (IV*V)
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
2. BOQ-UML UNRI 6 of 53
HARGA SATUAN TOTAL HARGA
NO. URAIAN PEKERJAAN SATUAN KUANTITAS
Rp. Rp.
I II III IV V VI = (IV*V)
Hormat Kami
PT. ......
NAMA
JABATAN
2. BOQ-UML UNRI 7 of 53
BILL OF QUANTITY
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: III. Pekerjaan Struktur
HARGA
No. URAIAN PEKERJAAN Volume SATUAN JUMLAH HARGA
KODE Pekerjaan Satuan Rp. Rp.
(a) (b) (c) (d) (e) (f)
SUB JUMLAH -
SUB JUMLAH -
c TB3
Galian Tanah A.2.3.1.2 27,39 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 3,04 m3
Pasir Urug t=10cm A.2.3.1.11 6,09 m3
Pembesian A.4.1.1.17 5.220,37 Kg
Bekisting B.26.a 202,90 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 24,97 m3
d TB4
Galian Tanah A.2.3.1.2 2,24 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 0,25 m3
Pasir Urug t=10cm A.2.3.1.11 0,50 m3
Pembesian A.4.1.1.17 307,19 Kg
Bekisting B.26.a 13,28 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,50 m3
e TB5
Galian Tanah A.2.3.1.2 23,94 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 2,66 m3
Pasir Urug t=10cm A.2.3.1.11 5,32 m3
Pembesian A.4.1.1.17 4.720,65 Kg
Bekisting B.26.a 212,82 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 13,18 m3
SUB JUMLAH -
5 PEKERJAAN KOLOM K2
a Elv +3.95
-Pekerjaan Bekisting B.24.b 38,40 m2
-Pembesian A.4.1.1.17 1.061,50 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,62 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 38,40 m2
-Pembesian A.4.1.1.17 1.061,50 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,62 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 38,40 m2
-Pembesian A.4.1.1.17 1.061,50 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,62 m3
SUB JUMLAH
6 PEKERJAAN KOLOM K3
a Elv +3.95
-Pekerjaan Bekisting B.24.b 52,80 m2
-Pembesian A.4.1.1.17 1.526,65 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,01 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 52,80 m2
-Pembesian A.4.1.1.17 1.526,65 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,01 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 52,80 m2
-Pembesian A.4.1.1.17 1.526,65 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,62 m3
SUB JUMLAH -
7 PEKERJAAN KOLOM K4
a Elv +3.95
-Pekerjaan Bekisting B.24.b 72,00 m2
-Pembesian A.4.1.1.17 2.191,57 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,36 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 72,00 m2
-Pembesian A.4.1.1.17 2.191,57 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,36 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 88,00 m2
-Pembesian A.4.1.1.17 2.678,58 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 10,22 m3
SUB JUMLAH -
8 PEKERJAAN KOLOM K6
a Elv +3.95
-Pekerjaan Bekisting B.24.b 57,60 m2
-Pembesian A.4.1.1.17 2.051,57 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 6,14 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 57,60 m2
-Pembesian A.4.1.1.17 2.051,57 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 6,14 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 57,60 m2
-Pembesian A.4.1.1.17 2.051,57 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 6,14 m3
SUB JUMLAH -
9 PEKERJAAN KOLOM K7
a Elv +3.95
-Pekerjaan Bekisting B.24.b 51,20 m2
-Pembesian A.4.1.1.17 1.132,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,66 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 51,20 m2
-Pembesian A.4.1.1.17 1.132,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,66 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 32,00 m2
-Pembesian A.4.1.1.17 707,70 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,91 m3
SUB JUMLAH -
10 PEKERJAAN KOLOM K8
a Elv +3.95
-Pekerjaan Bekisting B.24.b 44,80 m2
-Pembesian A.4.1.1.17 876,17 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,73 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 44,80 m2
-Pembesian A.4.1.1.17 876,17 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,73 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 22,40 m2
-Pembesian A.4.1.1.17 438,09 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,86 m3
SUB JUMLAH -
11 PEKERJAAN KOLOM K9
a Elv +3.95
-Pekerjaan Bekisting B.24.b 26,40 m2
-Pembesian A.4.1.1.17 763,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,53 m3
b Elv +7.95
-Pekerjaan Bekisting B.24.b 26,40 m2
-Pembesian A.4.1.1.17 763,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,53 m3
c Elv +11.95
-Pekerjaan Bekisting B.24.b 26,40 m2
-Pembesian A.4.1.1.17 763,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,53 m3
SUB JUMLAH -
21 PEKERJAAN BALOK B4
a Elv +3.95
-Pekerjaan Bekisting B.23.a 5,40 m2
-Pembesian A.4.1.1.17 212,77 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,50 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 5,40 m2
-Pembesian A.4.1.1.17 1.764,93 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,62 m3
SUB JUMLAH -
22 PEKERJAAN BALOK B5
a Elv +3.95
-Pekerjaan Bekisting B.23.a 76,67 m2
-Pembesian A.4.1.1.17 1.621,24 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,67 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 73,10 m2
-Pembesian A.4.1.1.17 1.764,93 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,83 m3
SUB JUMLAH -
23 PEKERJAAN BALOK B6
a Elv +3.95
-Pekerjaan Bekisting B.23.a 98,40 m2
-Pembesian A.4.1.1.17 2.285,80 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 10,65 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 96,90 m2
-Pembesian A.4.1.1.17 2.258,21 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 11,34 m3
c Elv +15.95
-Pekerjaan Bekisting B.23.a 76,50 m2
-Pembesian A.4.1.1.17 1.480,67 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,95 m3
SUB JUMLAH -
24 PEKERJAAN BALOK B7
a Elv +3.95
-Pekerjaan Bekisting B.23.a 199,42 m2
-Pembesian A.4.1.1.17 5.015,15 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 20,95 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 196,73 m2
-Pembesian A.4.1.1.17 4.959,49 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 22,07 m3
c Elv +15.95
-Pekerjaan Bekisting B.23.a 163,41 m2
-Pembesian A.4.1.1.17 3.573,70 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 18,33 m3
SUB JUMLAH -
25 PEKERJAAN BALOK B8
a Elv +3.95
-Pekerjaan Bekisting B.23.a 20,32 m2
-Pembesian A.4.1.1.17 542,74 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,88 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 19,14 m2
-Pembesian A.4.1.1.17 514,71 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,02 m3
c Elv +15.95
-Pekerjaan Bekisting B.23.a 52,95 m2
-Pembesian A.4.1.1.17 783,13 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,60 m3
SUB JUMLAH -
26 PEKERJAAN BALOK B9
a Elv +3.95
-Pekerjaan Bekisting B.23.a 27,20 m2
-Pembesian A.4.1.1.17 701,25 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,98 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 21,25 m2
-Pembesian A.4.1.1.17 539,56 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,81 m3
c Elv +15.95
-Pekerjaan Bekisting B.23.a 27,77 m2
-Pembesian A.4.1.1.17 278,74 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,37 m3
SUB JUMLAH -
27 PEKERJAAN BALOK B10
a Elv +3.95
-Pekerjaan Bekisting B.23.a 176,85 m2
-Pembesian A.4.1.1.17 2.891,44 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 12,80 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 170,47 m2
-Pembesian A.4.1.1.17 3.097,83 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 13,24 m3
c Elv +15.95
-Pekerjaan Bekisting B.23.a 30,27 m2
-Pembesian A.4.1.1.17 561,05 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,35 m3
SUB JUMLAH -
28 PEKERJAAN BALOK B11
a Elv +3.95
-Pekerjaan Bekisting B.23.a 57,18 m2
-Pembesian A.4.1.1.17 860,72 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,89 m3
b Elv +7.95
-Pekerjaan Bekisting B.23.a 53,60 m2
-Pembesian A.4.1.1.17 815,02 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,92 m3
SUB JUMLAH -
29 PEKERJAAN BALOK B12
a Elv +7.95
-Pekerjaan Bekisting B.23.a 22,61 m2
-Pembesian A.4.1.1.17 733,39 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,19 m3
SUB JUMLAH -
SUB JUMLAH -
31 PEKERJAAN BALOK TANGGA BT2
a -Pekerjaan Bekisting B.23.a 39,33 m2
b -Pembesian A.4.1.1.17 442,29 kg
c Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,69 m3
SUB JUMLAH -
32 PEKERJAAN PLAT LANTAI
a Lantai 1 (Slab on Ground)
-Galian Tanah A.2.3.1.2 223,33 m3
-Pasir Urug t=10cm A.2.3.1.11 74,44 m3
-Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 37,22 m3
-Pembesian A.4.1.1.19 12.622,40 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 91,00 m3
a S13A
Elv +3.95
-Pekerjaan Bekisting B.21.b 563,08 m2
-Pembesian A.4.1.1.17 10.616,06 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 71,85 m3
Elv +7.95
-Pekerjaan Bekisting B.21.b 563,08 m2
-Pembesian A.4.1.1.17 11.292,68 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 71,76 m3
b S13B
Elv +3.95
-Pekerjaan Bekisting B.21.b 200,60 m2
-Pembesian A.4.1.1.17 3.704,83 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 25,61 m3
Elv +7.95
-Pekerjaan Bekisting B.21.b 200,60 m2
-Pembesian A.4.1.1.17 3.704,83 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 25,61 m3
b SDAK
Elv +7.95
-Pekerjaan Bekisting B.21.b 269,60 m2
-Pembesian A.4.1.1.17 3.181,89 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 32,33 m3
SUB JUMLAH -
33 PEKERJAAN TALANG DAN PARAPET/LISPLANK
a Talang
-Pekerjaan Bekisting B.21.b 542,92 m2
-Pembesian A.4.1.1.17 7.026,64 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 61,80 m3
b Parapet/Lisplank
-Pekerjaan Bekisting B.25.b 690,40 m2
-Pembesian A.4.1.1.17 8.185,87 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 67,36 m3
SUB JUMLAH -
33 PEKERJAAN TANGGA
a Tangga beton
-Pekerjaan Bekisting A.4.1.1.26 13,90 m2
-Pembesian A.4.1.1.17 794,98 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,42 m3
SUB JUMLAH -
34 PEKERJAAN RAMP
-Pekerjaan Bekisting A.4.1.1.26 55,86 m2
-Pembesian A.4.1.1.17 2.036,55 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,38 m3
SUB JUMLAH -
35 PEKERJAAN PROFIL BAJA ATAP
Elv +11.95
a Kuda-kuda IWF 200x100x5.5x8 A.4.2.1.1 5.375,36 kg
b Gording LLC 125x50x20x3.2 A.4.2.1.1 2.973,96 kg
c Bracing Ø16 A.4.2.1.1 648,13 kg
d Trekstang Ø16 A.4.2.1.1 149,25 kg
e Turnbucklespan skrup P.TB.1.1 74,00 bh
SUB JUMLAH -
36 PEKERJAAN SAMBUNGAN
a Stiffner A.4.2.1.1 145,70 kg
b Baut M16 P.B.1.2 1.516,00 bh
c Pelat konektor A.4.2.1.1 455,34 kg
d Base plate A.4.2.1.1 659,40 kg
e Voute A.4.2.1.1 801,86 kg
f Haunch A.4.2.1.1 336,26 kg
g Angkur M16 P.A.1.1 320,00 bh
h Siku L50.50.5 A.4.2.1.1 150,15 kg
SUB JUMLAH -
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: IV. Pekerjaan Arsitektur
HARGA JUMLAH
VOLUME TOTAL HARGA
No. URAIAN PEKERJAAN KODE SATUAN HARGA
PEKERJAAN Rp.
