Anda di halaman 1dari 15

H2 CH4 C2H4 C2H6 C2H2

DGA Portable 0 29 22 3 0
(15 Oktober 2018)

DGA Portable 0 23 21 5 0
(5 Maret 2019)

DGA Portable 0 27 27 8 0
(26 Agustus 2019)

DGA Portable 0 43 60 16 0
(11 Mei 2020)

DGA Portable 0 0 22 6 0
(15 Juli 2020)
DGA Portable 0 33 16 11 8
(6 Oktober 2020)

DGA Portable Myrkos


(23 Nop 2018)
1345 1994 3012
1200
1008
1000

800

600
429
400
205
200
4 21
0
H2 CH4 C2H4 C2H6 C2H2 CO CO2 TDCG
800

600
429
400
205
200
4 21
0
H2 CH4 C2H4 C2H6 C2H2 CO CO2 TDCG
TRENDING DGA IBT#2 PHASA T G

200
CO CO2 TDCG

117 9341 171 170

92 8345 141
140

77 10032 139

75 9060 194 110

65 8465 93
80

64 9368 132

50

20

DGA Portable DGA Portable DGA Portable


-10 (15 Oktober 2018) (5 Maret 2019) (26 Agustus 201

1994 3012

H2 CH4 C2H4

CO2 TDCG
DGA
Portable 205 1008 1345
CO2 TDCG (8 Juni
2020)
G DGA IBT#2 PHASA T GITET CIRATA

H2

CH4

C2H4

C2H6

C2H2

CO

CO2

TDCG

able DGA Portable DGA Portable DGA Portable


019) (26 Agustus 2019) (11 Mei 2020) (15 Juli 2020)

C2H6 C2H2 CO CO2 TDCG


429 4 21 1994 3012
PT PLN (PERSERO)
TRANSMISI JAWA BAGIAN TENGAH

PENGUJIAN DGA (DISSOLVED GAS ANALYSIS)

Unit / APP : KARAWANG Tanggal Sampling : 15-Oct-20


Lokasi / GI : GITET CIRATA Tanggal Uji : 15-Oct-20
Peralatan : IBT#2 PHASA T Alat Uji : Morgan Schaffer
Titik Sampling : MIDDLE Metoda : ASTM 3612

Klasifikasi Kondisi
Jumlah
No Gas IEEE C57.104 TJBT Typical
(ppm)
2008 Conc Value
1 H2 (Hydrogen)* - Kondisi 1 Kondisi 1
2 CH4 (Methane)* - Kondisi 1 Kondisi 1
3 CO (Carbon Monoxide)* 5 Kondisi 1
4 CO2 (Carbon Dioxide) 698 Kondisi 1
5 C2H4 (Ethylene)* - Kondisi 1 Kondisi 1
6 C2H6 (Ethane)* - Kondisi 1
7 C2H2 (Acetylene)* - Kondisi 1 Kondisi 1
8 O2 (Oxygen) -
9 N2 (Nytrogen) -

10 TDCG (Total dissolved 5 Kondisi 1 Kondisi 1


combustible gases)
-
Hasil pengujian sebelumnya (bila ada)
Tanggal Uji : 15-Jul-20
TDCG : 93 ppm

Laju pertumbuhan gas per hari


-1 ppm / hari

Rekomendasi pengambilan sampel dan pengujian kembali


Tahunan

Rekomendasi tindak lanjut (Act Based TDCG IEEE C57.104 - 2009)

Normal Operasi
(Abaikan Analisa Komposisi Gas)

Analisa Validitas PLN P3B JB


Klasifikasi
#DIV/0!
Kategori (1/6/9)
#DIV/0!
hal 1/2

Analisa Komposisi Gas

Key Gases

12 70 100 92 90 85 70
63 60
90 80
10 60 60
80 70
50 70 50
8 60
40 60 40
50
6 50 30
30 40 30
40
4 19 30
20 16 30 20
20 20 13
2 10 10 5 3
0 2 10 10 1 1 2
0 0 0 0 0

co h2 ch4 c2h6 c2h4 c2h2 co h2 ch4 c2h6 c2 h4 c2 h2 co h2 ch4 c2 h6 c2 h4 c2h2 co h2 ch4 c2 h6 c2 h4 c2 h2 co h2 ch4 c2 h6 c2 h4 c2 h2

Thermal in Oil Thermal in Paper Partial Discharge Arcing

Duval Triangle Duval Pentagon

100 90 80 70 60 50 40 30 20 10 0
% Acety lene
(C2H2)

