Anda di halaman 1dari 19

3rd Year Studio - Spring 2010 4-5

individual project

3rd Year Studio - Spring 2010 6-9


individual project

4th Year Studio - Fall 2010 10-15


collaborative project (2)

4th Year Studio - Spring 2011 16-17


collaborative project (22)

1st Year Studio - Spring 2008 18-19

6-9 16-17
4-5 10-15 18-19

2
Shane Thomas Nies
North Dakota State University

309 North 3rd Ave


Sartell, MN 56377

nies.shane@gmail.com
320.333.2999

3
Muncie, IN

This is a design for a


Community Aquatic Center
in Muncie, IN. I believe that
individual characteristics
are each unique but with
the interaction of each other
they can enhance and
unify the community. Each
piece is unique but has a
common link or identity
that when composed
together unifies the assembly.

4
5
Fargo, ND

As sustainable strategies
become increasingly important,
we need to take action. I
have proposed a Bus Rapid
Transit system throughout
the city of Fargo with another
Transit Hub Station on the
corner of broadway and 4th
ave. Throughout my design I
demonstrate the importance
of a public connection in
the city through my form,
sustainable strategies, detailed
connections, and spatial
organization. I strongly feel that
this Bus Rapid Transit System
will embrace a RE-Connection
throughout the city of Fargo.

6
7
8
9
San Francisco, CA

A San Francisco High-rise


Design Competition is the
capstone of the Architectural
Undergraduate at NDSU. We
traveled to San Francisco, CA
as a class to research, analyze,
and choose a site for our design.
This was a collaborative project
with one other individual where
we researched, innovated, and
used sustainable strategies
throughout a mix-used high-
rise. Structural earthquake
resistance strategies were also
implemented into the design.

10
11
12
13
14
15
16
start
Initial Reactions

start

66-73
Initial Reactions

models
sketches
Itasca Site Vist

66-73

models
sketches
Eco-Experience Visit

74-77

preliminary preliminary
Itasca Site Vist

site photos

36-39
presentation
Eco-Experience Visit

photos
74-77
Schematic Presentation

site photos

36-39
presentation
Passive House in the Woods

photos
78-89
Schematic Presentation

models

40-43
pha

drawings
Passive House in the Woods
se
1

photos
78-89

models

40-43
pha

drawings
se
472
studio
1

photos
innovate research collaborate identify

craft process communicate coordinate

designbuild

2011
pha pha
se se
2 3
Full-Scale Material Studies

CD Drawing Set

132-143

90-121
DD Drawing Set

122-131
to be continued...

construction documents
detail mock-ups
educational mock-ups
connections final model
materials renderings
innovations Eco display boards
drawings
Schematic Projects
FlatPak House

ICON House

photos photos MSUM retro-fit photos


Bio Haus

Habit 4 Humaity
City of Fargo

44-47 48-51 52-59 60-63

17
18
19

Anda mungkin juga menyukai