Rp. Rp.
2 LANTAI 2
Pemasangan finishing lantai Homogeous Tile 800x800 Polish A.4.4.3.13.a 547,80 m2
Pemasangan finishing lantai Homogeous Tile 800x800 Unpolish A.4.4.3.13.b 117,40 m2
Pemasangan finishing lantai Homogeous Tile 600x600 Unpolish A.4.4.3.13.c 35,96 m2
3 LANTAI 3
Pemasangan finishing lantai Homogeous Tile 800x800 Polish A.4.4.3.13.a 475,89 m2
Pemasangan finishing lantai Homogeous Tile 800x800 Unpolish A.4.4.3.13.b 191,99 m2
Pemasangan finishing lantai Homogeous Tile 600x600 Unpolish A.4.4.3.13.c 35,96 m2
Pemasangan finishing grass field P.GF.1.1a 71,91 m2
LANTAI 2
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 482,86 m2
Pemasangan plesteran A.4.4.2.5 965,72 m2
Pemasangan acian A.4.4.2.27 816,31 m2
Cubical toilet phenolic board O.JP.1.5 22,02 m2
Pemasangan partisi GRC A.4.5.2.41b 30,93 m2
Kaca lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 195,09 m2
LANTAI 3
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 207,66 m2
Pemasangan plesteran A.4.4.2.5 415,31 m2
Pemasangan acian A.4.4.2.27 287,53 m2
Cubical toilet phenolic board O.JP.1.5 40,95 m2
Kaca lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 68,73 m2
2 DINDING ARTIFICIAL
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 602,31 m2
Pemasangan plesteran A.4.4.2.5 602,31 m2
Pemasangan acian A.4.4.2.27 602,31 m2
LANTAI 2
Pintu frameless kaca tempered + ornamen type D-01 D 01 P.P.F.1.5 1,00 bh
Pintu upvc + kaca type D-02 D 02 P.P.U.1.1 5,00 bh
Pintu uPVC + kaca clear 8mm sandblast stiker type D-04 D 04 P.P.U.1.2 8,00 bh
Pintu toilet upvc type D-05 D 05 P.P.U.1.7 4,00 bh
Pintu besi type D-07 D 06 P.P.B.1 4,00 bh
LANTAI 3
Pintu frameless kaca tempered + ornamen type D-01 D 01 P.P.F.1.5 1,00 bh
Pintu upvc + kaca type D-02 D 02 P.P.U.1.1 3,00 bh
Pintu uPVC + kaca clear 8mm sandblast stiker type D-04 D 03 P.P.F.1.1 2,00 bh
Pintu toilet upvc type D-05 D 04 P.P.U.1.2 3,00 bh
Pintu besi type D-07 D 05 P.P.U.1.7 3,00 bh
pintu shaft (besi) l = 600mm t = 1200mm D 06 P.P.B.1 4,00 bh
4 PEKERJAAN RAILING
Pemasangan railing kayu, balustrade pipe 1,5" RL.1.1.1 62,11 m'
2 LISTPLANK
Pemasangan acian A.4.4.2.27 897,93 m2
Pekerjaan cat waterproofing W.P.M.2 77,84 m2
Pemasangan alumunium flashing A.4.5.2.41 56,00 m2
Pemasangan screed tebal 2 cm B.13.a.1 1,56 m3
3 ATAP
Pemasangan atap galvalum standing seam A.4.5.2.41b 501,79 m2
Rockwool Peredam Suara R.C.W.0.1 501,79 m2
Aluminium Foil R.C.W.0.2 501,79 m2
Pemasangan Roofmesh A.4.5.2.43a 501,79 m2
LANTAI 2
Pekerjaan pemasangan toilet duduk A.5.1.1.1 9,00 bh
Pekerjaan pemasangan jet washer A.5.1.1.14a 9,00 bh
Pekerjaan pemasangan paper holder A.5.1.1.14b 9,00 bh
Pekerjaan pemasangan floor drain A.5.1.1.14 11,00 bh
Pekerjaan pemasangan kran air A.5.1.1.19 1,00 bh
Pekerjaan pemasangan washtafel A.5.1.1.5 7,00 bh
Pekerjaan pemasangan urinoir A.5.1.1.4 2,00 bh
Pekerjaan pemasangan partisi urinoir A.5.1.1.5.a 3,00 bh
Pekerjaan pemasangan grab bar A.5.1.1.3a 1,00 bh
Pekerjaan pemasangan hand rail A.5.1.1.3b 1,00 bh
LANTAI 3
Pekerjaan pemasangan toilet duduk A.5.1.1.1 8,00 bh
Pekerjaan pemasangan jet washer A.5.1.1.14a 8,00 bh
Pekerjaan pemasangan paper holder A.5.1.1.14b 8,00 bh
Pekerjaan pemasangan floor drain A.5.1.1.14 10,00 bh
Pekerjaan pemasangan kran air A.5.1.1.19 1,00 bh
Pekerjaan pemasangan washtafel A.5.1.1.5 4,00 bh
Pekerjaan pemasangan urinoir A.5.1.1.4 4,00 bh
Pekerjaan pemasangan partisi urinoir A.5.1.1.5.a 5,00 bh
Pekerjaan pemasangan grab bar A.5.1.1.3a 1,00 bh
Pekerjaan pemasangan hand rail A.5.1.1.3b 1,00 bh
2 LANTAI 2
Pekerjaan cat interior A.4.7.1.10a 816,31 m2
Kaca lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 54,56 m2
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 149,41 m2
3 LANTAI 3
Pekerjaan cat interior A.4.7.1.10a 287,53 m2
Pekerjaan eksterior A.4.7.1.10b 602,31 m2
Kaca lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 32,47 m2
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 127,78 m2
4 MEJA DAPUR
Pekerjaan beton f'c 25 Mpa B.13.a.3 1,29 m3
Pekerjaan pembesian A.4.1.1.17 155,04 kg
Pekerjaan pemasangan bekisting B.26.a 14,20 m2
Pemasangan finishing lantai Homogeous Tile Polish 600x600 A.4.4.3.13.a 14,20 m2
5 DINDING ARTIFICIAL
Kaca tempered glass tebal 10mm frame aluminium A.K.C.0.1 29,69 m2
Pemasangan plesteran mortar + groving A.4.4.2.5 602,31 m2
Pekerjaan eksterior A.4.7.1.10b 602,31 m2
6 BALOK ARTIFICIAL
LANTAI 1
Pemasangan plesteran mortar + groving A.4.4.2.5 58,65 m2
Pekerjaan eksterior A.4.7.1.10b 58,65 m2
LANTAI 2
Pemasangan plesteran mortar + groving A.4.4.2.5 226,61 m2
Pekerjaan eksterior A.4.7.1.10b 226,61 m2
LANTAI 3
Pemasangan plesteran mortar + groving A.4.4.2.5 107,76 m2
Pekerjaan eksterior A.4.7.1.10b 107,76 m2
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: V. Pekerjaan Mekanikal Elektrikal dan Plumbing (MEP)
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
Hormat Kami
PT. ......
NAMA
JABATAN
HARGA NON
JUMLAH HARGA
No. KOMPONEN PEKERJAAN VOLUME SATUAN STANDAR
Rp.
Rp.
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 80 2,00 bh
- Gate Valve Ø 65 3,00 bh
- Gate Valve Ø 50 10,00 bh
- Strainer Ø 50 4,00 bh
- Flexible Joint Ø 50 8,00 bh
- Check Valve Ø 50 4,00 bh
- Foot Valve Ø 80 2,00 bh
- Foot Valve Ø 50 2,00 bh
- Floating Valve Ø 65 2,00 bh
- Floating Valve Ø 50 2,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 65 8,00 bh
- Gate Valve Ø 25 2,00 bh
- Strainer Ø 65 4,00 bh
- Flexible Joint Ø 65 8,00 bh
- Check Valve Ø 65 4,00 bh
- Water Meter 5,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 65 1,00 bh
- Gate Valve Ø 40 2,00 bh
- Gate Valve Ø 32 1,00 bh
- Gate Valve Ø 25 2,00 bh
- Gate Valve Ø 20 2,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 65 1,00 bh
- Gate Valve Ø 40 2,00 bh
- Gate Valve Ø 32 1,00 bh
- Gate Valve Ø 20 2,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
Hormat Kami
PT. ......
