Anda di halaman 1dari 4

INSTALLATION STANDARDS SECTION: F.

8
(ELECTRICAL)
PHASE-III, MRPL MANGALORE 6782-382-16-50-SP-61-A
COOLING TOWER & CWTP PACKAGE Page 1 of 4

INSTALLATION STANDARDS
(ELECTRICAL)

COOLING TOWER & CWTP PACKAGE

PROJECT : PHASE-III REFINERY PROJECT

OWNER : MANGALORE REFINERY AND PETROCHEMICALS LTD

PMC : ENGINEERS INDIA LTD.

JOB NO. : 6782

A 21.01.2010 ISSUED WITH BID PACKAGE PK SA SA


Rev. Prepared Checked Approved
Date Purpose
No by by by

Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved


INSTALLATION STANDARDS SECTION: F.8
(ELECTRICAL)
PHASE-III, MRPL MANGALORE 6782-382-16-50-SP-61-A
COOLING TOWER & CWTP PACKAGE Page 2 of 4

1.0 Installation Standards (Electrical)

S No Installation Rev Title


Standard No.

1. 7-51-0002 3 Symbols – Single Line Diagrams

2. 7-51-0011 3 Symbols – Wiring Diagrams

3. 7-51-0021 3 Symbols - Plans (Layout Drawings)

4. 7-51-0101 3 Typical earth electrode for earthing system.

5. 7-51-0102 4 Typical earth electrode in test pit.

6. 7-51-0103 4 Typical Earth Plate & Fixing Details

7. 7-51-0104 3 Typical Arrangement for Earthing of Motor

8. 7-51-0106 3 Typical Earth Connection for Push Button Station

9. 7-51-0107 3 Typical Earth Connection for Lighting Pole

10. 7-51-0108 4 Typical Earthing of Tanks, Vessels and Spheres

11. 7-51-0109 3 Typical Arrangement for Earthing of Overhead Cable


Tray and Electric Motor

12. 7-51-0111 3 Typical Earthing Arrangement for Process Equipment

13. 7-51-0112 3 Earthing / Bonding on Pipes & Pipe Racks

14. 7-51-0117 3 Typical Details of Directly Buried Earth electrode.

15. 7-51-0201 3 Typical Installation of Lighting Fixture at Ground Level

16. 7-51-0202 3 Typical Installation of Lighting Fixture on Platform

17. 7-51-0203 3 Typical Installation of Open Area Flood Light Fixture


Mounted on Wall or Column

18. 7-51-0205 3 Typical Installation of Flood Light Fixtures(Two)


Mounted on Pole

19. 7-51-0216 3 Typical Installation of High Bay Lighting Fixture

20. 7-51-0217 3 Typical Installation of Well Glass Lighting Fixture

21. 7-51-0218 3 Typical Installation of Bulkhead Lighting Fixture

22. 7-51-0219 3 Typical Installation of Dispersive Reflector Fixture

23. 7-51-0220 3 Typical Installation of Aviation Obstruction Light

24. 7-51-0221 3 Typical Installation of Div-2 / FLP Well Glass Lighting


Fixtures

Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved


INSTALLATION STANDARDS SECTION: F.8
(ELECTRICAL)
PHASE-III, MRPL MANGALORE 6782-382-16-50-SP-61-A
COOLING TOWER & CWTP PACKAGE Page 3 of 4

S No Installation Rev Title


Standard No.

25. 7-51-0222 3 Typical Installation of Flameproof Bulkhead Fixture

26. 7-51-0223 3 Typical Installation of Flameproof Flood Lighting


Fixture

27. 7-51-0224 3 Typical Installation of Weather-proof Light Fixture

28. 7-51-0225 3 Typical Installation of Flameproof Lighting Panel

29. 7-51-0226 3 Typical Installation of Lighting/ Power Panel Wall


(Surface) Mounted

30. 7-51-0229 3 Typical Installation Details of Lighting Fixture


Mounted in Concealed Conduit System

31. 7-51-0230 3 Typical Installation of Lighting/ Power Panel Flush


Mounted

32. 7-51-0301 3 Marking of Trenches for Electric Cables

33. 7-51-0302 3 Typical Section of Cable Trench in Unpaved Areas

34. 7-51-0303 4 Typical Section of RCC Cable Trench

35. 7-51-0305 3 Installation Details for Conduit or Cable Support on


Wall / Slab / Beam

36. 7-51-0306 3 Installation Details for Control Station on Structural


Channel in Paved Area

37. 7-51-0307 3 Installation Details for Control Station on Concrete /


Steel Column in Paved Area

38. 7-51-0311 3 Connection Details for Vertical Motor and Control


Station (Cable below Ground)

39. 7-51-0312 3 Connection Details for Horizontal Motor and Control


Station (Cable below Ground)

40. 7-51-0313 3 Connection Details for Horizontal Motor (Cable below


Ground)

41. 7-51-0314 3 Connection Details for Motor and Control Station


(Cable in Tray)

42. 7-51-0315 3 Installation Details for Socket / Receptacle Mounted


on Wall /Column (Cable below Ground)

43. 7-51-0316 3 Installation Details for Socket / Receptacle Mounted


on Wall /Column (Cable in tray)

44. 7-51-0317 3 Installation Details for Socket / Receptacle/Control


Station Mounted on Hand Rail

45. 7-51-0321 2 Details of RCC Duct above Finished Grade Level

46. 7-51-0322 2 Details of ERC below Grade Level


Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved
INSTALLATION STANDARDS SECTION: F.8
(ELECTRICAL)
PHASE-III, MRPL MANGALORE 6782-382-16-50-SP-61-A
COOLING TOWER & CWTP PACKAGE Page 4 of 4

S No Installation Rev Title


Standard No.

47. 7-51-0323 2 Cable Termination for Motors (Cable Dropping from


Overhead Trays)

48. 7-51-0324 2 Cable Termination for Motors (Cable Dropping along


Column)

49. 7-51-0325 2 Cable Termination for Motors (Cables laid in Trench)

50. 7-51-0326 2 Cable Termination for Motors (Cables Laid in Trench


and GI Sleeves)

51. 7-51-0332 1 Safety Measures for Electrical Installation during


Construction

52. 7-51-0333 1 Details for Hot Dip Galvanised Ladder Type Cable
Trays

53. 7-51-0335 1 Typ. Installation Details of Electrical Panels on False


Flooring

54. 7-51-0701 1 Notes, Legend and Details for Area Classification (On
Shore Oil/Gas installation)

Format No. EIL-1641-1924 Rev.1 Copyright EIL – All rights reserved