Cross Section
Cross Section
866
UNIVERSITAS SUMATERA UTARA
DEPARTEMEN TEKNIK SIPIL
865
FAKULTAS TEKNIK
864
+2,7% -2,7%
863
Elevasi (m)
862
861
860
859
858
Titik 1 2 3 4 5 6 7 (A) 8 9 10 11 12 13 14
Jarak (m) 1,0 1,0 1,0 1,0 2,0 3,5 3,5 3,5 3,5 2,0 1,0 1,0 1,0 1,0
Kelandaian (%) 0 95 0 95 8,5 -2 863,000 864,78 -2 8,5 95 0 95 0
Elevasi Muka
Tanah Asli (m)
862,690
862,690
861,690
862,690
862,860
862,930
862,930
862,860
862,690
861,690
862,690
862,690
861,690
861,690
Elevasi
Rencana (m)