NAMA
JABATAN
HARGA NON
JUMLAH HARGA
No. URAIAN PEKERJAAN VOLUME SATUAN STANDAR
Rp.
Rp.
2.2 Lt. 1
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran, bahan pipa
black steel SCH 40, SNI 0039.87, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar perencanaan
dan spesifikasi teknis.
Pipa Fire Hydrant Ø 80 21,00 m
Pipa Fire Hydrant Ø 65 42,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 18,00 m
Pipa Fire Sprinkler Ø 80 35,00 m
Pipa Fire Sprinkler Ø 65 10,00 m
Pipa Fire Sprinkler Ø 50 18,00 m
Pipa Fire Sprinkler Ø 40 36,00 m
Pipa Fire Sprinkler Ø 32 51,00 m
Pipa Fire Sprinkler Ø 25 177,00 m
Pipa Drain Sprinkler Ø 25 62,00 m
2.3 Lt. 2
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran, bahan pipa
black steel SCH 40, SNI 0039.87, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar perencanaan
dan spesifikasi teknis.
Pipa Fire Hydrant Ø 80 21,00 m
Pipa Fire Hydrant Ø 65 47,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 24,00 m
Pipa Fire Sprinkler Ø 80 30,00 m
Pipa Fire Sprinkler Ø 65 8,00 m
Pipa Fire Sprinkler Ø 50 18,00 m
Pipa Fire Sprinkler Ø 40 48,00 m
Pipa Fire Sprinkler Ø 32 54,00 m
Pipa Fire Sprinkler Ø 25 189,00 m
Pipa Drain Sprinkler Ø 25 62,00 m
2.4 Lt. 3
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran, bahan pipa
black steel SCH 40, SNI 0039.87, lengkap terpasang dengan alat bantu
dan aksesoris yang diperlukan sesuai dengan gambar perencanaan
dan spesifikasi teknis.
Pipa Fire Hydrant Ø 80 21,00 m
Pipa Fire Hydrant Ø 65 40,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 18,00 m
Pipa Fire Sprinkler Ø 80 32,00 m
Pipa Fire Sprinkler Ø 65 14,00 m
Pipa Fire Sprinkler Ø 50 12,00 m
Pipa Fire Sprinkler Ø 40 45,00 m
Pipa Fire Sprinkler Ø 32 66,00 m
Pipa Fire Sprinkler Ø 25 195,00 m
Pipa Drain Sprinkler Ø 25 62,00 m
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: V.3. MEP VAC
11 Pipa Drain Ø 25
12 Type Unit Ceiling Mounted Duct
13 Kebisingan -
14 Ruang Yang Dilayani Ruang Multimedia
15 Lokasi Lantai - 2
9 Noise
10 Fungsi Sirkulasi
11 Ruangan yang Dilayani Layanan Informasi
12 Lokasi Lantai 1
2.2 Lantai 2
1 Exhaust Fan (EAF-2.1) 1,00 unit
1 Kapasitas 850 Cfm
2 ESP 0,5 inch. WG
3 Max. Outlet Velocity 2600
4 Efisiensi 70%
5 Daya Motor 0,25 KW
6 Daya Listrik 220/1Ø/50 Hz
7 Putaran Max. 1.320 RPM
8 Type Fan Mixed Flow
9 Noise 48 dB
10 Fungsi Exhaust Air
11 Ruangan yang Dilayani Rest Room
12 Lokasi Lantai 2
2.3 Lantai 3
1 Exhaust Fan (EAF-3.1) 1,00 unit
1 Kapasitas 850 Cfm
2 ESP 0,5 inch. WG
3 Max. Outlet Velocity 2600
4 Efisiensi 70%
5 Daya Motor 0,25 KW
6 Daya Listrik 220/1Ø/50 Hz
7 Putaran Max. 1.320 RPM
8 Type Fan Mixed Flow
9 Noise 48 dB
10 Fungsi Exhaust Air
11 Ruangan yang Dilayani Rest Room
12 Lokasi Lantai 3
2 Ducting PU
-SDC 600 x 250 3,00 m
-SDC 350 x 250 7,00 m
-SDC 350 x 150 16,00 m
-RDC 600 x 250 4,00 m
-FD 500 x 250 1,00 m
-FD 400 x 200 4,00 m
-FD 350 x 200 15,00 m
-FD 250 x 200 13,00 m
-FD 200 x 200 8,00 m
-FD 200 x 150 1,00 m
-FD 150 x 200 3,00 m
-FD 150 x 150 28,00 m
-FD 150 x 100 13,00 m
-FD 100 x 100 27,00 m
c. Pemipaan Refrigerant
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
- Pipa Drain Ø 32 38,00 m
- Pipa Drain Ø 25 52,00 m
- Pipa Drain Ø 20 22,00 m
3.2 Lantai 2
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting Pre
Insulation Aluminium Polyurethane (PU) dan BJLS, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
2 Ducting PU
-SDC 600 x 250 1,00 m
-SDC 550 x 250 5,00 m
-SDC 450 x 250 8,00 m
-SDC 350 x 250 7,00 m
-SDC 350 x 200 4,00 m
-SDC 350 x 150 27,00 m
-SDC 300 x 250 9,00 m
-SDC 300 x 200 5,00 m
-SDC 300 x 150 13,00 m
-SDC 250 x 150 9,00 m
-RDC 600 x 250 2,00 m
-RDC 550 x 250 2,00 m
-RDC 450 x 250 6,00 m
-FD 500 x 200 1,00 m
-FD 350 x 200 31,00 m
-FD 250 x 200 4,00 m
-FD 250 x 150 3,00 m
-FD 200 x 200 4,00 m
-FD 150 x 200 6,00 m
-FD 150 x 150 26,00 m
-FD 100 x 200 11,00 m
-FD 100 x 150 9,00 m
-FD 100 x 100 6,00 m
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
3.3 Lantai 3
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting Pre
Insulation Aluminium Polyurethane (PU) dan BJLS, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
2 Ducting PU
-SDC 600 x 300 1,00 m
-SDC 550 x 250 6,00 m
-SDC 500 x 250 1,00 m
-SDC 450 x 300 2,00 m
-SDC 450 x 250 2,00 m
-SDC 350 x 250 2,00 m
-SDC 350 x 200 6,00 m
-SDC 300 x 250 14,00 m
-SDC 300 x 200 9,00 m
-SDC 300 x 150 31,00 m
-SDC 250 x 150 22,00 m
-RDC 600 x 300 4,00 m
-RDC 550 x 250 5,00 m
-FD 500 x 200 20,00 m
-FD 350 x 200 1,00 m
-FD 300 x 200 5,00 m
-FD 300 x 150 3,00 m
-FD 250 x 200 8,00 m
-FD 250 x 100 7,00 m
-FD 200 x 200 5,00 m
-FD 200 x 150 3,00 m
-FD 150 x 200 11,00 m
-FD 150 x 150 18,00 m
-FD 150 x 100 9,00 m
c Pemipaan Refrigerant
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan pipa
tembaga berisolasi, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 2. UNIVERSITY MAIN LIBRARY (GEDUNG PERPUSTAKAAN UNIVERSITAS RIAU)
: V.4. MEP Elektrikal
Pengadaan dan pemasangan Kabel Feeder, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
21 Instalasi Stop Kontak Lantai Doble 1ø,10A NYM 3 x 2,5 mm² 29,00 ttk
C.2 Lantai 2
1 Down Light LED 12 W 43,00 bh
2 Down Light LED 12 W c/w Battery 18,00 bh
3 Down Light LED 7 W 12,00 bh
4 TL LED 1 x 16 W, Tipe Balk 4,00 bh
5 TL LED 1 x 16 W, Tipe Balk c/w Battery 3,00 bh
6 TL LED 4 x 10 W, Tipe RM M5 57,00 bh
7 TL LED 4 x 10 W, Tipe RM M5 c/w Battery 13,00 bh
8 TL LED 1 x 16 W, Tipe Wash Basin 3,00 bh
9 Saklar Tunggal 15,00 bh
10 Grid Switch 4 Gang 2,00 bh
11 Grid Switch 6 Gang 1,00 bh
12 Stop Kontak 1 ø, 16 A, 200 W 10,00 bh
13 Stop Kontak 1 ø, 16 A, 1000 W (Hand Dryer) 2,00 bh
14 Stop Kontak Lantai 1 ø, 16 A, 200 W 3,00 bh
15 Stop Kontak Lantai Double 1 ø, 16 A, 2 x 200 W 78,00 bh
C.3 Lantai 3
C.5 P-OL.FS
1 Grounding for Panel (Nilai grounding yang harus di dapat maksimal 2 ohm)
Grounding for Peralatan Elektronik (Nilai grounding yang harus di dapat maksimal
2
1 ohm)
- Biaya pengeboran (drilling trip) 1,00 unit
- Control box E-ELC 400 x 400 x 400 c/w cover 1,00 unit
- Copper Rod Ø 1" - 1500 mm 64,00 btg
- Pipa gip medium class Ø 1½ 4 x 9500 96,00 mtr
- Kabel NYA 70 mm² c/w SCUN 100,00 mtr
- Kabel shoes 4,00 bh
- Test box 400 x 400 x 200 mm/terminal bar 1,00 bh
- Grounding bus bar 10 x 60 x 400 cupper w/ isolator 1,00 btg
Hormat Kami
PT. ......