Keterangan: Keterangan:
• PD: corona partial discharges, • PD: corona partial discharges,
• D1: low energy discharges, • D1: low energy discharges,
• D2: high energy discharges, • D2: high energy discharges,
• T1: thermal faults <300°C. • T1: thermal faults <300°C.
• T2: thermal faults of 300 to 700°C, and • T2: thermal faults of 300 to 700°C, and
• T3: thermal faults >700°C, • T3: thermal faults >700°C,
• T3-H: thermal faults T3-H in oil only,
• C: thermal faults T3-C, T2-C, and T1-C with
carbonization of paper,
• O: overheating T1-O <250°C, and
• S: stray gassing S of mineral oil at 120 and 200°C in
the laboratory.
updated date : 20180511 hal 2/2
WORKPLAN PENGGANTIAN IBT#1 PHASA T DENGAN IBT SP
Hari ke 1 2 3
NO URAIAN KEGIATAN PIC
Tanggal
I ADMINISTRASI

Surat ijin prinsip + Permintaan Anggaran Tambahan ke


1 RENEV
Kantor Induk terkait pemakaian IBT Spare Merk CG Pauwels

II PENGGESERAN IBT SPARE CG PAUWELLS

Pengujian Elektrikal (Tahanan Isolasi, Tandelta, Ratio, Rdc,


1 ULTG/ VENDOR
SFRA, BDV, Uji Fungsi) IBT Spare

2 Pengadaan klem bushing primer, sekunder dan tersier RENEV

3 Penurunan Minyak sampai ± 80% Vendor 1

4 Bongkar aksesoris (bushing primer, radiator kanan-kiri, Vendor 1


konservator)
5 Penutupan plendes bushing dan radiator, pengisian Vendor 1
nitrogen (untuk transportasi)
6 Penggeseran IBT spare CG Pauwels sampai di samping IBT Vendor 2
ELLIN Phasa T
7 Pembongkaran pagar, tiang pintu dan saluran oil pit Vendor 2
III PENGGANTIAN IBT ELLIN
1 Pembongkaran wiring, konduktor dan klem ULTG/ VENDOR

2 Vendor 2
Penggeseran IBT ELLIN ke tempat penyimpanan sementara
3 Penggeseran IBT spare CG PAUWELS baru dari lokasi dekat Vendor 2
IBT ke pondasi eksisting
4 Instal bushing primer, radiator dan konservator Vendor 1

5 Pemasangan wiring dan konduktor, modifikaasi konduktor ULTG/ VENDOR


netral LV
6 Vacuum dan filling oil Vendor 1

7 ULTG/ VENDOR
Pengujian Elektrikal
8 PRA KOMISIONING PUSERTIF
9 TESTING KOMISIONING DAN PEMERIKSAAN PUSERTIF PUSERTIF
10 Penerbitan RLB PUSERTIF
11 Energize PUSERTIF
12 Pemasangan pagar Vendor 2
13 Pembuatan pembatas saluran oil pit Vendor 2

14 Vendor 1
Pembongkaran bushing primer, radiator dan konservator
15 Penggeseran IBT ELLIN ke pondasi IBT spare Vendor 2

Note:
Tanpa padam
Perlu pemadaman
Multi axle untuk menggeser trafo berikut personil siap
ASA T DENGAN IBT SPARE CG PAUWELS GITET CIRATA
4 5 6 7 8 9 10 11 12 13 14
KETERANGAN

Alokasi angaran investasi, kemungkinan penunjukan


langsung, kajian resiko (emergency), pecah paket
pekerjaan menjadi 3 antara lain (penggeseran,
pengeluaran, penggantian)

-Surat permintaan Supervisi ke CG Powers


-Estimasi 3 jam, beserta pengukuran klem stud bushing
primer, sekunder dan tersier.

Jika ukuran klem sama tidak perlu pengadaan, jika perlu


pengadaan untuk klem penjepit dibuat lebih banyak.
Supervisi dari CG Power

Supervisi dari CG Power

Supervisi dari CG Power

Supervisi dari CG Power diturunkan dari multi eksel ke plat


(disediakan vendor 1)

Grup 1, diletakan di plat jalan, kondisi aksesoris terpasang

Group 2

konduktor menggunakan material gudang

-Surat permintaan Manufacture Agreement dari CG Power


Supervisi dari Pusertif
Supervisi dari Pusertif
JASER
Supervisi dari Pusertif

Aksesoris di packing dengan terpal lapisan aluminium foil


ESTIMASI KEBUTUHAN ANGGARAN

Anda mungkin juga menyukai