BIM-based IPD in an innovative he althcare proje ct: a unique,
cross-organizationa l IPD te am won the BIM cate gory of the
Tekla BIM Awards 2010 with their 3D building information model
of the Sutter Me dica l Ce nter (also known as SMCCV and Eden)
situated in Ca stro Valley, USA. The cente r is sche dule d to be
delive red 30% faster than compara ble hea lthca re projects
in California , which requires impleme ntation of lean
construction principles and technologies such as BIM.

Reliable communication of building information


During the project, the Integrated Project Delivery (IPD) team meets regularly to compare modeled building
information. For example, in the detailed design coordination phase, the coordination process involved reviewing all
the individual disciplinary models floor by floor.

All the firms involved in the project are using the solutions in which they have the best expertise. The models are
being developed together, so that the MEP engineer and detailer are working in sy nc on the same model and so are
the architect and contractor. The building information in the models is reliable and the team can accurately extract
automated quantity takeoffs whenever they are needed

“In the US , MEP coordination has become fairly standard on complex projects like this, and the workflows for MEP
coordination have been developed and are generally well understood by the MEP subcontractors, says Natha n
Wood, project engineer at DPR Construction. “What makes this project so special is the amount of effort that went
into the modeling and coordination of the entire core and shell of the building - concrete, rebar, steel, and exterior
skin - none of which could have been done without Tekla. And while there were challenges in learning the best way to
coordinate around these new modeling scopes, the benefit of identifying these issues before fabrication or installation
far outweighs any of the additional costs of modeling and coordination.”

”Tekla Structures is one of the tools that enables Harris Rebar (reinforcing steel) to be part of this process,” say s La
yne Olson, BIM manager for Harris Salinas Rebar in California. ”Using Tekla gives us the ability to quickly and
accurately reveal and communicate conflicts with design, constructability issues and clashes with other trades. The
ability to have experienced and successful people from different disciplines come together builds trust, develops
innovation and brings to realization the value added to each and every project willing to focus on the customer’s
expectations and goals.”
Single 3D model dramatically reduces field errors

For rebar coordination, MEP wall sleeves were imported from the
MEP modeling software into Tekla, and 50-60 2D DWG files were
imported to create the exterior skin fabrication model. Tekla’s ability
to import 2D profiles from curtain wall manufacturers was used to
create, for example, detailed mullion clips and door frames in 3D. The
model created from these 2D drawings was compared with an IFC
model of the architect’s Revit model using Tekla. CADuct, AutoCAD
MEP, and Revit software were all used to interface or exchange data
with Tekla in this project.

On top of the main contract for the structural steel, general contractor
DPR asked Herrick Corporation to model all the elements in the
building skin system that connected to the structural steel, to assist in coordinating the various trades. “This is only
possible in a 3D model-based environment and dramatically reduces the number of potential fixes required in the
field,” say s Wayne Morrison, pre-construction manager for Herrick.

The company worked with Candraft, a steel detailing company based


in Vancouver, Canada, to develop a Tekla toolkit to be used both
within Herrick and by their subcontractors. The aim was to produce a
single, standardized model that was information-rich and in a format
that was accessible to all members of the project team. The toolkit
includes standard reports, drawing templates, API interfaces for RFI
creation and management, visualization tools, etc. It has since been
used successfully on other projects and has become an integral part
of Herrick’s approach to many jobs.

Much of the toolkit was developed using Tekla Open API™ tools. To
enable the project team to rely entirely on electronic approval, Herrick
and Candraft created a 3D model-only approval interface for use by the Engineer of Record, TMAD. At various times
during construction, the project team imported TMAD’s Revit structure, Candraft’s Tekla model, and models from
various sub-trades. Drawings were only extracted from the fabrication model after it was approved. ”We find it much
easier and cheaper to detect errors and make changes in the model rather than rework drawings,” asserts Way ne
Morrison.

BIM technology saves time and money

“By creating customized wall layout drawings using Tekla Structures, DPR Concrete was able to see a 10%
increase in productivity during wall and embed lay out,” says Nathan Wood. “For exterior skin, over 25% of the wall
penetrations required for the precast sy stem were moved or removed due to conflicts with congested rebar areas.
These changes were accomplished without a schedule delay due to model coordination with the reinforcing bars
using Tekla.

”Sutter Medical Center Castro Valley is the first completed IPD and BIM project for Harris Rebar,” says Lay ne Olson.
”Working in a collaborative environment utilizing lean construction principles and having powerful tools such as Tekla
Structures promotes a successful project that is higher in quality and lower in cost.”

Says John Cooper, president and CEO of Candraft Detailing Inc. of Vancouver Canada: ”Together with Herrick, we
utilized the software to the maximum, investing our resources in the development of the electronic model approval
interface and training TMAD to use the interface. But it was worth it, the investment paid tremendous dividends in
terms of cost savings for all the stakeholders, and in terms of accuracy , interdisciplinary model coordination and on-
time delivery.”

Curt Thon, the project manager at Herrick, believes that Herrick’s investment in BIM-related technology and
processes really paid off on this project, pointing to the fact that Herrick delivered ahead of time, with virtually zero
errors in the field. This contributed to Herrick completing the structural steel portion of the project 1.6 million dollars
under budget. ”It was a true team effort,” he say s. ”Special thanks go to the representatives from Sutter Health and
DPR who were willing to think outside of the box.”
Developments extend to future projects

"Candraft is now working on another major hospital project with Herrick and DPR where we can benefit from this
same application and process,” says John Cooper. ”Our Tekla Manager, Ray MacWillia ms, is leading our in-house
Tekla development team on refinements and enhancements to the model approval interface and RFI and Change
Order tracking and reporting systems that will further enhance the BIM process.”

"The Tekla model was very helpful with respect to the exterior skin coordination,” say s Nathan Wood of DPR . “It
helped us to identify constructability issues, gaps in design, and issues with skin trade interfaces. The feedback
from our exterior skin subcontractors was very positive. They were often surprised at what their skin shop drawings
looked like when they were extruded into a 3D model. The modeling in Tekla has profoundly affected the future
processes of our skin subs as well as our rebar subcontractor.”

"At the next Sutter hospital project, Alta Bates, we are continuing to use Tekla and BIM,” Nathan Wood say s. ”We
are continually trying to adapt our model workflow to create a more streamlined design to construction flow. We are
also experimenting with the Tekla/Trimble integration along with other construction management tools and 4D
scheduling. I am very excited to see new Tekla BIMsight go to the cloud and create a serverbased model that can
house submittals, RFIs, etc. It is my opinion that the future of BIM will come from developments and BIM adoption
by the fabricators and installers rather than coming down from the owner. The more BIM is exposed to these
subcontractors, the more value they see in it for themselves, and the more likely they will adopt it without adding a
premium to their pricing. Model-to-field technology will also be integral to the success of BIM adoption."