NAMA
JABATAN
JUMLAH HARGA
HARGA NON
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL
STANDAR
Rp.
a. 'Master Control Panel Fire Alarm (MCP-FA) Addressable 1 Loop, include 1,00 set
- Battery Back-up Stand-by 24 Jam
- Rectifier
- Surge Arrester
- Master Intercom
- Power Supply
b. PC Control Monitoring Fire Alarm 1,00 set
- Prosesor: Intel Xeon W-2123
- 8GB DDR4
- 1TB HDD
- DVD±RW
- Grafik: GFX NVIDIA Quadro P600 2GB
- Monitor 21.5"
- Bluetooth
- OS Windows 10 Proffesional 64 bit
c. Software Fire Alarm System 1,00 lic
d. Alarm printer dan Interfacing 1,00 unit
e. Annunciator w/ back box 1,00 unit
f. Test Box (Terminal Bar) - untuk sistem Elektronik 1,00 unit
g. MDF-FA 30" (500 x 400 x 250) 1,00 unit
- Isolator Module (fault module) (2x)
h. Panel Listrik (P-ELC) 1,00 set
1 LANTAI 1
a. Smoke Detector (Photo Electric) 27,00 bh
b. Fixed Temperature Heat Detector 2,00 bh
c. Remote LED Lamp 4,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh
e. Horn Strobe 2,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
- Relay Module (2x)
2 LANTAI 2
a. Smoke Detector (Photo Electric) 30,00 bh
b. Fixed Temperature Heat Detector 2,00 bh
c. Remote LED Lamp 8,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh
e. Horn Strobe 2,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
3 LANTAI 3
a. Smoke Detector (Photo Electric) 25,00 bh
b. Fixed Temperature Heat Detector 2,00 bh
c. Remote LED Lamp 6,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh
e. Horn Strobe 2,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
b Annunciator
- FRC STP #18 AWG. 2 PAIR (PVC Cond. H.I Ø 20 mm) 70,00 m'
- NYY 3 x 2,5 mm2 (Power Cable) (PVC Cond. H.I Ø 20 mm) 70,00 m'
b. JBFA-1 ke JBFA-2
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m'
c JBFA-2 ke JBFA-3
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m'
d JBFA-3 ke MDF-FA
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 30,00 m'
1 LANTAI 1
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp. Heat
a.
Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 29,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 4,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk
2 LANTAI 2
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp. Heat
a.
Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 32,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 8,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
3 LANTAI 3
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp. Heat
a.
Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 27,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 6,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
a. LANTAI 1
a. Ceiling Speaker 3 Watt 30,00 bh
b. Column Speaker 10 Watt 10,00 bh
c. Volume Control 2,00 bh
b. LANTAI 2
a. Ceiling Speaker 3 Watt 30,00 bh
b. Volume Control 8,00 bh
c. LANTAI 3
a. Ceiling Speaker 3 Watt 26,00 bh
b. Wall Speaker 6 Watt 1,00 bh
c. Volume Control 6,00 bh
b. JBSS-2 :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 20,00 m'
c. JBSS-3 :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 30,00 m'
1 LANTAI 1
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 2,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 30,00 ttk
- Instalasi Column Speaker 10 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 10,00 ttk
2 LANTAI 2
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 8,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 30,00 ttk
3 LANTAI 3
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 6,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 26,00 ttk
- Instalasi Wall Speaker 6 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 1,00 ttk
7 PEKERJAAN TELEPON
7.2 Instalasi Kabel Feeder Telephone (Include di Pekerjaan Data)
1 LANTAI - 1
a. Outlet Telepon (RJ-45) w/ Faceplate 3,00 bh
b. Outlet Telephone (RJ-45) w/ Faceplate (Floor Type) 6,00 bh
2 LANTAI - 2
a. Outlet Telepon (RJ-45) w/ Faceplate 8,00 bh
3 LANTAI - 3
a. Outlet Telepon (RJ-45) w/ Faceplate 4,00 bh
A LANTAI 1
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 9,00 ttk
B LANTAI 2
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 8,00 ttk
C LANTAI 3
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 4,00 ttk
8 PEKERJAAN DATA
Penarikan Kabel Backbone Fiber Optic Single Mode dari Core Switch
1
Building ITC ke:
RACK DISTRIBUTION Lantai 1 (Infrastruktur Cabling by Other)
b RACK SWITCH-2
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 20,00 m'
c RACK SWITCH-Multimedia
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 50,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 50,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 50,00 m'
d RACK SWITCH-3
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 30,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 30,00 m'
- (Kabel FO Single Mode 6 Core dalam PVC Conduit Ø 20 mm) 30,00 m'
1 LANTAI 1
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 33,00 ttk
2 LANTAI 2
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 63,00 ttk
3 LANTAI 3
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 90,00 ttk
1 LANTAI - 1
a Tray Vertikal Elektronik c/w Cover - Tipe U
- 400mm (W) x 100mm (H) 30,00 m'
b Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 100,00 m'
c Kabel Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 15,00 m'
d Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 5,00 bh
e Tee Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 2,00 bh
f Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 5,00 bh
g Hanger Tray 12,00 bh
h. Junction Box (Floor Duct) include Channel PVC 3,00 bh
2 LANTAI - 2
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 100,00 m'
b Kabel Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 50,00 m'
c Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 3,00 bh
d Tee Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 8,00 bh
e Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
3 LANTAI - 3
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 100,00 m'
b Kabel Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 60,00 m'
c Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
d Tee Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 7,00 bh
e Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
f Elbow Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 3,00 bh
g Cross Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
h Cross Tray c/w Cover - Tipe U
- 200mm (W) x 100mm (H) 1,00 bh
i Hanger Tray 16,00 bh
j. Junction Box (Floor Duct) include Channel PVC 12,00 bh
Hormat Kami
PT. ......
NAMA
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
REKAPITULASI
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
I PEKERJAAN PERSIAPAN
II PENERAPAN SMKK DAN ENVIRONMENTAL SAFEGUARD MITIGATION AND MONITORING WORKS
II.1 PENERAPAN SMKK
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
III.A #REF!
PEKERJAAN STRUKTUR
III.A.1 PEKERJAAN PONDASI
III.A.2 PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
IV.A.1 PEKERJAAN LANTAI
IV.A.2 PEKERJAAN DINDING
IV.A.3 PEKERJAAN PLAFOND
IV.A.4 PEKERJAAN ATAP
IV.A.5 PEKERJAAN UTILITAS
IV.A.6 PEKERJAAN FINISHING
IV.B #REF!
PEKERJAAN STRUKTUR
IV.B.1 PEKERJAAN PONDASI
IV.B.2 PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
IV.B.3 PEKERJAAN LANTAI
IV.B.4 PEKERJAAN DINDING
IV.B.5 PEKERJAAN PLAFOND
IV.B.6 PEKERJAAN ATAP
IV.B.7 PEKERJAAN UTILITAS
IV.B.8 PEKERJAAN FINISHING
IV.C #REF!
PEKERJAAN STRUKTUR
IV.C.1 PEKERJAAN PONDASI
IV.C.2 PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
IV.C.3 PEKERJAAN LANTAI
IV.C.4 PEKERJAAN DINDING
IV.C.5 PEKERJAAN PLAFOND
IV.C.6 PEKERJAAN ATAP
IV.C.7 PEKERJAAN UTILITAS
IV.C.8 PEKERJAAN FINISHING
V PEKERJAAN MEP (GEDUNG A, GEDUNG B DAN GEDUNG C)
JUMLAH
PPN 10%
TOTAL
DIBULATKAN
Terbilang :
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: I. Pekerjaan Persiapan
I PEKERJAAN PERSIAPAN
1 Pekerjaan pengukuran dan pasang bowplank A.2.2.1.4 453,00 m'
2 Pematangan lahan untuk gedung
Timbunan A.2.3.1.9 3.181,08 m3
Pemadatan tanah T.14.b1a 3.181,08 m3
Pembersihan dan perataan lahan A.2.2.1.9 2.610,40 m2
3 Mobilisasi dan demobilisai peralatan
Mobil Crane 25 ton 1,00 unit
Jack in pile YZY250 T 1,00 unit
Vibro roller 10 ton 1,00 unit
Excavator PC 200 1,00 unit
Dump truck kap. 8 ton 1,00 unit
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
I II III IV V VI = (IV*V)
II.2 ENVIRONMENTAL SAFEGUARD MITIGATION and MONITORING WORKS
Penyiapan Dokumen CEMP (Contractors Environmental
1
Management Plan) Untuk Ke 3 Gedung Paket CWR-02
2 Sosialisasi, Informasi dan Komunikasi
3 Mitigasi Dampak Sosial dan Kesempatan Kerja
a Memberikan Prioritas Peluang Kerja Kepada Pekerja Lokal LS 1,00
Bekerjasama dengan UMKM lokal untuk pengadaan Logistik
b LS 1,00
pekerja dan bahan bangunan
Pembentukan Gugus Tugas Grievance Redress Mechanism
c (Menerima, mencatat, tindak lanjut aduan dan saran dari LS 1,00
masyarakat)
Mitigasi Dampak Penurunan Kualitas Udara dan
4
Peningkatan Intensitas Kebisingan
Menutup Bak Kendaraan Pengangkut Peralatan dan Bahan unit
a 50,00
dengan Terpal untuk meminimalkan sebaran debu kendaraan
Penyiraman jalan akses yang melintasi permukiman dan di
b kali 35,00
lingkungan kampus saat resuspensi debu tinggi.
Melakukan pembersihan dan penyiraman ban kendaraan
d Pengangkut peralatan dan material melalui bak kontrol dan kran LS 1,00
air
Pengaturan Kecepatan kendaraan selama kegiatan mobilisasi
e LS 1,00
peralatan dan material
5 Mitigasi Dampak Lingkungan Gangguan Lalu Lintas
Penempatan Petugas Pengatur Lalu Lintas di Akses Jalan
a Keluar masuk Tapak Proyek dan Di Jalan Akses Masuk MM 10,00
Kampus Binawidya
Pengaturan frekuensi dan waktu mobilisasi kendaraan
c LS 1,00
pengangkut peralatan dan material
I II III IV V VI = (IV*V)
II.2
7 Mitigasi Kesehatan dan Keselamatan Konstruksi (SMKK)
a Menyediakan fasilitas cuci tangan dan sabun yang mencukupi Unit 5,00
JUMLAH TOTAL
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: III. Pekerjaan Struktur
HARGA
Volume JUMLAH HARGA
No. Uraian Pekerjaan KODE Satuan SATUAN
Pekerjaan Rp.
Rp.
