first Energy inc./Aker Solutions
Fremont Energy Center (Co-Generation Facility)
fremont, ohio
value $3 million
The partially complete plant, located in Fremont, Ohio, was purchased
from Calpine Corporation in January 2008. The Fremont Energy Center
includes two natural gas combined-cycle combustion turbines and a
steam turbine capable of producing 544 megawatts (MW) of
load-following capacity and 163 MW of peaking capacity. My consulting
services include organizing & streamlining calibration turnovers to
the client start-up team, cost forecasting costs to complete
instrumentation controls on all systems, organizing & managing field
teams for installation of instrumentation controls on all systems.
SKANSKA USA BUILDING, INC., Construction Managers, Parsippany & Blue
Bell, PA (2002 To Feb. 2010)
Project Director
Consulting Services:
Novartis Vaccines
State of Pernambuco, Brazil
Value $1 million
Novartis Vaccines is contemplating designing and constructing a new
vaccines manufacturing facility in the State of Pernambuco, Brazil.
Services included providing high level coordination & consulting to
Novartis Vaccines Corporate Engineering & Skanska LA (Sao Paulo
Office). Novartis Vaccines awarded Skanska LA with front end site
preparation design & construction services. The project will
potentially be continued sometime in 2010 pending funding decisions by
the Novartis Board of Directors.
Project Director
Construction Management Services:
MedImmune, Inc, Philadelphia, PA
PA Line 1, 2 Retrofit Project (Influenza Vaccine)
Value $20 million
The MedImmune facility, located on Red Lion Road in NE Philadelphia,
produces FluMist (Influenza Virus Vaccine Live, Intranasal) on an
existing aseptic sterile production line, TBF (Thaw, Blend, Fill) Line
1. Another fill line, TBF Line 2, was previously under construction
and partially completed but work on this line was deferred in 2004 due
to changing market conditions. The completion of this partially
completed ascetic sterile filling line was the core of this retrofit.
The work included modification of sanitary process piping,
installation of new process equipment including a new high speed fill
machine, instrumentation modification and replacement, HVAC
modifications and re-pressurizations, automation hardware & software
modifications and replacements and completion & installation of
architectural items such as doors, hardware and floor, wall and
ceiling finishes. The new clean rooms now meet BSL-2 requirements.
Responsibilities included all preconstruction planning services,
capital cost estimate development and all Construction Management
Services including management of the Commissioning & Qualification
Services. This project was executed under a contract with MedImmune
and the U.S. Department of Health and Human Services (HHS) as part of
the U.S. Government's Pandemic Influenza Plan.
Project Director
Construction Management Services:
sanofi pasteur, Swiftwater, PA
B56 Remediation Project (Vaccine)
Value $30 million