Anda di halaman 1dari 10

3rd Year Studio - Spring 2010 4-5

individual project

3rd Year Studio - Spring 2010 6-9


individual project

4th Year Studio - Fall 2010 10-15


collaborative project (2)

4th Year Studio - Spring 2011 16-17


collaborative project (22)

1st Year Studio - Spring 2008 18-19

Shane Thomas Nies


North Dakota State University

309 North 3rd Ave


Sartell, MN 56377

nies.shane@gmail.com
320.333.2999

6-9 16-17
4-5 10-15 18-19

2 3
Muncie, IN

This is a design for a


Community Aquatic Center
in Muncie, IN. I believe that
individual characteristics
are each unique but with
the interaction of each other
they can enhance and
unify the community. Each
piece is unique but has a
common link or identity
that when composed
together unifies the assembly.

4 5
Fargo, ND

As sustainable strategies
become increasingly important,
we need to take action. I
have proposed a Bus Rapid
Transit system throughout
the city of Fargo with another
Transit Hub Station on the
corner of broadway and 4th
ave. Throughout my design I
demonstrate the importance
of a public connection in
the city through my form,
sustainable strategies, detailed
connections, and spatial
organization. I strongly feel that
this Bus Rapid Transit System
will embrace a RE-Connection
throughout the city of Fargo.

6 7
8 9
San Francisco, CA

A San Francisco High-rise


Design Competition is the
capstone of the Architectural
Undergraduate at NDSU. We
traveled to San Francisco, CA
as a class to research, analyze,
and choose a site for our design.
This was a collaborative project
with one other individual where
we researched, innovated, and
used sustainable strategies
throughout a mix-used high-
rise. Structural earthquake
resistance strategies were also
implemented into the design.

10 11
12 13
14 15
innovate research collaborate identify

472 craft process

studio
communicate coordinate

designbuild

2011
pha pha pha pha pha pha
se se se se se se
1 1 2 2 3 3

Full-Scale Material Studies

Full-Scale Material Studies


Schematic Presentation

Schematic Presentation
74-77 74-77
Itasca Site Vist

Itasca Site Vist

CD Drawing Set

CD Drawing Set
132-143 132-143

78-89 78-89 90-121 90-121

DD Drawing Set

DD Drawing Set
122-131 122-131
site photos site photos
Initial Reactions

Initial Reactions

66-73 66-73

to be continued...

to be continued...
presentation presentation construction documents
construction documents
start
start

detail mock-ups detail mock-ups


educational mock-ups
educational mock-ups
drawings drawings connections connections final model final model
models models materials materials renderings renderings
innovations innovations Eco display boards
Eco display boards
drawings drawings

sketches sketches
models models
Passive House in the Woods

Passive House in the Woods


Eco-Experience Visit

Eco-Experience Visit

Schematic Projects

Schematic Projects
FlatPak House

FlatPak House

preliminary preliminary
ICON House

ICON House
photos photos photos photos photos photos photos photos MSUM retro-fit MSUM retro-fit photos photos

Bio Haus

Bio Haus
Habit 4 Humaity Habit 4 Humaity
City of Fargo City of Fargo

36-39 36-39 40-43 40-43 44-47 44-47 48-51 48-51 52-59 52-59 60-63 60-63

16 17
18 19

Anda mungkin juga menyukai