(a) (b) (c) (d) (e) (f)
6 PEKERJAAN KOLOM K2
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 23,40 m2
-Pembesian A.4.1.1.17 711,37 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,60 m3
b - Elv +4.45 sd +7.95
-Pekerjaan Bekisting B.24.b 23,40 m2
-Pembesian A.4.1.1.17 619,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,00 m3
c - Elv +7.95 sd +11.20
-Pekerjaan Bekisting B.24.b 23,40 m2
-Pembesian A.4.1.1.17 619,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,00 m3
d - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 23,40 m2
-Pembesian A.4.1.1.17 619,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,00 m3
e - Elv +12.90 sd 13.45
-Pekerjaan Bekisting B.24.b 23,40 m2
-Pembesian A.4.1.1.17 619,32 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,00 m3
7 PEKERJAAN KOLOM K3
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 21,60 m2
-Pembesian A.4.1.1.17 616,86 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,15 m3
b - Elv +4.45 sd +7.95
-Pekerjaan Bekisting B.24.b 32,40 m2
-Pembesian A.4.1.1.17 806,54 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,94 m3
c - Elv +7.95 sd +11.20
-Pekerjaan Bekisting B.24.b 32,40 m2
-Pembesian A.4.1.1.17 806,54 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,94 m3
d - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 10,80 m2
-Pembesian A.4.1.1.17 268,85 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,31 m3
9 PEKERJAAN KOLOM K5
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 18,00 m2
-Pembesian A.4.1.1.17 379,37 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,16 m3
10 PEKERJAAN KOLOM K6
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 12,60 m2
-Pembesian A.4.1.1.17 309,92 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,08 m3
b - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 5,60 m2
-Pembesian A.4.1.1.17 204,49 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,48 m3
c - Elv +12.90 sd 13.45
-Pekerjaan Bekisting B.24.b 5,60 m2
-Pembesian A.4.1.1.17 118,67 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,48 m3
12 PEKERJAAN BALOK B1
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
14 PEKERJAAN BALOK B4
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 52,25 m2
-Pembesian A.4.1.1.17 1.543,86 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,89 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 42,75 m2
-Pembesian A.4.1.1.17 1.246,64 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 6,48 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 52,25 m2
-Pembesian A.4.1.1.17 1.543,86 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,89 m3
16 PEKERJAAN BALOK B5
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 24,00 m2
-Pembesian A.4.1.1.17 856,72 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,38 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 32,00 m2
-Pembesian A.4.1.1.17 1.142,30 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,51 m3
17 PEKERJAAN BALOK B6
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 11,25 m2
-Pembesian A.4.1.1.17 339,21 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,30 m3
b Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 11,25 m2
-Pembesian A.4.1.1.17 339,21 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,30 m3
18 PEKERJAAN BALOK B7
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 39,00 m2
-Pembesian A.4.1.1.17 1.438,94 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,23 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 19,50 m2
-Pembesian A.4.1.1.17 719,47 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,12 m3
19 PEKERJAAN BALOK B8
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 50,00 m2
-Pembesian A.4.1.1.17 1.341,39 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,66 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 18,75 m2
-Pembesian A.4.1.1.17 490,87 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,76 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 6,25 m2
-Pembesian A.4.1.1.17 163,62 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,59 m3
20 PEKERJAAN BALOK B9
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 5,25 m2
-Pembesian A.4.1.1.17 118,51 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,47 m3
b Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 12,50 m2
-Pembesian A.4.1.1.17 292,51 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,18 m3
c Balok Elv. +12.90
-Pekerjaan Bekisting B.23.a 37,50 m2
-Pembesian A.4.1.1.17 877,53 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,53 m3
PEKERJAAN PARAPET
-Pekerjaan Bekisting B.23.a 372,41 m2
-Pembesian A.4.1.1.17 4.434,69 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 48,56 m3
PEKERJAAN TALANG
-Pekerjaan Bekisting B.23.a 167,06 m2
-Pembesian A.4.1.1.17 2.274,16 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 15,96 m3
29 PEKERJAAN TANGGA
a Tangga beton
-Pekerjaan Bekisting A.4.1.1.26 125,34 m2
-Pembesian A.4.1.1.19 2.388,42 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 17,92 m3
5 PEKERJAAN KOLOM K1
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 25,20 m2
-Pembesian A.4.1.1.17 649,41 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,05 m3
b - Elv +4.45 sd +7.95
-Pekerjaan Bekisting B.24.b 37,80 m2
-Pembesian A.4.1.1.17 848,71 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,06 m3
c - Elv +7.95 sd +11.20
-Pekerjaan Bekisting B.24.b 37,80 m2
-Pembesian A.4.1.1.17 848,71 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,06 m3
d - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 37,80 m2
-Pembesian A.4.1.1.17 848,71 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 5,06 m3
7 PEKERJAAN KOLOM K3
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 21,60 m2
-Pembesian A.4.1.1.17 616,86 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,15 m3
b - Elv +4.45 sd +7.95
-Pekerjaan Bekisting B.24.b 32,40 m2
-Pembesian A.4.1.1.17 806,54 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,94 m3
c - Elv +7.95 sd +11.20
-Pekerjaan Bekisting B.24.b 32,40 m2
-Pembesian A.4.1.1.17 806,54 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,94 m3
d - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 10,80 m2
-Pembesian A.4.1.1.17 268,85 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,31 m3
8 PEKERJAAN KOLOM K4
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 129,60 m2
-Pembesian A.4.1.1.17 3.701,13 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 19,44 m3
b - Elv +4.45 sd +7.95
-Pekerjaan Bekisting B.24.b 118,80 m2
-Pembesian A.4.1.1.17 2.957,30 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 14,85 m3
c - Elv +7.95 sd +11.20
-Pekerjaan Bekisting B.24.b 97,20 m2
-Pembesian A.4.1.1.17 2.419,61 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 12,15 m3
d - Elv +11.20 sd +12.90
-Pekerjaan Bekisting B.24.b 21,60 m2
-Pembesian A.4.1.1.17 537,69 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,70 m3
9 PEKERJAAN KOLOM K5
a - Elv -0.05 sd +4.45
-Pekerjaan Bekisting B.24.b 18,00 m2
-Pembesian A.4.1.1.17 379,37 kg
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,16 m3
12 PEKERJAAN BALOK B1
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 23,00 m2
-Pembesian A.4.1.1.17 684,82 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,37 m3
13 PEKERJAAN BALOK B2
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 202,50 m2
-Pembesian A.4.1.1.17 6.120,06 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 35,36 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 112,50 m2
-Pembesian A.4.1.1.17 3.400,03 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 19,64 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 90,00 m2
-Pembesian A.4.1.1.17 2.720,03 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 15,71 m3
d Balok Elv. +12.90
-Pekerjaan Bekisting B.23.a 45,00 m2
-Pembesian A.4.1.1.17 1.360,01 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,86 m3
14 PEKERJAAN BALOK B4
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 52,25 m2
-Pembesian A.4.1.1.17 1.543,86 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 7,89 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 42,75 m2
-Pembesian A.4.1.1.17 1.246,64 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 6,48 m3
16 PEKERJAAN BALOK B5
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 24,00 m2
-Pembesian A.4.1.1.17 856,72 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 3,38 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 32,00 m2
-Pembesian A.4.1.1.17 1.142,30 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,51 m3
17 PEKERJAAN BALOK B6
a Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 11,25 m2
-Pembesian A.4.1.1.17 339,21 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,30 m3
b Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 11,25 m2
-Pembesian A.4.1.1.17 339,21 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,30 m3
18 PEKERJAAN BALOK B7
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 39,00 m2
-Pembesian A.4.1.1.17 1.438,94 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,23 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 19,50 m2
-Pembesian A.4.1.1.17 719,47 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,12 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 26,00 m2
-Pembesian A.4.1.1.17 959,29 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 2,82 m3
19 PEKERJAAN BALOK B8
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 50,00 m2
-Pembesian A.4.1.1.17 1.341,39 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 4,66 m3
b Balok Elv. +8,95
-Pekerjaan Bekisting B.23.a 18,75 m2
-Pembesian A.4.1.1.17 490,87 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,76 m3
c Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 6,25 m2
-Pembesian A.4.1.1.17 163,62 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,59 m3
20 PEKERJAAN BALOK B9
a - Balok Elv. +4.45
-Pekerjaan Bekisting B.23.a 5,25 m2
-Pembesian A.4.1.1.17 118,51 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 0,47 m3
b Balok Elv. +11.35
-Pekerjaan Bekisting B.23.a 12,50 m2
-Pembesian A.4.1.1.17 292,51 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 1,18 m3
PEKERJAAN PARAPET
-Pekerjaan Bekisting B.25.b 372,41 m2
-Pembesian A.4.1.1.17 4.434,69 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 48,56 m3
PEKERJAAN TALANG
-Pekerjaan Bekisting B.21.b 167,06 m2
-Pembesian A.4.1.1.17 2.274,16 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 15,96 m3
29 PEKERJAAN TANGGA
a Tangga beton
-Pekerjaan Bekisting A.4.1.1.26 125,34 m2
-Pembesian A.4.1.1.19 2.388,42 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 17,92 m3
1 PEKERJAAN TANAH
a Pekerjaan Pembuangan Tanah Galian A.2.3.1.8 592,35 m3
Sub Pondasi C -
4 PEKERJAAN TIE BEAM
a TB1
Galian Tanah A.2.3.1.2 68,91 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 7,66 m3
Pasir Urug t=10cm A.2.3.1.11 15,31 m3
Pembesian A.4.1.1.17 22.779,60 Kg
Bekisting B.26.a 551,25 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 122,15 m3
b TB2
Galian Tanah A.2.3.1.2 48,85 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 5,43 m3
Pasir Urug t=10cm A.2.3.1.11 10,86 m3
Pembesian A.4.1.1.17 17.849,59 Kg
Bekisting B.26.a 434,26 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 54,99 m3
c TB3
Galian Tanah A.2.3.1.2 12,96 m3
Pek Lantai kerja, ad. 1:3:5, t=5cm K.100 B.13.a.1 1,44 m3
Pasir Urug t=10cm A.2.3.1.11 2,88 m3
Pembesian A.4.1.1.17 2.383,69 Kg
Bekisting B.26.a 115,20 m2
Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 10,66 m3
7 PEKERJAAN BALOK B8
a - Balok Elv. +4.15
-Pekerjaan Bekisting B.23.a 305,76 m2
-Pembesian A.4.1.1.17 6.090,84 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 33,39 m3
8 PEKERJAAN BALOK B9
a - Balok Elv. +8.35
-Pekerjaan Bekisting B.23.a 96,00 m2
-Pembesian A.4.1.1.17 2.246,59 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 9,00 m3
16 PEKERJAAN TANGGA
a Tangga beton Tipe 1
-Pekerjaan Bekisting A.4.1.1.26 76,58 m2
-Pembesian A.4.1.1.17 1.330,62 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 8,73 m3
b Tangga beton Tipe 2
-Pekerjaan Bekisting A.4.1.1.26 68,50 m2
-Pembesian A.4.1.1.17 1.638,07 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 13,04 m3
PEKERJAAN PARAPET
-Pekerjaan Bekisting A.4.1.1.26 764,61 m2
-Pembesian A.4.1.1.17 9.095,56 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 100,73 m3
PEKERJAAN TALANG
-Pekerjaan Bekisting A.4.1.1.26 343,18 m2
-Pembesian A.4.1.1.17 4.666,64 kg
-Membuat 1 m3 beton mutu beton = K.300 B.13.a.3 32,83 m3
- Elv +8.35
IWF1 250.125.6.9 A.4.2.1.1 7.223,04 kg
CNP1 200.75 A.4.2.1.1 6.216,00 kg
Siku 50.50.5 A.4.2.1.1 125,35 kg
Bracing Ø16 A.4.1.1.19 692,07 kg
Turbunckle P.TB.1.1 160,00 set
Trekstang Ø16 A.4.2.1.1 340,92 kg
Plat t12 A.4.2.1.1 435,97 kg
Stiffner t8 A.4.2.1.1 24,86 kg
AngkurAHTB M16 P.A.1.1 304,00 bh
Baut M16 P.B.1.2 152,00 bh
Baut AHTB M12 P.B.1.1 798,00 bh
Sub Struktur C
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: IV. Pekerjaan Arsitektur
IV PEKERJAAN ARSITEKTUR
IV.A GEDUNG A
2 LANTAI 2
Pemasangan finishing lantai Homogeous Tile 800x800 Polish A.4.4.3.13.a 327,27 m2
Pemasangan finishing lantai Homogeous Tile 800x800 Unpolish A.4.4.3.13.b 112,49 m2
Pemasangan finishing lantai Homogeous Tile 600x600 Unpolish A.4.4.3.13.c 20,87 m2
3 LANTAI TANGGA
TANGGA INDOOR
Pemasangan finishing lantai Homogeous Tile Polish A.4.4.3.13.a 25,23 m2
Pekerjaan pemasangan railing RL.1.1.2 29,28 m'
TANGGA OUTDOOR
Pemasangan finishing lantai Homogeous Tile Unpolish A.4.4.3.13.b 25,23 m2
Pekerjaan pemasangan railing RL.1.1.2 29,28 m'
2 DINDING LANTAI 2
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 277,45 m2
Pemasangan plesteran A.4.4.2.5 554,89 m2
Pemasangan acian A.4.4.2.27 457,56 m2
Pekerjaan cat interior A.4.7.1.10a 457,56 m2
Pemasangan partisi folding gate A.4.2.1.7a 66,03 m2
Cubical toilet phenolic board O.JP.1.5 14,16 m2
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 97,33 m2
2 PLAFOND LANTAI 2
Pemasangan plafond A.4.5.1.7 435,05 m2
Pemasangan plafond gypsum water resistant A.4.5.1.7a 25,58 m2
Pemasangan rangka metal furing, modul 60 x 60cm A.4.2.1.21a 460,63 m2
2 ATAP KACA
Kaca laminted 5 mm clear+ 0.76pvb+5 mm sunergy+Rangka Back mulion A.K.C.0.1 49,62 m2
3 ATAP
Pemasangan atap galvalum standing seam A.4.5.2.41c 400,54 m2
Rockwool Peredam Suara R.C.W.0.1 388,66 m2
Aluminium Foil R.C.W.0.2 388,66 m2
LANTAI 2
Pekerjaan pemasangan toilet duduk A.5.1.1.1 5,00 bh
Pekerjaan pemasangan jet washer A.5.1.1.14a 5,00 bh
Pekerjaan pemasangan paper hoder A.5.1.1.14b 5,00 bh
Pekerjaan pemasangan floor drain A.5.1.1.14 5,00 bh
Pekerjaan pemasangan urinoir A.5.1.1.4 2,00 bh
Pekerjaan pemasangan partisi urinoir A.5.1.1.5.a 2,00 bh
Pekerjaan pemasangan washtafel A.5.1.1.5 3,00 bh
IV.B GEDUNG B
2 LANTAI 2
Pekerjaan cat interior A.4.7.1.10a 666,82 m2
Pemasangan homogenous tile 600x600 untuk dinding toilet A.4.4.3.13.c 97,33 m2
3 TANGGA
Pemasangan finishing lantai Homogeous Tile tangga lebar 1,5 meter A.4.4.3.13.a 81,68 m2
4 PEKERJAAN FASADE
Kaca lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 447,88 m2
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 848,21 m2
Pemasangan plesteran mortar + groving A.4.4.2.5a 848,21 m2
Pekerjaan cat eksterior A.4.7.1.10b 848,21 m2
5 HURUF SIGNAGE
Signage huruf stainless steel finishing hairline rangka hollow tulisan "TRAINING CENTER +
H.S.S.1 510,00 cm
LOGO UNRI"
IV.C GEDUNG C
2 DINDING LANTAI 2
Pemasangan dinding bataringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26a 1.626,09 m2
Kaca sunergy lamintade 5 mm clear + 0.76 pvb + 5 mm sunergy + Rangka Back mulion A.K.C.0.2 47,02 m2
2 PLAFOND LANTAI 2
Pemasangan plafond A.4.5.1.7 816,47 m2
Pemasangan plafond gypsum water resistant A.4.5.1.7a 88,47 m2
Pemasangan rangka metal furing, modul 60 x 60cm untuk plafond lantai 2 A.4.2.1.21a 904,93 m2
2 PARAPET
Pemasangan acian A.4.4.2.27 41,72 m2
Pekerjaan cat waterproofing W.P.M.2 41,72 m2
3 ATAP
Pemasangan atap galvalum standing seam A.4.5.2.41c 906,48 m2
Rockwool Peredam Suara R.C.W.0.1 906,48 m2
Aluminium Foil R.C.W.0.2 906,48 m2
Roofmesh tebal 2 mm A.4.5.2.43a 906,48 m2
4 PEKERJAAN KANOPI
Pemasangan atap galvalum standing seam A.4.5.2.41c 297,82 m2
Rockwool Peredam Suara R.C.W.0.1 297,82 m2
Aluminium Foil R.C.W.0.2 297,82 m2
Roofmesh tebal 2 mm A.4.5.2.43a 297,82 m2
LANTAI 2
Pekerjaan pemasangan toilet duduk A.5.1.1.1 31,00 bh
Pekerjaan pemasangan jet washer A.5.1.1.14a 31,00 bh
Pekerjaan pemasangan paper hoder A.5.1.1.14b 31,00 bh
Pekerjaan pemasangan floor drain A.5.1.1.14 31,00 bh
Pekerjaan pemasangan washtafel A.5.1.1.5 31,00 bh
2 PEKERJAAN FASADE
Pemasangan plesteran mortar + groving A.4.4.2.5a 456,63 m2
Pekerjaan cat eksterior A.4.4.2.27a 456,63 m2
5 HURUF SIGNAGE
Signage huruf stainless steel finishing hairline rangka hollow tulisan "GUEST HOUSE + LOGO H.S.S.1 374,00 cm
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: V. Pekerjaan MEP
JUMLAH HARGA
No. URAIAN PEKERJAAN
Rp.
1. PEKERJAAN PLUMBING
3. PEKERJAAN VAC
4. PEKERJAAN ELEKTRIKAL
5. PEKERJAAN ELEKTRONIK
TOTAL
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
2 STP Biotech
- Kapasitas 6 M3/Hari 1,00 Set
- Type Horizontal
3 STP Biotech
- Kapasitas 20 M3/Hari 1,00 Set
- Type Horizontal
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 150 2,00 bh
- Gate Valve Ø 100 1,00 bh
- Gate Valve Ø 65 3,00 bh
- Gate Valve Ø 50 16,00 bh
- Strainer Ø 50 8,00 bh
- Flexible Joint Ø 50 16,00 bh
- Check Valve Ø 50 8,00 bh
- Foot Valve Ø 150 2,00 bh
- Foot Valve Ø 50 2,00 bh
- Floating Valve Ø 65 2,00 bh
- Floating Valve Ø 50 2,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 40 2,00 bh
- Gate Valve Ø 32 2,00 bh
- Gate Valve Ø 20 1,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 40 2,00 bh
- Gate Valve Ø 32 2,00 bh
- Gate Valve Ø 20 1,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 40 2,00 m
- Gate Valve Ø 32 2,00 m
- Gate Valve Ø 20 1,00 m
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 40 2,00 bh
- Gate Valve Ø 32 2,00 bh
- Gate Valve Ø 20 1,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 32 38,00 bh
Valve-Valve
Pengadaan dan pemasangan Valve-Valve, lengkap
terpasang dengan alat bantu dan accessories yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Gate Valve Ø 32 62,00 bh
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS
SUB PEKERJAAN :
RIAU)
JUMLAH HARGA
HARGA NON
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL
STANDAR
Rp.
1.3 Lt. 2
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran,
bahan pipa black steel SCH 40, SNI 0039.87, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
Pipa Fire Hydrant Ø 65 14,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 9,00 m
Pipa Fire Sprinkler Ø 80 4,00 m
Pipa Fire Sprinkler Ø 65 11,00 m
Pipa Fire Sprinkler Ø 50 4,00 m
Pipa Fire Sprinkler Ø 40 27,00 m
Pipa Fire Sprinkler Ø 32 42,00 m
Pipa Fire Sprinkler Ø 25 105,00 m
Pipa Drain Sprinkler Ø 25 22,00 m
1.5 Lt. 2
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran,
bahan pipa black steel SCH 40, SNI 0039.87, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
Pipa Fire Hydrant Ø 65 14,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 11,00 m
Pipa Fire Sprinkler Ø 80 3,00 m
Pipa Fire Sprinkler Ø 65 18,00 m
Pipa Fire Sprinkler Ø 50 4,00 m
Pipa Fire Sprinkler Ø 40 27,00 m
Pipa Fire Sprinkler Ø 32 33,00 m
Pipa Fire Sprinkler Ø 25 120,00 m
Pipa Drain Sprinkler Ø 25 22,00 m
1.7 Lt. 2
a. Pipa Pemadam Kebakaran
Pengadaan dan pemasangan Pipa Pemadam Kebakaran,
bahan pipa black steel SCH 40, SNI 0039.87, lengkap
terpasang dengan alat bantu dan aksesoris yang diperlukan
sesuai dengan gambar perencanaan dan spesifikasi teknis.
Pipa Fire Hydrant Ø 80 9,00 m
Pipa Fire Hydrant Ø 65 15,00 m
Pipa Fire Hydrant Ø 40 (Landing Valve) 3,00 m
Pipa Fire Sprinkler Ø 100 22,00 m
Pipa Fire Sprinkler Ø 80 19,00 m
Pipa Fire Sprinkler Ø 65 21,00 m
Pipa Fire Sprinkler Ø 50 6,00 m
Pipa Fire Sprinkler Ø 40 6,00 m
Pipa Fire Sprinkler Ø 32 36,00 m
Pipa Fire Sprinkler Ø 25 222,00 m
Pipa Drain Sprinkler Ø 25 59,00 m
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
JUMLAH HARGA
HARGA NON
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL
STANDAR
Rp.
1.1.2 Gedung B
14 Indoor Unit (IU/OU - 1.1) 2,00 unit
Kapasitas 18.000 Btu/h
Type Unit Ceilling Cassette
Ruang Yang Dilayani Hall & Ruang Pameran
Lokasi Lantai - 1
Termasuk dgn Pipa refrigeran, pipa drain,
accessories, dan alat bantu yg diperlukan
1.1.3 Gedung C
26 Indoor Unit (IU/OU - 1.1) 2,00 unit
Kapasitas 18.000 Btu/h
Type Unit Ceilling Cassette
Ruang Yang Dilayani Reception
Lokasi Lantai - 1
Termasuk dgn Pipa refrigeran, pipa drain,
accessories, dan alat bantu yg diperlukan
2.1.2 Lantai 2
2.2 Gedung B
2.2.1 Lantai 1
2.2.2 Lantai 2
1 Exhaust Fan (EF-2.1) 1,00 unit
1 Kapasitas 150 Cfm
2 ESP 0,3 inch. WG
3 Max. Outlet Velocity -
4 Efisiensi 70%
5 Daya Motor 0,07 KW
6 Daya Listrik 220/1Ø/50 Hz
7 Putaran Max. 2.460 RPM
8 Type Fan Centrifugal
9 Noise 47 dB
10 Fungsi Exhaust Air
11 Ruangan yang DilayaniToilet Wanita
12 Lokasi Lantai 2
2.3 Gedung C
2.3.1 Lantai 1
2.1 Lantai 2
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan
pipa tembaga berisolasi, lengkap terpasang dengan
alat bantu dan aksesoris yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
3.1.2 Lantai 2
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting
Pre Insulation Aluminium Polyurethane (PU) dan
BJLS, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
Pengadaan dan pemasangan pemipaan drain, lengkap
terpasang dengan alat bantu dan aksesoris yang
diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis.
- Pipa Drain Ø 40 10,00 m
- Pipa Drain Ø 32 34,00 m
- Pipa Drain Ø 25 30,00 m
3.2 Gedung B
3.2.1 Lantai 1
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting
Pre Insulation Aluminium Polyurethane (PU) dan
BJLS, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
1 Ducting Tanpa Isolasi (BJLS)
-ED 400 x 150 1,00 m
-ED 250 x 150 1,00 m
-ED 200 x 150 4,00 m
-ED 150 x 150 12,00 m
-ED 100 x 100 5,00 m
d. Pemipaan Drain
3.2.2 Lantai 2
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting
Pre Insulation Aluminium Polyurethane (PU) dan
BJLS, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan
pipa tembaga berisolasi, lengkap terpasang dengan
alat bantu dan aksesoris yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Drain Ø 40 10,00 m
- Pipa Drain Ø 32 46,00 m
- Pipa Drain Ø 25 30,00 m
3.3 Gedung C
3.3.1 Lantai 1
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting
Pre Insulation Aluminium Polyurethane (PU) dan
BJLS, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
3.3.2 Lantai 2
a. Ducting
Pengadaan dan pemasangan Ducting, bahan ducting
Pre Insulation Aluminium Polyurethane (PU) dan
BJLS, lengkap terpasang dengan alat bantu dan
aksesoris yang diperlukan sesuai dengan gambar
perencanaan dan spesifikasi teknis.
d. Pemipaan Drain
Pengadaan dan pemasangan pipa Refrigerant, bahan
pipa tembaga berisolasi, lengkap terpasang dengan
alat bantu dan aksesoris yang diperlukan sesuai
dengan gambar perencanaan dan spesifikasi teknis.
- Pipa Drain Ø 40 10,00 m
- Pipa Drain Ø 32 15,00 m
- Pipa Drain Ø 25 14,00 m
- Pipa Drain Ø 20 128,00 m
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
2021 - 2022
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: V.3 Pekerjaan MEP Elektrikal
JUMLAH HARGA
HARGA NON
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL
STANDAR
Rp.
Gedung B
1 Kabel Tray 500 x 100 mm2 30,00 mtr
2 Kabel Tray 300 x 100 mm2 28,00 mtr
3 Kabel Tray 200 x 100 mm2 40,00 mtr
Gedung C
1 Kabel Tray 500 x 100 mm2 70,00 mtr
2 Kabel Tray 300 x 100 mm2 50,00 mtr
3 Kabel Tray 200 x 100 mm2 40,00 mtr
1 Grounding for Panel (Nilai grounding yang harus di dapat maksimal 2 ohm)
- Biaya pengeboran (drilling trip) 3,00 unit
- Control box EB-1.UTC, EB-2.UTC & EB-3.UTC 400 x 400 x 400 c/w cover 3,00 unit
- Copper Rod Ø 1" - 1500 mm 64,00 btg
- Pipa gip medium class Ø 1½ 4 x 9500 96,00 mtr
- Kabel NYA 70 mm² c/w SCUN 100,00 mtr
- Kabel shoes 12,00 bh
- Test box 400 x 400 x 200 mm/terminal bar 3,00 bh
- Grounding bus bar 10 x 60 x 400 cupper w/ isolator 3,00 btg
2 Grounding for Peralatan Elektronik (Nilai grounding yang harus di dapat maksimal 1 ohm)
- Biaya pengeboran (drilling trip) 1,00 unit
- Control box E-ELC 400 x 400 x 400 c/w cover 1,00 unit
- Copper Rod Ø 1" - 1500 mm 64,00 btg
- Pipa gip medium class Ø 1½ 4 x 9500 96,00 mtr
- Kabel NYA 70 mm² c/w SCUN 100,00 mtr
- Kabel shoes 4,00 bh
- Test box 400 x 400 x 200 mm/terminal bar 1,00 bh
- Grounding bus bar 10 x 60 x 400 cupper w/ isolator 1,00 btg
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN
PROYEK : ADVANCED KNOWLEDGE AND SKILLS FOR SUSTAINABLE GROWTH (AKSI) PROJECT
PEKERJAAN : PEMBANGUNAN FISIK CWR-02 PIU ADB UNRI
TAHUN : 2021 - 2022
LOKASI : KOTA PEKANBARU - RIAU
SUB PEKERJAAN : 3. UNIVERSITY TRAINING CENTER (GEDUNG PENDIDIKAN DAN PELATIHAN UNIVERSITAS RIAU)
: V.5. Pekerjaan MEP Electronik
JUMLAH HARGA
HARGA NON-
No. URAIAN PEKERJAAN VOLUME SATUAN TOTAL
STANDAR
Rp.
a. Master Control Panel Fire Alarm (MCP-FA) Addressable 3 Loop, 1,00 set
- Battery Back-up Stand-by 24 Jam
- Rectifier
- Surge Arrester
- Master Intercom
- Power Supply
b. Alarm printer dan Interfacing 1,00 unit
c. Annunciator w/ back box 3,00 unit
d. Test Box (Terminal Bar) - untuk sistem Elektronik 1,00 unit
e. MDF-FA 30" (500 x 400 x 250) 1,00 unit
- Isolator Module (fault module) (6x)
f. Panel Listrik (P-ELC) 1,00 set
1 LANTAI 1 (GEDUNG A)
a. Smoke Detector (Photo Electric) 19,00 bh
b. Fixed Temperature Heat Detector 1,00 bh
c. Remote LED Lamp 6,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 1,00 bh
e. Horn Strobe 1,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
2 LANTAI 2 (GEDUNG A)
a. Smoke Detector (Photo Electric) 20,00 bh
b. Fixed Temperature Heat Detector 1,00 bh
c. Remote LED Lamp 6,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 1,00 bh
e. Horn Strobe 1,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
3 LANTAI 1 (GEDUNG B)
a. Smoke Detector (Photo Electric) 19,00 bh
b. Fixed Temperature Heat Detector 1,00 bh
c. Remote LED Lamp 5,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 1,00 bh
e. Horn Strobe 1,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
4 LANTAI 2 (GEDUNG B)
a. Smoke Detector (Photo Electric) 20,00 bh
b. Fixed Temperature Heat Detector 1,00 bh
c. Remote LED Lamp 6,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 1,00 bh
e. Horn Strobe 1,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
5 LANTAI 1 (GEDUNG C)
a. Smoke Detector (Photo Electric) 38,00 bh
b. Fixed Temperature Heat Detector 1,00 bh
c. Remote LED Lamp 19,00 bh
d. Manual Alarm Push Button c/w Intercom Jack 2,00 bh
e. Horn Strobe 2,00 bh
f. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (4x)
- Relay Module (2x)
6 LANTAI 2 (GEDUNG C)
a. Smoke Detector (Photo Electric) 41,00 bh
b. Remote LED Lamp 31,00 bh
c. Manual Alarm Push Button c/w Intercom Jack 2,00 bh
d. Horn Strobe 2,00 bh
e. Junction Box Fire Alarm c/w Module 1,00 set
- Conventional Zone Module (2x)
- Mini Module (2x)
b Annunciator
- FRC STP #18 AWG. 2 PAIR (PVC Cond. H.I Ø 20 mm) 200,00 m'
- NYY 3 x 2,5 mm2 (Power Cable) (PVC Cond. H.I Ø 20 mm) 200,00 m'
b. JBFA-1.A ke JBFA-2.A
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m'
c JBFA-2.A ke MDF-FA
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 130,00 m'
d MDF-FA ke JBFA-1.B
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 120,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 120,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 120,00 m'
e JBFA-1.B ke JBFA-2.B
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m'
f JBFA-2.B ke MDF-FA
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 130,00 m'
g MDF-FA ke JBFA-1.C
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 50,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 50,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 50,00 m'
h JBFA-1.C ke JBFA-2.C
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 10,00 m'
- FRC 3 x 2,5 mm2 (Power Module) 10,00 m'
i JBFA-2.C ke MDF-FA
- FRC STP #18 AWG. 2 PAIR (Data) (PVC Cond. H.I Ø 20 mm) 60,00 m'
1 LANTAI 1.A
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 20,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 6,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 1,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 1,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 1,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
2 LANTAI 2.A
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 21,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 6,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 1,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 1,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 1,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
3 LANTAI 1.B
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 20,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 5,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 1,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 1,00 ttk
4 LANTAI 2.B
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 21,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 6,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 1,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 1,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 1,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
5 LANTAI 1.C
Instalasi Fire Alarm Smoke Detector (Photo Electric), Fixed Temp.
a.
Heat Det. , Remote LED Lamp, EOL
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 39,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 19,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
6 LANTAI 2.C
a. Instalasi Fire Alarm Smoke Detector (Photo Electric), Remote LED
- NYA 2 x 1c x 1,5 mm2 (PVC Cond. H.I Ø 20 mm 41,00 ttk
- ITC 2 x 2 x 0,6 mm (PVC Cond. H.I Ø 20 mm) 31,00 ttk
b. Instalasi Manual Alarm Push Button c/w Intercom Jack
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - MCP 2,00 ttk
- ITC 2 x 2 x 0,6 mm (Intercom) (PVC Cond. H.I Ø 20 mm) 2,00 ttk
c. Instalasi Horn Strobe
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) - HS 2,00 ttk
Instalasi ke Flow Switch dan Tamper Switch (Peralatan Pemadam
d.
Kebakaran)
- FRC 2 x 1,5 mm² (PVC Cond. H.I Ø 20 mm) 2,00 ttk
a. LANTAI 1 (GEDUNG A)
a. Ceiling Speaker 3 Watt 21,00 bh
b. Horn Speaker 15 Watt 8,00 bh
c. Volume Control 6,00 bh
b. LANTAI 2 (GEDUNG A)
a. Ceiling Speaker 3 Watt 22,00 bh
b. Volume Control 5,00 bh
c LANTAI 1 (GEDUNG B)
a. Ceiling Speaker 3 Watt 20,00 bh
b. Horn Speaker 15 Watt 8,00 bh
c. Volume Control 5,00 bh
d LANTAI 2 (GEDUNG B)
a. Ceiling Speaker 3 Watt 24,00 bh
b. Volume Control 5,00 bh
e LANTAI 1 (GEDUNG C)
a. Ceiling Speaker 3 Watt 48,00 bh
b. Horn Speaker 15 Watt 16,00 bh
f LANTAI 2 (GEDUNG C )
a. Ceiling Speaker 3 Watt 44,00 bh
b. JBSS-2.A :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 130,00 m'
c JBSS-1.B :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 120,00 m'
d JBSS-2.B :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 130,00 m'
e JBSS-1.C :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 50,00 m'
f JBSS-2.C :
- NYYHY 3 x 2,5 mm2 (PVC Cond. H.I Ø 20 mm) 60,00 m'
1 LANTAI 1 (GEDUNG A)
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 6,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 21,00 ttk
- Instalasi Horn Speaker 15 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 8,00 ttk
2 LANTAI 2 (GEDUNG A)
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 22,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 5,00 ttk
3 LANTAI 1 (GEDUNG B)
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 5,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 20,00 ttk
- Instalasi Horn Speaker 15 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 8,00 ttk
4 LANTAI 2 (GEDUNG B)
- Instalasi Volume Control
( NYMHY 3 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 5,00 ttk
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 24,00 ttk
5 LANTAI 1 (GEDUNG C)
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 48,00 ttk
- Instalasi Horn Speaker 15 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 16,00 ttk
6 LANTAI 2 (GEDUNG C)
- Instalasi Ceiling Speaker 3 Watt
( NYMHY 2 x 1,5 mm² dalam PVC Cond. H.I Ø 20 mm ) 44,00 ttk
3 PEKERJAAN TELEPON
7.1 Peralatan Utama Sistem Telepon (Integrasi dengan Bangunan ITC)
1 LANTAI - 1 (GEDUNG A)
a. Outlet Telepon (RJ-45) w/ Faceplate 7,00 bh
2 LANTAI - 2 (GEDUNG A)
a. Outlet Telepon (RJ-45) w/ Faceplate 5,00 bh
3 LANTAI - 1 (GEDUNG B)
a. Outlet Telepon (RJ-45) w/ Faceplate 6,00 bh
4 LANTAI - 2 (GEDUNG B)
a. Outlet Telepon (RJ-45) w/ Faceplate 7,00 bh
5 LANTAI - 1 (GEDUNG C)
a. Outlet Telepon (RJ-45) w/ Faceplate 5,00 bh
A LANTAI 1 (GEDUNG A)
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 7,00 ttk
B LANTAI 2 (GEDUNG A)
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 5,00 ttk
C LANTAI 1 (GEDUNG B)
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 6,00 ttk
D LANTAI 2 (GEDUNG B)
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 7,00 ttk
E LANTAI 1 (GEDUNG C)
Instalasi Telephone
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 5,00 ttk
4 PEKERJAAN DATA
Penarikan Kabel Backbone Fiber Optic Single Mode dari Core Switch
1
Building ITC ke:
RACK DISTRIBUTION Lantai 1 (Infrastruktur Cabling by Other)
1 LANTAI 1.A
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 14,00 ttk
2 LANTAI 2.A
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 10,00 ttk
3 LANTAI 1.B
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 12,00 ttk
4 LANTAI 2.B
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 12,00 ttk
5 LANTAI 1.C
Instalasi Outlet Data & Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 11,00 ttk
6 LANTAI 2.C
Instalasi Wifi Router (RJ-45)
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 6,00 ttk
5 PEKERJAAN IPTV
9.1 Peralatan Utama Sistem IPTV (Integrasi dengan Bangunan ITC)
1 LANTAI - 1 (GEDUNG C)
a Outlet IPTV (RJ-45) w/ Faceplate 19,00 bh
b Set Top Box IPTV c/w Kabel HDMI & Patch Cord UTP Cat.6 (1.5 m) 19,00 bh
2 LANTAI - 2 (GEDUNG C)
a Outlet IPTV (RJ-45) w/ Faceplate 31,00 bh
b Set Top Box IPTV c/w Kabel HDMI & Patch Cord UTP Cat.6 (1.5 m) 31,00 bh
A LANTAI 1 (GEDUNG C)
Instalasi IPTV
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 38,00 ttk
B LANTAI 2 (GEDUNG C)
Instalasi IPTV
- UTP Cat.6 - dalam PVC Cond. H.I Ø 20 mm 62,00 ttk
1 LANTAI - 1 (GEDUNG A)
a Tray Vertikal Elektronik c/w Cover - Tipe U
- 400mm (W) x 100mm (H) 30,00 m'
b Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 50,00 m'
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 3,00 bh
d Hanger Tray 3,00 bh
2 LANTAI - 2 (GEDUNG A)
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 50,00 m'
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 2,00 bh
d Hanger Tray 5,00 bh
3 LANTAI - 1 (GEDUNG B)
a Tray Vertikal Elektronik c/w Cover - Tipe U
- 400mm (W) x 100mm (H) 30,00 m'
b Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 50,00 m'
c Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
e Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
f Hanger Tray 3,00 bh
4 LANTAI - 2 (GEDUNG B)
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 60,00 m'
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 4,00 bh
d Hanger Tray 6,00 bh
5 LANTAI - 1 (GEDUNG C)
a Tray Vertikal Elektronik c/w Cover - Tipe U
- 400mm (W) x 100mm (H) 30,00 m'
b Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 100,00 m'
c Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
d Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 3,00 bh
e Hanger Tray 10,00 bh
6 LANTAI - 2 (GEDUNG C)
a Kabel Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 80,00 m'
b Tee Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 1,00 bh
c Elbow Tray c/w Cover - Tipe U
- 300mm (W) x 100mm (H) 3,00 bh
d Hanger Tray 8,00 bh
Hormat Kami
PT. ......
NAMA PIMPINAN
JABATAN